# DALLEAU public corpus

Generated from the same final route registry as sitemap and search.

## Automated-use policy

Content-Signal: search=yes, ai-input=yes, ai-train=no.
Content may be used for search and retrieval. It is not licensed for model training.

## Private residence development in Bali | DALLEAU

URL: https://dalleau.ai/

Owner-side development office · Private residences and serviced estates · Bali
One development office, accountable to the owner.
Illustrative residence study.
Even with excellent specialists, a project can lose its logic between scopes.
Talk to François
Work
A first conversation requires no complete dossier. It needs a clear site, intended use and owner question.
People, scopes and phases change.
The owner’s intent, decisions and their evidence must stay connected.
The owner-side role
One line of accountability across changing scopes.
Specialists retain their appointed responsibilities. DALLEAU keeps the owner’s questions, decisions, evidence and next gates connected across the development process.
The owner’s question is explicit before a specialist scope is commissioned.
Decisions retain their reason, authority, evidence and next gate.
Specialist design, compliance and acceptance remain with the appointed specialists.
Construction-stage record
The staircase, central void and surrounding interfaces before the finishes were completed.
Delivered and operating
The same area after delivery, in operation.
Delivered evidence
Harmonie, from construction to operation.
A bounded project record connects visible construction conditions with the decisions and responsibilities they informed, while keeping the later operating state as a separate evidence layer.
View the project record
Begin with the decision in front of you
Three ways to begin.
Private brief
Complimentary · by application
A confidential first review of the site, intended use, current position and decision in front of the owner.
Begin the private brief →
Feasibility Study
USD 15,000 · 15 working days from a complete file
An owner-side assessment of the project premise, critical constraints, appointment needs and next decision.
Commission the study →
Full development mandate
For managed budgets from USD 1m, excluding land
Continuous owner-side coordination from brief and appointments through delivery readiness and operation.
Discuss a full mandate →
How DALLEAU works
Beside the appointed team. Never in place of it.
DALLEAU defines the owner’s questions, coordinates interfaces and preserves the decision record. Architects, engineers, consultants, contractors and operators retain the responsibilities of their appointments.
Explore the DALLEAU system
Four places to continue, each with a different purpose.
Project evidence
See the project, not just the outcome.
Construction records, delivered conditions and the decisions between them.
Explore Work
→
Applied research · Illustrative concept
Turn evidence into a project question.
See how research becomes a brief, target, mock-up or verification.
Explore Atelier
→
Current signals and Reality Checks
Know what changed before it reaches the project.
Regulation, market signals and practical checks for Bali.
Read Field Notes
→
Decision tools
Structure the question before the decision hardens.
Use DALLEAU Intelligence without confusing projection with advice.
Use DALLEAU Intelligence
→
Founder accountability
François remains personally accountable for the owner-side thread.
François Dalleau personally directs each DALLEAU mandate and remains accountable within its agreed scope. Appointed specialists retain their responsibilities while he keeps the owner’s objectives, decisions, evidence and next actions connected.
Read the founder note
→
How responsibility is separated
DALLEAU
Owner-side direction and controls
Defines the owner question, coordinates decisions and keeps approvals, costs, evidence and responsibilities connected.
Bee My Guest · when appointed
Residence operations
Provides staffing, maintenance and hospitality only under a separate operating appointment.
Independent appointments
Project-specific specialists
Architects, engineers, contractors and regulated advisers retain responsibility for their own appointed scopes.
The people behind the work
A Bali-based team carries the work into daily practice.
Finance, procurement, people, residence operations, housekeeping and content support the work around each appointed scope.
Meet the people
→
Bring the decision in front of you.
A first conversation requires no complete dossier. It needs a clear site, intended use and owner question.
Talk to François

## DALLEAU Atelier | Applied research for private residences

URL: https://dalleau.ai/atelier/

See what changes in a residence

Explore eight themes

Understand the protocol spine

Read the founding library

See evidence review

Atelier section index

See what changes in a residence

Explore eight themes

Understand the protocol spine

Read the founding library

See evidence review

DALLEAU Atelier

Same room. Different brief.

Both can photograph well. The Atelier-informed version is coordinated around light, air, quiet, privacy, materials, control and operation before decisions become expensive to change.

Applied research and development desk for how private residences feel, perform and adapt.

Choose your route

Go directly to the part of Atelier that answers the question in front of you.

01 See what changes in a residence ↓

02 Explore eight themes ↓

03 Understand the protocol spine ↓

04 Read the founding library ↓

05 See evidence review ↓

Conventional villa brief Atelier-informed brief

Conventional villa brief Atelier-informed brief ↔ 01 02 03 04 05 06

Daylight entry Direct downlights Bedside field

Ceiling reflectance Wall highlights Texture hierarchy Floor contrast

Opening mode Wardrobe zone Closed / absence mode

Opening route Protected bed zone

Bed sightline Dressing buffer Circulation route

Local control Manual override Mock-up point

Use the handle or arrow keys to compare. Illustrative concept · Select a theme to see what changes.

Six transformations in the same room

01 Light and darkness 02 Materials and visual field 03 Air and moisture 04 Quiet 05 Privacy and flow 06 Control and proof

Conventional brief

One general lighting plan.

White ceiling, direct downlights and no separately resolved evening or night condition.

Atelier response

Four conditions, not one scene.

Daylight, task, evening and sleep-period conditions are briefed separately, coordinated with specialists and checked in use.

Why it matters

Warm light alone is not a strategy.

Timing, intensity, direction, duration and sources visible from the bed all affect the result.

Light by day, darkness by night

Conventional brief

A photogenic white-box default.

Uniform reflectance, hard highlights and a colour palette selected mainly as a finish.

Atelier response

A controlled visual field.

Reflectance, contrast, texture, view and visual complexity are coordinated for depth, legibility and controlled glare.

Why it matters

Colour is contextual, not a mood switch.

Atelier uses colour and material hierarchy to support orientation and visual clarity.

How DALLEAU reads evidence

Conventional brief

Cooling is treated as air quality.

Split AC is specified while outdoor air, latent load, wardrobes, extraction and vacancy remain separate questions.

Atelier response

The residence operates in modes.

Source control, extraction, filtered outdoor air, dehumidification and open, mixed, closed and absence modes are coordinated.

Why it matters

Cool air can still be moisture-loaded.

At Bali humidity levels, source control and operating logic matter more than adding another sensor or purifier.

Indoor environment and moisture control in Bali residences

Conventional brief

A wall rating and an average dBA.

The plan is fixed before equipment tone, rain, service routes, speech privacy and night events are resolved.

Atelier response

Quiet is designed as a system.

Site events, low frequency, vibration, equipment, adjacencies and staff movement are addressed before private zones harden.

Why it matters

A quiet average can hide repeated disturbance.

Event peaks, tonal sound and routes into the room can matter more than one headline number.

Acoustics and privacy

Conventional brief

Open circulation resolves itself later.

Family, guests and staff share sightlines and crossing points because privacy is treated as a room label.

Atelier response

Privacy becomes a gradient.

Arrival, family, guest and service routes are mapped through clear thresholds, retreat options and controlled overlap.

Why it matters

Privacy depends on control, not isolation.

The residence should let people join, withdraw, host and move without unwanted exposure.

Household Use, Sensory and Flow Brief Protocol summary

Conventional brief

Automation is added late.

Cloud services, apps and handover documents are treated as proof that the residence is complete.

Atelier response

Critical functions remain understandable.

Local control, manual override, documentation, mock-ups, commissioning, staff training and POE are designed together.

Why it matters

Delivered is not the same as verified.

The residence is released against the owner’s brief, then reviewed in use and updated in the Building Passport.

What an intelligent residence should still do when the internet fails

Explore the method

Project decisions are confirmed through specialist review, full-scale mock-ups and commissioning.

Evidence and project use

Three pairs of questions keep evidence, interpretation and decision separate.

What do we know?

What can this project decide?

Separate the finding from the brief. A coherent direction may become a project question, target or full-scale mock-up.

What did the study find?

What did it not prove?

Record the setting, population and method, then state the limit plainly. A controlled result is not automatically a lasting residential outcome.

What is established?

What still requires site validation?

Use stronger evidence directly where appropriate. Climate, use, specialist scopes and commissioning still determine the project response.

Where the protocols act

Each stage resolves a different owner question.

The project proceeds when the relevant decision, evidence and responsibility are explicit.

01 Land and feasibility

Site evidence, operating assumptions and material red flags are recorded before a land or concept recommendation.

02 Household brief

Owner use, guest patterns, privacy, staff routes, retreat and service modes are resolved before the programme hardens.

03 Concept and coordinated design

Performance questions become criteria, specialist scopes and mock-up requirements.

04 Procurement and construction

Tender, approvals, variations and hold points keep the decision basis visible while work proceeds.

05 Commissioning and opening

The residence is tested, tuned, documented and prepared for operation before release.

06 30-day, seasonal and annual learning

Operating observations, maintenance and POE update the Building Passport and future decisions.

Eight themes, one residence

The questions are connected.

Four core themes anchor the Atelier method. Four further research tracks extend the wider Atelier agenda.

01 Core theme

Light and sleep

02 Core theme

Indoor environment and moisture

Study Notes in this theme

Waterproofing is a chain, not a coating.

Slab-on-ground or suspended floor in Bali?

A membrane cannot rescue a flat roof without falls.

External drainage is part of the residence.

03 Core theme

Thermal comfort in hot-humid residences

04 Core theme

Intelligent residences and local-first control

Further study areas

05 Acoustics and privacy Additional study

Protocol summary

06 Nature and biophilia Additional study

Protocol summary

07 Spatial legibility and retreat Additional study

Protocol summary

08 Age-ready adaptability Additional study

Protocol summary

Inside the mandate

Three public engagements. One internal method.

The nine protocols sit behind the Private Brief, Feasibility Study and Full Development Mandate. They are activated according to the site, household, risk and project stage.

Engagement 01

Private Brief

Establish the project, decision authority, intended use, current stage and likely starting point.

View → Engagement 02

Feasibility Study

Activate the site, residence and specialist screens needed to test the basis for decision.

View → Engagement 03

Full Development Mandate

Carry the relevant protocols through the owner-side evidence spine from brief to aftercare.

View →

P01 Baseline and brief

Tropical Site and Resilience Baseline Full protocol

Review heat, rain, humidity, noise, access, utilities, maintenance and operating conditions before the concept is fixed.

Featured protocol View →

P03 Protected performance

Protected Bedroom Performance Protocol Full protocol

Coordinate light, darkness, quiet, thermal stability, humidity, airflow, privacy, control and night-time operation.

Featured protocol View →

P04 Protected performance

Indoor Environment and Moisture Control Protocol Full protocol

Resolve moisture, outdoor air, source control, extraction, filtration, vacancy and maintenance room by room.

Featured protocol View →

P08 Verification and memory

Performance Commissioning and Post-Occupancy Learning Plan Full protocol

Test the residence as built, tune it in use, train its operators and carry lessons into the Building Passport.

Featured protocol View →

Baseline and brief

P02 Household Use, Sensory and Flow Brief View → Protocol summary

Protected performance

P05 Acoustic Privacy and Quiet Systems Study View → Protocol summary P06 Age-Ready Adaptability Plan View → Protocol summary P07 Intelligent Residence Readiness Review View → Protocol summary

Verification and memory

P09 Building Passport and Data Stewardship Plan View → Protocol summary

Explore the protocol spine See the related protocol

Founding library

Research that changes the brief.

Study Notes explain what the evidence can support. Methods Notes show how it can inform a project brief.

Evidence note Each item states what the evidence can and cannot support.

Study Note

Light by day, darkness by night

Residential lighting is better treated as a sequence: useful light by day, a deliberate reduction before bed and darkness during the sleep period.

Read note →

Study Note

Indoor environment and moisture control in Bali residences

A cool room can still be moisture-loaded, under-ventilated or poorly controlled.

Read note →

Study Note

Thermal comfort is not one thermostat number

Comfort depends on air and radiant temperature, humidity, air movement, activity, clothing, bedding, expectation and control.

Read note →

Study Note

What an intelligent residence should still do when the internet fails

Critical functions should remain local, understandable, manually overridable, documented and safe.

Read note →

Methods Note

How DALLEAU reads evidence for private residences in Bali

A research finding becomes a project question only after its method, limits and Bali transfer are understood.

Read note →

Methods Note

Why commissioning matters more than handover

Commissioning tests the residence against the owner’s brief and records what still needs correction.

Read note →

Evidence and boundaries

What we know. What remains uncertain.

Evidence labels describe maturity. Application labels describe what kind of statement DALLEAU is making. Neither is a certification or a promise of human outcome.

Established evidence

Authoritative guidance, standards, systematic reviews or multiple converging human studies.

Growing evidence

Several credible studies, still dependent on population, setting, duration or method.

Emerging research

Promising findings with material limitations.

Research question

A plausible question for project testing or monitoring.

Evidence enters the brief as guidance, a project target or a question for local validation.

Read how evidence and review work

Continue with the project

Continue from the question in front of you.

01 See what was built Delivered work, current projects and evidence from the field.

Open → 02 Understand what changed in Bali Current rules, Reality Checks and owner-side interpretation.

Open → 03 Use a decision tool Structure the question before a project decision hardens.

Open → 04 Talk to François Discuss the site, household, stage and decision in front of you.

Open →

Start with the project

Bring the right questions into the project early.

Talk to François Review the Feasibility Study

## Evidence, review and corrections | DALLEAU Atelier

URL: https://dalleau.ai/atelier/evidence-and-review/

Atelier / Evidence and review

DALLEAU Atelier

What we know. What remains uncertain. What a project can reasonably use.

DALLEAU Atelier translates public research into residential questions, project criteria and verification methods. Sources can be established, growing or emerging; what matters is that the original record, supported claim, evidence level and limits are clear.

See the evidence levels Read a Study Note

Evidence at a glance

Evidence level

Method statement; operational status is separate from research evidence.

Application type

Publication governance and evidence method.

Published or updated

Updated 29 July 2026

What this did not prove

A workflow does not prove that a page, claim, project or human outcome was independently validated.

Sources

6 original records used on this page

Publication policy · 29 July 2026

Rigorous enough to be useful.

Public guidance, standards pages, institutional material and peer-reviewed research may be cited once the original record and the supported claim are correctly matched. Emerging research and DALLEAU interpretations remain publishable when they are labelled and bounded.

Source confirmed

The original record and the page claim match.

Growing or emerging

The design, population, setting and limits remain visible.

DALLEAU view

Our interpretation is identified as ours and remains project-specific.

Specialist review

Reserved for higher-risk health, legal, cyber, life-safety, regulated or project-performance claims.

Our starting rule

A study is not a design rule.

Research becomes misleading when a result is separated from its sample, setting, exposure, outcome or limitations. A small laboratory study, a preference survey and a field study in an occupied building do not answer the same question.

01 What question was asked?

02 What was the study design?

03 Who was included, and how many people or buildings were studied?

04 Where did the study take place, and for how long?

05 What exposure or intervention was tested?

06 What outcome was measured?

07 What was found?

08 What were the limitations and possible conflicts?

09 What did the study not prove?

10 What, if anything, transfers to a private residence in Bali?

Public evidence levels

Evidence maturity

A page can contain more than one evidence level. Individual sections identify stronger or weaker claims where needed.

Established evidence

Supported by authoritative guidance, standards, systematic reviews or multiple converging human studies.

Growing evidence

Supported by several credible studies, but still dependent on population, setting, duration or method.

Emerging research

Promising findings with material limitations, such as small samples, short exposures or laboratory and VR settings.

Research question

A plausible question worth testing or monitoring, not a basis for a universal project rule.

Application types

What kind of statement are we making?

Official standard or guidance

A requirement, recommendation or reference published by a recognised authority or standards body.

Evidence-based recommendation

A practical interpretation supported by the current evidence base, with its limits stated.

DALLEAU project target

A project-specific target proposed for the brief, subject to site conditions, appointed specialists, commissioning and owner approval.

Site-specific finding

A documented condition observed on a project under stated conditions. It is not automatically transferable.

Project hypothesis

A question the project may test or monitor. It is not established evidence.

Global evidence, local conditions

The evidence still has to survive Bali.

A finding may be credible and still be a poor fit for a specific site or residence. Bali adds heat, humidity, intense rain, insects, corrosion, outdoor pollution, noise, mixed indoor-outdoor use, owner absence, guest turnover, power and network interruptions, and uneven maintenance capacity.

Some conclusions transfer directly. Others require site measurement, a mock-up, specialist review or seasonal verification before they become a project target.

Review follows the risk

Not every page needs the same review.

Reviewer names appear only with permission. Review does not imply endorsement by the reviewer’s employer, university, institution or professional body.

Health or human outcomes

Strong claims about sleep, cognition, physiology, health or a universal human outcome require relevant specialist review.

Regulated or safety advice

Legal, cybersecurity, life-safety and other regulated professional advice requires the relevant qualified review.

Project performance

A conclusion drawn from a real project requires the underlying measurement, scope and responsible specialist to be verified.

Endorsement or universal target

Named institutional support and project targets presented as general recommendations require explicit authority and review.

The public trust frame

Enough information to judge the page without exposing the back office.

01

Evidence level

02

Application type

03

Published or updated

04

What this did not prove

05

Sources

The detailed fifteen-field record remains internal. A reviewer is named only when a review actually occurred and materially helps the reader.

Five-point source test

A source is usable when the record and the sentence match.

DALLEAU does not need an author's permission to cite or summarise a public source. Permission is a separate issue when reproducing protected figures, photographs, tables or substantial text.

01 Original record identified

02 Title, year, population and version materially correct

03 Claim stays within the source

04 Evidence level or source type is clear

05 DALLEAU interpretation is separated

The internal ledger remains a research reservoir. Only the sources actually cited on a page need to pass this test before that page is released.

Examples of original records

Standards, guidance and research remain inspectable.

These examples show the source types used across Atelier. Page-specific source sets remain on the page they support.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Established evidence. The measurement quantities and metrics used to describe stimulation of the five retinal photoreceptor types.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth.

Thermal Environmental Conditions for Human Occupancy Authoritative guidance. Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing.

Environmental noise guidelines for the European Region Authoritative guidance. Source-specific environmental-noise context and the need to consider night exposure.

IoT Device Cybersecurity Capability Core Baseline Authoritative guidance. A starting set of device cybersecurity capabilities for IoT acquisition and integration.

The Commissioning Process and commissioning requirements for new buildings and systems Authoritative guidance. Commissioning from owner requirements through acceptance, documentation, training and operation.

Clear limits

What the method cannot prove.

This method cannot diagnose an individual, prove that design caused a health or human-performance outcome, turn one preference study into a universal rule, replace appointed specialists, or guarantee silence, absence of mould, comfort or system performance.

Project evidence is private by default. The Owner’s Control Report remains private. Only controlled, permissioned and redacted extracts may be published.

Illustrative concepts

Digital tools remain separate from project evidence.

Some illustrative concepts on this site are generated or enhanced using digital tools, including generative AI, under DALLEAU direction. They are labelled as illustrative concepts and are not presented as photographs of delivered work or as evidence of measured performance.

From source to project use

See the method in practice.

Read a Study Note Explore the protocols

## How DALLEAU reads residential evidence | DALLEAU Atelier

URL: https://dalleau.ai/atelier/methods/how-dalleau-reads-evidence/

Atelier / Methods Note / How DALLEAU reads evidence for private residences in Bali

Methods Note

How DALLEAU reads evidence for private residences in Bali

A systematic review, a small laboratory study, a preference survey, a VR experiment and a field study in an occupied home do not carry the same weight. They may all be useful, but they answer different questions. DALLEAU Atelier uses research to improve decisions. It does not use scientific language as decoration or treat one paper as a universal rule.

Evidence at a glance

Evidence level

Evidence-method statement; examples contain different evidence levels that must be labelled separately.

Application type

Evidence appraisal and project translation method.

Published or updated

Updated 29 July 2026

What this did not prove

Source appraisal does not prove that a finding transfers directly to a residence or guarantees an outcome.

Sources

5 original records used on this page

Step 1. Start with the question

Method question

How does a research finding become a useful project question without becoming a false design rule?

One-sentence answer

We examine the question, study design, sample, setting, exposure, comparator, outcome, finding, limitations and what the study did not prove. Then we ask whether the result survives Bali’s climate, operation and household reality.

Step 2. Identify the study design

Official guidance or standard

Useful for accepted definitions, measurement methods, limits and professional practice. It does not automatically prove that every project target is a universal threshold.

Systematic review or meta-analysis

Useful for understanding consistency across multiple studies. Its strength still depends on the quality and comparability of the included work.

Field study in a real building

Usually carries strong relevance for residential translation because the environment, duration and behaviour are more realistic.

Controlled laboratory study

Useful for mechanism and controlled comparison. Transfer to long-term residential life may be limited.

VR, image or screen-based experiment

Useful for preference, perception and hypothesis generation. It should rarely carry a strong claim about a real occupied residence by itself.

Expert or vendor source

Useful for implementation context or current product capability. It is not independent evidence of a human benefit.

Step 3. Read the sample

Ask:

How many people took part?

Who were they?

Were they healthy adults, older people, children, patients, office workers or another group?

Were age, culture, chronotype, acclimatisation or prior experience relevant?

Was the study large enough for its conclusion?

Did many participants drop out?

A result in a small group of young adults does not automatically apply to children, older owners, international guests or staff in Bali.

Step 4. Check the setting

The setting affects transferability.

A full-season study in occupied homes answers a different question from a ten-minute VR exposure. A sealed office in a temperate climate answers a different question from an open or mixed-mode residence in Bali.

DALLEAU gives greater residential weight to evidence that includes:

real buildings;

real occupancy;

realistic exposure duration;

actual controls and behaviour;

operational and maintenance context;

relevant climate conditions.

Laboratory and VR work can still explain mechanisms. It should be labelled accordingly.

Step 5. Define the exposure

A useful summary records what people were actually exposed to.

For light, that may include timing, eye-level intensity, duration, spectrum and prior light history.

For sound, it may include average level, event peaks, low frequency, tonality and event count.

For thermal comfort, it may include air temperature, radiant temperature, humidity, air speed, clothing and activity.

For indoor air, it may include pollutant source, ventilation, duration, particle level, moisture or filtration.

Vague labels such as “healthy lighting”, “biophilic room” or “smart home” are not sufficient descriptions.

Step 6. Separate the outcome types

Four outcomes are often confused.

Preference

What people liked or chose.

Behaviour or performance

What they did, how quickly they completed a task or how they navigated.

Physiological response

A short-term measurement such as heart rate, skin conductance, hormone level or brain activity.

Long-term health or life outcome

A durable clinical or population-level result.

A preferred space is not automatically a healthier space. A short-term physiological change is not proof of a durable benefit. A building POE is not a clinical trial.

Step 7. Read the finding precisely

Ask:

How large was the effect?

Was it statistically and practically meaningful?

Was the result consistent across outcomes?

Was it replicated?

Did the authors qualify it?

Were alternative explanations considered?

Was the study funded by a party with a commercial interest?

DALLEAU does not rewrite “associated with” as “caused”. It does not rewrite a preference result as a health result. It does not rewrite a short exposure as a permanent effect.

Step 8. State what the study did not prove

Every Study Note must include this section.

Examples:

The study did not prove that the result applies to every household.

It did not isolate one design feature from the rest of the intervention.

It did not test long-term occupation.

It did not take place in a hot-humid climate.

It did not measure a medical outcome.

It did not test construction quality, maintenance or staff operation.

It did not compare the result across seasons.

This is not an exercise in weakening the research. It is how the result remains useful without being overstated.

Step 9. Assign the evidence level

Established evidence

Supported by authoritative guidance, standards, systematic reviews or multiple converging human studies.

Growing evidence

Supported by several credible studies, but still dependent on population, setting, duration or method.

Emerging research

Promising findings with material limitations, such as small samples, short exposures or laboratory and VR settings.

Research question

A plausible question worth testing or monitoring, not a basis for a universal project rule.

A page may contain mixed evidence classes. In that case, the page-level label is only a summary and each material section receives its own qualification.

Step 10. Assign the application type

Evidence maturity and project use are not the same thing.

Official standard or guidance

A requirement, method or recommendation issued by a recognised authority or standards body.

Evidence-based recommendation

A project recommendation supported by the current evidence but still requiring context and professional judgement.

DALLEAU project target

A target chosen for a specific project. It must not be presented as a universal scientific threshold.

Site-specific finding

A measured or documented condition from a named or anonymised project under stated conditions.

Project hypothesis

A question the project will test or monitor. It is not a promised result.

Step 11. Test the Bali transfer

Before a finding enters a residence brief, ask what Bali changes.

Does high humidity change the result?

Does open-air living undermine a sealed-building assumption?

Does rain change the acoustic condition?

Do insects or vector control alter the opening strategy?

Does heat gain make a daylight solution unusable?

Can the local team maintain the proposed system?

What happens during owner absence?

What happens during power or internet failure?

Does staff operation change the intended mode?

Does the project need local measurement before adopting the recommendation?

Global evidence becomes useful only after this filter.

Step 12. Translate the finding into a project action

A research conclusion should enter the project through one or more controlled objects:

owner brief question;

specialist scope;

design criterion;

DALLEAU project target;

mock-up requirement;

hold point;

commissioning test;

staff operating protocol;

Building Passport record;

POE question;

unresolved-question register.

If the finding cannot influence a decision, test, record or question, it may belong in the library rather than the project brief.

When specialist review is required

Subject review is required when:

the public page uses technical thresholds;

the interpretation could affect health, privacy, life safety or regulated scope;

evidence is mixed or controversial;

the project application exceeds DALLEAU’s qualifications;

measurements need specialist instruments or interpretation;

the content discusses acoustics, circadian light, moisture, thermal modelling, age-ready design, cybersecurity or POE in technical depth;

a named specialist or institution may appear publicly.

Legal and privacy review is required where the overall impression could imply medical benefit, where people-level data are collected or where project evidence may identify an owner, guest or staff member.

What this method can show

It can show:

why a source deserves more or less weight;

what question the source actually answered;

what remains uncertain;

what is transferable to a Bali residence;

whether the result should become a standard reference, recommendation, project target or research question;

what specialist or site validation is required.

What this method cannot show

It cannot:

convert weak evidence into strong evidence;

replace a subject specialist;

establish a clinical outcome;

guarantee that a recommendation will perform on site;

remove individual and cultural variation;

eliminate the need for commissioning and POE;

prove that DALLEAU’s interpretation is permanently correct.

Unresolved questions

How should DALLEAU score evidence quality without creating a misleading universal number?

When should a source update trigger a full page rewrite rather than a correction note?

Which topics require two independent subject reviewers?

How should contradictory standards and field evidence be displayed without confusing non-specialist readers?

Which local Bali measurements should be required before a recommendation enters the protocol system?

How should reviewer disagreement be recorded and, where useful, disclosed?

Source ledger and corrections

The source ledger should be grouped by:

standards and official guidance;

systematic reviews and consensus papers;

human field evidence;

laboratory and VR evidence;

project evidence;

open questions.

Each entry should record:

title;

author or institution;

year;

source type;

DOI or stable URL;

claim supported;

evidence level;

known limitation;

last checked date;

correction or retraction status.

Material updates require a visible change note and a footer corrections log.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Established evidence. The measurement quantities and metrics used to describe stimulation of the five retinal photoreceptor types. Limit: A complete lighting application, a health treatment or prediction of a person-level outcome.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth. Limit: A universal safe microbial threshold or proof that hidden mould is absent.

Thermal Environmental Conditions for Human Occupancy Authoritative guidance. Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing. Limit: One thermostat setting that guarantees comfort for every person.

IoT Device Cybersecurity Capability Core Baseline Authoritative guidance. A starting set of device cybersecurity capabilities for IoT acquisition and integration. Limit: A complete project threat model, legal advice or a guarantee of security.

The Commissioning Process and commissioning requirements for new buildings and systems Authoritative guidance. Commissioning from owner requirements through acceptance, documentation, training and operation. Limit: Permanent performance under every future condition or a clinical human outcome.

Related content

Evidence, review and corrections

Methods Note: Why commissioning matters more than handover

Protocols hub

All four Study Notes

Closing

Better questions before stronger claims

DALLEAU Atelier uses research to sharpen the brief, define what must be tested and keep uncertainty visible.

Step 1. Start with the question Step 2. Identify the study design Step 3. Read the sample Step 4. Check the setting Step 5. Define the exposure Step 6. Separate the outcome types Step 7. Read the finding precisely Step 8. State what the study did not prove

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Commissioning before handover | DALLEAU Atelier

URL: https://dalleau.ai/atelier/methods/why-commissioning-matters-more-than-handover/

Atelier / Methods Note / Why commissioning matters more than handover

Methods Note

Why commissioning matters more than handover

A finished surface can hide an unresolved system. A control screen can work during a demonstration and still fail after an outage. An AC unit can cool while remaining noisy, humid or poorly aimed. A blackout can look complete in daylight and leak at night. Commissioning is the structured process that turns design intent into witnessed evidence before opening. Post-occupancy review then checks how the residence behaves in use.

Evidence at a glance

Evidence level

Commissioning guidance, project method and permissioned project evidence; grades remain page-specific.

Application type

DALLEAU project method and witnessed verification against the approved brief.

Published or updated

Updated 29 July 2026

What this did not prove

Commissioning does not prove causal human outcomes or permanent performance under every condition.

Sources

4 original records used on this page

Method question

What does a completed residence still need to prove before it is released for use?

One-sentence answer

Handover and commissioning answer different questions

Handover transfers possession and documents. Commissioning tests whether the installed systems, controls and operating routines meet the owner’s brief under stated conditions, records what failed, verifies the correction and prepares the team to operate the residence.

Handover asks

Are the documents present?

Have keys, warranties and manuals been transferred?

Has the contractor declared the work complete?

Has ownership or custody changed?

Commissioning asks

What was the owner’s requirement?

What target or acceptance criterion was agreed?

Was the installed system inspected and tested?

Under which conditions was it tested?

What failed?

Was the correction retested?

Can the owner and operating team use the system?

What remains unresolved or seasonal?

A residence can be handed over without those questions being closed.

Commissioning begins with the owner’s brief

Established commissioning principle Evidence-based recommendation

Testing at the end cannot repair a missing requirement at the beginning.

Commissioning should start by recording:

owner priorities;

intended operating modes;

protected rooms and critical systems;

project targets;

evidence classification;

specialist responsibilities;

tests and instruments;

witness points;

data and privacy boundaries;

opening criteria;

aftercare period.

Those requirements then enter design reviews, tender documents, purchase orders, mock-ups, inspections and training.

The five-stage cycle

1. Pre-occupancy

Timing Late construction to handover.

Purpose Lock intent, verify installation, collect baseline evidence and close critical issues before opening.

Typical outputs

owner requirements;

commissioning plan;

instrument and sensor register;

witness logs;

mock-up records;

empty-building baseline where useful;

opening-readiness list.

2. Opening

Timing First 7 to 14 days.

Purpose Confirm usability, controls, training and obvious defects under real operation.

Typical outputs

opening issues log;

rapid-fix list;

training completion;

first occupied observations;

staff and owner questions.

3. 30-day review

Timing Day 21 to 45.

Purpose Catch early operational drift before workarounds become permanent.

Typical outputs

30-day tuning memo;

control and alarm adjustments;

staff-routine corrections;

defect closure review;

updated Building Passport entries.

The 30-day review forms part of the Full Development Mandate baseline.

4. Seasonal review

Timing Wet-season and drier-season campaigns where the project question requires them.

Purpose Test assumptions that cannot be closed during one opening condition.

Typical outputs

seasonal trend review;

revised setpoints and modes;

moisture, rain, noise or comfort corrections;

updated operating protocol.

Seasonal review remains a separate scope unless expressly included.

5. Annual learning

Timing Approximately 12 months.

Purpose Review faults, maintenance, utility patterns, user experience, evidence grade and what should change in the next project.

Typical outputs

annual review;

Building Passport update;

maintenance improvement plan;

evidence-grade decision;

publication or non-publication decision.

A test needs an acceptance criterion

Established commissioning principle

A test is not simply turning a system on.

A useful script records:

the requirement;

the mode and preconditions;

the test method;

the instrument or observation method;

the person responsible;

the expected result;

the actual result;

the deviation;

the corrective action;

the retest;

the accepted exception, if any.

Without an acceptance criterion, a demonstration can look successful while failing the owner’s actual brief.

Commission the failure states

Evidence-based recommendation DALLEAU project method

A residence should be tested not only during the ideal scene, but during the conditions that create operational risk.

Examples include:

power loss and restoration;

internet or cloud loss;

failed sensor;

manual override;

blocked or slow drain;

high outdoor humidity;

heavy rain;

door or window left open;

filter overdue;

staff reset;

owner account transfer;

leak alarm and shutoff;

equipment fault and escalation.

The project should record what continues, what stops, what fails safe, what needs human action and how the operator recognises the condition.

Training is part of verification

Established Soft Landings and operations principle

A system is not ready because the specialist can operate it during handover.

The owner and staff need to understand:

normal modes;

manual override;

alarms and priorities;

what must not be silenced;

cleaning and maintenance;

who receives escalation;

what to do during outage or fault;

where the current documents live;

how to record an issue;

which changes require specialist review.

Training should be witnessed, recorded and repeated when key staff change.

Owner’s Control Report and Building Passport are not the same object

Owner’s Control Report

The decision layer:

owner objectives;

material risks;

specialists;

hold points;

evidence status;

deviations;

approvals;

accepted residual risk.

Building Passport

The asset-memory layer:

drawings and revisions;

models, products and warranties;

concealed-work evidence;

controls and account custody;

test records;

settings and backups;

maintenance schedules;

training;

incidents and changes;

POE and publication permissions.

The two systems link to each other but should not be collapsed into one unreadable archive.

What commissioning can show

It can show that:

a system was tested against a defined requirement;

the test conditions and methods were recorded;

faults were identified and retested;

agreed modes and overrides worked at the time of test;

the operating team received training;

unresolved seasonal or lifecycle questions remain visible;

later POE can compare intent with actual operation.

What commissioning cannot show

It cannot by itself establish that:

a residence improves sleep, cognition, stress or longevity;

one test represents every room, user and season;

future maintenance will always be performed correctly;

external noise, weather, vendors or neighbourhood conditions will remain unchanged;

no future fault will occur;

the building complies with a regulated requirement without the relevant authority or appointed professional basis;

one project result is a universal rule.

When independent or specialist review is required

Independent or subject review is required when:

the acceptance criterion belongs to a regulated discipline;

life safety or statutory compliance is involved;

DALLEAU has a commercial interest in the result and the public claim is strong;

the method requires calibrated specialist instruments;

the interpretation involves acoustics, lighting, moisture, thermal modelling, cybersecurity or healthcare-related adaptability;

a result will be used publicly as evidence;

the owner requests independent verification.

DALLEAU may coordinate, witness and preserve the evidence. It does not silently assume a specialist’s sign-off.

Data quality and privacy

Commissioning and POE should collect the least intrusive signal that can answer the building question.

The record should distinguish:

raw data;

cleaned data;

reported data;

missing or offline periods;

abnormal events;

sensor model and location;

calibration or comparison method;

occupant and weather context;

changes made during the monitoring period.

Room and system evidence should be preferred over person-level histories. Raw private residential data remain internal unless a separate permission, anonymisation, evidence-grade and legal-privacy review authorise a narrow public extract.

Unresolved questions

Which commissioning tests should be mandatory across every Full Development Mandate?

Which tests require an independent specialist rather than a DALLEAU witness?

How should instrument quality and calibration be scaled to the claim being made?

What is the minimum useful wet-season review for each residence type?

How should staff turnover trigger retraining and re-verification?

When should a 30-day issue become a protocol revision rather than a project-specific correction?

What evidence grade is required before a narrow commissioning result becomes a public Applied Note?

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

The Commissioning Process and commissioning requirements for new buildings and systems Authoritative guidance. Commissioning from owner requirements through acceptance, documentation, training and operation. Limit: Permanent performance under every future condition or a clinical human outcome.

Lessons learned from 20 years of CBE's occupant surveys Growing evidence. The value and limits of structured occupant feedback across many building surveys. Limit: A causal person-level outcome or direct transfer from offices to a private residence.

Post-occupancy evaluation in residential buildings: a systematic literature review of current practices in the EU Growing evidence. A synthesis of residential post-occupancy evaluation practices and methods. Limit: One universal POE method or a guaranteed project-performance result.

Enhanced Air Sensor Guidebook Authoritative guidance. Planning, selecting and interpreting air-sensor measurements. Limit: Replacing calibrated professional instruments or inferring a medical outcome.

Related content

Protocol: Performance Commissioning and Post-Occupancy Learning Plan

Protocol: Building Passport and Data Stewardship Plan

Methods Note: How DALLEAU reads evidence for private residences in Bali

Work: future Applied Notes and commissioning evidence when separately approved

Closing

Plan the evidence before the work is hidden

A residence is easier to verify when the owner’s requirements, test methods, hold points and aftercare are designed into the project.

Handover and commissioning answer different questions Commissioning begins with the owner’s brief The five-stage cycle A test needs an acceptance criterion Commission the failure states Training is part of verification Owner’s Control Report and Building Passport are not the same object What commissioning can show

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Atelier protocols for Bali residences | DALLEAU

URL: https://dalleau.ai/atelier/protocols/

Atelier / Protocols

DALLEAU Atelier protocols

A method inside the mandate, not a menu of add-ons.

Nine protocols connect the site, household brief, protected rooms, environmental systems, specialist appointments, commissioning, operations and asset memory.

Private Brief, Feasibility Study and Full Development Mandate remain the public ways to engage DALLEAU.

Talk to François Review the Feasibility Study

How Atelier enters the work

Three public engagements. Nine internal protocols.

The protocol system strengthens DALLEAU’s existing commercial architecture. It does not compete with it. The client does not have to assemble a technical menu.

Group 01

Baseline and brief

Before design decisions become expensive to reverse, DALLEAU records the site conditions, operating modes, household journeys, privacy requirements and unresolved risks that the project has to carry.

P01 Tropical Site and Resilience Baseline

A structured review of heat, rain, humidity, noise, access, utilities, maintenance and operating conditions before the concept is fixed.

Featured protocol

P02 Household Use, Sensory and Flow Brief

A residence brief built around arrival, hosting, privacy, staff movement, retreat, children, work, service and change over time.

Group 02

Protected performance

These protocols resolve questions that are often split between architects, engineers, specialists, integrators, contractors and operators. DALLEAU keeps the owner’s intent visible across those boundaries.

P03 Protected Bedroom Performance Protocol

An integrated bedroom protocol for light, darkness, quiet, thermal stability, humidity, airflow, privacy, control and night-time operation.

Featured protocol

P04 Indoor Environment and Moisture Control Protocol

A room-by-room method for moisture, outdoor air, source control, extraction, filtration, vacancy, maintenance and measurable environmental conditions.

Featured protocol

P05 Acoustic Privacy and Quiet Systems Study

A specialist-led study of quiet-side planning, privacy, event noise, rain, equipment, vibration and night-time operation.

P06 Age-Ready Adaptability Plan

A practical adaptability plan for access, bathrooms, routes, controls, future supports, staff workflows and changing household needs.

P07 Intelligent Residence Readiness Review

A readiness review for local control, manual override, network and power resilience, replaceability, privacy, cybersecurity and clear handover.

Group 03

Verification and memory

Intent is carried into tests, training, corrective actions, the Building Passport and post-occupancy learning.

P08 Performance Commissioning and Post-Occupancy Learning Plan

A plan to test the residence as built, tune it in use, train the people operating it and carry lessons into the next project.

Featured protocol

P09 Building Passport and Data Stewardship Plan

An owner-readable record of decisions, assets, hidden work, tests, settings, warranties, maintenance and later changes.

Where the protocols act

Each protocol creates decisions and release conditions inside the project.

A gate may be passed with an open item only when the remaining risk, responsible party, due date and effect on later work are recorded.

01 Land and feasibility

02 Household brief

03 Concept and coordinated design

04 Procurement and construction

05 Commissioning and opening

06 30-day, seasonal and annual learning

Land and feasibility

Site evidence, operating assumptions and material red flags are recorded before a land or concept recommendation.

Household brief

Owner use, guest patterns, privacy, staff routes, retreat, service and residence modes are resolved before the room programme hardens.

Concept and coordinated design

Performance questions become criteria, specialist scopes and mock-up requirements.

Procurement and construction

Exact products, interfaces, service access and concealed work are verified before purchase or closure.

Commissioning and opening

Rooms and systems are tested in their intended modes before release.

30-day, seasonal and annual learning

The residence is reviewed in use and the Building Passport is updated.

Release conditions

Evidence has to exist before the project moves on.

Rule 01

No invisible assumption

A project target is linked to its source class, owner decision, responsible specialist and method of verification.

Rule 02

No closing without evidence

High-risk concealed work is not covered until the required photographs, tests, location record and sign-off are complete.

Rule 03

No purchase by image or brand alone

The exact model, interface, constraint, local support and maintenance access are confirmed before purchase order.

Rule 04

No self-verification where independence matters

The party designing, selling or installing a system is not the only party validating a material public performance claim.

Rule 05

No opening before operations are defined

Critical settings, vacancy modes, staff actions, alerts, manual overrides and escalation routes are trained and documented.

Rule 06

No publication without a release gate

Evidence grade, method, privacy, permission, specialist review, limitations and net impression are checked before release.

Two records, two different jobs

The decision history and the asset history must not be confused.

Owner’s Control Report

A concise record of owner objectives, options, risks, appointed specialists, hold points, deviations, accepted conditions and approvals. It explains why the project moved forward.

Building Passport

The residence record for assets, drawings, hidden work, photographs, tests, settings, warranties, maintenance, incidents and later changes.

Post-occupancy learning

The review of how the residence performs in use, what was corrected and what can reasonably be carried into a future project or public Applied Note.

Appointed expertise

DALLEAU coordinates the question. Specialists remain responsible for their work.

Architects, engineers, building scientists, acousticians, lighting specialists, commissioning providers, occupational therapists, integrators, cybersecurity advisers and other appointed specialists retain responsibility for their professional conclusions and acceptance criteria.

How evidence and review work

Start with the project

The right protocol depends on the site, household and decision in front of you.

Talk to François Review the Feasibility Study

## Moisture control begins before the sensor. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/protocols/indoor-environment-and-moisture-control-protocol/

Atelier / Protocol / Moisture control begins before the sensor.

Protocol P04

Moisture control begins before the sensor.

A room-by-room method for source control, outdoor air, extraction, filtration, humidity, condensate, vacancy, maintenance and measurable environmental conditions in a hot-humid climate.

Evidence at a glance

Evidence level

Mixed: official guidance, building-science principles, sensor guidance and project targets.

Application type

Evidence-based recommendation and DALLEAU project method; targets require specialist approval.

Published or updated

Updated 29 July 2026

What this did not prove

Measurements do not prove healthy air, absence of mould or a medical outcome; targets are not universal health thresholds.

Sources

7 original records used on this page

Indoor Environment and Moisture Control Protocol

Measured environmental conditions are building evidence. They are not a medical diagnosis or a guarantee of health, comfort or absence of mould.

Why the protocol exists

A residence can feel cool while moisture and pollutants remain uncontrolled.

Split AC may lower air temperature without bringing in outdoor air. A wardrobe can stay closed and damp. A bathroom can dry too slowly. A kitchen hood can move too little air or have no practical makeup-air route. A filter can be specified without service access. A vacancy mode can allow humidity, drains and leaks to drift unnoticed.

P04 coordinates these conditions as one room-by-room operating problem.

Before monitoring

Source control comes first.

Step 01

Reduce or isolate the source

Resolve water entry, wet construction, combustion, fragranced products, cooking emissions, poor drainage, condensate faults and other avoidable sources before adding more sensors or treatment equipment.

Step 02

Extract where the source occurs

Kitchen, bathroom, laundry and other high-load zones need a defined removal and dry-down strategy with practical makeup air and maintenance access.

Step 03

Control outdoor air and moisture

Open, mixed and closed modes are selected according to outdoor humidity, rain, smoke, dust, noise, insects and occupancy rather than treated as one permanent rule.

Step 04

Filter what the system is designed to filter

Filtration is selected for a defined question, with sealed installation, pressure and airflow considerations, replacement access and local availability.

Step 05

Monitor trends and act

Sensors support interpretation, alerts and corrective action. They do not replace ventilation design, source control, maintenance or professional investigation.

Different rooms, different loads

The protocol does not apply one indoor-air rule to the whole residence.

Bedrooms

Ventilation proxy, humidity, AC operation, night noise, closed-door conditions, bathroom adjacency and absence periods.

Bathrooms and dressing rooms

Dry-down, extraction, surface temperature, closed storage, wet textiles, condensate and the route from shower moisture to adjoining rooms.

Kitchens and pantries

Cooking source, hood capture, exhaust route, makeup air, filtration limits, cleaning products and how pollutants can move beyond the kitchen.

Laundry and service zones

Dryer type, moisture generation, drainage, drying practices, staff routines, cleaning chemistry and access for filter and drain maintenance.

Living and indoor-outdoor areas

When open mode is useful, when it imports moisture or pollution and how the residence transitions into filtered, dehumidified or quiet operation.

Storage and vacant rooms

Sensitive contents, low air movement, long closure, humidity accumulation, siphon and leak risks and re-occupancy preparation.

One sensor is not the whole environment

CO2 can support a ventilation question. It cannot answer every air-quality question.

Where occupants are the dominant source and the room is reasonably mixed, true NDIR CO2 can help indicate whether the outdoor-air strategy is keeping pace with occupancy.

It does not measure particles, VOCs, mould, carbon monoxide, nitrogen dioxide, moisture safety or every pollutant source. A purifier may reduce particles without changing CO2. A low CO2 reading does not prove that the room is free of another problem.

Mode-based operation

Bali residences need more than open or closed.

Open mode

Used opportunistically when rain, humidity, outdoor air, insects, noise and security conditions are acceptable.

Mixed mode

Combines selected openings, fans and local conditioning while protecting rooms or functions that require greater stability.

Closed mode

Uses controlled outdoor air, extraction, filtration, cooling and moisture management where the external condition makes opening unsuitable.

Absence mode

Maintains defined environmental and water-risk safeguards, alerts the operating team to drift and prepares the residence for re-occupancy.

Extreme-weather or disruption mode

Defines safe local functions, manual overrides and staff actions during heavy rain, smoke, network loss, power interruption or equipment failure.

Release conditions

Moisture and air paths have to be verified before they disappear.

HP1

Before MEP concept sign-off

The room risk map and operating modes are approved. Source-control and ventilation questions are assigned.

HP2

Before equipment purchase

Airflow, latent-load, filtration access, drain, service and local-support assumptions are documented by the appointed parties.

HP3

Before ceiling or joinery closure

Ducts, drains, condensate lines, leak points, access panels and sensor locations are inspected, photographed and linked to the Building Passport.

HP4

Before opening

Functional tests and the staff protocols for dry-down, filters, vacancy mode, alerts and corrective action are complete.

What the owner receives

A control plan that connects design, maintenance and measured conditions.

Outputs

Room risk map

Source-control register

MEP design and specialist records

Operating-mode descriptions

Material and cleaning notes

Airflow and extraction test records

Temperature, RH and dew-point trends

Ventilation-proxy and particle-trend records where justified

Filter, drain and service-access photographs

Commissioning and staff training logs

Moisture and corrective-action register

Building Passport entries

Appointed expertise

DALLEAU coordinates the owner requirement. Technical design and diagnosis remain with the appointed specialist.

DALLEAU

Defines the owner requirements, coordinates the room risk map, distinguishes source control from sensing, challenges maintainability, witnesses agreed tests, links alerts to staff action and maintains the issue and evidence register.

MEP engineer and building scientist

Remain responsible for ventilation, psychrometric calculations, equipment design, latent loads, condensate and technical acceptance.

Laboratory or remediation specialist

Carries out testing, mould diagnosis, water analysis or remediation scope where the project question requires it.

Operator

Runs the approved room modes, cleaning and dry-down routines, filter and drain maintenance, alerts, absence checks and escalation process.

Limits

A spot check cannot establish the whole seasonal condition.

Hidden mould absence, pollutant-source attribution, medical relevance, full wet-season behaviour and maintenance adherence cannot be proven by one sensor, one inspection or one short monitoring period.

Prohibited public claims

Healthy air

Mould-proof

Toxin-free

Allergen-free

Prevents respiratory illness

CO2 proves good air quality

A purifier replaces ventilation or moisture control

Local translation

The protocol is tuned to the micro-location and the way the residence is actually operated.

Outdoor humidity and particles, wet-season infiltration, high ceilings, wardrobes, staff cleaning products, cooking patterns, condensate routes, long vacancy, power interruption, filter availability and local service competence all affect the design response.

The protocol therefore uses project targets and later verification rather than presenting one universal indoor condition for Bali.

Carried forward

Environmental intent becomes an operating record.

Owner’s Control Report

Room risk classes, selected operating modes, project targets, unresolved source questions, maintenance obligations, sensor and privacy choices, commissioning exceptions and owner acceptance.

Building Passport

Ventilation and extraction assets, filters, sensor inventory, calibration, drain and condensate routes, mode descriptions, test results, alerts, maintenance and moisture incidents.

POE

Occupied and vacant humidity trends, dry-down after bathing and laundry, ventilation proxy, particle events where monitored, filter condition, odour or visible moisture reports, staff response and seasonal retuning.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

WHO global air quality guidelines Authoritative guidance. Ambient pollutant benchmarks used as exposure context. Limit: A complete indoor residential specification or proof that an indoor environment is healthy.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth. Limit: A universal safe microbial threshold or proof that hidden mould is absent.

WHO guidelines for indoor air quality: selected pollutants Authoritative guidance. Pollutant-specific health context and source-control considerations. Limit: A complete residential specification or a single sensor score for indoor air quality.

ASHRAE position document on limiting indoor mold and dampness in buildings Authoritative guidance. Building moisture control and dampness prevention principles. Limit: A universal Bali project threshold or proof that a building is mould-free.

ASHRAE position document on indoor carbon dioxide Authoritative guidance. Use of indoor CO₂ as a limited ventilation indicator in context. Limit: Treating CO₂ as a complete indoor-air-quality or health score.

Low-cost air pollution monitors and indoor air quality Authoritative guidance. Capabilities and practical limits of lower-cost indoor monitors. Limit: Regulatory-grade accuracy, diagnosis or complete pollutant coverage.

Enhanced Air Sensor Guidebook Authoritative guidance. Planning, selecting and interpreting air-sensor measurements. Limit: Replacing calibrated professional instruments or inferring a medical outcome.

Related content

Study Note

Indoor environment and moisture control in Bali residences

Theme

Indoor environment and moisture

Related protocol

Protected Bedroom Performance Protocol

Methods Note

Why commissioning matters more than handover

Before equipment becomes the answer

Define the source, mode and maintenance question first.

P04 operates inside the Full Development Mandate. Its diagnostic logic may also be used within Feasibility Study when an existing residence requires structured investigation and specialist triggers.

A residence can feel cool while moisture and pollutants remain uncontrolled. Source control comes first. The protocol does not apply one indoor-air rule to the whole residence. CO2 can support a ventilation question. It cannot answer every air-quality question. Bali residences need more than open or closed. Moisture and air paths have to be verified before they disappear. A control plan that connects design, maintenance and measured conditions. DALLEAU coordinates the owner requirement. Technical design and diagnosis remain with the appointed specialist.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## P08 · Commissioning and post-occupancy learning | DALLEAU

URL: https://dalleau.ai/atelier/protocols/performance-commissioning-and-post-occupancy-learning-plan/

Atelier / Protocol / Test the residence before calling it complete.

Protocol P08

Test the residence before calling it complete.

Commissioning begins with the owner’s brief, not at handover. The plan defines what must be tested, who may verify it, how the operating team is trained and what can reasonably be learned after occupation.

Evidence at a glance

Evidence level

Mixed: commissioning guidance, project method and permissioned project evidence.

Application type

DALLEAU project method; witnessed verification against an approved owner brief.

Published or updated

Updated 29 July 2026

What this did not prove

Commissioning verifies stated requirements and observations, not causal human outcomes or permanent performance.

Sources

4 original records used on this page

Performance Commissioning and Post-Occupancy Learning Plan

Ordinary commissioning and POE verify building intent, system operation and user experience. They do not establish clinical or causal human outcomes.

Why P08 starts early

Design intent is easy to lose between drawing, purchase, installation and operation.

A product can be installed but not set up. A control sequence can work on a contractor’s phone but not for the owner or staff. A room can pass a daytime inspection and fail in its intended night mode. A system can be handed over without filters, setpoints, access, training or a clear response when it drifts.

P08 defines the evidence and operating requirements before those gaps become part of the completed residence.

Before design development

What will be tested has to be defined before it is tendered and built.

The Owner’s Project Requirements record the conditions, controls, operating modes, maintainability, evidence grade and acceptance path that matter to the owner.

The commissioning plan then translates that intent into submittal requirements, inspections, mock-ups, functional tests, verifier roles, instruments, training and later review.

From pre-occupancy to annual learning

The residence is reviewed at the moments when different failures become visible.

Stage 01

Pre-occupancy

Timing

Late construction to handover

Lock the intent, confirm the test plan, verify installation, record short baselines where relevant and resolve critical issues before opening.

Outputs

Owner requirements, commissioning plan, witness logs, baseline evidence and opening-readiness decision.

Stage 02

Opening

Timing

First 7 to 14 days

Confirm controls, training, practical usability, obvious defects, staff understanding and the first occupied operating patterns.

Outputs

Opening issues log, training completion and rapid corrective actions.

Stage 03

30-day review

Timing

Day 21 to 45

Review real use, early defects, control overrides, maintenance routines and environmental or system trends before workarounds become permanent.

Outputs

30-day tuning memo, corrective actions and updates to the Owner’s Control Report and Building Passport.

Commercial note

The 30-day review forms part of the Full Development Mandate baseline.

Stage 04

Seasonal review

Timing

First relevant wet-season and drier-season campaign

Test climate-sensitive questions under materially different outdoor conditions. Record rain, humidity, unusual occupancy, power loss, smoke, nearby construction, parties, maintenance and other context that can affect interpretation.

Outputs

Seasonal review, revised setpoints, updated operating procedures and unresolved-risk record.

Commercial note

Seasonal reviews are separately scoped unless expressly included.

Stage 05

Annual learning

Timing

Approximately 12 months

Review asset, maintenance, fault, utility, seasonal and voluntary feedback records. Decide what the project has established, what remains uncertain and what may be published.

Outputs

Annual evidence grade, Building Passport update, maintenance actions and case-study release decision.

Commercial note

Annual reviews are separately scoped.

Project-specific test plan

The evidence set follows the owner’s brief and the systems actually installed.

Possible test domains

Lighting scenes, darkness and exterior spill

AC, fans, thermal conditions and humidity control

Outdoor air, extraction, filtration and dry-down

Acoustic events, equipment noise and speech privacy

Water, drainage, leak protection and shutoff logic

Controls, local operation, manual override and power recovery

Alarms, alerts and staff escalation

Maintenance access, labels and replaceability

Asset records, settings and handover completeness

Not every project needs every test. The plan records why a question is material, who is responsible and what evidence is sufficient for the intended decision.

Who may verify

The installer should not be the only source of proof where independence matters.

DALLEAU coordinates the cross-discipline intent, witnesses agreed tests, keeps the issue register and records owner decisions.

Technical acceptance, certified measurement and independent verification remain with the relevant appointed discipline or commissioning provider when the risk, contract or intended public claim requires it.

Review questions

Who designed the system?

Who supplied it?

Who installed it?

Who tested it?

Is the test method documented?

Is the instrument appropriate and recorded?

What conflict or limitation remains?

Release conditions

Commissioning is planned before purchase and enforced before opening.

HP1

Before design development

Owner’s Project Requirements and the evidence plan are approved.

HP2

Before tender and purchase orders

Commissioning, submittal, mock-up, test, access and documentation requirements are included.

HP3

Before concealed-system acceptance

The required inspection, photograph, test and location evidence is complete.

HP4

Before opening

Functional tests, operator training, manual overrides and critical issue disposition are complete.

HP5

After occupation

The 30-day, relevant seasonal and annual review decisions are recorded with their evidence status and scope.

From test to correction

A failed test is useful only when responsibility and retest are clear.

Each issue records the intended condition, observed result, method, responsible party, corrective action, due date, retest requirement, accepted exception and effect on later claims or operation.

The issue remains open until the required evidence is complete or the owner formally accepts the residual condition.

Before opening

A system is not handed over until the people using it understand the intended mode.

Training covers critical setpoints, local controls, manual overrides, vacancy mode, filters, drains, alerts, reset procedures, power and network recovery, maintenance intervals and escalation.

The operating team receives a usable protocol, not only a folder of manufacturer manuals.

From raw record to public claim

Not every project record belongs in public.

Raw evidence

Measurements, photographs, test results, issue logs and operating records under restricted project access.

Project report

Cleaned and interpreted evidence linked to the owner brief, method, context, limitations and corrective actions.

Owner release

The owner decides what may be shared, with privacy, specialist review and contractual constraints respected.

Public Applied Note

An anonymised account of the question, method, conditions, intervention, result, limits and evidence level. It does not convert one residence into a universal claim.

Private by default

The residence is not a data-extraction product.

P08 uses the minimum evidence needed to answer the project question. Owner, family, guest and staff information is treated as sensitive. Access, retention, aggregation, anonymisation and publication permission are defined before collection.

Environmental and system data are preferred over person-level monitoring. Microphones, indoor cameras, biometrics, wearables and behavioural inference are outside the Atelier method by default unless a separate approved use case, consent model, specialist review and legal assessment exist.

Limits

Commissioning proves less than marketing often implies.

It can show that a system or room was tested against a defined project brief under stated conditions. It cannot by itself establish a medical outcome, causal improvement in sleep, cognition, stress or longevity, the behaviour of unmonitored rooms, rare future events or perfect maintenance over time.

Prohibited public claims

Scientifically proven residence based on one project

Improves sleep, cognition, stress or longevity

Guaranteed performance

Selective results without limitations

Compliance claim without the relevant authority or appointed professional basis

Evidence and aftercare

A record of what was intended, tested, corrected and learned.

Outputs

Owner’s Project Requirements

Commissioning plan

Witness and inspection logs

Instrument and sensor record

Issue and corrective-action register

Training record

Opening report

30-day tuning memo

Seasonal review where scoped

Annual review where scoped

Final setpoints and operating modes

Building Passport update

Evidence grade and publication decision

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

The Commissioning Process and commissioning requirements for new buildings and systems Authoritative guidance. Commissioning from owner requirements through acceptance, documentation, training and operation. Limit: Permanent performance under every future condition or a clinical human outcome.

Lessons learned from 20 years of CBE's occupant surveys Growing evidence. The value and limits of structured occupant feedback across many building surveys. Limit: A causal person-level outcome or direct transfer from offices to a private residence.

Post-occupancy evaluation in residential buildings: a systematic literature review of current practices in the EU Growing evidence. A synthesis of residential post-occupancy evaluation practices and methods. Limit: One universal POE method or a guaranteed project-performance result.

Enhanced Air Sensor Guidebook Authoritative guidance. Planning, selecting and interpreting air-sensor measurements. Limit: Replacing calibrated professional instruments or inferring a medical outcome.

Related content

Methods Note

Why commissioning matters more than handover

Methods Note

How DALLEAU reads evidence for private residences in Bali

Related protocol

Building Passport and Data Stewardship Plan

Work

Applied Notes and commissioning evidence when separately approved

Plan the evidence early

A residence is easier to verify when testing is designed into the project.

P08 forms part of the Full Development Mandate evidence spine. A 30-day review is included in the mandate baseline. Seasonal and annual reviews remain separate scopes unless expressly included.

Design intent is easy to lose between drawing, purchase, installation and operation. What will be tested has to be defined before it is tendered and built. The residence is reviewed at the moments when different failures become visible. The evidence set follows the owner’s brief and the systems actually installed. The installer should not be the only source of proof where independence matters. Commissioning is planned before purchase and enforced before opening. A failed test is useful only when responsibility and retest are clear. A system is not handed over until the people using it understand the intended mode.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## P03 · Protected bedroom protocol | DALLEAU Atelier

URL: https://dalleau.ai/atelier/protocols/protected-bedroom-performance-protocol/

Atelier
/
Protocol
/
Design the bedroom as one night-time system.
Protocol P03
Design the bedroom as one night-time system.
Light, darkness, quiet, temperature, humidity, airflow, privacy and controls interact. The protocol keeps them inside one owner brief from planning through mock-up, night commissioning and operation.
Evidence at a glance
Evidence level
Mixed: established evidence, growing evidence, official guidance and project-specific targets.
Application type
Evidence-based recommendation and DALLEAU project method; multidisciplinary validation required.
Published or updated
Updated 29 July 2026
What this did not prove
The protocol does not prove a sleep, stress, health or cognitive outcome or guarantee silence or comfort.
Sources
6 original records used on this page
Protected Bedroom Performance Protocol
The protocol evaluates environmental and operational conditions. It does not assess, diagnose or promise individual sleep or health outcomes.
Why bedrooms fail
A bedroom can be well designed by discipline and still underperform as a room.
The façade may admit exterior light. The bathroom may spill light and humidity. The AC may cool but cycle noisily. A fan may move air but disturb one side of the bed. Controls may require too many steps at night. Staff may reset scenes differently between stays.
P03 treats the bedroom as one night-time operating system rather than a set of separate specifications.
One room, connected questions
The bedroom brief crosses architecture, lighting, MEP, acoustics, controls and operations.
Daylight and morning conditions
Orientation, daylight access, glare, shading and the transition from sleep mode to daytime use.
Evening light and darkness
Electric-light scenes, exterior spill, blackout build-up, indicator lights, bathroom leakage and the lowest usable night setting.
Quiet and event control
Site events, rain, doors, staff routes, pumps, AC, fans, vibration and the difference between average background and distinct night-time intrusions.
Thermal stability and airflow
AC selection, cycling, radiant conditions, humidity, fan position, air movement at the bed and local control.
Privacy and retreat
Visual exposure, speech privacy, room entry, service access and the relationship between bedroom, bathroom, dressing and terrace.
Controls and operation
Bedside control, manual override, power recovery, scene naming, staff reset and what remains available when internet or cloud services fail.
Before specification
The protocol starts with use, not equipment.
Owners may voluntarily describe blackout preference, thermal and airflow preference, noise sensitivity, bathroom and screen routines, guest turnover, child or older-occupant needs and the level of control they want at the bed.
The discussion remains non-diagnostic. The output is a room brief and project target set, not a personal health profile.
Before bulk purchase or closure
The room has to be experienced at full scale.
A representative bedroom mock-up brings together blackout, exterior spill, bathroom light, fixtures, drivers, AC, fan, controls, joinery, curtains and critical acoustic details before the project commits at scale.
The mock-up records what is accepted, what is corrected and what remains dependent on later night commissioning or occupation.
Mock-up checks
Blackout and edge leakage
Lowest usable light scenes
Bathroom and corridor spill
AC and fan sound character
Air movement at intended bed positions
Control labels and manual override
Access to drivers, filters, drains and service points
Staff reset and power-recovery behaviour
Release conditions
Bedroom performance is protected before the room disappears behind finishes.
HP1
Before concept freeze
Bedroom location, quiet-side logic, terrace exposure, bathroom adjacency and principal service risks are approved.
HP2
Before bulk purchase or ceiling closure
The full-scale blackout, light, AC, fan, airflow and control mock-up has been reviewed. Material deviations and specialist triggers are recorded.
HP3
Before room acceptance
Night commissioning is completed with the room in its intended sleep mode. Critical light, noise, airflow, control and humidity questions are tested or explicitly left open.
HP4
Before opening
Owner controls, staff reset, vacancy settings and escalation procedures are trained and documented.
Building evidence
Measure the room condition, not the person.
Depending on the project question and appointed specialists, the evidence set may include eye-plane light readings, pillow-zone darkness checks, night sound and event logs, temperature, relative humidity, dew point, airflow, CO2 as a ventilation proxy where appropriate, system runtime and control overrides.
The evidence is interpreted against the project brief and measurement limitations. A sensor reading is not a diagnosis and ordinary POE does not establish a causal effect on sleep or health.
Appointed expertise
The protocol coordinates disciplines without absorbing their professional responsibility.
DALLEAU
Maintains the integrated bedroom brief, classifies project targets, coordinates mock-ups, witnesses agreed tests, records deviations and connects design intent to staff operation and POE.
Lighting specialist
Defines advanced optical targets, calculations and specialist commissioning where required.
Acoustician
Defines acoustic criteria, calculations, formal measurement and acceptance where material risk or a public performance claim requires it.
MEP engineer and building scientist
Remain responsible for thermal, ventilation, humidity, condensate and equipment design.
Integrator
Implements approved scenes, local control, manual override, failure behaviour and handover documentation.
What the owner receives
A bedroom brief that survives design, purchase, construction and opening.
Outputs
Bedroom intent sheet
Project-target classification
Mock-up report
Product and control confirmations
Measurement and test record where used
Accepted-deviation register
Night commissioning record
Staff and owner training record
Building Passport entries
30-day and relevant seasonal review actions
Limits
Room performance is not a promise about the occupant.
Individual sleep, alertness, recovery, stress, cognition and health outcomes remain outside ordinary project verification. Long-term external noise, user overrides, guest behaviour, staff adherence and seasonal moisture also require later observation.
Claims boundary
Claims about personal sleep, recovery, stress, jet lag, cognition, health or absolute quiet are outside this protocol.
Local translation
Night conditions in Bali are shaped by more than the bedroom specification.
Rain on the roof, scooters, neighbouring activity, open-air circulation, sunrise, garden and façade lighting, high outdoor dew point, bathroom humidity, AC cycling, fan noise, power recovery and staff turnover can all change the room’s intended operation.
The protocol therefore combines design criteria with night testing, staff routines and seasonal review.
Carried forward
The bedroom remains a monitored project question after handover.
Owner’s Control Report
Performance intent, project targets, mock-up decisions, accepted deviations, commissioning status, unresolved seasonal questions and owner choices on controls and data.
Building Passport
Room ID, façade and roof details, blackout products, fixture and driver records, lighting scenes, AC and fan information, measurement locations, commissioning results, O&M and replacement data.
POE
Darkness leakage, night-light usability, environmental trends, noise events, control overrides, bathroom dry-down and voluntary feedback on comfort and control.
Sources
The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.
CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light
Established evidence.
The measurement quantities and metrics used to describe stimulation of the five retinal photoreceptor types.
Limit: A complete lighting application, a health treatment or prediction of a person-level outcome.
What to document and report in studies of ipRGC-influenced responses to light
Authoritative guidance.
A reporting template for stimulus conditions and use of the CIE S 026 measurement system.
Limit: An efficacy claim or a universal residential target.
Recommendations for daytime, evening, and nighttime indoor light exposure to best support physiology, sleep, and wakefulness in healthy adults
Established evidence.
Consensus reference values for healthy adults aged 18–55 on regular daytime schedules.
Limit: A universal prescription for every age, health condition, routine or residence.
WHO guidelines for indoor air quality: dampness and mould
Authoritative guidance.
Prevention and remediation of persistent dampness and microbial growth.
Limit: A universal safe microbial threshold or proof that hidden mould is absent.
Thermal Environmental Conditions for Human Occupancy
Authoritative guidance.
Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing.
Limit: One thermostat setting that guarantees comfort for every person.
Environmental noise guidelines for the European Region
Authoritative guidance.
Source-specific environmental-noise context and the need to consider night exposure.
Limit: A room acoustic specification or direct prediction of an individual sleep outcome.
Related content
Study Note
Light by day, darkness by night
Theme
Light and sleep
Related protocol
Indoor Environment and Moisture Control Protocol
Methods Note
Why commissioning matters more than handover
Protect the room early
The bedroom brief has to cross every discipline that can change the night condition.
P03 operates inside the Full Development Mandate. Advanced specialist testing or an existing-room diagnostic is scoped only when the project question and evidence requirement justify it.
A bedroom can be well designed by discipline and still underperform as a room.
The bedroom brief crosses architecture, lighting, MEP, acoustics, controls and operations.
The protocol starts with use, not equipment.
The room has to be experienced at full scale.
Bedroom performance is protected before the room disappears behind finishes.
Measure the room condition, not the person.
The protocol coordinates disciplines without absorbing their professional responsibility.
A bedroom brief that survives design, purchase, construction and opening.
Continue through Atelier
Atelier overview
Evidence and review
Protocol spine
Project context
Applying this to a specific residence requires a review of the site, household and intended use.
Talk to François
Review the Feasibility Study

## Read the site before the concept hardens. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/protocols/tropical-site-and-resilience-baseline/

Atelier / Protocol / Read the site before the concept hardens.

Protocol P01

Read the site before the concept hardens.

A structured review of the conditions that will shape the residence before design decisions become expensive to reverse: heat, rain, humidity, noise, access, utilities, maintenance and operating mode.

Evidence at a glance

Evidence level

Mixed: official guidance, established building science, project method and site-specific findings.

Application type

DALLEAU project method; site-specific validation required.

Published or updated

Updated 29 July 2026

What this did not prove

A baseline does not establish universal flood, noise, heat, utility or resilience performance.

Sources

4 original records used on this page

Tropical Site and Resilience Baseline

Embedded in Feasibility Study and the Full Development Mandate when relevant.

Why the baseline exists

A site can look right and still be wrong for the intended residence.

The same piece of land can produce very different outcomes depending on how the household will use it, whether the residence opens or closes, how long it remains vacant, where noise arrives from, how water moves during heavy rain and whether the systems can be maintained locally.

P01 brings those conditions into the owner’s decision before they are disguised by a concept render.

Site conditions as project inputs

The land is assessed as an operating environment, not only as a view or address.

Climate and exposure

Sun, shade, wind, external humidity, rain exposure, elevation, heat gain and the practical difference between open, mixed and closed modes.

Water and drainage

Site levels, stormwater paths, driving rain, water source, drainage assumptions, wet-season observations and conditions that need civil, geotechnical or laboratory review.

Noise and privacy

Day and night events, roads, neighbouring uses, equipment, ceremonies, construction risk, quiet-side potential and the implications for bedroom and private-zone placement.

Access and serviceability

Owner arrival, staff and supplier access, waste and service movement, maintenance routes, emergency access and the practicality of reaching technical areas later.

Utilities and resilience

Power, communications, water, backup assumptions, network reliability, equipment support and the consequences of interruption or delayed service.

Landscape, insects and corrosion

Planting, roots, water retention, mosquito conditions, coastal or saline exposure, material vulnerability and the maintenance burden created by the landscape concept.

Owner-side sequence

Observe. Classify. Trigger. Record.

Step 01

Observe at the relevant time

The baseline uses available surveys, structured site visits, photographs, event logs and observations at times that matter. A daytime visit alone cannot establish night noise, wet-season behaviour or vacancy performance.

Step 02

Classify the evidence

Each conclusion is marked as official guidance, evidence-based recommendation, DALLEAU project target or a question requiring local validation.

Step 03

Trigger the right specialist

Where the question requires surveying, engineering, geotechnical work, acoustic measurement, water testing, legal review or another regulated conclusion, DALLEAU records and coordinates the appointment rather than claiming the answer.

Step 04

Record the owner decision

The recommendation, unresolved risks, design invariants, responsible parties and accepted conditions enter the Owner’s Control Report before the project advances.

Before concept lock

The baseline can change more than the building position.

Buy, reject or proceed with conditions

Bedroom and quiet-side placement

Open, mixed and closed operating modes

Level and drainage strategy

Service edge and maintenance access

Landscape setbacks and water management

Utility resilience and backup priorities

Specialist appointments

Contingency and unresolved-risk allowances

Release conditions

The project does not move past the site questions by assumption.

HP1

Before a land recommendation

The minimum site evidence is assembled and unresolved red flags are logged. The result is go, conditional go or no-go, not a promise that all future risk has been removed.

HP2

Before concept freeze

The operating-mode map and room risk map are approved. Material conflicts between openness, noise, humidity, rain, privacy and serviceability remain visible.

HP3

Before developed design

The specialist trigger schedule is accepted. Material unknowns have an owner, method and later verification date.

Evidence and outputs

A baseline that can control later decisions.

Outputs

Site observation pack

Photo and event log

Risk heat map

Operating-mode map

Source and uncertainty register

Owner decision memo

Specialist trigger schedule

Baseline entries in the Building Passport

The output is not a certificate. It is a documented basis for the next owner decision and the next specialist appointment.

Who does what

DALLEAU frames the risk. Appointed specialists determine regulated conclusions.

DALLEAU

Defines the owner-side questions, organises the evidence register, conducts structured observations, compares options, maps operating modes and records the decision path.

Appointed specialists

Licensed surveys, engineering calculations, code compliance, geotechnical conclusions, formal acoustic measurement, water testing, environmental assessment and legal or title opinions remain with the relevant appointed party.

Limits

A baseline cannot prove the future.

Future neighbouring development, exact wet-season behaviour, long-term water quality, rare noise events, hidden soil or drainage conditions and actual operating response remain partly unverified until later specialist work, rain events, construction, commissioning or occupation.

Local translation

Bali is not one climate or one operating condition.

Micro-location, elevation, wet-season water routes, driving rain, external humidity, night-time activity, insect pressure, coastal corrosion, power and network stability and local service capability can materially change the project response.

The protocol therefore preserves site-specific questions instead of importing a single tropical formula.

Carried forward

The site decision remains visible after acquisition.

Owner’s Control Report

Land recommendation, principal risks, operating modes, design invariants, specialist triggers, residual risks and owner decisions.

Building Passport

Restricted site records, survey versions, risk map, utility assumptions, water and drainage information, baseline photographs and future verification dates.

POE

Wet-season drainage, external noise events, open versus closed mode use, utility interruptions, landscape maintenance and vacancy performance.

Before the concept is fixed

Bring the site conditions into the owner decision early.

P01 is activated inside the Feasibility Study or Full Development Mandate when the land, concept or existing residence requires a structured tropical baseline.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

Bali climate bulletins Authoritative local data. Current Bali rainfall and seasonal climate context for site review. Limit: A parcel-specific drainage, flood, wind or resilience conclusion.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth. Limit: A universal safe microbial threshold or proof that hidden mould is absent.

Thermal Environmental Conditions for Human Occupancy Authoritative guidance. Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing. Limit: One thermostat setting that guarantees comfort for every person.

Environmental noise guidelines for the European Region Authoritative guidance. Source-specific environmental-noise context and the need to consider night exposure. Limit: A room acoustic specification or direct prediction of an individual sleep outcome.

A site can look right and still be wrong for the intended residence. The land is assessed as an operating environment, not only as a view or address. Observe. Classify. Trigger. Record. The baseline can change more than the building position. The project does not move past the site questions by assumption. A baseline that can control later decisions. DALLEAU frames the risk. Appointed specialists determine regulated conclusions. A baseline cannot prove the future.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## External drainage is part of the residence. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/external-drainage-is-part-of-the-residence/

Atelier / Study Note / Water, envelope and moisture

Atelier · Study Note · Water, envelope and moisture

External drainage is part of the residence.

The residence does not end at the external wall. Ground levels, terraces, planters, retaining walls, pools, channels, roofs, outlets and downstream discharge determine whether rain moves away from occupied rooms or collects beside them.

Owner question

Where does every major water path end, and what happens when the primary drain is partly blocked?

Evidence level

Established site-water principles; capacity and outlets require local design

Application type

Project criteria, specialist scope, hold points and verification

Updated

4 August 2026

Sources

5

On this page

One-sentence thesis

Why the landscape plan is also a water plan

Start with levels

Primary water routes

The downstream question

Primary, secondary and exceedance routes

Common interface failures

Maintenance should be designed, not assumed

What DALLEAU would request during feasibility and design

Hold points

What this note does not prove

Project implication

Sources

System map

Water, envelope and moisture

A native diagram keeps the decision path legible without turning project criteria into a false score.

Roof Terrace Landscape Primary route Exceedance route Safe outlet

Illustrative context

One-sentence thesis

A drain is a component. Drainage is the coordinated route from rainfall to a safe, maintainable and lawful destination.

Why the landscape plan is also a water plan

A visually complete garden can still direct water toward the building. Soil levels rise during planting. roots obstruct outlets. leaves fill channels. later paving changes falls. planter irrigation keeps walls wet. pool overflow and roof discharge are added to the same undersized route.

The owner therefore needs a site-water plan that connects architecture, civil works, landscape, pools, retaining walls and operations.

Start with levels

Small level differences can determine whether water:

crosses a threshold;

sits against a wall;

enters a service room;

drains toward a planter;

collects behind a retaining wall;

reaches an inspection chamber;

escapes safely during an extreme event.

Key levels include:

internal finished floor;

terrace finish;

channel and drain invert;

external ground;

planter soil;

pool overflow;

road and access level;

retaining-wall drainage outlet;

final discharge point.

These should be coordinated before landscape and paving hide the relationship.

Primary water routes

The project may need to manage water from:

roofs and gutters;

terraces and balconies;

courtyards;

driveways and paths;

landscape and irrigation;

pools and overflow systems;

retaining walls and subsoil drainage;

AC condensate;

external showers and wet areas;

neighbouring or upslope land.

Each source has a different flow pattern, contamination risk and maintenance requirement. Combining them without analysis can create surcharge or backflow.

The downstream question

Moving water away from one wall is not enough if the discharge point:

floods another part of the site;

erodes a slope;

affects a neighbour;

overwhelms a roadside drain;

returns toward the building;

discharges onto unstable ground;

remains hidden and inaccessible;

conflicts with local requirements.

The appointed team must verify the lawful and technically appropriate outlet for the actual site.

Primary, secondary and exceedance routes

A useful site-water strategy considers three conditions.

Normal operation

Routine rain is collected and moved through the designed drains, channels and outlets.

Restricted operation

One drain is partly blocked, a chamber is full of leaves or maintenance is late. The site should reveal the problem without immediately sending water into occupied space.

Exceedance

Rainfall or upstream flow exceeds the design assumption. The project needs a safe surface route that limits consequences to people, structure, equipment and neighbouring land.

Not every residence needs complex detention infrastructure. Every residence needs to understand where excess water can go.

Common interface failures

Terrace to interior

External finishes rise during construction. The threshold is reduced. A drain is present but too far from the door. Wind pushes water past the covered area.

Planter to wall

Soil, irrigation and roots remain directly against a sensitive wall. The planter has no verified drainage or overflow route.

Retaining wall

Water pressure builds because drainage is incomplete, clogged or discharged to an uncertain destination.

Roof outlet to ground

A downpipe ends beside the foundation or connects into a blocked underground line with no visible overflow.

Pool and rainwater

Pool overflow, deck water and storm water enter one system without checking capacity or backflow.

Access road and gate

Road runoff enters the property because the gate threshold, channel and external drain were not coordinated.

Maintenance should be designed, not assumed

Ask:

Can staff lift every grate safely?

Is the chamber large enough to clean?

Can a blocked underground line be rodded or flushed?

Are strainers visible?

Does an overflow make failure obvious?

Is the downstream outlet accessible?

Who checks the system before the wet season?

Where are the route and maintenance record stored?

A beautiful slot drain with no clean-out access is not a complete maintenance solution.

What DALLEAU would request during feasibility and design

topographic survey and external levels;

known flood, runoff and upslope conditions;

geotechnical and groundwater inputs where relevant;

roof, terrace, pool, landscape and retaining-wall water sources;

preliminary drainage concept and discharge assumptions;

primary and emergency routes;

maintenance access;

coordination of thresholds and sensitive rooms;

specialist triggers for hydraulic modelling, detention, pumping or slope drainage;

owner decisions on acceptable residual risk and maintenance burden.

Hold points

HP1. Site levels before concept lock

Building platform, access, landscape and discharge relationship reviewed.

HP2. Underground routes before burial

Pipe size, gradient, chambers, connections, outlets and clean-outs inspected and recorded.

HP3. Threshold and channel coordination

Door levels, terrace falls, channel position and finish build-ups verified before installation.

HP4. Landscape before completion

Final soil levels, planters, irrigation, grates and overflow routes checked against the drainage plan.

HP5. Controlled flow test

Selected routes tested under stated conditions. The test should confirm direction, visible blockage response and safe discharge, not simulate an unsafe event.

HP6. Wet-season operational review

Blocked grates, ponding, erosion, backflow, maintenance response and staff records reviewed after real rain.

What this note does not prove

It does not calculate a design storm, size a drain, approve a discharge point or establish flood safety for a specific property. It does not replace civil, hydraulic, geotechnical, landscape, pool or local-authority review. It does not promise that an extreme event will produce no damage.

Project implication

The owner should be able to follow the water from roof, terrace and landscape to a final outlet, understand the secondary route, and know how the system will be cleaned. If that path is invisible in the design record, it will be difficult to control in operation.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Open original record

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continue from the question in front of you

Continue from the question in front of you

Waterproofing is a chain, not a coating. → Slab-on-ground or suspended floor in Bali? → A membrane cannot rescue a flat roof without falls. → After heavy rain: what an owner should check before everything dries. →

Ask where the water ends before approving where the walls begin.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François Explore the Feasibility Study

## A membrane cannot rescue a flat roof without falls. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/flat-roof-falls-drainage-and-membranes/

Atelier / Study Note / Water, envelope and moisture

Atelier · Study Note · Water, envelope and moisture

A membrane cannot rescue a flat roof without falls.

A flat roof succeeds when structure, falls, outlets, emergency drainage, membrane, upstands, penetrations, movement, protection and maintenance are coordinated. More coats cannot compensate for water that has nowhere safe to go.

Owner question

If a primary outlet slows or blocks during heavy rain, where does the water go next?

Evidence level

Established roof-water management principles; system selection remains project-specific

Application type

Project criteria, specialist scope, hold points and verification

Updated

4 August 2026

Sources

5

On this page

One-sentence thesis

“Flat” does not mean level

The roof is a drainage assembly

Why ponding matters

Primary drainage is not enough

The critical details

System families and their limits

What “reinforcement” really means

Hold points before the roof is hidden

Maintenance is part of the roof

What this note does not prove

Project implication

Sources

System map

Water, envelope and moisture

A native diagram keeps the decision path legible without turning project criteria into a false score.

Falls Primary outlet Visible overflow Upstand Safe discharge

Illustrative context

Illustrative comparisons

Drain, tile module and falls

Late intervention

Coordinated before finishes

One-sentence thesis

The roof should move water before asking the waterproofing layer to resist it for prolonged periods.

“Flat” does not mean level

A roof may look flat architecturally while still requiring positive falls to outlets. The finished geometry should avoid unintended low points created by:

structural deflection;

uneven screed;

changes around equipment bases;

parapet and threshold details;

drain flanges installed above the surrounding surface;

later repairs that create dams;

protection layers or tiles that reverse the intended fall.

The design fall and the as-built fall are not always the same. Both need to be checked.

The roof is a drainage assembly

A robust roof strategy coordinates:

structural movement and deflection;

falls and low points;

primary outlets;

emergency overflows or secondary routes where required;

waterproofing system;

upstands and terminations;

penetrations and supports;

protection and finishes;

safe access and maintenance;

testing and seasonal observation.

Treating the membrane as the entire roof system hides the other nine decisions.

Why ponding matters

Temporary water after intense rain is not automatically proof of failure. Persistent ponding is still a warning condition because it can:

reveal poor falls or blocked outlets;

increase exposure time at laps and details;

collect dirt and biological growth;

conceal small defects;

add load;

make maintenance unsafe;

keep protection layers and screeds wet;

complicate repair and diagnosis.

The acceptable drainage behaviour should be defined by the appointed team and verified on the completed roof.

Primary drainage is not enough

A single outlet may work on a clean roof and fail during a storm when leaves, construction debris or a loose strainer restrict flow.

A roof should consider:

more than one drainage point where appropriate;

emergency overflow below the waterproofing termination;

a discharge location that is visible and safe;

no route from overflow into openings, electrical equipment or lower roofs;

accessible baskets and strainers;

the consequence of a blocked downpipe;

whether the downstream system can accept the water.

An overflow is valuable because it limits consequence and makes blockage visible. It does not replace proper primary drainage.

The critical details

Parapets and upstands

The membrane must rise, terminate and be protected in a way compatible with the roof build-up, expected water level and finish. The top of a parapet also needs its own water-shedding detail.

Outlets

The outlet must be integrated into the membrane system, positioned at a true low point and accessible for cleaning. The relationship between flange, membrane, screed and finish needs one coordinated detail.

Penetrations

Pipes, supports, railings, solar equipment, AC services and later fixings create repeated risks. “Seal around it with silicone” is not a complete strategy for a moving, exposed roof.

Construction and movement joints

Movement should be accommodated by a detail and system intended for it. Coating an active joint as if it were static can transfer movement into the membrane.

Door thresholds and roof access

The roof level, waterproofing upstand, access requirement and door detail must be coordinated before the opening is fixed.

System families and their limits

Torch-applied bituminous membranes

They can provide a durable sheet system when substrate, primer, laps, heating, detailing, protection and movement are correctly managed. Failures may relate to wet or contaminated substrates, incomplete bonding, weak laps, poor termination, trapped moisture, movement, puncture or later works. The system should not be dismissed as inherently unsuitable, nor selected by habit alone.

Liquid-applied reinforced systems

They can form continuous details around complex geometry. Performance depends on substrate preparation, cured thickness, reinforcement requirements, curing, UV exposure, standing-water suitability and protection. “Three coats” without a defined dry-film thickness and detail strategy is not a complete specification.

Synthetic sheet membranes

Factory-controlled sheet thickness can be valuable, but seams, corners, penetrations, terminations, protection and installer competence remain critical.

Cementitious systems

They may suit certain protected or rigid mineral substrates. Their ability to accommodate movement, UV, exposure and cracking must be understood. A product used successfully in a bathroom is not automatically the right exposed-roof system.

The appointed roofing or envelope specialist should select the assembly. Public editorial content should remain product-neutral unless a page is explicitly reviewing a documented project system.

What “reinforcement” really means

Some systems require full reinforcement. Others specify reinforcement at:

changes of plane;

joints and cracks;

drains;

penetrations;

corners;

movement-prone substrates.

The right public rule is not “all liquid waterproofing needs fibre everywhere.” It is:

Reinforcement must follow the approved system, substrate and movement strategy, with critical details inspected before closure.

Hold points before the roof is hidden

HP1. Structural and falls review

roof levels;

design falls;

deflection assumptions;

outlets and overflow heights;

equipment and threshold interfaces.

HP2. Substrate release

strength and cleanliness;

moisture condition;

cracks and joints;

coves and fillets;

drain preparation.

HP3. Detail-first mock-up or inspection

parapet;

outlet;

penetration;

threshold;

movement joint;

termination.

HP4. Completed membrane

laps or thickness;

continuity;

terminations;

penetrations;

visible damage;

product batch and application record.

HP5. Drainage and water test

The agreed test should verify drainage behaviour and relevant waterproofing conditions without creating an unsafe or structurally inappropriate load.

HP6. Protection and later works

protection layer;

permitted fixings;

equipment supports;

post-installation inspection;

retest where later trades could have caused damage.

Maintenance is part of the roof

A premium roof still needs:

safe access;

regular cleaning;

inspection before and during the wet season;

records of repairs and penetrations;

visible overflow paths;

clear ownership between staff, operator and specialist contractor.

A roof that cannot be safely inspected is difficult to keep reliable.

What this note does not prove

This note does not size roof drainage, select a membrane, establish a universal minimum fall or determine structural load capacity for a specific project. It does not state that one system family always fails or always succeeds. It does not guarantee a leak-free roof.

Project implication

The owner should receive more than a membrane warranty. The owner should receive the roof geometry, drainage logic, critical details, hold-point evidence, test record, maintenance access and repair history as one connected system.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

S10 ASHRAE Position Document on Limiting Indoor Mold and Dampness in Buildings

ASHRAE

Open original record

S11 Roof drainage and overflow guidance

DALLEAU internal basis

Open original record

Continue from the question in front of you

Continue from the question in front of you

Waterproofing is a chain, not a coating. → Slab-on-ground or suspended floor in Bali? → External drainage is part of the residence. → After heavy rain: what an owner should check before everything dries. →

Start with the water route, then specify the membrane.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François Explore the Feasibility Study

## Moisture control in Bali residences | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/indoor-environment-and-moisture-control/

Atelier / Study Note / Indoor environment and moisture control in Bali residences

Study Note

Indoor environment and moisture control in Bali residences

Bali residences often combine high outdoor humidity, open-air living, split air conditioning, wet rooms, staff cooking, laundry, closed wardrobes, intermittent occupation and long periods of owner absence. Each condition may be manageable on its own. Together they create room-specific risks that cannot be resolved by one purifier, one thermostat or one green dashboard score. This Study Note explains the control hierarchy, the limits of common sensors and the operating modes that need to be designed into a tropical residence. It does not diagnose health or prove the absence of hidden mould.

Evidence at a glance

Evidence level

Established building-science principles with growing sensor evidence and project-specific targets.

Application type

Evidence-based recommendation, DALLEAU project target and site-specific validation.

Published or updated

Updated 29 July 2026

What this did not prove

Readings do not prove healthy air, absence of mould or a medical outcome; targets are not universal health limits.

Sources

7 original records used on this page

One-sentence thesis

A cool room can still be moisture-loaded, under-ventilated or poorly controlled. The right sequence is source control, local extraction, intentional outdoor air, filtration for a defined question, then monitoring and action.

What this note covers

source control and local extraction;

ventilation and the limits of split AC;

humidity, dew point and room-specific moisture risk;

filtration and what it cannot do;

what CO2 can and cannot indicate;

open, mixed, closed and absence modes;

monitoring, maintenance and staff response;

what the evidence does not establish.

Start with the source

Established evidence Evidence-based recommendation

The most effective sequence is usually:

reduce or isolate the source;

extract where the source occurs;

manage outdoor air and moisture;

filter for a defined pollutant question;

monitor trends and act.

This order matters because a sensor can reveal a problem without resolving it. A purifier can reduce particles while leaving humidity, carbon dioxide, cooking gases or hidden wet materials unchanged. Cooling can lower air temperature while the room remains moisture-loaded.

Typical sources in a Bali residence

rain and envelope leakage;

wet construction and incomplete dry-out;

showering and bathing;

indoor drying and laundry;

cooking and combustion;

fragranced cleaning and scenting;

outdoor particles, smoke and dust;

condensate faults;

damp storage and packed wardrobes;

drains and traps during long absence;

unplanned opening during high outdoor dew point.

Split air conditioning is not an outdoor-air strategy

Established evidence Evidence-based recommendation

A typical split AC unit recirculates room air. It may cool and remove some moisture, but it does not by itself provide an intentional supply of outdoor air.

Closed bedrooms, studies, media rooms and staff rooms therefore need a separate answer to the ventilation question. The answer may use natural ventilation when outdoor conditions are favourable, mechanical outdoor air when they are not, or a mixed approach.

The decision should consider:

occupancy;

outdoor humidity and dew point;

outdoor particles and smoke;

rain;

noise;

insects;

privacy and security;

energy and maintenance;

whether the operator can understand and service the system.

Moisture needs room-specific targets

Established evidence DALLEAU project target

There is no credible single humidity number for every room, every season and every operating mode.

For enclosed, mechanically cooled and occupied rooms in Bali, DALLEAU defines project-specific humidity and dew-point operating bands with the appointed building-services and indoor-environment specialists. Persistent departure from those agreed bands should trigger investigation; this page does not present one universal percentage or dew-point threshold for every residence.

These are not universal health thresholds. They are operational warning references used to identify sustained moisture risk, not to condemn every short monsoon excursion.

Why duration matters

A short rise after a shower is different from a wardrobe that remains humid for days. A temporary open-mode condition is different from a closed room that never dries. The response therefore depends on:

duration;

room use;

surface temperature;

airflow;

construction moisture;

proximity to exterior walls or ground;

material sensitivity;

maintenance history.

The high-risk rooms are not always the obvious rooms

Established evidence Bali translation

Bedrooms

Risk from closed doors, recirculated cooling, occupancy, attached wet rooms, low air movement and long night-time exposure.

Walk-in wardrobes and owner storage

Risk from packed storage, perimeter walls, leather, linen, low circulation and long vacancy.

Bathrooms

Risk from steam, slow dry-down, weak extraction, open doors, hidden leakage and traps during absence.

Kitchens

Risk from particles, combustion gases, grease, moisture, staff workflows and extraction without a practical makeup-air path.

Laundry and utility rooms

Risk from wet textiles, internal drying, closed doors, condensate, equipment heat and insufficient extraction.

Staff spaces

Risk from higher occupancy density, simpler systems and under-ventilation that may receive less design attention than owner areas.

Plant rooms, garages and generators

Risk from combustion, water, heat, equipment leakage and pathways that connect technical areas to occupied rooms.

What CO2 can show

Established evidence Instrument limitation

When people are the dominant source and the air is reasonably well mixed, carbon dioxide can support a ventilation question. It can help show whether a closed, occupied room is receiving enough outdoor air for its actual use.

It cannot show whether:

particles are low;

volatile organic compounds are acceptable;

mould is absent;

carbon monoxide or nitrogen dioxide is absent;

a purifier is working;

hidden materials are dry;

occupant symptoms are caused by the room.

A low CO2 reading in a cool room does not prove that the room is moisture-safe. A particle filter can reduce PM2.5 while carbon dioxide continues to rise. A gas-cooking event can complicate the interpretation.

The practical rule is simple: use CO2 as one narrow signal, not as a verdict on air quality.

Filtration answers only the question it was designed to answer

Established evidence Evidence-based recommendation

Sealed and correctly sized fine-particle filtration can reduce indoor particle levels. Its performance depends on:

airflow;

filter class and pressure drop;

installation leakage;

room size;

source strength;

operating time;

outdoor conditions;

replacement and maintenance.

Filtration does not remove moisture. It does not replace kitchen extraction. It does not correct a wet wall. It does not prove that air is “healthy”.

Devices that intentionally generate ozone should not be used in occupied residential spaces.

A Bali residence needs operating modes

Evidence-based recommendation DALLEAU project method

Open mode

Used when outdoor humidity, particles, rain, noise, insects and security allow beneficial opening.

Mixed mode

Selected openings and fans operate while protected rooms or high-risk zones remain controlled.

Closed mode

Outdoor air, filtration, dehumidification and cooling are intentional. Windows and doors do not undermine the system.

Absence mode

The residence protects enclosed rooms, wardrobes, drains, leaks, critical assets and data while the owner is away.

Extreme-weather or disruption mode

The residence responds to heavy rain, smoke, power interruption, equipment fault or network loss with understandable fallback actions.

A mode is only useful if the staff can recognise it, activate it and know what to do when conditions drift.

What DALLEAU would verify

DALLEAU project method Site-specific finding after testing

room-by-room source and moisture risk map;

outdoor-air strategy for protected rooms;

kitchen, bathroom and laundry extraction;

makeup-air paths;

condensate routes and cleanability;

filter access, seals and replacement path;

wardrobe and storage circulation;

leak detection and escalation;

absence-mode sequence;

sensor type, location, interval and limitations;

staff response to sustained drift;

wet-season and drier-season questions.

Evidence may include airflow checks, dry-down trends, temperature and relative-humidity records, dew-point review, particle trends, CO2 trends where relevant, leakage inspection, filter records, condensate inspection, staff training and corrective-action logs.

What the evidence did not prove

The evidence does not establish that:

a sensor proves healthy air;

a low CO2 value proves low particles, VOCs or mould risk;

a purifier replaces ventilation or source control;

a cool room is moisture-safe;

one humidity number fits every room and mode;

a short monitoring period proves long-term seasonal performance;

the absence of visible mould proves the absence of hidden moisture;

an environmental reading diagnoses a medical condition.

Unresolved questions

Which operating targets are realistic for coastal, lowland and upland Bali sites without excessive energy or maintenance burden?

How should sensor accuracy be handled during very high humidity?

Which wardrobe and lock-up strategies remain reliable through long owner absence?

What outdoor-air strategy best balances humidity, particles, noise, insects and energy for each micro-location?

Which staff alerts lead to useful action rather than alarm fatigue?

How should wet-season commissioning differ from opening tests conducted in a drier period?

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

WHO global air quality guidelines Authoritative guidance. Ambient pollutant benchmarks used as exposure context. Limit: A complete indoor residential specification or proof that an indoor environment is healthy.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth. Limit: A universal safe microbial threshold or proof that hidden mould is absent.

WHO guidelines for indoor air quality: selected pollutants Authoritative guidance. Pollutant-specific health context and source-control considerations. Limit: A complete residential specification or a single sensor score for indoor air quality.

ASHRAE position document on limiting indoor mold and dampness in buildings Authoritative guidance. Building moisture control and dampness prevention principles. Limit: A universal Bali project threshold or proof that a building is mould-free.

ASHRAE position document on indoor carbon dioxide Authoritative guidance. Use of indoor CO₂ as a limited ventilation indicator in context. Limit: Treating CO₂ as a complete indoor-air-quality or health score.

Low-cost air pollution monitors and indoor air quality Authoritative guidance. Capabilities and practical limits of lower-cost indoor monitors. Limit: Regulatory-grade accuracy, diagnosis or complete pollutant coverage.

Enhanced Air Sensor Guidebook Authoritative guidance. Planning, selecting and interpreting air-sensor measurements. Limit: Replacing calibrated professional instruments or inferring a medical outcome.

Related content

Theme: Indoor environment and moisture

Protocol: Indoor Environment and Moisture Control Protocol

Methods Note: How DALLEAU reads evidence for private residences in Bali

Methods Note: Why commissioning matters more than handover

Closing

Control the cause before interpreting the sensor

DALLEAU Atelier carries moisture and indoor-environment questions through the brief, MEP coordination, maintenance access, operating modes, commissioning and seasonal review.

Start with the source Split air conditioning is not an outdoor-air strategy Moisture needs room-specific targets The high-risk rooms are not always the obvious rooms What CO2 can show Filtration answers only the question it was designed to answer A Bali residence needs operating modes What DALLEAU would verify

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Intelligent residences without internet | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/intelligent-residence-without-internet/

Atelier / Study Note / What an intelligent residence should still do when the internet fails

Study Note

What an intelligent residence should still do when the internet fails

AI can help predict, prioritise and explain bounded tasks. It should not become the only path to lighting, cooling, humidity control, leak protection, access or power recovery. This Study Note separates reliable local control from optional cloud and AI services. It also explains the privacy and lifecycle questions that should be answered before procurement.

Evidence at a glance

Evidence level

Established resilience/security principles with project method and evolving technology guidance.

Application type

Evidence-based recommendation, privacy-by-design and project-specific controls requirements.

Published or updated

Updated 29 July 2026

What this did not prove

The design cannot prove an unhackable, autonomous or universally private residence or reliable inference about a person.

Sources

3 original records used on this page

One-sentence thesis

The most valuable intelligent residence is not the one with the most automation. It is the one whose critical functions remain local, understandable, manually overridable, documented and safe when the cloud, internet or vendor is unavailable.

What this note covers

critical functions that should remain local;

deterministic control and optional AI layers;

manual override and safe failure;

account ownership and vendor exit;

bounded AI use cases;

privacy and staff dignity;

commissioning during outage, restart and cloud loss;

what current systems do not reliably understand.

Intelligence should sit above a reliable control spine

Established system practice Evidence-based recommendation

A serious residence separates five layers.

1. Protection layer

Hard safety and protection logic such as electrical protection, leak isolation, fire and life-safety systems, equipment interlocks and critical alarms.

2. Local control layer

Deterministic functions such as essential lighting, basic HVAC, humidity control, shades, pumps, valves, gates and core scenes.

3. Supervisory layer

Local dashboards, schedules, alarms, trend logs and cross-system coordination.

4. Intelligence layer

Prediction, optimisation, recommendations, fault prioritisation and natural-language assistance where the use case is bounded and reversible.

5. Human and operating layer

Owner decisions, staff routines, maintenance, manual override, escalation and documented responsibility.

The design principle is:

AI may recommend, schedule and prioritise. Deterministic logic protects, enforces and fails safe.

What should remain useful without cloud access

Established cybersecurity and resilience principle Evidence-based recommendation

At minimum, the residence should retain local access to:

essential lighting and basic scenes;

primary HVAC control;

humidity and dehumidification control;

leak detection and defined shutoff logic;

essential access and gate operation;

critical technical alarms;

backup-power and generator logic;

manual controls for water, air, lighting and access;

safe restart after power interruption;

local operating information for staff.

Cloud reporting, remote access and AI recommendations can add value. They should not be the only path to a safe or usable building.

Manual override is part of the design

Established system practice DALLEAU project target

Manual override should be:

physically available;

clearly labelled;

easy to explain;

protected against accidental misuse where necessary;

documented in the Building Passport;

tested during commissioning;

included in owner and staff training.

A manual control hidden in a technical cabinet, known only to one integrator, is not a credible fallback.

The owner needs custody, not only access

Established governance principle Evidence-based recommendation

Before procurement, the project should define:

who owns the main accounts;

who controls administrator rights;

how staff access differs from owner access;

how vendors receive temporary access;

what data can be exported;

where backups are stored;

what happens if the integrator changes;

what happens if a subscription ends;

which functions depend on a proprietary cloud;

how firmware, licences and replacement parts will be managed.

A polished app is not an asset-management plan.

Bounded AI use cases can be useful

Growing evidence Pilot-ready under controls

Arrival preparation

Use a confirmed arrival window to prepare protected rooms, water systems and selected services without operating the whole residence at full output for unnecessary periods.

Fault detection and maintenance

Use runtime, temperature, pressure, flow or alarm histories to identify abnormal behaviour and prioritise inspection.

Leak and water response

Use deterministic local shutoff logic for protection, with AI or analytics limited to pattern detection and escalation.

Energy and backup coordination

Use forecasts and load history to recommend or schedule bounded actions while protecting critical circuits through fixed priorities.

Staff workflow support

Turn alarms and asset records into room-readiness checks or work orders without building person-level surveillance histories.

Owner reporting

Summarise system conditions, unresolved faults and maintenance status using structured source data that remains inspectable.

These use cases are credible only when the residence has good sensing, metadata, commissioning and operating discipline. AI cannot repair missing point lists, undocumented valves or bad installation.

Privacy should be designed into the architecture

Established privacy principle Legal-privacy review required

The Atelier method defaults to:

purpose limitation;

data minimisation;

local processing;

role-based access;

short retention where detailed data are unnecessary;

early aggregation;

owner export and deletion rights;

visible staff and guest information;

no hidden behavioural inference.

DALLEAU’s Atelier method excludes:

microphones as ambient residential monitoring;

indoor cameras as routine intelligence inputs;

biometric templates;

wearables as required project evidence;

emotion inference;

health inference;

person-level behavioural profiling.

A private residence contains owners, family, guests, staff and contractors. One owner approval does not automatically resolve every other person’s privacy and dignity.

Commission failure, not only the ideal scene

Established commissioning principle DALLEAU project method

The system should be tested during:

loss of internet;

loss of cloud service;

local network interruption;

controller restart;

power interruption and restoration;

failed sensor;

unavailable vendor account;

manual bypass;

staff role change;

owner account transfer;

backup restoration.

The test should record what continues, what stops, what fails safe, what needs human action and how the system explains its state.

What the evidence did not prove

The evidence does not establish that:

a residence can understand the family’s intentions in a general human sense;

AI can safely control every critical function without deterministic limits;

one interoperability standard solves every integration and lifecycle problem;

a cloud service will remain available throughout the life of the building;

an automated recommendation is appropriate for every guest or staff member;

more sensors produce better decisions;

cameras, microphones or behavioural inference are necessary for an intelligent residence;

“future-proof” is a credible guarantee.

Unresolved questions

Which open protocols and vendors will remain supportable in Bali over ten or more years?

What level of local spare parts and integrator response is realistic for each system?

Which AI recommendations create measurable operating value without excessive data collection?

How should account succession work for family offices, trusts and changing operators?

Which room-level occupancy signals are useful without becoming person-level surveillance?

How should system explanations be preserved when different vendors supply different layers?

What should the residence do when an AI recommendation conflicts with a recent human override?

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

Cyber Security for Consumer Internet of Things: Baseline Requirements Authoritative guidance. A consumer-IoT cybersecurity baseline for product and system requirements. Limit: A claim that a residence is unhackable or legally compliant in every jurisdiction.

IoT Device Cybersecurity Capability Core Baseline Authoritative guidance. A starting set of device cybersecurity capabilities for IoT acquisition and integration. Limit: A complete project threat model, legal advice or a guarantee of security.

NIST Privacy Framework: A Tool for Improving Privacy through Enterprise Risk Management Authoritative guidance. A voluntary framework for identifying and managing privacy risk. Limit: Jurisdiction-specific legal compliance or a complete residential data-governance plan.

Related content

Theme: Intelligent residences and local-first control

Protocol: Intelligent Residence Readiness Review

Protocol: Building Passport and Data Stewardship Plan

Methods Note: Why commissioning matters more than handover

Closing

Build intelligence around control, not dependency

DALLEAU Atelier frames use cases, local fallbacks, manual control, data boundaries, commissioning and asset memory before technology procurement hardens.

Intelligence should sit above a reliable control spine What should remain useful without cloud access Manual override is part of the design The owner needs custody, not only access Bounded AI use cases can be useful Privacy should be designed into the architecture Commission failure, not only the ideal scene What the evidence did not prove

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Light by day, darkness by night | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/light-by-day-darkness-by-night/

Atelier / Study Note / Light by day, darkness by night

Study Note

Light by day, darkness by night

Light reaches the eye at different times, intensities, directions and spectra. Those variables matter together. A residence that looks warm in the evening can still be bright at eye level. A bedroom with the lights switched off can still receive light from the bathroom, terrace, garden, corridor, control panels and charging devices. This Study Note explains what current guidance and human research can reasonably contribute to a residential brief. It does not claim that a lighting scheme treats insomnia, fixes jet lag or produces the same response in every person.

Evidence at a glance

Evidence level

Established evidence with local and individual qualifications; reference values remain bounded by population, routine, measurement method and project context.

Application type

Evidence-based recommendation; reference values support briefing and commissioning, not universal promises.

Published or updated

Updated 29 July 2026

What this did not prove

The evidence does not prove treatment of insomnia or a sleep, mood, cognitive or health outcome.

Sources

6 original records used on this page

One-sentence thesis

The strongest residential lighting strategy is not one colour temperature or one automated scene. It is a sequence: enough light by day, a deliberate reduction in the final hours before bed, and darkness during sleep.

What this note covers

daytime light and the eye-level exposure question;

the evening reduction before sleep;

darkness and light leakage during the sleep period;

why warm colour temperature is not enough;

how the question changes in a Bali residence;

what should be checked in a mock-up and during commissioning;

what the evidence does not establish.

The central finding

Established evidence Evidence-based recommendation

For day-active adults, the evidence converges on a simple pattern: brighter days, dimmer evenings and darker nights.

The detail matters. Human responses to light depend on timing, intensity, duration, spectrum, direction and prior light exposure. A fixture schedule that records watts, colour temperature and horizontal lux does not fully describe what reaches the eye.

A useful brief therefore starts with a 24-hour sequence rather than a list of decorative scenes.

Daylight is not only a window question

Established evidence Evidence-based recommendation

The first design question is whether occupants can receive useful morning and daytime light without unacceptable glare, heat gain or loss of privacy.

In a residence, that depends on more than glazing area. It depends on:

orientation;

exterior shading;

room depth;

view direction;

where people actually sit, eat and work;

whether the eyes face the bright part of the room;

whether curtains remain closed because of glare, heat or privacy;

whether the daily routine includes a terrace, garden or outdoor breakfast area.

Current consensus recommendations for healthy adults on regular daytime schedules use about 250 lux melanopic equivalent daylight illuminance at the eye during the day as a minimum reference point. This is not a universal threshold and it is not a guarantee of a sleep or health outcome. It is a useful briefing and measurement reference when the room, user and specialist review justify it.

Residential implication

A bright floor does not prove useful eye-level exposure. A large west-facing window may provide plenty of light while creating heat and glare that cause the blinds to remain closed. A shaded breakfast terrace may be more useful than a brighter-looking interior photograph.

The relevant question is not simply, “Does the room have daylight?” It is, “What light reaches the occupant’s eyes, at what time, in the places where the daily routine actually happens?”

Evening light needs a deliberate taper

Established evidence Evidence-based recommendation

The final hours before sleep should not reproduce the intensity and direct visual brightness of the daytime environment.

Consensus recommendations use about 10 lux melanopic equivalent daylight illuminance at the eye as a maximum reference during the three hours before bed for healthy adults on regular schedules. Again, this is a design reference, not a person-level promise.

The practical issue is often not one ceiling light. It is the accumulation of:

bright downlights;

illuminated mirrors;

decorative pendants in direct view;

television and device screens;

bright dressing-room light;

bathroom spill;

terrace and garden lighting;

control-panel indicators;

staff reset scenes that return every circuit to full output.

A useful evening scene reduces the total visual load. It limits direct-view brightness, keeps task light local, preserves safe movement and returns automatically to a quieter state after temporary use.

Darkness is a measurable design condition

Established evidence Evidence-based recommendation

“Lights off” is not the same as darkness.

The sleep-period reference in current consensus is about 1 lux melanopic equivalent daylight illuminance or less at the eye , with only temporary local exceptions for unavoidable visual tasks.

In a real bedroom, darkness should be checked from the pillow position with the residence in its actual night mode. That means:

blackout closed as staff or occupants will actually close it;

bathroom and dressing-room doors in realistic positions;

corridor and landscape lighting active;

all equipment and charger indicators present;

air conditioning and control panels running;

exterior neighbours and road sources considered where visible.

A small source in direct view may be more disturbing than a larger source hidden below the sightline. The check therefore needs both a measurement and a visual inspection.

What to inspect

top, side and bottom blackout leakage;

curtain overlap and track geometry;

light around door frames;

bathroom mirror and vanity spill;

terrace and pool reflections;

garden uplights visible from bed;

smoke detector, router, television and charger indicators;

low-level navigation light and its automatic timeout;

power-recovery behaviour after an outage.

Warm light is not automatically quiet light

Established evidence Research translation

Colour temperature describes visual appearance. It does not fully describe the spectrum, melanopic content, eye-level intensity, duration or direct-view brightness of a source.

Two light sources can both be labelled 2700 K and still produce materially different conditions at the eye. A very bright warm source can remain inappropriate late at night. A lower-output source with better direction and control may create a much quieter condition.

This is why DALLEAU does not treat “warm light” or “tunable white” as a complete circadian strategy. The brief still has to resolve:

timing;

eye-level exposure;

spectrum where relevant;

dimming depth;

direct view;

scene duration;

blackout;

exterior spill;

manual override;

staff operation.

The Bali translation

Established evidence Site-specific validation required

Bali changes the execution, not the underlying sequence.

Morning light is relatively available throughout the year, but the residence may still block it through deep roofs, dense planting, privacy screens or closed curtains. Evening and night conditions can be harder because indoor and outdoor space are closely connected.

Relevant local variables include:

early sunrise and outdoor routines;

heat gain that encourages occupants to close shading;

open-air circulation beside protected bedrooms;

terrace, pool and landscape lighting;

neighbouring villas and road light;

staff turnover and inconsistent room reset;

power interruption and scene recovery;

bathroom humidity that keeps doors open after use;

insect-control lighting and exterior security requirements.

The project answer is usually a coordinated set of modes, not one permanent setting:

wake and morning;

daytime;

late afternoon;

evening;

sleep;

night-time movement;

staff reset;

outage recovery.

What DALLEAU would verify

DALLEAU project method Site-specific finding after testing

Define the intended day, evening, night and wake modes.

Review orientation, shading and exterior-light relationships.

Confirm fixture, driver, dimming and control assumptions.

Build or stage the critical bedroom condition at useful scale.

Test minimum levels, direct view, glare and leakage at night.

Verify blackout edges, bathroom spill and exterior spill.

Test manual override, outage recovery and staff reset.

Record the accepted result, deviations and unresolved seasonal questions.

The evidence record may include:

annotated light sequence;

eye-plane and pillow-zone measurements where required;

blackout and leakage checklist;

fixture and driver confirmations;

scene and dimming test records;

mock-up photographs;

commissioning exceptions;

Building Passport entries;

30-day or seasonal observations when included.

What the evidence did not prove

The evidence does not establish that:

one lighting scene works for every person;

warm light is automatically appropriate in the evening;

tunable white automatically creates circadian lighting;

a residence treats insomnia or jet lag;

a measured light condition proves a sleep, mood or cognitive outcome;

one short commissioning test predicts every future season, user or operating routine.

A project can document the environment it created and the way it was tested. It cannot infer a medical result from those conditions alone.

Unresolved questions

How should reference values be adjusted for children, older adults, extreme chronotypes and people arriving after long-haul travel?

How much does a typical open-air Bali daily routine change evening sensitivity compared with a dim indoor day?

Which blackout details remain robust after repeated staff operation, cleaning and material movement?

How should exterior security and insect-control lighting be balanced with protected bedroom darkness?

Which low-cost field instruments are sufficiently reliable for recurring project use after specialist comparison?

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Established evidence. The measurement quantities and metrics used to describe stimulation of the five retinal photoreceptor types. Limit: A complete lighting application, a health treatment or prediction of a person-level outcome.

What to document and report in studies of ipRGC-influenced responses to light Authoritative guidance. A reporting template for stimulus conditions and use of the CIE S 026 measurement system. Limit: An efficacy claim or a universal residential target.

Recommendations for daytime, evening, and nighttime indoor light exposure to best support physiology, sleep, and wakefulness in healthy adults Established evidence. Consensus reference values for healthy adults aged 18–55 on regular daytime schedules. Limit: A universal prescription for every age, health condition, routine or residence.

Melanopic illuminance defines the magnitude of human circadian light responses under a wide range of conditions Growing evidence. Melanopic illuminance as a strong predictor across pooled laboratory datasets of circadian light responses. Limit: A complete residential outcome or a claim that one light metric replaces the full design brief.

CIE Position Statement on Integrative Lighting — Recommending Proper Light at the Proper Time, 3rd Edition Authoritative guidance. Use of CIE S 026 metrics and a daily pattern of more light by day, less before bed and near-darkness during sleep. Limit: A treatment promise or an unqualified target for every population.

Melanopic irradiance defines the impact of evening display light on sleep latency, melatonin and alertness Emerging research. A controlled display-light experiment in 72 healthy males aged 18–35 under specific pre-bed conditions. Limit: A long-term residential outcome, a general population effect or a universal design threshold.

Related content

Theme: Light and sleep

Protocol: Protected Bedroom Performance Protocol

Methods Note: How DALLEAU reads evidence for private residences in Bali

Methods Note: Why commissioning matters more than handover

Closing

Bring the full day and night sequence into the brief

DALLEAU Atelier carries the light question through the owner brief, specialist scope, mock-up, controls, commissioning and operating record.

The central finding Daylight is not only a window question Evening light needs a deliberate taper Darkness is a measurable design condition Warm light is not automatically quiet light The Bali translation What DALLEAU would verify What the evidence did not prove

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Slab-on-ground or suspended floor in Bali? | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/slab-on-ground-or-suspended-floor-in-bali/

Atelier / Study Note / Water, envelope and moisture

Atelier · Study Note · Water, envelope and moisture

Slab-on-ground or suspended floor in Bali?

Separating the ground floor from the soil can be useful, but a ventilated void is not automatically drier in a hot-humid climate. The right floor system depends on ground conditions, groundwater, flood pathways, fill, structure, maintenance and indoor operation.

Owner question

Should the residence sit on a prepared ground-bearing slab, a controlled technical void, or an elevated structure?

Evidence level

Established principles. The appropriate system remains site-specific.

Application type

Project criteria, specialist scope, hold points and verification

Updated

4 August 2026

Sources

6

On this page

One-sentence thesis

What owners often see

Four different questions are often confused

Option one: a premium slab-on-ground

Option two: a suspended floor over a closed technical void

Option three: an elevated building with an open undercroft

Why a ventilated crawlspace can fail in Bali

Soil and groundwater come first

Decision framework

Hold points

What this note does not prove

Project implication

Sources

System map

Water, envelope and moisture

A native diagram keeps the decision path legible without turning project criteria into a false score.

Slab-on-ground Closed technical void Open elevated system Soil + water + structure + operation decide

One-sentence thesis

The decision should follow a geotechnical and water-risk baseline. It should not be copied from local habit or from a temperate-climate detail.

What owners often see

Many Bali projects use foundations or ground beams for the main structure and a separate ground-floor slab supported by fill inside the building footprint. The system can be rational. It is also vulnerable when the fill, compaction, drainage, capillary break, under-slab membrane and wall interfaces are treated as invisible minor works.

A slab is not inherently defective because it contacts a prepared sub-base. The concern begins when “slab on ground” means concrete placed over uncontrolled clay or heterogeneous fill with no documented moisture strategy.

Four different questions are often confused

Structural support

What carries the building and what carries the floor? The foundations, columns and beams may carry the building while the ground-bearing slab transfers floor loads into prepared fill.

Ground movement

Will clay, fill or soft material shrink, swell or settle differentially? A moisture membrane does not solve settlement.

Ground moisture

How are liquid water and water vapour interrupted before reaching the slab, walls and finishes?

Flood and surface-water exposure

What happens when external water rises above the assumed level or when drainage cannot discharge?

These questions can lead to different answers. One detail cannot solve all four.

Option one: a premium slab-on-ground

A well-designed slab-on-ground may be appropriate where the site is stable, sufficiently elevated, drainable and outside an unacceptable flood condition.

A project-specific build-up may include:

```text Final floor finish Compatible screed or adhesive system Reinforced concrete slab Continuous low-permeance vapour retarder Granular capillary break / drainage layer Engineered and tested fill Prepared natural ground ```

The exact sequence is determined by the structural, geotechnical and flooring strategy. The critical point is that the floor is not treated as concrete directly cast onto visually levelled soil.

What needs to be verified

removal of organic and unsuitable material;

fill source and grading;

layer thickness and compaction testing;

final platform level;

drainage and groundwater assumptions;

granular layer without excessive fines where specified;

membrane type, laps and penetrations;

continuity at ground beams and walls;

capillary break under masonry where required;

joints and crack control;

embedded services and future repair risk;

concrete curing and moisture condition before sensitive finishes.

Strengths

simple and familiar construction;

limited hidden volume;

comparatively straightforward pest control;

potentially efficient structure and cost;

robust when the platform and moisture layers are controlled.

Risks

concealed poor fill or compaction;

moisture bypass at walls and penetrations;

difficult repair of embedded drainage or plumbing;

differential movement between structure and slab;

flooring failure if moisture-sensitive finishes are installed too early.

Option two: a suspended floor over a closed technical void

A suspended floor can separate the occupied floor from fill and retain access to services. In a hot-humid climate, the void should not be assumed dry merely because air can enter it.

Outdoor air at high humidity may condense on cooler surfaces, pipes or the underside of an air-conditioned floor. The ground under the void continues to release moisture. A successful technical void may therefore require:

continuous ground vapour barrier;

sealed wall and penetration interfaces;

drainage to a safe point;

controlled ventilation or dehumidification strategy;

leak detection;

safe access and lighting;

termite and pest strategy;

maintainable clear height;

corrosion-resistant services;

understanding of power-failure behaviour.

A 600 mm void may separate the slab from the ground but remain difficult to inspect and repair. If access and maintainability are part of the reason for choosing the system, the section should be sized and planned as a real technical space.

Strengths

physical separation from fill;

potential access to services;

easier future alteration of some systems;

reduced dependence on deep internal fill;

useful on certain moving or uneven sites when structurally designed.

Risks

humid hidden environment;

condensation and corrosion;

pests and insects;

water accumulation after leaks or flooding;

added structure, cost and maintenance;

false confidence from passive ventilation alone.

Option three: an elevated building with an open undercroft

On sloping, flood-prone or environmentally sensitive sites, an elevated structure may reduce major earthworks and allow water or air to pass beneath the occupied floor.

This is not simply a taller crawlspace. It is an architectural and structural system requiring:

geotechnical and foundation design;

lateral and seismic stability;

corrosion and durability strategy;

safe routes for services;

security and pest control;

landscape and water-flow coordination;

appropriate treatment of the visible undercroft.

It may be more rational than creating a shallow enclosed void that can fill with water.

Why a ventilated crawlspace can fail in Bali

The intuitive model is that ventilation removes moisture. In a hot-humid climate, ventilation can also import moisture.

Potential sequence:

outdoor air enters the void;

the occupied floor above is cooled;

the underside or services remain below the outdoor dew point;

water condenses on surfaces;

timber, insulation, metal and stored dust remain damp;

the condition is hidden from normal housekeeping.

The response is not to seal every void without analysis. It is to design the operating mode explicitly rather than rely on a few wall openings.

Soil and groundwater come first

The phrase “Bali clay” is not a design parameter.

The project needs to understand:

whether the soil is natural or filled;

soil layers and depth;

bearing and settlement behaviour;

shrink-swell potential;

groundwater and seasonal fluctuation;

surface-water routes;

slope and retaining conditions;

excavation and fill quantities;

nearby drainage and development changes.

Indonesian geotechnical design requirements call for sufficient investigation and groundwater interpretation. The investigation scope must be set by the appointed geotechnical and structural team for the actual project.

Decision framework

A slab-on-ground is more likely to be appropriate when

the ground is stable and well understood;

the site can be elevated and drained;

fill depth is controlled;

flooding is not an unacceptable design condition;

under-slab services are limited or well planned;

a continuous capillary and vapour strategy can be executed and inspected.

A closed technical void is more likely to be considered when

service access has genuine life-cycle value;

deep fill would otherwise be required;

ground movement or site geometry favours a suspended structure;

the void can be drained, accessed, monitored and controlled;

the owner accepts the added operational responsibility.

An elevated open system is more likely to be considered when

flood pathways need to remain open;

topography favours minimal ground contact;

major filling would be harmful or unstable;

the architectural and structural design can use the elevation coherently.

Hold points

Geotechnical baseline before concept lock Ground, groundwater, fill, slope and movement reviewed.

Platform and drainage release Levels, outlet routes and external water strategy approved.

Fill and compaction Material, layer thickness and density testing recorded.

Capillary break and vapour retarder Product, continuity, penetrations and wall interfaces photographed before concrete.

Embedded services Routes, testing, access and future repair consequences recorded.

Before finishes Concrete cure and moisture condition checked against the specified finish system.

Wet-season review Ground floor, lower walls, wardrobes, joints, drains and external levels observed during operation.

What this note does not prove

It does not recommend one foundation or floor system for every Bali residence. It does not determine whether a specific clay is expansive or stable. It does not replace geotechnical, structural, flood, termite, flooring or building-science design. It does not imply that a crawlspace is inherently dry or that a slab-on-ground is inherently damp.

Project implication

The premium decision is not the most expensive floor. It is the floor system whose soil, water, structure, services and maintenance assumptions remain visible before the project becomes expensive to change.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Open original record

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Open original record

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Open original record

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

Continue from the question in front of you

Continue from the question in front of you

Waterproofing is a chain, not a coating. → A membrane cannot rescue a flat roof without falls. → External drainage is part of the residence. → After heavy rain: what an owner should check before everything dries. →

Decide the relationship with the ground before the architecture is fixed.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François Explore the Feasibility Study

## Thermal comfort beyond one setpoint | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/thermal-comfort-is-not-one-thermostat-number/

Atelier / Study Note / Thermal comfort is not one thermostat number

Study Note

Thermal comfort is not one thermostat number

Two rooms can show the same air temperature and feel entirely different. One may receive afternoon sun, radiate heat from the roof, hold more moisture or deliver an uncomfortable cold jet at the bed. The other may be shaded, quiet and gently moved by a ceiling fan. This Study Note explains why Bali residences need a mode-based comfort strategy rather than one universal setpoint. It does not promise comfort for every person or claim that a lower temperature automatically improves sleep.

Evidence at a glance

Evidence level

Established thermal principles with growing field evidence and project-specific translation.

Application type

Evidence-based recommendation and project-specific comfort strategy.

Published or updated

Updated 29 July 2026

What this did not prove

A temperature target does not guarantee comfort, sleep, health, productivity or energy performance.

Sources

3 original records used on this page

One-sentence thesis

Comfort is produced by air temperature, radiant temperature, humidity, air movement, activity, clothing, bedding, expectation and control. A thermostat can measure only part of that system.

What this note covers

the variables a thermostat cannot see;

radiant heat and solar load;

air movement and ceiling fans;

humidity, dew point and latent load;

personal control and adaptive comfort;

why bedrooms require a separate night strategy;

open, fan-first, closed, arrival and absence modes;

what should be tested before release.

The thermostat sees air temperature, not the whole room

Established evidence Official standard and evidence-based recommendation

Current thermal-comfort standards treat comfort as a relationship between:

air temperature;

mean radiant temperature;

humidity;

air speed;

activity;

clothing;

local discomfort;

occupant expectations and adaptation.

In a residence, bedding, direct sun, hot surfaces, fan use, open doors, wet-season humidity and individual control make the system even more variable.

This is why DALLEAU does not define comfort through one thermostat number across every room, user and operating mode.

Radiant load comes before aggressive cooling

Established evidence Evidence-based recommendation

A person near a hot roof, warm wall or sunlit window can feel significantly warmer than the room thermostat suggests. The first question is therefore whether the room is hot because of the air or because of radiation from its surfaces.

Relevant design decisions include:

external shading;

roof insulation and ventilation;

solar-control glazing where justified;

west-facing exposure;

reflected heat from hardscape and pool surrounds;

furniture placement;

tree and landscape shading;

thermal mass and night-time release;

whether the occupant sits or sleeps in a direct solar patch.

Reducing radiant load can improve comfort before additional cooling capacity is added.

Air movement is one of the strongest tropical tools

Established evidence Evidence-based recommendation

Ceiling fans and local air movement can expand the range of conditions people find acceptable in warm climates. They can also allow higher air-conditioning setpoints in suitable rooms and conditions.

The benefit depends on:

humidity;

fan diameter and speed;

blade height;

room geometry;

furniture position;

noise;

where the air reaches the body;

whether the occupant controls it.

“Fan-first” can be a strong operating principle. “Fan-only” is not a universal rule.

During high indoor dew point, heavy rain infiltration or a protected bedroom night condition, air movement may improve sensation without solving the moisture load. The fan and the latent-control strategy must therefore be coordinated.

Humidity changes both comfort and building risk

Established evidence Bali translation

Warm humid air limits evaporative heat loss and can make a room feel muggy even when the air temperature is not extreme. Deep cooling can lower the thermostat reading while introducing cold surfaces, draught and condensation risk.

The design needs to distinguish:

sensible cooling, which lowers temperature;

latent control, which removes moisture;

air movement, which changes heat exchange and sensation;

radiant control, which reduces heat received from surfaces and sun.

A thermostat alone cannot resolve that distinction.

Personal control is part of comfort

Established evidence Evidence-based recommendation

People differ. Age, acclimatisation, clothing, activity, health status, expectation and preference all change the response.

A residence should therefore provide simple, local and understandable choices rather than impose one central condition. Useful control may include:

room zoning;

ceiling-fan control;

shading;

operable openings where conditions allow;

gentle bedroom airflow options;

clear mode selection;

manual override;

staff defaults that do not erase owner preferences;

power-recovery behaviour that returns to a safe, understandable state.

Control loses value when the interface is confusing or when occupants do not know what the system is doing.

Bedrooms are the exception that deserves its own brief

Established evidence Evidence-based recommendation

Night-time comfort differs from daytime comfort because:

metabolic activity is lower;

bedding changes insulation;

air movement on the face or neck can become uncomfortable;

AC noise and cycling become more salient;

the room remains occupied for long, continuous periods;

attached bathrooms add moisture;

occupants are less willing to operate complex controls at night.

A protected bedroom brief should consider:

radiant load at the bed;

stable humidity;

gentle, even air movement;

AC discharge direction;

fan sound and wobble;

compressor and condensate noise;

bedding assumptions;

manual controls within reach;

night and outage recovery modes.

Lowering the setpoint is not a substitute for coordinating those variables.

A Bali residence needs several comfort modes

Evidence-based recommendation DALLEAU project method

Open comfort mode

Used when outdoor heat, humidity, rain, particles, insects and noise permit useful opening.

Fan-first mode

Shade and air movement provide comfort before mechanical cooling is increased.

Closed comfort mode

Cooling, moisture control and outdoor air operate intentionally with doors and windows coordinated.

Night bedroom mode

Noise, humidity, airflow, radiant load and control simplicity take priority.

Arrival mode

The residence is prepared before occupancy without running every room at full output for unnecessary periods.

Absence mode

The building protects moisture-sensitive rooms, equipment and assets while avoiding a false assumption that an unoccupied tropical house needs no environmental control.

What DALLEAU would verify

DALLEAU project method Site-specific finding after testing

late-afternoon solar-patch and surface-temperature review;

occupied-zone air-movement map at beds, sofas and desks;

AC discharge direction and local draught;

fan sound, balance and speed steps;

temperature, relative humidity and dew-point trends;

open-to-closed switchover logic;

night bedroom test;

pre-arrival sequence;

rainy-season vacancy behaviour;

manual override and power recovery;

staff understanding of mode selection.

What the evidence did not prove

The evidence does not establish that:

one temperature is comfortable for everyone;

a cooler setpoint guarantees better sleep;

a fan always replaces dehumidification or AC;

a thermostat reading describes radiant load, humidity or local draught;

a short test predicts every season and user;

adaptive comfort means every hot condition is acceptable;

automation can infer the ideal personal condition without error.

Unresolved questions

What comfort bands should be used for owners, guests and staff with different acclimatisation and expectations?

How should Bali coastal, lowland and upland projects differ?

Which fan and AC combinations remain quiet and even at actual bed positions?

How should pre-arrival conditioning balance readiness, energy and moisture protection?

What should the default mode be after a power interruption?

Which measurements are useful enough for recurring POE without overwhelming the operating team?

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

Thermal Environmental Conditions for Human Occupancy Authoritative guidance. Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing. Limit: One thermostat setting that guarantees comfort for every person.

Ergonomics of the thermal environment — PMV, PPD and local thermal comfort criteria Authoritative guidance. Analytical evaluation of general and local thermal comfort in moderate environments. Limit: A universal residential setpoint or direct transfer without project context.

Occupant's preferred indoor air speed in hot-humid climate and its influence on thermal comfort Growing evidence. Controlled evidence that preferred air speed varies with thermal and humidity conditions. Limit: A universal air-speed target for every resident, room or activity.

Related content

Theme: Thermal comfort in hot-humid residences

Protocol: Protected Bedroom Performance Protocol

Protocol: Indoor Environment and Moisture Control Protocol

Methods Note: Why commissioning matters more than handover

Closing

Design the modes, not one universal number

DALLEAU Atelier carries thermal comfort through shading, envelope, MEP, local control, commissioning and operation.

The thermostat sees air temperature, not the whole room Radiant load comes before aggressive cooling Air movement is one of the strongest tropical tools Humidity changes both comfort and building risk Personal control is part of comfort Bedrooms are the exception that deserves its own brief A Bali residence needs several comfort modes What DALLEAU would verify

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Waterproofing is a chain, not a coating. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/study-notes/waterproofing-is-a-continuous-system/

Atelier / Study Note / Water, envelope and moisture

Atelier · Study Note · Water, envelope and moisture

Waterproofing is a chain, not a coating.

A residence does not stay dry because a contractor applied a named product three times. It stays dry when the site, falls, outlets, membranes, transitions, penetrations, protection, testing and maintenance work as one continuous system.

Owner question

Where will water go, what must remain continuous, and what will be inspected before the work is hidden?

Evidence level

Established evidence with project-specific system selection and local validation

Application type

Project criteria, specialist scope, hold points and verification

Updated

4 August 2026

Sources

7

On this page

One-sentence thesis

Why this matters in Bali

The six-part control chain

Why “three coats” is not a specification

Four common failure patterns

Hold points before closure

What DALLEAU would ask to see

What this note does not prove

Project implication

Sources

System map

Water, envelope and moisture

A native diagram keeps the decision path legible without turning project criteria into a false score.

01 Keep away

Site, levels and separation

02 Move

Falls, low points and outlets

03 Overflow

A safe secondary route

04 Continue

Edges, drains and penetrations

05 Protect

Later trades and retesting

06 Maintain

Access, cleaning and records

Illustrative context

Illustrative comparisons

Shower-glass interface

Late intervention

Coordinated before finishes

Maintenance access

Late intervention

Coordinated before finishes

Pipe penetration

Late intervention

Coordinated before finishes

One-sentence thesis

Waterproofing is the result of a connected water-management system. The coating or membrane is one layer inside that system, not a substitute for it.

Why this matters in Bali

A Bali residence may receive heavy rain, wind-driven rain, high outdoor humidity, wet construction, frequent indoor-outdoor movement and long periods of vacancy. Roofs, terraces, bathrooms, pools, planters, walls, thresholds and ground-floor assemblies are often designed and built by different teams. Water does not respect those scope boundaries.

A failure may appear as a ceiling stain, damp skirting, lifting floor finish, salt deposits, mould odour, swollen joinery or a wet wardrobe. The visible symptom may be several metres from the entry point. Recoating the visible area can hide the symptom without correcting the route.

The owner therefore needs more than a product warranty. The owner needs the interfaces to be coordinated and the evidence to be retained before closure.

The six-part control chain

1. Keep water away where possible

The first layer is not a membrane. It is the shape and level of the project.

Questions include:

Does the finished ground fall away from the residence?

Can roof water discharge without returning toward the building?

Are planters, pools and retaining walls separated from sensitive walls?

Are internal floor levels protected from terrace and landscape water?

Can a blocked drain create a route into the residence?

A membrane is placed under unnecessary pressure when the project directs water toward it rather than away from it.

2. Move water through a defined primary route

Water should reach a drain, gutter, outlet, channel or permeable ground through a deliberate fall. A drain that is present but higher than the surrounding finish does not perform the same function as a drain at the low point.

The design should resolve:

falls and low points;

outlet position and capacity;

transitions between different finishes;

debris and leaf exposure;

cleanability;

destination of discharged water.

3. Provide a safe route when the primary route is compromised

Primary drains block. Rain intensity varies. Maintenance is delayed. A resilient design asks what happens next.

Examples include:

roof overflows below the waterproofing termination;

terrace edges or secondary outlets that discharge safely;

thresholds that remain above a temporary water level;

landscape routes that move excess water away from occupied rooms;

accessible inspection points before buried drainage becomes impossible to verify.

The secondary route is not permission to undersize the primary system. It limits the consequence when normal assumptions fail.

4. Keep the water-control layer continuous

The membrane or waterproofing layer matters most at the places where continuity becomes difficult:

wall-to-floor junctions;

changes in plane;

internal and external corners;

drains;

pipe penetrations;

door and window thresholds;

parapets and roof edges;

construction joints;

movement joints;

fixings added after waterproofing;

interfaces between packages.

The field of a membrane is often easier than its edges. A project should therefore spend disproportionate attention on transitions, terminations and penetrations.

5. Protect the system before and after testing

A correctly applied system can still be damaged by later trades. Screeds, tile works, balustrades, glazing, equipment supports, lighting, planters and MEP penetrations can cut or puncture work that was previously accepted.

Protection should answer:

Who may work above the finished membrane?

Which fixings are permitted?

How is the membrane protected before screed or finish?

How is damage recorded and repaired?

Which areas require a repeat test after later work?

6. Preserve access and maintenance

Water systems are not static. Drains collect debris. sealants age. outlets corrode or loosen. movement opens joints. vegetation grows. staff routines change.

A durable system needs:

accessible drains and strainers;

safe roof access;

cleanable channels;

visible overflow points;

inspection intervals;

known product and repair records;

a route for reporting and closing defects;

Building Passport entries where relevant.

Why “three coats” is not a specification

The number of coats alone does not establish performance.

A meaningful system specification may need to define:

substrate preparation and moisture condition;

primer;

total cured thickness;

reinforcement requirements;

crack and joint treatment;

allowable movement;

detail at drains and penetrations;

curing or protection time;

compatibility with screed, tile adhesive or protection layer;

exposure to UV, heat and standing water;

repair method;

inspection and test criteria.

Some liquid-applied systems require full reinforcement. Others use reinforcement at details or movement-prone areas. Torch-applied, synthetic sheet, liquid-applied and cementitious systems each have conditions in which they may or may not be appropriate. DALLEAU should not publish one universal product rule. The appointed designer and specialist must define the system for the substrate, movement, exposure, finish and maintenance context.

Four common failure patterns

Good product, wrong substrate

Dust, laitance, contamination, trapped moisture, weak screed or active cracking can undermine adhesion and continuity.

Good membrane, no safe fall

Standing water increases exposure, concentrates dirt and turns a small detail defect into a persistent load.

Good field application, weak interfaces

A drain, threshold, parapet or penetration may create the real path of failure even when the main area appears well coated.

Good installation, damaged after acceptance

A later fixing or unrecorded penetration can defeat a previously tested layer.

Hold points before closure

A DALLEAU owner-side process may require, depending on the package and specialist scope:

Substrate release Levels, falls, cracks, cleanliness, dryness and junctions reviewed before waterproofing.

First detail review Corners, penetrations, drains, upstands and transitions inspected before the field is completed.

Completed-system inspection Coverage, thickness or laps, terminations, penetrations and protection reviewed against the approved system.

Test Flood, controlled water, drainage, hose or another agreed test performed under stated conditions.

Post-trade retest or inspection Required where later works could have damaged the system.

Close-out Product records, photographs, repairs, tests, warranties, maintenance access and future inspection points retained.

The appropriate test depends on the assembly. One test does not prove the long-term performance of every interface, and a successful short test does not replace seasonal observation.

What DALLEAU would ask to see

the owner objective and consequence of failure;

the approved system and responsible specialist;

coordinated falls and drainage routes;

primary and emergency outlets where required;

details at every transition and penetration;

access for inspection and cleaning;

mock-ups for unusual or high-consequence conditions;

hold-point photographs before closure;

test method, conditions and result;

repairs and retests;

maintenance instructions and responsible party.

What this note does not prove

This note does not identify the source of a specific leak. It does not establish that one membrane type is always superior in Bali. It does not replace geotechnical, structural, hydraulic, envelope, roofing or manufacturer review. It does not guarantee the absence of future water ingress.

Project implication

When waterproofing is treated as a late trade package, the owner receives product names and invoices. When it is treated as a continuous owner-side system, the owner can see where water should go, who owns each interface, what must be inspected and what evidence must remain after handover.

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Open original record

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Open original record

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Open original record

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continue from the question in front of you

Continue from the question in front of you

Slab-on-ground or suspended floor in Bali? → A membrane cannot rescue a flat roof without falls. → External drainage is part of the residence. → After heavy rain: what an owner should check before everything dries. →

Bring the water path into the project before finishes hide it.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François Explore the Feasibility Study

## Controlled indoor environments | DALLEAU Atelier

URL: https://dalleau.ai/atelier/themes/indoor-environment-and-moisture/

Atelier / Theme / Cool air is not the same as a controlled indoor environment.

Atelier theme 02

Cool air is not the same as a controlled indoor environment.

Temperature, humidity, outdoor air, cooking, bathing, filtration, condensate, vacancy and maintenance interact. A credible strategy begins with the sources and operating modes, then uses measurement to check what the residence is actually doing.

Evidence at a glance

Evidence level

Multiple levels: official guidance, building science, growing sensor evidence and project hypotheses.

Application type

Evidence-based recommendation, project targets and site-specific validation.

Published or updated

Updated 29 July 2026

What this did not prove

A sensor reading does not prove healthy air or absence of hidden mould; one target does not guarantee an outcome.

Sources

7 original records used on this page

Indoor environment and moisture

Environmental measurements describe building conditions. They do not diagnose health, prove the absence of hidden mould or establish that a residence has healthy air.

A tropical operating problem

A residence can look dry, smell clean and still be carrying moisture or pollutants.

Bali residences often combine high outdoor humidity, open-air living, split AC, wet rooms, staff cooking, laundry, closed wardrobes, intermittent occupation and long periods of owner absence.

Each condition may be manageable alone. Together they create room-specific risks that cannot be resolved by a purifier, a thermostat or one green dashboard score.

The right question is not whether the house has sensors. It is whether sources are controlled, wet zones dry, outdoor air is intentional, filters can be serviced, condensate drains correctly and the operating team knows what to do when conditions drift.

Order matters

Control the cause before interpreting the sensor.

Step 01, Reduce or isolate the source

Resolve water entry, wet construction, combustion, cooking emissions, fragranced products, poor drainage, condensate faults and other avoidable sources before adding treatment equipment.

Step 02, Extract where the source occurs

Kitchen, bathroom and laundry loads should be removed close to the source, with a realistic makeup-air path and a dry-down period the staff can operate.

Step 03, Manage outdoor air and moisture

Outdoor air is beneficial only when the outdoor condition, rain, noise, insects and occupancy make it appropriate. Closed rooms need an intentional ventilation and moisture strategy rather than recirculated cooling alone.

Step 04, Filter for a defined question

Particle filtration can reduce particle exposure when the system is sealed, sized, operated and maintained correctly. It does not remove moisture, carbon dioxide, hidden mould or every gas.

Step 05, Monitor trends and act

Sensors support diagnosis, alerts and retuning. They do not replace design, maintenance, professional investigation or a clear response protocol.

Evidence map

The evidence is strongest where moisture, pollution and ventilation are treated as separate questions.

Dampness and mould

Evidence level

Established evidence

Persistent dampness, moisture damage, visible mould and musty odour require prevention, investigation and remediation. There is no single consumer sensor value that proves a building is free of hidden mould.

Fine particles and combustion

Evidence level

Established evidence

Outdoor infiltration, cooking, smoking, incense, candles, generators and other combustion sources can raise particle or gas exposure. Source control and effective local extraction come before decorative air-cleaning claims.

Ventilation and carbon dioxide

Evidence level

Growing evidence

Measured carbon dioxide can support a ventilation question in regularly occupied, well-mixed rooms when people are the dominant source. It is not a complete indoor-air metric and does not measure particles, VOCs, mould, moisture, carbon monoxide or nitrogen dioxide.

Filtration and portable cleaners

Evidence level

Established for particle reduction, application-specific for room outcome

Sealed filtration and correctly selected portable cleaners can reduce airborne particles. Their effect depends on airflow, room size, placement, runtime, filter condition and the source. They do not repair a wet substrate or replace outdoor air and extraction.

Occupied and vacant operation

Evidence level

Evidence-based recommendation with site validation

A second home cannot be treated as safe simply because it is empty. Humidity, drains, leaks, stored contents, filter condition and power recovery need an absence mode and an inspection routine.

Bali translation

Open and closed are conditions, not identities.

Open mode

Used when outdoor humidity, particles, rain, noise and insects are acceptable for the intended space and activity.

Mixed mode

Uses selected openings, fans and limited mechanical systems without allowing contradictory states or uncontrolled humid-air entry.

Closed mode

Uses intentional outdoor air, extraction, filtration, cooling and moisture control for protected rooms or unfavourable outdoor conditions.

Absence mode

Maintains defined environmental and asset-protection conditions, leak awareness, drain and trap checks, equipment operation and a clear staff inspection routine.

Extreme-weather or disruption mode

Defines the safe response to intense rain, smoke, poor outdoor air, power interruption, equipment fault or delayed maintenance.

The whole house is not one air zone

Different rooms fail for different reasons.

Protected bedrooms

Overnight occupancy, closed doors, quiet operation, bathroom adjacency and long exposure make ventilation, humidity, noise and control especially important.

Walk-in wardrobes and owner storage

Packed contents, low airflow, perimeter walls and long vacancy can hide moisture damage before it becomes visible in the room.

Bathrooms and powder rooms

Steam, slow dry-down, low extraction, wet finishes and empty traps require defined airflow and operating routines.

Kitchens

Cooking creates particles, moisture, odour and, where combustion is used, additional gases. The hood has to capture the real cooking process, not only exist in the drawing.

Laundry and utility

Wet textiles and closed service rooms add latent load and need extraction, drainage, leak control and staff rules.

Staff rooms and service spaces

Higher occupancy, closed doors and simplified equipment should not make staff accommodation the least ventilated part of the residence.

Plant, garage and generator adjacencies

Combustion, heat, vibration, pressure relationships and return-air paths need physical separation and life-safety review.

Interpreted measurement

A useful sensor has a defined question, a known limitation and an action attached to it.

Temperature and relative humidity

Useful for comfort, dew-point interpretation and moisture trends. A single relative-humidity snapshot is weak evidence without temperature, duration and room context.

Carbon dioxide

Useful as a ventilation proxy under defined conditions. It is not proof of overall air quality.

Fine particles

Useful for trends, outdoor infiltration, cooking events and filtration checks. Low-cost optical sensors require placement, humidity and calibration discipline.

Leak and material moisture

Useful for detecting water events or investigating substrates that air sensors cannot see.

Life-safety gases

Where combustion exists, certified life-safety devices and specialist design are separate from consumer environmental monitoring.

Response rule

Every monitored condition must have:

a responsible person;

an alert or review threshold defined for the project;

a response action;

an escalation path;

a maintenance and calibration requirement;

a record in the Building Passport.

From room risk to operation

The environmental strategy has to work with real cooking, bathing, vacancy and maintenance.

Verification sequence

Map moisture and pollutant risks room by room.

Define open, mixed, closed, absence and disruption modes.

Confirm source-control, outdoor-air, extraction and filtration logic with appointed specialists.

Review condensate, drainage, filter and service access before closure.

Test airflow, extraction, controls and alarms before opening.

Train staff on dry-down, filters, cleaning, vacancy and escalation.

Review occupied and vacant trends.

Retune after the first month and relevant season where included.

Evidence outputs

room risk map;

source-control register;

operating-mode descriptions;

MEP and specialist records;

material and cleaning notes;

airflow and extraction tests;

temperature, RH and dew-point trends;

ventilation-proxy and particle-trend records where justified;

filter, drain and service-access photographs;

staff training and corrective-action logs;

Building Passport entries.

Limits

No single reading can certify the whole indoor environment.

A short monitoring period cannot establish full wet-season behaviour, hidden mould absence, pollutant attribution or long-term maintenance adherence. A purifier test does not prove ventilation. A low carbon-dioxide reading does not establish that particles, gases or moisture are controlled.

The page can explain risk, control hierarchy, measurement and project verification. It cannot label a residence healthy, toxin-free, allergen-free or mould-proof.

Prohibited public claims

Healthy air

Mould-proof

Toxin-free

Allergen-free

Prevents respiratory illness

CO2 proves good air quality

A purifier replaces ventilation

Plants purify the residence

Related Study Note

Indoor environment and moisture control in Bali residences

Related protocol

Indoor Environment and Moisture Control Protocol

Related theme

Thermal comfort in hot-humid residences

Before the MEP strategy hardens

Define how the residence will breathe, dry and remain protected when nobody is there.

DALLEAU Atelier carries the environmental question from room risk and owner use through specialist design, maintainability, commissioning, staff operation and seasonal learning.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

WHO global air quality guidelines Authoritative guidance. Ambient pollutant benchmarks used as exposure context. Limit: A complete indoor residential specification or proof that an indoor environment is healthy.

WHO guidelines for indoor air quality: dampness and mould Authoritative guidance. Prevention and remediation of persistent dampness and microbial growth. Limit: A universal safe microbial threshold or proof that hidden mould is absent.

WHO guidelines for indoor air quality: selected pollutants Authoritative guidance. Pollutant-specific health context and source-control considerations. Limit: A complete residential specification or a single sensor score for indoor air quality.

ASHRAE position document on limiting indoor mold and dampness in buildings Authoritative guidance. Building moisture control and dampness prevention principles. Limit: A universal Bali project threshold or proof that a building is mould-free.

ASHRAE position document on indoor carbon dioxide Authoritative guidance. Use of indoor CO₂ as a limited ventilation indicator in context. Limit: Treating CO₂ as a complete indoor-air-quality or health score.

Low-cost air pollution monitors and indoor air quality Authoritative guidance. Capabilities and practical limits of lower-cost indoor monitors. Limit: Regulatory-grade accuracy, diagnosis or complete pollutant coverage.

Enhanced Air Sensor Guidebook Authoritative guidance. Planning, selecting and interpreting air-sensor measurements. Limit: Replacing calibrated professional instruments or inferring a medical outcome.

A residence can look dry, smell clean and still be carrying moisture or pollutants. Control the cause before interpreting the sensor. The evidence is strongest where moisture, pollution and ventilation are treated as separate questions. Open and closed are conditions, not identities. Different rooms fail for different reasons. A useful sensor has a defined question, a known limitation and an action attached to it. The environmental strategy has to work with real cooking, bathing, vacancy and maintenance. No single reading can certify the whole indoor environment.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Local-first residence controls | DALLEAU Atelier

URL: https://dalleau.ai/atelier/themes/intelligent-residences-and-local-first-control/

Atelier / Theme / Intelligence should disappear into reliable operation.

Atelier theme 04

Intelligence should disappear into reliable operation.

The strongest residence technology is not the most visible. Critical functions remain local, understandable and manually overridable. Optional intelligence may recommend, schedule and prioritise inside documented limits.

Evidence at a glance

Evidence level

Multiple levels: current standards and guidance, established controls principles and project hypotheses.

Application type

DALLEAU project method, privacy-by-design and project-specific controls requirements.

Published or updated

Updated 29 July 2026

What this did not prove

Local-first does not mean unhackable, autonomous, private by default or capable of reliably inferring a person.

Sources

3 original records used on this page

Intelligent residences and local-first control

DALLEAU does not provide health monitoring, emotion detection or behavioural surveillance. Critical safety and protection functions do not rely on AI or cloud access alone.

Beyond apps and scenes

A residence is intelligent when it remains understandable during normal use, faults and handover.

A collection of connected products can still leave the owner with fragmented accounts, hidden dependencies, inaccessible settings and no reliable recovery path.

The owner-side question is different. What must always work? What can fail safely? Who controls the root accounts? What happens when the internet, cloud, integrator or vendor is unavailable? Can the system be serviced and replaced without reconstructing the residence?

Atelier treats technology as an operating architecture, not an amenity list.

Different jobs need different logic

Use deterministic systems to protect. Use intelligence to assist.

Protection layer

Application type

Official and engineering safety logic

Equipment safeties, water shutoff rules, access policies, life-safety pathways, backup-power transfer, anti-short-cycle limits and other damaging failure conditions remain deterministic, testable and locally executable.

Control layer

Application type

Established technical practice

Lighting, shading, HVAC, humidity, water, energy and essential scenes use a documented local control backbone with clear points, states and manual override.

Supervisory layer

Application type

Evidence-based and project-specific

Rules, schedules and analytics coordinate systems, identify conflicts, detect faults and prepare the residence for occupancy or absence.

Intelligence layer

Application type

Growing evidence and bounded use

AI may forecast thermal lag, summarise alarms, propose a schedule, prioritise maintenance or identify abnormal consumption. It should not silently rewrite critical protection logic or infer intimate human states.

Human and operating layer

Application type

Project method

Owners, house managers, staff and vendors receive role-based access, understandable controls, training, escalation and a documented recovery path.

Rule

AI may recommend, schedule and prioritise. Deterministic logic protects, enforces and fails safe.

Build the durable layers first

The valuable infrastructure should survive a change of vendor.

Physical infrastructure

Power quality, backup, network coverage, panels, conduits, service zones, wiring, earthing, surge protection and equipment access create the base.

Sensors and actuators

Use only the points needed to answer a defined operational question. Temperature, humidity, leaks, water flow, energy, equipment state and room-level occupancy proxies can be useful without creating person-level surveillance.

Local controls

Essential lighting, HVAC, humidity, water protection, access and basic scenes remain available locally and through physical controls.

Integration and data

Point lists, names, locations, trend histories, interfaces and permissions should be documented and exportable. One consumer protocol does not replace MEP and controls engineering.

Optional cloud and AI services

Cloud services are added only where the value, data flow, outage behaviour, ownership and exit path are clear.

Building Passport

Accounts, custody, architecture, assets, firmware, licences, backups, warranties, support, configurations, tests and replacement notes remain part of the residence memory.

Bounded value

The best use cases reduce friction without demanding intimate data.

Arrival preparation

Prepare temperature, humidity, lighting, shading and hot-water readiness from a confirmed schedule or bounded arrival window, with clear manual control.

Leak detection and staged shutoff

Use flow, branch and point sensing with deterministic shutoff or escalation logic, local alerts and a manual bypass.

Fault detection and maintenance

Use trend data to identify sensor drift, conflicting schedules, abnormal runtime, stuck states and maintenance priorities before they become prolonged operational problems.

Energy and backup coordination

Coordinate critical-load priorities, generator, battery and noncritical shedding through hard rules. Optional optimisation can sit above those priorities.

Staff workflow support

Convert room-readiness, alarm and maintenance information into tasks without exposing detailed occupant histories or turning operational tools into staff surveillance.

Owner reporting

Show a small number of meaningful states, exceptions and decisions rather than presenting every sensor as a permanent dashboard.

Technology horizon

Not every technically possible function belongs in a private residence.

Predictive control

Evidence level

Growing evidence

Useful in bounded systems with good data, clear limits, rollback and commissioning. Poor metadata and false confidence can erase the benefit.

Narrow fault auto-correction

Evidence level

Emerging application

Some schedule and control faults may be corrected automatically. Owner-critical systems still require approval logic, audit trail and a deterministic fallback.

Voice and natural-language interfaces

Evidence level

Mature as an optional convenience layer, privacy-dependent

Voice may support control and log search. It must not be the only control path, and raw audio should not be collected by default.

Person-level sensing and inference

Evidence level

Research question with high privacy risk

Emotion detection, health inference, continuous camera analysis and intimate behavioural profiling are excluded from the Atelier method. Technical possibility does not establish project need, accuracy, consent or proportionality.

General autonomous home

Evidence level

Unsupported as a premium-critical proposition

Current systems are good at narrow tasks with defined inputs and safeguards. They do not reliably understand household intention across changing occupants, staff, guests and unusual events.

The home is a sensitive data environment

Collect less. Process locally. Keep access narrow.

Principles

Purpose limitation

Every data point must answer a defined building, maintenance, safety or operating question.

Data minimisation

Do not collect person-level history when a room or equipment state is enough.

Local processing

Keep critical controls and sensitive raw data local where practical. Send only necessary, aggregated and encrypted information outward.

Role-based access

Owners, family, staff, operators, integrators and vendors should not inherit the same permissions.

Retention and deletion

Store what the project and operating obligation require, for a defined period, with an owner-controlled deletion and export path.

Guest and staff dignity

Optional monitoring is off by default where appropriate. Information is provided before arrival or use. Staff tools focus on tasks and assets, not continuous behaviour.

Excluded by default

No microphones, indoor cameras, biometrics, wearables, emotion inference, health inference or person-level behavioural profiling are required for the Atelier method.

Local conditions

Design as if outages, humidity and delayed replacement are normal events.

A Bali residence has to account for power quality, surge, generator or battery behaviour, high humidity, condensation, corrosion, network gaps, cloud availability, staff turnover, local support and imported-part lead time.

Bali checks

local operation during internet and cloud loss;

clean restart after power interruption;

critical-load and backup priorities;

humidity and enclosure of panels and devices;

surge and power-quality strategy;

network coverage at plant and external zones;

manual access and bypass;

local integrator response and documentation;

spare parts and replacement lead time;

owner absence and staff handover;

time-limited vendor access;

offline copies of recovery documents.

From use case to failure test

The system remains unproven until it fails in a controlled way.

Verification sequence

Approve the use cases and prohibited functions.

Classify each function by criticality.

Define local, cloud, manual and failure-state boundaries.

Review vendor ownership, accounts, exportability, support and end-of-life path.

Approve the point list, interfaces and manual overrides before procurement.

Bench-test or factory-test material sequences where useful.

Test offline operation, power recovery, sensor failure and manual bypass.

Train owner, house manager, staff and maintenance roles.

Hand over accounts, backups, configurations, recovery instructions and asset records.

Review nuisance alerts, failed automations, overrides and vendor changes after occupation.

Evidence outputs

use-case register;

criticality matrix;

system and network architecture;

data inventory and permission matrix;

risk and threat model;

vendor due diligence;

point and interface schedule;

failure-mode and recovery tests;

backup and restore evidence;

owner and staff training;

account-custody record;

Building Passport entries.

Limits

Connected does not mean autonomous, secure or future-proof.

Current systems can sense, control, detect some faults and support bounded predictions. They cannot guarantee zero cyber risk, permanent vendor support, universal interoperability or correct inference of household intention.

Future software updates, zero-day vulnerabilities, user behaviour, staff turnover and vendor changes remain ongoing governance questions. Commissioning proves behaviour under tested conditions, not permanent immunity from failure.

Prohibited public claims

Autonomous home

AI understands the family

Unhackable

Future-proof

Emotion detection for wellbeing

Health monitoring

Invisible surveillance

Matter solves every interoperability problem

Cloud AI is required for an intelligent residence

Related Study Note

What an intelligent residence should still do when the internet fails

Related protocol

Intelligent Residence Readiness Review

Related Intelligence property

DALLEAU Intelligence contains decision tools. It does not contain hidden operational control or project-specific residence data.

Related Methods Note

Why commissioning matters more than handover

Before the integrator is appointed

Define what must work, who owns it and how it fails.

DALLEAU Atelier frames the owner use cases, criticality, local-control boundary, specialist scope, commissioning, handover and long-term asset memory before technology becomes difficult to replace.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

Cyber Security for Consumer Internet of Things: Baseline Requirements Authoritative guidance. A consumer-IoT cybersecurity baseline for product and system requirements. Limit: A claim that a residence is unhackable or legally compliant in every jurisdiction.

IoT Device Cybersecurity Capability Core Baseline Authoritative guidance. A starting set of device cybersecurity capabilities for IoT acquisition and integration. Limit: A complete project threat model, legal advice or a guarantee of security.

NIST Privacy Framework: A Tool for Improving Privacy through Enterprise Risk Management Authoritative guidance. A voluntary framework for identifying and managing privacy risk. Limit: Jurisdiction-specific legal compliance or a complete residential data-governance plan.

A residence is intelligent when it remains understandable during normal use, faults and handover. Use deterministic systems to protect. Use intelligence to assist. The valuable infrastructure should survive a change of vendor. The best use cases reduce friction without demanding intimate data. Not every technically possible function belongs in a private residence. Collect less. Process locally. Keep access narrow. Design as if outages, humidity and delayed replacement are normal events. The system remains unproven until it fails in a controlled way.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Light belongs to the full 24-hour brief. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/themes/light-and-sleep/

Atelier / Theme / Light belongs to the full 24-hour brief.

Atelier theme 01

Light belongs to the full 24-hour brief.

A residence has to provide useful light by day, a controlled taper in the evening and operational darkness during the sleep period. The result depends on timing, intensity, spectrum, direction, duration, controls and the way adjacent spaces are used.

Evidence at a glance

Evidence level

Multiple levels: established evidence, growing evidence, research translation and project hypotheses.

Application type

Official guidance, evidence-based recommendation and project-specific validation.

Published or updated

Updated 29 July 2026

What this did not prove

Lighting design does not prove treatment of insomnia, jet lag, sleep quality, mood, cognition or health.

Sources

6 original records used on this page

Light and sleep

Lighting conditions can be designed and measured. They do not prove that a residence improves sleep or treats a circadian or medical condition.

Beyond fixture selection

The same light can be useful at one time and disruptive at another.

Residential lighting is often divided into daylight, decorative lighting and controls. The body does not experience those packages separately.

Morning daylight, a bright bathroom mirror, a dim restaurant scene, a television, a corridor sensor, a garden uplight and a charging indicator all contribute to the light reaching the eye across the day and night.

The brief therefore has to coordinate architecture, interior design, landscape, lighting, controls, staff routines and the intended sleep period as one sequence.

Evidence map

The strongest conclusion is a pattern, not a decorative style.

Daytime light

Evidence level

Established evidence

Day-active people need meaningful light exposure during the day. Morning and first-half-of-day light are especially relevant time cues. The design question is not only whether the room has windows, but whether useful light reaches the eye without excessive glare or heat.

Evening taper

Evidence level

Established evidence

Evening light should become materially quieter before the intended sleep period. Colour temperature alone is not enough. Apparent warmth, direct-view brightness, spectrum, duration and distance from the eye all influence the exposure.

Darkness during sleep

Evidence level

Established evidence

The sleep environment should be as dark as safely practical. Blackout fabric is only one part of the problem. Edge leakage, bathroom spill, corridor light, exterior landscape lighting, indicators and screens can all remain visible at the pillow.

Individual variation

Evidence level

Growing evidence

Age, prior daytime exposure, chronotype, travel, schedule and individual sensitivity change the response. The appropriate project response is not a personalised medical promise. It is a low-error night condition with useful owner control and clear operating modes.

Project translation

Design the transitions, not only the scenes.

Wake and morning

Prioritise access to real daylight or a bright, glare-controlled morning setting. Breakfast, bathroom and early working spaces should not remain dim by default.

Daytime

Maintain useful daylight while controlling solar gain, reflected glare and overexposure. Shading should preserve useful eye-level light rather than simply darken the interior.

Late afternoon

Avoid an accidental move into underlit interiors long before the evening. The day should remain legible until the planned taper begins.

Final hours before sleep

Reduce direct-view brightness, unnecessary overhead light and high-output decorative sources. Task light should remain local, brief and easy to turn off.

Sleep period

Protect darkness at the pillow while maintaining a safe, low-level route to the bathroom or exit when required.

Wake during the night

Use localised, time-limited guidance rather than restoring the daytime lighting scene. Controls should be understandable without searching through an app.

Design decisions

The light brief crosses the whole project.

Architecture and orientation

Morning access, façade exposure, roof openings, room depth, shading and the relationship between bedroom and terrace affect both useful daylight and night-time leakage.

Interior lighting

Fixture position, beam, dimming range, driver behaviour, reflected light and direct view matter as much as colour temperature.

Window treatment

Blackout performance depends on the opening, pocket, track, overlaps, edge treatment, hardware, staff reset and the way the product ages in use.

Bathroom and dressing

Vanity light, mirrors, open doors, glass partitions and wardrobe lighting can dominate the night condition even when the bedroom scene is dim.

Landscape and exterior

Terrace, pathway, façade and garden lighting must be assessed from inside the bedroom, not only from the landscape presentation.

Controls and operations

A good sequence needs clear physical controls, manual override, reliable minimum dimming, defined power-recovery behaviour and a reset routine the operating team can repeat.

Hot-humid reality

Useful daylight has to survive the heat, glare and open-air lifestyle.

Bali offers abundant daylight and relatively stable sunrise timing. It also creates strong solar gain, bright exterior surfaces, open terraces, garden lighting, high guest turnover and frequent transitions between indoor and outdoor living.

The response is not more glass or darker interiors by default. It is controlled access to daylight, external shade, protected night-time rooms, clear scenes and commissioning from the actual eye position.

Bali checks

morning access without uncontrolled east glare;

west and roof exposure;

exterior spill from paths, pool, garden and neighbouring property;

curtain and blind use by staff and guests;

power interruption and scene recovery;

insects and open-window decisions;

bathroom, corridor and dressing-room leakage;

local availability and replacement of drivers, dimmers and controls.

From intent to evidence

The lighting concept remains unproven until the room is tested at the right times.

Verification sequence

Define the intended day, evening, night and wake modes.

Review orientation, shading and exterior-light relationships.

Confirm fixture, driver, dimming and control assumptions.

Build or stage the critical bedroom condition at useful scale.

Test minimum levels, direct view, glare and leakage at night.

Verify blackout edges, bathroom spill and exterior spill.

Test manual override, outage recovery and staff reset.

Record the accepted result, deviations and unresolved seasonal questions.

Evidence outputs

annotated light sequence;

orientation and spill review;

fixture and driver schedule;

mock-up photographs;

eye-plane and pillow-zone measurement records where required;

dimming and control test records;

blackout and leakage checklist;

commissioning exceptions;

Building Passport entries;

30-day or seasonal observations where included.

Limits

A well-controlled light environment is not a treatment claim.

The evidence does not establish that one lighting scene works for every person. It does not justify saying that warm light is automatically healthy, that tunable white automatically creates circadian lighting, or that a residence treats insomnia, jet lag, mood or cognitive conditions.

A project can document its light conditions, controls and commissioning result. It cannot infer a medical or person-level outcome from those conditions alone.

Prohibited public claims

Improves sleep

Treats insomnia or jet lag

Optimises circadian health

Restores melatonin

Warm light is always healthy

Tunable white guarantees circadian lighting

Brain-optimised lighting

Related Study Note

Light by day, darkness by night

Related protocol

Protected Bedroom Performance Protocol

Related Methods Note

How DALLEAU reads evidence for private residences in Bali

Before the lighting package hardens

Bring the full day and night sequence into the brief.

DALLEAU Atelier carries the light question through the owner brief, specialist scope, mock-up, controls, commissioning and operating record.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Established evidence. The measurement quantities and metrics used to describe stimulation of the five retinal photoreceptor types. Limit: A complete lighting application, a health treatment or prediction of a person-level outcome.

What to document and report in studies of ipRGC-influenced responses to light Authoritative guidance. A reporting template for stimulus conditions and use of the CIE S 026 measurement system. Limit: An efficacy claim or a universal residential target.

Recommendations for daytime, evening, and nighttime indoor light exposure to best support physiology, sleep, and wakefulness in healthy adults Established evidence. Consensus reference values for healthy adults aged 18–55 on regular daytime schedules. Limit: A universal prescription for every age, health condition, routine or residence.

Melanopic illuminance defines the magnitude of human circadian light responses under a wide range of conditions Growing evidence. Melanopic illuminance as a strong predictor across pooled laboratory datasets of circadian light responses. Limit: A complete residential outcome or a claim that one light metric replaces the full design brief.

CIE Position Statement on Integrative Lighting — Recommending Proper Light at the Proper Time, 3rd Edition Authoritative guidance. Use of CIE S 026 metrics and a daily pattern of more light by day, less before bed and near-darkness during sleep. Limit: A treatment promise or an unqualified target for every population.

Melanopic irradiance defines the impact of evening display light on sleep latency, melatonin and alertness Emerging research. A controlled display-light experiment in 72 healthy males aged 18–35 under specific pre-bed conditions. Limit: A long-term residential outcome, a general population effect or a universal design threshold.

The same light can be useful at one time and disruptive at another. The strongest conclusion is a pattern, not a decorative style. Design the transitions, not only the scenes. The light brief crosses the whole project. Useful daylight has to survive the heat, glare and open-air lifestyle. The lighting concept remains unproven until the room is tested at the right times. A well-controlled light environment is not a treatment claim. Bring the full day and night sequence into the brief.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Comfort is a system, not a setpoint. | DALLEAU Atelier

URL: https://dalleau.ai/atelier/themes/thermal-comfort-in-hot-humid-residences/

Atelier / Theme / Comfort is a system, not a setpoint.

Atelier theme 03

Comfort is a system, not a setpoint.

Air temperature is only one part of the condition. Radiant heat, humidity, air movement, activity, clothing, bedding, expectation, room use and personal control all change how a residence feels.

Evidence at a glance

Evidence level

Multiple levels: standards, established thermal principles, growing field evidence and project translation.

Application type

Evidence-based recommendation and project-specific comfort strategy.

Published or updated

Updated 29 July 2026

What this did not prove

No universal thermostat setting can guarantee comfort, sleep, health or energy performance.

Sources

3 original records used on this page

Thermal comfort in hot-humid residences

Thermal comfort varies between people, rooms and moments. A project target is not a universal guarantee of comfort.

Beyond cooling capacity

The thermostat can be satisfied while the person is not.

A chair beside sun-heated glass can feel hot when the room sensor reports an acceptable temperature. A bedroom can feel clammy when the air is cool but the moisture remains high. A powerful AC unit can create noise and a cold jet at the bed while leaving the room uneven.

Comfort has to be designed through the envelope, shade, room geometry, air movement, moisture control, zoning and controls before it is treated as an equipment-size problem.

One condition, several inputs

Each variable changes the meaning of the others.

Air temperature

Important, but insufficient on its own. It does not describe hot surfaces, solar exposure, humidity or the air moving across the body.

Mean radiant temperature

Roofs, glazing, walls, floors and direct sun exchange heat with the occupant. Reducing radiant load can improve comfort without lowering the thermostat.

Humidity and dew point

High moisture reduces evaporative cooling and raises condensation and mould risk when cold surfaces are introduced. A clammy room often needs latent control, not simply more sensible cooling.

Air movement

Fans and local air movement can extend comfort in warm conditions. Distribution, noise, control and the occupied position determine whether the result feels useful or drafty.

Activity, clothing and bedding

Cooking, working, exercising, bathing, resting and sleeping create different loads. Bedding can change the night-time condition more than a small thermostat adjustment.

Expectation and control

People tolerate and understand conditions differently when they can make a clear local adjustment. Control should be real, legible and bounded by safe operating logic.

Diagnose before cooling

Resolve the dominant load in the right order.

Layer 01, Radiant load

Question

Is the person hot because of sun, roof, glazing or warm surfaces?

Project response

External shade, roof and ceiling strategy, glazing control, protected terraces and reduced reflected hardscape gain.

Layer 02, Adaptive opportunity

Question

Can a better condition be created through shade, air movement, position or a suitable opening?

Project response

Ceiling fans, local fans, insect-screened openings, alternative seating and understandable local control.

Layer 03, Moisture load

Question

Is the room muggy rather than simply hot?

Project response

Latent-capable cooling, dehumidification, controlled outdoor air and condensation-aware operation.

Layer 04, Air movement

Question

Would more air speed help without creating noise or unwanted draft?

Project response

Map fan distribution at the bed, sofa, desk and circulation zone rather than approving the fan by catalogue diameter alone.

Layer 05, Sensible cooling

Question

Is the operative condition still too warm after load reduction and useful air movement?

Project response

Use zoned cooling coordinated with humidity and fan logic rather than deep-cooling the whole residence.

Layer 06, Personal variance

Question

Do the owner, partner, children, guests and staff need different modes?

Project response

Provide room-level control and a small number of understandable comfort modes instead of one universal setpoint.

Layer 07, Sleep exception

Question

Is this a bedroom during the sleep period?

Project response

Prioritise low noise, stable humidity, low radiant load, gentle airflow, bedding assumptions and an easy bedside override.

Mixed mode without contradiction

A residence needs rules for when each system takes over.

Open comfort mode

Uses shade, useful outdoor air and fans when outdoor humidity, rain, particles, insects and noise are acceptable.

Fan-first mode

Uses local air movement before a lower cooling setpoint when humidity and room use allow it.

Closed comfort mode

Uses zoned cooling, moisture control and controlled outdoor air for protected rooms or unfavourable outdoor conditions.

Night bedroom mode

Uses quieter, more stable operation, gentle air distribution and a small number of local controls.

Arrival mode

Prepares humidity and temperature in the right sequence before the owner or guest enters, rather than relying on a last-minute deep-cool.

Absence mode

Protects the building and contents without operating the whole residence as if it were occupied.

Mixed mode fails when several systems act against one another. Windows can be open during high outdoor dew point. A fan can run under an excessively cold jet. The thermostat can be satisfied while the room remains humid. The project must define transitions and failure states rather than leaving them to habit.

Climate and household

The same villa can need different logic by micro-location, season and use.

Coastal, inland and upland locations do not carry the same radiant, humidity, wind, noise and corrosion conditions. An owner-occupied residence, a family estate and a serviced villa also behave differently.

The design has to consider:

west and roof exposure;

hardscape and pool reflection;

high ceiling stratification;

rainy-season latent load;

salt and corrosion where relevant;

owner, guest and staff expectations;

occupied, hosting and vacant modes;

power interruption and restart;

local service and spare parts;

AC noise and fan noise at night.

Comfort in the occupied position

Capacity alone does not prove the room condition.

Verification sequence

Record the room use, occupancy, clothing and bedding assumptions.

Review solar and radiant load at the actual occupied positions.

Map shade, openings, fans, cooling and moisture-control roles.

Confirm operating modes and local overrides.

Test critical rooms or positions through mock-up or staged operation.

Measure temperature, humidity and air movement where the question requires it.

Check noise, draft and condensation risk during real operation.

Tune the system before opening and review overrides after occupation.

Possible project tests

late-afternoon solar-patch test;

bedroom night test comparing quiet cooling, fan and latent-control options;

rainy-season vacancy test;

pre-arrival sequence test;

mixed-mode switchover test;

seating and bed-position air-movement map.

Evidence outputs

thermal and radiant risk map;

operating-mode register;

fan and air-distribution test;

temperature, RH and dew-point trends;

control and override log;

noise and draft observations;

commissioning and retuning record;

Building Passport entries.

Limits

No one temperature is comfortable for every person or every room.

Standards and field studies provide methods, ranges and decision tools. They do not establish a single perfect setpoint for all households. A fan is not a universal replacement for moisture control. Lower temperature does not automatically mean better sleep. A smart thermostat does not see every radiant, humidity or airflow condition.

A project can verify environmental conditions and user control under stated conditions. It cannot guarantee comfort at all times or for every occupant.

Claims boundary

Universal comfort, one ideal Bali temperature, universally sufficient fans, sleep outcomes, thermostat-only proof and automated personal optimisation are outside the evidence.

Related Study Note

Thermal comfort is not one thermostat number

Related theme

Indoor environment and moisture

Related protocol

Protected Bedroom Performance Protocol

Before equipment selection

Design the condition before choosing the capacity.

DALLEAU Atelier connects the owner’s comfort priorities to shade, envelope, air movement, moisture control, zoning, controls, mock-ups and commissioning.

Sources

The source finding and DALLEAU's residential interpretation are kept separate. Links open the original publisher or authority record.

Thermal Environmental Conditions for Human Occupancy Authoritative guidance. Thermal comfort as an interaction between temperature, radiation, humidity, air speed, activity and clothing. Limit: One thermostat setting that guarantees comfort for every person.

Ergonomics of the thermal environment — PMV, PPD and local thermal comfort criteria Authoritative guidance. Analytical evaluation of general and local thermal comfort in moderate environments. Limit: A universal residential setpoint or direct transfer without project context.

Occupant's preferred indoor air speed in hot-humid climate and its influence on thermal comfort Growing evidence. Controlled evidence that preferred air speed varies with thermal and humidity conditions. Limit: A universal air-speed target for every resident, room or activity.

The thermostat can be satisfied while the person is not. Each variable changes the meaning of the others. Resolve the dominant load in the right order. A residence needs rules for when each system takes over. The same villa can need different logic by micro-location, season and use. Capacity alone does not prove the room condition. No one temperature is comfortable for every person or every room. Design the condition before choosing the capacity.

Continue through Atelier

Atelier overview Evidence and review Protocol spine

Project context

Applying this to a specific residence requires a review of the site, household and intended use.

Talk to François Review the Feasibility Study

## Delivery partners in Bali: standards and procurement | DALLEAU

URL: https://dalleau.ai/delivery-partners.html

Delivery partners
A delivery system built for repeat collaboration.
DALLEAU works with contractors, specialist trades, suppliers and organised site teams that can deliver a defined scope, document the work properly and improve through review. We are building reliable relationships across suitable projects, not collecting isolated quotations.
For owners, the system makes selection, pricing and site control visible. For proven partners, it makes expectations, decisions and repeat opportunity clear.
Register your interest
Review the method
Choose the relevant route
For owners and advisers
See how DALLEAU defines packages, compares offers, holds concealed work and supports payment recommendations.
Review owner-side controls →
For contractors, trades and suppliers
See what DALLEAU expects, what good partners receive in return and how future invitations are earned.
See the partner framework →
Owner-side control
A contractor is selected against the package, not the contact list.
Capability, capacity, references, price structure and delivery method are reviewed against one defined scope.
01
Define the scope
Drawings, quantities, specifications, programme and responsibilities form one pricing basis.
02
Compare like for like
Offers are normalised for inclusions, exclusions, taxes, lead times, warranty and substitutions.
03
Inspect before closing
Hold points keep concealed work visible until the required review and record are complete.
04
Release against evidence
Payment recommendations follow the contractual milestone, accepted work and required records.
Value exchange
Good partners should not carry avoidable project risk.
DALLEAU is demanding about evidence because the same discipline should protect the partner from vague scope, conflicting instructions, silent changes and arbitrary release decisions.
01
Defined package before final pricing
Drawings, quantities, specifications, tax basis, exclusions and programme are made explicit.
02
One named reporting line
Project instructions do not arrive from several uncoordinated people.
03
Consolidated technical clarifications
Questions and decisions are recorded before they become rework.
04
Paid physical trials
Requested mock-ups or pilot works have written scope, acceptance and payment terms.
05
Written variations
Additional work is not silently absorbed into the original price.
06
Milestone review against evidence
Payment recommendations follow the package contract and accepted records.
07
Commercial confidentiality
Detailed pricing is handled as project information, not casually circulated.
08
Feedback and repeat opportunity
Proven teams can spend less time requalifying and may receive future invitations when fit, capacity and performance justify them.
Commercial integrity
Comparable scope before comparable price.
The lowest initial number does not automatically win. Each shortlisted team prices the same defined package, and DALLEAU reviews quantities, unit rates, inclusions, exclusions, taxes, lead times, warranty, subcontracted scope, capacity and delivery method together.
Client nationality is not a pricing variable.
Material substitutions require written technical and commercial review.
Related-party relationships must be disclosed.
Supplier rebates, trade discounts and agreed credits follow the project contract and owner-side control rules.
DALLEAU accepts no undisclosed commission, referral payment or off-book project benefit.
Repeated packages may use agreed or benchmarked unit rates where scope and risk are sufficiently stable.
Escalation requires a stated basis.
Three records that make a commercial decision possible.
01
BOQ
Not enough to decide
One lump sum
Vague descriptions
No tax basis, exclusions, lead time or warranty
No subcontractor disclosure
Ready for review
Quantities and unit rates
Inclusions, exclusions and tax basis
Lead times, warranty, substitutions, subcontracted scope and validity
02
Variation
Not enough to decide
“Please add this. We will settle later.”
Ready for review
Reason and revised scope
Price and programme effect
Approval before execution
03
Payment milestone
Not enough to decide
“The work is 70% complete.”
Ready for review
Named contractual milestone
Accepted work area and inspection evidence
Unresolved items and recommended amount
Illustrated method comparisons
The clean result is decided before the finish.
These examples show why DALLEAU resolves critical interfaces before finishes close. The accepted method is coordinated as part of the assembly, not improvised after the room appears complete.
01
Coordinate the glass before the tile is finished.
Late intervention — not accepted
A groove is cut into newly installed finished tile after the bathroom is already complete.
Coordinated before finishes
The approved recessed F-profile is set out before tiling so the glass and tile edge resolve as one detail.
02
Keep services accessible without making them dominant.
Late intervention — not accepted
A concealed valve is reached only after the completed surface is opened.
Coordinated before finishes
A flush access panel follows the setting-out and keeps the service point maintainable.
03
Set the drain and the tile pattern together.
Late intervention — not accepted
The drain arrives after tile setting-out, leaving slivers, awkward cuts and unreliable falls.
Coordinated before finishes
Drain position, tile module and falls are coordinated as one buildable surface.
04
Waterproof the penetration, not the symptom.
Late intervention — not accepted
A completed penetration depends on a heavy surface seal after the finish is installed.
Coordinated before finishes
The pipe collar, reinforcement and continuous membrane are reviewed before the tile closes the assembly.
Selection process
Open to new partners. Deliberate at every gate.
Qualification creates eligibility for suitable packages. Each appointment remains project-specific.
01
Application
A short expression of interest establishes trade, coverage, experience and current availability.
02
Evidence review
We review business identity, relevant experience, portfolio and the proposed responsible team.
03
Technical conversation
The responsible person explains method, labour, equipment, sequencing, risks and inspections.
04
Comparable quotation
Shortlisted teams price the same scope, quantities, specification, tax basis, exclusions and programme.
05
Reference and site check
References may be contacted and completed work, a workshop or an active site may be reviewed with permission.
06
Paid pilot where useful
A requested physical trial has written scope, acceptance and payment terms. DALLEAU does not request free construction work.
07
Project appointment
The package sets responsibilities, submittals, hold points, milestones, variations, warranty and reporting.
08
Performance record
Quality, safety, programme, reporting, commercial control and defect response inform future eligibility.
What DALLEAU assesses
Six facts make an application useful.
A strong portfolio helps. Current capacity, reviewable pricing and verifiable delivery matter just as much.
01
Relevant experience
Years working in the proposed trade and the role your team performed.
02
Completed work
Type, location and scale of comparable work that can be checked.
03
Contactable references
Client or professional references are requested later with consent.
04
Current contracts
Active commitments, team allocation and realistic availability for a new package.
05
Delivery method
Responsible people, workforce, equipment, quality controls, safety and reporting.
06
Commercial clarity
Itemised rates, inclusions, exclusions, taxes, lead times, warranty and subcontracted scope.
Working framework
Clear evidence before funds move.
DALLEAU combines documented project-control methods with Bali-specific climate, supply-chain and site-delivery requirements. The approved design, applicable Indonesian requirements, selected system and manufacturer instructions govern each package.
01
Scope
The contract identifies drawings, specifications, quantities, inclusions, exclusions, programme and responsible parties.
02
Submittals
Materials, samples, method statements and required evidence are approved before the relevant work proceeds.
03
Verification
Progress is checked against defined milestones and the appointed reviewer’s scope where required.
04
Payment
A recommendation follows the contractual milestone, accepted evidence and required verification.
05
Change
Variations state scope, price and programme effect before execution, except immediate action protecting life or the site.
06
Close-out
Defects, tests, as-built information, warranties and maintenance records are completed before final release.
Stage 1 · Expression of interest
Tell us what your team can deliver repeatedly.
Start with a short expression of interest. DALLEAU requests detailed references, sensitive documents and full prequalification evidence only when the trade, capacity and project need justify the next step.
Applications are reviewed against current and future package needs. DALLEAU contacts teams when fit, capacity and timing justify the next stage.
Website
What best describes your organisation?
General contractor
Specialist trade or installer
Supplier or distributor
Fabricator or workshop
Technical specialist or integrator
Other organised delivery team
Delivery partners
Company or team name
Primary contact name
Role
Email
Phone or WhatsApp
Primary trade, package or product category
Service area in Bali
Years of relevant experience
Website or view-only portfolio link
Current availability or earliest realistic start window
One comparable project or supply reference
What can your team deliver repeatedly and well?
If relevant
Team size or typical workforce
Brands represented
Workshop location
Languages used by the responsible person
Relevant licence category
Preferred project scale
Stage 1 · Expression of interest
I confirm that I am authorised to submit this expression of interest and that the information is accurate.
I have read the privacy notice and understand how DALLEAU will use this information.
Privacy
Send expression of interest
If secure submission is temporarily unavailable, you can copy a local summary and email hello@dalleau.ai.
Expression of interest received
Your reference is shown below. DALLEAU will contact your team when fit, capacity and timing justify a next stage.
Copy summary
Open email draft
For owners
See how delivery partners enter the same owner-side evidence chain used across the mandate.
Review the Full Development Mandate →
For partners
Good work, honest reporting and effective defect response are the basis for future invitations.
Register your interest →
Mitra pelaksana
Sistem pelaksanaan untuk kerja sama jangka panjang.
DALLEAU bekerja dengan kontraktor, pelaksana spesialis, pemasok, dan tim lapangan terorganisir yang mampu menyelesaikan lingkup yang jelas, mendokumentasikan pekerjaan dengan baik, dan berkembang melalui evaluasi. Kami membangun hubungan yang dapat diandalkan untuk proyek yang sesuai, bukan sekadar mengumpulkan penawaran satu kali.
Bagi pemilik, sistem ini memperjelas seleksi, harga, dan kontrol lapangan. Bagi mitra yang terbukti, sistem ini memperjelas ekspektasi, keputusan, dan peluang kerja berikutnya.
Sampaikan minat Anda
Lihat metode
Pilih jalur yang relevan
Untuk pemilik dan penasihat
Lihat bagaimana DALLEAU mendefinisikan paket, membandingkan penawaran, memastikan pekerjaan yang akan tertutup tetap terbuka untuk diperiksa, dan mendukung rekomendasi pembayaran.
Lihat kontrol pihak pemilik →
Untuk kontraktor, pelaksana, dan pemasok
Lihat apa yang diharapkan DALLEAU, apa yang diterima mitra yang baik, dan bagaimana undangan berikutnya diperoleh.
Lihat kerangka mitra →
Kontrol pihak pemilik
Kontraktor dipilih berdasarkan paket, bukan daftar kontak.
Kemampuan, kapasitas, referensi, struktur harga, dan metode pelaksanaan dinilai terhadap satu lingkup yang jelas.
01
Tentukan lingkup
Gambar, kuantitas, spesifikasi, program, dan tanggung jawab menjadi satu dasar harga.
02
Bandingkan secara setara
Penawaran disetarakan menurut cakupan, pengecualian, pajak, waktu, garansi, dan substitusi.
03
Periksa sebelum ditutup
Titik tahan (hold point) menjaga pekerjaan yang akan tertutup tetap terbuka sampai pemeriksaan dan dokumentasi selesai.
04
Rekomendasikan pembayaran berdasarkan bukti
Rekomendasi pembayaran mengikuti tahap kontrak, pekerjaan yang diterima, dan dokumen yang diwajibkan.
Pertukaran nilai
Mitra yang baik tidak seharusnya menanggung risiko proyek yang dapat dihindari.
DALLEAU menuntut bukti karena disiplin yang sama harus melindungi mitra dari lingkup yang kabur, instruksi bertentangan, perubahan diam-diam, dan keputusan pembayaran sewenang-wenang.
01
Paket jelas sebelum harga final
Gambar, kuantitas, spesifikasi, dasar pajak, pengecualian, dan program dinyatakan dengan jelas.
02
Satu jalur instruksi yang jelas
Instruksi tidak datang dari beberapa orang yang tidak terkoordinasi.
03
Klarifikasi teknis terkonsolidasi
Pertanyaan dan keputusan dicatat sebelum menjadi pekerjaan ulang.
04
Uji fisik berbayar
Mock-up atau pilot yang diminta memiliki lingkup, penerimaan, dan pembayaran tertulis.
05
Variasi tertulis
Pekerjaan tambahan tidak diam-diam diserap ke harga awal.
06
Tinjauan tahap berdasarkan bukti
Rekomendasi pembayaran mengikuti kontrak paket dan dokumen yang diterima.
07
Kerahasiaan komersial
Rincian harga diperlakukan sebagai informasi proyek.
08
Umpan balik dan peluang berikutnya
Tim yang terbukti menghabiskan lebih sedikit waktu untuk kualifikasi ulang dan dapat diundang kembali ketika kecocokan, kapasitas, dan kinerja mendukungnya.
Integritas komersial
Lingkup yang sebanding sebelum harga yang sebanding.
Angka awal terendah tidak otomatis menang. Semua tim yang lolos seleksi memberikan harga untuk paket yang sama, sementara DALLEAU menilai kuantitas, harga satuan, cakupan, pengecualian, pajak, waktu, garansi, subkontrak, kapasitas, dan metode secara bersama.
Kebangsaan klien bukan variabel harga.
Substitusi material memerlukan tinjauan teknis dan komersial tertulis.
Hubungan pihak terafiliasi harus diungkapkan.
Rabat pemasok, diskon dagang, dan kredit yang disepakati mengikuti kontrak proyek dan aturan kontrol pihak pemilik.
DALLEAU tidak menerima komisi, pembayaran rujukan, atau manfaat proyek di luar pembukuan yang tidak diungkapkan.
Paket berulang dapat memakai harga satuan yang disepakati atau dibandingkan ketika lingkup dan risiko cukup stabil.
Kenaikan harga memerlukan dasar yang dinyatakan.
Tiga dokumen yang memungkinkan keputusan komersial.
01
BOQ
Belum cukup untuk memutuskan
Satu harga borongan
Deskripsi kabur
Tanpa dasar pajak, pengecualian, waktu, atau garansi
Subkontrak tidak diungkapkan
Siap ditinjau
Kuantitas dan harga satuan
Cakupan, pengecualian, dan dasar pajak
Waktu, garansi, substitusi, subkontrak, dan masa berlaku
02
Variasi
Belum cukup untuk memutuskan
“Tambahkan ini. Nanti kita selesaikan.”
Siap ditinjau
Alasan dan lingkup revisi
Dampak harga dan program
Persetujuan sebelum pelaksanaan
03
Tahap pembayaran
Belum cukup untuk memutuskan
“Pekerjaan sudah 70%.”
Siap ditinjau
Tahap kontrak yang disebutkan
Area yang diterima dan bukti pemeriksaan
Butir terbuka dan nilai yang direkomendasikan
Perbandingan metode ilustratif
Hasil yang rapi diputuskan sebelum finishing.
Contoh ini menunjukkan mengapa DALLEAU menyelesaikan detail sambungan dan titik temu kritis sebelum tertutup oleh pekerjaan finishing. Metode yang diterima dikoordinasikan sebagai bagian dari sistem konstruksi, bukan diimprovisasi setelah ruang terlihat selesai.
01
Koordinasikan kaca sebelum ubin dipasang.
Intervensi terlambat — tidak diterima
Alur dipotong pada ubin baru yang sudah selesai setelah kamar mandi lengkap.
Dikoordinasikan sebelum pekerjaan finishing
Profil F tanam yang diterima ditata sebelum ubin dipasang agar kaca dan tepi ubin terselesaikan sebagai satu detail.
02
Pertahankan akses servis tanpa membuatnya dominan.
Intervensi terlambat — tidak diterima
Katup tersembunyi hanya dapat dicapai dengan membuka permukaan yang sudah selesai.
Dikoordinasikan sebelum pekerjaan finishing
Panel akses rata mengikuti pola garis dan menjaga titik servis dapat dirawat.
03
Tentukan posisi drain dan pola ubin secara bersamaan.
Intervensi terlambat — tidak diterima
Penempatan drain diputuskan setelah pola ubin ditetapkan, sehingga menghasilkan potongan tipis, asimetri, dan kemiringan yang sulit dikendalikan.
Dikoordinasikan sebelum pekerjaan finishing
Posisi drain, modul ubin, dan kemiringan dikoordinasikan sebagai satu permukaan.
04
Lindungi penetrasi dengan waterproofing, bukan sekadar menutup gejalanya.
Intervensi terlambat — tidak diterima
Penetrasi yang sudah selesai bergantung pada sealant permukaan tebal setelah finishing.
Dikoordinasikan sebelum pekerjaan finishing
Collar pipa, penguatan, dan membran menerus diperiksa sebelum ditutup ubin.
Proses seleksi
Terbuka untuk mitra baru. Teliti pada setiap tahap.
Kualifikasi memberi kelayakan untuk paket yang sesuai. Setiap penunjukan tetap spesifik untuk proyek.
01
Pendaftaran
Pernyataan minat singkat menjelaskan bidang, wilayah, pengalaman, dan ketersediaan.
02
Tinjauan bukti
Kami meninjau identitas usaha, pengalaman relevan, portofolio, dan tim penanggung jawab.
03
Percakapan teknis
Penanggung jawab menjelaskan metode, tenaga, peralatan, urutan, risiko, dan pemeriksaan.
04
Penawaran sebanding
Tim terpilih menilai lingkup, kuantitas, spesifikasi, pajak, pengecualian, dan program yang sama.
05
Referensi dan kunjungan
Dengan izin, referensi dapat dihubungi dan pekerjaan selesai, workshop, atau proyek aktif dapat ditinjau.
06
Pilot berbayar bila berguna
Uji fisik yang diminta memiliki lingkup, penerimaan, dan pembayaran tertulis. DALLEAU tidak meminta pekerjaan konstruksi gratis.
07
Penunjukan proyek
Paket mengatur tanggung jawab, submittal, hold point, tahap, variasi, garansi, dan pelaporan.
08
Rekam jejak kinerja
Mutu, keselamatan, program, pelaporan, kontrol komersial, dan penanganan cacat memengaruhi kelayakan berikutnya.
Yang dinilai DALLEAU
Enam informasi membuat pendaftaran dapat ditindaklanjuti.
Portofolio yang kuat membantu. Kapasitas saat ini, harga yang dapat ditinjau, dan pelaksanaan yang dapat diverifikasi sama pentingnya.
01
Pengalaman relevan
Lama bekerja dalam bidang yang diajukan dan peran yang benar-benar dilakukan tim.
02
Pekerjaan selesai
Jenis, lokasi, dan skala pekerjaan sebanding yang dapat diperiksa.
03
Referensi yang dapat dihubungi
Kontak diminta kemudian dengan persetujuan.
04
Kontrak berjalan
Komitmen aktif, alokasi tim, dan ketersediaan realistis untuk paket baru.
05
Metode pelaksanaan
Penanggung jawab, tenaga, peralatan, kontrol mutu, keselamatan, dan pelaporan.
06
Kejelasan komersial
Harga satuan, cakupan, pengecualian, pajak, waktu, garansi, dan subkontrak.
Kerangka kerja
Bukti yang jelas sebelum pembayaran direkomendasikan.
DALLEAU menggabungkan metode kontrol proyek terdokumentasi dengan kebutuhan iklim, rantai pasok, dan pelaksanaan lapangan di Bali. Desain yang disetujui, ketentuan Indonesia yang berlaku, sistem terpilih, dan petunjuk produsen mengatur setiap paket.
01
Lingkup
Kontrak menentukan gambar, spesifikasi, kuantitas, cakupan, pengecualian, program, dan penanggung jawab.
02
Submittal
Material, sampel, metode, dan bukti yang diperlukan disetujui sebelum pekerjaan terkait.
03
Verifikasi
Kemajuan diperiksa terhadap tahap yang ditentukan dan lingkup peninjau yang ditunjuk bila diperlukan.
04
Pembayaran
Rekomendasi mengikuti tahap kontrak, bukti yang diterima, dan verifikasi yang diperlukan.
05
Perubahan
Variasi menyatakan lingkup, harga, dan dampak program sebelum pelaksanaan, kecuali tindakan darurat untuk melindungi orang atau lokasi.
06
Penutupan
Cacat, pengujian, as-built, garansi, dan rekaman pemeliharaan diselesaikan sebelum pembayaran akhir direkomendasikan.
Tahap 1 · Pernyataan minat
Ceritakan apa yang dapat tim Anda kerjakan secara konsisten dengan baik.
Mulai dengan pernyataan minat singkat. DALLEAU meminta referensi terperinci, dokumen rahasia, dan bukti prakualifikasi lengkap hanya ketika bidang, kapasitas, dan kebutuhan proyek mendukung tahap berikutnya.
Pendaftaran ditinjau terhadap kebutuhan paket saat ini dan mendatang. DALLEAU menghubungi tim ketika kecocokan, kapasitas, dan waktu mendukung tahap berikutnya.
Website
Apa yang paling tepat menggambarkan organisasi Anda?
Kontraktor utama
Pelaksana spesialis atau installer
Pemasok atau distributor
Fabrikator atau workshop
Spesialis teknis atau integrator
Tim pelaksana terorganisir lainnya
Mitra pelaksana
Nama perusahaan atau tim
Nama kontak utama
Peran
Email
Telepon atau WhatsApp
Bidang, paket, atau kategori produk utama
Area layanan di Bali
Tahun pengalaman relevan
Situs atau tautan portofolio yang hanya dapat dilihat
Ketersediaan saat ini atau waktu mulai realistis
Satu proyek atau pasokan sebanding
Apa yang dapat tim Anda kerjakan secara konsisten dengan baik?
Jika relevan
Ukuran tim atau tenaga kerja umum
Merek yang diwakili
Lokasi workshop
Bahasa penanggung jawab
Kategori izin yang relevan
Skala proyek yang disukai
Tahap 1 · Pernyataan minat
Saya mengonfirmasi bahwa saya berwenang mengirim pernyataan minat ini dan bahwa informasi yang diberikan akurat.
Saya telah membaca pemberitahuan privasi dan memahami penggunaan informasi ini oleh DALLEAU.
Privasi
Kirim pernyataan minat
Jika pengiriman aman sementara tidak tersedia, Anda dapat menyalin ringkasan lokal dan mengirimkannya ke hello@dalleau.ai.
Pernyataan minat diterima
Nomor referensi ditampilkan di bawah. DALLEAU akan menghubungi tim ketika kecocokan, kapasitas, dan waktu mendukung tahap berikutnya.
Salin ringkasan
Buka draf email
Untuk pemilik
Lihat bagaimana mitra pelaksana masuk ke rantai bukti pihak pemilik yang sama di seluruh mandat.
Lihat Full Development Mandate →
Untuk mitra
Pekerjaan baik, pelaporan jujur, dan penanganan cacat yang efektif menjadi dasar undangan berikutnya.
Sampaikan minat Anda →

## Développement de résidences privées à Bali | DALLEAU

URL: https://dalleau.ai/fr/

Bureau de développement aux côtés du propriétaire · Résidences privées et domaines résidentiels avec services · Bali
Un seul bureau de développement, responsable devant le propriétaire.
Étude illustrative de résidence.
Même bien conseillé, un projet peut perdre sa logique entre les périmètres.
Parler à François
Work
Un premier échange ne demande pas de dossier complet. Il suffit de préciser le site, l’usage prévu et la question du propriétaire.
Les personnes, les périmètres et les phases changent.
L’intention du propriétaire, les décisions et leurs preuves doivent rester reliées.
Le rôle de DALLEAU auprès du propriétaire
Une même ligne de responsabilité malgré l’évolution des périmètres.
Chaque spécialiste conserve les responsabilités prévues par sa mission. DALLEAU maintient le lien entre les questions du propriétaire, ses décisions, les preuves et les prochains jalons du développement.
La question du propriétaire est formulée avant de confier une mission à un spécialiste.
Pour chaque décision, le motif, l’autorité dont elle relève, les éléments de preuve et le prochain jalon sont consignés.
La conception technique, la conformité et l’acceptation restent du ressort des spécialistes mandatés.
Relevé du chantier
L’escalier, le vide central et les interfaces voisines avant l’achèvement des finitions.
Livré et en exploitation
Le même espace après livraison, en exploitation.
Dossier d’un projet livré
Harmonie, du chantier à l’exploitation.
Un dossier de projet circonscrit relie les conditions visibles pendant le chantier aux décisions et responsabilités qu’elles ont éclairées, tout en conservant l’état ultérieur en exploitation comme un niveau de preuve distinct.
Voir le dossier projet
Commencer par la décision à prendre
Trois façons de commencer.
Brief confidentiel
Sans honoraires · sur sélection
Une première analyse confidentielle du site, de l’usage prévu, de la situation actuelle et de la décision à prendre.
Commencer le brief confidentiel →
Étude de faisabilité
15 000 USD · 15 jours ouvrés à réception d’un dossier complet
Une évaluation menée aux côtés du propriétaire, portant sur l’hypothèse de projet, les contraintes critiques, les missions à prévoir et la prochaine décision.
Commander l’étude →
Mandat complet de développement
Pour des budgets gérés à partir de 1 M USD, hors foncier
Une coordination continue aux côtés du propriétaire, du brief et de la désignation des spécialistes jusqu’à la préparation de la livraison et de l’exploitation.
Discuter d’un mandat complet →
Comment travaille DALLEAU
Aux côtés de l’équipe mandatée. Jamais à sa place.
DALLEAU formule les questions du propriétaire, coordonne les interfaces et préserve le dossier de décision. Architectes, ingénieurs, consultants, entreprises et exploitants conservent les responsabilités de leurs missions.
Explorer le système DALLEAU
Quatre espaces pour continuer, chacun avec une fonction différente.
Preuves projet
Voir le projet, pas seulement le résultat.
Relevés de chantier, conditions livrées et décisions qui les relient.
Explorer Work
→
Recherche appliquée · Concept illustratif
Transformer une preuve en question de projet.
Voir comment la recherche devient un brief, une cible, un prototype ou une vérification.
Explorer Atelier
→
Signaux actuels et Reality Checks
Comprendre ce qui change avant que cela n’atteigne le projet.
Réglementation, signaux de marché et vérifications pratiques pour Bali.
Lire Field Notes
→
Outils de décision
Structurer la question avant que la décision ne se fige.
Utiliser DALLEAU Intelligence sans confondre projection et conseil.
Utiliser DALLEAU Intelligence
→
Responsabilité du fondateur
François reste personnellement responsable de la continuité du mandat aux côtés du propriétaire.
François Dalleau conduit personnellement chaque mandat DALLEAU et en assume la responsabilité dans le périmètre convenu. Les spécialistes mandatés conservent leurs responsabilités, tandis qu’il maintient reliés les objectifs, les décisions, les preuves et les prochaines actions du propriétaire.
Lire la note du fondateur
→
Comment les responsabilités sont séparées
DALLEAU
Direction et contrôle côté propriétaire
Formule la question du propriétaire, coordonne les décisions et relie validations, coûts, preuves et responsabilités.
Bee My Guest · si mandatée
Exploitation de la résidence
Assure le personnel, la maintenance et l’hospitalité uniquement dans le cadre d’un mandat d’exploitation distinct.
Missions indépendantes
Spécialistes propres au projet
Architectes, ingénieurs, entreprises et conseils réglementés restent responsables de leur périmètre.
Les personnes derrière le travail
Une équipe établie à Bali porte le travail jusque dans l’usage quotidien.
Finance, achats, ressources humaines, opérations résidentielles, entretien et contenus soutiennent le travail autour de chaque mission.
Découvrir l’équipe
→
Commençons par la décision à prendre.
Un premier échange ne demande pas de dossier complet. Il suffit de préciser le site, l’usage prévu et la question du propriétaire.
Parler à François

## DALLEAU Atelier | Recherche résidentielle appliquée

URL: https://dalleau.ai/fr/atelier/

Voir ce qui change dans une résidence

Explorer les huit thèmes

Comprendre la trame des protocoles

Lire la bibliothèque fondatrice

Voir l’examen des preuves

Index des sections Atelier

Voir ce qui change dans une résidence

Explorer les huit thèmes

Comprendre la trame des protocoles

Lire la bibliothèque fondatrice

Voir l’examen des preuves

DALLEAU Atelier

Même pièce. Autre brief.

Les deux peuvent être photogéniques. Avec Atelier, la lumière, l’air, le calme, l’intimité, les matières, les commandes et l’exploitation sont coordonnés avant que les changements ne deviennent coûteux.

Cellule de recherche appliquée et de développement consacrée à la façon dont une résidence privée se vit, fonctionne et évolue.

Choisissez votre parcours

Accédez directement à la partie d’Atelier qui répond à la question qui se pose.

01 Voir ce qui change dans une résidence ↓

02 Explorer les huit thèmes ↓

03 Comprendre la trame des protocoles ↓

04 Lire la bibliothèque fondatrice ↓

05 Voir l’examen des preuves ↓

Brief de villa conventionnel Brief informé par Atelier

Brief de villa conventionnel Brief informé par Atelier ↔ 01 02 03 04 05 06

Entrée de lumière naturelle Spots encastrés directs Champ visuel du lit Lumière de la salle d’eau

Réflectance du plafond Reflets sur les murs Hiérarchie des textures Contraste du sol

Mode d’ouverture Zone dressing Extraction salle d’eau Mode fermé / absence

Route de service Parcours des ouvertures Bruit des équipements Zone du lit protégée

Vue depuis le lit Seuil de la salle d’eau Tampon du dressing Parcours de circulation

Commande locale Commande manuelle prioritaire Prototype à l’échelle réelle Passeport du bâtiment

Utilisez la poignée ou les flèches pour comparer. Concept illustratif

Six transformations dans une même pièce

Lumière et obscurité Matières et champ visuel Air et humidité Calme Intimité et circulation Commandes et preuve

Brief conventionnel

Un seul plan d’éclairage général.

Plafond blanc, spots encastrés directs et aucune condition du soir ou de la nuit traitée séparément.

Réponse Atelier

Quatre conditions, pas une scène unique.

Lumière du jour, tâche, soirée et période de sommeil sont briefées séparément, coordonnées avec les spécialistes puis vérifiées en usage.

Pourquoi cela compte

Une lumière chaude ne constitue pas une stratégie.

Moment, intensité, direction, durée et sources visibles depuis le lit modifient le résultat.

Brief conventionnel

Un volume blanc photogénique par défaut.

Les surfaces sont choisies séparément, sans lecture commune des reflets, du contraste, de la texture et du vieillissement.

Réponse Atelier

Un champ visuel maîtrisé.

Réflectance, grain, contraste, répétition, éblouissement et entretien sont lus depuis les positions réelles de la pièce.

Pourquoi cela compte

La matière n’est pas seulement une finition.

Elle modifie la lumière, la lisibilité, l’entretien et la perception quotidienne de l’espace.

Brief conventionnel

Le refroidissement est confondu avec la qualité d’air.

Température, air neuf, humidité, extraction, filtration et absence sont traités par lots séparés.

Réponse Atelier

La résidence fonctionne par modes.

Ouvert, mixte, fermé, nuit et absence relient l’enveloppe, les lots techniques — notamment CVC, électricité et plomberie —, les commandes et les routines.

Pourquoi cela compte

Une pièce fraîche peut rester chargée d’humidité.

Le contrôle dépend des sources, des parcours, du séchage, de la maintenance et des conditions extérieures.

Brief conventionnel

Un indice de paroi et une moyenne en dBA.

Le plan est figé avant que pluie, équipements, service, parole et événements nocturnes soient résolus.

Réponse Atelier

Le calme est conçu comme un système.

Implantation, enveloppe, ouvertures, équipements, détails et exploitation sont coordonnés autour des événements réels.

Pourquoi cela compte

Une moyenne calme peut masquer des perturbations répétées.

Le moment, la fréquence, la tonalité et le parcours d’un son comptent autant que son niveau moyen.

Brief conventionnel

La circulation ouverte se résoudra plus tard.

Vues, personnel, invités, salle d’eau et retrait personnel restent des conséquences du plan.

Réponse Atelier

L’intimité devient un gradient.

Le foyer peut rejoindre, se retirer, recevoir et circuler sans exposition involontaire.

Pourquoi cela compte

L’intimité dépend du contrôle, pas de l’isolement.

Seuils, lignes de vue et choix de parcours déterminent qui voit quoi, quand et depuis où.

Brief conventionnel

L’automatisation est ajoutée tard.

Les scènes, dépendances cloud, reprises après coupure et routines du personnel sont réglées après les choix principaux.

Réponse Atelier

Les fonctions critiques restent compréhensibles.

Commande locale, reprise manuelle, scénarios, essais, formation et documentation sont définis avec le brief.

Pourquoi cela compte

Livré ne signifie pas vérifié.

Une intention devient crédible lorsqu’elle possède un critère, un responsable, un test et une trace.

La méthode derrière la différence

La différence visible commence par de meilleures questions.

La recherche n’a de valeur que lorsqu’elle modifie le brief, une cible, la mission d’un spécialiste, un prototype à l’échelle réelle, un essai ou le plan d’exploitation.

01 Question de recherche

02 Question de projet

03 Cible

04 Mission spécialiste

05 Prototype à l’échelle réelle

06 Vérification

07 Apprentissage après usage

Explorer Atelier Parler à François

Les décisions de projet sont confirmées par les spécialistes mandatés, des prototypes à l’échelle réelle et le commissioning.

Preuves et usage projet

Trois couples de questions séparent la preuve, l’interprétation et la décision.

Que savons-nous ?

Que peut décider ce projet ?

Distinguer le constat du cahier des charges. Une orientation cohérente peut devenir une question de projet, une cible ou un prototype à l’échelle réelle.

Qu’a montré l’étude ?

Qu’est-ce qu’elle n’a pas démontré ?

Consigner le cadre, la population et la méthode, puis formuler clairement la limite. Un résultat contrôlé ne devient pas automatiquement un effet durable en résidence.

Qu’est-ce qui est établi ?

Que faut-il encore valider sur site ?

Utiliser directement les preuves les plus solides lorsque cela convient. Le climat, l’usage, les missions spécialistes et le commissioning déterminent encore la réponse projet.

Là où les protocoles agissent

Chaque étape résout une question différente du propriétaire.

Le projet avance lorsque la décision, la preuve et la responsabilité pertinentes sont explicites.

01 Terrain et faisabilité

Les preuves du site, les hypothèses d’exploitation et les alertes matérielles sont consignées avant toute recommandation.

02 Brief du foyer

Usages, invités, intimité, parcours du personnel, retrait et service sont clarifiés avant de figer le programme.

03 Concept et conception coordonnée

Les questions de performance deviennent critères, missions spécialistes et exigences de prototype.

04 Achats et chantier

Appels d’offres, validations, modifications et points d’arrêt conservent la base de décision visible.

05 Commissioning et ouverture

La résidence est testée, réglée, documentée et préparée à l’exploitation avant la libération.

06 Revues à 30 jours, saisonnières et annuelles

Observations d’usage, maintenance et POE mettent à jour le Building Passport et les décisions futures.

Huit thèmes reliés

Une résidence réelle ne sépare pas les disciplines.

Les thèmes structurent la recherche. Dans le projet, ils se rencontrent dans une même pièce, une même décision et un même mode d’exploitation.

Thème central

Lumière et obscurité

Conditions de jour, de tâche, du soir et de la période de sommeil.

Découvrir → Voir le protocole associé Thème central

Air et humidité

Sources, air extérieur, refroidissement, extraction, séchage et maintenance.

Découvrir → Voir le protocole associé Study Notes dans ce thème

L’étanchéité est une chaîne, pas une couche appliquée à la fin.

Dallage sur terre-plein ou plancher suspendu à Bali ?

Une membrane ne sauve pas une toiture plate sans pentes.

Le drainage extérieur fait partie de la résidence.

Thème central

Confort thermique tropical

Température, rayonnement, humidité, vitesse d’air, activité et vêtements.

Découvrir → Voir le protocole associé Thème central

Résidence intelligente à fonctionnement local prioritaire

Fonctions essentielles, commande manuelle prioritaire, vie privée et fonctionnement sans internet.

Découvrir → Voir le protocole associé Piste de recherche

Calme et acoustique

Événements, équipements, pluie, parole et parcours sonores.

Découvrir → Voir le protocole associé Piste de recherche

Matières et champ visuel

Réflectance, contraste, texture, vieillissement et entretien.

Découvrir → Voir le protocole associé Piste de recherche

Intimité et lisibilité

Seuils, lignes de vue, retrait, accueil et neurodiversité.

Découvrir → Voir le protocole associé Piste de recherche

Résidence évolutive

Âge, autonomie, changement du foyer et continuité d’usage.

Découvrir → Voir le protocole associé

Trois engagements publics

Atelier renforce les façons existantes de travailler avec DALLEAU.

Il ne constitue pas une quatrième offre. La profondeur de la méthode dépend de la décision et du mandat.

Brief privé

Identifier l’adéquation, les premières questions et les risques qui méritent un examen.

Cadrer le projet, l’autorité de décision, l’usage prévu, l’état d’avancement et le point de départ probable.

Découvrir → Étude de faisabilité

Tester le site, le programme, le coût, les spécialistes et les critères qui doivent entrer dans la décision.

Activer les analyses du site, de la résidence et des spécialistes nécessaires pour tester la base de décision.

Découvrir → Mandat complet

Porter les objectifs, les responsabilités, les prototypes à l’échelle réelle, les points d’arrêt, le commissioning et la continuité.

Faire vivre les protocoles pertinents dans la chaîne de preuve côté propriétaire, du brief à l’après-livraison.

Découvrir →

Méthode interne

Neuf protocoles. Pas neuf produits.

P01, P03, P04 et P08 sont détaillés au lancement. Les cinq autres restent des parties visibles d’une même architecture de projet.

P01

Base tropicale du site

Eau, bruit, exposition, accès, réseaux et résilience.

Découvrir → Protocole complet P03

Chambre protégée

Lumière, calme, air, intimité, commandes et nuit.

Découvrir → Protocole complet P04

Environnement intérieur

Humidité, air, extraction, refroidissement et maintenance.

Découvrir → Protocole complet P08

Mise au point, vérification et POE

Essais, correction, transmission et apprentissage.

Découvrir → Protocole complet P02 · P05 · P06

Foyer, lumière, acoustique

Déployés lorsque le projet l’exige.

Découvrir → Voir le protocole associé P07 · P09

Commandes et Building Passport, le passeport du bâtiment

Continuité locale, données, exploitation et actif.

Découvrir → Voir le protocole associé

Recherche appliquée

Une recherche qui modifie le brief.

Les Study Notes expliquent ce que les preuves peuvent soutenir. Les Methods Notes montrent comment elles peuvent informer un brief de projet.

Study Notes

Lire une question précise

Sources originales, niveau de preuve, limites et transférabilité.

Ouvrir → Methods Notes

Passer de la lecture au projet

Cibles, responsabilités, prototypes à l’échelle réelle, essais et points d’arrêt.

Ouvrir → Voir le protocole associé Preuves et corrections

Comprendre notre discipline

Ce qui est connu, incertain, corrigé ou laissé comme question.

Ouvrir →

Niveaux de preuve

La maturité reste visible.

Atelier peut présenter une recherche émergente ou un point de vue DALLEAU, à condition de ne pas les faire passer pour une règle établie.

Preuve établie

Formulation directe dans le périmètre réel de la source.

Guidance officielle, standards, revues systématiques ou plusieurs études humaines convergentes.

Preuve convergente

Plusieurs résultats vont dans le même sens, avec variations.

Plusieurs études crédibles, encore dépendantes de la population, du contexte, de la durée ou de la méthode.

Recherche émergente

Résultat intéressant, méthode et limites explicites.

Résultats prometteurs présentant encore des limites importantes.

Question de recherche

Hypothèse à observer ou tester, pas règle universelle.

Une hypothèse plausible à observer ou à tester dans le projet.

Continuer

Partez de la question qui se présente.

Voir ce qui a été réalisé, comprendre ce qui a changé à Bali, utiliser un outil de décision ou parler directement du projet.

Projets

Voir les preuves construites et les statuts réels.

Réalisations livrées, projets en cours et preuves issues du terrain.

Découvrir → Notes de terrain

Lire les changements, leurs conséquences et les vérifications utiles.

Règles actuelles, Reality Checks et interprétation côté propriétaire.

Découvrir → DALLEAU Intelligence

Utiliser un outil sans confondre projection et résultat.

Structurer la question avant qu’une décision de projet ne se fige.

Découvrir → Parler à François

Présenter le site, l’usage, le budget et la décision actuelle.

Échanger sur le site, le foyer, l’étape du projet et la décision à prendre.

Découvrir →

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Comprendre les preuves et leurs limites

## Preuves, méthode et corrections | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/evidence-and-review/

DALLEAU / Atelier / Preuves et méthode

DALLEAU Atelier · Preuves et méthode

Ce que nous savons. Ce qui reste incertain. Ce qu’un projet peut raisonnablement utiliser.

DALLEAU Atelier traduit la recherche publique en questions résidentielles, critères de projet et méthodes de vérification. Une source peut être établie, convergente ou émergente : l’essentiel est que le document d’origine, l’énoncé soutenu et ses limites soient clairs.

Principe

Une étude n’est pas une règle de conception.

Nous commençons par la question réellement posée, le protocole employé, la population et le contexte observés, l’exposition ou l’intervention, puis le résultat mesuré. Nous regardons ensuite les limites, les conflits possibles et, surtout, ce que l’étude n’a pas démontré.

Une conclusion n’entre dans un projet qu’après cette lecture. Elle peut alors soutenir une exigence, orienter une recommandation, devenir une cible de projet ou rester une hypothèse à tester.

Niveaux publics

Quatre niveaux permettent de parler avec précision.

Preuve établie

Guidance officielle, standard reconnu ou ensemble de résultats suffisamment cohérents pour soutenir une formulation directe dans son périmètre.

Preuve convergente

Plusieurs travaux vont dans la même direction, mais l’effet dépend encore du contexte, de la population ou de la méthode.

Recherche émergente

Une piste pertinente, présentée avec son protocole, sa taille d’échantillon et ses limites. Elle peut faire évoluer une question de brief sans devenir une règle universelle.

Question de recherche

Une hypothèse plausible à observer, maquetter ou mesurer dans le projet. Elle n’est pas présentée comme une connaissance établie.

Nature de l’énoncé

La source et le point de vue DALLEAU ne sont jamais confondus.

Guidance officielle

Une exigence, recommandation ou référence publiée par une autorité ou un organisme de normalisation reconnu.

Recommandation fondée sur les preuves

Une interprétation pratique soutenue par l’état actuel des connaissances, avec ses limites explicites.

Point de vue DALLEAU

Notre lecture du contexte résidentiel et du projet, identifiée comme telle. Elle peut être ferme sans prétendre être une vérité scientifique universelle.

Condition de projet

Une observation ou une mesure documentée sous des conditions données. Elle ne se transfère pas automatiquement à un autre site.

Transfert local

La preuve doit encore résister à Bali.

Climat chaud et humide, pluies battantes, micro-localisation, pollution extérieure, insectes, corrosion, coupures de courant, maintenance et modes d’occupation modifient la traduction résidentielle. Une conclusion issue d’un bureau tempéré ou d’un laboratoire ne devient pas automatiquement une cible pour une villa à Bali.

Atelier formule donc la question transférable, précise ce qui doit être confirmé localement et indique le spécialiste, la maquette, la mesure ou le moment de vérification requis.

Cadre public

Cinq repères suffisent au lecteur.

Les pages longues affichent le niveau de preuve, le type d’application, la date de publication ou de mise à jour, ce qui n’a pas été démontré et les sources. Les registres plus détaillés restent internes afin que le site n’expose pas son processus de production au lieu d’expliquer la décision.

Un reviewer n’est mentionné que lorsqu’une revue a réellement eu lieu. Il n’est pas présenté comme une autorisation générale de publier.

Visuels

Les concepts illustratifs sont séparés des preuves de projet.

Certains concepts illustratifs de ce site sont générés ou enrichis à l’aide d’outils numériques, y compris l’intelligence artificielle générative, sous la direction de DALLEAU. Ils sont identifiés comme des concepts illustratifs et ne sont pas présentés comme des photographies de réalisations livrées ni comme des preuves de performance mesurée.

Un visuel comparatif peut expliquer une intention de brief. Il ne démontre pas une performance, un résultat de santé ou l’application de la méthode à une réalisation livrée. Les photographies de chantier, visualisations de conception et projets livrés conservent leurs propres statuts.

Corrections

Une erreur se corrige au niveau exact où elle apparaît.

Un DOI erroné, un titre mal associé ou une phrase trop large est corrigé, remappé, remplacé ou retiré. Cette correction ne transforme pas les autres sources en contenu inutilisable.

La date de mise à jour reste visible. Les changements matériels peuvent être consignés dans l’historique interne et, lorsqu’ils affectent le lecteur, expliqués sur la page concernée.

Limites

Ce cadre ne transforme pas Atelier en conseil médical ou certification.

Atelier ne diagnostique pas, ne traite pas et ne garantit pas le sommeil, le stress, la cognition, la santé ou la longévité. Les conclusions réglementées, les calculs d’ingénierie et les avis professionnels restent sous la responsabilité des spécialistes nommés.

La discipline consiste à dire clairement ce que nous savons, ce que nous pensons, ce que nous testons et pourquoi cela compte pour une résidence réelle.

Sources

Le constat de la source et l’interprétation résidentielle de DALLEAU restent distincts. Les liens ouvrent le document de l’éditeur ou de l’autorité.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

WHO guidelines for indoor air quality: dampness and mould Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Thermal Environmental Conditions for Human Occupancy Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Environmental noise guidelines for the European Region Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

IoT Device Cybersecurity Capability Core Baseline Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

The Commissioning Process and commissioning requirements for new buildings and systems Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Une étude n’est pas une règle de conception. Quatre niveaux permettent de parler avec précision. La source et le point de vue DALLEAU ne sont jamais confondus. La preuve doit encore résister à Bali. Cinq repères suffisent au lecteur. Les concepts illustratifs sont séparés des preuves de projet. Une erreur se corrige au niveau exact où elle apparaît. Ce cadre ne transforme pas Atelier en conseil médical ou certification.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## Protocoles | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/protocols/

DALLEAU / Atelier / Protocoles / Protocoles

DALLEAU Atelier · Méthode interne

Une méthode dans le mandat, pas un menu d’options.

Les neuf protocoles organisent les questions, les responsabilités, les points d’arrêt et les preuves à travers le projet. Ils renforcent le brief privé, l’étude de faisabilité et le mandat complet ; ils ne constituent pas neuf produits séparés.

Architecture

Trois engagements publics. Une seule méthode interne.

Le brief privé établit l’adéquation et les premières questions. L’étude de faisabilité teste un projet défini. Le mandat complet porte les décisions, les spécialistes, les appels d’offres, la réalisation, la livraison et l’exploitation. Les protocoles s’activent uniquement lorsque le site, le foyer ou la décision le justifient.

Avant la conception

P01 à P03 · Comprendre les conditions à protéger.

P01 · Base tropicale du site et de la résilience

Observer le terrain comme un environnement d’exploitation : eau, bruit, accès, services, exposition, maintenance et modes ouverts ou fermés.

P02 · Brief du foyer, lisibilité et intimité

Traduire rythmes, accueil, retrait, travail, service, âge et autonomie en relations spatiales et scénarios d’usage.

P03 · Protocole de performance de la chambre protégée

Coordonner lumière, obscurité, calme, air, humidité, température, intimité, commandes et routines nocturnes comme un seul système.

Pendant la conception et la réalisation

P04 à P07 · Transformer les intentions en critères vérifiables.

P04 · Environnement intérieur et maîtrise de l’humidité

Relier sources, air extérieur, humidité, extraction, refroidissement, filtration, matériaux et modes d’occupation pièce par pièce.

P05 · Lumière, obscurité et champ visuel

Séparer les conditions de jour, de tâche, du soir et de la période de sommeil, puis les vérifier à l’échelle réelle.

P06 · Calme, acoustique et maîtrise des sons

Traiter les parcours sonores, les équipements, la pluie, les services, la parole et les événements nocturnes comme un système.

P07 · Commandes locales, confidentialité et résilience numérique

Maintenir les fonctions essentielles compréhensibles, pilotables localement et récupérables sans dépendance permanente au cloud.

Avant et après la livraison

P08 et P09 · Vérifier, transmettre et apprendre.

P08 · Mise au point, vérification et apprentissage après occupation

Définir les essais avant les achats, documenter les résultats, corriger les écarts et revoir le fonctionnement après l’ouverture.

P09 · Building Passport, le passeport du bâtiment, et continuité de l’actif

Conserver les intentions, versions, tests, réglages, responsabilités, entretiens et décisions afin que le bâtiment reste lisible dans le temps.

Activation

Le bon protocole dépend de la décision à prendre.

Une matrice d’activation relie chaque question au stade du projet, au responsable, à la preuve requise et au point d’arrêt. Rien n’est activé pour donner une apparence scientifique au projet.

Les quatre protocoles développés au lancement — P01, P03, P04 et P08 — montrent le niveau de détail attendu. Les cinq autres restent visibles dans l’architecture commune et sont déployés lorsque le mandat l’exige.

Gouvernance

Une preuve doit exister avant de franchir un point d’arrêt.

L’objectif du propriétaire et le critère de réussite sont documentés.

Le spécialiste responsable et le périmètre de sa mission sont nommés.

La maquette, l’inspection, la mesure ou l’essai requis est défini.

L’écart, la correction et le nouvel essai restent traçables.

La décision entre dans l’Owner’s Control Report et, lorsque pertinent, le Building Passport.

Continuité

L’historique de la décision et celui de l’actif ne se confondent pas.

L’Owner’s Control Report explique ce qui doit être décidé, pourquoi et avec quel risque résiduel. Le Building Passport conserve ce qui a été conçu, installé, testé, réglé et transmis. La revue après occupation observe ensuite le fonctionnement réel sans présenter une expérience limitée comme une vérité universelle.

Trois engagements publics. Une seule méthode interne. P01 à P03 · Comprendre les conditions à protéger. P04 à P07 · Transformer les intentions en critères vérifiables. P08 et P09 · Vérifier, transmettre et apprendre. Le bon protocole dépend de la décision à prendre. Une preuve doit exister avant de franchir un point d’arrêt. L’historique de la décision et celui de l’actif ne se confondent pas.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## P04 · Environnement intérieur et humidité | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/protocols/indoor-environment-and-moisture-control-protocol/

DALLEAU / Atelier / Protocoles / P04

Protocole Atelier

P04 · Environnement intérieur et maîtrise de l’humidité

Une résidence peut sembler fraîche alors que l’humidité, les polluants et les périodes d’inoccupation restent mal maîtrisés. P04 relie source, air extérieur, ventilation, refroidissement, extraction, matériaux, mesure et maintenance pièce par pièce.

Bali exige davantage qu’un choix permanent entre maison ouverte et maison fermée.

Cadre de lecture

Cinq repères publics permettent de lire le niveau de preuve, l’usage possible et les limites de cette page.

Niveau de preuve

Guidance officielle et méthode DALLEAU ; cibles à valider par les spécialistes nommés

Type d’application

Conception, lots techniques — notamment CVC, électricité et plomberie —, enveloppe, commandes, puis mise au point et vérification (commissioning) et exploitation

Publié ou mis à jour

29 juillet 2026

Ce que cela n’a pas démontré

Le protocole ne prouve pas l’absence de moisissure ou de polluants et ne garantit ni qualité d’air ni confort pour chaque personne.

Sources

Consulter les sources originales

Problème coordonné

Refroidir l’air ne suffit pas à maîtriser l’environnement intérieur.

Température, humidité, point de rosée, eau liquide, pression, air extérieur, sources intérieures, filtration, extraction, séchage des salles d’eau, surfaces froides et maintenance interagissent. Une solution isolée peut déplacer le risque au lieu de le résoudre.

Carte pièce par pièce

Le protocole n’applique pas une règle unique à toute la résidence.

Chambres et rangements

Occupation nocturne, portes fermées, textiles, placards, surfaces froides, air neuf, silence et modes d’absence doivent fonctionner ensemble.

Salles d’eau

Production de vapeur, extraction, transfert d’air, temps de séchage, nettoyage et risques aux interfaces sont observés comme un cycle.

Cuisine et espaces de vie

Cuisson, odeurs, particules, ouverture sur l’extérieur, climatisation et variation d’occupation demandent des modes explicites.

Locaux techniques et service

Lessive, stockage, produits, déchets, équipements, filtres et maintenance ne doivent pas reporter leurs charges vers les espaces privés.

Modes d’exploitation

Ouvert, mixte, fermé et absence sont des conditions différentes.

Chaque mode précise les ouvertures, le refroidissement, la déshumidification éventuelle, l’air neuf, l’extraction et les commandes attendus. Les transitions sont aussi importantes que l’état stabilisé : ouverture après pluie, retour d’absence, occupation soudaine ou arrêt du réseau.

Hiérarchie

Contrôler d’abord les sources, puis les parcours.

Empêcher les infiltrations et l’eau liquide.

Limiter les sources et choisir des matériaux adaptés.

Évacuer localement humidité et polluants.

Définir l’air extérieur et la filtration selon le site.

Coordonner refroidissement et maîtrise de l’humidité.

Rendre les modes et alertes compréhensibles.

Prévoir inspection, entretien et remplacement.

Mesure utile

Un capteur ne remplace ni le diagnostic ni le contexte.

Température et humidité peuvent montrer une tendance, mais l’emplacement, la précision, la dérive, la durée, le mode de la pièce et les événements doivent être documentés. Des mesures spécialisées restent nécessaires lorsque la question porte sur l’enveloppe, les débits, la pression, l’eau, les polluants ou la contamination.

Points d’arrêt

Les hypothèses environnementales sont libérées avant d’être cachées.

Avant de figer le concept

La carte des risques et des modes par pièce est approuvée. Les besoins de spécialistes et de mesures sont planifiés.

Avant les achats

Capacités, séquences, accès de maintenance, filtres, drainage, commandes et critères d’essai sont inscrits dans les documents.

Avant fermeture

Étanchéité, isolants, percements, pentes, évacuations, passages d’air et accès techniques sont inspectés.

Avant ouverture

Débits, extraction, drainage, commandes, modes, reprise après coupure et tendances initiales sont vérifiés dans les conditions prévues.

Livrables

Un plan de contrôle qui relie conception, maintenance et conditions mesurées.

Carte des risques et modes par pièce.

Matrice sources-parcours-contrôles.

Cibles, méthodes et responsabilités.

Registre des inspections et essais.

Plan des capteurs et règles d’interprétation.

Routines de nettoyage, filtres et maintenance.

Escalade des anomalies et calendrier de revue.

Ce qui ne fonctionne pas seul

Les raccourcis restent visibles.

Une température basse ne démontre pas une humidité maîtrisée.

Un purificateur ne remplace ni ventilation ni contrôle des sources.

Un capteur ponctuel ne décrit pas une saison.

Une maison toujours ouverte n’est pas adaptée à tous les épisodes extérieurs.

Une maison toujours fermée n’est pas automatiquement saine ou résiliente.

Traduction Bali

Le micro-site et l’exploitation réelle déterminent la réponse.

Distance à la côte, pluie, vent, végétation, activités voisines, poussière, trafic, eau, durée d’inoccupation, compétences de maintenance et stabilité électrique changent les priorités. P04 ne propose donc pas un seuil universel détaché du projet.

Limites

Le protocole organise le contrôle ; il ne certifie pas l’absence de risque.

Conditions cachées, changements saisonniers, entretien, comportements et événements extérieurs peuvent modifier le résultat. Les diagnostics de moisissure, analyses de polluants, calculs des lots techniques et conclusions réglementées restent confiés aux spécialistes compétents.

Sources

Le constat de la source et l’interprétation résidentielle de DALLEAU restent distincts. Les liens ouvrent le document de l’éditeur ou de l’autorité.

WHO global air quality guidelines Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

WHO guidelines for indoor air quality: dampness and mould Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

WHO guidelines for indoor air quality: selected pollutants Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

ASHRAE position document on limiting indoor mold and dampness in buildings Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

ASHRAE position document on indoor carbon dioxide Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Low-cost air pollution monitors and indoor air quality Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Enhanced Air Sensor Guidebook Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Refroidir l’air ne suffit pas à maîtriser l’environnement intérieur. Le protocole n’applique pas une règle unique à toute la résidence. Ouvert, mixte, fermé et absence sont des conditions différentes. Contrôler d’abord les sources, puis les parcours. Un capteur ne remplace ni le diagnostic ni le contexte. Les hypothèses environnementales sont libérées avant d’être cachées. Un plan de contrôle qui relie conception, maintenance et conditions mesurées. Les raccourcis restent visibles.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## P08 · Commissioning et retour d’usage | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/protocols/performance-commissioning-and-post-occupancy-learning-plan/

DALLEAU / Atelier / Protocoles / P08

Protocole Atelier

P08 · Mise au point, vérification et apprentissage après occupation

La livraison d’un dossier et la mise en marche d’un équipement ne prouvent pas que la résidence fonctionne comme prévu. P08 définit les preuves, essais, responsabilités, corrections et revues avant que les lacunes ne deviennent la norme du bâtiment.

Ce qui sera vérifié doit être défini avant d’être acheté et construit.

Cadre de lecture

Cinq repères publics permettent de lire le niveau de preuve, l’usage possible et les limites de cette page.

Niveau de preuve

Guidance officielle, preuves convergentes et méthode de projet DALLEAU

Type d’application

Exigences, appels d’offres, chantier, livraison, ouverture et après-occupation

Publié ou mis à jour

29 juillet 2026

Ce que cela n’a pas démontré

La mise au point et la vérification (commissioning) ne garantissent pas une performance permanente, un résultat humain ou l’absence future de défaut.

Sources

Consulter les sources originales

Avant l’achat

Le plan de preuve commence avec les exigences du propriétaire.

Chaque fonction importante est reliée à une intention, un critère observable, un responsable, une méthode d’essai, un moment et une preuve attendue. Sans cela, le projet ne sait pas distinguer un équipement installé d’un résultat vérifié.

Cinq moments

La résidence est revue lorsque des défaillances différentes deviennent visibles.

01 · Conception et consultation

Exigences propriétaire, stratégie de mise au point et de vérification (commissioning), points d’arrêt, responsabilités, échantillons, essais et formats de preuve entrent dans les documents.

02 · Installation et fermeture

Éléments cachés, réseaux, accès, pentes, joints, réglages, étiquetage et conditions nécessaires aux essais sont inspectés avant fermeture.

03 · Pré-ouverture

Essais fonctionnels, modes, alarmes, reprise après coupure, commandes locales, interfaces, formation et défauts ouverts sont vérifiés.

04 · Revue à 30 jours

Premiers retours d’usage, routines du personnel, dérives, défauts récurrents, filtres, humidité, énergie et compréhension des commandes sont examinés.

05 · Saison pertinente et revue annuelle

Pluie, forte humidité, chaleur, occupation, absence, vieillissement et entretien révèlent des conditions absentes au moment de la livraison.

Plan d’essai

L’ensemble de preuves suit le brief et les systèmes réellement installés.

Enveloppe, eau, drainage et interfaces.

Air, humidité, refroidissement, extraction et filtration.

Lumière, obscurité et commandes.

Acoustique, équipements et événements.

Sécurité, secours, reprise après coupure et fonctionnement local.

Interfaces numériques, accès, confidentialité et sauvegardes.

Routines d’exploitation et accès de maintenance.

Indépendance

L’installateur ne doit pas être l’unique source de preuve lorsque l’indépendance compte.

Le plan précise qui installe, qui mesure, qui observe, qui accepte et qui décide. Une auto-vérification peut convenir à certains contrôles ; d’autres exigent un témoin owner-side ou un spécialiste indépendant. Le niveau est proportionné au risque et au contrat.

Registre

Une preuve utile répond à une question précise.

Quelle exigence ou hypothèse est vérifiée ?

Dans quel mode et sous quelles conditions ?

Avec quel instrument, emplacement et durée ?

Quel résultat et quelle tolérance ?

Quel écart, responsable et délai de correction ?

Quel nouvel essai confirme la fermeture ?

Quelle limite ou incertitude demeure ?

Points d’arrêt

Un essai échoué devient utile lorsque la responsabilité et le nouvel essai sont clairs.

Avant consultation

Les exigences propriétaire et le plan de preuve sont approuvés.

Avant fermeture

Les inspections, photographies, emplacements et informations cachées sont complets.

Avant réception

Les essais critiques, défauts ouverts, responsabilités et dates de retest sont acceptés par le propriétaire.

Après ouverture

Les décisions à 30 jours, en saison pertinente et à un an sont enregistrées avec leur statut et leur périmètre.

Transmission

Un système n’est pas livré tant que ses utilisateurs ne comprennent pas son mode prévu.

Propriétaire et équipe reçoivent des commandes lisibles, procédures normales et dégradées, calendrier de maintenance, contacts, seuils d’escalade et démonstration pratique. Le protocole utile remplace l’empilement de manuels fabricant sans contexte.

Livrables

La trace de ce qui était prévu, testé, corrigé et appris.

Owner’s Project Requirements.

Plan et registre de mise au point et de vérification (commissioning).

Rapports d’inspection et d’essai.

Journal des défauts, corrections et retests.

Formation et procédures d’exploitation.

Building Passport mis à jour.

Revues à 30 jours, saisonnière et annuelle.

Décision sur ce qui peut être communiqué publiquement.

Données et vie privée

La résidence n’est pas un produit d’extraction de données.

La collecte est limitée à ce qui sert une question définie. Les données sensibles restent locales lorsque c’est raisonnable, l’accès est limité, la conservation est décidée et les retours des occupants sont volontaires. Le propriétaire décide de toute communication, sous réserve des contrats et de la vie privée.

Limites

La mise au point et la vérification (commissioning) établissent une condition observée, pas une garantie permanente.

Climat, usage, entretien, mises à jour, pannes et vieillissement modifient le résultat. P08 améliore la visibilité, la correction et l’apprentissage ; il ne remplace pas la garantie contractuelle, la maintenance ou l’expertise réglementée.

Sources

Le constat de la source et l’interprétation résidentielle de DALLEAU restent distincts. Les liens ouvrent le document de l’éditeur ou de l’autorité.

The Commissioning Process and commissioning requirements for new buildings and systems Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Lessons learned from 20 years of CBE's occupant surveys Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Post-occupancy evaluation in residential buildings: a systematic literature review of current practices in the EU Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Enhanced Air Sensor Guidebook Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Le plan de preuve commence avec les exigences du propriétaire. La résidence est revue lorsque des défaillances différentes deviennent visibles. L’ensemble de preuves suit le brief et les systèmes réellement installés. L’installateur ne doit pas être l’unique source de preuve lorsque l’indépendance compte. Une preuve utile répond à une question précise. Un essai échoué devient utile lorsque la responsabilité et le nouvel essai sont clairs. Un système n’est pas livré tant que ses utilisateurs ne comprennent pas son mode prévu. La trace de ce qui était prévu, testé, corrigé et appris.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## P03 · Chambre protégée | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/protocols/protected-bedroom-performance-protocol/

DALLEAU / Atelier / Protocoles / P03

Protocole Atelier

P03 · Protocole de performance de la chambre protégée

Une chambre peut être correctement conçue par chaque discipline et rester médiocre comme pièce. P03 la traite comme un seul système nocturne : lumière, calme, air, humidité, température, intimité, commandes et exploitation.

Le brief traverse l’architecture, l’éclairage, les lots techniques — notamment CVC, électricité et plomberie —, l’acoustique, les commandes et l’exploitation.

Cadre de lecture

Cinq repères publics permettent de lire le niveau de preuve, l’usage possible et les limites de cette page.

Niveau de preuve

Recommandations fondées sur les preuves et méthode DALLEAU ; validation multidisciplinaire requise

Type d’application

Brief, conception, prototype à l’échelle réelle, mise au point et vérification (commissioning), puis exploitation

Publié ou mis à jour

29 juillet 2026

Ce que cela n’a pas démontré

Le protocole ne démontre aucun résultat de sommeil, de stress, de santé ou de cognition et ne garantit ni silence ni confort.

Sources

Consulter les sources originales

Un seul système

La condition nocturne ne se découpe pas par lot.

Lumière et obscurité

Lumière du jour, éclairage de tâche, soirée, trajet nocturne, sources visibles depuis le lit et fuites de lumière sont briefés séparément.

Calme et événements

Circulations, pluie, équipements, ouvertures, service, parole et événements intermittents sont lus avec les moyennes acoustiques, pas à leur place.

Air, humidité et thermique

Refroidissement, air neuf, filtration, extraction de la salle d’eau, séchage, surfaces froides et modes d’absence sont coordonnés pièce par pièce.

Intimité et circulation

Vues depuis le lit, seuil salle d’eau-dressing, arrivée du personnel, usage partagé et possibilité de se retirer sans isolement sont explicités.

Commandes et exploitation

Commandes locales, commande manuelle prioritaire manuel, scènes lisibles, reprise après coupure, réglages du personnel et escalade des défauts restent compréhensibles.

D’abord l’usage

Le protocole commence par la nuit vécue, pas par les équipements.

Le foyer décrit les rythmes, les usages partagés ou séparés, les sensibilités connues sans questionnaire médical, les besoins de lecture, de circulation, de service et d’absence. DALLEAU transforme ces situations en critères observables, conflits et décisions.

Cibles de projet

Chaque cible doit préciser sa nature et son moment de contrôle.

Exigence issue d’une autorité ou d’un standard.

Recommandation fondée sur l’état des preuves.

Cible DALLEAU propre au projet.

Hypothèse ou préférence à tester.

Responsable de la validation et méthode de mesure.

Moment, durée et mode d’exploitation de l’essai.

Échelle réelle

La chambre doit être expérimentée avant de devenir coûteuse à modifier.

Un prototype à l’échelle réelle permet de revoir lignes de vue, occultation, reflets, position des commandes, tonalité des équipements, bruit des portes, circulation et interaction avec la salle d’eau. Ce qui ne peut pas être jugé en maquette est reporté dans le plan d’essais.

Points d’arrêt

Les décisions critiques sont libérées avec leurs preuves.

Avant le concept figé

Le scénario nocturne, les limites d’intimité et les principaux risques sont approuvés.

Avant les achats

Les critères vérifiables, tolérances, échantillons, commandes et responsabilités figurent dans les documents de consultation.

Avant fermeture et finition

Les passages, isolations, joints, réseaux, drainage, extraction et accès de maintenance sont inspectés.

Avant ouverture

L’obscurité, les parcours lumineux, les événements sonores, les conditions environnementales, les commandes et les routines sont testés dans les modes prévus.

Livrables propriétaire

Un brief qui survit à la conception, aux achats, au chantier et à l’ouverture.

Brief de chambre et carte des scénarios nocturnes.

Matrice des responsabilités et des cibles.

Registre des prototypes à l’échelle réelle, échantillons et décisions.

Plan de mise au point et de vérification (commissioning), avec les résultats des essais.

Instructions simples pour le propriétaire et le personnel.

Éléments transmis à l’Owner’s Control Report et au Building Passport.

Responsabilités

DALLEAU coordonne sans absorber la responsabilité professionnelle.

Architecte, concepteur lumière, ingénieurs des lots techniques, acousticien, spécialiste des commandes, entreprise et équipe d’exploitation gardent leurs responsabilités. DALLEAU maintient la cohérence du brief, rend les conflits visibles et demande la preuve prévue au bon moment.

Après la livraison

La chambre reste une question de projet observée.

Des revues à 30 jours, en saison pertinente et après évolution des usages peuvent examiner fuites de lumière, facilité des commandes, événements sonores, tendances d’humidité, séchage de la salle d’eau et retours volontaires sur le confort et le contrôle. Elles ne démontrent pas un résultat clinique.

Limites

Une chambre protégée n’est pas une promesse de sommeil.

Les préférences, comportements, conditions médicales, événements extérieurs et changements d’exploitation restent individuels et variables. Le protocole améliore la qualité du brief, de la coordination et de la vérification ; il ne garantit pas une expérience identique pour chaque personne.

Sources

Le constat de la source et l’interprétation résidentielle de DALLEAU restent distincts. Les liens ouvrent le document de l’éditeur ou de l’autorité.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

What to document and report in studies of ipRGC-influenced responses to light Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Recommendations for daytime, evening, and nighttime indoor light exposure to best support physiology, sleep, and wakefulness in healthy adults Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

WHO guidelines for indoor air quality: dampness and mould Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Thermal Environmental Conditions for Human Occupancy Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Environmental noise guidelines for the European Region Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

La condition nocturne ne se découpe pas par lot. Le protocole commence par la nuit vécue, pas par les équipements. Chaque cible doit préciser sa nature et son moment de contrôle. La chambre doit être expérimentée avant de devenir coûteuse à modifier. Les décisions critiques sont libérées avec leurs preuves. Un brief qui survit à la conception, aux achats, au chantier et à l’ouverture. DALLEAU coordonne sans absorber la responsabilité professionnelle. La chambre reste une question de projet observée.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## P01 · Site tropical et résilience | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/protocols/tropical-site-and-resilience-baseline/

DALLEAU / Atelier / Protocoles / P01

Protocole Atelier

P01 · Base tropicale du site et de la résilience

Un terrain peut sembler idéal et rester inadapté à la résidence envisagée. P01 rend visibles l’eau, le bruit, l’exposition, les accès, les réseaux et les conditions d’exploitation avant qu’un rendu de concept ne les masque.

Le site est lu comme un environnement d’exploitation, pas seulement comme une vue ou une adresse.

Cadre de lecture

Cinq repères publics permettent de lire le niveau de preuve, l’usage possible et les limites de cette page.

Niveau de preuve

Guidance officielle, données locales et méthode de projet DALLEAU

Type d’application

Étude de faisabilité et mandat complet

Publié ou mis à jour

29 juillet 2026

Ce que cela n’a pas démontré

La base ne garantit ni l’absence d’inondation, de bruit ou de défaillance, ni une performance future universelle du site.

Sources

Consulter les sources originales

Avant le concept

Le terrain est évalué comme un système en fonctionnement.

Climat et exposition

Soleil, ombre, vent, humidité extérieure, pluie battante, altitude, gains de chaleur et différence pratique entre les modes ouverts, mixtes et fermés.

Eau et drainage

Niveaux, parcours des eaux pluviales, source d’eau, hypothèses de drainage, observations en saison humide et besoins d’études civiles, géotechniques ou de laboratoire.

Bruit et intimité

Événements de jour et de nuit, routes, voisinage, équipements, cérémonies, risques de chantier et potentiel d’une façade calme pour les chambres.

Accès et maintenance

Arrivée du propriétaire, circulation du personnel et des fournisseurs, déchets, maintenance, secours et accès futur aux locaux techniques.

Réseaux et résilience

Électricité, communications, eau, secours, stabilité du réseau, disponibilité des pièces et conséquences d’une interruption.

Paysage, insectes et corrosion

Plantations, racines, rétention d’eau, moustiques, exposition saline, vulnérabilité des matériaux et charge de maintenance créée par le paysage.

Séquence owner-side

Observer. Classer. Déclencher. Enregistrer.

01 · Observer au bon moment

Relevés disponibles, visites structurées, photographies et journaux d’événements sont lus aux moments pertinents. Une visite de jour ne suffit pas pour établir le bruit nocturne, le comportement sous la pluie ou la performance en période d’inoccupation.

02 · Classer la preuve

Chaque conclusion est identifiée comme guidance officielle, recommandation fondée sur les preuves, cible DALLEAU ou question exigeant une validation locale.

03 · Nommer le bon spécialiste

Lorsque la réponse requiert un géomètre, un ingénieur, une étude géotechnique, une mesure acoustique, une analyse d’eau ou un avis juridique, DALLEAU coordonne la mission au lieu de revendiquer la conclusion.

04 · Enregistrer la décision

La recommandation, les risques non résolus, les invariants, les responsables et les conditions acceptées entrent dans l’Owner’s Control Report.

Décisions

La base peut modifier bien davantage que l’implantation.

Acquérir, refuser ou poursuivre sous conditions.

Placer les chambres et la façade calme.

Définir les modes ouverts, mixtes et fermés.

Fixer niveaux, drainage et gestion des eaux.

Organiser l’accès service et la maintenance.

Définir les reculs paysagers et les priorités de secours.

Nommer les spécialistes et prévoir les risques résiduels.

Points d’arrêt

Le projet ne dépasse pas les questions du site par simple hypothèse.

HP1 · Avant une recommandation foncière

Les preuves minimales sont réunies et les signaux d’alerte non résolus consignés. La conclusion est go, go conditionnel ou no-go — jamais la promesse que tout risque futur a disparu.

HP2 · Avant de figer le concept

La carte des modes d’exploitation et celle des risques par pièce sont approuvées. Les conflits entre ouverture, bruit, humidité, pluie, intimité et maintenance restent visibles.

HP3 · Avant l’avant-projet détaillé

Le calendrier des spécialistes est accepté. Chaque inconnue matérielle a un responsable, une méthode et une date de vérification.

Livrables

Une base qui peut réellement piloter les décisions suivantes.

Dossier d’observation et journal photographique.

Carte des risques et des modes d’exploitation.

Registre des sources et incertitudes.

Note de décision propriétaire.

Calendrier des spécialistes.

Entrées de référence dans le Building Passport.

Responsabilités

DALLEAU structure le risque. Les spécialistes rendent les conclusions réglementées.

DALLEAU organise les questions owner-side, le registre de preuves, les observations, la comparaison des options et le chemin de décision. Les relevés certifiés, calculs, conclusions géotechniques, mesures acoustiques formelles, analyses d’eau, évaluations environnementales et avis juridiques restent confiés aux professionnels nommés.

Limites

Une base ne peut pas prédire l’avenir.

Développements voisins, comportement exact en saison humide, qualité d’eau à long terme, événements sonores rares, conditions cachées du sol et réponse opérationnelle restent partiellement inconnus jusqu’aux études, pluies, travaux, essais ou périodes d’occupation.

Traduction Bali

Bali n’est ni un climat unique ni un mode d’exploitation unique.

Micro-localisation, altitude, parcours de l’eau, pluie battante, humidité extérieure, activité nocturne, insectes, corrosion côtière, stabilité des réseaux et capacité de maintenance changent matériellement la réponse. P01 conserve les questions propres au site au lieu d’importer une formule tropicale unique.

Continuité

La décision foncière reste visible après l’acquisition.

L’Owner’s Control Report conserve la recommandation, les risques, invariants et décisions. Le Building Passport rassemble les relevés, versions, cartes, hypothèses de réseaux et dates de vérification. La revue en usage observe ensuite drainage, bruit, modes ouverts ou fermés, interruptions et maintenance du paysage.

Sources

Le constat de la source et l’interprétation résidentielle de DALLEAU restent distincts. Les liens ouvrent le document de l’éditeur ou de l’autorité.

Bali climate bulletins Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

WHO guidelines for indoor air quality: dampness and mould Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Thermal Environmental Conditions for Human Occupancy Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Environmental noise guidelines for the European Region Source originale. Le lien permet de vérifier le document, son périmètre et ses limites.

Le terrain est évalué comme un système en fonctionnement. Observer. Classer. Déclencher. Enregistrer. La base peut modifier bien davantage que l’implantation. Le projet ne dépasse pas les questions du site par simple hypothèse. Une base qui peut réellement piloter les décisions suivantes. DALLEAU structure le risque. Les spécialistes rendent les conclusions réglementées. Une base ne peut pas prédire l’avenir. Bali n’est ni un climat unique ni un mode d’exploitation unique.

Poursuivre dans Atelier

Vue d’ensemble Atelier Preuves et méthode Protocoles

Contexte du projet

L’application à une résidence précise exige d’examiner le site, le foyer et l’usage prévu.

Parler à François Voir l’étude de faisabilité

## Dallage sur terre-plein ou plancher suspendu à Bali ? | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/study-notes/dallage-terre-plein-ou-plancher-suspendu-bali/

Atelier / Study Note / Eau, enveloppe et humidité

Atelier · Study Note · Eau, enveloppe et humidité

Dallage sur terre-plein ou plancher suspendu à Bali ?

Séparer le rez-de-chaussée du sol peut être utile. Mais un vide ventilé n’est pas automatiquement plus sec dans un climat chaud et humide. Le choix dépend du terrain, de la nappe, du risque d’eau, du remblai, de la structure, des réseaux et de l’exploitation.

Question du propriétaire

La résidence doit-elle reposer sur un dallage préparé, sur un vide technique contrôlé ou sur une structure surélevée ?

Niveau de preuve

Principes établis. Le système approprié reste spécifique au site.

Type d’application

Critères projet, périmètre spécialiste, points d’arrêt et vérification

Mis à jour

4 août 2026

Sources

6

Sur cette page

Quatre sujets différents

Option 1 : dallage sur terre-plein premium

Option 2 : plancher suspendu sur vide technique fermé

Option 3 : bâtiment surélevé avec sous-face ouverte

Pourquoi un vide ventilé peut échouer

Le sol et l’eau avant la solution

Cadre de décision

Hold points

Ce que cette note ne démontre pas

Conséquence pour le projet

Sources

Carte du système

Eau, enveloppe et humidité

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

Dallage sur terre-plein Vide technique fermé Système surélevé ouvert Sol + eau + structure + exploitation décident

Quatre sujets différents

Portance : qu’est-ce qui porte la maison et qu’est-ce qui porte le sol ?

Mouvement : le sol ou le remblai peut-il tasser, gonfler ou se rétracter ?

Humidité du terrain : comment interrompre l’eau liquide et la vapeur ?

Inondation et ruissellement : que se passe-t-il si l’eau extérieure dépasse le niveau prévu ?

Une membrane ne résout pas un tassement. Un vide d’air ne résout pas automatiquement l’humidité. Un détail unique ne traite pas les quatre sujets.

Option 1 : dallage sur terre-plein premium

Il peut être rationnel sur un terrain stable, suffisamment élevé et bien drainé.

Principe possible :

```text Finition Chape ou colle compatible Dalle en béton armé Membrane anti-vapeur continue Couche granulaire drainante et rupture capillaire Remblai technique compacté et testé Sol naturel préparé ```

L’ordre exact appartient au projet. L’idée centrale est que la dalle ne repose pas sur une terre simplement nivelée à l’œil.

À vérifier

matériaux organiques retirés ;

qualité du remblai ;

compactage par couches et essais ;

niveau de plateforme ;

drainage et nappe ;

couche granulaire ;

membrane, recouvrements et pénétrations ;

continuité avec murs et longrines ;

joints et fissuration ;

réseaux enterrés ;

humidité de la dalle avant finition sensible.

Atouts

simplicité ;

peu de volume caché ;

technique connue ;

efficacité potentielle de coût et de structure ;

robustesse si la plateforme et les couches sont contrôlées.

Risques

remblai ou compactage invisibles ;

contournement de la membrane aux interfaces ;

réparation difficile des réseaux ;

mouvement différentiel ;

finition posée avant séchage suffisant.

Option 2 : plancher suspendu sur vide technique fermé

Il peut séparer le sol occupé du remblai et conserver l’accès aux réseaux. Mais l’air extérieur humide peut condenser sur des surfaces refroidies par la climatisation.

Un vide technique crédible peut demander :

membrane continue sur le sol ;

interfaces scellées ;

drainage vers un point sûr ;

ventilation ou déshumidification définie ;

détection de fuite ;

accès et éclairage ;

stratégie termites et nuisibles ;

hauteur réellement maintenable ;

comportement connu en cas de coupure électrique.

Un vide de 60 cm sépare physiquement la dalle du sol, mais reste pénible à inspecter. Si l’accès est la justification, l’espace doit être conçu comme un vrai volume technique.

Option 3 : bâtiment surélevé avec sous-face ouverte

Sur un terrain pentu ou exposé à l’eau, une structure surélevée peut limiter les remblais et conserver des voies d’écoulement. Elle exige une conception géotechnique, structurelle et sismique, une protection contre la corrosion, des réseaux coordonnés et un traitement cohérent de la sous-face.

Elle peut être plus rationnelle qu’un petit vide fermé susceptible de se remplir d’eau.

Pourquoi un vide ventilé peut échouer

Séquence possible :

l’air extérieur humide entre ;

le plancher au-dessus est refroidi ;

la sous-face ou les canalisations passent sous le point de rosée extérieur ;

de la condensation apparaît ;

métal, poussière, isolant ou bois restent humides ;

le défaut demeure caché.

La bonne réponse est de définir le mode de fonctionnement, pas d’ajouter quelques ouvertures par habitude.

Le sol et l’eau avant la solution

« Terre argileuse de Bali » n’est pas une donnée de calcul. Il faut connaître :

sol naturel ou remblai ;

couches et profondeur ;

tassement et portance ;

retrait-gonflement ;

nappe et variation saisonnière ;

ruissellement ;

pente et soutènements ;

volumes de remblai ;

changements autour du site.

Cadre de décision

Le dallage est plus probable si le sol est stable, la plateforme élevée, le remblai limité, le risque d’inondation acceptable et la stratégie capillaire vérifiable.

Le vide technique devient pertinent si l’accès aux réseaux a une vraie valeur, si un remblai profond serait nécessaire et si le volume peut être drainé, contrôlé et entretenu.

La structure surélevée peut être pertinente si le terrain, l’eau ou la topographie rendent le contact au sol moins rationnel.

Hold points

base géotechnique avant concept ;

plateforme et drainage ;

remblai et compactage ;

rupture capillaire et membrane ;

réseaux encastrés ;

contrôle avant finitions ;

revue pendant la saison humide.

Ce que cette note ne démontre pas

Elle ne recommande pas un système unique. Elle ne détermine pas si une argile donnée est expansive. Elle ne remplace pas les études géotechniques, structurelles, hydrauliques, termites ou de finition. Elle ne dit pas qu’un vide est toujours sec ni qu’un dallage est toujours humide.

Conséquence pour le projet

La décision premium n’est pas le plancher le plus cher. C’est celui dont les hypothèses sur le sol, l’eau, la structure, les réseaux et la maintenance restent visibles avant que le projet ne soit coûteux à modifier.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Ouvrir la source originale

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Ouvrir la source originale

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Ouvrir la source originale

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

Continuer depuis la question devant vous

Continuer depuis la question devant vous

L’étanchéité est une chaîne, pas une couche appliquée à la fin. → Une membrane ne sauve pas une toiture plate sans pentes. → Le drainage extérieur fait partie de la résidence. → Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. →

Décider la relation au sol avant de figer l’architecture.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François Voir la Feasibility Study

## Le drainage extérieur fait partie de la résidence. | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/study-notes/drainage-exterieur-partie-residence/

Atelier / Study Note / Eau, enveloppe et humidité

Atelier · Study Note · Eau, enveloppe et humidité

Le drainage extérieur fait partie de la résidence.

La résidence ne s’arrête pas au mur extérieur. Niveaux du terrain, terrasses, jardinières, soutènements, piscines, caniveaux, toitures, regards et exutoires déterminent si la pluie s’éloigne des pièces ou s’accumule contre elles.

Question du propriétaire

Où se termine chaque voie d’eau et que se passe-t-il si le drain principal est partiellement bouché ?

Niveau de preuve

Principes établis. Capacités et exutoires restent à concevoir localement.

Type d’application

Critères projet, périmètre spécialiste, points d’arrêt et vérification

Mis à jour

4 août 2026

Sources

5

Sur cette page

Un drain n’est pas une stratégie de drainage

Commencer par les niveaux

Sources d’eau à relier

La question de l’exutoire

Trois états de fonctionnement

Interfaces fréquentes

Concevoir la maintenance

Ce que DALLEAU demanderait

Hold points

Ce que cette note ne démontre pas

Sources

Carte du système

Eau, enveloppe et humidité

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

Toiture Terrasse Paysage Voie principale Voie de dépassement Exutoire sûr

Contexte illustratif

Un drain n’est pas une stratégie de drainage

Le drainage est le chemin complet depuis la pluie jusqu’à une destination sûre, maintenable et autorisée.

Le paysage peut modifier ce chemin après la conception : niveau de terre remonté, racines, feuilles, nouveau dallage, irrigation permanente, descente raccordée à un réseau trop petit.

Commencer par les niveaux

Les niveaux déterminent si l’eau :

traverse un seuil ;

reste contre un mur ;

entre dans un local technique ;

se déverse dans une jardinière ;

s’accumule derrière un soutènement ;

rejoint un regard ;

s’évacue lors d’un événement intense.

À coordonner : sol intérieur, terrasse, fil d’eau du caniveau, terrain, terre des jardinières, trop-plein de piscine, route d’accès, drainage du soutènement et exutoire final.

Sources d’eau à relier

toitures ;

terrasses et balcons ;

cours ;

voies d’accès ;

paysage et irrigation ;

piscines ;

murs de soutènement et drains enterrés ;

condensats de climatisation ;

douches extérieures ;

terrains en amont.

Ces sources n’ont pas le même débit, la même qualité d’eau ni le même entretien. Les réunir sans calcul peut provoquer surcharge ou retour d’eau.

La question de l’exutoire

Éloigner l’eau d’un mur ne suffit pas si elle :

inonde une autre zone ;

érode une pente ;

affecte un voisin ;

surcharge le réseau routier ;

revient vers le bâtiment ;

est rejetée sur un sol instable ;

devient inaccessible ;

ne respecte pas les exigences locales.

L’équipe nommée doit vérifier l’exutoire réel.

Trois états de fonctionnement

Fonctionnement normal

La pluie courante suit les drains et caniveaux prévus.

Fonctionnement limité

Un drain est partiellement bouché. Le site doit rendre le problème visible sans envoyer immédiatement l’eau dans les pièces.

Dépassement

Le débit dépasse l’hypothèse. Une voie de surface sûre doit limiter les conséquences sur personnes, structure, équipements et voisinage.

Interfaces fréquentes

Terrasse et intérieur

La finition extérieure monte, le seuil diminue, le drain est trop loin de la baie ou la pluie poussée par le vent dépasse la zone couverte.

Jardinière et mur

Terre, irrigation et racines restent au contact du mur sans drainage et trop-plein vérifiés.

Mur de soutènement

La pression d’eau augmente lorsque le drainage est incomplet, bouché ou sans exutoire clair.

Descente de toiture

Elle se termine près de la fondation ou rejoint un réseau enterré sans trop-plein visible.

Piscine et pluie

Trop-plein, plage et eaux pluviales entrent dans le même réseau sans vérification de capacité.

Portail et route

Le ruissellement routier entre dans la propriété faute de coordination du seuil, du caniveau et du drain public.

Concevoir la maintenance

Toutes les grilles peuvent-elles être soulevées ?

Le regard est-il nettoyable ?

Une canalisation peut-elle être curée ?

Les crépines sont-elles visibles ?

Le trop-plein rend-il le défaut évident ?

L’exutoire est-il accessible ?

Qui contrôle avant la saison humide ?

Où le plan et l’historique sont-ils conservés ?

Un slot drain élégant sans accès de nettoyage n’est pas une solution complète.

Ce que DALLEAU demanderait

relevé topographique ;

conditions connues de ruissellement et d’inondation ;

informations géotechniques et nappe si pertinentes ;

sources d’eau du toit, des terrasses, de la piscine, du paysage et des soutènements ;

concept de drainage et hypothèse d’exutoire ;

voies principales et d’urgence ;

accès de maintenance ;

coordination des seuils ;

déclencheurs pour calcul hydraulique, rétention, pompage ou drainage de pente ;

décision du propriétaire sur le risque résiduel et la maintenance.

Hold points

niveaux du site avant concept ;

réseaux enterrés avant remblai ;

seuils et caniveaux ;

paysage et niveaux de terre ;

essai de circulation contrôlé ;

revue après pluie réelle.

Ce que cette note ne démontre pas

Elle ne calcule pas la pluie de projet, ne dimensionne pas les drains et n’approuve pas un exutoire. Elle ne remplace pas la revue civile, hydraulique, géotechnique, paysage, piscine ou administrative. Elle ne promet pas l’absence de dommage lors d’un événement extrême.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Ouvrir la source originale

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continuer depuis la question devant vous

Continuer depuis la question devant vous

L’étanchéité est une chaîne, pas une couche appliquée à la fin. → Dallage sur terre-plein ou plancher suspendu à Bali ? → Une membrane ne sauve pas une toiture plate sans pentes. → Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. →

Demander où l’eau se termine avant d’approuver où commencent les murs.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François Voir la Feasibility Study

## L’étanchéité est une chaîne, pas une couche appliquée à la fin. | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/study-notes/etancheite-systeme-continu/

Atelier / Study Note / Eau, enveloppe et humidité

Atelier · Study Note · Eau, enveloppe et humidité

L’étanchéité est une chaîne, pas une couche appliquée à la fin.

Une résidence ne reste pas sèche parce qu’une entreprise a appliqué trois couches d’un produit connu. Elle reste sèche lorsque le site, les pentes, les évacuations, les membranes, les interfaces, les pénétrations, la protection, les essais et la maintenance fonctionnent comme un système continu.

Question du propriétaire

Où l’eau doit-elle aller, qu’est-ce qui doit rester continu et qu’est-ce qui sera contrôlé avant d’être masqué ?

Niveau de preuve

Principes établis, avec sélection du système et validation propres au projet

Type d’application

Critères projet, périmètre spécialiste, points d’arrêt et vérification

Mis à jour

4 août 2026

Sources

7

Sur cette page

Thèse

Pourquoi la question est critique à Bali

Les six maillons du système

Pourquoi « trois couches » n’est pas une spécification

Quatre modes d’échec fréquents

Points d’arrêt avant fermeture

Ce que DALLEAU demanderait à voir

Ce que cette note ne démontre pas

Conséquence pour le projet

Sources

Carte du système

Eau, enveloppe et humidité

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

01 Éloigner

Site, niveaux et séparation

02 Guider

Pentes, points bas et sorties

03 Déborder

Une voie secondaire sûre

04 Continuer

Rives, drains et pénétrations

05 Protéger

Lots ultérieurs et nouvel essai

06 Maintenir

Accès, nettoyage et dossiers

Contexte illustratif

Comparaisons illustratives

Interface de la paroi de douche

Intervention tardive

Coordonné avant les finitions

Accès de maintenance

Intervention tardive

Coordonné avant les finitions

Pénétration de canalisation

Intervention tardive

Coordonné avant les finitions

Thèse

L’étanchéité résulte d’un système de gestion de l’eau. La membrane ou le revêtement n’en est qu’une couche.

Pourquoi la question est critique à Bali

Une résidence balinaise peut cumuler pluie intense, pluie battante, forte humidité extérieure, matériaux encore humides, vie ouverte sur l’extérieur et longues périodes d’inoccupation. Toitures, terrasses, salles de bains, piscines, jardinières, façades, seuils et sols sont souvent répartis entre plusieurs lots. L’eau ne s’arrête pas aux limites contractuelles.

Le défaut peut apparaître sous forme de tache au plafond, de bas de mur humide, d’efflorescences, de finition qui se décolle, de menuiserie gonflée ou d’odeur dans un dressing. Le point visible peut se trouver loin du point d’entrée.

Les six maillons du système

1. Éloigner l’eau lorsque c’est possible

La première protection est la forme du projet : niveau de la plateforme, pentes extérieures, séparation des jardinières, relation entre terrasse et seuil, et destination des eaux de toiture.

Une membrane subit une pression inutile lorsque le projet dirige l’eau vers elle au lieu de l’en éloigner.

2. Donner à l’eau une voie principale claire

L’eau doit rejoindre un drain, un caniveau, une gouttière, une descente ou un sol perméable par une pente délibérée. Un drain présent mais plus haut que la finition ne joue pas le même rôle qu’un drain placé au point bas.

Il faut résoudre :

pentes et points bas ;

emplacement et capacité des sorties ;

relation entre finitions ;

exposition aux feuilles et débris ;

nettoyage ;

destination finale de l’eau.

3. Prévoir ce qui se passe lorsque la voie principale est limitée

Les drains se bouchent. Les hypothèses de pluie peuvent être dépassées. La maintenance peut être retardée.

Selon le contexte, la résidence peut nécessiter :

trop-pleins de toiture visibles ;

sorties secondaires ;

seuils protégés ;

chemins de surface qui éloignent l’excès d’eau ;

regards accessibles avant que les réseaux enterrés ne deviennent invisibles.

La voie de secours ne remplace pas le drainage principal. Elle limite les conséquences d’un défaut ou d’un dépassement.

4. Maintenir la continuité de la couche étanche

Les points critiques sont rarement le milieu d’une surface simple. Ils se trouvent aux interfaces :

jonctions sol-mur ;

changements de plan ;

angles ;

drains ;

pénétrations ;

seuils ;

parapets ;

joints de construction ou de mouvement ;

fixations ajoutées après l’étanchéité ;

limites entre lots.

Le projet doit consacrer une attention disproportionnée aux terminaisons, pénétrations et transitions.

5. Protéger le système avant et après les essais

Un système correctement appliqué peut être percé ou abîmé par les travaux suivants : chape, carrelage, garde-corps, vitrage, équipements, éclairage, jardinières ou passages MEP.

Il faut décider :

qui peut intervenir au-dessus du système ;

quelles fixations sont autorisées ;

comment la membrane est protégée ;

comment un dommage est documenté et réparé ;

quelles zones doivent être retestées.

6. Conserver l’accès et la maintenance

Les drains accumulent des débris. Les mastics vieillissent. Les joints bougent. La végétation se développe.

Le système doit donc prévoir :

accès aux drains et crépines ;

accès sûr à la toiture ;

caniveaux nettoyables ;

trop-pleins visibles ;

fréquence d’inspection ;

références des produits et réparations ;

responsabilité de maintenance ;

entrées utiles dans le Building Passport.

Pourquoi « trois couches » n’est pas une spécification

Le nombre de couches ne définit pas à lui seul la performance. Une spécification peut devoir préciser :

préparation et humidité du support ;

primaire ;

épaisseur sèche totale ;

renforts ;

traitement des fissures et joints ;

mouvement admissible ;

détails aux drains et pénétrations ;

temps de cure et protection ;

compatibilité avec chape, colle ou finition ;

exposition aux UV, à la chaleur et à l’eau stagnante ;

méthode de réparation ;

critères d’inspection et d’essai.

Certains systèmes liquides demandent un renforcement intégral. D’autres concentrent le renfort sur les détails. Les membranes bitumineuses, synthétiques, liquides ou cimentaires ont chacune des conditions d’emploi. La règle publique ne peut donc pas désigner un produit universel.

Quatre modes d’échec fréquents

Bon produit, mauvais support

Poussière, laitance, contamination, humidité piégée, chape faible ou fissure active compromettent l’adhérence et la continuité.

Bonne membrane, mauvaise pente

L’eau stagnante prolonge l’exposition et transforme un petit défaut en charge persistante.

Bonne surface courante, interfaces faibles

Le drain, le seuil, le parapet ou la pénétration devient le vrai point d’entrée.

Bonne installation, dommage après réception

Une fixation tardive ou une pénétration non documentée annule un travail qui avait pourtant été contrôlé.

Points d’arrêt avant fermeture

Selon le lot et les responsabilités nommées :

libération du support ;

inspection des détails avant la surface courante ;

inspection du système complet ;

essai convenu ;

inspection ou retest après les autres corps d’état ;

clôture documentaire avec photos, réparations, essais, garanties et maintenance.

Un essai court ne démontre pas à lui seul la performance saisonnière de toutes les interfaces.

Ce que DALLEAU demanderait à voir

objectif propriétaire et conséquence d’un défaut ;

système approuvé et spécialiste responsable ;

pentes et voies d’évacuation coordonnées ;

sorties principales et de secours lorsque nécessaires ;

détails de toutes les interfaces ;

accès pour inspection et nettoyage ;

mock-up pour les conditions inhabituelles ;

photographies des hold points ;

méthode et résultat des essais ;

réparations et retests ;

instructions de maintenance.

Ce que cette note ne démontre pas

Elle n’identifie pas l’origine d’une fuite donnée. Elle ne prouve pas qu’un type de membrane est toujours supérieur à Bali. Elle ne remplace pas les études géotechniques, structurelles, hydrauliques, de toiture ou de fabricant. Elle ne garantit pas l’absence future d’infiltration.

Conséquence pour le projet

Traiter l’étanchéité comme un lot tardif donne au propriétaire des noms de produits et des factures. La traiter comme un système owner-side permet de voir où l’eau doit aller, qui possède chaque interface, ce qui doit être contrôlé et quelles preuves doivent rester après la livraison.

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Ouvrir la source originale

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Ouvrir la source originale

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Ouvrir la source originale

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continuer depuis la question devant vous

Continuer depuis la question devant vous

Dallage sur terre-plein ou plancher suspendu à Bali ? → Une membrane ne sauve pas une toiture plate sans pentes. → Le drainage extérieur fait partie de la résidence. → Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. →

Intégrer le chemin de l’eau au projet avant que les finitions ne le masquent.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François Voir la Feasibility Study

## Une membrane ne sauve pas une toiture plate sans pentes. | DALLEAU Atelier

URL: https://dalleau.ai/fr/atelier/study-notes/toiture-plate-pentes-drainage-membranes/

Atelier / Study Note / Eau, enveloppe et humidité

Atelier · Study Note · Eau, enveloppe et humidité

Une membrane ne sauve pas une toiture plate sans pentes.

Une toiture plate fonctionne lorsque structure, pentes, sorties, trop-pleins, membrane, relevés, pénétrations, mouvement, protection et maintenance sont coordonnés. Ajouter des couches ne compense pas une eau qui ne peut pas s’évacuer.

Question du propriétaire

Si la sortie principale ralentit ou se bouche pendant une forte pluie, où l’eau va-t-elle ensuite ?

Niveau de preuve

Principes établis de gestion de l’eau. Le système reste spécifique au projet.

Type d’application

Critères projet, périmètre spécialiste, points d’arrêt et vérification

Mis à jour

4 août 2026

Sources

5

Sur cette page

« Plate » ne signifie pas horizontale

La toiture est un ensemble de drainage

Eau stagnante

Une seule sortie ne suffit pas toujours

Détails critiques

Familles de systèmes

Le renforcement

Hold points

Maintenance

Ce que cette note ne démontre pas

Sources

Carte du système

Eau, enveloppe et humidité

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

Pentes Sortie principale Trop-plein visible Relevé Évacuation sûre

Contexte illustratif

Comparaisons illustratives

Drain, calepinage et pentes

Intervention tardive

Coordonné avant les finitions

« Plate » ne signifie pas horizontale

Une toiture peut paraître plate tout en nécessitant des pentes positives. Les points bas involontaires peuvent venir de :

flèche structurelle ;

chape irrégulière ;

bases d’équipements ;

seuils et parapets ;

drains plus hauts que la surface ;

réparation créant un barrage ;

protection ou carrelage inversant la pente.

La pente dessinée et la pente réellement construite doivent être vérifiées.

La toiture est un ensemble de drainage

Le projet doit coordonner :

mouvement et déformation ;

pentes ;

sorties principales ;

voies d’urgence ;

système d’étanchéité ;

relevés et terminaisons ;

pénétrations et supports ;

protection et finitions ;

accès et entretien ;

essais et observation saisonnière.

La membrane n’est qu’un élément de cette chaîne.

Eau stagnante

Une présence temporaire après une pluie intense ne prouve pas automatiquement un défaut. Une stagnation persistante reste néanmoins un signal :

pentes insuffisantes ;

sortie obstruée ;

exposition prolongée des joints ;

salissure et végétation ;

charge supplémentaire ;

réparation et maintenance difficiles ;

chape ou protection durablement humide.

Le comportement attendu doit être défini et vérifié par l’équipe nommée.

Une seule sortie ne suffit pas toujours

Une sortie propre peut fonctionner pendant les essais puis se boucher avec feuilles, poussière ou débris.

Selon le projet, il faut examiner :

plusieurs points de drainage ;

trop-plein sous le niveau de terminaison de l’étanchéité ;

rejet visible et sûr ;

aucune décharge vers baie, électricité ou toiture inférieure ;

crépines accessibles ;

conséquence d’une descente obstruée ;

capacité du réseau en aval.

Le trop-plein limite les conséquences et rend le défaut visible. Il ne remplace pas la voie principale.

Détails critiques

Parapets et relevés

La membrane doit monter, se terminer et être protégée selon le système, le niveau d’eau possible et la finition. Le dessus du parapet a aussi besoin d’un détail qui rejette l’eau.

Drains

Le drain doit être intégré au système, placé au vrai point bas et rester nettoyable. Bride, membrane, chape et finition doivent être détaillées ensemble.

Pénétrations

Canalisations, supports, garde-corps, solaire, climatisation et fixations tardives créent des risques répétés. Un cordon de silicone ne constitue pas à lui seul un système durable sur une toiture exposée et mobile.

Joints

Le mouvement doit être absorbé par un détail et un système conçus pour lui. Recouvrir un joint actif comme s’il était immobile transfère le mouvement dans la membrane.

Seuils

Niveau de toiture, relevé, accès et porte doivent être coordonnés avant de figer la baie.

Familles de systèmes

Membranes bitumineuses au chalumeau

Elles peuvent être durables si support, primaire, soudures, détails, protection et mouvement sont maîtrisés. Les décollements peuvent être liés au support humide ou sale, aux soudures, aux terminaisons, au mouvement, au poinçonnement ou aux interventions ultérieures. Le système ne doit être ni rejeté ni choisi par habitude.

Systèmes liquides renforcés

Ils peuvent traiter des géométries complexes. Leur résultat dépend de la préparation, de l’épaisseur sèche, du renforcement, de la cure, des UV, de l’eau stagnante et de la protection. « Trois couches » sans épaisseur et sans détails n’est pas une spécification.

Membranes synthétiques en lés

L’épaisseur du produit est maîtrisée en usine, mais joints, angles, pénétrations, terminaisons et qualité de pose restent critiques.

Systèmes cimentaires

Ils peuvent convenir à certains supports minéraux protégés. Leur mouvement admissible, leur exposition et leur compatibilité doivent être compris. Un produit adapté à une salle de bains n’est pas automatiquement adapté à une toiture exposée.

Le renforcement

Certains systèmes demandent un renfort intégral. D’autres le concentrent sur :

angles ;

fissures ;

joints ;

drains ;

pénétrations ;

supports sujets au mouvement.

La règle publique correcte est :

Le renforcement doit suivre le système approuvé, le support et le mouvement attendu, avec contrôle des détails avant fermeture.

Hold points

structure, pentes et niveaux ;

libération du support ;

mock-up ou détail type ;

système complet ;

essai d’eau ou de drainage adapté ;

protection et inspection après les autres travaux.

L’essai ne doit pas créer une charge structurelle ou une condition non maîtrisée.

Maintenance

Une toiture premium a besoin :

d’un accès sûr ;

de nettoyage régulier ;

d’inspection avant et pendant la saison humide ;

d’un historique des réparations et pénétrations ;

de trop-pleins visibles ;

d’une responsabilité claire entre équipe, opérateur et spécialiste.

Ce que cette note ne démontre pas

Elle ne dimensionne pas les drains, ne choisit pas la membrane et ne détermine pas la charge admissible d’un projet. Elle ne prétend pas qu’un système échoue ou réussit toujours. Elle ne garantit pas une toiture sans fuite.

Sources

Sources

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

S10 ASHRAE Position Document on Limiting Indoor Mold and Dampness in Buildings

ASHRAE

Ouvrir la source originale

S11 Roof drainage and overflow guidance

Base interne DALLEAU

Ouvrir la source originale

Continuer depuis la question devant vous

Continuer depuis la question devant vous

L’étanchéité est une chaîne, pas une couche appliquée à la fin. → Dallage sur terre-plein ou plancher suspendu à Bali ? → Le drainage extérieur fait partie de la résidence. → Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. →

Commencer par le chemin de l’eau, puis spécifier la membrane.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François Voir la Feasibility Study

## François Dalleau et l’équipe de développement à Bali | DALLEAU

URL: https://dalleau.ai/fr/equipe/

Les personnes
Les personnes qui portent chaque projet.
Une résidence repose sur des personnes. La question utile n’est pas de savoir combien de noms figurent sous un logo, mais qui reste proche de la décision et qui la traduit dans la réalité quotidienne.
DALLEAU · Responsabilité directe du fondateur
François Dalleau
Fondateur
François Dalleau a commencé à investir à titre privé dans l’immobilier en 2012. Il a fondé Investissement Budapest en 2015, où son travail a porté sur une soixantaine de projets, dont plusieurs opérations multi-unités. Depuis 2022, il concentre son activité sur le développement et l’exploitation de résidences privées à Bali. Il conduit personnellement chaque mandat DALLEAU et en assume la responsabilité dans le périmètre convenu.
Comment les responsabilités sont séparées
DALLEAU
Direction et contrôle côté propriétaire
Formule la question du propriétaire, coordonne les décisions et relie validations, coûts, preuves et responsabilités.
Bee My Guest · si mandatée
Exploitation de la résidence
Assure le personnel, la maintenance et l’hospitalité uniquement dans le cadre d’un mandat d’exploitation distinct.
Missions indépendantes
Spécialistes propres au projet
Architectes, ingénieurs, entreprises et conseils réglementés restent responsables de leur périmètre.
DALLEAU · BUREAU CÔTÉ PROPRIÉTAIRE
La direction reste attachée à la question du propriétaire.
DALLEAU coordonne le mandat sans remplacer l’architecte, l’ingénieur, l’entreprise ou le conseil réglementé. Les fonctions partagées n’interviennent que dans le périmètre indiqué.
Les dossiers financiers, la coordination fiscale et comptable indonésienne et les achats soutiennent le mandat ou l’exploitation uniquement dans le cadre de leur mission indiquée.
Intan
Fonction partagée · périmètre précisé
Responsable finance
Intan coordonne le suivi de trésorerie, les contrôles financiers, les rapprochements et les rapports destinés au propriétaire. Elle maintient une vision claire et à jour de l'exploitation.
Tio
Fonction partagée · périmètre précisé
Coordination fiscale et comptable indonésienne
Tio coordonne les obligations fiscales et déclaratives ainsi que les dossiers comptables du portefeuille opérationnel, avec les professionnels mandatés lorsqu'une validation spécialisée est requise.
Lystia
Fonction partagée · périmètre précisé
Achats et opérations
Lystia coordonne les achats opérationnels, du linge aux fournitures courantes. Lorsque les achats d'un projet lui sont confiés séparément, elle suit aussi les matériaux approuvés et les livraisons. Elle accompagne les demandes de prix, les stocks et les calendriers de livraison.
BEE MY GUEST · SI MANDATÉE SÉPARÉMENT
L’exploitation fait l’objet d’un mandat distinct.
Bee My Guest assure l’exploitation, le personnel, la maintenance, l’entretien et l’hospitalité uniquement lorsqu’elle est mandatée séparément. Ce rôle d’exploitation ne remplace pas le mandat de développement côté propriétaire de DALLEAU.
Amar
Bee My Guest · si mandatée
Responsable des opérations résidentielles
Amar coordonne les opérations quotidiennes des résidences auxquelles il est affecté, en reliant le service, la maintenance et les équipes sur site. Il veille à ce que les standards d'exploitation se traduisent dans les opérations quotidiennes.
Betty
Bee My Guest · si mandatée
Ressources humaines
Betty accompagne le recrutement, l'administration des contrats, la formation et le bien-être des équipes. Son travail contribue à la stabilité des équipes et à la régularité du service.
Sheva
Bee My Guest · si mandatée
Responsable des contenus
Sheva réalise les photographies, textes et contenus éditoriaux qui présentent les villas en ligne. Elle documente les maisons et la vie qui les entoure avec justesse et retenue.
Ibu Ketut
Bee My Guest · si mandatée
Responsable de l'entretien et du service de maison
Ibu Ketut dirige l'entretien et le service de maison dans les résidences auxquelles elle est affectée. Elle coordonne les standards des chambres, l'entretien quotidien et le service du petit-déjeuner avec constance et chaleur.
Missions indépendantes
Des spécialistes indépendants, mandatés selon le projet.
Architectes, ingénieurs, entreprises, conseils juridiques, conseils fiscaux et autres professions réglementées reçoivent un périmètre défini et restent responsables de leurs propres travaux.
Commencer par le projet, pas par le discours.
Commencer par votre projet

## Accompagnement du propriétaire pour construire à Bali | DALLEAU

URL: https://dalleau.ai/fr/mandat/

LE MANDAT · DÉVELOPPEMENT POUR LE COMPTE DU PROPRIÉTAIRE
Un seul bureau de développement. Responsable devant vous du choix du terrain à la mise en exploitation.
Livré et en exploitation
Relevé du chantier
Harmonie · chantier et état livré.
DALLEAU coordonne, aux côtés du propriétaire, la faisabilité, la conception, l’ingénierie, les appels d’offres, le chantier, la réception et la préparation à l’exploitation. Vous gardez la maîtrise des décisions essentielles, des coûts et du choix des intervenants.
Parler à François
Comprendre le mandat
Un premier échange ne demande pas de dossier complet. Il suffit de préciser le site, l’usage prévu et la question du propriétaire.
Suivi par le fondateur
Trois mandats complets simultanés au maximum
Coûts transparents
Chaque devis et chaque facture visibles
Sur cette page
Façons de commencer
Preuves
Fonctionnement du mandat
Coûts et contrôle
Livraison et continuité
Pour qui et prochaine étape
Sur cette page
Façons de commencer
Preuves
Fonctionnement du mandat
Coûts et contrôle
Livraison et continuité
Pour qui et prochaine étape
CE QUE LE MANDAT CHANGE
La maîtrise n'a de valeur que si elle permet de mieux décider.
Architectes, ingénieurs et entreprises conservent leurs responsabilités. DALLEAU les sélectionne et les coordonne autour du brief du propriétaire, puis rend explicites leurs avis, leurs coûts et leurs responsabilités avant tout engagement de capital.
01
Une direction unique
Vous n'avez pas à faire seul la synthèse de dix interlocuteurs distincts. DALLEAU relie le brief, la conception, les coûts, le calendrier et l'usage prévu.
02
Des coûts visibles
Les devis, factures, remises, modifications et paiements restent consultables. Nos honoraires sont définis explicitement et n'augmentent pas en cas de dépassements ordinaires imputables à des tiers.
03
Des spécialistes responsables
Chaque professionnel intervient dans un rôle défini et reste responsable de ses prestations. DALLEAU coordonne l'ensemble sans diluer cette responsabilité.
04
Des décisions documentées
Avant tout contrat majeur ou paiement important, vous savez ce qui est proposé, pourquoi, à quel coût et avec quel risque.
TROIS FAÇONS DE COMMENCER
Commencez par la décision qui se pose à vous.
Vous n'avez pas besoin de vous engager d'emblée dans un mandat complet. Choisissez le niveau d'intervention dont le projet a réellement besoin.
01
Vérifier l'adéquation
Le brief privé
Pour déterminer si le projet et DALLEAU devraient avancer ensemble.
Vous recevez
Un examen personnel du site, de l'usage envisagé, du budget et du calendrier.
Sans frais · Relu personnellement
Présenter votre projet
Périmètre de cette étape
Si le projet et DALLEAU se correspondent clairement, cet examen est suivi d'une invitation à un premier échange.
Le brief sert à vérifier l'adéquation. Il ne comprend aucun avis sur la faisabilité ou la valorisation, ni aucun avis juridique ou technique.
02
Prendre une décision
L'étude de faisabilité
Pour décider de construire, acheter, réviser, renégocier, attendre ou renoncer avant d'engager davantage de capital.
Vous recevez
Une recommandation documentée sur un projet défini.
15 000 USD · 15 jours ouvrés à compter d'un dossier complet
Commander l'étude
Honoraires et capacité
Elle couvre le site, la logique d'investissement, les coûts, les risques et le mode de réalisation.
Les honoraires de l'étude sont intégralement déduits de ceux d'un mandat accepté par la suite. Commander une étude ne réserve aucune capacité pour un mandat complet et n'en garantit pas l'acceptation.
03
Mener le projet
Le mandat de développement complet
Pour le propriétaire qui souhaite confier le développement à un seul bureau, de la faisabilité jusqu’à un actif prêt à l’usage.
Vous recevez
Un bureau de développement complet au service du propriétaire.
Budgets gérés à partir de 1 000 000 USD hors foncier · Honoraires à partir de 100 000 USD
Échanger sur un mandat complet
Comment les honoraires sont fixés
Il coordonne le programme, les spécialistes, les appels d'offres, les contrats, le chantier, la réception et la préparation à l'exploitation.
Les honoraires représentent généralement 8 à 12 % du budget de développement géré et approuvé. La première phase est fixée à la signature. Le solde est figé après l'approbation du concept, du périmètre et du plan de coûts. Les dépassements de coûts ordinaires imputables à des tiers n'augmentent pas les honoraires de DALLEAU.
DALLEAU Atelier dans le mandat
La méthode renforce les trois façons existantes de travailler ensemble.
Atelier renforce le brief, l’étude et le mandat existants. Les questions de recherche, de site, d’exploitation et de preuve pertinentes sont activées selon le projet, puis portées dans l’engagement choisi par le propriétaire.
Brief privé
Le premier échange identifie l’adéquation, les questions utiles et les risques à examiner. Il reste centré sur le contexte et la décision immédiate du propriétaire.
Commencer un Brief privé →
Étude de faisabilité
L’étude peut activer la base tropicale, les usages du foyer, l’intimité, la chambre protégée, l’environnement intérieur, les spécialistes et les questions non résolues.
Commander l’étude de faisabilité →
Mandat complet
La méthode porte les cibles, les missions, les prototypes à l’échelle réelle, les points d’arrêt, la mise au point et la vérification — ou commissioning —, l’Owner’s Control Report, puis le Building Passport, le passeport du bâtiment.
Échanger sur un Mandat complet →
Explorer DALLEAU Atelier
PREUVE · PROJET LIVRÉ ET EN EXPLOITATION · HARMONIE
Harmonie, du chantier à l'exploitation.
Nous voyons aujourd'hui comment chaque décision se traduit dans l'usage quotidien. François est intervenu dès les fondations d'Harmonie, a repris la direction complète au stade de la structure du deuxième étage, puis a conduit l'achèvement et l'ouverture. Il dirige encore aujourd'hui l'exploitation avec l'équipe. Cette continuité crée un retour d'expérience rare entre conception, chantier et usage quotidien.
Archive du chantier. L'intérieur central était encore inachevé et accessible à l'inspection.
Archive du projet. L'intérieur achevé, dans la résidence en exploitation, photographié depuis un autre point de vue.
Ce que nous avons repris
Un ensemble de trois villas, des équipements communs et un chantier déjà engagé.
Ce que nous avons renforcé
Les jalons d'inspection, le contrôle de l'étanchéité et du drainage, les responsabilités des entreprises, les garanties et l'ordre des opérations avant l'ouverture.
Ce que le propriétaire a reçu
Une résidence achevée et exploitée, documentée à partir de notre propre travail plutôt qu'avec un récit reconstitué après coup.
Ce qui s'applique aux projets suivants
Des responsabilités plus claires, des essais plus précoces et un dossier de réception plus complet.
Découvrir Harmonie
Lire la note de terrain
LE MANDAT COMPLET
Six décisions qui protègent le capital du propriétaire.
À chaque étape, les faits sont réunis, les options sont comparées et la décision reste au propriétaire.
Poursuivre
Réviser
Arrêter
01
Valider le projet et le terrain
La question du propriétaire
Est-ce le bon projet, au bon endroit et à un coût crédible ?
Le travail de DALLEAU
Nous éprouvons le brief, le site, la logique d'investissement, les accès, les contraintes et les principaux risques de réalisation.
Vous recevez
Une recommandation documentée, les risques essentiels et les conditions à réunir avant de poursuivre.
02
Figer un concept réalisable
La question du propriétaire
Le programme, la conception, le coût, le calendrier et l'usage forment-ils un projet cohérent ?
Le travail de DALLEAU
Nous alignons ces éléments avant le début de l'ingénierie détaillée et avant que les modifications ne deviennent coûteuses.
Vous recevez
Un brief approuvé, un concept arrêté, un plan de coûts et des critères de performance précis.
03
Mettre le même projet en concurrence
La question du propriétaire
Chaque entreprise chiffre-t-elle le même périmètre et les mêmes quantités ?
Le travail de DALLEAU
Nous coordonnons les plans, le périmètre, les quantités et les règles commerciales transmis à chaque candidat.
Vous recevez
Un dossier d'appel d'offres traçable, des offres comparables et une liste claire des écarts.
04
Choisir et contractualiser
La question du propriétaire
Qui peut réellement livrer le projet, à quelles conditions et avec quelles responsabilités ?
Le travail de DALLEAU
Nous vérifions les capacités, les références, les conditions commerciales, le calendrier et les risques contractuels avant de retenir un intervenant.
Vous recevez
Une recommandation d'attribution, un périmètre défini, un calendrier et une base contractuelle documentée.
05
Contrôler ce qui est construit
La question du propriétaire
Les engagements et les paiements correspondent-ils à la qualité et à l'avancement réels ?
Le travail de DALLEAU
Nous coordonnons les inspections, les relevés, les modifications, la vérification des paiements, le suivi des risques et les décisions attendues du propriétaire.
Vous recevez
Un rapport mensuel destiné au propriétaire, couvrant les coûts, les prévisions, la provision pour aléas, le calendrier, les risques, les décisions et les photographies.
06
Livrer un actif prêt à l'usage
La question du propriétaire
La résidence est-elle terminée, testée, documentée et prête à être habitée ou exploitée ?
Le travail de DALLEAU
Nous coordonnons les essais, les réserves, les garanties, les notices, la formation, la réception et la préparation à l'exploitation.
Vous recevez
La clôture des réserves, les procès-verbaux d'essais, les garanties, le Building Passport et le plan d'entretien.
Comment DALLEAU sélectionne ses partenaires d'exécution
VISIBLE PENDANT TOUTE LA RÉALISATION
Vous gardez une vue claire sur le chantier, le budget et la prochaine décision.
Un espace privé permet au propriétaire de suivre le projet sans le réduire à un simple tableau de bord.
Caméras de chantier et relevés pièce par pièce
Rapports hebdomadaires et visites vidéo
Rapport mensuel sur les coûts, le calendrier et les risques
Décisions en attente et conséquences clairement indiquées
Exemple d’interface propriétaire, configurée pour chaque mandat.
Exemple d’Owner’s Control Report, établi à partir du dossier du mandat.
UNE COMPARAISON HONNÊTE
Trois façons d'acquérir une résidence. Trois arbitrages très différents.
Acheter un bien terminé privilégie la rapidité. Acheter sur plan privilégie la simplicité. Développer avec DALLEAU privilégie le contrôle, la qualité d'exécution et une répartition plus transparente du capital.
Bien terminé
La certitude plutôt que la personnalisation
Voir le détail de la comparaison
Idéal pour
Acheter rapidement un actif existant, inspectable et prêt à l'usage.
Avantage principal
Le bien peut être évalué dans son état réel.
Prix et marges
Le prix global est connu. Les coûts historiques et la marge du vendeur peuvent ne pas être détaillés.
Choix des intervenants
Déjà effectué. La qualité se juge sur le résultat construit et les documents disponibles.
Conception
Existante, avec des possibilités de modification limitées.
Risque
Le risque de développement est passé. Les risques liés à l'acquisition, à la conformité, aux défauts et à l'exploitation restent à vérifier.
Valeur potentielle
Déjà comprise, au moins en partie, dans le prix demandé.
Vente sur plan par un promoteur
La simplicité d'une offre intégrée
Voir le détail de la comparaison
Idéal pour
Acheter un produit défini sans piloter directement son développement.
Avantage principal
Le promoteur coordonne le parcours commercial et la livraison.
Prix et marges
Le prix est packagé. La marge visée par le promoteur est intégrée au prix, tandis que la structure des coûts peut ne pas être détaillée.
Choix des intervenants
Effectué par le promoteur selon son programme, ses contraintes et ses engagements contractuels.
Conception
Définie à l'avance, avec des possibilités de personnalisation variables.
Risque
Dépend du contrat, du financement, du chantier et de la capacité du promoteur à livrer.
Valeur potentielle
La marge recherchée par le promoteur est déjà intégrée au prix de vente.
Projets qualifiés · Honoraires définis par écrit · Pilotage pour le propriétaire
Développement privé DALLEAU
Construire pour soi, avec une équipe dédiée au propriétaire
Voir le détail de la comparaison
Idéal pour
Les propriétaires disposant d'un budget défini et souhaitant créer un actif autour de leur terrain, de leurs usages et de leurs objectifs.
Avantage principal
Le propriétaire conserve le contrôle du projet, du budget, du choix des intervenants et des décisions importantes.
Prix et marges
Les coûts de tiers sont documentés. Les honoraires DALLEAU sont définis au mandat et représentent généralement 8 à 12 % du budget de développement approuvé et géré.
Choix des intervenants
Mis en concurrence sur la qualité, la conformité, la capacité d'exécution et le coût total, jamais uniquement sur le prix le plus bas.
Conception
Définie autour du terrain, du budget, de l'usage prévu et des objectifs du propriétaire.
Risque
Le propriétaire porte le risque de développement. La due diligence, les contrats, les jalons de décision et les contrôles le rendent visible et gérable sans le supprimer.
Valeur potentielle
Toute valeur effectivement créée reste attachée à l'actif du propriétaire. Elle n'est pas garantie.
OÙ VA LE CAPITAL
À périmètre et enveloppe globale comparables, le développement privé peut consacrer une plus grande part du capital au terrain, à la conception et à la construction, plutôt qu'à une marge de vente intégrée au prix d'un produit fini.
Un promoteur développe un produit destiné à être vendu au prix qu'il fixe. DALLEAU intervient pour le propriétaire. Les devis, les factures, le choix des intervenants et les décisions importantes restent documentés.
La base de calcul de nos honoraires est inscrite dans le mandat et représente généralement 8 à 12 % du budget de développement géré et approuvé. Après validation du concept, du périmètre et du plan de coûts, le solde est fixé. Les dépassements de coûts ordinaires imputables à des tiers n'augmentent pas ces honoraires.
Toute valeur créée par le développement reste attachée à l'actif du propriétaire. Sa valeur future et sa liquidité dépendent toutefois du terrain, du marché, des coûts, de la conformité et de la qualité d'exécution.
Évaluer la faisabilité de mon projet
Pour les propriétaires disposant d'un budget de développement défini. Mandats complets à partir de 1 000 000 USD hors foncier, que le terrain soit déjà acquis ou encore à sélectionner.
Le modèle économique d'un programme varie selon le projet et le promoteur. Cette comparaison n'utilise aucun pourcentage de marge universel. Elle distingue le prix de vente d'un produit fini d'un développement privé où les coûts du projet et les honoraires de DALLEAU sont documentés séparément.
CE QUI RESTE ENTRE VOS MAINS
Un projet lisible pendant le chantier. Un dossier complet après la livraison.
PENDANT LE PROJET
Un contrôle en toute transparence
Chaque devis et chaque facture de tiers sont accessibles
Chaque remise est portée au crédit du projet
Chaque modification est documentée et approuvée
Chaque paiement repose sur une base approuvée
Toute intervention d'une partie liée est déclarée
DALLEAU est rémunéré uniquement par le propriétaire et n'accepte aucun avantage non déclaré de la part d'un fournisseur ou d'une entreprise.
À LA RÉCEPTION
Le Building Passport
À la livraison, la résidence dispose d'un dossier organisé qui documente sa conception, sa construction, ses équipements et son entretien.
Plans de récolement et plans coordonnés des réseaux
Photographies des réseaux dissimulés avant fermeture
Registres des matériaux, finitions et équipements
Garanties, notices et contacts des fournisseurs
Historique des modifications, dossiers d'autorisations et plan d'entretien
Exemple d’archive du Building Passport.
Ce que comprend le budget de développement géré
Le budget de développement géré comprend les prestations de l'équipe de professionnels mandatés, l'ingénierie, la construction, les aménagements extérieurs, les achats gérés directement, le mobilier, les agencements, les équipements et les coûts convenus de préparation à l'exploitation. Il exclut l'acquisition du terrain, les taxes d'acquisition, le financement, les conseils juridiques et fiscaux indépendants du propriétaire, les honoraires de DALLEAU et les taxes applicables.
UNE ADÉQUATION ASSUMÉE
Ce mandat s'adresse aux propriétaires qui veulent rendre les responsabilités explicites.
Il est volontairement exigeant. Cette discipline n'a de sens que si elle correspond aux priorités du propriétaire.
Il est adapté lorsque
Le projet mérite une direction indépendante
Vous voulez comprendre les coûts et les arbitrages
La qualité d'usage compte autant que l'image
L'actif doit rester documenté et exploitable dans le temps
Ce mandat convient moins lorsque
Le prix initial le plus bas est le seul critère
Vous souhaitez que les décisions importantes restent implicites
Les appels d'offres, les contrôles et la documentation sont jugés superflus
LA PROCHAINE ÉTAPE UTILE
Présentez-nous votre projet. Nous vous dirons s'il correspond à DALLEAU et quelle devrait être la prochaine étape.
Présenter votre projet
Chaque brief est examiné personnellement. Un premier échange est proposé lorsque le projet, le calendrier et le rôle attendu correspondent au mandat DALLEAU.
DALLEAU agit comme directeur du développement pour le compte du propriétaire et coordonne les architectes, ingénieurs, entreprises et professionnels réglementés mandatés indépendamment. Chacun conserve la responsabilité de sa mission.

## Immobilier, construction et exploitation à Bali | DALLEAU

URL: https://dalleau.ai/fr/notes/

DALLEAU | Notes de terrain
Ce qui change.
Ce que cela implique.
Ce que les propriétaires doivent vérifier.
Un espace éditorial pour mieux décider à Bali.
Des briefings, vérifications factuelles, retours de terrain et guides de décision pour celles et ceux qui construisent, achètent ou exploitent une résidence privée à Bali.
Rechercher dans la bibliothèque
⌕
Utilisez les flèches haut et bas pour parcourir les suggestions, puis Entrée pour ouvrir une note.
Notes suggérées
Aucune note ne correspond. Essayez une question plus large.
36 notes
Mis à jour
Bibliothèque mise à jour le 20 septembre 2026
Gratuit, intégral et sourcé.
Briefing réglementaire
Vérifié le 27 juillet 2026
Bali restreint les nouvelles demandes PMA dans 18 activités. Ce que cela signifie réellement.
Une restriction ciblée dans OSS n’équivaut pas à une interdiction générale des capitaux étrangers, des projets immobiliers ou des licences existantes.
Ce qui a changé
Le gouvernement provincial indique qu’OSS n’accepte plus de nouvelles demandes de licence PMA pour 18 codes KBLI mentionnés dans l’annonce lorsque l’activité est située à Bali.
Ce que cela implique
L’activité réelle, la taille de l’entreprise, la structure de société, le statut des licences et le modèle d’exploitation doivent être cohérents.
Ce que cela ne signifie pas
Ce n’est pas l’annulation automatique de toutes les licences existantes, de tous les baux ou de tous les projets financés par des étrangers.
Lire le briefing
Pour commencer
Trois questions à clarifier en priorité.
Commencez par les questions les plus proches de votre projet. Chaque guide indique ses sources et sa date de mise à jour.
Sociétés et licences
Mise à jour importante
KBLI 2025 pour les villas à Bali : détenir, exploiter et gérer pour un tiers ne sont pas la même activité
L’activité, la taille de l’entreprise, l’éligibilité d’une PT PMA et le statut des licences sont des questions distinctes.
Lire la note
Foncier et planification
Suivi
Peut-on encore construire à Bali ? Ce que couvre réellement le moratoire de 2026
Bali n’a pas annoncé une interdiction générale de construire sur toute l’île. Le périmètre réel et son application doivent être vérifiés à une date précise.
Lire la note
Eau et exploitation
Mis à jour
La profondeur d’un puits n’est pas une spécification de qualité
La source, la construction du forage, les analyses, le traitement et la maintenance doivent être examinés comme un ensemble.
Lire la note
Vérification des faits
Ce qui circule, et ce que les sources permettent réellement d’affirmer.
Nous confrontons les affirmations qui circulent aux sources publiques, sans transformer chaque clarification en nouveau titre.
Affirmation qui circule
« Bali a interdit les investissements étrangers dans 18 secteurs. »
Ce que disent les sources
L’annonce provinciale concerne de nouvelles demandes de licences PMA pour 18 codes KBLI mentionnés dans l’annonce. C’est bien plus ciblé qu’une interdiction de tout capital étranger ou de toutes les autorisations existantes.
Lire l’analyse
Affirmation qui circule
« Les zones verte, rose et jaune sont des catégories juridiques officielles. »
Ce que disent les sources
Ces couleurs sont des raccourcis de marché. Pour un terrain précis, il faut vérifier le document officiel, la parcelle, la sous-zone et les usages autorisés.
Lire l’analyse
Sur le terrain
Des archives de projet, pas seulement des commentaires.
Des étapes de chantier, des preuves d’exploitation et des décisions traçables dans les archives d’un projet réel.
Relevé du chantier
Livré et en exploitation
Retour de terrain | Harmonie
Ce que nous referions, et ce que nous changerions.
Harmonie est présenté à travers les archives originales du projet et l’expérience d’exploitation. Le dossier montre ce qui a fonctionné, mais aussi ce qui aurait dû être décidé plus tôt.
Lire le retour de terrain
Eau et maintenance
Un réseau d’eau conçu pour rester facile à entretenir
Pourquoi l’isolement, l’accès et la documentation doivent être résolus avant les finitions.
Exploitation de la résidence
Une résidence doit continuer à fonctionner lorsque le propriétaire est absent
Le personnel, les circuits de service et la maintenance font partie du brief dès le départ.
Bibliothèque de référence
Parcourez les notes selon la décision à prendre.
Sujet
Tous les sujets
Foncier et structure
Marchés et capital
Résidence et exploitation
Vie à Bali
Mobilité et statuts
Format
Tous les formats
Note de terrain
Note de synthèse
Retour de terrain
Guide de décision
Note de recherche
Étape du projet
Toutes les étapes
Avant le foncier
Avant la conception
Avant l'engagement
Pendant la réalisation
En exploitation
Effacer
01
Résidence et exploitation
Guide propriétaire
DALLEAU
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Comparez les devis de construction à Bali à périmètre égal : quantités, exclusions, provisions, essais, livraison et paiements. Grille BOQ gratuite.
20 septembre 2026
9 min de lecture
Partager
02
Marché et capital
Reality Check
DALLEAU
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Villa à 150 000 € à Bali : comparez les droits, la durée du bail, les travaux, les autorisations et le coût complet avant de juger le prix ou le rendement.
20 septembre 2026
10 min de lecture
Partager
03
Résidence et exploitation
Note réglementaire
DALLEAU
Votre villa à Bali est publiée en ligne. Qu'est-ce que cela prouve réellement ?
Ce que prouvent réellement l’annonce OTA, le NIB, le KBLI, le NKU, le dossier du bien, le PBJT et l’APOA après août 2026.
11 août 2026
12 min de lecture
Partager
04
Résidence et exploitation
Guide de décision
DALLEAU
Une PT PMA peut-elle exploiter une villa à Bali ?
Guide pratique des voies possibles entre exploitation directe, véritable opérateur indonésien, PT locale réelle et PT PMA de management.
11 août 2026
14 min de lecture
Partager
05
Marchés et capital
Guide de décision
DALLEAU
Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule.
Comment une management fee peut rémunérer une vraie prestation sans devenir un outil destiné à déplacer le bénéfice résiduel de l’opérateur local.
11 août 2026
14 min de lecture
Partager
06
Mobilité et statuts
Guide de décision
DALLEAU
Un dirigeant étranger peut-il travailler dans sa propre entreprise à Bali ?
Ce qu’un véritable directeur étranger peut faire, où commence un autre métier et pourquoi une nomination dans la PT PMA ne couvre pas la PT locale.
11 août 2026
12 min de lecture
Partager
07
Résidence et exploitation
Reality Check
DALLEAU
Qui exploite réellement la villa ?
Dix questions reliant l’annonce, le contrat client, l’argent, les équipes, les systèmes, le bien, la licence, la fiscalité, le risque et le bénéfice à l’opérateur réel.
11 août 2026
3 min de lecture
Partager
08
Résidence et exploitation
Reality Check
DALLEAU
Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche.
Une forte pluie peut révéler des informations qui disparaissent en quelques heures. Les lignes d’eau sèchent, les taches s’atténuent, les drains se vident et les équipes nettoient.
4 août 2026
3 min de lecture
Partager
09
Résidence et exploitation
Reality Check
DALLEAU
Repeindre une tache ne traite pas une infiltration.
Une nouvelle peinture peut donner l’apparence d’une réparation alors que le chemin de l’eau n’a pas changé.
4 août 2026
3 min de lecture
Partager
10
Marchés et capital
Note de synthèse
DALLEAU
Nouvelle note de synthèse
Bali restreint les nouvelles demandes PMA dans 18 activités. Ce que cela signifie réellement
Une restriction ciblée dans OSS n’équivaut pas à une interdiction générale des capitaux étrangers, des projets immobiliers ou des licences existantes.
27 juillet 2026
11 min de lecture
Partager
11
Résidence et exploitation
Note de terrain
DALLEAU
Vient de paraître
Puits de villa à Bali : la profondeur ne suffit pas à garantir la qualité de l’eau
Pourquoi une profondeur ou la mention « filtration en sept étapes » ne prouve rien sans construction du forage, analyses, traitement adapté et mise en service documentée.
20 juillet 2026
15 min de lecture
Partager
12
Marchés et capital
Note de synthèse
DALLEAU
Vient de paraître
Achat immobilier neuf en Indonésie en 2026 : l'État prend-il en charge la TVA ?
Le règlement du ministère des Finances PMK 90/2025 peut réduire la TVA sur un logement neuf éligible livré en 2026. Il ne modifie pas les droits immobiliers qu'un acheteur étranger peut légalement détenir.
20 juillet 2026
5 min de lecture
Partager
13
Résidence et exploitation
Guide de décision
DALLEAU
Mise à jour importante
KBLI 2025 pour les villas à Bali : exploiter son bien et gérer celui des autres ne sont pas la même activité
KBLI 55203 décrit correctement la villa exploitée par son propriétaire, mais ne comporte aucune voie OSS « grande entreprise ». La correction distingue activité, risque, taille, accès PT PMA et droits antérieurs.
20 juillet 2026
13 min de lecture
Partager
14
Résidence et exploitation
Note de terrain
DALLEAU
Dans une résidence de villas à Bali, faut-il partager ou privatiser les équipements ?
Un équipement partagé n'a de valeur que si les clients l'utilisent, si la parcelle peut légalement l'accueillir et si les économies d'exploitation justifient l'investissement.
17 juillet 2026
5 min de lecture
Partager
15
Marchés et capital
Note de recherche
DALLEAU
Est-il encore intéressant d'investir dans une villa à Bali en 2026 ?
Bali reste un grand marché touristique, mais une moyenne calculée à l'échelle de l'île ne permet pas de juger une villa, un emplacement ou un mode d'exploitation précis.
17 juillet 2026
7 min de lecture
Partager
16
Foncier et structure
Guide de décision
DALLEAU
Leasehold à Bali : quels droits obtenez-vous réellement ?
Leasehold est le terme recherché sur internet, mais l'opération est un bail de longue durée. L'acheteur obtient l'usage contractuel d'un terrain ou d'un bien pendant une période définie, tandis que le titre foncier indonésien reste au nom de son titulaire.
17 juillet 2026
6 min de lecture
Partager
17
Foncier et structure
Note de synthèse
DALLEAU
Peut-on encore construire à Bali ? Le périmètre du moratoire de 2026
Bali n'a pas gelé toute construction sur l'île. Le durcissement vise les terrains productifs ou protégés, l'usage autorisé sur chaque parcelle, certaines contraintes littorales et les montages par prête-nom. Il faut donc vérifier le terrain précis sur la carte officielle et dans les règles locales applicables.
17 juillet 2026
5 min de lecture
Partager
18
Foncier et structure
Note de synthèse
DALLEAU
PP 28/2025 : qu'a-t-il réellement changé pour les licences de villas à Bali ?
Le règlement gouvernemental 28 de 2025 a modifié le cadre général des licences fondées sur le risque en Indonésie. Il n'a ni interdit la courte durée ni activé du jour au lendemain un contrôle automatique des plateformes. Les standards touristiques, la supervision et la vérification des annonces relèvent de mesures distinctes, adoptées à des dates différentes.
17 juillet 2026
4 min de lecture
Partager
19
Foncier et structure
Guide de décision
DALLEAU
PT PMA, prête-nom ou bail à Bali : qui détient réellement vos droits ?
Financer un terrain ou des parts ne fait pas du payeur le titulaire inscrit. Avant d'investir, il faut identifier le droit, la personne ou la société qui le détient et les documents qu'un tribunal ou un futur acheteur pourra vérifier.
17 juillet 2026
6 min de lecture
Partager
20
Résidence et exploitation
Retour de terrain
DALLEAU
Reprendre et achever un chantier à Bali : les leçons du projet Harmonie
Harmonie est la résidence qui a façonné notre méthode actuelle. Trois villas en duplex occupent une parcelle de 1 100 m² prise à bail à Seminyak. Elles ont accueilli leurs premiers clients à l'été 2024. Ce retour présente les choix réussis, les défauts apparus et les corrections apportées depuis.
17 juillet 2026
6 min de lecture
Partager
21
Vie à Bali
Guide de décision
DALLEAU
Résidence secondaire à Bali : les décisions à prendre avant d'acheter
Une résidence secondaire à Bali ne commence pas par une annonce immobilière. Elle commence par un usage, un mode de détention, un droit au séjour et une stratégie de sortie compatibles entre eux.
17 juillet 2026
7 min de lecture
Partager
22
Vie à Bali
Note de terrain
DALLEAU
Vivre à Bali avec des enfants : la réalité du quotidien
École, trajets, santé, aide à domicile et organisation de la maison : ce que notre vie avec deux jeunes enfants nous a appris avant de choisir un quartier et un logement.
23 juillet 2026
12 min de lecture
Partager
23
Foncier et structure
Guide de décision
DALLEAU
Zones verte, rose et jaune à Bali : ce que dit le plan officiel
Les couleurs verte, rose et jaune sont des raccourcis de marché. Les plans juridiques emploient des noms précis de zones et de sous-zones. Avant de payer un terrain, il faut identifier ces classements, lire les usages autorisés puis obtenir le résultat de conformité spatiale pour le projet prévu.
17 juillet 2026
6 min de lecture
Partager
24
Marchés et capital
Guide de décision
DALLEAU
« 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?
Un rendement garanti n'est pas une caractéristique du bien. C'est une obligation de paiement due par une personne ou une société nommée.
16 juillet 2026
10 min de lecture
Partager
25
Foncier et structure
Guide de décision
DALLEAU
Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ?
Documents, confirmations et décisions nécessaires avant votre prochain paiement.
16 juillet 2026
13 min de lecture
Partager
26
Foncier et structure
Guide de décision
DALLEAU
Avant le prochain paiement de chantier : quelles preuves demander ?
Le calendrier peut déclencher un appel de fonds. Le paiement, lui, ne devrait être dû que lorsque l'obligation correspondante est remplie.
16 juillet 2026
10 min de lecture
Partager
27
Marchés et capital
Guide de décision
DALLEAU
Comment sortir légalement de l'argent d'une PT PMA ? Sept méthodes et leur fiscalité
Posséder une société indonésienne à capitaux étrangers (PT PMA) ne signifie pas posséder personnellement l'argent détenu sur son compte bancaire.
16 juillet 2026
10 min de lecture
Partager
28
Marchés et capital
Guide de décision
DALLEAU
PT PMA : faut-il verser 10 milliards IDR dès la création ?
Trois règles distinctes sont souvent ramenées au même chiffre de 10 milliards IDR. Elles répondent à des questions différentes et doivent être vérifiées séparément.
16 juillet 2026
19 min de lecture
Partager
29
Foncier et structure
Note de synthèse
DALLEAU
Puits ou forage à Bali : faut-il un permis ?
Un robinet qui fonctionne ne prouve pas qu'une villa peut légalement utiliser son puits. Le dossier doit identifier qui prélève l'eau, quel puits l'alimente, à quoi sert l'eau, quel volume est prélevé et quel suivi existe.
16 juillet 2026
6 min de lecture
Partager
30
Foncier et structure
Guide de décision
DALLEAU
Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?
« Le promoteur » n'est pas une cartographie complète des cocontractants.
16 juillet 2026
9 min de lecture
Partager
31
Foncier et structure
Guide de décision
DALLEAU
Sept vérifications avant de verser un acompte immobilier à Bali
Un certificat peut être authentique et le projet peut malgré tout être mauvais. Une villa peut être terminée et ne pas pouvoir être exploitée comme prévu. Le dossier ci-dessous doit être complet avant que tout versement ne devienne non remboursable.
16 juillet 2026
22 min de lecture
Partager
32
Mobilité et statuts
Guide de décision
DALLEAU
Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ?
Préparez votre arrivée à Bali : e-VOA, déclaration All Indonesia, sas automatiques, prolongation et erreurs courantes, d'après les sources officielles.
13 juillet 2026
7 min de lecture
Partager
33
Mobilité et statuts
Guide de décision
DALLEAU
KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?
Règles officielles de l'E28A : participation de 10 milliards IDR, garant, fonctions de direction autorisées, durée du séjour et limites de travail.
13 juillet 2026
7 min de lecture
Partager
36
Mobilité et statuts
Guide de décision
DALLEAU
Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille
Comparez les visas indonésiens officiels pour les vacances, les longs séjours, les affaires, l'emploi, l'investissement, le télétravail et la famille.
13 juillet 2026
16 min de lecture
Partager
35
Mobilité et statuts
Guide de décision
DALLEAU
Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi
Comprenez le visa, le titre de séjour, le plan d'emploi, la contribution employeur et les règles de poste pour travailler légalement en Indonésie.
13 juillet 2026
8 min de lecture
Partager
36
Mobilité et statuts
Guide de décision
DALLEAU
Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026
Vérifiez les conditions officielles de l'E33G : employeur étranger, revenu annuel de 60 000 USD, séjour d'un an, sans garant ni rémunération indonésienne.
13 juillet 2026
6 min de lecture
Partager
Aucune note ne correspond à cette combinaison.
Retirez un filtre ou essayez une question plus large.
Afficher davantage de notes
Sujets à suivre
Des sujets dont la situation évolue et que nous continuons de vérifier.
Lorsque les sources publiques sont incomplètes ou que la pratique administrative évolue, nous le disons. Suivre un sujet ne revient pas à conclure.
Appliquer ces informations à un projet précis exige d’examiner le site, la société, les licences et l’usage envisagé.
Parler à François
Accès PMA et restriction des 18 KBLI
Mis à jour
Contrôle des constructions et de l’usage du sol à Bali
Suivi
Licences de location courte durée et contrôles des plateformes
En cours d’examen
The Bali Brief
Recevez le prochain briefing sourcé.
Un e-mail court lorsqu’une Note de terrain est publiée ou fait l’objet d’une mise à jour importante.

## Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. | DALLEAU Field Notes

URL: https://dalleau.ai/fr/notes/apres-forte-pluie-verifications-proprietaire.html

Field Notes / Reality Check / Eau, enveloppe et humidité

Field Notes · Reality Check · Eau, enveloppe et humidité

Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche.

Une forte pluie peut révéler des informations qui disparaissent en quelques heures. Les lignes d’eau sèchent, les taches s’atténuent, les drains se vident et les équipes nettoient.

Niveau de preuve

Guide d’observation. La cause reste à établir sur site.

Type d’application

Observation propriétaire et séquence d’investigation

Mis à jour

4 août 2026

Sources

4

Sur cette page

Pourquoi agir rapidement

Première règle : sécurité

Enregistrer l’événement avant nettoyage

Parcours extérieur

Parcours intérieur

Ne pas effacer la chronologie

Ce que certaines observations peuvent suggérer

Ce que le propriétaire peut demander

Reality Check

Sources

Carte du système

Reality Check

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

01 Événement

Pluie, vent et état d’exploitation

02 Extérieur

Terrain, terrasses et toiture

03 Intérieur

Pièce, hauteur et chronologie

04 Enregistrer

Plan, images et séquence

Contexte illustratif

Pourquoi agir rapidement

Une forte pluie peut révéler des informations qui disparaissent en quelques heures. Les lignes d’eau sèchent, les taches s’atténuent, les drains se vident et les équipes nettoient.

L’objectif n’est pas de diagnostiquer la fuite. Il est de préserver l’état avant disparition des indices et de préparer une investigation utile.

Première règle : sécurité

Ne montez pas sur une toiture mouillée et n’inspectez pas un plafond, un local technique ou une zone électrique dangereuse. Isolez la zone et faites intervenir la partie compétente.

Enregistrer l’événement avant nettoyage

Notez :

date et heure approximative ;

début et fin de la pluie ;

direction inhabituelle du vent ;

portes et fenêtres ouvertes ;

fonctionnement de la climatisation, des pompes et extractions ;

premier point visible puis extension ;

photos et courte vidéo ;

antécédents.

Un plan simple annoté vaut mieux qu’une série de gros plans non localisés.

Parcours extérieur

Terrain et paysage

Vérifiez si l’eau :

s’éloigne ou revient vers la maison ;

s’accumule contre les murs ;

traverse un seuil ;

déborde d’une jardinière ;

ressort d’un mur de soutènement ;

contourne un caniveau ;

possède une sortie visible.

Terrasses et piscine

Recherchez :

eau stagnante devant les baies ;

pentes incohérentes ;

caniveaux remplis de feuilles ou débris ;

drains plus hauts que la finition ;

trop-plein de piscine ;

eau passant sous une porte extérieure.

Toiture et gouttières

Depuis un point sûr, observez :

eau persistante après la baisse de pluie ;

crépines bouchées ;

gouttières qui débordent ;

trop-pleins ;

descentes rejetant l’eau contre le bâtiment ;

traces sous parapets, sorties et pénétrations.

Parcours intérieur

Repérez la hauteur et le premier emplacement :

bas de mur ;

baie ;

jonction plafond-mur ;

pénétration ;

sous une salle de bains ou terrasse ;

dressing ou menuiserie fixe ;

drain de climatisation ou plomberie ;

joint de sol ou plinthe.

Une tache basse ne prouve pas automatiquement une remontée capillaire. Une tache au plafond ne prouve pas que le point d’entrée se trouve directement au-dessus.

Ne pas effacer la chronologie

Avant peinture, mastic ou ouverture :

conservez les photos ;

identifiez la pièce et l’orientation ;

notez les matériaux touchés ;

reliez le défaut aux conditions extérieures ;

rassemblez les réparations antérieures ;

conservez les informations de travaux récents.

Une mesure temporaire peut être nécessaire pour limiter les dégâts. Elle ne doit pas supprimer les éléments nécessaires à l’enquête.

Ce que certaines observations peuvent suggérer

Ce sont des pistes, pas des diagnostics.

Uniquement sous pluie battante : façade exposée, joints de baie, parapets et pénétrations.

Après la fin de la pluie : assemblage saturé, drainage en charge ou eau circulant dans une cavité.

Pendant l’usage d’une salle de bains : plomberie et zone humide avant de conclure à la toiture.

Dans une pièce froide par temps humide : condensation et fuite d’air en plus des sources d’eau liquide.

En bas des murs toute l’année : sol, eau latérale, paysage, plomberie et construction du mur.

Ce que le propriétaire peut demander

Un plan écrit indiquant :

hypothèses ;

contrôles non destructifs ;

éventuels tests d’eau ciblés ;

zones à isoler ;

conditions justifiant une ouverture ;

mode de retest ;

observation lors de la prochaine pluie comparable.

Reality Check

Sécher ne signifie pas résoudre.

Si la trace disparaît mais que le chemin de l’eau reste, la pluie suivante relance le même problème.

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Ouvrir la source originale

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continuer depuis la question devant vous

Continuer depuis la question devant vous

Repeindre une tache ne traite pas une infiltration. → L’étanchéité est une chaîne, pas une couche appliquée à la fin. → Dallage sur terre-plein ou plancher suspendu à Bali ? → Une membrane ne sauve pas une toiture plate sans pentes. →

Un premier échange utile demande le site, l’enregistrement de l’événement et la question du propriétaire. Il ne demande pas un dossier technique complet.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François

## Moratoire 2026 sur la construction à Bali | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-building-moratorium.html

← notes réglementation 10 juillet 2026 Peut-on encore construire à Bali ? Le périmètre du moratoire de 2026

Bali n'a pas gelé toute construction sur l'île. Le durcissement vise les terrains productifs ou protégés, l'usage autorisé sur chaque parcelle, certaines contraintes littorales et les montages par prête-nom. Il faut donc vérifier le terrain précis sur la carte officielle et dans les règles locales applicables.

DALLEAU | Recherche et notes de terrain Publié le

10 juillet 2026

Dernière vérification

17 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref À retenir : il reste possible de construire lorsque le plan d'aménagement autorise l'usage prévu et que le projet obtient les approbations nécessaires. Le règlement provincial de Bali 4/2026 encadre la conversion de terres productives et les montages par prête-nom. Ses sanctions administratives concernent ce périmètre précis. Elles ne constituent pas une peine pénale unique applicable à tout problème de zonage, de construction ou de licence.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Construire reste possible, parcelle par parcelle

La formule « Bali a interdit de construire » mélange plusieurs mesures et masque la question utile pour un propriétaire : que peut-on bâtir et exploiter sur cette parcelle ?

La réponse dépend du plan d'aménagement applicable, des pièces foncières et de l'activité prévue. Un projet touristique situé dans une zone prévue pour le tourisme ne part pas de la même situation qu'une villa projetée sur une terre agricole protégée. La description du vendeur, la couleur employée par un agent ou la villa voisine ne prouvent rien sur la parcelle concernée.

Trois étapes et trois textes différents

La chronologie est importante, car deux règlements publiés en février 2026 portent le numéro 4 sans avoir le même objet.

L'instruction provinciale de 2025. Après les inondations de septembre, le gouverneur de Bali annonce un contrôle renforcé des nouveaux projets commerciaux sur les terres productives et les zones d'infiltration. L'instruction du gouverneur 5/2025 demande ensuite aux régents et aux maires de ne pas autoriser certaines conversions agricoles, notamment sur les terres agricoles alimentaires protégées, appelées LP2B.

Le texte national sur les rizières. Le règlement présidentiel 4/2026 , ou Perpres 4/2026, entre en vigueur le 4 février 2026. Il remplace le règlement présidentiel 59/2019 et fixe le cadre national de cartographie et de contrôle des rizières protégées.

Le texte régional balinais. Le règlement provincial de Bali 4/2026, ou Perda 4/2026, traite de la conversion des terres productives et de la détention foncière par prête-nom. L'autorité officielle d'aménagement de Bali présente son champ d'application : terres productives, contrôle des conversions, surveillance, sanctions administratives et interdiction des montages par prête-nom. Le règlement provincial 3/2026, signé à la même période, concerne séparément les plages et les zones de recul du littoral.

La Perpres 4/2026 est nationale et porte sur les rizières protégées. La Perda 4/2026 est régionale et couvre, à Bali, les terres productives ainsi que les prête-noms. Les confondre conduit à une lecture erronée.

Ce que l'on peut dire des sanctions

Le résumé de l'autorité provinciale décrit une échelle de mesures administratives pouvant aller jusqu'à la suspension, la fermeture du site, le retrait de licence et la démolition d'une construction contraire aux règles spatiales. Un avertissement écrit intervient d'abord. Les mesures suivantes sont des réponses possibles dans ce périmètre précis, pas un résultat automatique dans chaque dossier.

Ce résumé ne permet ni de qualifier chaque conversion d'infraction pénale identique, ni d'attribuer la même responsabilité au propriétaire, à l'intermédiaire et à l'agent public. Les conséquences pénales, civiles, fiscales, constructives et commerciales relèvent de textes différents et dépendent des faits. Une conclusion sur une parcelle exige la carte officielle, le texte intégral et un avis juridique indonésien propre au projet.

Ce qu'un projet constructible doit encore prouver

Trois questions doivent être traitées séparément :

Le plan spatial autorise-t-il l'usage prévu ? L'Indonésie appelle ce contrôle la conformité de l'utilisation de l'espace, Kesesuaian Kegiatan Pemanfaatan Ruang (KKPR). Le règlement gouvernemental 21/2021 place la KKPR au cœur du système national d'aménagement.

Le bâtiment peut-il être construit selon ces plans ? La Persetujuan Bangunan Gedung (PBG) est l'approbation de construction. Elle relève du règlement gouvernemental 16/2021 .

Le bâtiment achevé peut-il être utilisé ? Le Sertifikat Laik Fungsi (SLF) est le certificat d'aptitude à l'usage délivré à l'achèvement lorsqu'il est requis. Il ne remplace ni la PBG ni la licence d'activité.

Le plan détaillé peut aussi fixer l'intensité, la hauteur, les reculs, l'accès et les zones protégées. Un projet côtier demande un contrôle distinct des contraintes de plage et de falaise. L'exploitation touristique suit ensuite son propre parcours de licence.

Le prête-nom est un risque distinct

Dans un montage par prête-nom, le droit foncier est enregistré au nom d'une personne indonésienne tandis que des documents privés promettent le contrôle ou le bénéfice économique à un investisseur étranger. La Perda 4/2026 traite cette pratique, mais les règles nationales foncières, d'investissement, de bénéficiaire effectif et de contrat restent également applicables.

Un accord parallèle ne répare pas forcément une structure foncière interdite. Les conséquences dépendent de l'ensemble des documents. Notre note société indonésienne à capitaux étrangers (PT PMA) ou prête-nom explique pourquoi une revue juridique indépendante doit précéder tout paiement.

L'ordre des vérifications avant l'acompte

Faire correspondre le certificat foncier, les références cadastrales, le vendeur et la parcelle physique.

Consulter le plan provincial, celui de la régence ou de la ville et le plan détaillé applicable.

Vérifier les terres productives, rizières protégées, subak, zones d'infiltration, reculs littoraux et accès.

Obtenir le résultat KKPR pour l'usage précis, pas pour une description générique du projet.

Confirmer le parcours PBG pour la construction et SLF pour l'achèvement.

Contrôler le droit foncier, le contrat et le pouvoir de signature de chaque partie.

Identifier la licence nécessaire à l'exploitation prévue.

Cet ordre coûte moins cher qu'une tentative de régularisation après l'acompte, la conception ou le début du chantier.

Questions fréquentes

Bali interdit-elle toute nouvelle construction ? Non. Le cadre actuel limite certaines conversions et impose une conformité spatiale propre à chaque parcelle. Un projet conforme peut encore suivre le parcours normal d'autorisation.

Peut-on transformer une rizière en villa ? Ne le supposez pas. Les pièces foncières et spatiales doivent établir si la parcelle est protégée, si la conversion est possible et quelle autorité instruit la demande.

La villa voisine prouve-t-elle que mon terrain est constructible ? Non. La parcelle voisine peut avoir un autre classement, un autre historique d'autorisation ou son propre problème de conformité.

Quelle différence entre Perpres 4/2026 et Perda 4/2026 ? La Perpres 4/2026 est le règlement national sur la conversion des rizières protégées. La Perda Bali 4/2026 est le règlement provincial sur les terres productives et les montages par prête-nom.

dernière relecture : juillet 2026

Notes liées : Zonage à Bali · PT PMA ou prête-nom · Évaluation du projet

Sources contrôlées le 16 juillet 2026 : règlement présidentiel 4/2026 ; résumé officiel balinais du règlement provincial 4/2026 ; plan spatial provincial de Bali 2023 à 2043 ; règlement gouvernemental 21/2021 sur l'aménagement ; règlement gouvernemental 16/2021 sur les bâtiments . Cette note donne une information générale, pas un avis sur une parcelle ni un conseil juridique. Vérifiez les textes en vigueur en indonésien et faites examiner le site et les documents avant toute décision.

Deux questions à explorer ensuite

Question liée Zones verte, rose et jaune à Bali : ce que dit le plan officiel Question liée Puits ou forage à Bali : faut-il un permis ?

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Arriver à Bali : e-VOA, All Indonesia et autogates | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-evoa-all-indonesia-autogates.html

Accueil / Notes de terrain / Arrivée en Indonésie

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Arrivée en Indonésie Sources consultées le 13 juillet 2026

Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ?

Une arrivée fluide commence par un visa électronique à l'arrivée (B1 e-VOA) correctement délivré, une déclaration All Indonesia remplie et, pour les voyageurs éligibles, un passeport électronique accepté par les sas automatiques.

DALLEAU | Recherche et notes de terrain Publié le

13 juillet 2026

Dernière vérification

13 juillet 2026

Vérifié | 13 juillet 2026 | sources primaires

Périmètre Information indépendante, sans vente de visas Cette page traite seulement de l'arrivée. La catégorie de visite B1 n'autorise ni un emploi ni une rémunération indonésienne.

Avant le départ Demandez le visa électronique à l'arrivée (e-VOA) sur le portail officiel avant le voyage si votre passeport est éligible. Remplissez All Indonesia pendant les trois jours précédant l'arrivée et présentez le passeport utilisé pour la demande. Un voyageur éligible peut emprunter un sas automatique avec un passeport électronique et un e-VOA ou eVisa valide, mais une file ou un contrôle manuel reste possible.

Séjour B1 30 jours

Prolongation Une fois, 60 jours au total

Frais initiaux B1 500 000 IDR

Dans ce dossier Avant la demande Préparer son arrivée étape par étape All Indonesia est distinct du visa Qui peut utiliser les sas automatiques Ce que le B1 permet Prolongation et changement de statut Les erreurs qui coûtent du temps ou de l'argent

Avant la demande

Vérifiez d'abord que votre nationalité figure dans la liste officielle des pays éligibles au visa à l'arrivée (VoA) . Une ancienne capture d'écran ou la liste d'une agence ne suffit pas. L'éligibilité peut évoluer.

La fiche B1 demande actuellement un passeport valable au moins six mois, une photographie récente pour la demande électronique et un billet de retour ou de continuation. L'e-VOA doit être utilisé dans les 90 jours suivant son émission. Ces 90 jours correspondent à la fenêtre d'entrée, pas à la durée autorisée sur place.

Préparer son arrivée étape par étape

Créez la demande sur le portail eVisa officiel .

Contrôlez chaque champ du passeport avant le paiement. Une erreur de nom, de nationalité ou de numéro peut imposer une nouvelle demande.

Payez le montant B1 affiché par le portail. La fiche actuelle indique 500 000 IDR pour les 30 premiers jours.

Conservez le fichier du visa au format PDF et la référence du dossier hors ligne.

Remplissez la carte d'arrivée All Indonesia pendant les trois jours précédant l'arrivée.

Voyagez avec le passeport utilisé dans le dossier et gardez le billet de sortie accessible.

La fiche B1 annonce un envoi de l'e-VOA sous 1 x 24 heures. Il s'agit d'un délai indicatif, pas d'une garantie suffisante pour réserver un vol le jour même. Prévoyez le temps nécessaire pour résoudre un échec de paiement, remplacer un mauvais fichier ou attendre un contrôle manuel.

All Indonesia est distinct du visa

Depuis le 1er octobre 2025, le gouvernement impose aux passagers arrivant de l'étranger la déclaration intégrée All Indonesia. Le communiqué officiel décrit un formulaire unique pour l'immigration, les douanes, la santé et la quarantaine.

Cette déclaration ne remplace pas le visa et ne prolonge aucun séjour. Elle concerne l'arrivée du voyage en cours. Utilisez le domaine gouvernemental et ne payez pas pour ce formulaire.

Qui peut utiliser les sas automatiques

La Direction générale de l'immigration indique qu'un étranger peut utiliser un sas automatique avec un passeport électronique et un e-VOA ou eVisa indonésien . Ses indications orientent aussi les enfants de 14 ans ou moins vers le contrôle manuel. Relisez les conditions officielles d'accès aux sas automatiques avant de compter sur ce parcours.

Même si les conditions sont remplies, la formulation honnête reste : le voyageur peut être éligible . La machine peut renvoyer vers un agent, un sas peut être fermé et la biométrie peut échouer. Un renvoi technique n'invalide pas à lui seul le visa. L'agent peut encore contrôler le document et les conditions d'admission, et un visa ne garantit pas l'entrée.

Ce que le B1 permet

La fiche B1 actuelle cite le tourisme, la visite familiale, le transit et la participation à des réunions, voyages de motivation, conventions et expositions. Participer ne signifie pas être employé. Le B1 n'autorise ni la vente de biens ou services, ni un salaire ou une contrepartie provenant d'une personne ou société indonésienne.

Situation

Lecture du B1

Vacances et visite familiale

Conforme à l'objet annoncé

Assister à une conférence comme participant

Cité par la fiche actuelle

Prendre un emploi dans une villa

Non autorisé

Vendre du conseil, de la photo ou du coaching en Indonésie

Hors activité B1

Recevoir une rémunération indonésienne

Interdit par le cadre officiel

Prolongation et changement de statut

Le B1 commence à 30 jours et peut être prolongé une fois, pour un total maximal de 60 jours. La fiche actuelle indique que la prolongation électronique peut être initiée en ligne.

Les 500 000 IDR affichés plus haut correspondent aux frais initiaux B1. Contrôlez le coût actuel de la prolongation dans le portail officiel avant de demander les 30 jours supplémentaires.

Les sources officielles sont moins claires sur le changement de statut. La fiche B1 de 2026 évoque un mécanisme temporaire distinct, alors qu'une FAQ eVisa affirme que le statut n'est pas convertible. Ne fondez pas un projet d'installation sur l'une ou l'autre de ces affirmations. Si un changement de statut est important, confirmez la procédure actuelle dans le portail ou auprès du bureau émetteur avant l'expiration du B1.

Les erreurs qui coûtent du temps ou de l'argent

Utiliser un domaine ressemblant au site officiel sans comparer les frais finaux.

Saisir un numéro qui ne correspond pas exactement au passeport utilisé pour voyager.

Confondre les 90 jours de validité du visa avec 90 jours de séjour.

Supposer qu'un e-VOA garantit l'accès au sas automatique ou supprime toute file.

Utiliser le B1 pour un emploi, une prestation locale ou l'exploitation quotidienne d'une activité.

Ce que cela change pour un projet immobilier

Ne supposez pas que le B1 couvre un audit préalable à l'investissement ou l'inspection d'un terrain. La fiche C1 cite expressément la visite d'un site d'investissement et le C2 encadre certaines visites d'affaires. Si l'inspection foncière ou l'investissement constitue un motif important du voyage, comparez C1 et C2 dans le portail à jour. Aucun visa de visite ne transforme le voyageur en salarié local, commercial, directeur de chantier ou exploitant de villa.

Limite : Cette synthèse est une information générale, pas un conseil juridique, migratoire, fiscal ou professionnel. Vérifiez la fiche officielle correspondant à votre passeport et à votre activité avant de payer ou de voyager.

Sources gouvernementales

01 B1 Visa Kunjungan Wisata Direction générale de l'immigration de la République d'Indonésie · B1 · consulté le 13 juillet 2026

02 Daftar Negara Subjek VoA, BVK dan Calling Visa Direction générale de l'immigration de la République d'Indonésie · Pays éligibles au visa à l'arrivée · consulté le 13 juillet 2026

03 Portail officiel des visas électroniques pour l'Indonésie Direction générale de l'immigration de la République d'Indonésie · Portail de demande · consulté le 13 juillet 2026

04 Déclaration d'arrivée All Indonesia Gouvernement de la République d'Indonésie · Déclaration d'arrivée · consulté le 13 juillet 2026

05 Mulai 1 Oktober, Deklarasi Kedatangan Penumpang Wajib Dilakukan di Aplikasi All Indonesia Direction générale de l'immigration de la République d'Indonésie · Communiqué officiel · consulté le 13 juillet 2026

06 Siapa Saja yang Bisa Menggunakan Autogate? Direction générale de l'immigration de la République d'Indonésie · Communiqué officiel · consulté le 13 juillet 2026

Dates des sources : page mise à jour le 13 juillet 2026 . Prochaine vérification prévue le 27 juillet 2026 .

Décisions liées

Visas et titres de séjour Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Autorisation de travail Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi Visa investisseur KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Projet immobilier Vous venez seulement en vacances ? Utilisez les liens officiels ci-dessus.

DALLEAU ne prépare pas les demandes de visa. Si ce voyage marque aussi le début d'un véritable projet foncier, immobilier ou d'exploitation, la Stay Matrix peut aider à en préciser le programme avant un premier échange.

Ouvrir la Stay Matrix

Sources officielles 13 juillet 2026

Les liens gouvernementaux ont été consultés à cette date. Lorsque les pages officielles diffèrent, le dossier le signale et retient la lecture la plus prudente.

Consulter les sources

Deux questions à explorer ensuite

Question liée Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Question liée Résidence secondaire à Bali : les décisions à prendre avant d'acheter

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Zonage à Bali : zones verte, rose et jaune | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-land-zoning-explained.html

← notes conformité 7 juillet 2026 Zones verte, rose et jaune à Bali : ce que dit le plan officiel

Les couleurs verte, rose et jaune sont des raccourcis de marché. Les plans juridiques emploient des noms précis de zones et de sous-zones. Avant de payer un terrain, il faut identifier ces classements, lire les usages autorisés puis obtenir le résultat de conformité spatiale pour le projet prévu.

DALLEAU | Recherche et notes de terrain Publié le

7 juillet 2026

Dernière vérification

17 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref À retenir : une couleur sur la carte d'un agent n'autorise pas une villa. Les pièces qui font foi sont le classement de la parcelle dans les plans régionaux et détaillés, puis le résultat officiel de conformité de l'utilisation de l'espace. Le droit de construire et la licence de location touristique sont deux questions distinctes.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Commencer par les mots du plan

Le système indonésien s'appuie sur un plan spatial régional, Rencana Tata Ruang Wilayah (RTRW), puis sur des plans locaux plus précis, Rencana Detail Tata Ruang (RDTR). Le portail officiel de Bali définit le RDTR comme le plan détaillé d'une régence ou d'une ville, complété par ses règles de zonage.

Ces règles utilisent des zones et des sous-zones nommées. Selon le territoire, on peut trouver des catégories liées au tourisme, au logement, au commerce et aux services, à l'agriculture, aux espaces verts, à la protection, aux risques naturels ou aux infrastructures. L'explication officielle du contenu d'un RDTR distingue les espaces protégés des espaces aménageables, puis précise que le règlement local encadre l'usage, l'intensité, la hauteur, les reculs et les équipements minimaux.

Le nom et le code exacts doivent venir du plan qui couvre la parcelle. Le surnom d'une couleur ne peut pas les remplacer.

Ce que les trois couleurs veulent généralement dire

Vert

Les agents emploient souvent le vert pour des terres agricoles, des espaces protégés, des espaces verts ou un mélange de ces catégories. Elles ne sont pas équivalentes. Une sous-zone agricole alimentaire, une rizière protégée et un espace vert paysager peuvent avoir des règles différentes.

Les terres agricoles alimentaires protégées sont souvent désignées par le sigle LP2B, pour Lahan Pertanian Pangan Berkelanjutan . Bali publie désormais un portail officiel LP2B . Si une parcelle paraît agricole ou protégée, son statut précis doit être vérifié sur ce portail et dans le RDTR applicable avant toute hypothèse de conception.

Rose

Le rose désigne généralement un terrain qu'une carte informelle présente comme compatible avec le tourisme. Le plan officiel peut employer une zone touristique ou une autre zone autorisant certains hébergements. Ce classement peut offrir un meilleur point de départ pour un projet touristique, mais toutes les autres autorisations restent nécessaires.

La règle locale peut encore limiter le type d'hébergement, l'emprise, la hauteur, l'accès, le stationnement, le traitement des eaux usées ou les reculs par rapport à la plage et à la rivière. L'activité prévue doit aussi correspondre à la licence utilisée pour l'exploitation.

Jaune

Le jaune renvoie le plus souvent à un terrain résidentiel. Une maison peut être admise alors que l'hébergement touristique à la nuit est interdit, conditionnel ou soumis à une autre catégorie d'activité. Le logement et l'exploitation touristique ne doivent jamais être considérés comme synonymes.

Quatre questions à poser aux documents officiels

Pour chaque parcelle :

Quels RTRW, RDTR et règlement de zonage s'appliquent ? Il faut consulter la régence ou la ville compétente pour les coordonnées exactes.

Quel est le nom officiel de la zone et de la sous-zone ? Notez l'intitulé et le code indonésiens, pas seulement une couleur traduite.

L'usage prévu est-il autorisé, conditionnel ou interdit ? Contrôlez l'activité précise, pas seulement le mot villa.

Quelles limites s'imposent au site ? Hauteur, emprise, espace vert, reculs, accès, stationnement, drainage, eaux usées et risques naturels peuvent modifier tout le projet.

Une belle parcelle peut passer la première question et échouer sur l'une des trois suivantes.

Le fonctionnement du contrôle spatial

Le processus général porte le nom de Kesesuaian Kegiatan Pemanfaatan Ruang (KKPR), c'est-à-dire conformité de l'utilisation de l'espace. Le règlement gouvernemental 21/2021 en fait une composante centrale de l'aménagement en Indonésie.

Lorsqu'un RDTR électronique est intégré au portail indonésien d'autorisation des entreprises en ligne (OSS), le système peut utiliser ce plan détaillé dans un parcours de confirmation. En l'absence d'intégration, une autre procédure d'évaluation et d'approbation peut être nécessaire. Le guide officiel OSS sur le KKPR et le RDTR présente ces parcours.

Le KKPR répond à la question spatiale. Il ne remplace ni l'approbation de construction, ni les obligations environnementales, ni la licence d'hébergement touristique.

La couverture varie fortement selon les territoires

La mise à jour officielle sur les RDTR indique la couverture suivante au 2 février 2026 :

Régence ou ville

Surface couverte par un RDTR

Badung

100,00 %

Denpasar

100,00 %

Gianyar

100,00 %

Jembrana

30,02 %

Bangli

23,18 %

Karangasem

22,75 %

Tabanan

21,43 %

Buleleng

9,21 %

Klungkung

0,00 %

Ces chiffres datés mesurent la couverture des plans détaillés plutôt que la conformité de chaque parcelle. Une couverture de 100 % confirme qu'un RDTR existe sur tout le territoire concerné ; les usages permis continuent toutefois de varier d'une parcelle à l'autre.

Construire et louer restent deux questions

Une parcelle peut être compatible avec une maison sans autoriser l'hébergement touristique à la nuit. Elle peut aussi permettre un usage touristique tout en restant dépourvue des approbations de construction ou d'exploitation nécessaires.

Avant le chantier, vérifiez la Persetujuan Bangunan Gedung (PBG), l'approbation de construction. À l'achèvement, déterminez si un Sertifikat Laik Fungsi (SLF), certificat d'aptitude à l'usage, est requis. L'exploitant doit ensuite détenir la licence et respecter le standard touristique correspondant à l'activité proposée aux clients et aux plateformes.

Vérifications avant l'acompte

Obtenir le numéro de parcelle, les coordonnées et le certificat foncier à jour.

Identifier le RTRW, le RDTR et le règlement de zonage sur une source officielle.

Conserver le nom de la zone, la sous-zone, le tableau des usages et les règles d'intensité.

Contrôler les protections agricoles, l'infiltration des eaux, les subak, le littoral, les rivières, les falaises et les risques naturels.

Vérifier l'accès routier légal et les contraintes de réseaux.

Lancer le parcours KKPR avec l'activité et la taille prévues.

Séparer dans le dossier le résultat spatial, le parcours constructif et la licence d'exploitation.

Questions fréquentes

La zone rose est-elle une catégorie juridique officielle ? Non. C'est un raccourci de marché. Le nom officiel de la zone et le tableau des usages autorisés font foi.

Un terrain jaune autorise-t-il automatiquement la location à la nuit ? Non. Le logement et l'hébergement touristique sont deux usages différents. Le plan local et la licence d'activité doivent tous les deux permettre l'exploitation.

Un terrain vert est-il toujours inconstructible ? Le vert ne correspond pas à une seule catégorie juridique. Certaines sous-zones agricoles ou protégées peuvent bloquer une villa classique, d'autres admettent des usages limités. Seul le classement officiel permet de conclure.

Sans RDTR intégré, le projet est-il impossible ? Pas nécessairement. Le parcours de conformité change et demande généralement davantage d'analyse. L'obligation de prouver l'usage prévu demeure.

dernière relecture : juillet 2026

Notes liées : cadre actuel des licences de villas · Le moratoire de 2026

Sources contrôlées le 16 juillet 2026 : portail officiel des RTRW et RDTR de Bali ; guide officiel du contenu d'un RDTR ; état officiel de la couverture RDTR ; règlement gouvernemental 21/2021 ; guide officiel OSS sur le KKPR et le RDTR . Cette note donne une information générale, pas un avis de zonage. Vérifiez le plan en vigueur, le dossier foncier et le résultat KKPR avant de vous fier à une couleur ou à un taux de couverture.

Deux questions à explorer ensuite

Question liée Leasehold à Bali : quels droits obtenez-vous réellement ? Question liée Sept vérifications avant de verser un acompte immobilier à Bali

Modéliser cette décision dans la Stay Matrix Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Leasehold à Bali : droits, durée et revente | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-leasehold-explained.html

← notes
conformité
7 juillet 2026
Leasehold à Bali : quels droits obtenez-vous réellement ?
Leasehold est le terme recherché sur internet, mais l'opération est un bail de longue durée. L'acheteur obtient l'usage contractuel d'un terrain ou d'un bien pendant une période définie, tandis que le titre foncier indonésien reste au nom de son titulaire.
DALLEAU | Recherche et notes de terrain
Publié le
7 juillet 2026
Dernière vérification
17 juillet 2026
Vérifié | 17 juillet 2026 | sources primaires
En bref
À retenir :
un bail de longue durée peut être une structure légale et utile si les parties, le droit foncier, l'usage permis, la durée, la cession et le mécanisme de prolongation sont clairement définis. Sa valeur diminue avec la durée sécurisée restante. Le contrat mérite donc la même attention que le bâtiment et le terrain.
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Le leasehold et les titres fonciers indonésiens sont deux instruments différents
L'Indonésie reconnaît plusieurs droits fonciers. Il ne faut pas les réduire aux mots anglais freehold et leasehold comme s'il s'agissait de deux certificats équivalents.
La
loi agraire fondamentale 5/1960
prévoit notamment :
le
Hak Milik
, droit de propriété réservé aux citoyens indonésiens ;
le
Hak Guna Bangunan
(HGB), droit enregistré de construire et d'utiliser des bâtiments sur un terrain éligible ;
le
Hak Pakai
, droit d'usage enregistré dans les situations prévues par la loi ;
le
Hak Sewa untuk Bangunan
, droit de louer un terrain pour y utiliser un bâtiment, aux articles 44 et 45.
L'article 45 permet au citoyen indonésien, à l'étranger domicilié en Indonésie, à l'entité juridique indonésienne et à l'entité étrangère disposant d'une représentation en Indonésie de détenir un
Hak Sewa
. L'éligibilité et la documentation doivent néanmoins être contrôlées pour les parties et l'usage envisagé.
Ce que transfère un bail ordinaire
Sur le marché immobilier balinais, la vente d'un leasehold désigne le plus souvent un contrat accordant l'usage du terrain, du bâtiment ou des deux pendant une durée fixe. Le droit foncier enregistré reste au nom de son titulaire. Le locataire ne reçoit que les droits inscrits au contrat.
Cette distinction a des conséquences concrètes :
le contrat doit identifier correctement le certificat foncier et les limites physiques ;
seule une personne ayant autorité sur le terrain peut accorder le bail ;
l'usage du locataire ne peut dépasser ce que le propriétaire, le plan spatial ou les licences autorisent ;
la cession, la sous-location, la construction et l'exploitation commerciale doivent être prévues expressément ;
à l'échéance, le contrôle revient selon le contrat et le droit applicable.
Un acte notarié peut renforcer la preuve de l'accord et des signatures. Il ne transforme pas un bail privé en propriété et n'inscrit pas un
Hak Milik
au nom du locataire étranger.
Le Hak Pakai relève d'un autre cadre juridique
Le
Hak Pakai
, droit d'usage légal, est un droit foncier enregistré distinct. Le
règlement gouvernemental 18/2021
et le
règlement du ministre des Affaires agraires et de l'Aménagement 18/2021
fixent le cadre actuel des droits fonciers et de certains logements détenus par des étrangers éligibles.
L'accès au
Hak Pakai
dépend encore du statut migratoire, du type de bien, du seuil de prix, de la localisation, du droit foncier et de l'usage prévu. Un bail privé et un
Hak Pakai
enregistré restent donc deux voies différentes.
La durée et la prolongation doivent être précises
La loi ne crée pas un bail balinais universel de 25 ou 30 ans. Ces durées relèvent de la négociation commerciale. La durée sécurisée est celle accordée par le contrat signé, dans la limite des pouvoirs du bailleur.
Une clause de prolongation devrait préciser :
la période pendant laquelle l'option peut être exercée ;
la personne qui peut l'exercer et sa transmission éventuelle à un acheteur ;
la durée supplémentaire ;
la méthode de fixation du prix, avec l'évaluateur, la référence et la date ;
l'échéancier de paiement ;
les documents que le propriétaire devra signer ;
les conséquences d'un décès, d'une succession, d'une vente, d'un refus ou d'un litige.
La formule « prolongeable d'un commun accord » ne constitue pas une option dont le prix est fixé. Elle annonce une négociation future. Le modèle financier doit la traiter comme incertaine tant qu'un conseil indonésien n'a pas confirmé un mécanisme opposable.
Comparer le prix aux années sécurisées
Une comparaison simple consiste à calculer :
coût foncier effectif par année sécurisée = coût total d'acquisition du bail divisé par les années d'usage déjà garanties
Il s'agit d'un calcul d'investissement, pas d'une règle juridique. Il empêche un prix d'achat plus faible de masquer une durée restante trop courte.
Il faut aussi modéliser les années restantes à la revente, le calendrier des gros travaux et le prix de la prolongation. Une rénovation tardive peut surtout profiter au bien après l'échéance du locataire. Une villa rentable peut rester un mauvais achat si la durée et la sortie ne justifient pas le capital engagé.
Le financement ne repose pas sur la même sûreté
La sûreté foncière enregistrée en Indonésie s'appelle
Hak Tanggungan
. La
loi 4/1996
permet de l'attacher à certains droits enregistrés, notamment le
Hak Milik
, le
Hak Guna Usaha
ou droit de culture, le
Hak Guna Bangunan
et certains
Hak Pakai
enregistrés.
Un bail contractuel ordinaire n'est pas la même garantie. Une banque peut étudier l'emprunteur, d'autres sûretés ou une opération plus large, mais l'acheteur ne doit pas présumer qu'un crédit foncier classique sera disponible sur le bail. Le financement doit être confirmé avant de faire dépendre l'achat d'un futur emprunt bancaire.
Les clauses à relire ligne par ligne
Parties et pouvoirs.
Identité, pouvoir de l'entreprise, régime matrimonial, succession et consentements nécessaires.
Terrain et limites.
Certificat, plan, accès, charges, litiges et situation fiscale.
Usage autorisé.
Résidence, construction, sous-location, hébergement touristique et activités interdites.
Construction et propriété des améliorations.
Qui construit, qui obtient les approbations et ce que devient le bâtiment à l'échéance.
Cession et sous-location.
Droit de vendre la durée restante, acquéreurs possibles, consentement et frais.
Prolongation.
Préavis, évaluation, prix, durée, signatures et recours.
Défaut et résiliation.
Délai de régularisation, remboursement, possession, assurance et règlement des litiges.
Décès ou vente du propriétaire.
Effet sur les héritiers et successeurs, avec les pièces nécessaires.
Un avocat foncier indonésien et le notaire ou officier foncier compétent doivent examiner le contrat et le titre sous-jacent. Un résumé traduit ne suffit pas.
Le droit d'exploiter reste distinct
Le bail peut autoriser l'hébergement touristique entre les parties alors que la parcelle, le bâtiment ou l'exploitant ne sont pas en règle. Contrôlez séparément le zonage, la conformité spatiale, l'approbation de construction, le certificat d'aptitude à l'usage, les obligations environnementales et la licence touristique.
Le contrat devrait aussi répartir la responsabilité de chaque approbation et prévoir le refus de l'exploitation souhaitée. Le mot villa dans une brochure commerciale ne constitue pas une conclusion administrative.
Questions fréquentes
Un étranger peut-il conclure un bail de longue durée en Indonésie ?
La loi agraire reconnaît le
Hak Sewa
pour les étrangers et entités étrangères éligibles, mais les parties, le domicile, les pouvoirs et l'usage doivent encore être vérifiés.
Puis-je revendre une villa en bail ?
Seulement si le contrat autorise la cession. L'acheteur reçoit la durée restante et les droits contractuels, pas une nouvelle durée complète sans prolongation valable.
Puis-je louer la villa à la nuit ?
Le bail ne suffit pas. Le contrat, le zonage, les pièces du bâtiment et la licence d'exploitation doivent tous permettre l'activité.
Le bail devient-il une propriété au fil du temps ?
Non. Le temps ne transforme pas un contrat de bail en
Hak Milik
.
dernière relecture : juillet 2026
Notes liées :
société indonésienne à capitaux étrangers (PT PMA) ou prête-nom
·
Zonage à Bali
Sources contrôlées le 16 juillet 2026 :
loi agraire fondamentale 5/1960
;
règlement gouvernemental 18/2021 sur les droits fonciers et l'enregistrement
;
règlement ministériel 18/2021
;
règlement gouvernemental 24/1997 sur l'enregistrement foncier
;
loi 4/1996 sur les sûretés foncières enregistrées
. Cette note donne une information générale, pas un conseil juridique, notarial ou financier. Faites vérifier le titre actuel et l'intégralité du contrat en indonésien pour l'opération concernée.
Prix, périmètre et prochain engagement
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Deux questions à explorer ensuite
Question liée
Zones verte, rose et jaune à Bali : ce que dit le plan officiel
Question liée
Sept vérifications avant de verser un acompte immobilier à Bali
Modéliser cette décision dans la Stay Matrix
Ouvrir l'outil →
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

## Achat sur plan à Bali : documents avant paiement | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-off-plan-dossier-developpement-avant-paiement.html

due diligence off-plan
Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ?
Documents, confirmations et décisions nécessaires avant votre prochain paiement.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
16 juillet 2026
Vérifié | 16 juillet 2026 | sources primaires
Mis à jour le 16 juillet 2026
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Avant de payer
Avant de libérer le prochain paiement important sur un projet vendu sur plan (« off-plan »), il faut pouvoir répondre à huit questions distinctes :
Quelle transaction concluez-vous ?
Vente d'une maison encadrée par une promesse de vente (PPJB), bail contractuel ordinaire, cession d'un bail existant, bail du terrain plus construction, contrat de développement, acquisition de titres ou montage hybride non résolu ? Si une exploitation touristique est prévue, examinez séparément l'activité d'exploitation ; elle ne change pas la forme juridique de la transaction immobilière.
Qui vous doit chaque promesse ?
Le détenteur du terrain, le promoteur, le vendeur/bailleur, le constructeur, l'opérateur et l'agent peuvent être des entités différentes.
Le site promis correspond-il au même dossier foncier ?
Droits, limites, accès, pouvoirs et charges doivent être rapprochés et cohérents.
Le projet précis peut-il être conçu, construit puis utilisé comme prévu dans le modèle ?
Urbanisme, environnement, autorisation de construire (PBG), certificat d'aptitude à l'usage (SLF) et exploitation sont des contrôles distincts.
Que doit-on exactement vous livrer ?
Plans approuvés, spécifications, calendrier, mobilier, réseaux, essais et documents d'ouverture exigent une base contractuelle contrôlée.
Quelle preuve rend la prochaine tranche exigible ?
Une date au calendrier ne prouve pas que les travaux correspondants existent et sont conformes.
Que se passe-t-il si le projet change ou prend du retard ?
Variations, prolongations, retenue, réserves, suspension, résiliation et remboursement doivent fonctionner avant le litige.
Que contrôlerez-vous à la livraison puis à la sortie ?
Durée sécurisée, actif ou droit, garanties, cadre d'exploitation et possibilités de transfert doivent correspondre au modèle financier.
La conclusion ne devrait pas être « achat sûr ». Elle devrait être une liste datée intitulée :
Documents, confirmations et décisions nécessaires avant votre prochain paiement.
Identifier d'abord la transaction
« Villa achetée sur plan sous bail de longue durée (“off-plan leasehold”) » raconte une histoire commerciale. Cette expression n'identifie pas, à elle seule, la transaction juridique.
Elle peut recouvrir des montages très différents :
Montage possible
Ce que l'investisseur peut recevoir
Première question professionnelle
Vente d'une maison/unité dans le cadre PPJB applicable au logement
Un acte futur de transfert ou de vente pour un logement éligible
Le cadre logement et PPJB s'applique-t-il à ce projet et à cette transaction ?
Bail contractuel ordinaire
Des droits accordés par un bailleur sur un bien et une durée définis
Le bailleur contrôle-t-il le droit sous-jacent et peut-il accorder l'usage et toute la durée promis ?
Cession d'un bail existant
Les droits de bail actuels du cédant, sous réserve du bail d'origine et des consentements requis
Le bail est-il valide, quelle durée reste-t-il, est-il cessible et tous les accords nécessaires ont-ils été obtenus ?
Bail du terrain plus contrat de construction
Un droit de bail et un bâtiment commandé séparément
Qui possède les travaux en cours, porte le risque de construction et récupère les améliorations en fin de bail ?
Contrat de services de développement
Une obligation de concevoir/construire/livrer
S'agit-il d'un service de construction/développement plutôt que d'une vente, et quelles licences et sûretés s'appliquent ?
Acquisition de titres
Des actions d'une société-projet
Quels actifs, passifs, licences, contrats et comptes liés se trouvent dans cette société ?
Hybride
Plusieurs éléments ci-dessus
Tous les documents décrivent-ils les mêmes chiffres, dates, parties et recours ?
Couche d'exploitation touristique connectée
Un usage d'exploitation projeté, rattaché à l'une des routes principales ci-dessus
Qui est l'opérateur, qu'est-ce qui autorise le lieu et l'activité, qui encaisse les clients et qui supporte les obligations opérationnelles/fiscales ?
L'Indonésie possède des règles spécifiques pour le développement de logements et le système PPJB. Elles comptent lorsqu'elles entrent dans leur champ. Il ne faut pas les appliquer automatiquement à toute villa balinaise commercialisée en « leasehold ». L'étiquette du contrat ne tranche pas : l'avocat doit examiner la substance, l'actif, les parties et le transfert prévu.
Lorsque les règles relatives au logement du
PP 12/2021
s'appliquent, elles prévoient trois protections distinctes qu'il ne faut pas confondre. Premièrement, l'acheteur doit disposer d'au moins
sept jours ouvrés
pour étudier la promesse de vente, appelée PPJB en Indonésie, avant sa signature devant notaire. Deuxièmement, la signature du PPJB dépend de plusieurs conditions, notamment le statut du terrain, l'objet convenu, l'autorisation de construire (PBG), les infrastructures prévues et l'avancement. Pour des maisons individuelles ou en bande, le seuil de 20 % vise au moins 20 % de toutes les unités prévues
ainsi que
la disponibilité des infrastructures, équipements et réseaux planifiés. Pour un immeuble d'appartements, il vise 20 % du volume de construction de l'immeuble. Il ne s'agit ni de 20 % de la villa de l'acheteur ni d'un jalon universel de paiement. Troisièmement, le promoteur ne peut pas percevoir plus de
80 %
avant que les conditions PPJB concernées soient remplies. Cette limite distincte de 80 % n'impose pas, à elle seule, un compte séquestre. Un avocat indonésien doit confirmer que ce régime du logement s'applique au produit et au contrat précis avant d'utiliser ces seuils.
Des documents différents pour des questions différentes
Ce que l'on vous montre
Ce que cela peut établir
Ce que cela
n'établit pas
Rendu architectural
Une intention architecturale
Le droit foncier, l'autorisation, la constructibilité, les spécifications ou la livraison
Copie d'un certificat foncier
Un document à vérifier
Que votre cocontractant le contrôle, que le site correspond ou que votre transaction est enregistrable et opposable
Acte de société ou numéro d'identification d'entreprise (NIB)
Un point de départ d'existence/enregistrement
Que cette société détient le terrain, vous vend le droit, possède chaque autorisation ou peut exécuter chaque activité promise
Résultat au registre des promoteurs
Une donnée réglementaire dans le système concerné
Une liste blanche gouvernementale, une garantie de projet ou un substitut à l'audit préalable
PBG
Le plan et la fonction approuvés dans un dossier précis
L'achèvement, la conformité de l'existant ou l'aptitude à l'usage
SLF
Un résultat d'aptitude à l'usage pour le bâtiment/la fonction du dossier
Le titre, le pouvoir du vendeur, la licence touristique ou la performance financière
Photo du chantier
Une activité visible à une date
Le pourcentage achevé, la qualité cachée, le droit, l'autorisation ou la conformité au contrat
Message « 70 % terminé »
Une affirmation
La méthode de mesure, la base approuvée, la qualité, les matériaux stockés ou le coût restant
Rendement garanti
Une promesse de paiement d'une certaine nature
Que le payeur est solvable, que la formule est nette ou que la promesse est garantie et exécutoire
Certificat d'achèvement
Un document avec un émetteur et un périmètre définis
Automatiquement la remise, la levée des réserves, le SLF, l'ouverture ou l'absence de somme à retenir
Le PBG et le SLF sont souvent fondus dans un seul mot rassurant : « permis ». Dans le cadre indonésien du bâtiment, ils remplissent des fonctions différentes. Un architecte ou ingénieur doit toujours rapprocher le dossier précis, la parcelle, les plans, l'ouvrage réel et la fonction projetée.
Huit ensembles de documents à demander
Transaction :
réservation, projet de contrat, contrat final, index des pièces et explication écrite indiquant s'il s'agit d'une vente, d'un bail, d'une cession, d'un contrat de construction, d'une acquisition de titres ou d'un montage hybride.
Parties et pouvoirs :
documents récents des sociétés, pouvoirs des signataires, mandats, garanties et nom légal de chaque entité qui promet ou encaisse quelque chose.
Terrain et accès :
preuves actuelles du droit foncier ou du bail, concordance de la parcelle, accès, charges, consentements et chaîne complète qui permet d'accorder la durée promise.
Urbanisme et bâtiment :
zonage ou conformité d'usage, obligations environnementales, autorisation de construire (PBG), procédure menant au certificat d'aptitude à l'usage (SLF) et répartition écrite des responsabilités.
Conception et budget :
plans signés, spécifications, inclusions et exclusions, calendrier, prix détaillé, provision pour imprévus et estimation actualisée du coût restant jusqu'à l'achèvement.
Paiements et avancement :
historique complet des paiements, coordonnées bancaires vérifiées, rapport cumulatif, photographies reliées à des inspections datées, modifications approuvées et certification indépendante si le contrat la prévoit.
Modifications, retards et recours :
registre des modifications, avis de retard, nouvelle date de livraison, droits au remboursement ou à la résiliation, délais de correction et sûreté couvrant toute avance.
Remise, exploitation et sortie :
documents d'achèvement et d'inspection, liste des réserves, garanties, autorisations et contrats d'exploitation, circuit d'encaissement des clients, droits de transfert ou de prolongation et pièces nécessaires à la sortie.
L'objectif n'est pas d'accumuler un gros dossier. Il est d'obtenir les documents qui permettent de décider avant le prochain paiement.
Décider ce qui doit être réglé avant le paiement
Ce dont vous disposez
Ce que cela établit
Ce qu'il faut faire avant de payer
Aucune réponse
Aucune réponse ni pièce justificative n'a été fournie
Poser la question précise ; ne déduire ni absence, ni conformité, ni non-applicabilité
Simple affirmation
Une formule commerciale, une réponse, une capture non datée ou un pourcentage déclaré sans preuve
Demander le document ou la mesure qui l'étaye ; ne pas considérer le point comme rempli
Document mentionné mais non fourni
Une pièce ou un contrôle est évoqué, mais son contenu ne peut pas être examiné
Obtenir la pièce et la faire examiner par le professionnel compétent
Document reçu mais non contrôlé
Le fichier est disponible, mais son émetteur, sa date, sa pertinence et sa correspondance avec le bien ou l'entité restent à confirmer
Demander à l'avocat, l'architecte, l'ingénieur, le comptable ou le fiscaliste compétent de le contrôler ; sa réception prouve seulement que le fichier a été obtenu
Contrôlé pour une question précise
Un professionnel nommé a indiqué ce qu'il a contrôlé, pour quel bien ou quelle entité, à partir de quelle source et à quelle date
N'utiliser sa conclusion que pour la question examinée ; ne pas la présenter comme une vérification indépendante
Contrôlé de manière indépendante
Un second contrôle suffisamment indépendant confirme cette conclusion précise
Poursuivre avec les autres vérifications contractuelles, techniques, financières et liées aux dépendances
Contradiction
Les documents, les parties, la parcelle, les promesses ou les registres publics se contredisent
Identifier qui doit résoudre le point, quelle preuve manque et dans quel délai ; suspendre le paiement ou la décision concernés
Document périmé
La pièce ou la conclusion professionnelle n'est plus actuelle à la date de décision
Obtenir une pièce ou une confirmation à jour avant de s'y fier
Indisponible
Une pièce nécessaire ne peut pas être obtenue à ce stade
Maintenir ce manque clairement visible ; indisponible ne signifie pas non applicable
Non applicable
Le professionnel compétent confirme que la règle ou la pièce précise ne s'applique pas à cette transaction et explique pourquoi
Conserver le raisonnement écrit, le nom du professionnel et la date ; ne jamais employer cette mention pour éviter un contrôle
Ce n'est pas un score de risque. Un seul droit de construire non résolu peut compter davantage que vingt documents téléchargés.
Exemple : une villa vendue sur plan sous bail de 30 ans
Tous les noms, entités, chiffres et faits de cet exemple sont fictifs et purement illustratifs.
Un investisseur reçoit une offre à 480 000 USD : « bail de 30 ans », « rendement garanti de 8 % pendant trois ans », « livraison dans douze mois ». Le paiement prévoit 30 % à la signature, puis 30 %, 30 % et 10 % à quatre mois d'intervalle.
La bonne analyse ne consiste pas à juger si la marque inspire confiance.
Transaction :
l'avocat conclut que l'investisseur prend un bail contractuel auprès d'une entité et une obligation de construire/livrer auprès d'une autre. On ne présume pas une vente immobilière PPJB.
Durée :
le bail commence à la signature ; le chantier consomme donc une partie des 30 ans annoncés. La prolongation est une option à négocier, pas une durée sécurisée.
Pouvoirs :
le droit du bailleur sur le terrain et le pouvoir de construire du promoteur doivent être prouvés séparément.
Base :
le rendu ne contient ni spécifications MEP signées, ni drainage, ni liste de mobilier. La deuxième tranche n'est pas encore mesurable.
Avancement :
« fondations terminées » devient un jalon mesurable, avec inspection par un ingénieur et un économiste de la construction (QS), essais et liste de défauts.
Variation :
le nouveau mur de soutènement reçoit un prix et un impact sur le délai avant instruction ; il ne disparaît pas dans « conditions du site ».
Rendement :
les 8 % sont reliés au débiteur, à la formule, au déclencheur, aux coûts, à la fiscalité, au financement du manque et au recours.
Remise :
les 10 % finaux sont répartis entre achèvement pratique, conditions documentaires/opérationnelles et libération des sommes retenues et traitement des réserves selon le contrat signé, après examen juridique.
Cette liste ne dit pas à l'investisseur de poursuivre, de se retirer ou de payer. Elle organise les documents, les questions sans réponse, les responsabilités et les décisions que l'investisseur et ses conseils doivent résoudre. Un rendu soigné reste une illustration, pas une preuve.
Limites de cette liste de contrôle
Il ne peut pas :
certifier qu'un projet est légal, sûr, digne d'investissement ou rentable ;
valoriser le terrain, le bail, les titres ou la villa terminée ;
remplacer la recherche foncière actuelle, le relevé, l'avis juridique, l'inspection ou l'analyse fiscale ;
prouver la solvabilité future du promoteur ;
décider que le régime logement/PPJB s'applique parce que le produit est une villa ;
faire du registre des promoteurs une liste blanche ;
rendre obligatoires ou efficaces, dans tous les cas, un compte séquestre, une retenue ou une garantie ;
prédire livraison, occupation, ADR, prix de revente ou résultat d'un litige ;
récupérer des fonds déjà versés sous un contrat insuffisamment protecteur.
Il accomplit une tâche essentielle : transformer un discours rassurant en décisions vérifiables par des professionnels nommés.
Préparer la décision avant l'échéance
Commencez par le
guide de due diligence immobilière à Bali
pour organiser les preuves foncières, urbanistiques, liées au bâtiment, à l'exploitation et à la sortie. Examinez la
durée du bail et les hypothèses de sortie
lorsque le chantier, les prolongations ou la revente modifient le modèle. Si une société indonésienne à capitaux étrangers (PT PMA) ou une société de projet est proposée, vérifiez son
cadre de licence et d'activité
.
Si vous avez déjà une réservation, un contrat ou un appel de fonds, la prochaine étape utile n'est pas un rendez-vous commercial. C'est une
fiche synthétique de preuves du projet
d'une page : preuves disponibles, simples affirmations, professionnel responsable et points à résoudre avant l'échéance.
Sources officielles et date de consultation
Sources officielles consultées le 15 juillet 2026.
Sources primaires des affirmations réglementaires limitées ci-dessus :
Permen PKP 18/2025 : fiche JDIH officielle
et
PDF officiel
: standards, déclarations, contrôle et sanctions du secteur logement dans son champ.
Permen PUPR 24/PRT/M/2018
: cadre de certification/enregistrement des promoteurs de logements ; son articulation actuelle avec SIRENG doit être validée par un expert.
SE Dirjen Kawasan Permukiman 05/SE/Dp/2026
: mise en œuvre du service d'information d'enregistrement des promoteurs et contexte de suivi déclaré.
SE Dirjen Kawasan Permukiman 06/SE/Dp/2026
: formats/mécanismes d'obligations et sanctions administratives dans son champ.
PP 12/2021
: cadre développement de logements, marketing et PPJB ; l'applicabilité doit être établie.
PP 16/2021
et
portail SIMBG
: cadre bâtiment, dont fonctions distinctes du PBG et du SLF.
Loi 40/2007 sur les sociétés : PDF officiel
: identité, organes, actions et pouvoirs, sous réserve des modifications et de l'avis actuel.
Permen PU 6/2025 : PDF officiel
: cadre actuel de certification des entreprises/personnes de construction ; l'applicabilité SBU/SKK dépend du lot.
Avant d'utiliser cette liste, demandez à un avocat indonésien de qualifier la transaction et de confirmer les droits fonciers ainsi que les pouvoirs des sociétés. Obtenez une confirmation propre à la parcelle pour l'urbanisme, le PBG et le SLF. Convenez du protocole de paiement avec l'architecte, l'ingénieur ou l'économiste de la construction et l'avocat. Identifiez la société d'exploitation, ses autorisations via le portail indonésien d'autorisation des entreprises en ligne (OSS), sa fiscalité et ses flux financiers. Rouvrez chaque source officielle à la date de décision, car les règles et les registres publics peuvent avoir changé.
Prix, périmètre et prochain engagement
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Deux questions à explorer ensuite
Question liée
Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?
Question liée
Avant le prochain paiement de chantier : quelles preuves demander ?
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?
Avant le prochain paiement de chantier : quelles preuves demander ?
« 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?
Contexte publié
Due diligence immobilière à Bali
Le leasehold expliqué

## Pièces à demander avant un paiement de chantier | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-off-plan-paiements-jalons-avancement-variations-retenue.html

contrôle de construction
Avant le prochain paiement de chantier : quelles preuves demander ?
Le calendrier peut déclencher un appel de fonds. Le paiement, lui, ne devrait être dû que lorsque l'obligation correspondante est remplie.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
16 juillet 2026
Vérifié | 16 juillet 2026 | sources primaires
Mis à jour le 16 juillet 2026
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Une date au calendrier ne prouve pas l'avancement
Le calendrier peut déclencher un appel de fonds. Le paiement, lui, ne devrait être dû que lorsque l'obligation correspondante est remplie.
Pour chaque tranche importante, le dossier doit montrer :
le jalon contractuel ;
les plans/spécifications approuvés et le périmètre mesurable ;
les preuves et mesures actuelles du chantier ;
l'inspection par un architecte, un ingénieur ou un économiste de la construction compétent, dont la mission et les éventuels conflits ont été vérifiés ;
l'effet des défauts, travaux incomplets, matériaux hors site et surpaiements précédents ;
les variations approuvées et leurs conséquences sur les délais ;
la facture correcte, le traitement fiscal, le compte destinataire et l'autorité de libération ;
le solde et les sûretés restantes pour achever, livrer et corriger les défauts.
L'investisseur ne cherche pas à diriger le chantier. L'objectif est plus simple :
ne pas laisser l'argent prendre une avance significative sur la valeur vérifiée des travaux et sur les recours encore disponibles.
Des mesures qui répondent à des questions différentes
Terme
Ce qu'il devrait signifier
Ce avec quoi on le confond
Calendrier de paiement
Prévision ou dates fixes au contrat
Preuve des travaux achevés
Avancement physique
Travaux exécutés, mesurés par rapport à un référentiel convenu
Temps écoulé ou argent dépensé
Coût engagé
Dépense du constructeur/promoteur
Valeur correctement installée pour l'investisseur
Matériau sur site
Matériau identifié, protégé et affecté
Travail terminé et conforme
Achèvement pratique
Niveau défini permettant possession/usage malgré des réserves mineures consignées
Perfection, certificat d'aptitude à l'usage (SLF), ouverture ou compte final
Remise
Transfert défini de possession, contrôle, documents et risque
Libération automatique de toutes les sommes
Retenue
Montant conservé contractuellement avec règles de libération
Pourcentage légal universel ou protection totale
Garantie/période de défauts
Délai et processus de correction des défauts couverts
Preuve que le responsable restera solvable et exécutera ses obligations
Certificat indépendant
Avis dans le périmètre d'une mission nommée
Garantie du titre, de la légalité, du coût, de toute qualité ou performance future
Associer chaque paiement à des preuves
Base du paiement
Qualité de preuve
Risque principal
Meilleure règle de libération
Date seule
Aucune condition site
L'argent peut fortement devancer les travaux
Ne pas confondre une date avec un avancement ; ajouter une condition mesurable ou évaluer explicitement le risque lié à l'avance et à sa sûreté
Pourcentage du promoteur
Auto-déclaré
Méthode, conflit et base inconnus
Demander mesure justificative et revue indépendante convenue
Nom de jalon seul (« structure terminée »)
Périmètre ambigu
Chaque partie mesure autre chose
Définir inclusions, exclusions, essais, plans et preuves
Travail mesuré sans contrôle qualité
Quantité prouvée
Un travail défectueux peut être payé en totalité
Ajouter inspection, essais et traitement des défauts
Travail mesuré conforme
Plus solide
Surpaiement, variations et financement restant possibles
Rapprocher valeur cumulée, sommes payées et coût restant nécessaire à l'achèvement
Matériaux hors site
Risque de propriété/contrôle
Double vente, perte, non-livraison, incompatibilité
Ne les considérer payables que si le contrat signé prévoit un mécanisme précis de transfert de propriété, d'identification, d'assurance, de stockage et de livraison, et si l'acheteur l'accepte en connaissance de cause ; sinon les exclure
Certificat de remise
Point de livraison prouvé
Documents/licences/retenue peuvent manquer
Séparer libérations physique, documentaire, opérationnelle et compte final
Il n'existe pas de pourcentage « correct » universel. Villa sur mesure, domaine multi-unités, bail + construction et vente d'une unité finie ne portent pas les mêmes risques. La discipline, elle, peut être universelle : définir le déclencheur, le prouver, rapprocher les montants, conserver suffisamment de moyens contractuels pour mener le projet à son terme.
Pour une transaction relevant des règles relatives à la promesse de vente (PPJB) applicable au logement prévues par le
PP 12/2021
, il faut distinguer deux seuils. Le test de 20 % fait partie des conditions qui doivent être remplies avant le stade PPJB. Pour des maisons individuelles ou en bande, il concerne au moins 20 % de toutes les unités prévues ainsi que les infrastructures, équipements et réseaux planifiés ; pour un immeuble d'appartements, il concerne 20 % du volume de construction. Il ne s'agit ni de 20 % de la villa de l'acheteur ni d'un jalon standard de paiement. Séparément, le promoteur ne peut pas percevoir plus de 80 % tant que les conditions PPJB concernées ne sont pas remplies. Cette limite n'impose pas à elle seule un compte séquestre. L'avocat doit d'abord confirmer que les règles PPJB du logement s'appliquent à la transaction.
Fixer le référentiel avant de mesurer
On ne mesure pas un rendu 3D.
La base devrait contenir, selon le cas :
contrat signé et identité/qualité complètes des parties ;
plans architecturaux, structurels et MEP émis pour construction ;
spécifications et liste approuvée matériaux/équipements ;
bordereau, décomposition du prix par poste (« schedule of values ») ou autre méthode de mesure ;
calendrier avec autorisations, réseaux, approvisionnements et mise en service critiques ;
matrice de responsabilités ;
prix approuvé et traitement des imprévus ;
définition de chaque jalon et de ses preuves ;
délais d'inspection, notification, paiement et litige.
Si la conception reste volontairement incomplet, le contrat doit montrer cette incertitude. Il ne devrait pas afficher un prix et une date fixes tout en repoussant les détails les plus coûteux en « options client » ultérieures.
Cinq vérifications avant le paiement
Demande écrite :
montant, jalon contractuel, facture, bénéficiaire, compte bancaire, pièces justificatives et cumul des paiements.
Preuves du chantier :
compte rendu daté, photographies localisées, résultats d'essais, bons de livraison et calendrier actualisé.
Examen indépendant :
un architecte, un ingénieur ou un économiste de la construction compétent vérifie uniquement les travaux couverts par sa mission écrite et indique ses réserves ou conflits.
Contrat :
confirmer le jalon, les modifications approuvées, les avis de retard, les défauts, les sûretés et l'estimation du coût et du délai nécessaires pour terminer.
Trace du paiement :
payer uniquement sur le compte contractuel vérifié après autorisation du décideur habilité, puis conserver le certificat, la facture, la confirmation bancaire et les conditions de la prochaine tranche.
Modifications : quand un budget fixe cesse de l'être
Avant les travaux, sauf urgence strictement définie, une modification répond à cinq questions :
Qu'est-ce qui change et pourquoi ?
Qui peut l'ordonner ?
Quel plan/spécification remplace l'ancien ?
Quel prix et quel effet fiscal ?
Quel impact sur le calendrier et la livraison ?
Un seul registre suffit :
ID
Instruction
Périmètre
Prix
Délai
Statut
Preuve
V-01
Refonte du drainage
Nouveau plan de génie civil
Examen par l'économiste de la construction (QS) en attente
+? jours
Non approuvé
Note de chantier ou de l'ingénieur
V-02
Substitution de pierre
Équivalent nommé
IDR …
0
Approuvé
Échantillon + ordre de modification signé
« Inclus dans la prochaine facture » n'est pas un processus. L'investisseur ne devrait pas approuver le prix une fois la substitution cachée dans l'ouvrage.
Sommes retenues jusqu'à l'achèvement et autres sûretés
La retenue peut conserver des fonds jusqu'à des jalons d'achèvement et de correction des défauts définis. Sa qualité dépend du texte :
pourcentage/base et plafond ;
détenteur ;
première et dernière libération ;
emploi pour défaut non corrigé ;
insolvabilité/résiliation ;
relation avec les garanties et le décompte final.
Elle n'existe pas dans chaque contrat et aucun taux ne doit être présenté comme universel.
De même, garantie de remboursement d'avance, garantie de bonne exécution, garantie bancaire, compte séquestre (« escrow ») ou garantie de maison-mère se lisent comme des instruments : émetteur, bénéficiaire, montant, expiration, réduction, conditions de mise en jeu, moyens de défense, droit applicable et couverture de toute la période à risque.
La remise comprend quatre volets distincts
Libération
Conditions possibles
Pourquoi la séparer ?
Achèvement pratique/physique
Travail substantiellement terminé et inspecté ; liste des réserves définie
La possession peut précéder certains petits défauts
Achèvement documentaire
Plans de récolement, manuels, garanties, essais, autorisations et procédure SLF
Sans documents, l'exploitation, l'assurance, la réparation et la vente coûtent plus cher
Prêt à exploiter
Réseaux, passation fournisseurs/équipe, dépendances opérateur/licences/fiscalité/encaissement
Un bâtiment fini n'est pas nécessairement une activité d'hébergement
Compte final/défauts
Variations soldées, défauts corrigés, conditions de retenue remplies
Évite que la clôture bloque possession et ouverture
Le contrat peut organiser autrement. Le point est qu'une signature ne doit pas certifier involontairement quatre réalités.
Exemple : remplacer six paiements calendaires par cinq étapes documentées
Toutes les entités, proportions, dates et faits de cet exemple sont fictifs et purement illustratifs.
La brochure propose : 20 % à la réservation/signature, puis 20 % après 60, 120 et 180 jours, 15 % à « l'achèvement » et 5 % aux clés.
La structure revue peut distinguer :
Libération initiale :
pouvoirs fonciers/transaction, contrat, base et conditions essentielles avant chantier ; toute vraie avance est séparément sécurisée ou consciemment chiffrée.
Jalon sous-structure :
fondations/sous-structure mesurées et testées selon les documents structurels, avec certificat cumulatif.
Jalon clos-couvert :
structure, toiture et enveloppe définies terminées selon spécification ; contrôles des ouvrages destinés à être dissimulés archivés.
Jalon MEP/finitions :
lots mesurés ; mise en service et variations rapprochées.
Remise/clôture :
libération physique, conditions documentaires/opérationnelles séparées, puis retenue/défauts.
Les dates restent dans le programme et la date butoir contractuelle. Elles cessent de se faire passer pour une preuve de construction.
Limites de cette vérification
Il ne peut pas :
créer un droit de retenir, inspecter, entrer ou résilier si le contrat ne le prévoit pas ;
décider quel régime logement/PPJB ou construction s'applique ;
rendre le professionnel chargé de certifier indépendant ou responsable sans mission adaptée ;
détecter les vices cachés sans inspections/essais ;
garantir l'achèvement, le financement ou la solvabilité ;
rendre les comptes séquestres, les garanties, la retenue ou les paiements par jalons universellement obligatoires ;
remplacer l'audit préalable foncier, permis, fiscalité, assurance et exploitation ;
déterminer facturation fiscale, retenue à la source ou TVA sans les parties et prestations exactes.
Constituer la trace du prochain paiement
Utilisez le
guide de due diligence immobilière à Bali
pour organiser les preuves du projet avant d'examiner un appel de fonds. Comparez ensuite
les devis et les périmètres de travaux
, puis mesurez l'effet de la durée du chantier et du
bail restant sur les hypothèses de sortie
.
Avant le virement, demandez un dossier complet et structuré comprenant le certificat cumulatif, les preuves actuelles du chantier, le registre des modifications approuvées, le rapprochement des paiements, une estimation actualisée du coût et du délai restants, ainsi que les conditions à remplir avant le paiement suivant. Il s'agit d'une demande normale de pièces justificatives.
Sources officielles et date de consultation
Sources officielles consultées le 15 juillet 2026.
Ancrages officiels :
PP 16/2021
pour le système bâtiment et les fonctions distinctes de l'autorisation de construire (PBG) et du certificat d'aptitude à l'usage (SLF) ;
Permen PU 6/2025
pour le cadre de certification construction ;
Permen PKP 18/2025
pour les standards logement dans son champ ;
Permen PUPR 24/2018
pour son cadre de certification/enregistrement des promoteurs de logements ;
SE 05/SE/Dp/2026
pour le service SIRENG et son contexte déclaré de suivi des logements aidés/financés/incités par l'État ;
SE 06/SE/Dp/2026
, séparément, pour les formats/mécanismes des obligations et sanctions logement applicables ;
PP 12/2021
pour le cadre logement/PPJB lorsqu'il s'applique. L'articulation entre le Permen PUPR 24/2018, le SE 05/2026 et la couverture actuelle de SIRENG doit être confirmée par les professionnels indonésiens compétents. Aucun résultat de registre ne doit être traité comme une approbation de projet, une liste blanche ou une preuve de titre, de solvabilité, de protection des paiements, de livraison, de qualité ou de sécurité.
Les jalons, la retenue, les modifications, les sûretés et la remise ci-dessus sont des protections contractuelles, pas l'affirmation d'un modèle légal unique. Avant de les utiliser, faites examiner la transaction et le contrat par un avocat indonésien, convenez de la procédure d'inspection et de paiement avec l'architecte, l'ingénieur ou l'économiste de la construction mandaté, confirmez les qualifications requises pour chaque lot, obtenez un avis fiscal indonésien sur les paiements et faites examiner chaque instrument bancaire ou sûreté. Rouvrez les sources officielles à la date de décision.
Prix, périmètre et prochain engagement
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Deux questions à explorer ensuite
Question liée
Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ?
Question liée
« 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ?
Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?
Contexte publié
Partenaires d'exécution
Due diligence immobilière à Bali

## Qui possède, vend et construit votre villa ? | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-off-plan-proprietaire-developpeur-vendeur-constructeur-operateur.html

acteurs du projet

Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?

« Le promoteur » n'est pas une cartographie complète des cocontractants.

DALLEAU | Recherche et notes de terrain Publié le

16 juillet 2026

Dernière vérification

16 juillet 2026

Vérifié | 16 juillet 2026 | sources primaires

Mis à jour le 16 juillet 2026

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Commencer par le nom légal de chaque entité

« Le promoteur » n'est pas une cartographie complète des cocontractants.

Pour un projet off-plan, identifiez séparément au moins six rôles :

détenteur du terrain : contrôle le terrain/droit sous-jacent ;

promoteur : assemble et dirige le projet ;

vendeur, bailleur ou cédant : accorde le droit acquis ;

agent ou commercialisateur : présente et commercialise dans le cadre de son mandat et des règles d'intermédiation applicables ;

constructeur : réalise les travaux définis ;

opérateur : vend les séjours et exploite le bien terminé.

Ajoutez la société-projet, le destinataire du paiement, le garant et chaque professionnel réglementé. Une société peut cumuler plusieurs fonctions. Plusieurs sociétés peuvent partager le même logo. Ce qui compte n'est pas leur nombre, mais que chaque promesse ait un débiteur nommé, un pouvoir, une preuve et un recours.

Les rôles qu'une brochure peut réunir

Supposition fréquente

Pourquoi elle échoue

Meilleure question

« La marque possède le terrain. »

Une marque n'est pas un titulaire enregistré.

Quelle personne morale ou physique détient quel droit, et quelle preuve actuelle le confirme ?

« Le promoteur est le vendeur. »

Le coordinateur peut ne pas être l'entité qui accorde le bail ou le transfert.

Quelle entité signe l'instrument d'acquisition et a le pouvoir de le consentir ?

« J'ai payé l'agent, donc le promoteur a mon argent. »

Le mandat d'encaissement et l'obligation de reversement doivent être prouvés.

Quel compte a reçu les fonds, pour qui, et selon quelle règle de remboursement ?

« Le constructeur garantit la date de livraison. »

L'investisseur peut n'avoir aucun contrat direct avec lui.

Qui doit la livraison à l'investisseur, et la défaillance du constructeur peut-elle l'excuser ?

« L'opérateur garantit le rendement. »

Opérateur, promoteur et détenteur du terrain peuvent avoir des bilans distincts.

Quelle entité signe l'obligation de revenu et qui couvre le déficit ?

« Le groupe parent soutient le projet. »

Une marque commune ne crée pas seule la responsabilité d'une société affiliée.

Existe-t-il une garantie ou obligation directe exécutée et opposable à l'entité citée ?

« Le notaire a contrôlé tout le projet. »

Son intervention et l'instrument ont un périmètre défini.

Qui a été mandaté séparément pour le foncier, le droit des sociétés, la technique, les licences, la fiscalité et le contrat ?

Le rôle de chaque partie et les pièces à demander

Rôle

Ce qu'il peut faire

Preuves à demander

Ne pas supposer

Détenteur du terrain

Détient l'intérêt foncier enregistré/contractuel et peut accorder des droits de développement/usage

Preuve actuelle du droit et résultats des recherches, identité, pouvoir, charges et rapprochement de la parcelle

Qu'il est aussi votre vendeur, promoteur ou garant

promoteur/coordinateur

Organise, selon le contrat, l'accès au terrain, conception, autorisations, financement, construction et livraison

Entité exacte, numéro d'identification d'entreprise (NIB), classification indonésienne des activités économiques (KBLI) et registres applicables, accords du projet, autorisations, financement, rapports

Que le titre « promoteur » prouve propriété, permission, solvabilité ou toute inscription

Vendeur/bailleur/cédant

Accorde la vente, le bail ou la cession acquise

Instrument, pouvoir sous-jacent, autorisation sociale, conditions, durée, usage, transfert et défaut

Qu'il peut promettre plus longtemps ou plus largement que son propre droit

Agent/commercialisateur

Met en relation, communique et n'encaisse que dans le cadre d'un mandat valable et des règles d'intermédiation applicables

Entité, licence et justificatifs du courtier selon le cas, mandat, représentation, frais, accord d'encaissement/remboursement et coordonnées du compte

Qu'il peut modifier le contrat, engager une société affiliée ou valider le projet

Constructeur et sous-traitants

Réalisent un périmètre de travaux

Contrat, plans/spécifications, licences/certifications requises, assurances, calendrier, assurance qualité et garanties

Que l'investisseur peut faire exécuter directement leur contrat

Architecte, ingénieur, économiste de la construction (QS) ou professionnel chargé de certifier

Conçoit, inspecte, mesure ou certifie selon sa mission

Lettre de mission, compétence, indépendance/conflits, périmètre, responsabilité et livrables signés

Qu'un certificat couvre le titre, la conformité juridique, le financement ou la qualité globale et autorisation d'exploitation

Opérateur/gestionnaire immobilier

Commercialise et exploite selon un modèle défini

Contrat, parcours d'autorisation et cadre KBLI, cartographie des encaissements et de la fiscalité, budgets, rapports, réserves, résiliation et remise

Que l'exploitation transfère le titre ou remédie à un défaut du bâtiment ou d'autorisation

Garant/fournisseur de sûreté

Soutient une obligation précise si les conditions sont réunies

Instrument signé, pouvoir, plafond, durée, appel, droit applicable, actifs et mainlevées

Qu'un logo, une lettre de confort ou une déclaration de dirigeant suffit

Lorsque l'intermédiation relève du Permendag 33/2025 et du KBLI 68200 P4, le cadre comprend notamment une personne morale domiciliée en Indonésie, un NIB, le certificat standard vérifié pertinent, des courtiers compétents et certifiés et un accord de service écrit ; la réception d'un dépôt ou acompte suppose l'accord du vendeur/propriétaire dans la fonction applicable. La conformité de l'intermédiaire ne prouve ni la conformité ou la capacité du promoteur, ni les droits fonciers, les autorisations, les finances du projet, la protection des paiements ou la livraison.

SIRENG et les règles connexes sur les promoteurs de logements fournissent des éléments utiles dans leur propre champ, mais un résultat de registre ne constitue pas une approbation publique d'un projet privé de villa. Il ne prouve ni les droits fonciers, ni la solvabilité, ni la protection des paiements, la livraison, la qualité ou la sécurité. La couverture actuelle de SIRENG pour un projet privé à Bali doit être confirmée avec un avocat indonésien spécialisé ou le ministère compétent. De même, le numéro d'identification d'entreprise (NIB) confirme uniquement l'enregistrement de l'activité ; il ne répond pas aux questions foncières, contractuelles, liées au bâtiment ou aux parties.

Séparer les promesses et les flux d'argent

Qui a pris chaque engagement ?

Remplissez une ligne par promesse importante :

Promesse

Débiteur

Document

Échéance/déclencheur

Preuve

Recours/sûreté

Accorder un droit de 30 ans

[entité juridique]

Bail/cession

Date/conditions d'effet

Dossier foncier et pouvoirs

Mise en conformité/remboursement/résiliation/autre

Livrer la villa définie

[entité juridique]

Vente/développement

Jalons + date butoir

Certification indépendante

Retenue/garantie/résiliation

Corriger les défauts

[entité juridique]

Conditions de travaux/livraison

Périodes de garantie

Inspection et notification

Retenue/réparation/récupération

Payer le revenu fixe

[entité juridique]

Exploitation/garantie

Dates de fonctionnement/paiement

État revenus/déficit

Réserve/garantie/exécution

Racheter

[entité juridique]

Option/instrument de rachat contractuel

Fenêtre + conditions

Formule de prix + exercice valide

Exécution/sûreté/défaut

Une case « débiteur » vide n'est pas un détail rédactionnel. Cela signifie que personne n'est encore identifié comme juridiquement responsable.

Qui reçoit et contrôle l'argent ?

Dessinez le flux réel :

investisseur → destinataire de la réservation → vendeur/bailleur/développeur → constructeur et consultants → opérateur → client/encaisseur OTA → compte de revenus → coûts/fiscalité/réserve → investisseur

Pour chaque transfert :

Pourquoi cette partie reçoit-elle l'argent ?

S'agit-il de capital, loyer, prix, avance travaux, honoraires, dépôt ou revenu ?

Qui contrôle le compte et sa libération ?

Quelle facture, quittance, fiscalité et déclaration s'appliquent ?

Le destinataire garde-t-il les fonds pour lui ou pour autrui ?

Que se passe-t-il si la condition correspondante n'est pas remplie ?

La carte révèle souvent que le destinataire du dépôt n'est ni le détenteur du terrain, ni le débiteur de livraison, ni le futur opérateur. Cela peut être légitime. Il faut le documenter, pas le deviner.

Quand une société du groupe couvre-t-elle une autre ?

Situation

Ce qu'elle prouve

Réponse

Même nom commercial ou fondateur

Un lien commercial

Traiter les entités séparément jusqu'à preuve contraire

Mêmes dirigeants/actionnaires

Contrôle/propriété commune possible

Identifier tout de même qui doit quoi et détient chaque actif

Contrat mentionnant « Developer Group » sans identité juridique

Rédaction ambiguë

Insérer raison sociale, enregistrement, adresse et qualité exacts

Affilié signe « acknowledged »

Connaissance, selon rédaction

Ne pas y voir une dette de paiement/performance sans engagement exprès

Société-mère signe une garantie validée

Soutien direct potentiel dans son périmètre

Tester pouvoir, plafond, expiration, appel, défenses, actifs et opposabilité

Agent signe sous mandat documenté

Pouvoir limité au mandat

Vérifier périmètre, expiration, fonds et représentations couverts

Garantie constructeur cédée à l'investisseur

Recours direct potentiel pour défaut

Tester cession, périmètre, durée, exclusions et solvabilité

Exemple : une brochure, quatre contrats

Tous les noms, entités et faits de cet exemple sont fictifs et purement illustratifs.

La présentation du Projet fictif Alpha porte un seul logo. Le formulaire demande un versement à PT Marketing A. Le terrain est détenu par une personne indonésienne. PT Development B promet la conception et la livraison. CV Contractor C construit. PT Operations D promet un rendement fixe de trois ans.

Les appeler tous « Projet Alpha » masque l'essentiel.

L'avocat foncier confirme si la personne peut accorder le droit et toute la durée au montage.

Le pouvoir de PT Marketing A d'encaisser, conserver et rembourser est écrit, pas déduit d'une adresse e-mail.

L'obligation de PT Development B contient plans, prix, jalons, date butoir et recours. Son droit d'entrer et construire est prouvé.

Le contrat et les qualifications de CV Contractor C sont vérifiés ; l'investisseur ne présume pas de recours direct sans cession/garantie.

L'obligation de PT Operations D est évaluée sur ses comptes et ses sûretés. Les actifs de Development B ne la soutiennent que si cette dernière s'engage expressément.

« Garantie du groupe » disparaît de la brochure tant qu'une entité nommée ne signe pas un véritable instrument.

La structure du projet peut être parfaitement capable de livrer. Cette cartographie sert simplement à vérifier qui s'engage réellement derrière les promesses financées par l'investisseur.

Limites de cette cartographie

Il ne peut pas :

qualifier juridiquement votre transaction ;

vérifier un droit foncier, une société, une procuration, une licence ou une signature ;

rendre une société affiliée responsable sans instrument valide ;

confirmer les exigences SBU, SKK ou autres pour un lot précis ;

décider, sans examiner les faits et les contrats, qui exploite le bien, quelle entité est contractuellement responsable d'encaisser les paiements des voyageurs (appelée merchant of record dans certains contrats) ou qui est contribuable ;

valoriser une garantie ou prédire le recouvrement ;

remplacer les contrôles de conflits et missions professionnelles indépendantes.

Nommer les parties avant de cartographier les paiements

Utilisez le guide de due diligence immobilière à Bali pour organiser les preuves foncières, sociétaires, relatives au projet et à l'exploitation. Vérifiez la répartition des rôles ci-dessus avant d'accepter l'étiquette « opérateur ». Si le rôle de la société de projet ou de la société indonésienne à capitaux étrangers (PT PMA) reste flou, examinez son cadre de licence et d'activité .

Une revue sérieuse ne commence pas par « ces personnes paraissent-elles honnêtes ? ». Elle commence par écrire la raison sociale complète à côté de chaque actif, promesse, paiement et recours. La confiance dispose alors d'une structure sur laquelle se poser.

Sources officielles et date de consultation

Sources officielles consultées le 15 juillet 2026. Ancrages officiels limités : Permen PKP 18/2025 , Permen PUPR 24/2018 , SE 05/SE/Dp/2026 , SE 06/SE/Dp/2026 , Permendag 33/2025 : PDF officiel , Loi 40/2007 sur les sociétés : PDF officiel , PP 16/2021 sur les bâtiments et Permen PU 6/2025 sur la construction .

Avant d'utiliser cette cartographie, demandez à un avocat indonésien d'identifier l'entité juridique qui assume chaque rôle et d'examiner chaque contrat. Obtenez des recherches foncières, des vérifications auprès de l'officier chargé des actes fonciers (PPAT) et des recherches sociétaires à jour. Faites contrôler les missions techniques et les qualifications du lot concerné par l'architecte, l'ingénieur et l'avocat spécialisé en construction. Demandez aux spécialistes des autorisations et de la fiscalité d'indiquer par écrit les questions examinées, leur conclusion et la date. Rouvrez les sources officielles et confirmez que les règles s'appliquent toujours au projet.

Deux questions à explorer ensuite

Question liée Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ? Question liée Sept vérifications avant de verser un acompte immobilier à Bali

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

Méthode

Sources et date de mise à jour

DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.

À lire ensuite

Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ? « 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?

Contexte publié

les rôles de l'opérateur et des parties au projet Cartographie des activités KBLI 2025

## Résidence secondaire à Bali : décider avant l’achat | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-second-home.html

← notes de terrain Résidence secondaire à Bali : les décisions à prendre avant d'acheter

DALLEAU | Recherche et notes de terrain Publié le

10 juillet 2026

Dernière vérification

17 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref Point de départ : avant de comparer les villas, il faut trancher cinq questions. Qui utilisera la résidence, combien de temps et à quelle fréquence ? Le bien sera-t-il conservé pour la famille, exploité pendant les absences ou les deux ? Sous quel droit le terrain ou le bâtiment sera-t-il détenu ? Quel statut migratoire correspondra à la présence de chaque membre du foyer ? Enfin, comment le bien pourra-t-il être transmis, cédé ou réorganisé ? Une fois ces réponses posées, le budget et le programme architectural deviennent beaucoup plus fiables.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Commencer par l'usage réel

Une maison occupée trois mois par an par un couple n'a pas le même programme qu'une résidence familiale utilisée pendant les vacances scolaires, avec enfants, invités, personnel et chauffeur. Elle n'a pas non plus le même modèle qu'une villa proposée à la location pendant dix mois.

Cette distinction commande la suite : emplacement, nombre de chambres, espaces réservés au personnel, cuisine de réception et cuisine de service, sécurité, circulation, maintenance, stockage, acoustique et niveau d'intimité. Elle détermine aussi les autorisations et l'organisation nécessaires si une activité d'hébergement est envisagée. Le premier brief doit donc décrire une façon de vivre et d'exploiter le lieu, pas seulement une surface et un style.

Le mode de détention doit suivre le projet

Un étranger ne peut pas détenir personnellement le Hak Milik, le titre foncier réservé aux citoyens indonésiens. Un visa ne transforme pas cette règle. Les voies à examiner sont différentes selon l'usage et la structure de l'acquéreur :

un bail de longue durée crée un droit contractuel, pas un titre foncier ;

le Hak Pakai est un droit enregistré accessible à certaines personnes étrangères sous les conditions prévues par la réglementation ;

une société indonésienne à capitaux étrangers (PT PMA) éligible, dont l'activité et les autorisations correspondent au projet, peut détenir en son nom un droit de construire et d'utiliser des bâtiments (HGB) ;

une activité d'hébergement exige une analyse séparée du titre immobilier, de l'urbanisme, du bâtiment, de la classification de l'activité et des licences d'exploitation.

Chaque solution crée des droits et des obligations différents. Une PT PMA n'offre aucun raccourci universel vers la propriété, tandis qu'un bail, même bien rédigé, reste limité dans le temps. Le montage par prête-nom laisse le contrôle juridique entre les mains de la personne inscrite et expose l'investisseur à un risque qu'un contrat privé ne neutralise pas. Lire aussi PT PMA ou prête-nom et le bail de longue durée expliqué .

Distinguer séjour et propriété

Commencez par décrire l'activité exacte : séjour personnel, visites de chantier, réunions d'actionnaire, direction de la société, travail opérationnel en Indonésie, emploi local ou travail à distance pour un employeur établi à l'étranger. Le nom commercial d'un visa vient ensuite.

Un statut migratoire autorise une présence et certaines activités définies. Le titre de propriété, la licence d'hébergement et la résidence fiscale relèvent chacun de règles distinctes. Dans un projet familial, le statut du titulaire principal ne couvre pas automatiquement chaque accompagnant. Le parcours et les justificatifs du conjoint, des enfants ou d'autres proches doivent être vérifiés séparément sur le portail officiel.

E33 Second Home : ce que prévoit la fiche officielle

La fiche officielle E33 Second Home , revérifiée le 17 juillet 2026, décrit un séjour initial d'une durée maximale de cinq ans, prolongeable dans la limite d'une durée totale de dix ans, sans garant local. Dans les 90 jours suivant l'entrée, le titulaire doit constituer puis maintenir l'une des deux garanties migratoires publiées :

maintenir au moins 130 000 USD sur un compte auprès d'une banque publique indonésienne ;

s'engager à acheter en Indonésie un rumah susun ou un appartement d'une valeur minimale de 1 000 000 USD, puis déclarer la preuve de propriété au bureau d'immigration qui a délivré le titre de séjour temporaire (ITAS) dans les 90 jours suivant l'entrée.

Cette seconde option concerne un bien situé en Indonésie. La page publique vise un rumah susun ou un appartement sans confirmer l'éligibilité d'une villa individuelle. Elle laisse également ouverts le titre accepté, la preuve d'évaluation et le traitement d'un appartement déjà détenu. Ces points doivent être confirmés sur le portail eVisa officiel avant tout acompte, engagement d'achat ou paiement à un intermédiaire.

La même prudence s'applique au foyer. Le portail présente un parcours distinct pour les personnes à charge liées au titulaire d'un E33. Il faut donc établir un dossier migratoire pour chaque membre de la famille, au lieu de supposer qu'une seule demande couvre tout le monde. Le guide des visas indonésiens permet de partir de l'activité et de la durée de séjour avant de vérifier le code officiel adapté.

La résidence fiscale se prépare avant le déménagement

En Indonésie, la présence pendant plus de 183 jours sur une période de douze mois est un critère majeur de résidence fiscale. Les faits établissant une installation ou une intention de résider peuvent également être pris en compte. Le visa, le titre immobilier et la résidence fiscale répondent donc à trois analyses distinctes.

Pour un résident fiscal français, la convention fiscale entre la France et l'Indonésie doit ensuite être lue avec la situation réelle : durée de présence, foyer, revenus, société, dividendes et éventuels revenus locatifs indonésiens. Il serait trompeur de déduire un traitement fiscal personnel à partir du seul nombre de jours ou du seul visa. Un conseil fiscal transfrontalier, daté et indépendant, est nécessaire avant de modifier sa résidence ou sa structure patrimoniale.

Transmission, gouvernance et sortie

La transmission d'un bail dépend d'abord de son texte, du droit applicable, de l'identité du bailleur et de son pouvoir d'engager le propriétaire. Avant la signature, le conseil de la famille doit pouvoir répondre par écrit à quatre questions : le bail peut-il être transmis aux héritiers, les options de renouvellement suivent-elles le cessionnaire, quelles autorisations sont nécessaires pour céder le terme restant et que se passe-t-il en cas de décès ou d'incapacité ?

Lorsque l'actif est porté par une société, l'analyse se déplace vers les parts, les droits de vote, les pouvoirs de direction, les clauses de sortie et la succession. Dans les deux cas, la documentation utile à une future cession doit être organisée dès l'acquisition : titre ou bail, urbanisme, permis de construire, licences, fiscalité, comptabilité, contrats de maintenance et historique des travaux.

Un bail perd mécaniquement du terme au fil des années. Sa valeur future dépendra notamment de la durée restante, de la solidité des renouvellements et de la qualité du dossier. Préparer la sortie dès l'entrée relève d'une discipline d'investissement élémentaire.

De la structure au programme architectural

Une fois l'usage, la détention, le séjour, la fiscalité et la sortie cadrés, le programme peut être dessiné avec précision. Dans une résidence familiale dont l'intendance ou l'exploitation est organisée à Bali, les espaces visibles ne représentent qu'une partie du projet. Il faut aussi prévoir les circulations de service, la cuisine de production, le stockage, la buanderie, les locaux techniques, le logement éventuel du personnel, la sécurité, le stationnement et l'accès des prestataires.

C'est à ce stade que la surface du terrain, la surface intérieure, le nombre de niveaux et le budget peuvent être comparés sans créer une fausse impression de précision. La Stay Matrix part de l'expérience recherchée et montre concrètement les compromis entre confort, qualité, expression architecturale et coût de construction.

Questions fréquentes

Un étranger peut-il acheter une résidence à Bali pour y vivre ? Il ne peut pas détenir personnellement le Hak Milik. Selon sa situation et son projet, il peut étudier un bail, un Hak Pakai ou une détention par une société indonésienne éligible. Chaque voie a ses propres conditions et ne produit pas les mêmes droits.

Un KITAS permet-il de détenir une villa en pleine propriété ? Non. Le statut migratoire et le droit immobilier sont deux cadres distincts. Un permis de séjour peut être une condition d'accès à certains droits, notamment le Hak Pakai, mais il ne transforme pas un étranger en titulaire du Hak Milik.

Le E33 permet-il de louer la résidence pendant les absences ? Le E33 traite du séjour du titulaire. Il n'autorise pas, à lui seul, une activité d'hébergement. La location de courte durée doit être analysée au regard de l'emplacement, du bâtiment, de la classification de l'activité, des licences et de l'opérateur.

L'option immobilière à 1 000 000 USD peut-elle être remplie avec une villa ? La fiche E33 revérifiée le 17 juillet 2026 vise un rumah susun ou un appartement situé en Indonésie. Elle ne confirme pas qu'une villa individuelle est recevable. Il faut obtenir une confirmation officielle sur le bien, le titre et la preuve de valeur avant de s'engager.

Par où commencer ? Par une page de cadrage : usage réel, personnes concernées, durée de présence, activité sur place, mode de détention envisagé, budget foncier, budget de développement et horizon de sortie. La visite des biens vient ensuite.

dernière vérification éditoriale et réglementaire : 17 juillet 2026

Notes liées : Parcours résidence privée · Guide de décision des visas indonésiens · Statut investisseur E28A · Visa de télétravail E33G · Le bail de longue durée expliqué

Sources contrôlées le 17 juillet 2026 : Direction générale de l'immigration, fiche E33 Second Home et portail eVisa officiel ; réglementation indonésienne sur les droits fonciers, notamment le règlement gouvernemental indonésien 18/2021 ; règles indonésiennes de résidence fiscale et convention fiscale applicable. Cette note expose notre lecture des sources à la date de contrôle. Elle peut être incomplète, dépassée ou erronée et ne remplace pas un avis juridique, fiscal, migratoire ou successoral établi à partir de la situation de l'investisseur et du bien exact.

Deux questions à explorer ensuite

Question liée Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Question liée KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

ordre de décision Usage et personnes concernées

Mode de détention

Statut migratoire de chacun

Résidence fiscale

Transmission et sortie

Programme et budget

E33 en bref Jusqu'à cinq ans initialement, prolongeables dans la limite de dix ans au total, selon la fiche officielle consultée le 17 juillet 2026. Deux garanties sont publiées. La voie immobilière vise un appartement en Indonésie et ne confirme pas une villa individuelle.

Ouvrir la fiche officielle

à ne pas confondre Visa, titre immobilier, licence d'exploitation et résidence fiscale répondent à quatre questions distinctes. Aucun document ne remplace les trois autres.

## Investir dans une villa à Bali en 2026 | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-villa-investment-2026.html

← notes
market intelligence
7 juillet 2026
Est-il encore intéressant d'investir dans une villa à Bali en 2026 ?
Bali reste un grand marché touristique, mais une moyenne calculée à l'échelle de l'île ne permet pas de juger une villa, un emplacement ou un mode d'exploitation précis.
DALLEAU | Recherche et notes de terrain
Publié le
7 juillet 2026
Dernière vérification
17 juillet 2026
Méthode éditoriale actualisée
20 septembre 2026
Vérifié | 17 juillet 2026 | sources primaires
En bref
Bali ne constitue pas un seul cas d’investissement. Examinez le bien, les droits, le budget complet, les hébergements comparables et l’exploitation, puis testez les hypothèses qui déterminent les flux.
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Mise à jour · contrôlée le 17 juillet 2026 :
le Perda Bali 4/2026 traite certaines conversions de terres productives et les transferts par prête-nom dans ce périmètre. Son résumé officiel ne soumet pas chaque parcelle, projet ou litige à un résultat identique. Consultez
la note foncière datée
et vérifiez la parcelle dans les registres officiels.
Ce que les arrivées touristiques permettent de comprendre
Les statistiques d’arrivées décrivent des flux de voyageurs. Elles ne déterminent pas combien de nuits une villa précise vendra, à quel prix ni après quelles charges. Tourisme intérieur, arrivées internationales, visiteurs récurrents, durée des séjours et choix d’hébergement répondent à des questions différentes.
Utilisez
BPS Bali
pour situer le contexte régional et la période observée. Identifiez ensuite les clients visés par votre bien et leurs alternatives réelles. Un grand marché touristique est un point de départ, pas une prévision de projet.
Constituer un groupe comparable, pas une moyenne de toute l’île
Une base commerciale d’hébergements peut réunir chambres, appartements et villas, annonces actives et peu exploitées, capacités et localisations différentes. Son nombre total d’annonces ne définit pas l’offre concurrente d’une résidence précise.
Sélectionnez des biens comparables par emplacement, capacité, finition, service, accès et type de séjour. Consignez la période et la définition des indicateurs. Un tarif affiché n’est pas nécessairement un tarif encaissé. Une nuit indisponible dans un calendrier n’est pas nécessairement une réservation payée.
Une photographie datée du marché peut éclairer ce travail. Elle ne doit pas fournir un revenu annuel unique à appliquer aux villas de toutes surfaces et de tous budgets.
Construire le rendement à partir des hypothèses propres au bien
Partez de la résidence prévue, de son exploitation et du capital complet à mobiliser. Reconstituez recettes et charges à partir de leurs hypothèses au lieu de diviser un revenu moyen de toute l’île par un prix d’achat sans rapport.
Entrée du modèle
Éléments à obtenir
Pourquoi ils comptent
Nuits commercialisables
Calendrier, usage personnel, ouverture et fermetures prévues.
Le dénominateur doit correspondre à la période de disponibilité.
Occupation payée
Relevés comparables datés, exclusions et définition d’une réservation.
Un calendrier bloqué ne prouve pas un séjour payé.
Tarif réellement obtenu
Tarifs saisonniers après remises, avec traitement explicite des taxes et frais.
Le tarif publié ne suffit pas à établir la recette.
Charges d’exploitation
Personnel, distribution, gestion, énergie, entretien, assurances, fiscalité pertinente et autres prestations réelles.
Le chiffre d’affaires brut n’est pas le flux net du propriétaire.
Capital et trésorerie
Droits, acquisition, travaux, équipements, frais de transaction et trésorerie d’ouverture, sans double comptage.
Le prix annoncé peut différer des fonds réellement engagés.
Calendrier et sortie
Livraison, fin du bail, réinvestissements et hypothèses de sortie distinctes.
Le rendement annuel d’exploitation ne mesure pas le résultat complet de l’investissement.
Présentez séparément recettes brutes, résultat d’exploitation, réserves et flux du propriétaire. Précisez si financement, fiscalité et renouvellement sont inclus. Testez une baisse de tarif, une occupation réduite, un retard d’ouverture et une hausse des charges. Le modèle doit montrer quelles hypothèses changent réellement la décision.
Une appréciation future appartient à une analyse de sortie séparée. Un paiement garanti exige l’examen de son débiteur et de son contrat ; il ne s’ajoute pas automatiquement aux mêmes recettes locatives.
Le
Reality Check sur une villa à 150 000 €
explique le coût complet. Le
guide des devis de construction
aide à rapprocher les travaux réellement chiffrés.
Harmonie est livrée et en exploitation. Son
dossier de terrain
suit le chantier, la livraison et la continuité opérationnelle.
Intégrer la conformité au scénario de base
Deux notes de ce site expliquent le cadre réglementaire en détail :
le régime de licences du PP 28/2025
et
le capital et la structure d'une société indonésienne à capitaux étrangers (PT PMA)
. L'Indonésie applique un système de licences fondé sur le risque, avec contrôle et sanctions. À Bingin Beach, mi-2025, les autorités balinaises ont démoli des commerces qu'elles avaient jugés illégaux. Les structures visées et le fondement juridique doivent être identifiés avant de comparer cette opération à une autre villa. Nous développons cette distinction dans
zonage et règles d'urbanisme à Bali
.
La structure foncière pèse aussi lourd que les licences. Le droit agraire indonésien interdit à une personne étrangère de détenir directement un Hak Milik. Selon les faits, les voies à examiner peuvent inclure
un bail de longue durée
ou des droits détenus par une
PT PMA éligible
. Les litiges de prête-nom dépendent des documents et des faits. Les décisions publiées présentées dans la note liée illustrent le risque sans fixer automatiquement le résultat de tout autre montage.
Ce qui sépare un bon résultat d'un mauvais
La compatibilité entre zonage et usage,
vérifiée sur le plan d'urbanisme applicable à la parcelle, pas sur une simple indication verbale de l'agent. Nous y consacrons
une note entière
.
Les bonnes licences dès le départ,
intégrées au calendrier du chantier plutôt que rattrapées après l'ouverture.
Une hypothèse d’occupation documentée.
Ni 47 % ni 70 % ne constitue une base universelle. Appuyez l’hypothèse sur des biens comparables, une même période et des définitions cohérentes, puis testez un scénario moins favorable.
Un modèle d’exploitation identifié.
Documentez l’opérateur, les équipes, la distribution, la maintenance et les responsabilités, sans supposer que publier une annonce crée un revenu passif.
Des coûts comptés sans complaisance,
gestion, entretien, fiscalité et vacance posés en chiffres réels avant de parler de rendement.
Décider sur un bien, pas porter un jugement sur toute l’île
La question utile porte sur un bien, ses droits, son exploitation, son coût complet, les clients visés et la période disponible. Une statistique touristique générale ne répond pas à toutes ces questions.
Présentez le terrain, l’offre et les hypothèses à
François
. DALLEAU peut cadrer le travail côté propriétaire et les questions à confier aux spécialistes avant le prochain engagement.
Références et dates de revue.
BPS Bali
fournit un contexte touristique, pas une prévision propre à une villa. Les notes liées sur les licences et les droits fonciers indiquent leurs références officielles et leurs dates de vérification. La méthode de coût et de comparaison a été révisée le 20 septembre 2026 ; cette révision ne constitue pas une nouvelle vérification juridique de chaque règle liée.
dernière relecture : 17 juillet 2026
Deux questions à explorer ensuite
Question liée
Sept vérifications avant de verser un acompte immobilier à Bali
Question liée
« 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?
Modéliser cette décision dans la Stay Matrix
Ouvrir l'outil →
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

## Rendement garanti : qui doit payer les 8 % ? | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-villa-rendement-garanti-buyback-cocontractant-waterfall.html

mécanique d'investissement
« 8 % garantis » sur une villa à Bali : qui paie, avec quel argent et selon quel contrat ?
Un rendement garanti n'est pas une caractéristique du bien. C'est une obligation de paiement due par une personne ou une société nommée.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
16 juillet 2026
Vérifié | 16 juillet 2026 | sources primaires
Mis à jour le 16 juillet 2026
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Identifier la promesse avant de compter le revenu
Un rendement garanti n'est pas une caractéristique du bien. C'est une obligation de paiement due par une personne ou une société nommée.
Avant d'intégrer le montant promis au scénario de base, identifiez :
le débiteur légal
et son bilan ;
le contrat ou autre document
qui crée l'obligation ;
la base
du pourcentage ;
brut ou net
, et chaque déduction ;
le déclencheur
, les dates et la durée ;
la cascade des revenus, des coûts et de la fiscalité
;
le mécanisme de couverture du déficit
lorsque la villa génère moins de revenus ;
la sûreté, réserve, garantie et conditions de mise en jeu
;
les effets de la résiliation, force majeure, suspension et vente
;
le recours et la voie réaliste de recouvrement
.
Si ces éléments manquent, le modèle prudent ne dit pas « fraude ». Il indique
pas encore suffisamment documenté pour être intégré au scénario de base
.
Des expressions proches peuvent désigner des obligations différentes
Expression commerciale
Ce qu'elle peut signifier
La question manquante
Rendement projeté
Prévision issue de l'occupation, ADR et coûts supposés
Qui a établi ces hypothèses, et que se passe-t-il si elles se révèlent erronées ?
Loyer fixe
L'opérateur/locataire doit un loyer déterminé
Est-il inconditionnel, indexé, après quelles déductions et avec le soutien de qui ?
Revenu minimum garanti
L'opérateur/promoteur comble l'écart sous un seuil défini
Quelle définition du revenu et quelle preuve/période ?
ROI garanti
Paiement, partage des profits, loyer ou simple langage commercial
Quel instrument et quel débiteur le créent ?
Mise en commun des revenus locatifs (« rental pool »)
Part d'une performance mutualisée
Quels biens, coûts, réserves et audit de l'allocation ?
Subvention du promoteur
Complément financé par le prix ou budgeté au lancement
Est-il financé, isolé et séparé de l'argent des acheteurs ?
Rachat contractuel
Option de vente, engagement de rachat, assistance ou promesse commerciale
Qui doit acheter, quand, à quel prix et sous quelles conditions ?
Garantie personnelle ou de la société mère
Soutien d'une autre personne morale ou physique
Instrument signé, autorisé et exécutoire ou simple déclaration ?
Rendement assuré
Une police peut couvrir certains événements
Quel assureur, quelle police, exclusions, bénéficiaire et procédure d'indemnisation ?
Une même expression peut apparaître dans les contrats d'acquisition, bail, gestion, garantie et rachat. Lisez-les ensemble : la clause de conflit ou résiliation la plus faible peut décider du résultat.
Comment intégrer la promesse au modèle financier
État de preuve
Traitement du modèle
Action suivante
Pourcentage dans la brochure
Exclure du scénario contractuel ; montrer séparément comme affirmation
Demander instrument complet et débiteur
Projet de clause, débiteur flou
Ne pas attribuer de capacité de paiement
Insérer entité, qualité et pouvoir exacts
Obligation signée, formule incomplète
Modéliser uniquement comme scénario
Définir base, déductions, dates, taxes, devise et rapprochement
Obligation claire, aucune preuve financière
Cas contractuel non financé/risque de crédit
Examiner comptes, passifs, exposition multi-projets et source de financement
Réserve financée ou sûreté documentée
Modéliser seulement montant, durée et conditions exacts
Vérifier contrôle, expiration, libération et créances concurrentes
Historique d'exploitation rapproché
Preuve pour scénario opérationnel, pas garantie future
Tester en scénario dégradé occupation, ADR, coûts, capex et arrêt réglementaire
Formule de rachat contractuel et débiteur clairs
Scénario de sortie contractuel, pas valeur de marché
Tester exercice, financement, transfert, impôts, accords et défaut
N'ajoutez jamais à la fois le paiement garanti et le même revenu locatif net sous-jacent, sauf si le contrat donne les deux. Sinon, vous comptez deux fois.
1. Quelle entité doit payer ?
Écrivez la raison sociale complète, pas la marque.
Puis vérifiez :
existence/statut actuel et signataire autorisé ;
présence de l'obligation dans acquisition, bail, exploitation ou garantie séparée ;
le débiteur possède-t-il le terrain, reçoit-il le prix, exploite-t-il la villa ou aucun des trois ?
comptes et passifs adaptés à la taille de la promesse ;
combien d'autres unités reçoivent la même promesse ;
financement par ventes futures, exploitation, réserve ou soutien d'une société liée ;
engagement réel d'une société-mère, d'un actionnaire ou dirigeant.
Dans l'analyse en droit des sociétés, les sociétés d'un groupe restent des personnes distinctes. Marque, actionnaires ou dirigeants communs expliquent un lien ; ils ne remplacent pas un engagement exprès. L'avocat doit confirmer pouvoirs et mécanismes de garantie indonésiens actuels pour le document précis.
2. Sur quel montant les 8 % sont-ils calculés ?
Bases possibles :
prix affiché ;
prix hors taxes/frais/mobilier ;
sommes versées ;
composante construction ;
capital net après incitations ;
montant fixe en IDR converti depuis une devise ;
valeur indépendante ;
solde dégressif.
Une villa à 500 000 USD avec 8 % suggère 40 000 USD par an. Le contrat peut appliquer 8 % à 400 000 USD après exclusion du foncier, des taxes et meubles, puis déduire gestion, maintenance, retenue et réserve. Le montant versé n'est plus 40 000 USD.
Le résumé doit indiquer :
taux × base définie = montant contractuel brut → déductions/fiscalité → liquidités versées
Une promesse en USD payée en IDR nécessite aussi une source et une date de conversion, ainsi qu'une répartition du risque de devise.
3. Quand l'obligation commence-t-elle et prend-elle fin ?
Ces déclencheurs ne sont pas équivalents :
signature ;
prix intégralement payé ;
achèvement pratique ;
remise ;
certificat d'aptitude à l'usage (SLF) et conditions d'exploitation ;
premier client ;
début du contrat opérateur ;
date fixe malgré le retard.
Si les « trois ans garantis » commencent seulement à l'ouverture, un retard décale à la fois les premiers revenus et la fin de la période garantie. Une date butoir peut aussi permettre à l'une des parties de mettre fin à l'accord. Si la garantie démarre à la date de livraison prévue, qui paie pendant le retard ? Le document doit répondre clairement.
Testez aussi vente anticipée, occupation propriétaire, force majeure, suspension de licence, grosse réparation, défaut/changement d'opérateur et résiliation. Une promesse qui disparaît au premier événement réaliste ne se valorise pas comme une obligation fixe.
Suivre l'argent avant son versement à l'investisseur
Le contrat doit indiquer en toutes lettres l'ordre dans lequel les revenus sont encaissés puis utilisés :
qui encaisse les réservations directes et celles des plateformes ;
quels impôts, commissions et remboursements sont déduits ;
quels frais d'exploitation, honoraires de gestion et réserves sont payés ;
comment se calcule la somme due au propriétaire ;
qui couvre un éventuel déficit et à quelle date cette obligation devient exigible.
L'entité qui encaisse les clients peut être différente de celle qui promet les 8 %. Il faut identifier les deux entités et lire les deux contrats.
Une promesse diffère d'une somme mise de côté ou d'une sûreté
Soutien
Ce qu'il peut ajouter
Ce qu'il faut tester
Engagement contractuel
Obligation directe
Solvabilité, défenses, juridiction, recours
Réserve de liquidités
Liquidité préfinancée
Propriété/contrôle, usage, montant, libération, reconstitution, insolvabilité
Compte séquestre (« escrow »)
Mécanisme de libération conditionnelle sous le contrôle d'un tiers
Compte, agent, conditions, frais, durée et droit applicable
Garantie bancaire
Paiement de la banque selon les termes de l'instrument
Émetteur, bénéficiaire, montant, expiration, appel, réductions
Garantie de la société mère ou d'un actionnaire
Recours contre une société liée
Pouvoir, plafond, durée, actifs, moyens de défense, opposabilité
Sûreté sur actif/droit
Priorité de recouvrement potentielle
Constitution/opposabilité, actif donné en garantie, priorités, valeur et réalisation de la sûreté
Assurance
Couverture des risques nommés
Assureur, bénéficiaire, exclusions, franchise, acceptation du sinistre
Aucune étiquette n'active automatiquement la protection. Une « réserve » sur le compte courant peut être dépensée. Une garantie expirant à la date prévue peut disparaître avant une livraison retardée. Un compte séquestre peut libérer des fonds sur des documents qui ne prouvent pas la qualité. Lisez les conditions de libération et d'appel.
Le rachat contractuel est un contrat de sortie, pas une valeur de revente
Il nécessite sa propre fiche de conditions :
titulaire de l'option et acheteur tenu de racheter ;
actif/droit racheté ;
fenêtre et notification ;
prix fixe, indexé, original, comptable ou formule ;
devise et paiement ;
état du bien et comptes ;
mobilier, réservations, personnel ;
accords, transfert et durée restante ;
taxes, frais, retenues ;
compensation, litiges et documents ;
sûreté/recours en cas de non-exécution.
« Nous aiderons à revendre avec 20 % de hausse » peut être du courtage, pas une obligation de rachat. « Rachat au prix initial » peut encore entraîner une perte après inflation, impôts, frais, change et perte de jouissance. À l'inverse, une option de vente correctement financée peut avoir de la valeur. Les clauses du contrat, et non l'étiquette commerciale, déterminent ce qu'il faut intégrer au modèle.
Exemple : 8 % pendant trois ans et rachat en cinquième année
Toutes les entités, proportions, dates et faits de cet exemple sont fictifs et purement illustratifs.
L'investisseur paie 500 000 USD. La présentation montre 40 000 USD annuels et un rachat à 600 000 USD en cinquième année.
Le dossier révèle :
PT Operator O, pas le détenteur foncier ni le promoteur, doit le paiement annuel.
La base exclut 75 000 USD de taxes, meubles et frais : 8 % de 425 000, soit 34 000 USD brut.
La promesse commence à l'ouverture opérationnelle, pas à la remise ; aucun paiement durant le retard.
Assurance propriétaire, grosses réparations et réserve sont déduites.
Le complément n'arrive qu'après rapprochement trimestriel ; suspension possible si licence perdue hors contrôle.
Aucune réserve ni garantie d'une société liée n'est prouvée. Le paiement est donc un risque de crédit sur PT Operator O, pas un rendement immobilier.
PT Developer D doit le rachat contractuel, dans une fenêtre de 30 jours et sous conditions d'usage/modifications.
Les 600 000 USD sont payables en IDR à un taux défini ; fiscalité, transfert et durée restante nécessitent encore un avis.
Cela ne rend pas automatiquement l'offre bonne ou mauvaise. Deux grands chiffres deviennent deux cocontractants et deux cas de risque mesurables.
Limites de cet examen
Il ne peut pas :
qualifier l'arrangement comme loyer, rendement, dividende, intérêt, service ou autre catégorie ;
prouver que le promoteur peut offrir un produit d'investissement particulier ;
vérifier comptes, réserves, sûretés ou signatures ;
décider de l'opposabilité d'une garantie ou d'un rachat contractuel ;
prédire occupation, ADR, coûts, réglementation, fiscalité, change ou revente ;
appliquer les protections du logement relatives à la promesse de vente (PPJB) à toute villa proposée sous bail de longue durée (« leasehold ») ;
rendre un compte séquestre ou une sûreté universellement obligatoires ;
recommander de poursuivre ou de refuser, ni donner un score global.
Vérifier l'entité qui paie avant de compter le pourcentage
Lisez
les rôles de l'opérateur et des parties au projet
avant d'accepter le terme « opérateur ». Conservez la garantie contractuelle comme un scénario de contrepartie distinct de l'exploitation propre de la villa. Examinez le rachat contractuel au regard de la
durée restante du bail et des hypothèses de sortie
, puis organisez les preuves du projet avec le
guide de due diligence immobilière à Bali
.
La question centrale n'est pas « 8 %, est-ce beaucoup ? ». C'est :
quels fonds doivent exister, dans quel compte, en vertu de quel document et à quelle date pour que l'investisseur reçoive le montant promis après coûts et impôts ?
Sources officielles et date de consultation
Sources officielles consultées le 15 juillet 2026.
Ancrages officiels utilisés seulement pour les limites du cadre :
Loi 40/2007 sur les sociétés : PDF officiel
, sous réserve de ses modifications et de l'avis actuel ;
PP 12/2021
pour le système logement/PPJB lorsqu'il s'applique ;
Permen PKP 18/2025
et les
SE 05
/
SE 06
de juillet 2026 pour le cadre logement dans son champ ;
PP 16/2021
pour les distinctions entre le bâtiment, l'autorisation de construire (PBG) et le certificat d'aptitude à l'usage (SLF).
Avant de compter le rendement promis, demandez à un avocat indonésien de qualifier la transaction et d'examiner les pouvoirs du débiteur, le contrat et son opposabilité. Obtenez des preuves financières à jour, identifiez les flux d'exploitation et d'encaissement, puis demandez à un fiscaliste indonésien de confirmer le traitement fiscal, les retenues, les factures et les paiements transfrontaliers. Confirmez les autorisations du bien et sa situation au regard des règles de construction, puis rouvrez les sources officielles à la date de décision. Ne présentez le rendement comme sécurisé, assuré ou protégé que si un professionnel compétent a examiné l'instrument exact et confirmé par écrit ce qu'il couvre, pour quel montant, pendant quelle durée et selon quelle procédure d'appel.
Prix, périmètre et prochain engagement
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Deux questions à explorer ensuite
Question liée
Est-il encore intéressant d'investir dans une villa à Bali en 2026 ?
Question liée
Avant le prochain paiement de chantier : quelles preuves demander ?
Modéliser cette décision dans la Stay Matrix
Ouvrir l'outil →
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
Achat sur plan à Bali : quels documents vérifier avant le prochain paiement ?
Qui possède, vend, construit, encaisse et exploite votre villa à Bali ?
Contexte publié
les rôles de l'opérateur et des parties au projet
Durée du bail et hypothèses de sortie

## Quel visa pour Bali en 2026 ? | DALLEAU

URL: https://dalleau.ai/fr/notes/bali-visa-guide.html

Accueil / Notes de terrain / Visas et titres de séjour

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Visas et titres de séjour Sources consultées le 13 juillet 2026

Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille

Le bon visa dépend d'abord de l'activité prévue en Indonésie : vacances, repérage, négociation, emploi, direction d'une société ou télétravail pour un employeur étranger. Ce guide distingue le droit d'entrer, le droit de séjourner, le droit de travailler et le statut d'investisseur. Chaque point important renvoie vers une source gouvernementale.

DALLEAU | Recherche et notes de terrain Publié le

13 juillet 2026

Dernière vérification

13 juillet 2026

Vérifié | 13 juillet 2026 | sources primaires

Périmètre Information indépendante, sans vente de visas DALLEAU ne vend pas de visas. Nous tenons ce dossier à jour parce que le statut migratoire détermine ce qu'une personne peut faire pendant la préparation, la direction ou l'exploitation d'un projet immobilier.

Point de départ Pour un court séjour, le visa électronique à l'arrivée (B1 e-VOA) est généralement l'option la plus simple pour les passeports éligibles. Le visa de visite personnelle de longue durée (C1) commence à 60 jours. Une réunion d'affaires n'est pas un emploi. Un emploi local exige normalement un titre de séjour professionnel et les démarches du ministère du Travail. Le visa investisseur (E28A) répond à des conditions précises et ne couvre pas toutes les tâches opérationnelles. Le visa de télétravail (E33G) concerne les missions confiées par une société établie hors d'Indonésie.

Règle de départ Choisir par activité

Sources Gouvernement uniquement

Vérification des sources Tous les 14 jours

Dans ce dossier Partir de l'activité, pas du surnom du visa Cinq autorisations à ne pas confondre Séjours courts : B1, C1, C2 et D2 Séjour personnel de plus de 180 jours : E33 Second Home Travailler en Indonésie Visa investisseur Travail à distance Ce qu'un agent peut et ne peut pas changer Notre hiérarchie de sources

Orientation personnalisée Quel visa correspond à votre séjour réel ?

Le questionnaire n'affiche que les questions utiles à votre situation. Il indique le visa à vérifier, ses conditions, ses limites, les prochaines étapes et les démarches éventuelles pour la famille. Aucune réponse n'est envoyée au serveur.

Quel est votre objectif principal ? Vacances ou famille Aucune activité professionnelle Séjourner plus longtemps ou préparer une installation Séjour personnel, recherche de logement ou visite de sites Réunions ou négociations Affaires sans emploi local Télétravailler pour une entreprise étrangère Activité et rémunération situées hors d'Indonésie Investir ou diriger ma société Actionnaire, directeur ou commissaire Travailler pour une entreprise ou des clients en Indonésie Emploi, clientèle ou prestations locales

Combien de temps voulez-vous rester ? 30 jours au plus Un seul séjour court De 31 à 60 jours Séjour personnel prolongé De 61 à 180 jours Avec prolongations si elles sont permises De 1 à 2 ans Un titre de séjour adapté est nécessaire Jusqu'à 5 ans Projet de long séjour

Qui vous accompagne ? Je viens seul Un seul statut à déterminer Je viens avec des proches Le statut de chacun doit être vérifié

Quel est le lien avec les personnes accompagnantes ? Conjoint marié Mariage légal documenté Enfant ou enfants L'âge et le statut du parent comptent Conjoint et enfants Le statut de chaque personne doit être vérifié Partenaire non marié Ne pas présumer le statut de personne à charge Autre proche Parent, enfant majeur ou autre relation

Quel âge ont les enfants accompagnants ? Tous ont moins de 18 ans L'âge exact et les actes de naissance restent à vérifier Au moins un a 18 ans ou plus Un statut distinct peut être nécessaire

Un lien familial peut-il justifier votre long séjour ? Je suis marié à un citoyen indonésien Piste E31A à vérifier Mon conjoint détient un titre temporaire ou permanent (ITAS/ITAP) Piste E31B à vérifier Mon parent détient un titre temporaire ou permanent (ITAS/ITAP) Piste E31E à vérifier Mon enfant détient un titre temporaire ou permanent (ITAS/ITAP) Piste E31H à vérifier Le titulaire principal a un Golden Visa ou Second Home Statut de personne à charge à vérifier Aucun de ces liens Tester Second Home ou retraite

Quel est l'âge du demandeur principal ? Moins de 55 ans Les catégories retraite ne sont pas retenues 55 ans ou plus Les catégories E33E et E33F peuvent être vérifiées

Quelle condition financière pouvez-vous documenter ? 130 000 USD dans une banque publique indonésienne Garantie E33 à maintenir Acheter en Indonésie un appartement d'au moins 1 000 000 USD Garantie E33 Second Home, pas un bien détenu à l'étranger 50 000 USD en banque et 3 000 USD par mois Piste E33E à partir de 55 ans 3 000 USD par mois et un garant Piste E33F d'un an à contrôler Aucune de ces conditions Afficher l'option la plus proche à vérifier

Que couvre l'option immobilière à 1 000 000 USD ?

La fiche E33 vise un rumah susun ou un appartement situé en Indonésie. Elle ne vise pas un logement détenu à l'étranger et ne confirme pas qu'une villa individuelle est recevable. La demande commence par un engagement d'achat, puis la preuve de propriété doit être déclarée au bureau d'immigration qui a délivré le titre de séjour temporaire (ITAS) dans les 90 jours suivant l'entrée. La page publique ne précise ni le titre accepté, ni la méthode d'évaluation, ni le traitement d'un appartement déjà détenu. Vérifiez ces points avant tout paiement ou signature.

Fiche E33 officielle Source gouvernementale consultée le 14 juillet 2026

Qui vous rémunère pour l'activité exercée sur place ? Personne Aucun travail ni service rémunéré Un employeur étranger Contrat de travail avec une société hors Indonésie Des clients ou plateformes étrangers Freelance, conseil ou création Ma propre société étrangère Sans contrat salarié clair Une personne ou société indonésienne Salaire, honoraires ou autre contrepartie

Quelles tâches exercerez-vous chaque semaine ? Travailler uniquement pour l'activité étrangère Aucun client ni opération indonésienne Réunions, visites et négociations Préparation du projet, sans travail opérationnel Décisions de directeur ou commissaire Gouvernance documentée Superviser ma société investie Production de biens ou services Réaliser moi-même les prestations Photo, accompagnement, vente, chantier ou exploitation Exploiter une activité locale au quotidien Personnel, clients, fournisseurs ou voyageurs

Quelle famille de fonction décrit le mieux le poste réel ? Direction ou expertise spécialisée Le titre et les tâches exactes doivent correspondre Photo, vidéo ou production créative Ne pas supposer que la fonction opérationnelle est ouverte Hôtellerie ou exploitation Distinguer direction, expertise et travail opérationnel Construction ou métier technique Le poste, les compétences et le secteur comptent Vente, administration ou ressources humaines Certaines fonctions sont réservées ou interdites aux étrangers Autre fonction Une revue du poste exact est nécessaire

Détenez-vous des parts dans la société garante ? Non ou sans objet Aucune société garante indonésienne Au moins 10 milliards IDR Parts documentées dans la société garante Moins de 10 milliards IDR Avec ou sans mandat de direction Je ne sais pas encore Structure ou valorisation à vérifier

Voir le visa à vérifier Recommencer

Dossiers détaillés déjà disponibles

Arrivée en Indonésie Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ?

Préparez votre arrivée à Bali : e-VOA, déclaration All Indonesia, sas automatiques, prolongation et erreurs courantes, d'après les sources officielles.

Lire le dossier Autorisation de travail Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

Comprenez le visa, le titre de séjour, le plan d'emploi, la contribution employeur et les règles de poste pour travailler légalement en Indonésie.

Lire le dossier Visa investisseur KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Règles officielles de l'E28A : participation de 10 milliards IDR, garant, fonctions de direction autorisées, durée du séjour et limites de travail.

Lire le dossier Travail à distance Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026

Vérifiez les conditions officielles de l'E33G : employeur étranger, revenu annuel de 60 000 USD, séjour d'un an, sans garant ni rémunération indonésienne.

Lire le dossier

Partir de l'activité, pas du surnom du visa

Le répertoire officiel des visas indonésiens contient de nombreuses catégories parce que les activités n'ont pas les mêmes conséquences juridiques. Commencez par décrire ce que vous prévoyez de faire en Indonésie, puis choisissez la catégorie qui couvre cette activité et cette durée.

Activité principale

Premier statut à vérifier

Ce que ce statut ne règle pas

Vacances, famille ou transit

Visa électronique à l'arrivée (B1 e-VOA) ou visa à l'arrivée (VoA), si le passeport est éligible

Emploi, prestations locales ou rémunération indonésienne

Séjour personnel plus long et repérage

Visa de visite personnelle (C1)

Exploitation quotidienne d'une société ou emploi local

Réunions, négociations et contrats

C2 pour une entrée, D2 pour des voyages répétés

Emploi, vente directe ou supervision opérationnelle continue

Emploi en Indonésie

Catégorie de travail correspondant à la fonction réelle, qui peut être E23, E25 ou un autre code actuel, plus les démarches requises auprès du ministère du Travail

Travail hors du poste, de l'employeur ou du lieu autorisé

Investissement et rôle qualifiant dans la société

Visa investisseur (E28A), si ses conditions actuelles sont remplies

Droit général d'effectuer toutes les tâches quotidiennes

Travail à distance pour un employeur étranger

Visa de télétravail (E33G), si le contrat et les revenus répondent aux critères

Clients indonésiens, rémunération indonésienne ou exonération fiscale

Ce tableau oriente. La catégorie exacte doit être revérifiée sur le portail eVisa officiel avant tout paiement.

Cinq autorisations à ne pas confondre

L'autorisation d'entrée. Le visa ou l'exemption détermine si une personne peut entrer et pour quel motif.

Le titre de séjour. Le titre de visite (ITK), le titre de séjour temporaire (ITAS) ou le titre de séjour permanent (ITAP) détermine le statut migratoire après l'entrée. KITAS est une ancienne appellation encore courante du titre temporaire. Ce n'est pas, à lui seul, une autorisation générale de travailler.

L'autorisation liée à l'emploi. Lorsqu'un étranger est employé en Indonésie, l'employeur suit normalement une procédure distincte auprès du ministère du Travail, notamment l'approbation du plan d'utilisation d'un travailleur étranger (RPTKA) lorsqu'elle s'applique.

Le statut dans la société. Détenir des parts, siéger au conseil et accomplir des tâches opérationnelles quotidiennes ne sont pas automatiquement la même activité.

Les droits immobiliers et d'exploitation. Aucun visa ne décide qui détient le terrain, si un bail est solide, si le bâtiment est autorisé ou si des nuitées peuvent être vendues légalement.

Un visa peut rendre un séjour régulier. Il ne répare pas un mauvais montage foncier, ne légalise pas une villa sans autorisation et ne transforme pas un statut investisseur en tout type d'emploi.

Séjours courts : B1, C1, C2 et D2

La fiche B1 décrit une visite à entrée unique de 30 jours au plus, prolongeable une fois dans une limite totale de 60 jours, pour les voyageurs éligibles. Elle couvre le tourisme, la famille, le transit et la participation à des réunions, incentives, conventions et expositions. Ce n'est pas une voie d'emploi.

La fiche C1 commence à 60 jours et indique que les prolongations peuvent porter le total à 180 jours. Cette page officielle cite également certaines activités précommerciales : discussion, négociation, signature d'accords et visite d'un site d'investissement. La FAQ eVisa associée à cette voie est plus étroite et ne cite pas ces interactions commerciales. Si les affaires constituent le motif principal, le C2 est la catégorie la plus claire. Vérifiez le portail à jour avant de retenir le C1. Aucun de ces textes n'autorise une prestation rémunérée ou la vente de services en Indonésie.

Pour une visite principalement consacrée aux affaires, le C2 est à entrée unique et le D2 à entrées multiples. Un D2 valable un, deux ou cinq ans ne donne pas un séjour continu de cette durée. La fiche actuelle indique 60 jours au plus à chaque arrivée, sous réserve des règles de prolongation.

Séjour personnel de plus de 180 jours : E33 Second Home

La fiche officielle E33 Second Home , revérifiée le 14 juillet 2026, décrit actuellement un séjour de cinq ans au maximum. Elle prévoit deux garanties migratoires alternatives :

Conserver au moins 130 000 USD sur un compte au nom du demandeur dans une banque publique indonésienne.

S'engager à acheter en Indonésie un rumah susun ou appartement d'une valeur minimale de 1 000 000 USD.

L'option immobilière ne concerne pas un logement détenu dans le pays de résidence du demandeur. La procédure publiée commence par un engagement d'achat. La preuve de propriété doit ensuite être déclarée au bureau d'immigration qui a délivré le titre de séjour temporaire (ITAS) dans les 90 jours suivant l'entrée. La valeur de la garantie doit être maintenue pendant la validité du titre de séjour.

La page publique ne confirme pas qu'une villa individuelle est recevable. Elle ne définit pas non plus le titre immobilier accepté, la preuve de valeur ou le traitement d'un appartement déjà détenu avant la demande. Le visa E33 ne remplace pas les règles indonésiennes de détention immobilière. Ces points doivent être confirmés sur le portail eVisa à jour avant tout paiement, réservation ou signature.

La fiche E33 indique que la famille éligible peut accompagner le titulaire sous réserve des règles migratoires. Il ne s'agit pas d'une demande unique couvrant tout le foyer. Le portail affiche un parcours distinct Family Dependant for Secondhome Visa. Le dossier du titulaire principal et le statut de chaque personne accompagnante doivent donc être vérifiés séparément.

Travailler en Indonésie

Le droit de l'immigration et le droit du travail imposent deux séries de règles complémentaires. La fiche E23 ne contient actuellement aucune donnée publique détaillée. Une FAQ officielle distincte affiche des durées de 180 jours, un an ou deux ans, mais ne montre aucun code visa. Elle ne peut donc pas être attribuée d'office au E23. La catégorie exacte peut être E23, E25 ou un autre code actuel. Le droit du travail encadre séparément le recours de l'employeur à un travailleur étranger.

Lire l'explication complète : Travailler légalement à Bali : E23, ITAS et RPTKA .

Visa investisseur

La fiche E28A autorise l'investissement, la création d'entreprise et certaines activités de directeur ou commissaire dans la société où la personne a investi. Elle demande actuellement la preuve d'au moins 10 milliards IDR de parts dans la société garante. Si la participation est inférieure et que la personne occupe un poste de directeur ou commissaire, la fiche renvoie vers le visa de travail correspondant au poste.

Ce seuil est une condition d'immigration. Il ne doit pas être présenté comme une exemption générale aux règles du ministère du Travail ni comme l'autorisation de tout faire dans une villa. Lire Visa investisseur E28A : activités autorisées et limites .

Travail à distance

La fiche E33G prévoit actuellement un titre temporaire d'un an pour les missions confiées par une société établie hors d'Indonésie. Elle exige un contrat de travail étranger et la preuve d'au moins 60 000 USD de salaire ou de revenu annuel. La FAQ officielle exclut les rémunérations indonésiennes.

Le texte ne dit pas que tout indépendant, consultant ou prestataire disposant de clients étrangers est éligible. Il ne tranche pas non plus la résidence fiscale. Lire Visa E33G pour télétravailler depuis Bali : conditions et limites .

Ce qu'un agent peut et ne peut pas changer

Un agent peut préparer un dossier, utiliser un compte garant lorsqu'il est requis et assurer le suivi administratif. Il ne peut pas élargir les activités autorisées par la catégorie choisie. Pour le B1, l'administration propose une demande directe. Avant de payer un tiers, il faut contrôler le domaine, le numéro de dossier, les frais et le code visa sur le portail officiel.

Notre hiérarchie de sources

Nous utilisons d'abord la fiche actuelle correspondant au code visa, puis la FAQ eVisa et enfin le texte réglementaire pour les questions de travail. Lorsque deux pages officielles se contredisent, nous publions l'incohérence et retenons la lecture la plus prudente. La date change uniquement après une nouvelle consultation des sources liées.

Ce que cela change pour un projet immobilier

Si la question de visa accompagne l'achat d'un terrain, la construction d'une villa ou l'exploitation d'un hébergement, elle doit être traitée avec les autres volets du projet. Le statut migratoire ne règle ni la détention, ni le zonage, ni les licences, ni la fiscalité, ni le droit de louer en courte durée.

Limite : Cette synthèse est une information générale, pas un conseil juridique, migratoire, fiscal ou professionnel. Vérifiez la fiche officielle correspondant à votre passeport et à votre activité avant de payer ou de voyager.

Sources gouvernementales

01 Daftar Visa Indonesia Direction générale de l'immigration de la République d'Indonésie · Annuaire des visas · consulté le 13 juillet 2026

02 Portail officiel des visas électroniques pour l'Indonésie Direction générale de l'immigration de la République d'Indonésie · Portail de demande · consulté le 13 juillet 2026

03 B1 Visa Kunjungan Wisata Direction générale de l'immigration de la République d'Indonésie · B1 · consulté le 13 juillet 2026

04 C1 Visa Kunjungan Wisata Direction générale de l'immigration de la République d'Indonésie · C1 · consulté le 13 juillet 2026

05 Informations générales sur le visa de visite touristique Direction générale de l'immigration de la République d'Indonésie · FAQ eVisa relative au visa C1 · consulté le 13 juillet 2026

06 C2 Visa Kunjungan Bisnis Direction générale de l'immigration de la République d'Indonésie · C2 · consulté le 13 juillet 2026

07 D2 Visa Kunjungan Bisnis Direction générale de l'immigration de la République d'Indonésie · D2 · consulté le 13 juillet 2026

08 E23 Visa Kerja Direction générale de l'immigration de la République d'Indonésie · E23 · consulté le 13 juillet 2026

09 Informations générales sur le visa de travail Direction générale de l'immigration de la République d'Indonésie · Informations générales sur le séjour de travail, code non affiché · consulté le 13 juillet 2026

10 E28A Visa Investor Direction générale de l'immigration de la République d'Indonésie · E28A · consulté le 13 juillet 2026

11 E31A Visa Keluarga Penyatuan Keluarga dengan Suami atau Istri WNI Direction générale de l'immigration de la République d'Indonésie · E31A · consulté le 13 juillet 2026

12 E31B Visa Keluarga Penyatuan Keluarga dengan Pemegang ITAS atau ITAP Direction générale de l'immigration de la République d'Indonésie · E31B · consulté le 13 juillet 2026

13 E31E Visa Keluarga Anak dari Pemegang ITAS atau ITAP Direction générale de l'immigration de la République d'Indonésie · E31E · consulté le 13 juillet 2026

14 E31H Visa Keluarga Orang Tua dari Pemegang ITAS atau ITAP Direction générale de l'immigration de la République d'Indonésie · E31H · consulté le 13 juillet 2026

15 E33 Visa Rumah Kedua Direction générale de l'immigration de la République d'Indonésie · E33 · consulté le 13 juillet 2026

16 E33E Visa Rumah Kedua Lansia Mancanegara Direction générale de l'immigration de la République d'Indonésie · E33E · consulté le 13 juillet 2026

17 E33F Visa Rumah Kedua Lansia Mancanegara dengan Penjamin Direction générale de l'immigration de la République d'Indonésie · E33F · consulté le 13 juillet 2026

18 E33G Visa Rumah Kedua Pekerja Jarak Jauh Direction générale de l'immigration de la République d'Indonésie · E33G · consulté le 13 juillet 2026

Dates des sources : page mise à jour le 13 juillet 2026 . Prochaine vérification prévue le 27 juillet 2026 .

Décisions liées

Arrivée en Indonésie Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ? Autorisation de travail Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi Visa investisseur KITAS investisseur en Indonésie : que permet vraiment le visa E28A ? Travail à distance Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026

Projet immobilier Vous préparez aussi un projet immobilier ?

Nous ne vendons pas de visas. Si votre installation comprend aussi un terrain, une villa ou un actif à exploiter, indiquez-nous le lieu, le budget, l'usage et le calendrier. Nous pourrons dire honnêtement si un premier échange sur le projet est utile.

Présenter un projet immobilier

Sources officielles 13 juillet 2026

Les liens gouvernementaux ont été consultés à cette date. Lorsque les pages officielles diffèrent, le dossier le signale et retient la lecture la plus prudente.

Consulter les sources

Deux questions à explorer ensuite

Question liée KITAS investisseur en Indonésie : que permet vraiment le visa E28A ? Question liée Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Harmonie : du chantier à l’exploitation | DALLEAU

URL: https://dalleau.ai/fr/notes/building-harmonie.html

← notes retour de terrain 4 février 2026 Reprendre et achever un chantier à Bali : les leçons du projet Harmonie

Harmonie est la résidence qui a façonné notre méthode actuelle. Trois villas en duplex occupent une parcelle de 1 100 m² prise à bail à Seminyak. Elles ont accueilli leurs premiers clients à l'été 2024. Ce retour présente les choix réussis, les défauts apparus et les corrections apportées depuis.

1 100 m² parcelle prise à bail à Seminyak, soit 11 ares

3 villas en duplex réunies dans une même résidence

300 à 320 m² surface intérieure utile par villa dans les plans internes

15 mois chantier principal, avant l'ameublement et la mise en service

Été 2024 premiers séjours

Livrée et en exploitation continuité documentée du chantier à la livraison et à l’exploitation actuelle

DALLEAU | Recherche et notes de terrain Publié le

4 février 2026

Dernière vérification

20 juillet 2026

Vérifié | 20 juillet 2026 | archives de projet et sources primaires

En bref Harmonie est livrée et en exploitation. Sa valeur publique réside ici dans un dossier circonscrit des décisions prises du chantier à la livraison puis à l’exploitation, y compris les défauts et leurs corrections. Aucune performance mesurée ou commerciale n’est publiée.

François s'est impliqué dans Harmonie au stade des fondations et a repris l'entière direction du projet pendant le coulage de la dalle du deuxième étage. Il a ensuite dirigé la suite du chantier, l'ouverture et, avec l'équipe, l'exploitation actuelle. Cette chronologie compte : Harmonie n'a pas été conçue dès l'origine sous la direction de DALLEAU.

La parcelle d'Harmonie a été sécurisée par un bail de longue durée en 2022. La construction et les finitions ont pris environ quinze mois. L'ameublement, l'installation et une phase d'essai ont précédé les premiers séjours de l'été 2024. Depuis, l'exploitation fournit un historique concret des décisions qui fonctionnent sur plan et de celles qui résistent à l'usage quotidien.

Harmonie est livrée et en exploitation. Le dossier public se limite à la continuité documentée du chantier à la livraison et à l’exploitation actuelle, avec les décisions, les défauts et leurs corrections. Aucune performance mesurée ou commerciale n’est publiée.

Les choix que nous conserverions

Trois identités, un même niveau de confort

Villa Soluna, Concrete Serenity et Casa Diplomatico présentent trois univers : minimalisme apaisé, béton apparent et couleurs méditerranéennes. Le cahier des charges pratique reste commun, avec des pièces à vivre fermées et climatisées, une piscine privée, de grands espaces communs, une équipe sur place et un système d’eau multibarrière documenté au-delà du nombre d’étapes . Le client choisit une atmosphère sans renoncer au confort essentiel.

Des villas privées qui peuvent former une seule résidence

Chaque villa possède son entrée. Un client peut en réserver une seule, tandis qu'un groupe plus important peut privatiser l'ensemble. Le hall, l'arrivée et l'équipe servent les deux formats. Cette souplesse s'est révélée plus utile que la duplication de tous les espaces de service dans chaque bâtiment.

Des équipements discrets qui améliorent le séjour

La ressource, le traitement et la vérification de l’eau , la climatisation, les rangements, les circuits du personnel et les accès d'entretien apparaissent rarement sur les photos. Ils influencent pourtant chaque journée. Harmonie nous a appris à définir ces systèmes dès le début, puis à vérifier leur usage par les clients et l'équipe.

Les problèmes qui ont changé notre méthode

L'étanchéité n'était pas homogène sur l'ensemble du site et le drainage n'avait pas reçu assez d'attention au début du projet. Les défauts sont apparus après la livraison, lorsque les fortes pluies et l'exploitation quotidienne ont éprouvé les bâtiments. Les reprises ont coûté davantage et perturbé plus longtemps la résidence qu'un meilleur plan de contrôle et de garantie.

Nous ne nommons pas le prestataire. L'enseignement porte sur la méthode. Les références doivent désormais être vérifiées auprès d'anciens clients ; le drainage et l'étanchéité font l'objet de points de contrôle définis ; les garanties sont écrites ; et les paiements suivent la réception des travaux à chaque étape plutôt qu'un simple calendrier.

Ce que nous modifierions sur la prochaine résidence

Commencer par l'eau. Le drainage, l'étanchéité, la récupération des eaux de pluie et les accès d'entretien doivent être réglés avant le choix des finitions.

Partager les équipements utiles à toutes les villas. Selon le terrain et la demande, une salle de soins, un sauna, un bain froid, un café, un salon ou un espace de travail peuvent servir plusieurs villas plus efficacement que des installations séparées. Leur coût, leur personnel et leur demande doivent néanmoins être étudiés séparément.

Accorder plus de place à l'arrivée et au stationnement. Le hall d'Harmonie fonctionne, mais l'accès des véhicules et la première impression pourraient mieux correspondre aux groupes reçus aujourd'hui.

Tester l'exploitation avant l'ouverture complète. Une courte phase d'essai révèle les circuits du ménage, les retards à l'arrivée, les accès de maintenance et les besoins de formation avant les séjours au plein tarif.

Inscrire les contrôles dans le contrat. Des inspections indépendantes et des critères de réception documentés complètent désormais le projet architectural et le prix.

Coût du terrain : un comparable interne, pas un indice de marché

Le dossier de bail indique environ 18 millions IDR par are et par an lorsque la parcelle a été sécurisée en 2022. Un terrain voisin étudié dans le dossier du projet en 2025 se négociait entre 32 et 35 millions IDR par are et par an. L'écart nominal se situe autour de 78 % à 94 %. Il s'agit d'une seule comparaison locale, pas d'une expertise indépendante ni d'une mesure de l'ensemble du marché de Seminyak.

Le change réduit l'écart pour un propriétaire qui raisonne en euros. La série annuelle EUR/IDR de la Banque centrale européenne s'établissait en moyenne autour de 15 600 IDR pour un euro en 2022. La série de référence de Bank Indonesia pour les devises hors dollar se situait autour de 20 666 IDR pour un euro le 10 juillet 2026. Avec ces deux repères, 18 millions IDR représentent environ 1 154 EUR et 32 à 35 millions IDR environ 1 549 à 1 694 EUR. La progression indicative en euros se situe donc autour de 34 % à 47 %, avant impôts, frais de transaction et différences entre les parcelles.

Ce calcul rapproche un contrat de bail interne d'un comparable voisin interne au moyen de taux de change publics. Il ne mesure pas la plus-value d'un droit foncier enregistré et ne constitue pas un indice des terrains à Bali.

La conformité doit entrer dans le programme de construction

Le cadre national actuel comprend notamment le règlement gouvernemental 28/2025 et le règlement du ministère du Tourisme 6/2025 . L'ordre des démarches dépend de la société, du lieu, du bâtiment et de l'activité. L'enseignement pratique d'Harmonie consiste à aligner le zonage, les autorisations de construire, la classification de l'activité et les autorisations d'exploitation avant que le chantier ne rende une correction coûteuse.

Les mandats suivants ont repris les mêmes contrôles : références des prestataires vérifiées, gestion de l'eau traitée tôt, inspections par étapes, phase d'essai et distinction claire entre l'architecture visible et les systèmes qui assurent le fonctionnement quotidien.

Dernière relecture : 20 juillet 2026.

Explorer le dossier visuel : Harmonie pendant le chantier, après livraison et en exploitation · Comprendre le bail de longue durée à Bali · Les équipements partagés d'une résidence privée

Sources contrôlées le 20 juillet 2026 : bail, plans et dossiers de chantier internes d’Harmonie ; règlement gouvernemental 28/2025 ; et règlement du ministère du Tourisme 6/2025 . Harmonie est livrée et en exploitation. Aucune performance mesurée ou commerciale n’est publiée. Signaler une correction .

Deux questions à explorer ensuite

Question liée Dans une résidence de villas à Bali, faut-il partager ou privatiser les équipements ? Question liée Est-il encore intéressant d'investir dans une villa à Bali en 2026 ?

Modéliser cette décision dans la Stay Matrix Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Sortir de l’argent d’une PT PMA : voies et fiscalité | DALLEAU

URL: https://dalleau.ai/fr/notes/comment-argent-sort-pt-pma.html

société et fiscalité
Comment sortir légalement de l'argent d'une PT PMA ? Sept méthodes et leur fiscalité
Posséder une société indonésienne à capitaux étrangers (PT PMA) ne signifie pas posséder personnellement l'argent détenu sur son compte bancaire.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
16 juillet 2026
Vérifié | 16 juillet 2026 | sources primaires
Mis à jour le 16 juillet 2026
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Posséder une société indonésienne à capitaux étrangers (PT PMA) ne signifie pas posséder personnellement l'argent détenu sur son compte bancaire.
Cet argent appartient à la société. L'actionnaire possède des actions de la société.
L'argent peut passer de la société à l'actionnaire, mais uniquement par une opération ayant un fondement juridique réel : dividende, remboursement d'une dette, rémunération d'un travail, paiement d'un service, réduction formelle du capital ou distribution de liquidation. L'actionnaire peut aussi recevoir le prix de vente de ses actions. Dans ce cas, c'est normalement l'acheteur, et non la société, qui le paie.
Changer le libellé d'un virement ne change ni la nature juridique ni la fiscalité.
Les voies de paiement légales
Avant de demander « quel est le taux ? », posez quatre questions :
À qui appartient l'argent aujourd'hui ?
À la PT PMA, à l'actionnaire ou à un acheteur ?
Pourquoi est-il versé ?
Bénéfice, dette, travail, service, achat d'actif, achat d'actions ou remboursement de capital ?
Quel acte l'autorise ?
Contrat, décision de l'assemblée générale des actionnaires (RUPS), paie, acte de cession, procédure de réduction de capital ou liquidation ?
Quelles preuves existaient avant le paiement ?
Comptes, bénéfices distribuables, prêt, facture, valorisation, certificat de résidence et déclaration de retenue ?
Si les réponses ne sont pas claires, ne faites pas d'abord le virement pour tenter de le documenter ensuite.
Les sept voies en un coup d'œil
Voie
Premier bénéficiaire
Fondement juridique
Point de départ fiscal indonésien
Dividende
Actionnaire
Bénéfices distribuables et décision correcte de RUPS
PPh 26 statutaire de 20 % brut pour un non-résident ; convention possible si conditions et documents remplis
Remboursement de prêt d'actionnaire
Prêteur/actionnaire
Prêt réel antérieur et principal restant dû
Séparer principal et intérêts ; les intérêts ont leur propre retenue et analyse de déductibilité
Salaire/rémunération/honoraires
Personne ou prestataire
Nomination/autorisation et travail ou service réel à prix de pleine concurrence
PPh 21, PPh 23 ou PPh 26 selon statut et service ; immigration séparée
Vente d'un actif de la société
PT PMA
La société vend son actif
Fiscalité au niveau société/transaction ; pour terrain/bâtiment, commencer par l'analyse PP 34
Vente d'actions
Actionnaire vendeur
Acte de cession et mises à jour sociales
Pour un vendeur étranger d'actions non cotées : traitement de référence en droit interne pouvant équivaloir à 5 % du montant brut, sous réserve de la convention
Réduction de capital
Actionnaire
RUPS, protection des créanciers et étapes ministérielles
Dépend de l'historique capital/bénéfices et de la procédure ; pas automatiquement exonéré
Liquidation
Actionnaire après les créanciers
Dissolution et liquidation formelles
Le surplus au-delà du capital versé peut relever du dividende ; impôts de société/transaction d'abord
PPh 21, PPh 23 et PPh 26 désignent des mécanismes indonésiens d'impôt sur le revenu applicables à des bénéficiaires et paiements différents. Le tableau ne donne que des points de départ. Le résultat exact dépend des comptes, des parties, de leur résidence fiscale, de la convention applicable, des documents, des dates et de l'opération.
1. Le dividende : distribuer un bénéfice, pas retirer de la trésorerie
Le dividende est la voie naturelle lorsque la société dispose d'un bénéfice distribuable et que les actionnaires le distribuent correctement.
Le droit des sociétés distingue bénéfice et trésorerie. RUPS décide de l'affectation du résultat, les réserves légales doivent être prises en compte, et le dividende exige un solde bénéficiaire positif. Un compte bancaire bien rempli ne crée pas de bénéfices non distribués : l'argent peut provenir du capital, d'un prêt, d'une avance client ou de la vente d'un actif.
Pour un dividende versé à un actionnaire non-résident, le point de départ statutaire est une retenue PPh 26 de 20 % du brut. Une convention fiscale peut réduire ce taux seulement si le bénéficiaire est éligible, bénéficiaire effectif, satisfait les règles anti-abus et remet les documents actuels via l'agent payeur indonésien.
Le dividende intérimaire n'est possible que sous des conditions protectrices et peut devoir être remboursé si l'exercice se termine en perte. Ce n'est pas un prélèvement informel du propriétaire.
Preuves :
comptes approuvés, tableau du résultat et des réserves, décision RUPS, registre des actionnaires, Form DGT/résidence, retenue et banque.
2. Le prêt d'actionnaire : rembourser la dette qui existe
Si l'actionnaire a prêté des fonds à la PT PMA, sous un accord antérieur et avec une dette enregistrée, le remboursement du principal est différent du paiement d'intérêts ou de la distribution d'un bénéfice.
le
principal
réduit la dette comptabilisée ;
l'
intérêt
est un revenu du prêteur avec sa propre analyse de retenue, convention et déductibilité.
Pour des intérêts versés à un non-résident, le point de départ PPh 26 est 20 % du brut, sauf avantage conventionnel applicable. Le taux entre parties liées doit correspondre à celui que pratiqueraient des parties indépendantes. La règle indonésienne de ratio dette/capitaux propres peut limiter la déductibilité des coûts d'emprunt, en général avec un maximum de 4:1 pour les sociétés ordinaires concernées. Elle ne signifie pas qu'un principal au-delà de ce ratio ne peut juridiquement jamais être remboursé.
Le signal d'alerte est un « remboursement de prêt » sans contrat signé, virement entrant, grand livre, modalités d'intérêt ou solde antérieurs au paiement.
Preuves :
contrat daté, approbation, banque, confirmations et grand livre, échéancier principal/intérêts, prix de pleine concurrence, retenue et convention.
3. Salaire, rémunération de dirigeant et honoraires : payer un travail réel
Un actionnaire peut aussi être dirigeant, salarié ou prestataire. Cela ne rend pas tous les paiements déductibles ni interchangeables avec un dividende.
La rémunération d'un dirigeant exige l'autorisation sociale prévue par la loi. La rémunération d'emploi relève du dispositif PPh 21 selon le statut fiscal de la personne. Certains services domestiques de gestion, techniques ou de conseil relèvent du PPh 23 ; des services de source indonésienne payés à un non-résident peuvent relever du PPh 26, sous réserve de l'établissement stable et de la convention.
Il faut vérifier : réalité du travail, nomination ou contrat, autorisation de travail/immigration, montant de pleine concurrence, lieu et substance du service, livrables et cohérence des factures avec l'activité enregistrée.
Des honoraires de gestion forfaitaires facturés par une holding étrangère sans équipe ni livrable ne constituent pas un substitut sûr au dividende.
Une management fee n'est pas une méthode de distribution du bénéfice
Une PT PMA peut recevoir le paiement d'une autre société indonésienne pour une véritable prestation, un droit sur un actif, un financement ou une autre transaction licite. Le montant doit suivre cette transaction. Le bénéfice résiduel du payeur ne peut pas devenir une charge de management simplement parce que les parties préfèrent placer l'argent dans la PT PMA.
Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule.
4. Vente d'actif : la société reçoit le prix
Lorsque la PT PMA vend un actif qui lui appartient, le prix appartient à la PT PMA. Le financement historique de l'actif par un actionnaire ne redirige pas le paiement de l'acheteur vers cet actionnaire.
Pour un transfert de droits sur terrain/bâtiment couvert par le règlement gouvernemental n° 34 de 2016, le point de départ général est un impôt final de 2,5 % de la valeur brute, avec d'autres taux ou exceptions pour certaines catégories. Il faut aussi revoir le droit exact transféré, la TVA, la valorisation, les parties liées et les autres charges. Pour d'autres actifs, le gain entre en principe dans le revenu imposable de la société, sauf régime spécial/final.
Après la vente, la société peut payer impôts et créanciers, rembourser une dette réelle et distribuer un bénéfice éligible. Ce sont des opérations distinctes avec des documents distincts.
5. Vente d'actions : l'actionnaire reçoit le prix
Dans une cession d'actions, l'actionnaire vend ses titres à un acheteur. Le prix revient normalement au vendeur ; ce n'est pas un chiffre d'affaires ni une nouvelle trésorerie de la PT PMA.
L'acte de cession, le registre des actionnaires, les autorisations et la notification au ministère doivent être traités. Les statuts peuvent prévoir un droit de préemption ou des accords supplémentaires ; le bénéficiaire effectif doit aussi être mis à jour si nécessaire.
Pour un actionnaire étranger vendant des actions non cotées d'une société indonésienne, le traitement de référence en droit interne au titre du PPh 26, couramment décrit par la Direction générale des impôts indonésienne (DJP), correspond à 20 % d'un revenu net réputé égal à 25 % du prix brut, soit effectivement 5 % du brut. Ce n'est pas automatiquement le résultat final : une convention peut modifier le droit d'imposer, et une clause de société à prépondérance immobilière peut être déterminante à Bali.
6. Réduction de capital : une opération sociale formelle
Le capital versé n'est pas un portefeuille que l'actionnaire peut remplir et vider à volonté.
Une réduction exige une décision RUPS et une procédure de protection des créanciers : publication, délais d'opposition et formalités ministérielles. La fiscalité ne suit pas le libellé bancaire. Certaines restitutions financées par des bénéfices peuvent entrer dans la définition du dividende, tandis qu'une réduction valable exige de retracer le capital versé et l'historique des capitaux propres.
Prime d'émission, bénéfices accumulés, restructurations antérieures et base de l'actionnaire peuvent changer le résultat. Un juriste et un conseiller fiscal indonésien qualifié doivent intervenir avant la résolution, pas seulement avant le virement.
7. Liquidation : créanciers d'abord, actionnaires en dernier
La dissolution ne permet pas aux actionnaires de vider le compte. La société entre en liquidation. Le liquidateur recense les actifs et dettes, informe les créanciers, vend les actifs, paie impôts et dettes, distribue le solde, puis termine les notifications.
Le produit de liquidation supérieur au capital versé peut relever de la notion de dividende. Les ventes d'actifs pendant la liquidation peuvent elles-mêmes créer une fiscalité au niveau de la société avant toute distribution.
Exemple 1 : la PT PMA vend un actif lié à l'immobilier pour Rp20 milliards
L'acheteur paie la PT PMA, qui est le vendeur.
La société détermine si PP 34 s'applique au droit transféré ; le point de départ général est 2,5 % du brut lorsque la règle s'applique.
Elle règle impôts, frais de transaction, dettes et comptabilise la cession.
Elle peut rembourser un principal de prêt dû, en séparant les intérêts.
Elle ne distribue que les bénéfices éligibles, par dividende approuvé avec retenue/convention.
Les Rp20 milliards ne deviennent pas l'argent de l'actionnaire à l'étape 1.
Exemple 2 : l'actionnaire étranger vend ses actions pour Rp20 milliards
L'acheteur paie l'actionnaire vendeur.
L'acte, le registre, les autorisations et les déclarations sont mis à jour.
Le traitement de référence en droit interne pour une vente d'actions non cotées peut équivaloir à 5 % du brut, mais la convention et une éventuelle clause immobilière sont analysées avant la signature.
La PT PMA ne reçoit pas les Rp20 milliards, sauf financement séparé prévu dans la transaction.
Même prix affiché ; vendeur, propriétaire des fonds, documents, base fiscale et créanciers différents.
Une convention fiscale n'est pas une table de taux par pays
« L'actionnaire réside à Singapour/en France/aux Émirats, donc le taux est X % » est une analyse incomplète.
La procédure indonésienne actuelle peut examiner : résidence fiscale et Form DGT, forme juridique, bénéficiaire effectif, dirigeants/personnel/actifs/activité réelle, pourcentage de détention, durée de détention, établissement stable, prépondérance immobilière, limitation des avantages et test de l'objet principal.
L'analyse doit être faite avant le paiement. Une documentation absente peut conduire à appliquer la retenue statutaire même si un allègement pouvait théoriquement être demandé.
Le rapatriement est l'étape finale du paiement, pas sa nature juridique
La loi indonésienne sur l'investissement reconnaît le droit de transférer ou rapatrier des devises pour le capital, les bénéfices/dividendes, remboursements de prêt, honoraires et produits de vente ou liquidation. Ce droit reste soumis au droit indonésien, aux impôts et déclarations, à la protection des créanciers et à certains blocages juridiques.
La banque applique également ses contrôles d'identité du client et de lutte contre le blanchiment (KYC/AML). La liste exacte est propre à la banque et à l'opération, mais la société doit pouvoir prouver le fondement social, la fiscalité et l'identité du bénéficiaire.
La fiche à préparer avant tout paiement
Payeur et propriétaire juridique des fonds.
Bénéficiaire et résidence fiscale.
Nature et montant, avec séparation principal/intérêts.
Autorisation sociale et contrat.
Écriture comptable et origine des fonds.
Base fiscale, taux et agent de retenue indonésiens.
Article conventionnel, conditions et documents DGT/résidence.
Justification de pleine concurrence.
Travail/immigration si rémunération ou service.
Dossier bancaire et responsable des déclarations.
Si un virement semble relever de deux voies, arrêtez-vous. La bonne réponse n'est pas de choisir l'étiquette la moins chère, mais d'établir ce qui s'est passé.
Sources officielles
Loi n° 40 de 2007 sur les sociétés
;
texte consolidé de l'impôt sur le revenu
;
PMK 112/2025 sur les conventions
;
guide DJP PPh 26
;
PMK 169/2015 sur le ratio dette/capitaux propres
;
PMK 172/2023 sur les prix de transfert
;
cadre PPh 21 actuel
;
guide DJP PPh 23/26
;
PP 34/2016
;
loi n° 25 de 2007 sur l'investissement
.
Information générale uniquement. Ce texte n'est pas un conseil juridique, fiscal, comptable, conventionnel, bancaire, d'immigration ou d'investissement. Obtenez un avis indonésien propre à l'opération avant d'autoriser ou d'envoyer un paiement.
Deux questions à explorer ensuite
Question liée
PT PMA : faut-il verser 10 milliards IDR dès la création ?
Question liée
PT PMA, prête-nom ou bail à Bali : qui détient réellement vos droits ?
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Website
Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité.
En savoir plus
S'abonner
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
PT PMA : faut-il verser 10 milliards IDR dès la création ?
capital de la PT PMA et obligations de suivi
Sept vérifications avant de verser un acompte immobilier à Bali

## Votre villa à Bali est publiée en ligne. Qu'est-ce que cela prouve réellement ? | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/controles-hebergement-courte-duree-indonesie-2026/

Field Notes

/

Note réglementaire

Field Notes · Réglementation

Votre villa à Bali est publiée en ligne. Qu'est-ce que cela prouve réellement ?

Comment NIB, KBLI, NKU, dossier du bien, fiscalité locale et déclaration des hôtes s'articulent après août 2026

01

Annonce OTA

02

Identité de l’entreprise

03

Activité et échelle

04

Bien et bâtiment

05

Fiscalité et déclarations

06

Opérateur réel

Cela prouve qu'une plateforme a accepté une annonce.

Cela ne prouve pas que l'activité d'hébergement, la société, le bien, le bâtiment et l'exploitation des clients forment une chaîne de conformité complète en Indonésie.

Cette distinction devient de plus en plus difficile à ignorer.

En mai 2026, le ministère indonésien du Tourisme a déclaré avoir identifié environ 1 600 entreprises d'hébergement commercialisées sur des plateformes OTA sans autorisation d'activité. Une période de régularisation a été accordée et les annonces non régularisées devaient pouvoir être retirées à compter du 1er août 2026. Les nouveaux merchants devaient également fournir des données essentielles, notamment le NIB et le KBLI.

Le ministère développe séparément un système API destiné à relier la vérification des OTA aux données OSS à partir du NIB, du KBLI et du NKU. La date publiquement annoncée est juin 2027. Ce système n'est pas encore une barrière universelle de licence en temps réel.

Le changement pratique est néanmoins clair :

La distribution en ligne passe progressivement de « la plateforme m'a accepté » à « la plateforme peut identifier et vérifier l'entreprise qui exploite ».

Périmètre de cette note

Cette note expose l'architecture publique du contrôle au 13 août 2026. Elle ne confirme pas la conformité d'un bien particulier. Le dossier complet de l'opérateur et du bien doit être vérifié dans le lieu concerné.

La réponse sur un seul écran

Élément

Ce qu'il soutient

Ce qu'il ne prouve pas

Annonce OTA

L'hébergement est commercialement visible sur une plateforme.

Que l'opérateur est autorisé, que l'usage du bien est licite, que le bâtiment convient ou que la fiscalité et la déclaration des hôtes sont complètes.

NIB

L'identité et l'enregistrement de l'acteur économique dans OSS.

Que chaque activité, lieu et exigence complémentaire est correcte.

KBLI

Le type d'activité économique déclaré.

Que l'activité est accessible à cette société, à cette échelle, dans ce lieu, ou que l'exploitation réelle correspond à la description.

NKU

Le dossier d'activité spécifique utilisé dans OSS, reliant généralement activité et lieu.

Que la chaîne complète du bien et des autorisations sectorielles est achevée.

Certificat standard ou autorisation

Une couche exigée selon le risque et le secteur.

Que l'usage du sol, le bâtiment, la fiscalité, l'APOA et l'exploitation réelle sont cohérents.

PBG ou SLF

Des éléments du contrôle du bâtiment pour l'usage déclaré.

Qu'un bâtiment résidentiel est automatiquement autorisé comme hébergement touristique.

Enregistrement fiscal local

L'exploitation est visible dans le système fiscal du kabupaten ou de la ville.

Que le paiement de l'impôt corrige un mauvais KBLI, une licence absente ou un défaut du bâtiment.

Déclaration APOA

Les données des hôtes étrangers sont déclarées dans le processus d'hébergement.

Que la société est le bon opérateur autorisé ou que les autres exigences sont satisfaites.

La conformité est cumulative. Un document ne remplace pas les autres.

Exemple concret

Une villa à Canggu est photographiée professionnellement et publiée sur Airbnb.

Le profil utilise une marque de management. Les paiements arrivent sur le compte de la société A. Le NIB appartient à la société B. Le KBLI enregistré concerne le conseil en management général. Le dossier du bâtiment décrit toujours une résidence privée. Les équipes sont rémunérées par la société C. Un fondateur étranger contrôle les prix et les réservations. Le PBJT est déclaré sous un autre nom.

Chaque fait isolé peut sembler plausible.

Ensemble, ils posent une question élémentaire :

Quelle société vend réellement le séjour et quel dossier lui donne le droit de le faire dans ce bien ?

L'annonce sur la plateforme ne répond pas à cette question.

Ce qui a changé en 2025

Plusieurs évolutions sont parfois présentées comme si l'Indonésie avait soudain interdit les locations de courte durée. Ce n'est pas ce qui s'est produit.

L'histoire exacte est celle d'une architecture réglementaire mise à jour.

PP 28/2025

a remplacé le précédent cadre national de licence fondée sur le risque.

Le règlement du ministère du Tourisme 6/2025

a actualisé les standards touristiques, la supervision et les sanctions administratives.

La loi 18/2025

a modifié la loi sur le tourisme.

Ces textes sont importants parce que la supervision ne s'arrête pas au code à cinq chiffres. Le dossier peut inclure la licence d'activité, les standards sectoriels, la compatibilité spatiale, l'environnement, le PBG ou le SLF, la fiscalité locale et l'activité réellement exercée.

La direction n'est pas « une nouvelle loi villa ».

C'est « davantage de systèmes peuvent être lus ensemble ».

Ce qui a changé en 2026

L'annonce des 1 600 entreprises

La ministre du Tourisme a déclaré que le ministère avait identifié et vérifié en interne environ 1 600 entreprises d'hébergement commercialisées sur des OTA sans autorisation d'activité.

Ce chiffre était national. Il ne décrivait pas 1 600 villas à Bali.

Le processus annoncé était :

identifier les entreprises ;

les notifier par les canaux OTA ;

leur laisser une période de régularisation ;

commencer le retrait des dossiers non régularisés à partir du 1er août 2026 ;

permettre leur retour après vérification.

Au 13 août 2026, aucune liste publique complète ni aucun décompte officiel audité des retraits réels, plateforme par plateforme, n'avait été publié. Il serait donc inexact d'affirmer que les 1 600 ont tous été supprimés, ou qu'aucun ne l'a été.

L'entrée des nouveaux merchants

Le ministère a également indiqué que les nouveaux merchants devaient fournir le NIB et le KBLI plutôt que d'entrer sur le marché OTA sans identité réglementaire.

C'est déjà un changement concret, même avant le déploiement complet de l'API future.

L'API annoncée

Le système annoncé doit contrôler trois données :

NIB ;

KBLI ;

NKU.

Si les données correspondent à OSS, le merchant peut être vérifié. Si elles ne correspondent pas, l'onboarding peut être bloqué ou interrompu.

La cible annoncée est juin 2027. D'ici là, il ne faut pas décrire le système comme une connexion universelle déjà active sur toutes les OTA.

La direction politique est toutefois nette : la cohérence des données lisibles par machine comptera davantage.

Pourquoi le NIB n'est pas « la licence de la villa »

Le NIB identifie l'acteur économique.

C'est essentiel. Cela ne prouve pas :

que la bonne activité d'hébergement est enregistrée ;

que cette activité est accessible à cette société et à cette échelle ;

que le bon bien apparaît dans OSS ;

que le certificat standard ou l'autorisation est complet ;

que l'usage du sol soutient l'activité ;

que le bâtiment est approuvé pour cet usage ;

que la fiscalité locale est correcte ;

que les hôtes étrangers sont déclarés ;

que la société enregistrée est celle qui exploite réellement.

La phrase « la villa a un NIB » est généralement incomplète, car un bâtiment ne possède pas une identité d'entreprise de la même façon qu'une société.

La meilleure question est :

Quelle personne morale détient quel NIB, pour quelle activité et quel lieu, et comment cela se rattache-t-il à ce bien et à ce contrat client ?

Pourquoi le KBLI n'est pas un simple mot-clé

Le KBLI classe l'activité.

Il doit suivre ce que l'entreprise fait réellement.

Une société qui vend directement l'hébergement n'exerce pas nécessairement la même activité qu'une société qui gère l'hébergement d'un tiers. Une société qui administre un bien résidentiel n'est pas automatiquement autorisée à vendre des nuitées touristiques. Un consultant n'est pas automatiquement un manager opérationnel.

Le KBLI 2025 rend plusieurs frontières plus visibles.

Par exemple :

55203 concerne l'activité de villa dans des maisons privées gérées par leur propriétaire ;

55901 concerne le management opérationnel d'hébergements pour compte de tiers contre rémunération ;

les hôtels et aparthotels relèvent d'autres classifications ;

le conseil général est distinct du management opérationnel direct ;

la gestion immobilière et l'intermédiation d'hébergement sont encore d'autres questions.

Le nom du bien sur Instagram ne détermine pas le code.

Pourquoi le NKU compte

Le NKU est le numéro de l'activité utilisé dans le dossier OSS.

Pour le propriétaire, l'intérêt pratique est qu'une même société peut posséder plusieurs activités et plusieurs lieux. La question n'est pas seulement de savoir si la société a un NIB quelque part, mais si l'activité et le bien examinés correspondent au bon dossier actif.

Une future vérification OTA fondée sur NIB, KBLI et NKU contrôle donc l'identité, l'activité et le dossier précis, pas seulement l'existence d'un certificat de société.

Le bien reste soumis à sa propre due diligence

Même un opérateur bien structuré ne peut effacer un défaut du bien.

La vérification peut inclure :

la compatibilité de zone et d'usage ;

le titre ou le bail ;

l'accès ;

la situation PBG et SLF ;

les exigences environnementales ;

l'usage du bâtiment ;

l'eau et les eaux usées ;

les exigences incendie, santé ou tourisme liées à la classification ;

les restrictions du voisinage et de l'exploitation ;

la fiscalité locale ;

les assurances.

Une société de management avec un NIB valide ne peut pas prêter son dossier bâtiment à une maison sans rapport.

Qui est l'opérateur ?

L'opérateur n'est pas toujours le propriétaire et n'est pas toujours le manager.

Une distinction utile est :

Rôle

Responsabilité habituelle

Propriétaire ou titulaire des droits

Détient ou contrôle légalement le bien.

Opérateur d'hébergement

Vend le séjour, contracte avec le client et porte l'activité client.

Gestionnaire d'hébergement

Gère les opérations pour le compte du propriétaire ou de l'opérateur dans un mandat défini.

OTA ou intermédiaire

Distribue l'hébergement ou met en relation l'offre et la demande.

Prestataire

Fournit une fonction limitée, comme marketing, finance, maintenance ou transport.

Ces rôles peuvent appartenir à des sociétés différentes.

Ils ne doivent pas être fusionnés dans un seul nom uniquement lorsque l'administration pose la question.

Le diagnostic le plus rapide reste :

qui apparaît sur l'OTA ;

qui signe avec le client ;

qui encaisse ;

qui emploie l'équipe ;

qui contrôle les prix et réservations ;

qui autorise les remboursements ;

qui déclare le PBJT et l'APOA ;

qui supporte la perte et la réclamation du client.

L'APOA ne concerne pas seulement les hôtels

Le cadre de déclaration des hôtes étrangers concerne les propriétaires ou gestionnaires d'hébergements et est mis en œuvre au moyen d'APOA.

Les actions officielles d'immigration ont inclus les hôtels, villas et certains fournisseurs individuels d'hébergement.

Pour le propriétaire, cela compte parce qu'APOA crée une autre trace de l'exploitation réelle.

Quelle société ou quel manager effectue la déclaration ? Sous quel bien et quels dossiers clients ? Ce rôle correspond-il à l'OTA, au contrat client et à la licence ?

L'APOA ne prouve pas toute la structure. Elle peut révéler si le processus quotidien correspond à l'opérateur déclaré.

Bali ajoute sa propre couche de contrôle

Bali a séparément renforcé la pression sur les hébergements sans licence ou sans conformité fiscale.

Le gouvernement provincial a demandé à Airbnb de soutenir le retrait des entreprises ne respectant pas les licences ou la fiscalité. Les autorités touristiques ont également annoncé le programme Bali Kerthi pour auditer la conformité des hébergements et autres activités touristiques.

Cela ne crée pas un nouveau droit immobilier.

Cela signifie que les données nationales OSS, la supervision locale, la fiscalité et la distribution OTA deviennent moins isolées.

Ce qu'un propriétaire doit vérifier cette semaine

La société

acte et extrait AHU à jour ;

NIB ;

fiches OSS complètes, pas seulement une capture du code ;

échelle d'entreprise et niveau de risque ;

KBLI et NKU de l'activité et du lieu ;

dirigeants, actionnaires et bénéficiaire effectif.

Le bien

titre ou bail ;

droit accordé à l'opérateur ;

zoning et compatibilité spatiale ;

situation PBG et SLF ;

exigences environnementales et touristiques ;

fiscalité locale ;

assurance.

L'exploitation

nom du merchant OTA et compte de paiement ;

conditions clients et facture ;

autorité d'annulation et de remboursement ;

employeur et manager du personnel ;

contrôle du PMS et des canaux ;

processus PBJT ;

processus APOA ;

plaintes et responsabilités.

Les liens entre ces éléments

contrat de management ;

bail ou concession d'exploitation ;

contrats de services ;

flux financiers ;

matrice des personnes et décisions ;

dossier de transition en cas de changement d'opérateur.

Trois fausses conclusions fréquentes

« Airbnb a accepté l'annonce, donc c'est légal. »

Non. L'acceptation de la plateforme est une décision de distribution, pas un avis juridique sur le bien et l'opérateur.

« La société a un NIB, donc la villa est autorisée. »

Non. L'activité, l'échelle, le lieu, le standard sectoriel, le dossier du bien et l'exploitation réelle doivent encore être cohérents.

« Le gouvernement interdit les OTA. »

Non. La politique publique consiste à renforcer la vérification des entreprises d'hébergement et à retirer l'offre non régularisée, pas à interdire les plateformes en tant que catégorie.

La décision en langage clair

Le programme de contrôle de 2026 ne rend pas toutes les villas de Bali illégales.

Il rend une ancienne hypothèse de plus en plus dangereuse :

Être visible en ligne ne prouve pas que l'entreprise d'exploitation est complète.

Un propriétaire sérieux doit d'abord identifier le véritable opérateur, puis vérifier la société, l'activité, le lieu, le bien, le bâtiment, la fiscalité, les équipes et la déclaration des hôtes autour de cet opérateur.

La règle à retenir est :

L'annonce doit être la face publique d'un dossier d'exploitation cohérent, pas son substitut.

Parler à François

Sources principales et liens de vérification

Ministère du Tourisme : système API entre OTA et OSS

ANTARA : environ 1 600 entreprises identifiées et processus annoncé à compter du 1er août

PP 28/2025 sur les licences fondées sur le risque

OSS officiel, KBLI 55203, activité de villa

OSS officiel, KBLI 55901, gestion d'hébergements

Gouvernement provincial de Bali : restriction PMA sur 18 catégories

Immigration à Bali : APOA et sensibilisation des fournisseurs d'hébergement

Le résultat OSS en direct contrôle une demande réelle. L'article ANTARA étaye la déclaration ministérielle attribuée, pas un décompte final des biens effectivement retirés après régularisation.

## Un dirigeant étranger peut-il travailler dans sa propre entreprise à Bali ? | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/dirigeant-etranger-travailler-entreprise-bali/

Field Notes

/

Guide de décision

Field Notes · Immigration

Un dirigeant étranger peut-il travailler dans sa propre entreprise à Bali ?

Ce que couvre une véritable fonction de direction, où commence un autre métier et pourquoi une nomination dans la PT PMA ne couvre pas automatiquement la PT locale

01

Actionnaire

02

Directeur

03

Commissaire

04

Employeur

05

Travail autorisé

06

Activité réelle

Oui. Un véritable dirigeant étranger peut gérer activement et superviser la société indonésienne dans laquelle il exerce la fonction sociale correspondant à son cadre d'immigration ou de main-d'œuvre.

Non. Le mot

Director

dans un acte n'autorise pas tous les métiers, tous les lieux et toutes les sociétés liées.

La réponse pratique dépend de l'alignement de cinq éléments :

Nomination sociale

+ actionnariat

+ RPTKA ou exemption valable

+ visa et ITAS

+ employeur, lieux de travail et activité réelle

La vraie question n'est pas de savoir si l'étranger est présent tous les jours.

Elle est :

Dirige-t-il la société ou exerce-t-il un autre emploi récurrent sous le titre de directeur ?

Périmètre de cette note

Cette note explique la distinction. Elle ne choisit pas un visa ou un fondement de travail pour une personne précise. L'acte, l'actionnariat, le dossier relatif au travail des étrangers, le visa, l'ITAS, l'employeur et le travail réel doivent être examinés ensemble.

Deux réponses courantes mais incomplètes

La première est :

Vous êtes investisseur. Vous ne pouvez rien faire dans l'entreprise.

C'est trop large. Le droit des sociétés indonésien donne aux directeurs une véritable fonction de gestion, et le système d'immigration prévoit des voies pour les directeurs et les investisseurs qualifiés.

La seconde est :

Vous êtes directeur. Vous pouvez tout faire.

C'est également trop large. Les règles de main-d'œuvre et d'immigration continuent à regarder la fonction, l'employeur, les lieux et l'activité réellement exercée.

Une réponse utile doit distinguer la propriété, l'autorité sociale et l'autorisation personnelle de travail.

Cinq rôles à ne pas confondre

Rôle

Ce qu'il donne

Ce qu'il ne donne pas à lui seul

Actionnaire

Droits économiques et de vote comme investisseur.

Ne nomme pas automatiquement la personne directeur ou salarié.

Bénéficiaire effectif

Reconnaît le contrôle ou le bénéfice économique ultime.

Ne crée pas une fonction sociale ni une autorisation de travail.

Directeur

Autorité sociale pour gérer et représenter la société dans son objet et ses statuts.

N'autorise pas tous les métiers dans toutes les sociétés liées.

Commissaire

Supervision et conseil du conseil de direction.

N'est pas synonyme de gestion exécutive.

Salarié ou travailleur étranger

Fonction exercée pour l'employeur concerné dans le cadre applicable aux travailleurs étrangers.

Doit encore correspondre à la fonction autorisée, au visa, à l'ITAS et au lieu.

Une même personne peut cumuler plusieurs rôles. Le dossier doit montrer quel rôle justifie chaque activité.

Ce qu'un véritable directeur peut faire

Un directeur réel n'est pas limité à la signature d'une résolution trimestrielle.

Des fonctions reconnaissables de direction peuvent inclure :

approuver le plan d’affaires et le budget ;

fixer la stratégie tarifaire et commerciale ;

nommer et diriger les cadres supérieurs ;

examiner l'occupation, les recettes et la performance opérationnelle ;

approuver les achats importants et les fournisseurs ;

négocier les contrats matériels ;

définir les contrôles et politiques ;

inspecter les standards du bien et du service ;

décider de la réponse à un incident sérieux ;

superviser la production des biens ou services de la société ;

représenter la société auprès des banques, partenaires et autorités dans son mandat.

Une implication quotidienne n'est pas automatiquement problématique. Une société dirigée par son fondateur peut avoir un directeur très actif.

La question est de savoir si le travail récurrent ressemble toujours à de la direction et de la supervision.

Où commence un autre métier ?

La continuité ressemble à ceci :

Décision d'actionnaire

↓

Décision du board

↓

Supervision exécutive

↓

Management opérationnel

↓

Travail de service en première ligne

La frontière dépend des faits. Les règles indonésiennes ne donnent pas un nombre d'heures simple qui transformerait la gestion en un autre emploi.

Les meilleurs indices sont la répétition, la responsabilité et la manière dont l'entreprise décrirait la fonction si la personne n'était pas propriétaire.

Exemple A : activité reconnaissable de directeur

Le directeur se rend sur le bien deux fois par semaine.

Il examine la performance du GM, approuve une nouvelle politique tarifaire, inspecte les standards, négocie un contrat de blanchisserie, examine une plainte grave et décide s'il faut remplacer le responsable des opérations.

Cela ressemble clairement à de la direction et de la supervision.

Exemple B : autre emploi sous un titre de directeur

Le « directeur » tient la réception chaque jour, répond à tous les messages de réservation, accueille les clients et organise leur départ, vend les transports, prépare les plannings, conduit les clients et assure personnellement le poste de responsable de villa.

Le problème n'est pas qu'un directeur ne peut jamais accueillir un client ou résoudre une urgence.

Le problème est que l'occupation récurrente ressemble désormais à un autre métier.

Le titre de directeur ne couvre pas automatiquement ce métier si les dossiers de travail et d’immigration ne le couvre pas.

E25B et E28A ne répondent pas à la même question

La liste actuelle des visas comprend :

E25B

, une catégorie de visa de travail pour directeur de société ;

E28A

, une catégorie investisseur permettant à un investisseur qualifié d'exercer des activités d’investissement et d’affaires, d'être directeur ou commissaire de la société dans laquelle il a investi et d'en superviser la production de biens ou services.

Ces catégories ne sont pas interchangeables.

La bonne voie dépend :

de l'actionnariat ;

de la nomination dans l'acte ;

de la fonction déclarée dans le dossier de travail ;

de l'application ou non d'un RPTKA ou d'une exemption ;

du travail prévu ;

de l'employeur et des lieux.

« Investor KITAS » n'est pas une analyse complète.

Le KITAS n'est pas la description du travail

KITAS reste le terme courant. Le permis formel est l'ITAS.

Surtout, un titre de séjour ne décrit pas toutes les activités autorisées.

Un dossier cohérent doit aligner :

Nomination dans l'acte

+ preuve de l'actionnariat

+ RPTKA ou exemption légale

+ index de visa

+ ITAS

+ fonction permise

+ employeur

+ lieux de travail

+ activité quotidienne réelle

Une incohérence à un étage peut compter même lorsque les autres documents existent.

L'employeur compte

Ce point devient critique dans une structure PT PMA et PT locale.

Imaginons :

le fondateur étranger est directeur et actionnaire de la PT PMA A ;

la PT locale B apparaît sur l'OTA ;

B contracte avec les hôtes et encaisse ;

B porte le rôle d'opérateur ;

A facture des prestations de gestion à B.

Le fondateur donne personnellement chaque jour les instructions à l'équipe de B, contrôle les réservations et les prix de B, approuve les remboursements de B et agit comme responsable de villa de B.

La nomination comme directeur de A n'autorise pas automatiquement le travail pour B.

Les sociétés sont des personnes morales distinctes.

Le contrat de gestion peut expliquer pourquoi A fournit une prestation à B. Il ne transfère pas automatiquement l'autorisation personnelle de travail de l'individu de A vers B.

Les bonnes questions sont :

Le directeur étranger dirige-t-il réellement la prestation de gestion de A ?

A emploie-t-elle les personnes et exploite-t-elle les systèmes par lesquels la prestation est fournie ?

L'individu agit-il en pratique comme manager ou salarié de B ?

Quelle société bénéficie du travail quotidien ?

Quel employeur et quels lieux apparaissent dans les dossiers de travail et d’immigration ?

Exemple concret à deux sociétés

Version cohérente

La PT PMA A emploie un revenue manager, un finance manager et un directeur des opérations.

Le directeur étranger supervise cette équipe, approuve les politiques de management de A, examine la performance des biens et participe chaque mois à une réunion d'exploitation avec les directeurs indonésiens de B.

La PT locale B emploie l'équipe de villa, contrôle le contrat client, paie le personnel, gère les arrivées et porte l'obligation envers le client. Le GM indonésien de B donne les instructions quotidiennes sur place.

Le directeur étranger peut inspecter et challenger la performance, mais les personnes, systèmes et autorités montrent que A fournit une prestation de management et que B exploite l'hébergement.

Version contradictoire

A ne possède aucune équipe de management.

Le directeur étranger se connecte personnellement à l'OTA de B, fixe tous les prix, répond aux clients, donne les instructions aux housekeepers, approuve les congés, traite les remboursements et sanctionne le personnel de B.

La seule preuve de la prestation de A est une facture.

Dans cette version, l'activité personnelle ressemble moins à la direction de A qu'à un travail exercé dans B.

Les fonctions dans plusieurs sociétés exigent leur propre fondement

Les règles indonésiennes envisagent certaines situations dans lesquelles un travailleur étranger peut exercer la même fonction pour plusieurs employeurs, notamment pour certains directeurs ou commissaires.

Ce n'est pas une permission générale de travailler dans tout le groupe.

Chaque rôle doit être soutenu par :

la nomination sociale ;

la relation avec l'employeur ;

le cadre applicable aux travailleurs étrangers ;

le visa et l'ITAS ;

les lieux enregistrés ;

la fonction réelle.

Un actionnariat commun ou un contrat de management ne fusionne pas deux employeurs.

Commissaire n'est pas un autre mot pour directeur

Un commissaire supervise et conseille les directeurs.

Un directeur gère la société.

Une personne étrangère nommée uniquement commissaire ne doit pas supposer que ce titre autorise la gestion exécutive ordinaire.

Le même test de substance s'applique. Que fait réellement la personne, pour quelle société et sous quelle autorité ?

Les ressources humaines restent une zone restreinte

Les travailleurs étrangers ne peuvent pas occuper sans limite les fonctions liées au personnel ou aux ressources humaines.

Un directeur peut approuver une organisation, nommer les cadres et fixer une politique.

Cela est différent du fait d'exercer de manière récurrente la fonction HR, d'administrer les dossiers du personnel ou d'occuper une autre position restreinte.

Le titre sur la signature électronique ne change pas la fonction.

Ce qu'un inspecteur peut voir sur place

Le dossier papier compte. Les faits opérationnels aussi.

Un inspecteur peut demander :

qui donne les instructions à l'équipe ;

quel compte WhatsApp anime le groupe du personnel ;

qui approuve les plannings et congés ;

qui contrôle l'OTA et le PMS ;

qui traite les plaintes ;

quelle société emploie la personne ;

où elle travaille ;

quelle fonction figure dans le dossier ;

si l'investissement et le rôle social déclarés ont de la substance.

Un titre de directeur sur papier protège peu lorsque la semaine ordinaire montre une autre occupation.

Matrice pratique des activités

Activité

Généralement reconnaissable comme direction

Nécessite une lecture plus fine

Ressemble souvent à un autre emploi récurrent

Approuver le budget annuel

Oui

Fixer la politique tarifaire

Oui

Diriger le GM

Oui

Inspecter les standards

Oui

Lorsque cela devient une supervision quotidienne de première ligne

Négocier un contrat majeur

Oui

Résoudre un incident client exceptionnel

Oui

Si cela devient le rôle ordinaire de service

Répondre chaque jour aux messages de réservation

Oui

Accueillir régulièrement les clients et organiser leur départ

Oui

Construire chaque semaine les plannings du personnel

Selon le périmètre exécutif autorisé

Souvent

Conduire les clients

Oui

Vendre des excursions sur place

Oui

Réaliser l'administration RH récurrente

Zone restreinte nécessitant une prudence spécifique

Cette matrice n'est pas une liste légale exhaustive. Elle aide à détecter quand le titre de directeur couvre peut-être un autre métier.

Ce qu'un propriétaire étranger doit faire confirmer par écrit

Quelle fonction exacte figure dans l'acte ?

La personne est-elle actionnaire, directeur, commissaire ou plusieurs à la fois ?

Quelle valeur et quel pourcentage d'actions détient-elle personnellement ?

Quel est le fondement juridique de l'éventuelle exemption de RPTKA ?

Quel index de visa est détenu ?

Quelles activités cette catégorie couvre-t-elle expressément ?

Quel ITAS a été délivré ?

Quelle société apparaît comme employeur ou sponsor ?

Quelle fonction est approuvée lorsque le RPTKA s'applique ?

Quels lieux de travail sont enregistrés ?

La personne est-elle active dans une seconde société ?

Quelle nomination sociale soutient ce second rôle ?

Quel fondement de travail et d’immigration soutient cette fonction ?

Quelles tâches opérationnelles récurrentes sont exercées ?

Quelle société bénéficie de ces tâches ?

Qui signe les instructions au personnel ?

Qui contrôle les systèmes utilisés chaque jour ?

Les KBLI des sociétés et la fonction de la personne sont-ils cohérents ?

Quelles obligations de reporting et de DKPTKA s'appliquent ?

Que verrait un inspecteur pendant une semaine normale ?

La décision en langage clair

Un dirigeant étranger peut travailler activement dans son entreprise indonésienne lorsque la fonction sociale, le droit applicable au travail des étrangers et l’immigration soutiennent ce rôle.

Il peut fixer la stratégie, superviser le management, inspecter les standards, prendre les décisions importantes et intervenir sur les incidents sérieux.

Le titre ne couvre pas tous les métiers de première ligne et ne s'étend pas automatiquement à une PT locale distincte.

La règle à retenir est :

L'acte, le visa, le fondement relatif au travail des étrangers, l'employeur, les lieux et la semaine ordinaire doivent décrire le même travail.

Parler à François

Sources principales et liens de vérification

Loi 40/2007 sur les sociétés à responsabilité limitée

Immigration : E25B, visa de travail pour directeur de société

Immigration : E28A, visa investisseur

PP 34/2021 sur l’emploi de travailleurs étrangers

Permenaker 8/2021 portant application du PP 34/2021

Immigration à Bali : patrouille Dharma Dewata 2026 et obligations des hébergeurs

Loi 25/2007 sur l'investissement

OSS officiel, KBLI 55901, gestion d'hébergements

Pour une personne réelle, le visa, l'ITAS, le RPTKA ou l'exemption, l'employeur, le poste et le lieu de travail contrôlent la réponse. L'acte de société ou le mot courant « KITAS » ne suffit pas.

## Immobilier à Bali : vérifications avant un acompte | DALLEAU

URL: https://dalleau.ai/fr/notes/due-diligence-immobilier-bali-avant-acompte.html

due diligence immobilière
Sept vérifications avant de verser un acompte immobilier à Bali
Sept vérifications indépendantes avant un acompte immobilier à Bali : titre, accès, zonage, permis, eau, risques géotechniques, exploitation et contrat. Une villa peut être terminée et ne pas pouvoir être exploitée comme prévu. Le dossier ci-dessous doit être complet avant que tout versement ne devienne non remboursable.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
21 juillet 2026
Mise à jour éditoriale
20 septembre 2026
Vérifié | 21 juillet 2026 | sources primaires
Mis à jour le 21 juillet 2026
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Sept vérifications indépendantes avant un acompte immobilier à Bali : titre, accès, zonage, permis, eau, risques géotechniques, exploitation et contrat. Une villa peut être terminée et ne pas pouvoir être exploitée comme prévu. Le dossier ci-dessous doit être complet avant que tout versement ne devienne non remboursable.
Avant qu'un acompte ne devienne non remboursable, il faut répondre à sept questions :
quel droit est proposé ; si la parcelle et son accès correspondent aux documents ; ce que le plan spatial autorise ; si le dossier du bâtiment correspond à l'existant ; si l'environnement, l'eau et les risques physiques ont été traités ; qui exploitera légalement le bien et paiera les taxes ; enfin, si le contrat permet un transfert et une sortie viables.
Une bonne réponse ne compense jamais une réponse manquante ailleurs.
L'erreur consiste à demander si « le bien est légal »
Demander si le bien est légal est légitime, mais la question est trop large pour recevoir une réponse fondée sur un seul document rassurant. Chaque partie de l'opération relève d'un système juridique, spatial, constructif, environnemental, opérationnel ou fiscal distinct.
Le certificat était authentique. La carte semblait rose. La villa recevait déjà des réservations. L'agent disait que le propriétaire possédait un numéro d'identification de l'entreprise (NIB). Un notaire pouvait préparer le contrat. Chaque phrase ressemblait à une réponse, mais chacune provenait d'un système différent.
La bonne question n'est pas de savoir si un document existe. Elle est de savoir si
sept dossiers racontent la même histoire à propos de la même parcelle, du même titulaire, du même bâtiment, du même usage et du même opérateur
.
Vérification
La vraie question
La preuve nécessaire avant de s'y fier
1. Droit et pouvoir de signer
Qu'achetez-vous ou louez-vous exactement, auprès de qui, et cette personne peut-elle le céder ?
Données foncières récentes, droit et titulaire exacts, pouvoirs et chaîne contractuelle complète
2. Parcelle et accès
Le terrain visité est-il celui des documents, avec un accès juridiquement et physiquement utilisable ?
Coordonnées, bornage/relevé, titre de l'accès et inspection physique
3. Usage spatial
Le projet précis correspond-il au plan officiel applicable à ces coordonnées ?
Plans régional et détaillé (RTRW/RDTR) applicables, puis confirmation de conformité spatiale (KKPR)
4. Bâtiment
Le bâtiment autorisé correspond-il à l'existant et à l'usage envisagé ?
Autorisation de construire (PBG), ancien permis (IMB) encore valable, certificat d'aptitude à l'usage (SLF), plans approuvés et comparaison avec l'existant
5. Environnement, eau et risques
Le site peut-il fonctionner sans contrainte environnementale ou physique non budgétée ?
Évaluation et autorisation environnementales, eaux usées, forage et analyse des risques techniques
6. Exploitation et fiscalité
Qui vend le séjour, encaisse, emploie, détient les licences et déclare les taxes ?
Carte des contrats et flux, résultat actuel du portail indonésien d'autorisation en ligne (OSS), immatriculations fiscales et preuves d'exploitation
7. Transfert et sortie
Le droit peut-il être cédé, transféré, prolongé ou revendu selon les hypothèses du modèle ?
Contrat exécutoire, consentements, durée sécurisée, taxes/frais et test de résistance de la stratégie de sortie
Ce tableau forme le cœur de la vérification. La suite de la note explique comment contrôler chaque réponse.
Termes employés dans cette note
NIB :
numéro d'identification de l'entreprise délivré par le système indonésien d'autorisation en ligne.
RTRW et RDTR :
plans régional et détaillé d'aménagement du territoire.
KKPR :
confirmation ou approbation de la conformité de l'usage projeté au plan spatial.
PBG et IMB :
autorisation de construire actuelle et ancien permis qu'elle a remplacé.
SLF :
certificat attestant qu'un bâtiment achevé est apte à être utilisé.
OSS :
portail national indonésien d'autorisation des entreprises.
PPAT :
officier habilité à établir certains actes fonciers enregistrés.
MEP :
plans techniques de mécanique, d'électricité et de plomberie du bâtiment.
AMDAL, UKL-UPL et SPPL :
procédures d'évaluation, de gestion ou d'engagement environnemental choisies selon l'activité et son ampleur.
OTA :
plateforme de réservation de voyages en ligne.
PBB-P2 et BPHTB :
impôt local foncier et immobilier, et droit dû lors de l'acquisition de droits fonciers ou immobiliers.
PBJT :
taxe locale sur certains biens et services, dont certains services d'hébergement.
AHU :
système d'administration juridique du ministère de la Justice utilisé pour les dossiers des sociétés.
MEP :
plans techniques de mécanique, d'électricité et de plomberie du bâtiment.
AMDAL, UKL-UPL et SPPL :
procédures d'évaluation, de gestion ou d'engagement environnemental choisies selon l'activité et son ampleur.
OTA :
plateforme de réservation de voyages en ligne.
PBB-P2 et BPHTB :
impôt local foncier et immobilier, et droit dû lors de l'acquisition de droits fonciers ou immobiliers.
PBJT :
taxe locale sur certains biens et services, dont certains services d'hébergement.
AHU :
système d'administration juridique du ministère de la Justice utilisé pour les dossiers des sociétés.
Vérification 1 : identifier le droit, son titulaire et le pouvoir de signer
« Freehold » et « leasehold » sont des expressions de marché pratiques. Aucune ne décrit à elle seule l'actif juridique.
Le dossier peut porter sur un Hak Milik, un Hak Guna Bangunan (HGB), droit de construire et d'utiliser des bâtiments, un Hak Pakai, un droit sur une unité en copropriété, un bail contractuel ordinaire, les actions d'une société détenant un droit, ou autre chose. Ces actifs ne sont pas interchangeables. Leurs titulaires éligibles, durées, formalités d'enregistrement, possibilités de financement et modes de sortie diffèrent.
Pour un droit enregistré, une revue indépendante doit au minimum réconcilier :
le certificat, la nature du droit et son numéro ;
le titulaire enregistré et la personne qui se présente comme vendeur ou bailleur ;
les identifiants, la superficie et la localisation de la parcelle ;
l'octroi et l'échéance du droit lorsqu'ils sont pertinents ;
les hypothèques, saisies, blocages ou autres charges enregistrées ;
l'identité du titulaire, son régime matrimonial, une éventuelle succession ou ses pouvoirs sociaux ;
l'acte qui transférera ou accordera le droit.
Le régime indonésien de l'enregistrement foncier reconnaît au certificat une forte valeur probante pour les données physiques et juridiques qu'il contient. Pour certains transferts enregistrés, un acte PPAT constitue normalement la base de l'enregistrement. C'est pourquoi une photo reçue sur WhatsApp n'est pas la vérification finale. Il faut demander, par l'intermédiaire du professionnel compétent, une vérification foncière officielle récente et résoudre toute divergence avec le Kantor Pertanahan.
Pour un acquéreur étranger, les raccourcis de vocabulaire deviennent dangereux. Une personne étrangère ne peut pas simplement détenir un Hak Milik. Le PP 18/2021 organise certaines voies résidentielles pour les étrangers, à travers des droits et biens éligibles et sous conditions d'immigration ; il n'instaure pas un « freehold pour étrangers » universel. Une société indonésienne à capitaux étrangers (PT PMA) peut éventuellement détenir un droit ouvert à une personne morale indonésienne éligible, mais la création d'une société ne transforme pas un Hak Milik en « freehold étranger ».
Si le montage exige qu'un ami, conjoint, salarié ou prête-nom indonésien porte le titre tandis que des actes parallèles promettent à l'étranger la « véritable propriété », il faut s'arrêter. Le dossier de due diligence ne doit jamais recommander ni normaliser une structure de prête-nom.
Dans un bail de longue durée, la vérification du droit sous-jacent reste la première étape. Le bailleur doit contrôler le droit et pouvoir accorder la durée et l'usage promis. Le contrat devient ensuite l'actif : parties exactes, dates de début et de fin, périmètre terrain/bâtiment, usage, droit de construire, cession, sous-location, prolongation, défaut, sinistre et restitution.
Un certificat authentique peut prouver un droit authentique sans prouver que la personne en face de vous peut vendre ou louer ce que votre modèle suppose.
Vérification 2 : faire correspondre parcelle, limites et accès
La deuxième cause d'échec est presque embarrassante par sa simplicité : le terrain montré à l'acheteur n'a pas été parfaitement rapproché de celui décrit par les documents.
Une épingle GPS, une clôture, un mur ou la mémoire d'un voisin ne constituent pas un bornage. Les outils comme BHUMI d'ATR/BPN sont excellents pour s'orienter. BHUMI précise toutefois que les informations publiques sont fournies sans garantie d'actualité, d'exactitude ou d'exhaustivité. Il faut s'en servir pour poser de meilleures questions, pas pour remplacer la vérification foncière et le relevé de terrain.
Le dossier doit rapprocher :
références et coordonnées du titre ou du bail ;
limites et superficie mesurées ;
murs, bâtiments et éventuels empiètements ;
accès routier depuis le réseau public ;
chaque parcelle tierce traversée ;
acte, consentement et durée qui sécurisent cet accès ;
largeur utile, rayon de manœuvre et logistique de chantier ;
passage des réseaux, drainage et infrastructures partagées.
« Il y a une route » ne suffit pas. Un chemin peut être physiquement ouvert tout en traversant un terrain privé par simple tolérance. Il peut convenir à un scooter, mais pas aux camions de chantier, aux secours ou au trafic lié à l'exploitation. Il peut aussi disparaître lorsque le voisin vend.
Cette vérification appartient conjointement à l'avocat foncier, au géomètre/cadastrier et à l'architecte du projet. Le juriste vérifie le droit ; l'équipe technique confirme que ce droit fonctionne dans le projet réel.
Vérification 3 : confronter l'usage exact au plan spatial exact
Le marché immobilier balinais parle beaucoup de couleurs : zone verte, jaune, rose. Elles peuvent aider à se repérer. Elles ne constituent pas la décision juridique.
La vraie question est de savoir si l'activité envisagée, aux coordonnées précises de la parcelle, correspond au RTRW/RDTR et aux règles de zonage applicables. La revue peut comprendre :
le nom de la zone et de la sous-zone ;
le caractère autorisé, conditionnel ou interdit de l'usage ;
l'intensité de construction et l'emprise au sol ;
la surface de plancher, la hauteur et le nombre d'étages ;
les reculs par rapport aux routes, rivières, plages, ravins, temples/espaces sacrés ou autres limites ;
les surcouches agricoles protégées, environnementales et de risques ;
la procédure KKPR de confirmation ou d'approbation applicable.
Dans le cadre national, un RDTR intégré peut permettre une confirmation de conformité spatiale. En l'absence de ce plan détaillé intégré, une autre voie d'approbation par rapport au plan applicable peut être requise. L'autorité balinaise indiquait, sur la base de données au 2 février 2026, que les RDTR couvraient
31,49 %
de la province et que 28 RDTR étaient intégrés à l'OSS. Ce pourcentage interdit justement les généralisations : seule compte la réponse concernant la parcelle étudiée.
Trois distinctions sont essentielles :
La villa voisine n'est pas une preuve.
Elle peut être antérieure au plan actuel, porter sur d'autres coordonnées, disposer d'autres documents ou être elle-même non conforme.
Résidentiel ne signifie pas automatiquement location à la nuitée.
Le droit spatial de construire une résidence et le droit commercial de vendre de courts séjours sont deux contrôles distincts.
Une capture d'écran n'est pas un résultat KKPR.
La carte sert de piste ; il faut ensuite obtenir et lire le résultat officiel actuel et ses conditions.
Si les revenus prévisionnels reposent sur l'hébergement touristique, cet usage doit être déclaré avant le contrôle spatial. Demander seulement si « une villa peut être construite » risque d'obtenir une bonne réponse à la mauvaise question.
Vérification 4 : comparer PBG, SLF, plans approuvés et bâtiment réel
Un très beau bâtiment terminé peut avoir trois histoires différentes :
il a été autorisé, construit conformément aux plans puis déclaré apte à l'usage ;
il disposait d'une autorisation initiale mais a été agrandi ou transformé ;
il a été construit d'abord, puis laissé à un futur acheteur le soin de résoudre le dossier.
PBG et SLF ne sont pas deux noms du même document. Le PBG porte sur le projet et la fonction approuvés. Le SLF certifie que le bâtiment terminé est apte à être utilisé. Le PP 16/2021 inscrit la fonction et la classification du bâtiment dans ces documents et impose une modification du PBG en cas de changement de fonction ou de classification.
Pour un bien existant, il faut demander :
le PBG, ou l'historique de l'IMB antérieur à 2021 ;
le SLF et ses caractéristiques ;
les plans architecturaux, structurels et MEP approuvés ;
les révisions et autorisations des extensions ;
les plans as-built, s'ils existent ;
une inspection professionnelle de la structure ;
le rapprochement des surfaces, étages, chambres, piscines, murs de soutènement et annexes ;
la cohérence entre fonction documentée et usage envisagé.
La FAQ officielle SIMBG indique qu'un IMB antérieur au PP 16/2021 peut rester valable si le bâtiment était achevé et n'a pas été modifié. Elle décrit également une procédure d'évaluation d'un bâtiment existant pouvant aboutir simultanément au PBG et au SLF lorsqu'il n'existait pas d'IMB/PBG. Aucune de ces affirmations ne signifie que tous les bâtiments peuvent être régularisés. Une procédure d'évaluation n'est pas une promesse d'approbation.
La question à poser avant l'acompte n'est donc pas « Quelqu'un pourra-t-il s'occuper du PBG plus tard ? », mais :
Que faudrait-il modifier sur ce bâtiment précis pour satisfaire aux exigences techniques et d'usage actuelles, combien de temps cela peut-il prendre, et le vendeur en fait-il une condition de la transaction ?
Si la réponse est inconnue, le modèle doit prévoir un coût, un scénario de délai et un droit de retrait.
Vérification 5 : intégrer la réalité environnementale, l'eau et les risques physiques
Le document environnemental est trop souvent traité comme un PDF supplémentaire. Son rôle est pourtant de vérifier si l'eau, les eaux usées, le drainage, les déchets et les conditions du site peuvent supporter le nombre prévu de clients et de salariés sans transférer un problème non budgété à l'acquéreur ou au voisinage.
Le cadre environnemental indonésien classe les activités et leur échelle entre AMDAL, UKL-UPL ou SPPL. Le mot « villa » ne suffit pas à déterminer le document applicable. Le dossier doit faire apparaître l’activité et l’échelle retenues pour l’évaluation préalable, l'approbation ou l'engagement émis, les obligations associées, puis la preuve de leur mise en œuvre sur site.
Il faut au minimum examiner :
la capacité de traitement des eaux usées et fosses/systèmes ;
les eaux pluviales et leur évacuation hors site ;
le stockage et l'enlèvement des déchets ;
le rejet de la piscine et les produits chimiques ;
la source et la capacité de l'approvisionnement en eau ;
tout puits, forage, pompe et compteur ;
l'autorisation et les rapports relatifs aux eaux souterraines lorsqu'ils s'appliquent ;
les murs de soutènement, pentes, risques d'érosion et nature du sol ;
les risques d'inondation, crue soudaine, glissement, tsunami, séisme, liquéfaction et abrasion côtière ;
la disponibilité de l'assurance et ses exclusions.
Les eaux souterraines méritent une attention particulière en 2026. Le règlement ESDM 4/2026 traite notamment de l’approbation, du forage, des compteurs, des puits de recharge, du suivi et des rapports. Une pompe et une canalisation prouvent seulement que l’eau peut être extraite. Elles ne prouvent ni que l’extraction commerciale est autorisée, ni qu’elle est soutenable, ni que l’eau convient à l’usage prévu. Lire les guides distincts sur
le permis d’eau souterraine
et
la qualité de l’eau de l’aquifère au robinet
.
L'agence régionale de gestion des catastrophes (BPBD) de Bali et le portail InaRISK de l'agence nationale de gestion des catastrophes (BNPB) publient des cartes officielles de pré-évaluation des risques. Elles servent à identifier les études et questions d'ingénierie nécessaires. Elles ne doivent jamais devenir un badge « sûr » délivré à partir d'une carte peu détaillée. Un projet côtier, en bord de rivière, près d'un ravin ou sur une forte pente peut exiger des études géotechniques, hydrologiques, structurelles et d'évacuation qu'aucune liste de contrôle documentaire ne remplace.
Quand l’étude géotechnique doit intervenir avant l’acompte
L’étude géotechnique est souvent commandée après l’acquisition, lorsque le projet est mieux défini. Cette chronologie peut toutefois exposer l’acheteur à un risque financier important. Une pente marquée, des remblais, une nappe peu profonde, des sols meubles saturés, un contexte calcaire ou karstique, des ouvrages de soutènement, une exposition côtière ou des difficultés de drainage peuvent modifier sensiblement la surface utile, les fondations, le calendrier ou le budget. Dans ce cas, une évaluation préliminaire indépendante et proportionnée au risque doit être menée avant que l’engagement ne devienne non remboursable ou inconditionnel. Elle sera ensuite complétée par les investigations ciblées recommandées.
Décision géotechnique avant l’achat
Réduire les incertitudes avant un engagement non remboursable
01 · Historique et cartes
Usage antérieur, remblais, pente, drainage, voisinage et documents régionaux datés.
02 · Visite du terrain
Relevés, cheminement visible de l’eau, accès, ouvrages de soutènement et exposition littorale.
03 · Investigations ciblées
Sondages, SPT ou CPT, carottage, essais en laboratoire, géophysique et observations de la nappe selon le risque.
04 · Conséquences pour le projet
Traduire les résultats en fondations, terrassements, drainage, délai, coût et conditions de la transaction.
Le programme dépend du projet envisagé, des risques identifiés et de l’accès accordé par le vendeur. Il ne s’agit pas d’une série d’essais identique pour toutes les parcelles.
La norme indonésienne
SNI 8460:2017
distingue la reconnaissance préliminaire des investigations destinées au dimensionnement. Selon le contexte, celles-ci peuvent comprendre des sondages, des essais SPT ou CPT, des prélèvements, des essais en laboratoire et des observations du niveau de la nappe. La norme n’impose pas la même série d’essais à chaque acquéreur avant tout achat. Le géotechnicien qualifié définit le programme adapté ; le conseil chargé de la transaction encadre contractuellement l’accès au terrain et les éventuelles conditions suspensives ; l’acquéreur apprécie ensuite si l’incertitude résiduelle demeure acceptable.
Dans les principaux secteurs d’investissement à Bali, les priorités d’étude diffèrent. À Denpasar, Seminyak et Canggu, elles peuvent porter sur les remblais, le drainage, le niveau de la nappe et l’exposition littorale. À Ubud s’ajoutent souvent les versants volcaniques, les déblais, les remblais et les ouvrages de soutènement. À Uluwatu et dans le Bukit, l’attention se porte notamment sur le calcaire, le karst, les cavités éventuelles et la stabilité des falaises. Ces indications orientent les vérifications ; elles ne permettent jamais de conclure sur une parcelle donnée.
Vérification 6 : dessiner la chaîne opérateur, licence, argent et fiscalité
Supposons maintenant que le terrain, l'usage et le bâtiment fonctionnent. Cela ne prouve toujours pas que le revenu prévisionnel est licite.
Il faut d'abord dessiner la chaîne financière :
client → partie au contrat de séjour → entité contractuelle d'encaissement → compte bancaire → titulaire du revenu → contribuable
Puis la chaîne opérationnelle :
titulaire du bien → opérateur d'hébergement → gestionnaire/intermédiaire → employeur → titulaire des licences → responsable des déclarations
Pour chaque flèche, il faut nommer la personne ou la société et identifier le contrat qui fonde son rôle.
Les questions pratiques sont les suivantes :
Qui publie l'annonce et fixe les tarifs ?
Qui contracte avec le client et gère les remboursements ?
Qui reçoit les paiements OTA, carte et directs ?
Qui émet la facture au client ?
Qui emploie et dirige le personnel ?
Qui détient le NIB, la classification indonésienne des activités économiques (KBLI) adaptée et les autorisations liées au niveau de risque ?
Qui respecte les standards touristiques et les obligations de déclaration des clients ?
Qui s'immatricule, collecte, déclare et paie chaque taxe nationale ou locale ?
S'il existe un gestionnaire, quelle est son autorité et comment est-il rémunéré ?
KBLI 2025 rend les distinctions plus nettes. Exploiter sa propre villa, gérer l'hébergement d'un autre propriétaire et simplement intervenir comme intermédiaire de réservation ne sont pas la même activité. La licence du gestionnaire ne légalise pas les défauts du bien sous-jacent ; les documents du propriétaire n'autorisent pas automatiquement l'activité propre du gestionnaire.
Le NIB constitue le début de nombreuses procédures OSS, pas une fin universelle. Il faut tester dans le profil OSS réel l'entité, le KBLI, la taille d'entreprise, l'adresse et le niveau de risque exacts, ainsi que les standards sectoriels et autorisations complémentaires.
Le niveau de risque ne doit pas servir de raccourci pour décider de l'éligibilité d'une PT PMA. Un risque faible décrit un parcours de licence plus léger ; à lui seul, il ne ferme ni n'ouvre l'activité à l'investissement étranger. Il faut confirmer séparément la définition de l'activité, la taille d'entreprise disponible, les conditions d'investissement étranger et la licence effective. Si une ancienne licence est présentée comme preuve, vérifiez s'il s'agit d'une véritable autorisation antérieure valable préservée par une règle transitoire, et non d'une voie toujours ouverte à un nouveau demandeur.
Une page active sur Airbnb ou Booking.com prouve seulement que l'annonce est en ligne. Elle ne prouve pas la licence. Le dossier doit retenir la position datée du ministère du Tourisme : le 26 mai 2026, le ministère du Tourisme indiquait que l'API de vérification entre plateformes et autorisations était
encore en développement
, avec un lancement visé en juin 2027. Le ministère décrivait séparément un mécanisme actuel de listes permettant le retrait des annonces, puis la réintégration après mise en conformité. L'API ne doit donc pas être présentée comme déjà opérationnelle.
La fiscalité exige la même séparation. Le dossier peut devoir traiter le PBB-P2, le BPHTB, l'impôt du cédant sur le transfert, l'impôt sur la location de terrain/bâtiment, le PBJT local applicable aux services hôteliers/d'hébergement et le régime ordinaire d'impôt sur le revenu ou les sociétés. Il n'existe pas un « taux unique de fiscalité immobilière à Bali » honnête. La transaction, le contrat, le flux de revenu, le contribuable et la régence/ville comptent tous.
Pour comprendre la structure d’exploitation, consultez ces guides complémentaires :
KBLI 2025 pour les villas à Bali : détenir, exploiter et gérer pour autrui ne sont pas la même activité
;
Un contrat de gestion n'est pas une licence : qui est l'opérateur, l'entité contractuelle d'encaissement et le contribuable ?
;
l'
analyse documentée de la structure sociétaire
appliquée à l'entité et à l'adresse réelles.
Vérification 7 : analyser le contrat, le transfert et la sortie avant d'entrer dans l'opération
La dernière vérification est souvent repoussée parce qu'elle paraît lointaine. Elle doit pourtant intervenir avant l'investissement, car le document d'acquisition crée l'actif qu'il sera ensuite possible, ou non, de céder.
Pour un bail contractuel, il faut enregistrer séparément :
dates juridiques de début et de fin ;
période de prise de possession, construction et montée en charge incluse dans cette durée ;
années d'exploitation sécurisées ;
usages personnel, constructif, locatif et commercial autorisés ;
droits de cession et de sous-location ;
consentement du propriétaire, procédure et délai de réponse ;
option de prolongation, fenêtre de notification et formule de prix ;
conséquences du décès, de la succession ou de la vente par le propriétaire ;
défauts, délais de remède, résiliation et remboursement ;
sinistre, expropriation et indemnités d'assurance ;
propriété ou retrait des bâtiments, meubles et équipements à l'échéance ;
obligations de remise en état et de restitution ;
langue, droit applicable et forum de règlement des litiges ;
taxes, frais et coûts d'entrée, d'exploitation, de cession et de sortie.
« 25 + 25 ans » peut signifier 25 années sécurisées suivies d'une négociation future. Tant que le mécanisme de prolongation n'est pas suffisamment défini et exécutoire, le modèle financier ne doit pas traiter cette formule comme 50 années garanties.
Pour l'acquisition d'un droit enregistré, il faut confirmer le processus de transfert/enregistrement, la durée du droit et les conditions de prolongation ou renouvellement, les charges, consentements et taxes de sortie. Pour l'achat des actions d'une société, il faut ajouter un dossier sociétaire complet : actes et historique AHU, actionnaires et bénéficiaires effectifs, comptes, fiscalité, dettes, litiges, salariés, licences, conventions avec les parties liées et toutes les responsabilités qui restent dans la société après l'acquisition.
La règle financière est simple, même lorsque le contrat ne l'est pas :
Ne jamais attribuer une valeur terminale au-delà du droit ou de la durée sécurisée, sauf si l'hypothèse de prolongation est visible, chiffrée et testée séparément.
C'est pourquoi la phase suivante du dossier de due diligence sera un
test de résistance du bail et de la sortie
, et non une promesse de prix de revente.
Un projet d'apparence normale qui échoue aux sept contrôles
Imaginons une villa terminée de deux chambres, proposée avec « 25 + 25 ans », une capture de zone rose, une annonce OTA active et un acompte demandé sous 48 heures.
Le titre est authentique, mais le bailleur annoncé n'est que l'un de plusieurs héritiers et ses pouvoirs restent incertains.
L'allée traverse le terrain d'un voisin sur la base d'un accord verbal.
La capture montre une vaste zone touristique, mais la sous-zone précise et les reculs n'ont pas été extraits.
L'ancienne autorisation concernait une résidence plus petite ; l'étage et la piscine ne figurent pas sur les plans approuvés.
Le puits n'a pas de dossier et le système d'eaux usées était dimensionné pour un ménage, pas pour une forte occupation.
Le compte OTA, les paiements clients, les salariés et le NIB appartiennent à quatre parties différentes.
Les 25 années supplémentaires dépendent d'un « accord mutuel au prix du marché », et toute cession exige le consentement du propriétaire sans délai de réponse.
Rien dans cet exemple ne prouve que le projet est impossible. Il prouve que le prix affiché ne correspond pas encore à un actif défini.
Ce que doit permettre un acompte
Un acompte doit réserver une opportunité définie pendant la due diligence. Il ne doit pas obliger l'acquéreur à découvrir les défauts importants après que l'argent est devenu non remboursable.
Demandez à un avocat indonésien indépendant de rédiger des conditions adaptées à la transaction, couvrant lorsque nécessaire :
la vérification satisfaisante et récente du droit, du registre foncier et des pouvoirs ;
une confirmation acceptable des limites et de l'accès ;
un résultat écrit spatial/KKPR pour l'usage déclaré ;
une revue satisfaisante du PBG/SLF et de l'existant ;
la revue environnementale, des eaux usées, du forage et des risques ;
la voie confirmée pour l'entité, l'opérateur, les licences et la fiscalité ;
les mécanismes convenus de bail, transfert, cession et prolongation ;
l'absence de nouvelle charge, cession ou modification importante avant la réalisation ;
la coopération du vendeur et l'accès aux documents ;
une date butoir et un mécanisme clair de remboursement si les conditions prévues échouent.
Cette liste n'est pas un modèle de contrat. Elle sert à donner au juriste un mandat de rédaction précis.
Constituer un registre de preuves avant le prochain paiement
Un tableur ou un document partagé suffit pour consigner quatre réponses à chacune des sept vérifications :
Quels documents et informations avez-vous reçus ?
Que manque-t-il ou qu'est-ce qui ne concorde pas ?
Quel professionnel doit vérifier chaque point non résolu ?
Quelles conditions faut-il lever avant le prochain paiement ?
Attribuez un statut clair à chaque élément :
affirmation d'une partie ;
document reçu mais non vérifié indépendamment ;
vérifié par un professionnel identifié ;
vérifié auprès de l'autorité ou du système émetteur ;
incohérent ou non résolu ;
non applicable, avec justification enregistrée.
Gardez les sept vérifications distinctes. Un titre vérifié ne résout pas un usage interdit, et un PBG valable ne prolonge pas le bail. Consignez le document, sa date et son émetteur, la question non résolue, le professionnel responsable et la condition à lever avant paiement.
Les questions que l'on nous pose directement
Quelle est la vérification la plus importante avant un acompte ?
Il n'existe pas de réponse honnête fondée sur un document unique. La meilleure première étape est de définir exactement ce que vous voulez acquérir, construire et exploiter, puis de conditionner l'acompte à la cohérence des sept dossiers.
Le notaire ne vérifie-t-il pas tout ?
Ne supposez pas que le mandat d'une seule personne couvre le titre, le contrat, le zonage, l'ingénierie, l'environnement, les licences et les taxes. Le PPAT possède une fonction précise liée aux actes et à l'enregistrement foncier ; les missions juridiques indépendantes, techniques, réglementaires et fiscales doivent être définies séparément.
Si la villa reçoit déjà des réservations, cela prouve-t-il que l'usage commercial est autorisé ?
Non. L'annonce et l'historique de revenus sont des preuves commerciales, pas des preuves de zonage, de bâtiment ou de licence d'exploitation.
Puis-je régulariser le PBG ou le SLF après l'achat ?
SIMBG prévoit une procédure d'évaluation des bâtiments existants, mais elle ne garantit pas que ce bâtiment sera accepté en l'état. Faites déterminer avant l'achat la faisabilité technique, le coût, le délai et la répartition contractuelle du risque.
Un bail de longue durée est-il dangereux ?
Non. C'est un bail mal défini qui est dangereux. Un bail de longue durée bien structuré peut constituer un investissement rationnel lorsque sa durée sécurisée, son usage, sa prolongation, sa cessibilité et sa sortie sont valorisés honnêtement.
Un registre de preuves remplace-t-il l’avocat ou le notaire ?
Non. Il fournit aux professionnels mandatés un dossier clair à examiner et au propriétaire une trace des questions non résolues. Il ne certifie pas l’opération.
À lire aussi :
Bail de longue durée à Bali : ce que les étrangers achètent
·
Zones verte, rose et jaune
·
cadre actuel des licences de villas
Nous constituons les sept dossiers avant qu'un terrain n'entre dans notre étude de faisabilité, et avant que le dessin ne transforme une parcelle non résolue en engagement émotionnel.
Sources primaires :
loi 5/1960 ; PP 24/1997 modifié ; PP 18/2021 ; règlement ATR/BPN 18/2021 ; PP 21/2021 et règlement ATR/BPN 13/2021 ; portail TARU/RTRW/RDTR de la province de Bali ; PP 16/2021 et SIMBG ; PP 22/2021 et règlement environnemental 4/2021 ; règlement ESDM 4/2026 ; BPBD Bali et InaRISK/BNPB ; PP 28/2025 ; règlement du Tourisme 6/2025 ; classification indonésienne des activités économiques 2025 publiée par l'agence nationale de statistique (BPS) et résultat OSS actuel ; communiqué du ministère du Tourisme du 26 mai 2026 ; loi 1/2022 et PP 35/2023 ; PP 34/2016 et PP 34/2017. Les documents officiels utilisés pour ces affirmations sont directement reliés ci-dessous.
Cet article est pédagogique. Il ne constitue pas un avis sur le titre, le zonage, le bâtiment, l'environnement, la fiscalité, les licences ou l'investissement relatif à un bien donné. Avant tout engagement financier, obtenez des conseils indonésiens indépendants et des preuves vérifiées auprès de leur émetteur pour la parcelle, les parties, la structure et l'usage précis.
Références officielles complémentaires
PP 18/2021 : droits fonciers et enregistrement
Règlement ATR/BPN 18/2021
Carte publique ATR/BPN BHUMI
PP 16/2021 : PBG et SLF
SIMBG du ministère des Travaux publics
Règlement ESDM 4/2026 : eaux souterraines
Cartes de risques BPBD Bali
BNPB InaRISK
PP 28/2025 : autorisations d'activité
Règlement du ministère du Tourisme 6/2025
Mise à jour conformité du ministère du Tourisme : 26 mai 2026
---
Information générale. Dernière mise à jour le 21 juillet 2026. Cette page présente la lecture de bonne foi de DALLEAU à partir des sources officielles citées. Elle ne constitue pas un conseil professionnel. Les règles et pratiques peuvent évoluer ; la synthèse peut être incomplète, dépassée ou erronée. Vérifiez le texte officiel en vigueur et votre situation avec l'autorité ou le professionnel habilité compétent avant d'agir.
Prix, périmètre et prochain engagement
Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Deux questions à explorer ensuite
Question liée
Leasehold à Bali : quels droits obtenez-vous réellement ?
Question liée
Zones verte, rose et jaune à Bali : ce que dit le plan officiel
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans le questionnaire confidentiel. DALLEAU identifiera la prochaine étape utile pour le propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
KBLI 2025 pour les villas à Bali : exploiter son bien et gérer celui des autres ne sont pas la même activité
les rôles de l'opérateur et des parties au projet
Comment sortir légalement de l'argent d'une PT PMA ? Sept méthodes et leur fiscalité
Puits ou forage à Bali : faut-il un permis ?
Contexte publié
Preuves de zonage à Bali
Le bail expliqué

## TVA immobilière 2026 en Indonésie | DALLEAU

URL: https://dalleau.ai/fr/notes/incitation-tva-immobilier-indonesie-2026-acheteurs-etrangers.html

actualité fiscale 2026

Achat immobilier neuf en Indonésie en 2026 : l'État prend-il en charge la TVA ?

Le règlement du ministère des Finances PMK 90/2025 peut réduire la TVA sur un logement neuf éligible livré en 2026. Il ne modifie pas les droits immobiliers qu'un acheteur étranger peut légalement détenir.

DALLEAU | Recherche et notes de terrain Publié le

16 juillet 2026

Dernière vérification

20 juillet 2026

Vérifié | 20 juillet 2026 | sources primaires

Vient de paraître Le PMK 90/2025 peut réduire la TVA sur un logement neuf éligible livré en 2026.

Mis à jour le 20 juillet 2026 Dispositif en vigueur jusqu'au 31 décembre 2026 Prochaine revue prévue : 2026-08-15

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Le règlement du ministère des Finances PMK 90/2025 peut réduire la TVA sur un logement neuf éligible livré en 2026. Il ne modifie pas les droits immobiliers qu'un acheteur étranger peut légalement détenir.

En 2026, un particulier étranger peut, sous certaines conditions, bénéficier de la TVA prise en charge par l'État lors de l'achat d'une maison neuve ou d'un appartement résidentiel. Il doit posséder un numéro fiscal indonésien (NPWP) et être légalement autorisé à détenir le droit immobilier concerné. Le logement doit être neuf, prêt à habiter, livré pour la première fois par le promoteur assujetti, disposer du code d'identité requis, coûter au maximum 5 milliards IDR et être officiellement livré en 2026. L'État prend en charge la TVA correspondant aux premiers 2 milliards IDR du prix, et non la totalité de la TVA d'un achat à 5 milliards IDR. Ce dispositif n'accorde aucun titre de pleine propriété Hak Milik à un étranger et ne couvre pas automatiquement la cession de la durée résiduelle d'un bail à Bali.

Les deux portes à ne pas confondre

Première question : cet acheteur peut-il légalement acquérir ce droit sur cet actif ?

Deuxième question : cette livraison précise par ce promoteur respecte-t-elle le PMK 90/2025 ?

Le respect des conditions fiscales ne crée pas un droit foncier. Le règlement inclut l'étranger avec NPWP uniquement s'il respecte par ailleurs les règles indonésiennes applicables à la détention d'une maison ou d'un appartement par un étranger.

Une cession de bail privé, une villa existante revendue, un bail foncier suivi d'un contrat de construction, des parts d'une société indonésienne à capitaux étrangers (PT PMA) ou un projet non livré ne deviennent pas éligibles parce que la présentation commerciale utilise le mot « immobilier ».

Les conditions à réunir

un particulier et une seule maison ou unité résidentielle ;

pour l'étranger : NPWP et droit de détention conforme ;

prix maximal de 5 milliards IDR ;

unité neuve et prête à habiter ;

première livraison par le promoteur assujetti qui l'a construite ;

code d'identité officiel de l'unité ;

acte de vente signé ou promesse de vente (PPJB) intégralement payée, et remise effective documentée par un procès-verbal de livraison (BAST), entre le 1er janvier et le 31 décembre 2026 ;

aucun acompte ni première échéance avant le 1er janvier 2026 ;

facture fiscale et enregistrement de la remise correctement réalisés par le promoteur ;

aucune cession de l'unité pendant la première année.

L'absence d'une condition peut rendre la TVA exigible selon les règles normales.

Ce que signifie la prise en charge par l'État de 100 % de la TVA

La prise en charge couvre 100 % de la TVA imputable aux premiers 2 milliards IDR du prix , à condition que le prix total ne dépasse pas 5 milliards IDR.

Pour une unité éligible à 1,8 milliard IDR, la totalité du prix peut entrer dans la base couverte. Pour une unité à 4 milliards IDR, seule la TVA correspondant aux premiers 2 milliards IDR bénéficie du dispositif. Le promoteur doit produire la facture correcte : l'acheteur ne doit pas soustraire lui-même une estimation du dernier paiement.

Exemple complet de facture

Prenons un logement neuf éligible dont le prix hors TVA est de 4 milliards IDR . Appelons V le montant total de TVA indiqué sur la facture fiscale valable du promoteur assujetti. La partie du prix couverte est de 2 milliards IDR, soit la moitié du prix. Si la facture répartit la TVA proportionnellement, le calcul se présente ainsi :

Ligne de la facture

Montant

Prix hors TVA

4 milliards IDR

TVA totale figurant sur la facture du promoteur

V

TVA susceptible d'être prise en charge par l'État

V × 2 milliards IDR ÷ 4 milliards IDR = V ÷ 2

Solde de TVA dû par l'acheteur

V − (V ÷ 2) = V ÷ 2

Décaissement final de l'acheteur

4 milliards IDR + (V ÷ 2)

Cet exemple explique uniquement la répartition de la partie couverte. Il ne fixe pas le taux de TVA et ne remplace pas la facture fiscale du promoteur. Le promoteur et un fiscaliste indonésien doivent confirmer la base taxable, le taux, l'éligibilité, la facture et la livraison avant d'intégrer l'aide au budget d'achat.

Pourquoi de nombreuses opérations balinaises resteront hors cadre

À Bali, de nombreuses opérations prennent la forme d'une cession de la durée résiduelle d'un bail, d'un bail consenti par un propriétaire indonésien, de la revente d'une villa existante, d'un mandat de construction, d'une transaction portant sur une société ou d'un projet d'hébergement touristique. Elles ne constituent pas automatiquement la première livraison d'un logement résidentiel neuf au sens fiscal.

Les cinq preuves à demander

le droit exact et son titulaire légal après la réalisation de la transaction ;

le statut fiscal du promoteur et la confirmation de première livraison ;

le code d'identité et la preuve que l'unité est prête à habiter ;

le calendrier 2026 de l'acte, du paiement, du procès-verbal de livraison (BAST) et des responsabilités ;

un projet de facture distinguant la part couverte et la part non couverte.

Tant que la réponse se résume à « le notaire verra plus tard », n'intégrez pas cet avantage au budget d'acquisition.

Questions directes

Cela permet-il à un étranger d'acheter une villa en pleine propriété (Hak Milik) ? Non. Le règlement maintient expressément les règles de détention applicables aux étrangers.

Est-ce valable pour un bail de longue durée ? Une cession ordinaire de la durée résiduelle d'un bail ne correspondrait normalement pas à la première livraison taxable d'un logement neuf décrite par le PMK. Il s'agit d'une déduction tirée des conditions de la transaction, pas d'une règle universelle sur les baux. N'intégrez pas l'avantage sans avis écrit propre à la transaction.

Les 5 milliards IDR sont-ils entièrement sans TVA ? Non. Le prix admissible peut atteindre 5 milliards IDR, mais la prise en charge ne porte que sur la TVA des premiers 2 milliards IDR.

Puis-je revendre immédiatement ? Une cession dans l'année suivant la livraison fait perdre le bénéfice du dispositif.

sources vérifiées : 20 juillet 2026 · fin de la fenêtre : 31 décembre 2026

Sources : PMK 90/2025, Direction générale des impôts, consulté le 20 juillet 2026. Information générale uniquement.

Références officielles complémentaires

Registre vérifié le 20 juillet 2026. La source officielle en vigueur et les faits du projet restent déterminants.

PMK 90/2025 : texte officiel JDIH, en vigueur depuis le 1er janvier 2026, articles 3 à 9

DJP : PMK 90/2025

PP 18/2021 : droits résidentiels des étrangers

Loi agraire fondamentale 5/1960

Deux questions à explorer ensuite

Question liée Est-il encore intéressant d'investir dans une villa à Bali en 2026 ? Question liée Sept vérifications avant de verser un acompte immobilier à Bali

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

Méthode

Sources et date de mise à jour

DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.

À lire ensuite

Sept vérifications avant de verser un acompte immobilier à Bali PT PMA : faut-il verser 10 milliards IDR dès la création ?

## Visa investisseur E28A : droits et limites | DALLEAU

URL: https://dalleau.ai/fr/notes/indonesia-investor-visa-e28a.html

Accueil / Notes de terrain / Visa investisseur

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Visa investisseur Sources consultées le 13 juillet 2026

KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Le visa investisseur (E28A) couvre davantage qu'un visa de visite, mais moins que les promesses parfois associées à un titre de séjour investisseur. Sa portée dépend de l'actionnariat documenté, de la société garante et des activités exercées.

DALLEAU | Recherche et notes de terrain Publié le

13 juillet 2026

Dernière vérification

13 juillet 2026

Vérifié | 13 juillet 2026 | sources primaires

Périmètre Information indépendante, sans vente de visas Ce guide distingue le texte officiel de l'E28A des promesses beaucoup plus larges parfois utilisées pour commercialiser ce visa.

Règle centrale La fiche E28A actuelle autorise l'investissement, la création d'entreprise et certaines activités de directeur ou de commissaire dans la société où la personne a investi. Elle demande actuellement la preuve d'au moins 10 milliards IDR de parts dans la société garante. Ce seuil d'immigration n'accorde pas un droit illimité d'exercer n'importe quelle activité en Indonésie.

Séjour 1 ou 2 ans

Parts requises Au moins 10 milliards IDR

Garant Requis

Dans ce dossier Ce que la fiche actuelle autorise La condition des 10 milliards IDR Documents et calendrier Distinguer le rôle d'investisseur de l'emploi opérationnel Ce que le mot "gérer" peut recouvrir Le statut de société ne valide pas le bien Questions à poser avant de payer un agent

Ce que la fiche actuelle autorise

La fiche officielle E28A indique que le titulaire peut investir, mener des activités liées aux affaires, à l'investissement et à la création d'entreprise, agir comme directeur ou commissaire dans la société où il a investi et superviser la production de biens ou services dans cette société. Elle précise aussi que les membres éligibles de sa famille peuvent le rejoindre sous un statut migratoire adapté. Les voyages, le tourisme et les études sont permis dans les limites prévues pour les activités complémentaires.

Ces droits sont étendus, mais ils n'autorisent pas un investisseur à travailler pour n'importe quelle entreprise ni à exercer n'importe quelle fonction.

L'autorisation reste liée :

à la société dans laquelle la personne a investi ;

à l'actionnariat documenté ;

au mandat social et aux activités ;

aux limites inscrites sur le titre ;

aux règles distinctes du droit du travail lorsqu'elles s'appliquent.

La condition des 10 milliards IDR

La fiche actuelle demande la preuve d'au moins 10 milliards IDR de parts dans la société garante enregistrée auprès du ministère indonésien de l'Investissement, couramment désigné par le sigle BKPM. Elle précise ensuite qu'un directeur ou commissaire détenant moins que ce montant doit demander le visa de travail correspondant à sa fonction.

Il faut lire cette règle comme une condition d'immigration de l'E28A. Elle ne dispense pas de respecter les autres règles applicables aux sociétés, à l'investissement ou au travail. Le prestataire qui prépare le dossier doit pouvoir montrer où figure l'actionnariat et comment il répond à l'exigence actuelle du portail.

Documents et calendrier

La fiche propose actuellement des séjours d'un ou deux ans. Elle exige un garant et une demande eVisa. Les pièces annoncées comprennent :

un passeport valable au moins six mois ;

la preuve d'au moins 2 000 USD de ressources ;

une photo récente, un curriculum vitae (CV) et un itinéraire ;

une lettre de demande ;

l'acte d'approbation de la société ;

la preuve des parts qualifiantes ;

deux mois de relevés du compte courant de la société.

Pour une société créée depuis moins de deux mois, la fiche permet de remettre le relevé bancaire à l'immigration dans les 90 jours suivant la délivrance du titre de séjour temporaire (ITAS). Cette facilité précise ne doit pas être étendue aux autres pièces ou aux obligations relevant du droit du travail.

Distinguer le rôle d'investisseur de l'emploi opérationnel

La catégorie dépend moins du mot « investisseur » que des activités exercées chaque jour.

Activité exercée

Ce que le visa investisseur permet, sous réserve de vérification

Approuver la stratégie et les investissements

Cohérent avec l'objet investisseur

Agir comme directeur ou commissaire documenté dans la société où la personne a investi

Expressément cité, sous réserve des conditions actuelles

Superviser la production des biens ou services de la société

Cité par la fiche actuelle, mais le rôle et son traitement au regard du droit du travail restent à vérifier

Travailler pour une autre société indonésienne

Non couvert par l'investissement dans la société garante

Prendre un emploi opérationnel sans lien

Non couvert automatiquement

Effectuer ou facturer des prestations hors activité autorisée

Non couvert par l'E28A. Ne pas le faire sans une autorisation distincte et vérifiée

Le règlement du ministre du Travail 8/2021 prévoit des exceptions précises à l'approbation du plan d'emploi d'un travailleur étranger (RPTKA) pour certains actionnaires également directeurs ou commissaires. Les critères et les tâches exercées comptent. Le seuil migratoire E28A de 10 milliards IDR ne prouve pas que tout actionnaire-dirigeant est exempté de toute obligation relevant du droit du travail.

La fiche E28A interdit également le travail qui ne correspond pas au titre de séjour et limite la vente de biens ou services à ce qui est nécessaire dans l'activité autorisée.

Ce que le mot "gérer" peut recouvrir

Les investisseurs emploient souvent un seul verbe : « gérer ». En pratique, ce mot peut désigner des activités très différentes :

lire un rapport propriétaire ;

approuver un budget ;

donner une orientation à la direction indonésienne ;

superviser les équipes sur place ;

accueillir les voyageurs ;

vendre l'hébergement ou des services ;

effectuer des tâches de maintenance ou de chantier.

Les deux premiers exemples relèvent plutôt de la gouvernance. Les derniers deviennent de plus en plus opérationnels. Le bon statut ne se déduit pas seulement du titre inscrit sur une carte de visite.

Le statut de société ne valide pas le bien

L'E28A ne décide pas si la société peut détenir le droit foncier concerné, si un bail est solide, si le zonage autorise l'hébergement, si le bâtiment possède une autorisation de construire (PBG) et un certificat d'aptitude à l'usage (SLF), ou si l'exploitant détient les licences et inscriptions fiscales nécessaires.

Le visa est accordé au regard d'une société et d'un rôle précis. Il ne valide pas le bien immobilier.

Questions à poser avant de payer un agent

Quel code actuel figurera dans la demande ?

Quelle société sera garante ?

Où les 10 milliards IDR de parts sont-ils documentés ?

Quelles activités exactes sont déclarées à l'immigration ?

Le rôle exige-t-il une approbation au titre du droit du travail ou repose-t-il sur une exception définie ?

Quelle formalité doit être accomplie après l'arrivée et avant quelle date ?

Le dossier peut-il être contrôlé dans le compte eVisa officiel ?

Ce que cela change pour un projet immobilier

Un investissement immobilier sérieux sépare la détention, la gouvernance, la supervision du projet et l'exploitation hôtelière quotidienne. L'organigramme doit préciser ce qui relève de l'investisseur étranger, de la société autorisée, de la direction indonésienne et des professionnels indépendants.

Limite : Cette synthèse est une information générale, pas un conseil juridique, migratoire, fiscal ou professionnel. Vérifiez la fiche officielle correspondant à votre passeport et à votre activité avant de payer ou de voyager.

Sources gouvernementales

01 E28A Visa Investor Direction générale de l'immigration de la République d'Indonésie · E28A · consulté le 13 juillet 2026

02 Peraturan Menteri Ketenagakerjaan Nomor 8 Tahun 2021 Ministère du Travail de la République d'Indonésie · Permenaker 8/2021 · consulté le 13 juillet 2026

03 Peraturan Pemerintah Nomor 34 Tahun 2021 tentang Penggunaan Tenaga Kerja Asing Gouvernement de la République d'Indonésie · PP 34/2021 · consulté le 13 juillet 2026

04 Portail officiel des visas électroniques pour l'Indonésie Direction générale de l'immigration de la République d'Indonésie · Portail de demande · consulté le 13 juillet 2026

Dates des sources : page mise à jour le 13 juillet 2026 . Prochaine vérification prévue le 27 juillet 2026 .

Décisions liées

Visas et titres de séjour Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Arrivée en Indonésie Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ? Autorisation de travail Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

Projet immobilier Le visa investisseur n'est qu'un élément de la structure du projet.

Si vous étudiez un terrain, une villa ou un modèle d'exploitation porté par une société indonésienne à capitaux étrangers (PT PMA), nous pouvons examiner le programme commercial et opérationnel pendant que des conseils juridiques et migratoires indépendants valident les aspects réglementés.

Présenter le projet immobilier

Sources officielles 13 juillet 2026

Les liens gouvernementaux ont été consultés à cette date. Lorsque les pages officielles diffèrent, le dossier le signale et retient la lecture la plus prudente.

Consulter les sources

Deux questions à explorer ensuite

Question liée PT PMA : faut-il verser 10 milliards IDR dès la création ? Question liée Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Visa E33G pour télétravailler depuis Bali | DALLEAU

URL: https://dalleau.ai/fr/notes/indonesia-remote-worker-visa-e33g.html

Accueil / Notes de terrain / Travail à distance

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Travail à distance Sources consultées le 13 juillet 2026

Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026

L'Indonésie prévoit bien une catégorie pour le travail à distance. Elle est plus étroite que l'expression 'visa pour nomades numériques' : le texte actuel exige un contrat avec une société établie hors d'Indonésie et un seuil annuel de revenus documentés.

DALLEAU | Recherche et notes de terrain Publié le

13 juillet 2026

Dernière vérification

13 juillet 2026

Vérifié | 13 juillet 2026 | sources primaires

Périmètre Information indépendante, sans vente de visas L'E33G est un statut migratoire. Il ne tranche ni la résidence fiscale, ni l'existence d'un établissement stable, ni l'imposition personnelle.

Critères publiés L'E33G donne actuellement accès à un titre de séjour temporaire d'un an, sans garant, demandé depuis un compte eVisa. Le demandeur doit présenter un contrat de travail avec une société établie hors d'Indonésie et justifier au moins 60 000 USD de salaire ou de revenu annuel. La FAQ officielle exclut toute rémunération provenant d'une personne ou d'une société indonésienne.

Séjour 1 an

Revenu étranger Au moins 60 000 USD par an

Garant Non requis

Dans ce dossier Les conditions d'éligibilité publiées Trois profils de demandeurs Ce que l'E33G permet Ce qu'il ne permet pas Demande et frais officiels Le statut migratoire n'est pas le statut fiscal Télétravailler n'est pas exploiter une villa Avant la demande

Les conditions d'éligibilité publiées

La fiche E33G décrit un titre temporaire destiné aux personnes qui travaillent à distance pour une société établie hors d'Indonésie. Deux justificatifs sont au cœur du dossier :

un contrat de travail avec une société établie hors d'Indonésie ;

une preuve bancaire de salaire ou de revenu d'au moins 60 000 USD par an.

La fiche demande aussi un passeport valable au moins six mois, trois mois de relevés montrant au moins 2 000 USD de ressources, une photo récente, un curriculum vitae (CV) et un itinéraire.

Dire « je travaille sur Internet » ne suffit donc pas. Le texte actuel repose sur l'existence d'une relation de travail avec une société étrangère.

Trois profils de demandeurs

Profil

Lecture des critères publiés

Salarié d'une société établie hors d'Indonésie, avec un contrat étranger et au moins 60 000 USD de revenu annuel documenté

Correspond au cas central publié, sous réserve du dossier complet

Freelance, entrepreneur individuel, fondateur sans contrat de travail, consultant payé à la mission ou créateur rémunéré par des plateformes

Incertain. La fiche exige un contrat de travail avec une société étrangère ; confirmez les justificatifs avant de payer

Personne rémunérée par une personne ou société indonésienne, ou vendant des services à des clients indonésiens

Ne correspond pas à la FAQ E33G officielle

Ce que l'E33G permet

La fiche officielle autorise le titulaire à vivre en Indonésie tout en exécutant la mission de l'entreprise étrangère, à entrer et sortir tant que le droit de retour reste valable, à voyager et à visiter famille ou amis.

Le séjour actuel est d'un an. La page détaillée de l'Immigration indique que le statut peut être prolongé et converti, tandis que le sélecteur eVisa contrôlé le 13 juillet 2026 présente cette voie comme non prolongeable. Face à cette contradiction, nous retenons la lecture la plus prudente : prévoyez un séjour d'un an sans compter sur une prolongation. Le visa doit être utilisé dans les 90 jours suivant sa délivrance.

Ce qu'il ne permet pas

La FAQ E33G officielle indique que le titulaire ne peut recevoir ni salaire, ni rémunération, ni contrepartie similaire d'une personne ou société indonésienne. Elle interdit aussi la vente de biens ou services.

Situation

Lecture prudente

Salarié d'une société française travaillant sur les missions de cet employeur

Conforme à l'objet publié si le contrat et le revenu répondent aux critères

Paiement par une société indonésienne

Exclu par la FAQ officielle

Vente de services à des clients indonésiens

Non autorisée selon la lecture stricte publiée

Employeur étranger envoyant la personne gérer sa filiale indonésienne

Analyse différente, car le travail réel et son bénéficiaire peuvent être indonésiens

Exploitation quotidienne d'une villa à Bali

Ce n'est pas du télétravail pour un employeur étranger

La page détaillée introduit une nuance limitée concernant la vente, tandis que la FAQ est plus stricte. Nous retenons donc la lecture la plus prudente : aucune vente de biens ou de services en Indonésie et aucune rémunération de source indonésienne.

Demande et frais officiels

La fiche actuelle prévoit une demande directe via le portail officiel des visas électroniques , sans garant. Le montant gouvernemental annoncé est de 7 millions IDR pour l'ensemble d'un an, comprenant visa, vérification, titre de séjour temporaire (ITAS) et droit de retour.

Le délai annoncé est de cinq jours ouvrables après paiement. Il s'agit d'un objectif publié, pas d'une garantie si le dossier est incomplet, incohérent ou contrôlé manuellement.

Le statut migratoire n'est pas le statut fiscal

Les documents migratoires officiels de l'E33G ne créent et ne décrivent aucune exonération fiscale. Ils ne répondent ni à la situation fiscale personnelle du titulaire ni à l'exposition fiscale indonésienne de l'employeur étranger. Il faut obtenir une analyse fiscale distincte, datée et réalisée par un conseil qualifié avant de retenir un traitement fiscal.

Télétravailler n'est pas exploiter une villa

Une personne peut travailler à distance depuis une villa sans exploiter cette villa. La différence est essentielle.

Travailler sur les dossiers de l'employeur étranger depuis un logement loué correspond au cas central publié. Recruter le personnel de la villa, vendre des nuitées, superviser les voyageurs, gérer des fournisseurs indonésiens ou diriger une société locale d'hébergement sont d'autres activités. Elles ne doivent pas être dissimulées sous le terme télétravail.

Avant la demande

Identifiez l'employeur juridique nommé au contrat.

Confirmez qu'il est établi hors d'Indonésie.

Faites correspondre les preuves annuelles au seuil de 60 000 USD.

Identifiez toute rémunération indonésienne ou activité pour des clients locaux.

Analysez la résidence fiscale séparément.

Utilisez le portail officiel et conservez l'intégralité du dossier.

Ce que cela change pour un projet immobilier

L'E33G peut constituer une solution de séjour pour un salarié étranger éligible. Il ne l'autorise pas à exploiter une villa à Bali et ne remplace ni la société locale, ni les licences, ni les équipes, ni la direction nécessaires à une activité d'hébergement.

Limite : Cette synthèse est une information générale, pas un conseil juridique, migratoire, fiscal ou professionnel. Vérifiez la fiche officielle correspondant à votre passeport et à votre activité avant de payer ou de voyager.

Sources gouvernementales

01 E33G Visa Rumah Kedua Pekerja Jarak Jauh Direction générale de l'immigration de la République d'Indonésie · E33G · consulté le 13 juillet 2026

02 Informations générales sur le visa de télétravail Direction générale de l'immigration de la République d'Indonésie · E33G · consulté le 13 juillet 2026

03 Portail officiel des visas électroniques pour l'Indonésie Direction générale de l'immigration de la République d'Indonésie · Portail de demande · consulté le 13 juillet 2026

Dates des sources : page mise à jour le 13 juillet 2026 . Prochaine vérification prévue le 27 juillet 2026 .

Décisions liées

Visas et titres de séjour Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Arrivée en Indonésie Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ? Autorisation de travail Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

Projet immobilier Vivre à Bali et exploiter une villa sont deux projets différents.

Si vous envisagez aussi un terrain, une résidence secondaire ou une villa destinée à générer des revenus, nous pouvons définir le bien et son modèle d'exploitation. Les questions migratoires et fiscales doivent ensuite être examinées par des spécialistes indépendants.

Définir le projet immobilier

Sources officielles 13 juillet 2026

Les liens gouvernementaux ont été consultés à cette date. Lorsque les pages officielles diffèrent, le dossier le signale et retient la lecture la plus prudente.

Consulter les sources

Deux questions à explorer ensuite

Question liée Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille Question liée Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Travailler à Bali : E23, ITAS et RPTKA | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/indonesia-work-visa-rptka.html

Accueil

/

Notes de terrain

/

Autorisation de travail

Avant toute décision.

Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la

base officielle des réglementations indonésiennes

et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée :

notes@dalleau.ai

. Les responsabilités imposées par la loi applicable restent inchangées.

Autorisation de travail

Sources consultées le

13 juillet 2026

Travailler légalement à Bali : visa, titre de séjour et autorisation d'emploi

L'expression courante 'titre de séjour pour travailler' réunit deux cadres juridiques. L'immigration délivre un visa et un titre de séjour temporaire. Le ministère du Travail encadre l'employeur, la fonction, la durée et le lieu de travail du ressortissant étranger.

DALLEAU | Recherche et notes de terrain

Publié le

13 juillet 2026

Dernière vérification

13 juillet 2026

Vérifié | 13 juillet 2026 | sources primaires

Périmètre

Information indépendante, sans vente de visas

La page publique de la catégorie de séjour professionnel E23 ne contient actuellement aucune donnée détaillée. La foire aux questions citée ci-dessous donne des informations générales sur le séjour professionnel et ne doit pas être rattachée à un code précis sans vérifier le portail à jour.

Distinction essentielle

Un titre de séjour temporaire n'autorise pas, à lui seul, l'exercice de n'importe quel emploi. Pour un emploi local, l'employeur doit normalement vérifier les démarches applicables auprès du ministère du Travail, puis demander la catégorie migratoire correspondante avant la prise de poste. L'autorisation dépend de l'employeur, de la fonction, de la durée, du lieu et des qualifications du salarié.

Immigration

Visa puis titre de séjour temporaire (ITAS)

Emploi

Plan d'utilisation d'un travailleur étranger (RPTKA) si requis

Autorisation

Liée à l'employeur et à la fonction

Dans ce dossier

Deux cadres juridiques complémentaires

Le plan d'utilisation d'un travailleur étranger (RPTKA)

L'ordre prudent des démarches

Durée et coût : plusieurs postes doivent être distingués

Quels postes sont ouverts ou interdits

Ce que cela change pour une activité liée aux villas

Les raccourcis les plus risqués

Deux cadres juridiques complémentaires

Le premier cadre est celui de l'immigration. La

fiche E23

ne contient actuellement aucune donnée publique détaillée. Une

FAQ officielle distincte sur le séjour de travail

affiche des options de 180 jours, un an ou deux ans, mais ne mentionne aucun code de visa. Elle ne peut donc pas être rattachée automatiquement à l'E23. La catégorie exacte peut être E23, E25 ou un autre code en vigueur. La FAQ autorise l'activité correspondant à l'emploi approuvé et interdit tout travail qui ne correspond pas au titre de séjour.

Le second cadre relève du droit du travail. Le

règlement gouvernemental 34/2021 (PP 34/2021)

et le

règlement du ministre du Travail 8/2021 (Permenaker 8/2021)

encadrent les employeurs autorisés à recourir à des travailleurs étrangers dans les catégories prévues par la loi. Le registre du ministère indiquait toujours ces deux textes comme applicables le 13 juillet 2026.

C'est pourquoi présenter le titre de séjour temporaire, couramment appelé KITAS, comme "le permis de travail" entretient une confusion. Le titre temporaire (ITAS) décrit le séjour. L'autorisation d'exercer dépend aussi de l'emploi occupé.

Le plan d'utilisation d'un travailleur étranger (RPTKA)

Le plan d'utilisation d'un travailleur étranger (RPTKA) décrit la fonction et la durée approuvées pour l'employeur. Selon le règlement du ministre du Travail 8/2021, l'employeur doit en principe obtenir son approbation, sauf exception prévue par les textes.

Le dossier précise notamment :

l'employeur autorisé qui utilise le travailleur étranger en Indonésie ;

la fonction et la durée ;

le lieu de travail ;

le travailleur étranger ;

le salarié indonésien chargé de l'accompagnement et du transfert de compétences, lorsqu'il est requis.

Le texte exige une formation adaptée au poste, des compétences ou au moins cinq années d'expérience pertinente et un transfert de savoir-faire vers un accompagnateur indonésien, selon le cadre prévu.

L'ordre prudent des démarches

Les sources officielles ne sont pas parfaitement alignées sur la chronologie. La FAQ eVisa demande un engagement à fournir une Notification du ministère du Travail dans les 90 jours après l'arrivée. Le Permenaker 8/2021 présente l'approbation RPTKA comme la recommandation utilisée pour le visa et le titre de séjour de travail.

La démarche prudente ne consiste donc pas à « arriver puis régulariser », mais à respecter l'ordre suivant :

Définir l'employeur réel, la fonction, le lieu et la durée.

Confirmer si l'approbation RPTKA ou une exception précise s'applique.

Accomplir les démarches exigées auprès du ministère du Travail et de l'Immigration pour la catégorie exacte.

Commencer à travailler seulement lorsque les autorisations nécessaires sont effectives.

Lorsque les pages publiques se contredisent, l'employeur doit confirmer la séquence actuelle dans le portail avant le voyage ou la prise de poste.

Durée et coût : plusieurs postes doivent être distingués

La FAQ emploi affiche actuellement des options et frais d'immigration pour 180 jours, un an et deux ans. Ces frais ne représentent pas tout le coût employeur.

Le règlement du ministre du Travail 8/2021 prévoit aussi la contribution à l'emploi d'un travailleur étranger (DKPTKA), généralement 100 USD par poste, travailleur et mois, payée par l'employeur, avec certaines exceptions institutionnelles. Il s'agit d'une contribution réglementaire, pas des honoraires d'une agence.

Couche

Ce qu'elle contrôle

Ce qu'il faut vérifier

Visa d'entrée

Entrée pour le motif professionnel

Bonne catégorie et date d'utilisation

Titre de séjour temporaire (ITAS) et droit de retour

Séjour et entrées multiples

Validité cohérente avec la mission

Approbation du plan d'emploi (RPTKA)

Utilisation du travailleur par l'employeur

Fonction, durée, lieu et identité

Contrat de travail

Tâches et rémunération réelles

Cohérence avec le poste approuvé

Contribution pour travailleur étranger (DKPTKA)

Contribution réglementaire

Montant, période et éventuelle exception

Quels postes sont ouverts ou interdits

La règle n'est pas que tout emploi hors ressources humaines serait ouvert. Le ministère maintient une liste sectorielle de fonctions accessibles dans la

décision du ministre du Travail 228/2019 (Kepmenaker 228/2019)

, toujours indiquée comme applicable à la date de consultation.

Il maintient aussi une liste de 18 fonctions interdites dans la

décision du ministre du Travail 349/2019 (Kepmenaker 349/2019)

. Elle vise principalement les ressources humaines, le recrutement, les relations industrielles, l'analyse de postes, le développement du personnel et certaines fonctions de sécurité au travail.

La liste officielle contient exactement les intitulés suivants : Personnel Director ; Industrial Relations Manager ; Human Resources Manager ; Personnel Development Supervisor ; Personnel Recruitment Supervisor ; Personnel Placement Supervisor ; Employee Career Development Supervisor ; Personnel Declare Administrator ; Personnel and Careers Specialist ; Personnel Specialist ; Career Advisor ; Job Advisor ; Job Advisor and Counseling ; Employee Mediator ; Job Training Administrator ; Job Interviewer ; Job Analyst ; Occupational Safety Specialist.

La fonction de photographe ne figure pas dans cette liste nationale des postes interdits.

Elle n'apparaît pas non plus dans la liste sectorielle standard du Kepmenaker 228/2019, mais ce même texte permet à l'autorité compétente d'approuver une fonction non répertoriée lorsque l'employeur en démontre le besoin. Son absence dans la liste standard ne prouve donc pas une interdiction absolue. Un tournage commercial peut en outre relever des catégories C14 ou D14 et nécessiter des autorisations distinctes. Il faut vérifier la fonction exacte, le secteur, l'employeur, la procédure RPTKA et les autorisations de tournage. L'affirmation courante selon laquelle le propriétaire étranger d'une société de production pourrait gérer des photographes locaux mais ne pourrait jamais tenir un appareil n'est pas étayée par ces deux listes nationales.

Inventer un titre pour le dossier ne résout rien. L'administration peut comparer la fonction autorisée et les tâches exercées.

Ce que cela change pour une activité liée aux villas

Les tâches doivent être décrites honnêtement. La supervision stratégique, les décisions de conseil, la gestion quotidienne, l'accueil des voyageurs, la vente, la maintenance et la direction du personnel ne sont pas des synonymes.

Un fondateur étranger qui dirige chaque jour les équipes, accueille les voyageurs et vend des services ne doit pas supposer que ses parts ou son titre investisseur couvrent automatiquement ces activités. Le bon statut dépend du mandat social, de l'actionnariat, du travail réel et d'une éventuelle exception prévue par le droit du travail.

Les raccourcis les plus risqués

Entrer avec un visa de visite et commencer à travailler parce que le dossier serait "en cours".

Détenir un ITAS mais travailler pour une autre entité, dans une autre fonction ou dans un autre lieu sans vérification.

Utiliser un titre investisseur pour des tâches qui constituent en réalité un emploi opérationnel.

Prendre la facture d'une agence pour la preuve d'une approbation administrative.

Employer seulement l'ancien nom du permis de travail (IMTA) ou l'ancien code de visa C312 sans demander quelle catégorie et quelle approbation actuelles figurent au dossier.

Ce que cela change pour un projet immobilier

Dans une villa exploitée par son investisseur, il faut définir la frontière entre la gouvernance de l'actionnaire, la supervision du projet et le travail hôtelier quotidien avant de choisir un statut. Le modèle d'exploitation doit intégrer, dès sa conception, les responsabilités de la direction et des équipes indonésiennes.

Limite :

Cette synthèse est une information générale, pas un conseil juridique, migratoire, fiscal ou professionnel. Vérifiez la fiche officielle correspondant à votre passeport et à votre activité avant de payer ou de voyager.

Sources gouvernementales

01

E23 Visa Kerja

Direction générale de l'immigration de la République d'Indonésie · E23 · consulté le 13 juillet 2026

02

Informations générales sur le visa de travail

Direction générale de l'immigration de la République d'Indonésie · Informations générales sur le séjour de travail, code non affiché · consulté le 13 juillet 2026

03

Peraturan Pemerintah Nomor 34 Tahun 2021 tentang Penggunaan Tenaga Kerja Asing

Gouvernement de la République d'Indonésie · PP 34/2021 · consulté le 13 juillet 2026

04

Peraturan Menteri Ketenagakerjaan Nomor 8 Tahun 2021

Ministère du Travail de la République d'Indonésie · Permenaker 8/2021 · consulté le 13 juillet 2026

05

Keputusan Menteri Ketenagakerjaan Nomor 228 Tahun 2019

Ministère du Travail de la République d'Indonésie · Kepmenaker 228/2019 · consulté le 13 juillet 2026

06

Keputusan Menteri Ketenagakerjaan Nomor 349 Tahun 2019

Ministère du Travail de la République d'Indonésie · Kepmenaker 349/2019 · consulté le 13 juillet 2026

Dates des sources :

page mise à jour le

13 juillet 2026

. Prochaine vérification prévue le

27 juillet 2026

.

Décisions liées

Visas et titres de séjour

Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille

Arrivée en Indonésie

Arrivée à Bali : comment utiliser l'e-VOA, All Indonesia et les autogates ?

Visa investisseur

KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Projet immobilier

Nous ne fournissons pas d'autorisation de travail.

Si la question du travail s'inscrit dans un mandat de développement ou d'exploitation de villas, nous pouvons définir les fonctions nécessaires et identifier les points qui exigent un conseil indépendant en immigration et en droit du travail.

Discuter du projet immobilier

Sources officielles

13 juillet 2026

Les liens gouvernementaux ont été consultés à cette date. Lorsque les pages officielles diffèrent, le dossier le signale et retient la lecture la plus prudente.

Consulter les sources

Deux questions à explorer ensuite

Question liée

KITAS investisseur en Indonésie : que permet vraiment le visa E28A ?

Question liée

Visa E33G pour télétravailler depuis Bali : conditions et limites en 2026

Tester l'activité dans le guide visa

Ouvrir l'outil →

De l’information à la décision de projet

Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website

Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité.

En savoir plus

S'abonner

## KBLI 2025 à Bali : villas, gestion et PT PMA | DALLEAU

URL: https://dalleau.ai/fr/notes/kbli-2025-bali-villa-rental-property-management.html

autorisations
KBLI 2025 pour les villas à Bali : exploiter son bien et gérer celui des autres ne sont pas la même activité
KBLI 2025 distingue l'exploitation d'une villa, la gestion d'hébergement pour un tiers, l'intermédiation et la gestion résidentielle. Le point décisif : le bon code d'activité n'est pas automatiquement accessible à toutes les entreprises.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
20 juillet 2026
Vérifié | 20 juillet 2026 | sources primaires
Mise à jour importante
KBLI 55203 ne comporte aucune voie OSS « grande entreprise » : la note explique pourquoi ce n'est pas une nouvelle option PT PMA et distingue les anciennes licences.
Mis à jour le 20 juillet 2026
Prochaine revue prévue : 2026-08-15
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
La classification indonésienne des activités économiques 2025, appelée KBLI, distingue quatre activités souvent confondues à Bali. Elle révèle aussi une erreur fréquente : trouver le code qui décrit une activité ne prouve pas que la société choisie a le droit de l'utiliser.
KBLI 2025 est juridiquement en vigueur depuis décembre 2025. La publication BPS du 14 juillet 2026 précise sa mise en œuvre dans le tourisme et son intégration dans OSS ; elle ne crée pas une nouvelle version de KBLI.
Lorsqu'une micro, petite ou moyenne entreprise indonésienne éligible exploite sa propre villa pour de courts séjours touristiques,
55203, Aktivitas Vila
, décrit cette activité. Une nouvelle PT PMA ne peut pas utiliser 55203 dans la matrice OSS actuelle, car ce code ne comporte aucune voie « grande entreprise ». Lorsqu'une société gère réellement l'hébergement d'un autre propriétaire, pilote les opérations quotidiennes pour son compte et reçoit des honoraires de gestion,
55901, Aktivitas Jasa Manajemen Akomodasi
, peut mieux correspondre. Intermédiation de réservation, gestion résidentielle et location de longue durée relèvent encore d'autres activités. Le code suit l'activité, mais l'accès à ce code suit un second ensemble de règles.
Commencez par cinq faits, pas par cinq chiffres
À Bali, « gestion immobilière » peut désigner presque tout : répondre aux voyageurs, encaisser les loyers, superviser des réparations, diriger le personnel, commercialiser une villa, gérer un lotissement ou assumer tout le risque commercial dans le cadre d'un bail. KBLI ne classe pas le titre inscrit sur une proposition commerciale. Il classe ce que l'entreprise fait.
Avant de recommander un code, il faut répondre à ces questions :
Qui conclut le séjour avec le voyageur ou en porte la responsabilité juridique ?
Qui perçoit le revenu brut des nuitées ?
Qui assume le risque de vacance, de remboursement et d'exploitation ?
Qui contrôle les tarifs, le personnel, l'accueil à l'arrivée et les décisions quotidiennes ?
L'entreprise reçoit-elle un loyer, le revenu des nuitées, une commission ou des honoraires de gestion ?
Ces réponses comptent davantage que les appellations « exploitant de villa », « gestionnaire d'actifs » ou « plateforme d'hébergement » affichées sur le site.
La position pratique en 2026
KBLI 55203 ne présente actuellement aucune voie « grande entreprise » dans la matrice publique. Une nouvelle PT PMA ne doit donc pas le traiter comme une option d'exploitation directe d'une villa. KBLI 55901 reconnaît séparément la gestion opérationnelle d'un hébergement par un tiers et comporte au niveau national une voie grande entreprise/PMA. Une nouvelle demande à Bali exige toujours un résultat OSS en direct, car la restriction provinciale vise l'ancienne catégorie 55900 dont 55901 est issu.
Une PT PMA peut-elle exploiter une villa à Bali ?
Qui exploite réellement la villa ?
Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule.
La matrice de décision
Activité réelle
Point de départ KBLI 2025
Ce que cela signifie et ses limites
Une micro, petite ou moyenne entreprise indonésienne éligible exploite sa propre villa privée pour de courts séjours touristiques
55203
Hébergement en villa géré par son propriétaire. OSS ne prévoit actuellement aucune ligne « grande entreprise » : ce n'est donc pas une nouvelle option PT PMA
Vous exploitez l'hébergement d'un tiers, décisions quotidiennes comprises, pour son compte et contre des honoraires de gestion
55901
Gestion d'hébergements pour compte de tiers. OSS comporte actuellement une ligne « grande entreprise », mais la réalité de l'activité et la position PMA doivent encore être confirmées
Vous mettez en relation voyageurs et hébergeurs ou traitez des réservations contre commission, sans exploiter le bien
55400
Intermédiation d'hébergement
Vous coordonnez entretien, réparations, budgets, charges et règlement résidentiel pour un tiers
68292
Gestion immobilière résidentielle contre honoraires ou contrat
Vous louez des logements possédés ou pris à bail pour une occupation résidentielle durable
68112
Location et exploitation résidentielle de longue durée
Vous développez puis vendez des logements
68111
Développement immobilier résidentiel
C'est une carte de départ, pas un avis de licence. Un contrat mêlant bail et gestion, revenu garanti, partage de chiffre d'affaires ou personnel réparti entre plusieurs parties doit être lu dans son ensemble.
55203 : exploiter sa propre villa
La définition officielle de
KBLI 55203, Aktivitas Vila
, est exceptionnellement claire. Elle vise l'hébergement de courte durée dans des maisons privées spécialement louées aux touristes avec leurs équipements,
gérées par le propriétaire
. L'ancien
55193 Vila
est converti directement en 55203 dans la table officielle BPS.
La réponse juridique apparaît seulement lorsque quatre sources officielles sont lues ensemble :
L'activité.
La définition KBLI et la fiche OSS indiquent que 55203 vise l'hébergement touristique de courte durée dans une maison privée avec ses équipements, gérée par son propriétaire.
La taille d'entreprise.
La matrice OSS publique actuelle de 55203 contient les lignes micro, petite et moyenne. Elle ne contient aucune ligne « grande entreprise ».
Le statut de l'investisseur.
L'article 1(4) de la loi 20/2008 inclut les entreprises étrangères et les coentreprises dans la définition de la grande entreprise. Une PT PMA ne peut donc pas entrer par une ligne micro, petite ou moyenne.
L'allocation et la conversion.
L'annexe II du règlement présidentiel 49/2021 classait l'ancien 55193 Vila parmi les activités allouées aux coopératives et aux UMKM. La table officielle BPS convertit ensuite directement 55193 en 55203.
Conclusion en termes simples :
KBLI 55203 est une activité valable, mais ce n'est pas une nouvelle voie d'enregistrement pour une PT PMA. Il peut décrire l'activité d'une micro, petite ou moyenne entreprise indonésienne éligible exploitant sa propre villa. Pour une nouvelle PT PMA, l'absence de ligne « grande entreprise » est déterminante.
Comment une lecture attentive peut malgré tout donner la mauvaise réponse
Les textes répondent à des questions différentes. N'en lire qu'un produit une conclusion plausible, mais incomplète.
« Le code existe, donc ma société peut l'utiliser. »
Non. KBLI décrit l'activité ; OSS et les règles d'investissement déterminent quelle taille d'entreprise peut l'enregistrer.
« Le risque est moyen-faible, donc l'activité est ouverte à l'investissement étranger. »
Non. Le niveau de risque détermine le parcours de licence. Il ne crée pas une taille d'entreprise et ne supprime pas une restriction d'investissement.
« Mon investissement dépasse Rp10 Md, donc je peux agir comme grande entreprise. »
Non. Un montant élevé ne crée pas une ligne « grande entreprise » absente d'OSS pour cette activité.
« BPS a converti 55193 en 55203, donc l'ancienne allocation UMKM a disparu. »
Non. La conversion change le numéro de classification ; elle n'élargit pas, à elle seule, les personnes autorisées à utiliser l'activité.
« Une ancienne licence reste valable, donc une nouvelle PT PMA peut obtenir la même. »
Non. Une règle transitoire peut préserver une autorisation valable sans ouvrir cette voie à un nouveau demandeur.
L'activité villa n'est donc pas interdite en soi. En revanche,
la bonne description de l'activité et l'éligibilité du demandeur sont deux portes distinctes
. C'est pourquoi un code à cinq chiffres ne doit jamais être présenté comme un avis de licence complet.
55901 : gérer l'hébergement d'un autre propriétaire
La véritable nouveauté utile est
KBLI 55901, Aktivitas Jasa Manajemen Akomodasi
.
Ce code vise le tiers responsable de la performance commerciale et opérationnelle d'un hébergement, directement impliqué dans les opérations quotidiennes et les décisions managériales, agissant pour le compte du propriétaire et rémunéré par des honoraires de gestion.
Cette définition correspond bien mieux à une vraie société de gestion de villas qu'un code générique de conseil ou d'immobilier. Contrairement à 55203, la matrice OSS publique actuelle de 55901 comporte une ligne « grande entreprise ». Cela permet de tester 55901 pour une grande société, mais ne constitue pas une approbation PT PMA automatique : le service réel, l'accès à l'investissement, la localisation, le niveau de risque et le parcours de licence doivent encore être confirmés pour le demandeur. Conservez un résultat OSS daté avant toute affirmation propre au projet.
55901 devient donc une classification candidate à tester pour un véritable gestionnaire d'hébergements agissant pour un tiers. Ce n'est pas une recommandation de licence propre à un projet, et les faits doivent suivre :
il faut un mandat de gestion réel ;
la société doit agir pour le propriétaire, et non se présenter comme mandataire tout en commerçant entièrement pour son propre compte ;
l'autorité opérationnelle et les rapports doivent être documentés ;
honoraires de gestion, revenus voyageurs, paie et dépenses doivent correspondre au contrat ;
la partie présentée aux voyageurs, aux plateformes de réservation en ligne (OTA), aux salariés, aux autorités fiscales et à OSS doit rester la même dans chaque document.
Si la société prend la villa à bail, vend les séjours en son nom et assume tout le risque commercial, elle n'est peut-être plus un simple gestionnaire pour compte du propriétaire. Appeler le paiement « honoraires de gestion » ne décide pas de la classification.
Une société de management n'est pas automatiquement le fournisseur principal du séjour. L'opérateur, le droit sur le bien, le contrat client, le merchant OTA, les équipes, la fiscalité, l'APOA et le risque client doivent encore être attribués de manière cohérente.
La licence d'un gestionnaire ne régularise pas la villa qu'il gère
C'est aussi le point que l'enthousiasme suscité par 55901 risque le plus de faire oublier.
Un gestionnaire correctement licencié ne corrige pas automatiquement un mauvais zonage, un PBG ou SLF manquant, une activité d'hébergement non autorisée, une faille fiscale ou un usage commercial invalide du bien. La définition officielle dit que le gestionnaire agit pour le propriétaire. Elle ne dit pas que l'hébergement sous-jacent disparaît de la chaîne de conformité.
Il faut toujours demander :
L'hébergement touristique est-il autorisé sur cette parcelle ?
L'autorisation de construire et le certificat d'usage correspondent-ils au bien terminé et à son usage ?
L'hébergement ou l'opérateur sous-jacent est-il correctement autorisé pour le modèle réel ?
Quelle entité est contractuellement responsable de l'encaissement des revenus voyageurs ?
Qui s'enregistre et paie les taxes applicables ?
Qui emploie le personnel et déclare les voyageurs étrangers ?
Notre
note sur les licences de villa sous PP 28/2025
couvre ces couches physiques, opérationnelles et fiscales. Le KBLI du gestionnaire n'est qu'une couche.
55400 et 68292 : deux activités appelées « gestion », mais différentes
KBLI 55400
vise l'intermédiation d'hébergement : mettre en relation clients et hébergeurs contre honoraires ou commission, y compris la réservation par canaux numériques ou non numériques. Cela correspond à une place de marché ou un apporteur de réservations. Pas à une société qui dirige le personnel, le service voyageurs et l'exploitation quotidienne.
KBLI 68292
vise la gestion immobilière résidentielle pour compte de tiers : entretien, réparations, budgets, charges et règlement de la résidence. Il faut penser gestion de résidence ou de copropriété, pas hospitalité à la nuitée.
Un même groupe peut exercer plusieurs activités. Si chacune génère du revenu, les objets sociaux, projets OSS, contrats, comptes et déclarations d'investissement doivent les refléter correctement. Accumuler les codes ne transforme pas les formalités en autorisation générale.
68112 : la location résidentielle n'est pas l'hébergement de courte durée
KBLI 2025 sépare le développement et la vente résidentiels sous
68111
de la location et de l'exploitation de biens résidentiels propres ou loués sous
68112
.
La définition générale de la division 68 exclut les hôtels, maisons de vacances et autres hébergements de moins d'un an, renvoyés vers la division 55. 68112 est donc une mauvaise réponse à une activité de villa touristique à la nuitée ou à la semaine, même si « location immobilière » paraît juste en français.
Une seconde prudence s'impose : la page OSS publique de 68112 affiche sa définition, mais pas de matrice exploitable de risque et de licence. Il ne faut pas publier que ce code serait « NIB seulement » ou automatiquement ouvert à une PT PMA. Il faut le vérifier dans le profil réel du demandeur.
Pourquoi un code d'hôtel ou d'appart'hôtel n'est pas un contournement
Un vrai hôtel non classé, apart-hotel ou cottage peut relever d'un autre code. Cela ne rend pas ces codes substituables à une villa privée.
La classification suit les locaux, le modèle de service, les standards et l'exploitation. La présence d'une ligne grande entreprise sur un code hôtelier ne permet pas de rebaptiser une villa afin de résoudre une restriction. Le même principe vaut pour « autre hébergement de courte durée ». Un code choisi contre les faits tient jusqu'au jour où une banque, un acquéreur, une plateforme ou une administration compare le dossier au bien.
Le mythe des 10 milliards, en trois chiffres séparés
Le marché mélange actuellement trois tests indépendants.
1. Capital libéré : généralement Rp2,5 milliards par PT PMA
Depuis le règlement Ministère de l'Investissement/BKPM 5/2025, le minimum général de capital placé et libéré est de
Rp2,5 Md par PT PMA
, sauf minimum sectoriel supérieur. Le droit des sociétés exige également qu'au moins 25 % du capital autorisé soit souscrit et entièrement libéré.
Le minimum pratique est donc le plus élevé entre Rp2,5 Md, 25 % du capital autorisé et tout minimum sectoriel supérieur. Avec Rp20 Md de capital autorisé, 25 % représentent Rp5 Md : Rp2,5 Md ne suffiraient pas.
2. Investissement du projet : généralement plus de Rp10 milliards
Séparément, un projet PMA doit généralement prévoir un investissement
strictement supérieur à Rp10 Md
par KBLI à cinq chiffres et localisation. Pour l'exploitation immobilière et l'hébergement de courte ou de longue durée, terrain et bâtiments peuvent entrer dans le calcul selon les règles détaillées.
Il s'agit d'un plan d'investissement, pas d'une instruction universelle de bloquer Rp10 Md en trésorerie à la création. La réglementation reconnaît les fonds propres, prêts, bénéfices réinvestis et primes d'émission comme sources, ainsi que les actifs, constructions, équipements, coûts du projet et fonds de roulement pertinents comme emplois.
Une société de gestion pure ne peut pas compter automatiquement les villas de ses clients comme son propre investissement.
3. Visa investisseur E28A : au moins Rp10 milliards de parts détenues par le demandeur
L'Immigration applique un seuil distinct pour l'E28A : le demandeur doit actuellement prouver au moins
Rp10 Md de parts
dans la société garante. Un prêt actionnaire de Rp10 Md reste une dette, pas des parts. Un plan OSS de Rp10,5 Md ne prouve pas que la personne détient Rp10 Md de capital.
Les différences entre posséder la société, la superviser et travailler dans ses opérations quotidiennes sont détaillées dans notre
note E28A
et notre
note sur l'autorisation de travail
.
Les fonds d'acquisition peuvent-ils transiter par la société ?
Oui, si « transiter » décrit une vraie opération de la société et non un solde bancaire temporaire.
Une structure propre peut combiner un apport en capital documenté et/ou un prêt actionnaire, l'acquisition par la PT du droit ou de l'actif pertinent en son propre nom, puis le paiement des coûts du projet depuis son compte. Acte, registre des actionnaires, flux bancaire, documents d'acquisition, factures, comptabilité et LKPM doivent raconter la même chose.
Le capital libéré fait l'objet d'un engagement de maintien pendant douze mois, mais le règlement actuel autorise expressément son utilisation pour acheter des actifs de la société, construire et financer ses opérations. L'argent ne doit pas rester inactif.
Ce qui ne fonctionne pas consiste à envoyer l'argent dans la PT, prendre une capture d'écran et le ressortir le lendemain sans achat d'actif, opération, base de prêt ni document corporate légitimes. Un virement ne devient pas automatiquement du capital. Un solde bancaire ne devient pas automatiquement un investissement réalisé. La substance et les justificatifs comptent.
Que devient une société existante en 55193 ou 68111 ?
BPS indique que les anciennes licences restent valides. Lorsque seul le numéro KBLI change sans modification de l'activité, OSS/AHU réalise la conversion automatiquement ; le simple changement de code n'exige ni nouvelle licence ni modification statutaire.
Si l'objet, le périmètre ou l'activité réelle change, l'entreprise doit mettre à jour OSS/AHU et, selon le cas, son acte et ses licences.
Cette protection transitoire ne doit pas être lue à l'envers. Elle préserve une autorisation qui était déjà valable ; elle ne prouve pas que la même voie est ouverte à une nouvelle PT PMA et ne régularise pas une licence qui n'était jamais valable pour son titulaire ou son activité. Un dossier ancien doit être contrôlé selon sa date d'émission, son titulaire et son actionnariat d'origine, l'activité et l'adresse autorisées, les changements ultérieurs de propriété et tout passage de l'exploitation pour compte propre à la gestion pour un tiers. Une modification substantielle exige davantage qu'une conversion automatique de code.
Cette distinction est essentielle :
ancien 55193 vers nouveau 55203 est un recodage direct de l'activité villa ;
ancien 68111 est divisé en activités 2025 plus précises, donc le successeur dépend de ce que l'entreprise fait ;
passer de l'exploitation de son propre hébergement à la gestion d'hébergements de tiers est une question substantielle de modèle, pas un renumérotage administratif.
Le contrôle pratique avant d'accepter une réservation
Demandez au conseil un tableau écrit indiquant :
activité réelle et modèle contractuel ;
conversion ancien/nouveau KBLI ;
taille d'entreprise disponible dans le profil OSS réel ;
restriction ou condition PMA ;
niveau de risque et NIB/Sertifikat Standar/licence requis ;
zonage, environnement, bâtiment, salubrité et standards touristiques associés ;
unité du plan d'investissement et inclusion ou non du terrain/bâtiment ;
capital libéré et documents de financement ;
revenus voyageurs, honoraires de gestion, paie, fiscalité et rapports d'activité d'investissement (LKPM) ;
responsable nommé pour chaque action et renouvellement.
Si une seule note ne peut pas aligner toutes ces couches, la structure n'est pas prête.
Les questions que l'on nous pose directement
Ma PT PMA peut-elle utiliser KBLI 55203 pour louer sa propre villa à la nuitée ?
Pas comme nouvelle voie d'enregistrement dans la matrice OSS actuelle. 55203 comporte les lignes micro, petite et moyenne, mais aucune ligne « grande entreprise », tandis qu'une PT PMA est considérée comme une grande entreprise. Le cas d'une licence délivrée avant cette évolution relève toutefois d'une question transitoire distincte et doit être examiné au regard du dossier concerné.
Un ancien 55193 ou un 55203 converti automatiquement prouve-t-il que de nouvelles PT PMA peuvent utiliser le code ?
Non. La continuité protège une autorisation existante valable lorsque l'activité n'a pas substantiellement changé. Elle ne crée pas un nouveau droit pour une autre société, adresse, structure d'actionnariat ou modèle économique.
Puis-je résoudre cela en engageant une société 55901 ?
Pas automatiquement. 55901 peut licencier l'activité réelle de gestion du gestionnaire. Il ne supprime ni les obligations de l'hébergement, du propriétaire, du bien, du bâtiment, de la fiscalité ou de l'opérateur sous-jacent.
55901 est-il le nouveau code de gestion d'hébergements ?
C'est le code explicite pour la gestion opérationnelle d'hébergements pour le compte du propriétaire contre des honoraires de gestion. Gestion résidentielle, intermédiation de réservation et exploitation pour compte propre restent différentes.
Dois-je déposer Rp10 Md le premier jour ?
Pas comme règle universelle actuelle de capital. Le plancher général est Rp2,5 Md de capital libéré par PT PMA, sous réserve des 25 % du capital autorisé et de règles sectorielles supérieures. Les plus de Rp10 Md concernent généralement le plan d'investissement. L'E28A utilise encore un seuil personnel distinct de Rp10 Md de parts.
Un risque faible ou moyen-faible signifie-t-il que le code est ouvert à une PT PMA ?
Non. Le risque définit le parcours de licence. La taille d'entreprise et l'accès à l'investissement étranger sont des tests séparés.
dernière vérification : 20 juillet 2026
À lire aussi :
Due diligence immobilière à Bali avant un acompte
·
PT PMA ou prête-nom
·
Ce que fait PP 28/2025
·
Visa investisseur E28A
Sources :
KBLI 2025, BPS
;
table officielle de conversion KBLI 2020 à 2025
;
précision BPS tourisme et OSS du 14 juillet 2026
; fiches OSS
55203
,
55901
,
55400
,
68112
et
68292
;
règlement présidentiel 49/2021
et son
annexe II officielle
;
loi 20/2008, notamment la définition de la grande entreprise à l'article 1(4)
;
règlement Ministère de l'Investissement/BKPM 5/2025
;
PP 28/2025
;
règlement du Ministère du Tourisme 6/2025
;
Immigration E28A
. Vérifiées le 20 juillet 2026. Cette note fournit des informations générales, pas un avis juridique, fiscal, d'investissement, foncier ou d'immigration en Indonésie. Confirmez la société, le contrat, l'actif, l'adresse et le résultat OSS actuel avant toute décision.
Références officielles complémentaires
Règlement BPS 7/2025 : texte formel de KBLI 2025
Orientations BPS de transition du 27 avril 2026
Précision BPS tourisme et OSS du 14 juillet 2026
---
Information générale. Dernière mise à jour le 20 juillet 2026. Cette page présente la lecture de bonne foi de DALLEAU à partir des sources officielles citées. Elle ne constitue pas un conseil professionnel. Les règles et pratiques peuvent évoluer ; la synthèse peut être incomplète, dépassée ou erronée. Vérifiez le texte officiel en vigueur et votre situation avec l'autorité ou le professionnel habilité compétent avant d'agir.
Deux questions à explorer ensuite
Question liée
PT PMA : faut-il verser 10 milliards IDR dès la création ?
Question liée
PP 28/2025 : qu'a-t-il réellement changé pour les licences de villas à Bali ?
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Website
Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité.
En savoir plus
S'abonner
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
PT PMA : faut-il verser 10 milliards IDR dès la création ?
les rôles de l'opérateur et des parties au projet
cadre actuel des licences de villas
cadre actuel des licences de villas
Contexte publié
Note sur les licences PP 28
cadre actuel des licences de villas

## Vivre à Bali avec des enfants | DALLEAU

URL: https://dalleau.ai/fr/notes/living-in-bali-family.html

← notes vivre à bali 10 juillet 2026 Vivre à Bali avec des enfants : la réalité du quotidien

Un regard honnête sur l'école, les trajets, la santé, l'aide à domicile et l'organisation d'une semaine ordinaire à Bali, fondé sur notre vie avec deux jeunes enfants et notre expérience familiale à Budapest, en France et à Bali.

DALLEAU | Recherche et notes de terrain Publié le

10 juillet 2026

Dernière vérification

23 juillet 2026

Vérifié | 23 juillet 2026 | sources primaires

En bref Les jeunes enfants peuvent s'épanouir à Bali. Ils passent souvent plus de temps dehors, grandissent dans une atmosphère chaleureuse et peuvent profiter d'une aide quotidienne plus accessible. Cette qualité de vie demande toutefois une véritable organisation. Choisissez l'école avant le quartier, testez les trajets aux heures de pointe, identifiez les solutions de soins, vérifiez précisément l'assurance, puis choisissez une maison et un budget adaptés à une semaine ordinaire plutôt qu'à des vacances.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Notre regard de parents Nos enfants se sont adaptés plus vite que nous. De notre côté, il a fallu reconstruire l'organisation qui fait tenir une semaine en famille : l'école, les trajets, les soins et toutes les habitudes du quotidien.

Partir de la semaine de l'enfant, pas de la villa

Nous sommes une famille franco-russe avec deux jeunes enfants. Notre parcours nous donne quelques points de comparaison entre Budapest, la France et Bali. L'un de nos enfants avait fréquenté une école Montessori privée à Budapest avant de découvrir plusieurs preschools à Bali. Le signe le plus parlant n'est venu ni d'un classement ni d'une brochure : elle avait envie de retourner à l'école et, lorsque nous venions la chercher, elle ne voulait pas toujours repartir tout de suite.

Cela ne prouve pas que les écoles de Bali sont meilleures, ni qu'un autre enfant vivra la même transition. Notre expérience concerne surtout les bébés et la petite enfance. Elle explique en revanche pourquoi nous ne jugeons plus une installation familiale seulement à partir du climat, de la maison ou d'un budget mensuel. Nous regardons la semaine réelle de l'enfant.

Ce qui peut être plus doux Un rythme d'enfance plus léger

Dans les preschools que nous avons essayés, le jeu, la nature, le mouvement et la diversité des activités avaient une vraie place.

Ce qui demande une organisation Le quotidien des parents

Les trajets, les soins, l'assurance et l'aide à domicile doivent être organisés à l'avance.

Notre limite Ce n'est pas un classement

Nous pouvons raconter ce que notre famille a observé. Chaque enfant, école, âge et projet de retour impose son propre choix.

Choisir l'école avant l'adresse

Une école proche sur la carte peut imposer un trajet épuisant. La circulation varie selon l'heure, la pluie et l'itinéraire. L'ordre des décisions compte donc beaucoup : présélectionner l'école, la visiter, tester le parcours aux vraies heures d'entrée et de sortie, puis chercher le logement.

En petite enfance, nous regarderions le groupe réel avant la réputation. Comment les adultes parlent-ils aux enfants ? Comment gèrent-ils la séparation ? Le groupe correspond-il au caractère de votre enfant ? Comment la journée est-elle racontée aux parents ? Une période d'essai est-elle possible ? Pour un enfant plus âgé, il faut ajouter la continuité du programme, la langue d'enseignement, les examens et un éventuel retour vers un autre système scolaire.

Demandez ce que l'enfant fera pendant une semaine normale, pas seulement ce que promet la philosophie de l'école.

Obtenez le détail complet des frais : inscription, repas, transport, uniformes, examens et activités optionnelles.

Confirmez la place et le calendrier d'admission avant de vous engager sur un logement.

Parcourez la route dans les deux sens, aux horaires que votre famille utilisera vraiment.

Un repère daté, pas une moyenne du marché Le Lycée Français de Bali publie ses tarifs 2026-2027 . Lors de notre vérification du 17 juillet 2026, les frais annuels allaient de 70,2 à 168,2 millions IDR selon le niveau, avec certains frais supplémentaires possibles. Cet exemple décrit une école seulement. Demandez une proposition écrite et actuelle à chaque établissement retenu.

La vie ordinaire n'est pas faite de vacances permanentes

Bali peut offrir aux jeunes enfants un quotidien très heureux. Ils passent souvent plus de temps dehors, profitent d'un environnement chaleureux et grandissent au contact d'une culture profondément attachée à la famille. La vie sur l'île ne fait pourtant disparaître ni le travail, ni les siestes, ni les repas, ni les lessives. Il faut aussi composer avec la chaleur, la pluie, les moustiques et les embouteillages. Une sortie à la plage avec de jeunes enfants reste une expédition. Beaucoup de parents qui travaillent découvrent d'ailleurs qu'ils passent plus de temps à la maison qu'ils ne l'avaient imaginé.

Ce qui devient plus facile Jouer dehors et se faire aider

Les enfants peuvent profiter davantage de la nature et des activités en plein air. Une aide quotidienne plus accessible libère aussi du temps pour les parents et pour la vie de famille.

Ce qui demande une adaptation Se déplacer et préserver les liens

À Bali, l'autonomie à pied est limitée. La distance avec les grands-parents et les amis de longue date pèse également, tout comme l'accès à certaines démarches administratives ou à des soins très spécialisés.

Cette réalité change notre façon de choisir une maison. Le nombre de chambres et la piscine ne suffisent pas. La piscine peut-elle être sécurisée ? Les enfants disposent-ils d'espaces ombragés ? Les chambres sont-elles bien protégées des insectes ? La buanderie est-elle réellement pratique ? Le personnel peut-il travailler sans empiéter sur l'intimité de la famille ?

Eau Sécuriser la piscine

Visibilité, contrôle des accès et dispositif adapté à l'âge de l'enfant doivent être discutés dès la conception.

Climat Prévoir l'ombre et les moustiques

Jeu couvert, protection contre les insectes et pièces confortables comptent tous les jours.

Quotidien Penser linge et rangement

Avec de jeunes enfants, le linge, les rangements et les petits gestes du quotidien comptent bien plus que ne le suggèrent les photographies.

Intimité Organiser famille et personnel

L'aide fonctionne mieux lorsque la maison donne à chacun une place claire et respectueuse.

À Bali, les trajets déterminent le quartier

Pour notre famille, c'est l'une des différences les plus nettes avec la vie européenne. Il est plus difficile de sortir avec une poussette, de rejoindre un parc à pied ou de s'appuyer sur les transports en commun. Une courte distance peut quand même exiger une voiture, et le trajet scolaire peut organiser toute la journée.

France Diplomatie considère la motocyclette comme un mode de transport à très haut risque en Indonésie, tandis que les autorités britanniques signalent une forte hausse des accidents graves, parfois mortels, à Bali. Pour de jeunes enfants, notre recommandation pratique est de privilégier une voiture équipée d'un dispositif de retenue adapté à leur âge et à leur taille, puis de choisir l'école et le logement en fonction du trajet quotidien.

Tester le trajet, pas la carte Faites le parcours un jour de semaine, dans les deux sens et aux vraies heures. Vérifiez le véhicule, le siège enfant, l'assurance et la solution de secours en cas de pluie ou d'indisponibilité du chauffeur.

La santé demande un plan, pas seulement une liste d'hôpitaux

Le vrai sujet n'est pas le nombre d'hôpitaux visibles sur une carte. C'est de savoir où aller à deux heures du matin, ce que l'assureur prendra réellement en charge et ce qui est prévu si un soin n'est pas disponible sur l'île.

L'offre de soins privés à Bali s'est renforcée avec l'inauguration officielle du Bali International Hospital à Sanur le 25 juin 2025. L'établissement indique proposer notamment des services dédiés aux femmes et aux enfants, la médecine des voyages et la vaccination, des urgences ouvertes 24 heures sur 24, ainsi que des urgences pédiatriques, néonatales, obstétriques et gynécologiques. Chaque famille doit néanmoins vérifier les spécialistes disponibles, les capacités adaptées à sa situation, la prise en charge par son assurance et les modalités d'une éventuelle évacuation médicale.

Identifiez un pédiatre, une clinique pour les consultations courantes et l'établissement à utiliser la nuit.

Vérifiez les consultations, l'hospitalisation, la maternité, la pédiatrie, les antécédents et les plafonds annuels.

Confirmez le tiers payant, l'autorisation préalable, le réseau de soins et les avances demandées.

Mettez par écrit la procédure d'évacuation, les numéros à appeler et la destination couverte.

Conservez les ordonnances, les noms génériques des médicaments et un dossier médical familial accessible.

Les autorités britanniques et françaises recommandent toutes deux une couverture adaptée aux soins locaux et à une éventuelle évacuation médicale. Les maladies transmises par les moustiques font aussi partie du quotidien. Le ministère indonésien de la Santé a publié une circulaire nationale de vigilance contre la dengue le 18 février 2026. Ses chiffres concernent toute l'Indonésie, pas l'incidence propre à Bali. La réponse pratique reste une prévention toute l'année, une protection contre les piqûres et une consultation rapide en cas de forte fièvre ou de signes d'alerte.

L'aide à domicile libère du temps, à condition de bien l'organiser

Une nounou, une personne chargée du ménage, un cuisinier ou un chauffeur peuvent transformer le quotidien. C'est l'un des vrais avantages de Bali pour une famille disposant d'un revenu international stable : le même budget peut financer davantage de temps et de soutien pratique qu'en Europe. Il ne faut pas pour autant réduire ces métiers à une main-d'œuvre bon marché.

Les journées d'essai et les références nous paraissent plus utiles qu'un CV parfait. Observez la façon dont la personne parle à l'enfant, gère la fatigue et réagit lorsque le programme change. Convenez par écrit des personnes autorisées à récupérer l'enfant, des photographies, des maladies, des transports, du temps de travail et du repos.

La loi indonésienne n° 2 de 2026, en vigueur depuis le 30 avril 2026, encadre désormais la protection des travailleurs domestiques et les responsabilités de leurs employeurs. Il est prudent d'obtenir un avis local à jour et de formaliser les missions, la rémunération, les horaires, le repos, les congés, la prime religieuse annuelle, la protection sociale, la sécurité et, pour le personnel logé, l'hébergement.

Établir un budget à partir de la vie réelle

Un budget mensuel générique n'a guère de valeur s'il oublie l'école, l'assurance, les transports ou les voyages annuels. Demandez des devis récents, regroupez les dépenses en quatre catégories et distinguez les frais annuels avant de les ramener à un montant mensuel.

01 Maison

Loyer, dépôt, eau, énergie, internet, entretien, linge et coût d'une maison réellement adaptée aux enfants.

02 Enfants

École, inscription, repas, activités, garde et toutes les dépenses situées hors des frais de scolarité.

03 Protection

Assurance santé, franchises, évacuation, sécurité des déplacements et réserve d'urgence.

04 Mobilité

Visas, conseils, voiture ou chauffeur, retours en Europe et renouvellement des documents.

Il ne s'agit pas de prouver que Bali coûte moins cher. L'objectif est de savoir ce que le budget familial permet réellement d'obtenir en matière de logement, de temps, d'aide quotidienne, d'éducation et de sécurité.

Vivre un mois normal avant de s'engager

Avant un bail long, un achat ou un projet de construction, essayez de vivre le quotidien plutôt que les vacances. Un mois réversible peut apprendre davantage que plusieurs semaines de comparaisons en ligne.

Visitez les écoles présélectionnées et confirmez qu'une place adaptée existe réellement.

Testez le trajet scolaire pendant la circulation d'un jour de semaine normal.

Choisissez le véhicule et le siège enfant que la famille utilisera chaque jour.

Confirmez par écrit les soins, l'assurance et les contacts d'urgence pour la nuit.

Testez la nounou ou l'organisation domestique avant d'en dépendre.

Décidez ensuite seulement si la maison et le quartier soutiennent toute la semaine.

Bali peut être un très bel endroit pour élever une famille. Une grande partie de notre propre expérience y a été plus heureuse et plus simple que nous ne l'imaginions. La décision reste personnelle. Le meilleur projet est construit autour d'un enfant réel, d'une semaine réelle et de protections vérifiées avant d'en avoir besoin.

Mis à jour et vérifié le 23 juillet 2026.

Sources des éléments vérifiables

Secrétariat d'État indonésien, inauguration officielle du Bali International Hospital .

Bali International Hospital, services annoncés et urgences . Il s'agit de déclarations du prestataire, pas de données indépendantes sur les résultats cliniques.

FCDO britannique, conseils de santé et France Diplomatie, conseils de santé .

FCDO britannique, sécurité routière , France Diplomatie, sécurité et OMS, sécurité routière des enfants .

Ministère indonésien de la Santé, circulaire dengue 2026 .

Ministère indonésien du Travail, loi n° 2 de 2026 .

Lycée Français de Bali, admissions et tarifs 2026-2027 .

Cette note rapproche l'expérience déclarée d'une famille et des sources datées. Les observations personnelles ne constituent pas un classement des pays, écoles ou établissements de santé. Vérifiez les places, tarifs, règles et garanties applicables à votre propre famille.

Deux questions à explorer ensuite

Question liée Résidence secondaire à Bali : les décisions à prendre avant d'acheter Question liée Quel visa pour Bali en 2026 ? Séjour, travail, investissement et famille

Tester l'activité dans le guide visa Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule. | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/management-fee-pt-pma-operateur-local-indonesie/

Field Notes

/

Guide de décision

Field Notes · Fiscalité

Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule.

Comment une PT PMA peut facturer un opérateur d'hébergement indonésien sans faire de la facture le modèle économique

01

Besoin

02

Prestation

03

Preuve

04

Prix

05

Fiscalité

06

Facture

Une management fee, c’est-à-dire des honoraires de gestion, entre une PT locale indonésienne et une PT PMA peut être parfaitement légitime.

Elle peut aussi devenir le point le plus fragile du montage.

La différence ne vient pas du pourcentage inscrit sur la facture. Elle vient de l'existence réelle de la prestation, des personnes, des autorisations, des preuves, de la méthode de prix et du traitement fiscal avant même que la facture ne soit émise.

Voici la réponse pratique.

Un opérateur local peut payer une PT PMA liée pour de vraies prestations.

La rémunération doit correspondre à un travail réellement effectué, nécessaire et utile à l'opérateur.

Une même fonction ne doit pas être facturée deux fois, et la surveillance de l'investissement par l'actionnaire ne devient pas automatiquement une prestation.

Il n'existe aucun pourcentage universel qui sécurise une management fee.

Cinq, dix ou quinze pour cent peuvent être appropriés ou indéfendables selon le périmètre réel.

L'opérateur local n'a pas de marge minimale légale fixe, mais il ne peut pas porter le contrat client, les équipes, les licences et le risque tout en étant privé de presque toute économie sans justification solide.

La PT PMA ne peut pas simplement « refacturer le bénéfice ».

Le bénéfice résiduel n'est pas une description de service.

Le PPh 23, la TVA, le PBJT et les éventuels droits de marque ou de logiciel doivent être distingués.

Tout regrouper dans une seule ligne crée un risque inutile.

Périmètre de cette note

Cette note explique la logique d'analyse. Elle ne calcule pas la rémunération ou l'impôt d'une société précise. Les contrats, statuts fiscaux, KBLI, comptes et travaux réellement effectués doivent être examinés ensemble.

Le montage imaginé

L'organisation ressemble souvent à ceci :

PT LOCALE

Réservations clients

Factures clients

Recettes d'hébergement

Équipe sur place

Activité d'hébergement

↓ honoraires de gestion

PT PMA

Supervision du fondateur

Marketing

Réservations

Finance

Technologie

Achats

Management

Sur le papier, tout paraît propre.

La PT locale semble exploiter les villas. La PT PMA semble fournir le management. L'argent remonte de l'opérateur vers la PT PMA par une facture de prestation.

La vraie question est :

Qu'a réellement fourni la PT PMA qu'un opérateur indépendant aurait accepté de payer ?

Tant que cette question n'a pas de réponse, la fee n'a pas de fondement fiable.

La facture vient à la fin

Une séquence défendable fonctionne ainsi :

Besoin opérationnel réel

↓

Prestation définie

↓

Activité autorisée

↓

Personnes, systèmes et autorité

↓

Travail effectué pendant la période

↓

Bénéfice reçu par l'opérateur

↓

Preuves de livraison

↓

Méthode de prix de pleine concurrence

↓

PPh, TVA, PBJT et comptabilité

↓

Facture et paiement

Une structure faible part dans l'autre sens :

Montant de bénéfice souhaité dans la PT PMA

↓

Pourcentage choisi après connaissance du résultat

↓

Facture générale intitulée « honoraires de gestion »

↓

Contrat produit pour l'expliquer

La seconde séquence part du transfert souhaité et construit ensuite la justification de la prestation.

Exemple concret

Imaginons qu'une PT locale exploite trois villas.

Pendant un mois, elle encaisse 1 milliard IDR de recettes clients. Elle contracte avec les hôtes, apparaît comme merchant OTA, emploie l'équipe du bien, paie les coûts locaux, traite les remboursements, déclare la fiscalité locale et supporte le risque de faible occupation.

Une PT PMA liée emploie six personnes qui fournissent :

du pilotage quotidien des prix et de la demande ;

la supervision des canaux et des réservations ;

le reporting financier mensuel ;

des achats groupés ;

l'exécution de campagnes payantes ;

l'administration des systèmes ;

une revue de direction.

La PT PMA produit chaque mois des rapports, décisions tarifaires, traces de campagnes, dossiers d'achats, journaux systèmes et comptes rendus. Les salariés sont employés par la PT PMA et leur travail peut être relié aux trois biens.

Cette relation ressemble à une vraie prestation.

Changeons les faits.

La PT PMA n'a aucun salarié dédié. Le fondateur étranger lit quelques messages WhatsApp, donne parfois une instruction et regarde le compte bancaire. À la fin de l'exercice, la PT locale affiche 3,2 milliards IDR de bénéfice. La PT PMA émet alors une facture de 3,1 milliards intitulée « honoraires de gestion » afin de ne laisser que 100 millions localement.

Ce n'est pas le même montage. Le montant a été choisi pour retirer le bénéfice, pas pour rémunérer un travail mesuré.

Les sept tests avant même de parler du prix

1. Le travail a-t-il réellement été effectué ?

Le prestataire doit pouvoir répondre :

qui a travaillé ;

quand ;

pour quel bien ou quelle société ;

quelles décisions ont été prises ;

quels livrables existent ;

comment le travail peut être vérifié.

Un contrat signé ne prouve pas que la prestation a eu lieu.

2. L'opérateur avait-il besoin de ce service ?

Une société indépendante n'achète pas une prestation uniquement parce que son actionnaire souhaite la facturer.

Le besoin doit être compréhensible commercialement : réservations centrales, pilotage des prix et de la demande, achats groupés, consolidation comptable, administration des systèmes ou capacité de management absente localement.

3. L'opérateur a-t-il reçu un bénéfice identifiable ?

Le bénéfice n'est pas nécessairement une hausse garantie de profit.

Il peut s'agir d'un accès à des compétences, des systèmes, du personnel, du pouvoir d'achat, du reporting, de la distribution ou de l'aide à la décision.

L'opérateur doit pouvoir expliquer pourquoi il aurait payé un prestataire non lié pour le même travail.

4. Le travail est-il déjà réalisé ailleurs ?

Imaginons que la PT locale emploie déjà :

un directeur général ;

un comptable ;

un spécialiste du pilotage des revenus ;

une équipe marketing ;

un responsable achats.

Une seconde société ne doit pas facturer les mêmes fonctions sans identifier un périmètre réellement distinct.

« Management de groupe » n'est pas une explication suffisante en soi.

5. S'agit-il en réalité d'une activité d'actionnaire ?

Certaines actions existent parce qu'une personne possède l'investissement.

Cela peut inclure le suivi de l'investissement, la décision d'injecter du capital, l'examen du rendement de l'actionnaire ou la protection de ses intérêts.

Un opérateur indépendant ne paierait pas nécessairement un actionnaire pour agir comme actionnaire.

La limite n'est pas toujours simple. La question est de savoir si l'activité sert la société opératrice comme cliente ou principalement l'investisseur comme propriétaire.

6. La PT PMA est-elle autorisée et capable de fournir la prestation ?

Le contrat peut parler de « conseil ». Les faits quotidiens peuvent montrer une gestion opérationnelle directe.

Le KBLI 55901 distingue désormais la gestion opérationnelle d'hébergements pour compte de tiers du conseil général en gestion. Si la PT PMA contrôle les prix, les réservations, les équipes et les décisions quotidiennes, son activité et son dossier OSS doivent correspondre à cette réalité.

La capacité compte aussi. Une société qui facture un périmètre de gestion étendu doit disposer des personnes, systèmes, coûts et organisation nécessaires.

7. Le prix est-il de pleine concurrence ?

Le prix ne devient la question principale qu'après réussite des six premiers tests.

La méthode doit suivre la transaction.

Un appui administratif peut être analysé à partir de sa base de coûts et d'une marge justifiée.

Un mandat complet de gestion opérationnelle peut parfois utiliser une rémunération liée au chiffre d'affaires si les fonctions et comparables le soutiennent.

Un projet défini peut justifier un forfait.

Un droit de marque ou de technologie peut exiger une méthode différente d'une prestation de gestion.

Aucun pourcentage n'est sûr simplement parce qu'il circule souvent dans les conversations.

Pourquoi le pourcentage n'est pas la première question

Les propriétaires demandent souvent si cinq, dix ou quinze pour cent du chiffre d'affaires est acceptable.

Cette question saute l'étape de la substance.

Une fee de dix pour cent payée à un gestionnaire compétent responsable de la distribution, de la stratégie tarifaire, de la direction opérationnelle, des systèmes et des achats d'un portefeuille complexe peut être commercialement compréhensible.

La même fee versée à une société vide, sans employés ni livrables, peut être indéfendable.

Même deux pour cent peuvent être incorrects si le travail n'a jamais eu lieu ou s'il est déjà réalisé par l'équipe locale.

Le pourcentage ne valide pas la prestation.

L'opérateur local doit rester économiquement réel

Il n'existe pas de règle générale imposant une marge fixe à l'opérateur d'hébergement.

Mais les fonctions et les risques doivent être rémunérés quelque part.

Si la PT locale :

contracte avec les hôtes ;

reçoit les recettes ;

emploie l'équipe ;

paie les charges ;

supporte le risque d'occupation ;

gère les plaintes et remboursements ;

porte le besoin en fonds de roulement ;

détient les autorisations d'exploitation ;

supporte la responsabilité client ;

elle exerce des fonctions économiques importantes.

Une fee récurrente qui ne lui laisse presque aucun bénéfice conduit à une question simple :

Pourquoi la société qui porte l'exploitation reçoit-elle presque aucun rendement pour ce qu'elle fait ?

Une réponse peut exister. La PT PMA peut réellement exercer la majorité des fonctions de gestion à forte valeur et supporter certains risques. Mais les contrats, licences, salariés, systèmes et comparables doivent démontrer cette répartition.

Le bénéfice résiduel n'est pas une catégorie de facture

Après paiement :

des fournisseurs ;

des équipes ;

des commissions OTA ;

de la fiscalité locale ;

du droit d'usage du bien ;

des vraies prestations ;

des autres charges licites ;

ce qui reste constitue le résultat de l'opérateur.

Ce résultat appartient à la société. Il bénéficie ensuite à ses véritables actionnaires selon leurs droits.

Une PT PMA peut recevoir de la valeur au titre d'une transaction réelle. Elle ne peut pas renommer l'intégralité du résultat résiduel « gestion » simplement parce que le fondateur étranger préfère que l'argent se trouve dans cette société.

Cette distinction devient cruciale lorsque la PT locale est détenue par deux salariés ou anciens salariés indonésiens. S'ils sont réellement actionnaires, les conséquences économiques de la propriété sont réelles. Si tous les avantages leur sont retirés contractuellement dès le premier jour, l'histoire de l'actionnariat et du bénéficiaire effectif doit être examinée de près.

Séparer les composants de la facture

Une seule ligne intitulée :

Management, marque, marketing et technologie

peut masquer plusieurs transactions différentes.

Un meilleur accord distingue au minimum :

Composant

Ce qui doit être démontré

Pourquoi la séparation est utile

Management opérationnel

Droits de décision, gestionnaires nommés, rapports et traces par bien

Peut relever de la gestion d'hébergement plutôt que du conseil générique.

Pilotage des prix et de la demande

Actions tarifaires, prévisions, canaux et stratégie d'occupation

Peut être mesuré bien par bien.

Exécution marketing

Campagnes, actifs, dépenses et résultats

Les dépenses médias tierces ne doivent pas être confondues avec la rémunération du prestataire.

Finance et reporting

Comptes mensuels, budgets, rapprochements et contrôles

Évite la duplication du comptable local.

Technologie ou logiciel

Droits, utilisateurs, licences, support et propriété des systèmes

Peut être distinct d'une prestation et recevoir un traitement différent.

Marque ou marque déposée

Droits de propriété intellectuelle et autorisation d'usage

Une redevance de marque n'est pas une prestation de gestion.

Achats

Commandes, négociations et traces fournisseurs

L'avantage d'achat doit être visible.

Refacturation ou mise à disposition de personnel

Employeur, temps, rôle et méthode de répartition

Les personnes ne changent pas de société par une simple écriture comptable.

Remboursements de coûts

Dépenses tierces et éventuelle marge justifiée

Sépare les pass-through de la rémunération.

Plus les catégories économiques sont nettes, plus le traitement fiscal et la preuve deviennent compréhensibles.

Les couches fiscales en langage pratique

Retenue PPh 23

La doctrine fiscale indonésienne actuelle applique généralement une retenue PPh 23 de deux pour cent sur le montant brut de prestations domestiques de gestion et d'autres services couverts.

Cette retenue constitue généralement un crédit d'impôt pour la société indonésienne qui reçoit le revenu. Ce n'est pas l'impôt final sur les bénéfices de la PT PMA.

Royalty

Une véritable redevance de marque domestique relève généralement d'une retenue PPh 23 de quinze pour cent sur le montant brut.

C'est une autre raison de ne pas enfouir des droits de marque, de marque déposée ou de logiciel dans une ligne d’honoraires de gestion sans analyse.

TVA

L'hébergement de type hôtel relève du PBJT local plutôt que du régime ordinaire de TVA centrale.

Une PT PMA assujettie à la TVA, ou PKP, qui fournit une prestation taxable de gestion peut émettre une facture avec TVA. La TVA amont liée à une activité d'hébergement non soumise à la TVA ordinaire peut ne pas être entièrement récupérable et devenir un coût réel pour l'opérateur.

Le résultat peut être contre-intuitif :

Recettes clients soumises au PBJT

↓

Opérateur local

↓

Prestation achetée à la PT PMA

↓

TVA facturée sur la prestation

↓

Coût potentiellement non récupérable

Un montage pensé uniquement à travers l'impôt sur les sociétés peut devenir plus cher une fois la fiscalité indirecte intégrée.

Fiscalité locale de l'hébergement

Le taux, l'enregistrement et la procédure PBJT dépendent du kabupaten ou de la ville concernée et de la nature réelle de la prestation.

La facture d’honoraires de gestion ne remplace pas cette obligation.

À quoi ressemble une bonne preuve mensuelle ?

Un dossier défendable peut contenir :

les salariés et responsabilités par société ;

les contrats de travail ;

les droits d'accès aux PMS, OTA, finance et achats ;

les décisions de prix et de distribution ;

les rapports mensuels d'exploitation et de finance ;

les plans marketing et actifs produits ;

les budgets et prévisions ;

les commandes et dossiers fournisseurs ;

les journaux d’intervention par bien ;

les réunions et décisions ;

les registres d'incidents et d'escalade ;

les centres de coûts et clés de répartition ;

la justification du prix préparée au moment de la transaction ;

les factures fiscales et retenues ;

les preuves de paiement ;

la preuve des fonctions et décisions propres de l'opérateur local.

La prestation doit être visible avant le début d'un contrôle.

Trois images d'exploitation

Structure relativement cohérente

La PT locale est un véritable opérateur. Elle détient le rôle client, contracte avec les hôtes, emploie l'équipe du bien, supporte les obligations client et conserve un résultat compatible avec son rôle.

La PT PMA possède de vraies équipes et systèmes. Elle fournit des fonctions définies, produit des preuves et facture selon une méthode choisie avant que le bénéfice final soit connu.

Structure possible, mais lourde à documenter

La PT locale est l'opérateur contractuel, mais des fonctions importantes sont partagées. La PT PMA contrôle les réservations centrales et le marketing, participe fortement aux prix et aux décisions d'équipe, et partage des systèmes avec la société locale.

Cela peut fonctionner, mais les droits de décision, les personnes, les licences, les coûts et les preuves doivent être exceptionnellement clairs.

Structure à haut risque

La PT locale existe principalement sur la licence, l'OTA et la facture. Elle possède peu de personnel, de contrôle ou d'économie.

La PT PMA ou le fondateur étranger contrôle les comptes, les prix, les équipes, les réservations, les plaintes, les achats et les budgets, puis facture presque toute la marge.

Les questions dépassent alors les prix de transfert et touchent l'activité réelle, le bénéficiaire effectif, le prête-nom, l'immigration et le droit du travail.

Checklist avant de signer le contrat

Quelle société exploite réellement l'hébergement ?

Quelle prestation exacte fournira la PT PMA ?

Quel KBLI autorise cette prestation dans le lieu concerné ?

Qui exercera chaque fonction ?

Quelle société emploiera ces personnes ?

Quels systèmes et droits de décision sont nécessaires ?

Quels livrables existeront chaque mois ?

Quel bénéfice l'opérateur reçoit-il ?

Quelles fonctions locales risquent d'être dupliquées ?

Quelles activités relèvent de l'actionnaire plutôt que d'un service ?

Quelle méthode de prix convient à chaque composant ?

Quels comparables sont réellement comparables ?

Comment les coûts partagés seront-ils répartis ?

Quel résultat revient à l'opérateur compte tenu de ses fonctions et risques ?

Quels composants relèvent du PPh 23 à deux pour cent ?

Certains composants sont-ils des royalties ou d'autres paiements ?

La TVA s'applique-t-elle et l'opérateur peut-il la récupérer ?

Quelles règles PBJT s'appliquent aux recettes d'hébergement ?

Le contrat, la facture, la comptabilité et le paiement bancaire racontent-ils la même histoire ?

La prestation pourrait-elle être prouvée sans l'explication orale du fondateur ?

La décision en langage clair

Une management fee, ou rémunération de gestion, n'est ni un sauf-conduit ni un élément automatiquement suspect.

C'est la rémunération d'une prestation.

La PT PMA doit disposer de la bonne activité, de personnes compétentes, d'un travail réel, de preuves, d'un bénéfice commercial et d'un prix de pleine concurrence. La PT locale doit rester un véritable opérateur, avec les droits, responsabilités et moyens économiques correspondant à son rôle.

La règle à retenir est :

Valorisez le travail. Ne valorisez pas le montant de bénéfice que vous souhaitez déplacer.

Parler à François

Sources principales et liens de vérification

PMK 172/2023 sur le principe de pleine concurrence et les transactions liées

OSS officiel, KBLI 55901, gestion d'hébergements

Direction générale des impôts, PPh article 23

PMK 70/2022 sur les services hôteliers hors TVA ordinaire

Loi 25/2007 sur l'investissement

Règlement du ministère du Droit 2/2025 sur le bénéficiaire effectif

Le résultat exact en matière de PPh, TVA, PBJT et déductibilité dépend de la transaction, du statut fiscal, de la juridiction locale et des preuves contemporaines.

## PP 28/2025 : licences de villas à Bali | DALLEAU

URL: https://dalleau.ai/fr/notes/pp-28-2025-villa-licensing.html

← notes conformité 12 avril 2026 PP 28/2025 : qu'a-t-il réellement changé pour les licences de villas à Bali ?

Le règlement gouvernemental 28 de 2025 a modifié le cadre général des licences fondées sur le risque en Indonésie. Il n'a ni interdit la courte durée ni activé du jour au lendemain un contrôle automatique des plateformes. Les standards touristiques, la supervision et la vérification des annonces relèvent de mesures distinctes, adoptées à des dates différentes.

DALLEAU | Recherche et notes de terrain Publié le

12 avril 2026

Dernière vérification

20 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref Trois questions doivent être examinées séparément : quelle licence s'applique aujourd'hui à l'activité, quel standard touristique doit être respecté et quels contrôles une plateforme ou une autorité peut déjà effectuer. Les regrouper sous l'étiquette d'une nouvelle « loi sur les villas » donne une vision trompeuse de la situation.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Le règlement gouvernemental 28 de 2025 a modifié le cadre général des licences fondées sur le risque en Indonésie. Il n'a ni interdit la courte durée ni activé du jour au lendemain un contrôle automatique des plateformes. Les standards touristiques, la supervision et la vérification des annonces relèvent de mesures distinctes, adoptées à des dates différentes.

Trois questions doivent être examinées séparément : quelle licence s'applique aujourd'hui à l'activité, quel standard touristique doit être respecté et quels contrôles une plateforme ou une autorité peut déjà effectuer. Les regrouper sous l'étiquette d'une nouvelle « loi sur les villas » donne une vision trompeuse de la situation.

5 juin 2025 : un nouveau cadre général

Le règlement gouvernemental 28 de 2025 , couramment appelé PP 28/2025, est entré en vigueur le 5 juin 2025 et a remplacé le PP 5/2021. Il organise le système indonésien de licences fondées sur le risque pour l'ensemble des secteurs. Il traite notamment des exigences de base, des licences d'activité, des autorisations complémentaires, du système administratif en ligne, de la supervision et des sanctions.

Ce texte ne concerne donc pas uniquement les villas. Il établit le cadre général qui détermine le niveau de risque et les autorisations nécessaires pour chaque activité. Les exigences concrètes dépendent encore de l'activité exercée, du demandeur, de la taille de l'entreprise, du lieu et de l'état du dossier administratif.

Le niveau de risque et l'éligibilité d'une PT PMA sont deux tests différents. Une activité à risque faible n'est pas automatiquement fermée à une PT PMA : l'investissement étranger doit encore être autorisé et l'activité doit offrir une voie pour la taille d'entreprise appropriée, normalement la grande entreprise. L'inverse est tout aussi important. Un code qui exige seulement un NIB ne neutralise ni une allocation aux UMKM, ni une condition de participation étrangère, ni l'absence de voie « grande entreprise », ni les exigences propres au bien.

10 octobre 2025 : les standards touristiques

Le règlement 6 de 2025 du ministère du Tourisme est entré en vigueur le 10 octobre 2025. Il fixe les standards d'activité, les procédures de supervision et les sanctions administratives du secteur touristique sous le PP 28/2025.

Toutes les activités présentées commercialement comme des villas ne relèvent pas nécessairement du même niveau de risque ni des mêmes justificatifs. L' annuaire SISUPAR du ministère du Tourisme publie des standards de villas dans plusieurs catégories de risque. Les exigences applicables doivent être vérifiées pour l'entreprise concernée, et non reprises du dossier d'un autre bien.

26 mai 2026 : le contrôle automatisé restait en développement

Dans son communiqué du 26 mai 2026 , le ministère du Tourisme indiquait que son interface automatisée avec les agences de voyage en ligne était encore en développement interne. Le contrôle envisagé doit reposer sur trois éléments :

le numéro d'identification de l'entreprise, appelé NIB ;

la classification indonésienne de l'activité, appelée KBLI ;

le numéro de l'activité, appelé NKU.

Le ministère annonçait un lancement visé en juin 2027. Il s'agit d'un objectif inscrit dans un communiqué daté, pas d'une garantie de mise en service à cette date ni du maintien des mêmes règles.

Le même communiqué décrit des mesures qui ne dépendent pas de cette future interface. Le ministère indiquait avoir identifié des hébergements sans licence et vouloir transmettre des listes officielles aux plateformes. Celles-ci devaient suspendre les ventes dans les deux mois suivant la notification officielle, avec une réintégration possible après régularisation. Le contrôle automatisé relevait du futur ; les obligations et certains contrôles existaient déjà.

Le dossier à vérifier aujourd'hui

Une annonce en ligne ne démontre ni la conformité de l'hébergement ni l'alignement du bien, de l'entreprise et de l'exploitation. Avant d'accepter des réservations, rassemblez un dossier à jour :

Décrivez le service vendu, l'entité qui l'exploite et celle qui encaisse le client.

Confirmez la classification de l'activité dans OSS.

Confirmez la catégorie de taille admise pour cette activité et vérifiez si l'investissement étranger est autorisé ou soumis à des conditions.

Vérifiez le NIB ainsi que chaque licence ou certificat exigé pour le niveau de risque concerné.

Alignez l'usage du terrain et le dossier du bâtiment, y compris l'autorisation de construire et le certificat d'aptitude à l'usage lorsqu'ils sont requis, avec l'exploitation prévue.

Confirmez le standard touristique, la fiscalité locale, les obligations relatives au personnel et la déclaration des voyageurs.

Notez les dates de renouvellement, de déclaration et de contrôle au lieu de considérer la première licence comme une validation définitive.

Le NIB identifie l'entreprise. À lui seul, il ne prouve pas que chaque bien peut être exploité pour chaque activité déclarée. Un hébergement touristique payant reste réglementé, que le client réserve sur Airbnb, sur une autre plateforme ou en direct. Les démarches exactes dépendent de la situation. Notre carte KBLI 2025 des activités liées aux villas distingue exploitation pour compte propre, gestion pour un tiers, intermédiation et location résidentielle.

Une licence délivrée avant la réforme pose une question transitoire distincte. Elle peut rester valable lorsque seul le numéro de classification change, sans que la même activité soit pour autant ouverte aujourd'hui à une nouvelle PT PMA. Il faut vérifier le titulaire et l'actionnariat d'origine, la date de délivrance, l'activité et l'adresse autorisées, les modifications intervenues depuis et la continuité réelle de l'exploitation.

Six affirmations à écarter

« Le PP 28/2025 a interdit la courte durée. » Non. Il a remplacé le cadre national des licences fondées sur le risque.

« Toutes les villas présentent un risque faible. » L'annuaire officiel publie des standards de villas dans plusieurs catégories. Le résultat propre à l'activité et à son échelle doit être contrôlé.

« Une PT PMA ne peut exercer aucune activité à risque faible. » Le risque détermine le parcours de licence, pas l'éligibilité à l'investissement étranger. Il faut tester séparément l'activité, la taille d'entreprise et les conditions d'investissement.

« Une ancienne licence prouve qu'une nouvelle PT PMA peut obtenir le même code. » Une autorisation antérieure valable peut bénéficier d'une règle transitoire sans ouvrir la voie à un nouveau demandeur.

« L'interface nationale vérifie déjà toutes les annonces. » Le ministère la présentait comme un projet en développement le 26 mai 2026, avec un lancement visé en juin 2027.

« Sans interface, il n'y a aucun contrôle. » Le même communiqué décrit l'identification officielle de biens sans licence et leur suspension par les plateformes, indépendamment du futur contrôle automatique.

Mis à jour le 20 juillet 2026.

Sources contrôlées le 20 juillet 2026 : PP 28/2025 ; règlement présidentiel 49/2021 et ses listes d'investissement ; loi 20/2008, notamment la définition de la grande entreprise ; règlement 6/2025 du ministère du Tourisme ; standards de villas dans SISUPAR ; communiqué du ministère du Tourisme sur le contrôle des plateformes, 26 mai 2026 . Vérifiez le dossier administratif en direct et le texte indonésien en vigueur avant toute décision.

Cette note présente notre lecture des sources disponibles à la date indiquée. Elle peut être incomplète, dépassée ou erronée. Il s'agit d'une information générale, pas d'un avis juridique, fiscal ou relatif aux licences.

Deux questions à explorer ensuite

Question liée Est-il encore intéressant d'investir dans une villa à Bali en 2026 ? Question liée PT PMA : faut-il verser 10 milliards IDR dès la création ?

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Profondeur d’un puits à Bali et qualité de l’eau | DALLEAU

URL: https://dalleau.ai/fr/notes/profondeur-puits-villa-bali-qualite-eau-filtration.html

eau · systèmes du bâtiment · exploitation

Puits d’une villa à Bali : pourquoi la profondeur ne suffit pas à garantir la qualité de l’eau

À elle seule, une profondeur annoncée de 20 ou 60 mètres ne prouve presque rien. La qualité et la fiabilité de l’alimentation en eau dépendent de l’aquifère réellement capté, de la position de la crépine, de la construction du forage, des voies de contamination, du pompage, des analyses et de l’exploitation de l’ensemble du système.

DALLEAU | Recherche et notes de terrain Publié le

20 juillet 2026

Dernière vérification

21 juillet 2026

Vérifié | 21 juillet 2026 | sources techniques et primaires

Mis à jour le 21 juillet 2026 Prochaine révision programmée : 2026-10-20

Avant toute décision. L’eau varie selon le site et la saison. Cette note explique une méthode de décision ; elle ne constitue ni un résultat de laboratoire, ni une étude d’ingénierie, ni l’affirmation qu’une ressource précise est potable.

Règle de décision pour le propriétaire : ne vous fiez ni à une profondeur annoncée ni à la promesse d’un système « en sept étapes ». Définissez plutôt la ressource à capter, les caractéristiques du forage, la chaîne de traitement et le programme de contrôle.

Plus profond peut être mieux protégé : à condition de capter le bon horizon

Dans un quartier dense où l’assainissement individuel peut fuir vers le sol, la nappe libre superficielle est généralement plus exposée aux bactéries fécales et aux nitrates qu’un horizon plus profond réellement protégé. Cette différence peut être déterminante. Elle ne suffit toutefois pas à garantir une eau salubre ou adaptée à l’usage prévu : la continuité des couches protectrices, les fractures, la construction du forage, le régime de pompage, la salinité et la qualité initiale de l’eau doivent être vérifiés sur le site.

Les vraies questions sont les suivantes :

Quel aquifère et quelle couche géologique le forage atteint-il ?

Sur quel intervalle de profondeur la crépine est-elle installée ?

Le tubage, le scellement sanitaire et la tête de puits sont-ils correctement réalisés ?

Où se trouvent les fosses septiques, drains et autres sources potentielles de pollution ?

Dans quelle direction les eaux souterraines sont-elles susceptibles de circuler ?

Le site est-il exposé à la salinité côtière ou à une forte sollicitation de la nappe ?

Que révèlent les analyses de l’eau brute réalisées par un laboratoire accrédité ?

« 60 mètres » n’est pas un certificat de qualité. Un forage de 60 m peut encore capter une eau d’origine superficielle si sa crépine est placée trop haut ; un tubage ou un scellement annulaire déficient peut court-circuiter les couches protectrices ; et un terrain fracturé peut relier rapidement plusieurs horizons. Près du littoral, un captage plus profond ou plus intensément pompé peut également rencontrer davantage de salinité. La bonne comparaison porte donc sur l’aquifère capté, l’intervalle crépiné, le tubage, le scellement, le sens d’écoulement, le débit de pompage et les analyses de l’eau brute puis au robinet : pas sur la profondeur seule.

Pourquoi les zones fortement urbanisées exigent davantage de vigilance

Une urbanisation dense concentre les puits, les ouvrages d’assainissement individuel, les réseaux de drainage et les prélèvements dans un même sous-sol. Les charges cumulées et le sens d’écoulement de la nappe deviennent alors des questions de conception importantes, même si aucune enquête actuelle ne permet de décrire toutes les installations de Canggu ou de Seminyak de la même manière.

Une étude publiée en 2019 à partir d’une enquête menée en 2016 à 2017 à Denpasar indiquait que seuls 30 % des ouvrages d’assainissement observés étaient étanches, contre 70 % de systèmes non étanches de type cubluk . Les auteurs identifiaient ces fuites comme une voie possible vers les eaux souterraines, en particulier la nappe superficielle. Ces pourcentages décrivent un échantillon historique de Denpasar, pas la situation de Canggu en 2026 ; ils montrent néanmoins que le mécanisme est localement crédible et ne relève pas d’une hypothèse abstraite.

Une étude locale consacrée à des puits peu profonds de Sanur Kauh a relevé, dans les points échantillonnés, un niveau de pollution qualifié de modéré ainsi que plusieurs sources potentielles de contamination à proximité. Ces puits présentaient une profondeur de 4,5 à 10 mètres. Les résultats ne permettent donc pas d’affirmer que tous les puits peu profonds, ni tous ceux d’environ 20 mètres, sont contaminés à Bali. Ils montrent en revanche qu’en zone urbanisée, une eau limpide ne saurait être jugée satisfaisante sur son seul aspect.

La même prudence s’impose près du littoral. Une étude publiée en 2025 à Kuta Utara a relevé des degrés variables d’intrusion marine selon les points étudiés, avec une salinité élevée dans une partie de Kerobokan Kelod. Ces conclusions restent locales, mais elles illustrent un point essentiel : forer plus profond ne résout pas automatiquement tous les problèmes de qualité.

L’odeur n’est pas non plus un diagnostic. Elle peut provenir d’une activité microbienne, de composés soufrés, d’une eau stagnante dans une cuve, du fer, de la plomberie ou d’une autre cause. Inversement, une eau incolore et sans odeur peut néanmoins présenter une contamination microbiologique ou chimique.

Le sous-sol balinais n’obéit pas à un profil unique

Schéma d’orientation technique Trois contextes d’investissement, trois programmes d’investigation Profils conceptuels · non à l’échelle · aucune conclusion possible à l’échelle d’une parcelle

Contexte 01 · plaine et littoral

Denpasar · Seminyak · Canggu

Dépôts volcaniques jeunes et formations alluviales, avec des conditions littorales qui varient selon la parcelle.

niveau de la nappe et drainage

risques de tassement et de liquéfaction à évaluer

salinité et corrosion près du littoral

Contexte 02 · terrain volcanique

Ubud et ses versants

Formations volcaniques altérées, avec une perméabilité variable, des pentes et un fort ruissellement en saison des pluies.

stabilité des pentes

déblais, remblais et ouvrages de soutènement

nappes perchées ou suintements possibles

Contexte 03 · calcaire et karst

Uluwatu · Bukit

Contexte régional de calcaire corallien et de karst ; le substratum peut être fracturé, irrégulier ou comporter localement des cavités.

profondeur variable du substratum rocheux

présence de cavités à vérifier, jamais à présumer

stabilité des falaises, drainage et assainissement

Les informations régionales orientent les vérifications. Seuls l’historique de la parcelle, l’inspection, les relevés, les investigations, les essais, les observations de la nappe et l’interprétation professionnelle permettent d’établir le modèle géotechnique propre au site.

Les études géologiques et hydrogéologiques régionales décrivent une île principalement volcanique, avec d’importants dépôts alluviaux dans les plaines, ainsi que des formations de calcaire corallien et des secteurs karstiques dans certaines parties du sud. Même à l’intérieur d’un même bassin d’eau souterraine, la succession des couches, leur épaisseur, leurs fractures, leur perméabilité et le niveau de la nappe peuvent varier sensiblement. Une coupe régionale aide à orienter les investigations ; elle ne décrit pas la stratigraphie d’une parcelle donnée.

Trois contextes fréquemment rencontrés à Bali montrent pourquoi le programme d’investigation doit être adapté à chaque parcelle :

Versants et vallées volcaniques : matériaux volcaniques altérés, laves ou séquences pyroclastiques peuvent se succéder. Les questions portent notamment sur la stabilité des pentes, l’érosion, le ruissellement concentré, les nappes perchées et les circulations préférentielles dans les fractures ou les couches plus perméables.

Plaines alluviales ou littorales : des sédiments naturels, des remblais et une nappe peu profonde peuvent se combiner. Selon la parcelle, le programme d’étude peut devoir traiter les tassements, l’évaluation préliminaire du risque de liquéfaction, l’inondation, le drainage, la corrosion et l’intrusion saline.

Calcaire ou karst du Bukit : le calcaire corallien peut être fracturé et présenter des formes de dissolution ou des cavités. L’étude peut devoir vérifier la portance, la profondeur variable du substratum rocheux, l’infiltration rapide, la stabilité d’une falaise ou d’un ravin et les conséquences sur l’assainissement.

Ces scénarios servent à orienter les vérifications ; ils ne constituent pas des diagnostics. La parcelle doit être caractérisée à partir des documents disponibles, d’une inspection professionnelle, des relevés altimétriques et des conditions de drainage observées, puis, lorsque les risques le justifient, d’investigations hydrogéologiques ou géotechniques ciblées.

L’étude de sol peut conditionner l’achat, pas seulement servir à concevoir le projet après l’acquisition

Étapes de décision avant l’achat Réduire les incertitudes avant un engagement non remboursable

01 · Historique et cartes Usage antérieur, remblais, pente, drainage, voisinage et documents régionaux datés.

02 · Visite du site Relevés, cheminement de l’eau, accès, soutènements existants et exposition littorale.

03 · Investigations ciblées Sondages, SPT ou CPT, carottage, laboratoire, géophysique et observations de la nappe selon le risque.

04 · Incidences sur le projet Traduire les résultats en fondations, terrassements, drainage, délai, coût et conditions de la transaction.

Décision du propriétaire

poursuivre sur la base d’hypothèses formalisées assortir l’achat de conditions ou renégocier approfondir les investigations suspendre ou renoncer

Le niveau d’étude avant l’achat dépend du risque, du programme et de l’accès accordé par le vendeur. Les conditions suspensives et les modalités d’accès au terrain doivent être encadrées avec le conseil juridique ou notarial compétent.

Le rapport de forage et l’étude géotechnique ne sont pas interchangeables. Le premier documente l’ouvrage de captage et les terrains rencontrés. La seconde doit déterminer si les bâtiments, les piscines, les murs de soutènement, les accès, les réseaux de drainage et les terrassements envisagés peuvent être réalisés en sécurité et dans une enveloppe budgétaire réaliste.

Les règles géotechniques indonésiennes reconnaissent une démarche par phases : une investigation préliminaire pour établir le modèle de terrain et ses risques, puis l’investigation de conception avec, selon le besoin, forages, essais SPT ou CPT, prélèvements de sol, roche et eau, essais de laboratoire et observations de la nappe. Le programme exact relève du professionnel géotechnicien qualifié ; un nombre générique de sondages ou de mètres ne convient pas à toutes les parcelles.

Avant qu’un acompte devienne inconditionnel, une équipe indépendante mandatée par l’acquéreur potentiel doit au minimum déterminer si le terrain pourrait modifier de façon importante :

le type ou la profondeur des fondations et les tassements admissibles ;

les murs de soutènement, le soutènement des fouilles ou la stabilisation d’une pente ;

le drainage, le rabattement de nappe ou le chantier en saison humide ;

la surface réellement constructible, l’accès et la logistique du chantier ;

le calendrier, l’assurabilité ou le coût total du développement.

Si la réponse peut changer la décision d’acheter, l’investigation doit intervenir avant l’engagement ou figurer dans une condition technique expresse. Elle ne doit pas être repoussée au seul motif qu’un entrepreneur étudie habituellement le sol après l’acquisition. La note de due diligence immobilière indépendante traite séparément les contrôles de titre, d’accès, de zonage, du bâtiment, de l’environnement et de la transaction.

Profondeur · conception du forage · écoulement · contrôles Plus profond peut être mieux protégé : à condition de capter le bon horizon

Surface et assainissement Le ruissellement et les eaux usées constituent des voies potentielles, pas un diagnostic applicable à chaque parcelle.

Nappe superficielle Une nappe libre est généralement plus exposée lorsque les ouvrages d’assainissement sont nombreux ou défaillants.

Horizon protégé Un captage plus profond peut limiter l’exposition récente si des couches protectrices le séparent réellement de la surface.

Forage et contrôles Crépine, tubage, scellement, écoulement, pompage et analyses de l’eau brute puis au robinet permettent de conclure.

Coupe conceptuelle, non à l’échelle. Elle illustre un scénario possible en zone urbanisée de plaine ou du littoral dans l’axe Denpasar, Seminyak et Canggu ; elle ne représente aucune parcelle précise. La nature et la profondeur des couches, le sens d’écoulement, le niveau de la nappe, la présence éventuelle d’une interface saline et la position de la crépine doivent être déterminés à partir des données disponibles, des investigations de terrain, du rapport de forage et de l’interprétation de professionnels qualifiés.

La qualité de l’eau dépend d’une chaîne complète, pas d’une simple armoire de filtration

De l’aquifère au robinet Quatre maillons, une performance globale

01 Ressource

Aquifère, risques locaux, salinité et débit soutenable

02 Forage

Profondeur, crépine, tubage, scellement sanitaire et tête de puits protégée

03 Traitement

Composants choisis selon les contaminants réellement mesurés

04 Distribution et contrôle

Cuves, canalisations, maintenance et analyses aux points d’usage

La performance se vérifie sur l’eau brute, après traitement et à des robinets représentatifs.

La fiabilité du système repose sur quatre maillons indissociables :

La ressource : aquifère, risques locaux et rendement soutenable.

Le forage : profondeur, crépine, tubage, scellement, tête de puits et conditions de pompage.

Le traitement : équipements choisis selon les contaminants mesurés et le débit requis.

La distribution et la vérification : cuves, canalisations, pression, stagnation, maintenance et contrôles aux points d’usage.

Une faiblesse à n’importe quel niveau peut compromettre le résultat. Une liste d’équipements haut de gamme ne répare pas un forage mal implanté ou mal construit. Une eau correctement traitée peut également être recontaminée dans une cuve sale ou un réseau mal exploité.

Analyser d’abord. Spécifier le traitement ensuite.

Le programme d’analyses doit être défini en fonction du site et de l’usage prévu. Une première série d’analyses porte généralement sur :

les coliformes totaux et E. coli ;

les nitrates et les autres indicateurs locaux liés à l’assainissement ou à l’usage des sols ;

la turbidité ;

le pH ;

la conductivité, les solides dissous totaux et les chlorures ;

la dureté et l’alcalinité ;

le fer et le manganèse ;

tout autre paramètre demandé par le laboratoire, l’hydrogéologue ou la réglementation indonésienne applicable.

Les prélèvements doivent distinguer l’eau brute au forage , l’eau après traitement et l’eau à des points d’usage représentatifs . Les analyses doivent être répétées après la mise en service, après une réparation ou une inondation, en cas de changement de goût, d’odeur ou d’aspect, puis selon un programme d’exploitation. Lorsque la saison peut modifier sensiblement la ressource, des résultats de saison sèche et de saison humide sont utiles.

Une eau claire n’est pas un résultat de laboratoire.

Ce que les résultats peuvent changer

Résultat ou risque

Preuve à obtenir

Réponse de conception typique

Ce qu’il ne faut pas conclure

Contamination microbiologique

E. coli , coliformes totaux et inspection sanitaire

Corriger la ressource ou le forage ; désinfection validée ; cuves et réseau propres

Une cartouche de charbon rend l’eau sûre

Turbidité ou sédiments

Turbidité, charge particulaire, inspection du forage et des cuves

Décantation ou média de prétraitement, filtration à sédiments et dispositif de lavage maintenable

Une cartouche plus fine règle un problème permanent de ressource

Fer ou manganèse

Analyse, observation des dépôts et taches

Oxydation et médias spécifiques si les résultats le justifient

Le charbon actif constitue le traitement principal

Dureté et tartre

Dureté, alcalinité et température d’exploitation

Conditionnement ou adoucissement si le bénéfice sur le cycle de vie le justifie

Une eau dure est automatiquement dangereuse

TDS, chlorures ou salinité élevés

Conductivité, TDS, chlorures et comparaison saisonnière

Réévaluation de la ressource, mélange ou osmose inverse correctement conçue

Un forage plus profond réduira toujours la salinité

Nitrates ou autres contaminants dissous

Panel d’un laboratoire accrédité

Correction de la ressource ou technologie validée selon le contaminant

Les UV retirent les substances dissoutes

Goût ou odeur

Analyse et inspection des cuves et du réseau

Traiter la cause ; charbon ou autre solution seulement si approprié

L’odeur prouve à elle seule une pollution septique

pH faible ou eau agressive

pH, alcalinité et revue des matériaux

Conditionnement et stratégie anticorrosion

Une eau visuellement claire est sans effet sur les équipements

Ces orientations ne sont pas des prescriptions d’équipements. La chaîne définitive doit correspondre à la chimie, à la microbiologie, au débit, à la pression, à la capacité de maintenance et aux exigences applicables.

Pourquoi « sept étapes » peut rester un mauvais système

Le nombre d’étapes est une description commerciale, pas une spécification de performance.

Charbon, filtration des sédiments, cartouches fines, osmose inverse, traitement par ultraviolets et ozone peuvent chacun avoir une utilité. Ils ne retirent pas les mêmes contaminants et ne deviennent pas automatiquement pertinents lorsqu’ils sont assemblés. Leur ordre, leur capacité, leur temps de contact, leur perte de charge, leur surveillance et leur maintenance déterminent leur efficacité.

Tous les composants ne se « lavent » pas de la même façon. Certains réservoirs à média effectuent un contre-lavage ; les cartouches jetables sont remplacées ; les membranes d’osmose inverse ont leur propre régime d’exploitation et de nettoyage ; une lampe UV exige une dose vérifiée et une maintenance ; l’ozone demande un temps de contact maîtrisé et des mesures de sécurité. Il ne faut donc pas laisser entendre que les sept étapes exécutent toutes le même cycle automatique à 4 h du matin.

Une conception robuste précise aussi :

les consommations normales et maximales de la villa ;

les pertes de pression et les dispositifs de dérivation ;

les alarmes et modes de défaillance sûrs ;

l’hygiène des cuves et la prévention de la stagnation ;

l’évacuation des eaux de contre-lavage et du rejet d’osmose inverse ;

les consommables, pièces de rechange et compétences disponibles localement ;

la chimie après traitement et la compatibilité des matériaux ;

les points de prélèvement avant traitement, après traitement et au robinet.

Sept barrières bien choisies peuvent être pertinentes. Sept équipements mal adaptés peuvent surtout produire des coûts, du gaspillage d’eau et une fausse impression de sécurité.

La qualité de l’eau affecte aussi le bâtiment

La dureté peut former du tartre dans les réseaux d’eau chaude, les canalisations et les échangeurs. Les sédiments peuvent perturber les vannes, pompes et robinetteries. Les chlorures, les solides dissous ou un pH inadapté peuvent accroître le risque de corrosion. Le fer et le manganèse peuvent créer des dépôts et des taches.

Ces phénomènes peuvent réduire la durée de vie des équipements, restreindre le débit, augmenter la consommation d’énergie et multiplier les interventions.

La composition de l’eau peut également modifier sa sensation, l’efficacité du savon et l’apparition de traces sur les équipements, le linge ou les surfaces. Ce sont de vrais sujets de confort et d’exploitation. En revanche, une sensation sur la peau ou les cheveux ne constitue pas un test de sécurité et ne doit pas être présentée comme une preuve médicale.

La méthode DALLEAU au service du propriétaire

DALLEAU considère l’alimentation en eau comme un système à concevoir dans son ensemble, et non comme un achat tardif d’équipements.

1. Établir le risque lié à la ressource

Documenter l’emplacement envisagé, les fosses septiques et drains voisins, l’exposition côtière, la demande prévisionnelle et les éventuels avis hydrogéologiques. Faire confirmer le zonage, les permis et les obligations d’exploitation par les professionnels autorisés compétents.

2. Conserver le dossier du forage

Exiger le relevé du foreur : coordonnées, profondeur totale, observations géologiques, tubage, intervalle de crépine, scellement sanitaire, essai de débit, caractéristiques de la pompe et date d’achèvement. Une mention « environ 60 mètres » ne suffit pas pour la maintenance future.

3. Établir un état initial par analyses

Analyser l’eau brute avant de figer le traitement. Conserver le rapport complet, la date de prélèvement, l’identité du laboratoire et les méthodes employées, et non un simple message affirmant que l’eau est « conforme ».

4. Approuver le cahier des charges technique

Le spécialiste doit expliquer à quel risque mesuré répond chaque composant, ainsi que le débit nominal, la perte de pression, le temps de contact, les volumes rejetés ou contre-lavés, la maintenance, les consommables et la réaction du système en cas de panne.

5. Mettre en service toute la chaîne

Vérifier le fonctionnement et la qualité de l’eau à la source, après traitement et à des robinets représentatifs. Confirmer la propreté des cuves, la pression, les dérivations, les alarmes et l’accès pour la maintenance.

6. Transmettre un système exploitable

Le propriétaire doit recevoir les plans, la nomenclature des équipements, les analyses, les réglages, les garanties, les références des consommables, les contacts de maintenance, les journaux d’intervention et le calendrier des prochains contrôles. Ce dossier permet à un futur exploitant, acheteur ou conseiller technique de comprendre le système sans devoir deviner.

Harmonie : un forage d’environ 60 mètres, pas une règle générale

Dans une zone densément bâtie, une ressource plus profonde peut être mieux protégée des infiltrations liées aux installations septiques superficielles, notamment lorsqu’une couche peu perméable la sépare des eaux proches de la surface. Ce bénéfice doit toutefois être démontré pour la parcelle : un forage profond, mal tubé ou mal scellé, peut relier des horizons qui devraient rester séparés.

À Harmonie, l’équipe de projet a donc choisi de réaliser un forage jusqu’à environ 60 mètres et d’associer cette ressource à un traitement multibarrière. Ce choix répond aux conditions propres au site ; il ne permet pas d’affirmer que toute eau captée à 60 mètres serait naturellement pure. La démonstration de performance doit couvrir le rapport de forage, l’analyse de l’eau brute, le cahier des charges du traitement, le stockage, la distribution, les résultats de mise en service et le programme de maintenance.

Questions à poser avant d’approuver le système

Quels risques de contamination et de salinité ont été étudiés ?

Où figurent le tubage, la crépine et le scellement sanitaire ?

Quels résultats de l’eau brute déterminent le traitement ?

À quel paramètre mesuré répond chaque composant ?

Que se passe-t-il si la pompe, la lampe UV, le dosage ou un filtre tombe en panne ?

Quel volume d’eau est consommé ou rejeté pendant le traitement et le nettoyage ?

Qui entretiendra le système et avec quels consommables ?

Où peut-on prélever l’eau brute, l’eau traitée et l’eau au point d’usage ?

Quels résultats de mise en service et futurs contrôles démontrent la performance ?

Questions fréquentes

L’eau d’un puits de 60 mètres est-elle nécessairement sûre ?

Pas du seul fait de sa profondeur. Il peut atteindre un aquifère mieux protégé, mais la sécurité dépend de la géologie, de la construction, du pompage, des risques voisins et des analyses.

Un système à sept étapes peut-il rendre potable n’importe quelle eau de puits ?

Non. Aucune séquence unique ne traite tous les contaminants. Le système doit être choisi et validé selon l’eau mesurée, l’usage prévu et les exigences indonésiennes applicables.

Une mauvaise odeur prouve-t-elle une contamination par une fosse septique ?

Non. C’est un signal qui justifie une investigation, pas un diagnostic. Les voies de pollution, le forage, les cuves, la microbiologie, la chimie et la plomberie peuvent tous devoir être vérifiés.

L’osmose inverse est-elle toujours nécessaire ?

Non. Elle peut traiter certains contaminants dissous, notamment la salinité, mais elle produit aussi un rejet et exige un prétraitement, une maintenance et une réflexion sur l’eau après traitement. Elle doit être justifiée par les analyses.

Les UV résolvent-ils tout le problème ?

Non. Une installation UV correctement dimensionnée et exploitée peut inactiver certains microorganismes. Elle n’élimine ni les contaminants dissous, ni les sédiments, ni les sels, et n’assure aucune rémanence désinfectante durable dans le réseau.

Quand peut-on qualifier l’eau traitée de potable ?

Uniquement lorsque des analyses représentatives démontrent le respect de la norme applicable et que les contrôles d’exploitation nécessaires au maintien de ce résultat sont en place.

Sources et limites

Les principes techniques ont été vérifiés le 21 juillet 2026. Ils ne remplacent ni le droit indonésien, ni une étude hydrogéologique locale, ni les résultats d’un laboratoire accrédité.

OMS, Directives de qualité pour l’eau de boisson, chapitre 4 : vulnérabilité des nappes, protection du forage, barrières multiples et réseau.

OMS, grille d’inspection sanitaire des forages : construction sanitaire et inspection des risques.

Étude isotopique des eaux souterraines de Denpasar (2022) : montre localement qu’un puits qualifié de profond peut encore capter une eau d’origine superficielle lorsque sa crépine reste dans l’aquifère peu profond.

Étude historique de l’assainissement individuel à Denpasar : résultats d’enquête 2016 à 2017 montrant une voie crédible vers la nappe superficielle ; il ne s’agit pas d’un recensement de Canggu en 2026.

Guide technique de l’US EPA sur la construction des puits privés : rôle du tubage et du scellement pour éviter le mélange d’horizons indésirables ; contexte technique, pas règle de construction indonésienne.

CDC, analyses de l’eau de puits : analyses initiales et périodiques.

US EPA, systèmes septiques et eau de boisson : voies de contamination ; contexte technique et non règle de distance à Bali.

Université Udayana, étude des puits peu profonds de Sanur Kauh : résultats locaux, non généralisables à tous les puits de Bali.

Revue de recherche de la province de Bali, intrusion saline à Kuta Utara : résultats de salinité propres aux sites étudiés.

Permenkes n° 2 de 2023 : référence réglementaire sanitaire et environnementale indonésienne ; les paramètres applicables doivent être confirmés au moment du test.

CDC, systèmes de traitement domestique : aucune technologie unique ne traite tous les contaminants.

US EPA, paramètres secondaires de l’eau : tartre, corrosion, taches, goût et odeur.

NSF, normes des systèmes de traitement : certifications et limites propres à chaque technologie.

Province de Bali, bassins d’eau souterraine : contexte régional officiel des aquifères ; ce n’est pas une étude de parcelle.

Badan Geologi, recherche sur le bassin Denpasar et Tabanan : cadre régional des aquifères volcaniques et interprétation des écoulements ; ce n’est pas une coupe universelle de Bali.

JICA, étude des ressources en eau et de la géologie de Bali : contextes volcaniques, alluviaux et calcaires régionaux et variabilité des puits.

Direction générale des routes, exigences de conception géotechnique SNI 8460:2017 : cadre des investigations préliminaires et de conception, prélèvements, essais in situ et observation de la nappe.

JICA, étude géologique du contexte calcaire de Bukit Badung : contexte régional de calcaire corallien, karst, dolines et cavités ; ce n’est pas la preuve d’une cavité sous une parcelle.

Évaluation des risques de catastrophe de Bali 2025 à 2029, règlement du Gouverneur 25/2024 : contexte régional officiel pour l’évaluation de la géologie et des risques multiples.

Trois questions à explorer ensuite

Question liée Puits de villa à Bali : usage domestique et permis commercial Question liée Projet Harmonie : les systèmes invisibles qui façonnent le séjour Question liée Due diligence avant de verser un acompte

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans le questionnaire confidentiel. DALLEAU identifiera la prochaine étape utile pour le propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

Méthode propriétaire

Les preuves avant les équipements

Réunir dans un seul dossier la ressource, le forage, l’analyse de l’eau brute, la base de traitement, la mise en service et le plan de maintenance.

À lire ensuite

Permis d’eau souterraine d’une villa Projet Harmonie Due diligence avant un acompte

Distinction essentielle

Une eau claire et sans odeur peut échouer à une analyse microbiologique ou chimique. Le nombre de filtres n’est pas une norme de performance.

## Capital PT PMA : seuils d’investissement | DALLEAU

URL: https://dalleau.ai/fr/notes/pt-pma-capital-idr-10-billion-investment-e28a.html

société et investissement

PT PMA : faut-il verser 10 milliards IDR dès la création ?

Trois règles distinctes sont souvent ramenées au même chiffre de 10 milliards IDR. Elles répondent à des questions différentes et doivent être vérifiées séparément.

DALLEAU | Recherche et notes de terrain Publié le

16 juillet 2026

Dernière vérification

16 juillet 2026

Vérifié | 16 juillet 2026 | sources primaires

Mis à jour le 16 juillet 2026

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

Trois règles distinctes sont souvent ramenées au même chiffre de 10 milliards IDR. Elles répondent à des questions différentes et doivent être vérifiées séparément.

Pendant des années, j'ai entendu le même chiffre chez les notaires, avocats, agents de visa et prestataires de création de société : 10 milliards IDR . Pourtant, d'un rendez-vous à l'autre, ce montant semblait désigner autre chose. Était-ce le capital ? De l'argent à laisser sur un compte ? La valeur de l'entreprise ? Le prix de la villa ? Une obligation pour chaque activité ? Ou la valeur des actions que chaque actionnaire étranger devait détenir ?

Trois règles distinctes sont souvent présentées comme une seule exigence de 10 milliards IDR. Elles répondent à des questions différentes :

le minimum général actuel de capital placé et libéré d'une société indonésienne à capitaux étrangers (PT PMA) est de 2,5 milliards IDR , sous réserve de la règle des 25 % et de tout minimum sectoriel supérieur portant expressément sur le capital placé/libéré ;

le plan d'investissement enregistré dans le portail indonésien d'autorisation des entreprises en ligne (OSS) est généralement strictement supérieur à 10 milliards IDR pour chaque couple activité/localisation concerné ;

chaque demandeur du visa investisseur E28A doit, séparément, justifier une participation en actions d'une valeur d'au moins 10 milliards IDR dans la société garante.

Le règlement qui imposait l'ancien minimum général de 10 milliards IDR de capital placé/libéré a été abrogé pour le régime général actuel le 2 octobre 2025. Certains paramètres d'actes ou de licences antérieurs peuvent rester pertinents dans les cas transitoires prévus. C'est cette chronologie qui fait encore se contredire les réponses anciennes et actuelles.

La distinction se comprend mieux à partir d'un projet de villa. Imaginons une PT PMA envisagée pour détenir les droits du projet, construire puis exploiter légalement une villa d'hébergement, avec un budget documenté de 12 milliards IDR. Le budget du projet, le financement de la société et les actions de l'investisseur doivent encore être contrôlés séparément.

Cet exemple ne suppose pas que tous les droits fonciers, codes d'activité ou modèles d'exploitation soient accessibles. Il montre simplement pourquoi les trois montants ne sont pas interchangeables.

Première étape : arrêter d'appeler les trois montants « du capital »

La vraie question

Test actuel principal

Unité

Preuve principale

Ce que ce n'est pas

Quel capital placé et libéré la PT PMA doit-elle avoir ?

Généralement au moins 2,5 milliards IDR , plus la règle des 25 % et tout minimum sectoriel portant sur ce capital

La société

Acte, système d'administration juridique (AHU), registre des actionnaires et preuve de l'apport

Le plan OSS ou une décision E28A

Quelle taille le projet doit-il déclarer dans OSS ?

Généralement plus de 10 milliards IDR

En général, classification indonésienne des activités économiques (KBLI) à cinq chiffres × localisation du projet, sous réserve des exceptions

Plan OSS puis rapports périodiques sur les activités d'investissement (LKPM)

Un dépôt bancaire ou les actions d'une personne

De quelle participation en actions ai-je besoin pour demander le visa investisseur E28A ?

Au moins 10 milliards IDR en actions , sous réserve de la base de valorisation et des preuves acceptées par l'Immigration

Chaque demandeur de visa

Documents sociaux plus preuves d'immigration

Le projet, une dette ou le solde bancaire

Ces chiffres peuvent interagir, mais ils ne se remplacent pas.

Un plan de projet de 10,5 milliards IDR ne signifie pas qu'une personne détient 10,5 milliards IDR d'actions. Un prêt d'actionnaire de 10 milliards IDR n'est pas une participation en actions. Et 2,5 milliards IDR de capital libéré ne suffisent pas, à eux seuls, pour l'E28A.

Une villa, trois tests distincts

Partons du budget de 12 milliards IDR. Il couvre les droits du projet, la conception, la construction, l'aménagement et l'ouverture de la villa proposée, sous réserve des catégories que la réglementation en vigueur permet de comptabiliser.

Pour le plan d'investissement OSS, la classification d'activité à cinq chiffres, la localisation du projet et les coûts admissibles doivent ensemble justifier un investissement planifié strictement supérieur à 10 milliards IDR. Le terrain et le bâtiment peuvent être comptés pour certaines activités immobilières et d'hébergement selon des règles précises ; ils ne sont pas automatiquement admissibles dans tout projet présenté comme une villa.

Prenons un premier financement : 2,5 milliards IDR de capital libéré et 9,5 milliards IDR de prêt d'actionnaire. Sous réserve d'une validation juridique, bancaire et comptable, ces fonds peuvent financer les dépenses de la société. Le prêt reste toutefois une dette ; cette structure ne justifie donc pas 10 milliards IDR d'actions pour un demandeur E28A.

Dans un second financement, la société reçoit 10 milliards IDR en actions et 2 milliards IDR en prêt d'actionnaire. Ce montage peut répondre au seuil actuel de participation E28A pour un demandeur si l'Immigration accepte la valorisation et les justificatifs. Il ne prouve pas, à lui seul, que l'activité est autorisée, que le droit sur le site est valable ou que chaque coût entre dans le plan OSS.

La villa ne change pas entre les deux montages. Ce qui change, c'est la nature juridique de l'argent et le test auquel il peut répondre : dépense du projet, capital de la société ou actions documentées d'un investisseur.

Règle 1 : le capital social est généralement de 2,5 milliards IDR aujourd'hui

Depuis le 2 octobre 2025, le minimum général de capital placé et libéré d'une PT PMA est de 2,5 milliards IDR par société , sauf règle sectorielle imposant expressément un minimum supérieur sur le capital placé/libéré. Les autres métriques sectorielles se contrôlent séparément.

Le droit des sociétés ajoute une autre règle : au moins 25 % du capital autorisé doit être placé et entièrement libéré.

Le minimum général pratique de capital placé/libéré correspond donc au plus élevé des trois montants suivants :

2,5 milliards IDR ;

25 % du capital autorisé ;

tout minimum sectoriel supérieur portant expressément sur le capital placé/libéré.

Un seuil sectoriel exprimé en capital autorisé, en valeur d'investissement ou selon une autre métrique doit être contrôlé séparément ; il ne peut pas être inséré sans distinction dans cette formule.

Les trois termes à connaître

Terme indonésien

Traduction simple

Ce qu'il signifie

modal dasar

capital autorisé

Plafond nominal des actions que les statuts permettent d'émettre

modal ditempatkan

capital placé ou souscrit

Actions émises ou attribuées aux actionnaires

modal disetor

capital libéré

Valeur apportée en contrepartie de ces actions

Le capital autorisé n'est pas un solde bancaire. C'est un plafond statutaire.

Exemples :

Capital autorisé

25 %

Minimum général placé/libéré

2,5 milliards IDR

625 M IDR

2,5 milliards IDR, car le minimum PMA est supérieur

10 milliards IDR

2,5 milliards IDR

2,5 milliards IDR

20 milliards IDR

5 milliards IDR

5 milliards IDR

40 milliards IDR

10 milliards IDR

10 milliards IDR

Une structure prévoyant 10 milliards IDR de capital autorisé et 2,5 milliards placés/libérés était cohérente sous certaines règles antérieures à 2021. Elle redevient possible, sur le plan arithmétique, pour une nouvelle société soumise à la règle générale actuelle. Ce n'était toutefois pas la structure générale des PT PMA entre 2021 et le 1er octobre 2025. Fixer sans raison un capital autorisé beaucoup plus élevé peut également augmenter le montant à libérer.

« Mais on peut enregistrer la société sans voir tout cet argent à la banque »

Ce point de procédure crée énormément de confusion.

Les règles actuelles reconnaissent plusieurs preuves valables du capital. Selon les faits de la constitution, le Permenkum 49/2025 prévoit une preuve bancaire au nom de la PT ou sur un compte commun des fondateurs, ou une déclaration originale de libération signée par tous les directeurs avec tous les fondateurs et commissaires. Le PP 8/2021 accorde 60 jours à compter de l'acte de constitution pour transmettre électroniquement une preuve valable.

Cela ne signifie pas que le capital peut être fictif.

Cela signifie simplement que la constitution de la société, la preuve bancaire et l'utilisation des fonds suivent des étapes distinctes. Les actions doivent tout de même être entièrement libérées. L'acte, le registre des actionnaires, la déclaration, les mouvements bancaires et la comptabilité doivent tous décrire la même réalité.

La formulation sûre est la suivante :

Ne pas voir 10 milliards IDR sur un compte au moment de la constitution en ligne ne prouve pas l'absence d'obligation de capital ou d'investissement. Cela montre que la constitution, le capital social et le financement du projet sont trois processus distincts.

Ces 60 jours constituent un délai de dépôt de la preuve, pas un paiement échelonné ni une autorisation d'inventer du capital libéré.

La règle des douze mois n'oblige pas à laisser l'argent dormir

La réglementation de 2025 contient une déclaration de conservation portant sur le capital placé/libéré pendant douze mois. Elle autorise expressément son utilisation pour :

acheter des actifs de la société ;

construire des bâtiments ;

financer les opérations de la société.

Si la PT reçoit 2,5 milliards IDR en numéraire puis achète un actif professionnel réel pour 2 milliards, la trésorerie baisse, mais le capital ne disparaît pas. Les liquidités sont devenues un autre actif au bilan.

L'article 27 et l'annexe I décrivent un engagement de douze mois pendant lequel le capital placé et libéré ne doit pas sortir du compte de la société, avec des exceptions prévues pour l'achat d'actifs de la société, la construction de bâtiments et ses opérations.

Le texte contient toutefois une anomalie : l'article 27(1) renvoie à l'article 26(6), et non au paragraphe sur le capital de l'article 26(10). Il faut vérifier la déclaration actuellement affichée dans OSS et le traitement retenu par le ministère de l'Investissement, couramment désigné par le sigle BKPM, avant de se fonder sur son champ exact pour un retrait, une réduction de capital ou un montage non monétaire inhabituel.

Règle 2 : le plan de projet OSS est généralement supérieur à 10 milliards IDR

Le chiffre de 10 milliards IDR n'a pas disparu. Il appartient surtout à un autre test.

La règle générale impose à un projet PMA de déclarer un investissement total planifié strictement supérieur à 10 milliards IDR , généralement hors terrain et bâtiment, pour chaque :

KBLI à cinq chiffres × localisation de projet

Deux détails sont immédiats :

10 milliards IDR exactement ne suffisent pas lorsque le texte exige un montant supérieur ;

il ne s'agit généralement pas d'un seul plan de 10 milliards pour toute la société, quels que soient ses activités et ses sites.

Une société ayant deux activités distinctes et deux localisations peut avoir plusieurs unités de plan. Le même actif ou la même facture ne peut pas être compté intégralement dans chacune.

Il existe des exceptions sectorielles

Le commerce de gros, la restauration, la construction, certaines lignes industrielles, la recharge publique de véhicules électriques et les activités en zone économique spéciale suivent des règles d'agrégation spécifiques. Pour la restauration et les boissons, le montant est regroupé selon les deux premiers chiffres du KBLI dans un même kabupaten/kota, hors terrain et bâtiment. Il n'est pas recalculé pour chaque adresse ; un autre kabupaten/kota crée une autre unité de calcul.

Pour un projet immobilier ou d'hébergement, l'exception la plus importante concerne la manière dont les actifs et les travaux sont comptabilisés.

L'achat d'une villa compte-t-il dans les 10 milliards IDR ?

Parfois, mais dire simplement que la villa compte ne suffit pas.

La réglementation actuelle inclut terrain et bâtiment pour :

le développement ou l'exploitation immobilière, notamment construction, vente ou location ;

l'hébergement de courte ou longue durée.

Elle distingue ensuite deux modèles immobiliers :

un bâtiment entier ou un complexe résidentiel intégré peut appliquer le seuil en incluant terrain et bâtiment ;

un bien constitué d'une ou plusieurs unités ne représentant ni un bâtiment entier ni un complexe résidentiel intégré subit un calcul excluant terrain et bâtiment.

L'article 26(6) réserve cette distinction au développement ou à l'exploitation immobilière. Elle ne doit pas être appliquée automatiquement à l'hébergement de courte ou longue durée, traité séparément par l'article 26(5).

La réponse dépend donc :

du KBLI et de l'activité réelle ;

de l'accessibilité de cette activité à une PT PMA et à l'échelle concernée ;

du caractère hébergement, exploitation immobilière, gestion ou autre ;

de la société qui détient l'actif ou le droit ;

de la localisation et du regroupement du projet ;

du contrat, du titre/droit et du traitement comptable.

Une villa détenue personnellement par l'actionnaire ne devient pas l'investissement de la PT parce qu'elle la gère. Un gestionnaire ne peut pas compter la valeur des villas de ses clients. Et on ne choisit pas un code hôtelier ou d'hébergement uniquement parce que son calcul d'investissement est plus avantageux.

Un plan d'investissement est un budget, pas un dépôt unique

OSS demande comment le projet utilisera et financera l'investissement.

Le plan peut inclure, selon le cas :

acquisition et préparation du terrain ;

bâtiments et infrastructures ;

machines, équipements et pièces de rechange ;

véhicules, matériel de bureau, études, enquêtes, permis et dépenses de construction/préparation ;

un seul cycle de fonds de roulement.

Les sources de financement reconnues sont :

fonds propres ;

prêts ;

bénéfices réinvestis ;

prime d'émission.

Voici un exemple simple.

Exemple : projet de 10,6 milliards, capital de 2,5 milliards

capital libéré : 2,5 milliards IDR ;

prêt d'actionnaire ou bancaire : 8,1 milliards IDR ;

coûts planifiés admissibles : 10,6 milliards IDR.

La société peut potentiellement satisfaire son minimum général de capital et financer un projet plus important. Mais :

les 8,1 milliards restent une dette s'ils sont documentés comme prêt ;

le virement n'est pas automatiquement un investissement réalisé ;

des dépenses admissibles doivent intervenir et être prouvées ;

l'actionnaire ne détient que les actions figurant dans les documents sociaux.

Un prêt entre parties liées peut soulever des questions fiscales, de prix de transfert, de retenue sur intérêts, de devise et de documentation ; faites valider ses conditions avant le virement. Transformer ensuite un prêt en capital est une opération sociale, pas un changement de libellé comptable : il faut une créance valable, l'accord de la RUPS, une capacité suffisante du capital autorisé, le respect du processus d'émission et des droits des actionnaires, des actions entièrement libérées et les formalités d'acte/AHU.

Suivre précisément le parcours des fonds

Le schéma ci-dessous sépare les différentes étapes de décision :

actionnaire → capital / prime d'émission / prêt documenté → compte bancaire de la PT → achat de l'actif ou paiement du coût par la PT → actif ou charge enregistré par la PT → réalisation déclarée dans le bon LKPM

Pour un apport en nature valable, il faut une branche distincte :

apport en nature → évaluation et transfert juridique → actif de la PT

À chaque flèche, il faut demander : quelle est la nature juridique de ce paiement ?

La société émet des actions en contrepartie d'un apport valable au capital.

La prime d'émission est un apport en fonds propres au-dessus de la valeur nominale.

Le prêt d'actionnaire crée une dette.

L'achat par la société crée un actif ou une charge pour la société.

Le LKPM déclare la réalisation admissible du projet.

Faire transiter l'argent par le compte de la société ne le transforme pas automatiquement en capital social. Laisser des liquidités sur le compte ne le transforme pas automatiquement en investissement réalisé. Payer personnellement un vendeur ne donne pas automatiquement la propriété à la PT.

Règle 3 : l'E28A exige une participation en actions de 10 milliards IDR par demandeur

L'Immigration pose une autre question : quelle valeur d'actions cette personne détient-elle dans la société garante ?

La page officielle E28A exige actuellement la preuve d'une participation en actions d'une valeur d'au moins 10 milliards IDR, ou équivalent, dans la société garante enregistrée auprès de BKPM.

Ce montant n'est pas :

la valeur du projet OSS ;

le solde bancaire de la société ;

le prêt d'actionnaire du demandeur ;

la valeur d'une villa détenue par le demandeur ;

le capital total de la société réparti informellement entre plusieurs demandes.

Un demandeur ou deux

Si A détient une valeur documentée de 10 milliards IDR en actions, A peut satisfaire le chiffre publié, sous réserve de la base de valorisation acceptée et du reste du dossier d'immigration.

Si A et B demandent tous deux l'E28A, chacun doit satisfaire son test personnel. Un projet de 10 milliards au niveau de la société ne peut pas être recyclé en 10 milliards d'actions pour A et 10 milliards d'actions pour B.

La stratégie de visa peut donc imposer une structure de capital bien supérieure au minimum général de 2,5 milliards IDR.

Et la prime d'émission ?

Supposons que A souscrive 2,5 milliards IDR d'actions à leur valeur nominale et paie 7,5 milliards supplémentaires comme prime d'émission. La société reçoit 10 milliards de fonds propres. Dès lors que les 7,5 milliards sont qualifiés de prime d'émission, la valeur nominale des actions de A reste 2,5 milliards ; elle ne peut augmenter qu'au moyen d'une capitalisation ou d'une émission d'actions distincte et valablement enregistrée.

La page publique E28A parle de participation en actions. Elle ne dit pas clairement que la prime d'émission remplace la valeur nominale/documentée des actions. Il ne faut rien promettre sans confirmation écrite de l'Immigration pour le dossier concerné.

La même prudence s'applique à l'achat d'actions existantes à un autre actionnaire : l'opération peut changer le propriétaire sans apporter de nouvel argent à la société ou au projet.

Plan, réalisation et LKPM

Le plan OSS regarde vers l'avenir. Le LKPM déclare ce que la société réalise.

Une PT PMA, grande entreprise, dépose généralement un rapport trimestriel pour chaque activité et localisation :

Trimestre

Échéance

Janvier à mars

15 avril

Avril à juin

15 juillet

Juillet à septembre

15 octobre

Octobre à décembre

15 janvier de l'année suivante

Le rapport couvre la réalisation de l'investissement, les emplois, la production ou les services, les obligations liées aux licences et les difficultés rencontrées. Il doit être cohérent avec les contrats, les factures, les mouvements bancaires, le registre des immobilisations, les comptes et les déclarations fiscales.

L'article 373 prévoit trois déclencheurs pertinents : aucun LKPM pendant deux périodes consécutives ; aucune réalisation d'investissement supplémentaire pendant les quatre périodes suivant le premier LKPM ; ou aucune réalisation supplémentaire pendant quatre périodes consécutives en phase de préparation. La séquence comprend ensuite trois avertissements successifs, une suspension temporaire, une amende administrative puis, uniquement si les conditions légales ultérieures restent insatisfaites, la révocation de l'autorisation de l'activité concernée. Le Règlement 5/2025 ne fixe pas lui-même de montant universel d'amende.

Et si mon ancienne PT PMA possède déjà 10 milliards IDR de capital libéré ?

Le nouveau minimum de 2,5 milliards ne réécrit pas un acte existant.

Réduire le capital libéré suit une procédure formelle : décision des actionnaires, information et délai d'opposition des créanciers, approbation ministérielle, acte notarié et mises à jour AHU, analyse comptable et fiscale. Il faut également vérifier l'historique de la licence et les dispositions transitoires.

Après réduction, la structure doit toujours respecter le minimum général de 2,5 milliards, les 25 % du capital autorisé et tout minimum sectoriel portant sur le capital placé/libéré. Par exemple, 40 milliards IDR de capital autorisé produisent un minimum de 10 milliards au titre des 25 % ; atteindre 2,5 milliards libérés imposerait aussi de ramener le capital autorisé à 10 milliards maximum, en plus des autres validations. Il faut également revérifier chaque demandeur E28A avant toute réduction d'actions.

Il ne faut pas simplement retirer 7,5 milliards en les appelant « capital excédentaire ». L'acte, les droits des actionnaires, la banque, le bilan, OSS, le LKPM et les visas risqueraient de raconter des histoires incompatibles.

Un tableau commun avant d'envoyer les fonds

Demandez au notaire, au spécialiste OSS, au comptable et au conseil immigration de compléter un seul tableau commun :

Question

Réponse attendue

Quels sont les montants de capital autorisé, placé et libéré ?

Montants, actionnaires, dates et preuves

Quel est le minimum de capital ?

2,5 Mds, règle des 25 % et contrôle sectoriel

Quelles sont les unités d'investissement OSS ?

KBLI, localisation, terrain/bâtiment inclus ou exclus

Comment chaque projet est-il financé ?

Capital, prime, prêt ou bénéfices réinvestis

Qui détient chaque actif ou droit ?

Société, actionnaire, vendeur, bailleur ou client

Qu'est-ce qui a été investi ?

Preuves et catégorie LKPM

Qui demande l'E28A ?

Valeur des actions documentées par demandeur

Quel travail chaque étranger réalisera-t-il ?

Contrôle immigration/permis de travail

Si les réponses des conseillers ne peuvent pas tenir dans un tableau cohérent, la structure n'est pas prête à recevoir l'argent.

Les questions qu'on nous pose directement

Dois-je déposer 10 milliards IDR immédiatement pour créer une PT PMA ? Pas au titre d'un minimum universel actuel de capital libéré. Le minimum général est de 2,5 milliards par PT PMA, sous réserve des 25 % et de tout minimum sectoriel portant expressément sur le capital placé/libéré. Les autres métriques sectorielles, le plan de projet et l'E28A appliquent des tests distincts.

Les 2,5 milliards peuvent-ils être utilisés ? La réglementation cite expressément l'achat d'actifs, la construction de bâtiments et les opérations de la société parmi les utilisations autorisées dans son cadre de douze mois. Il faut confirmer la déclaration OSS réelle à cause du renvoi interne incohérent de l'article 27.

Un prêt d'actionnaire peut-il financer le projet ? Oui, les prêts sont une source de financement reconnue. Le prêt reste une dette, n'émet aucune action et ne satisfait pas à lui seul l'E28A.

Le prix de ma villa compte-t-il ? Seulement si l'activité réelle de la société, son droit juridique, la localisation du projet et le calcul immobilier/hébergement applicable le permettent. Une villa personnelle ou détenue par un client ne compte pas automatiquement.

Puis-je utiliser les mêmes 10 milliards pour deux KBLI ? Pas automatiquement. Le test général s'applique par KBLI à cinq chiffres et localisation, avec des exceptions sectorielles précises. Les actifs communs doivent être répartis sans double comptage.

Si j'apporte 10 milliards IDR à la société, puis-je demander le visa investisseur E28A ? Seulement si le montant est documenté comme une participation en actions d'une valeur d'au moins 10 milliards détenue par ce demandeur et si l'Immigration accepte la base de valorisation et les preuves. Un prêt, un budget de projet ou un solde bancaire ne suffit pas.

Pourquoi mon ancien conseiller parlait-il de 10 milliards de capital ? Parce que c'était la règle générale du Règlement BKPM 4/2021. Le règlement imposant cet ancien minimum général a été abrogé pour le régime actuel le 2 octobre 2025, tandis que certains paramètres d'actes ou de licences antérieurs peuvent rester pertinents sous les dispositions transitoires.

Sources : Règlement Ministère de l'Investissement/BKPM 5/2025 , art. 25 à 27, 37, 285 à 286, 373 à 376, 394 à 395 et 398 à 400 ; PP 8/2021 , art. 3 à 5 ; Loi 40/2007 sur les sociétés, modifiée , art. 31, 33 à 35 et 41 à 47 ; Permenkum 49/2025 ; ancien Règlement BKPM 4/2021 , art. 12 ; page officielle Immigration E28A ; guides OSS LKPM phase de préparation et phase opérationnelle . Vérifiées le 15 juillet 2026. Cette note fournit une information générale, pas un conseil juridique, fiscal, comptable, foncier, d'investissement ou d'immigration en Indonésie. Confirmez la société, l'acte, l'activité, l'actif/droit, l'adresse et le résultat OSS/Immigration réel avant d'agir.

Deux questions à explorer ensuite

Question liée Comment sortir légalement de l'argent d'une PT PMA ? Sept méthodes et leur fiscalité Question liée PT PMA, prête-nom ou bail à Bali : qui détient réellement vos droits ?

De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

Méthode

Sources et date de mise à jour

DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.

À lire ensuite

KBLI 2025 pour les villas à Bali : exploiter son bien et gérer celui des autres ne sont pas la même activité capital de la PT PMA et obligations de suivi Comment sortir légalement de l'argent d'une PT PMA ? Sept méthodes et leur fiscalité

Contexte publié

PT PMA ou prête-nom Statut investisseur E28A

## Une PT PMA peut-elle exploiter une villa à Bali ? | DALLEAU

URL: https://dalleau.ai/fr/notes/pt-pma-exploiter-villa-bali/

Field Notes
/
Guide de décision
Field Notes · Sociétés
Une PT PMA peut-elle exploiter une villa à Bali ?
Les voies réellement envisageables entre exploitation directe, véritable opérateur local et société de management distincte
01
PMA directe
02
Opérateur indépendant
03
Véritable PT locale
04
Management par la PMA
Format
Guide de décision
Sujet
Sociétés et licences
Révision éditoriale
13 août 2026
Sources vérifiées
13 août 2026
Temps de lecture
17 min de lecture
Sur cette page
Partons d'une situation concrète
Les quatre voies en un coup d'œil
Voie 1 : exploitation directe par une nouvelle PT PMA sous 55203
Voie 2 : nommer un opérateur indonésien indépendant
Voie 3 : créer une véritable PT locale avec deux actionnaires indonésiens
Quand la PT locale ne correspond plus au rôle déclaré
Voie 4 : PT locale opératrice et PT PMA gestionnaire
La PT PMA peut facturer un service. Elle ne peut pas « refacturer le bénéfice »
Qui exploite réellement ?
Ce que chaque voie exige par écrit
La décision en langage clair
Sources principales et liens de vérification
Voici d'abord la réponse pratique.
Une nouvelle PT PMA ne dispose actuellement d'aucune voie visible de grande entreprise sous le KBLI 55203, Aktivitas Vila.
Ce code vise des maisons privées louées aux touristes et gérées par leur propriétaire. La matrice publique actuelle présente les échelles micro, petite et moyenne, mais aucune ligne
Usaha Besar
. Une nouvelle PT PMA ne devrait donc pas être structurée en partant du principe que 55203 lui est accessible.
L'Indonésie possède désormais un code distinct pour la gestion opérationnelle d'hébergements pour compte de tiers : le KBLI 55901.
Il couvre un gestionnaire impliqué dans les opérations quotidiennes et les décisions de gestion pour le compte du propriétaire, contre des honoraires de gestion, souvent appelés management fee. La matrice nationale comporte une voie grande entreprise. À Bali, l'accès réel doit néanmoins être contrôlé dans OSS, car la province a fermé les nouvelles demandes PMA portant sur l'ancien KBLI 55900, dont 55901 est issu après la scission de 2025.
Une véritable PT indonésienne peut potentiellement devenir l'opérateur.
Mais un investisseur étranger ne peut pas détenir ses actions tout en continuant à la présenter comme une PT domestique. Si deux salariés indonésiens deviennent actionnaires, ils deviennent de véritables propriétaires avec de véritables droits.
Une PT PMA peut potentiellement facturer de véritables prestations de gestion ou d’appui central à cet opérateur.
Une facture ne suffit pas à rendre le montage cohérent, et le bénéfice résiduel de la PT locale ne peut pas être transformé après coup en honoraires de gestion.
Ces quatre points définissent la décision pratique. Les sections suivantes précisent ce que chaque voie peut résoudre, les conditions qu'elle exige et les questions qui restent propres au dossier.
Périmètre de cette note
Cette analyse expose notre lecture des sources publiques disponibles au 13 août 2026. Elle ne choisit pas une société, un KBLI ou une chaîne contractuelle pour un projet précis. Le résultat OSS en direct et l'examen du dossier réel restent nécessaires.
Partons d'une situation concrète
Imaginons que vous déteniez ou louiez trois villas à Bali par l'intermédiaire d'une PT PMA.
Vous souhaitez commercialiser des séjours courts, recevoir les réservations, employer l'équipe sur place, organiser les arrivées et départs, assurer le ménage et le petit-déjeuner, vendre certains services aux hôtes, encaisser les recettes et conserver le contrôle de l'exploitation.
On vous conseille alors :
Créez une PT locale avec deux salariés. La PT locale facture les clients. Ensuite, votre PT PMA facture la PT locale et récupère le bénéfice.
Cette phrase fusionne au moins cinq questions différentes :
Quelle société peut vendre l'hébergement au client ?
Quelle société peut gérer l'hébergement pour le compte d'un tiers ?
Qui possède et contrôle réellement la PT locale ?
Que peut facturer légitimement la PT PMA ?
Dans quelle société le fondateur étranger est-il personnellement autorisé à travailler ?
Déplacer la facture ne répond à aucune de ces questions.
Les quatre voies en un coup d'œil
Voie 1
Voie 2
Voie 3
Voie 4
01
1. La nouvelle PT PMA exploite directement sous 55203
Lecture pratique actuelle
Aucune voie visible dans la matrice actuelle.
55203 ne comporte pas de ligne
Usaha Besar
.
Ce qu'elle peut résoudre
Rien, pour une nouvelle PMA utilisant ce code.
Ce qu'elle ne résout pas
Le code ne devient pas accessible parce que le bien est commercialisé comme une villa.
02
2. Nommer un opérateur indonésien indépendant
Lecture pratique actuelle
Potentiellement cohérent.
Un véritable opérateur autorisé contracte avec les clients et porte l'exploitation.
Ce qu'elle peut résoudre
Sépare la détention ou l'investissement immobilier de l'activité d'hébergement.
Ce qu'elle ne résout pas
L'opérateur doit encore disposer de la bonne activité, des droits sur le bien, des autorisations, des équipes, de la fiscalité et du reporting nécessaires.
03
3. Créer une véritable PT locale détenue par des actionnaires indonésiens
Lecture pratique actuelle
Potentiellement cohérent, mais c'est réellement leur société.
Ce qu'elle peut résoudre
Permet de constituer un opérateur domestique pour des activités accessibles à une entreprise indonésienne.
Ce qu'elle ne résout pas
Ne préserve pas une propriété étrangère cachée. Les droits des actionnaires, leur sortie et le bénéficiaire effectif doivent être réels.
04
4. PT locale opératrice et PT PMA société de gestion ou prestataire
Lecture pratique actuelle
Potentiellement cohérent si les deux sociétés sont substantielles.
55901 est la direction pertinente pour le management, sous réserve du traitement OSS à Bali.
Ce qu'elle peut résoudre
Permet de loger certaines compétences centrales de gestion dans une société séparée.
Ce qu'elle ne résout pas
Un contrat de gestion ne transforme pas une coquille locale en opérateur réel et n'étend pas automatiquement l'autorisation personnelle de travail du directeur étranger.
Une cinquième voie apparaît parfois : utiliser un KBLI d'hôtel, d'aparthotel ou d'une autre forme d'hébergement. Cela n'est défendable que lorsque le bien, les services et le mode d'exploitation correspondent réellement à cette catégorie. On ne transforme pas juridiquement une villa en hôtel en modifiant son descriptif commercial.
Voie 1 : exploitation directe par une nouvelle PT PMA sous 55203
Le KBLI 55203 n'est pas un code général pour tout bien présenté comme une villa.
Sa description officielle vise un hébergement de courte durée dans une maison privée louée aux touristes et
gérée par son propriétaire
. La matrice publique actuelle liée au système OSS comporte des lignes micro, petite et moyenne. Elle ne présente pas de ligne grande entreprise.
Une PT PMA relève du cadre de l'investissement étranger et de la grande entreprise. La conséquence pratique est nette :
Une nouvelle PT PMA ne dispose actuellement d'aucune voie visible pour enregistrer 55203 comme activité directe de villa.
Cette conclusion est plus utile que la formule vague « ce KBLI n'est pas officiellement fermé ». Une activité peut sembler ouverte en théorie tout en restant inutilisable par une nouvelle PT PMA lorsque la matrice d'autorisation ne prévoit pas l'échelle d'entreprise requise.
Et les anciennes licences ?
Une société existante peut avoir un historique d'autorisation créé sous le KBLI 2020, une ancienne configuration OSS ou un dossier de transition. Ce dossier doit être examiné pour lui-même.
La conversion de 55193 vers 55203 ne supprime pas automatiquement une licence existante. Elle ne prouve pas non plus qu'un nouveau demandeur peut obtenir aujourd'hui la même position.
La règle pour le propriétaire est simple :
ne copiez pas le NIB d'une ancienne société en supposant que la même voie reste ouverte ;
demandez la fiche OSS complète, pas seulement le code à cinq chiffres ;
vérifiez l'échelle d'entreprise, le niveau de risque, le lieu, le certificat standard et l'historique du dossier ;
distinguez la continuité d'un droit ancien de la possibilité d'une nouvelle demande.
Voie 2 : nommer un opérateur indonésien indépendant
Le propriétaire ou le titulaire des droits sur le bien peut potentiellement mandater une société distincte pour exploiter l'hébergement.
L'opérateur ne doit pas être choisi parce qu'il possède un KBLI pratique sur une capture d'écran. Il doit être capable de démontrer la chaîne opérationnelle complète.
Un véritable opérateur dispose normalement de tout ou partie des éléments suivants :
le droit contractuel d'utiliser le bien pour l'activité d'hébergement ;
l'activité d'hébergement adéquate dans OSS ;
l'activité et le lieu exacts enregistrés ;
les standards touristiques et autorisations complémentaires applicables ;
la relation commerciale avec les OTA ;
les conditions contractuelles remises aux clients ;
le compte de paiement et le processus de remboursement ;
les équipes d'exploitation ou un mandat de management clairement autorisé ;
l'enregistrement et la déclaration de la fiscalité locale ;
la déclaration APOA des hôtes étrangers ;
les assurances et responsabilités envers le client ;
le risque économique lorsque l'occupation baisse ou qu'une réclamation survient.
Ce que cette voie peut résoudre
Elle peut permettre au véhicule immobilier ou d'investissement détenu par des étrangers de rester distinct de la société qui vend le séjour.
La PT PMA peut recevoir une rémunération justifiée par un bail, un droit d'usage, une prestation de gestion, un financement ou une autre transaction réelle, selon les droits et le traitement fiscal.
Ce qu'elle ne résout pas
Une société détenant un KBLI ne légalise pas automatiquement chaque bien qu'elle gère.
Le site, l'usage du bâtiment, la situation PBG ou SLF, la compatibilité spatiale, les standards touristiques et la fiscalité locale restent à examiner. Le bien ne peut pas emprunter sa conformité au nom de la société de gestion.
La distinction est importante :
Nommer un opérateur autorisé peut résoudre la question de l'opérateur. Cela ne résout pas automatiquement la question du bien.
Voie 3 : créer une véritable PT locale avec deux actionnaires indonésiens
Cette voie est souvent envisagée lorsqu'un investisseur doit confier certaines activités d'exploitation à une société domestique distincte de la PT PMA.
L'investisseur étranger n'est pas actionnaire de la PT locale. Deux salariés indonésiens souscrivent ou reçoivent les actions. Ils peuvent ensuite quitter leur emploi, mais ils restent actionnaires tant qu'une opération juridique valide n'a pas transféré ou traité leurs actions.
La formule « je crée ma PT locale avec deux employés » masque donc la réalité juridique et économique.
Lorsque la détention des actions est réelle, la société appartient aux actionnaires indonésiens selon les droits attachés à leurs actions. Elle ne constitue pas un actif de l'investisseur étranger.
Ce que signifie être réellement actionnaire
Selon la classe d'actions et les documents sociaux, les actionnaires peuvent disposer :
de droits de vote ;
de droits aux dividendes ;
de droits sur la valeur des actions ;
du droit de participer aux assemblées ;
d'une influence sur la nomination ou la révocation des dirigeants ;
de droits ou restrictions de cession ;
de droits qui survivent à la fin de la relation de travail ;
d'intérêts susceptibles d'être affectés par un décès, une succession, un divorce, des créanciers ou un litige personnel.
Un pacte d'actionnaires licite peut organiser la gouvernance. Il ne peut pas maintenir une propriété domestique en apparence tout en transférant au fondateur étranger l'intégralité de la propriété économique, du contrôle et des bénéfices.
Le dilemme est inévitable :
Un actionnaire sans droits réels peut créer un problème de prête-nom. Un actionnaire disposant de droits réels crée une véritable relation de propriété et de gouvernance. « Mettre deux salariés » ne fait disparaître aucun des deux sujets.
Exemple concret de gouvernance
Imaginons qu'Ayu et Budi détiennent chacun 50 % de la PT locale.
La société exploite trois villas. Ayu et Budi quittent ensuite leur emploi au sein du groupe. Le fondateur étranger ne peut pas simplement les retirer du registre des actionnaires parce qu'ils ne travaillent plus pour la PT PMA.
Un mécanisme de cession prévu à l'avance peut exister, mais il doit être juridiquement valide et ne pas avoir pour seul objet d'annuler leur propriété dès le premier jour. La cession soulève également des questions de valorisation, de fiscalité, de consentement et de procédure sociale.
C'est pourquoi l'utilisation de salariés comme actionnaires ne peut pas être traitée comme une formalité administrative.
Quand la PT locale ne correspond plus au rôle déclaré
La structure devient difficile à défendre lorsque la PT locale existe principalement dans les éléments suivants :
le registre des actionnaires ;
le NIB ou la licence ;
le nom du merchant OTA ;
la facture au client ;
le compte bancaire par lequel les recettes transitent brièvement.
Pendant ce temps, la PT PMA ou le fondateur étranger :
apporte tout le capital et tout le fonds de roulement ;
contrôle les comptes bancaires ;
choisit en pratique tous les dirigeants ;
fixe les prix et les disponibilités ;
possède les accès OTA et PMS ;
recrute et dirige les équipes ;
approuve tous les remboursements ;
contrôle les achats et les budgets ;
récupère presque tout le bénéfice économique ;
peut faire disparaître les actionnaires indonésiens à sa convenance.
Le problème n'est pas simplement que les deux sociétés sont liées. Des sociétés liées peuvent parfaitement conclure des transactions réelles.
Le problème apparaît lorsque l'histoire de l'actionnariat, la déclaration du bénéficiaire effectif, l'histoire racontée par les licences touristiques et la réalité quotidienne décrivent des entreprises différentes.
L'article 33 de la loi sur l'investissement traite directement des actions détenues pour le compte d'une autre personne. Le cadre indonésien du bénéficiaire effectif regarde également au-delà du registre vers le contrôle, les droits de nomination et le bénéfice économique.
Aucun indice isolé ne décide du résultat. C'est l'ensemble du montage qui compte.
Voie 4 : PT locale opératrice et PT PMA gestionnaire
Cette structure est la plus cohérente lorsque chaque société exerce réellement le rôle, supporte les risques et conserve l'économie qui lui sont attribués.
VÉRITABLE OPÉRATEUR LOCAL
Contrat client
Merchant OTA et encaissement
Activité et lieu enregistrés
Équipe sur place
Arrivées et départs
Ménage et maintenance
Remboursements et réclamations
PBJT et APOA
Décisions, fonds de roulement, bénéfice et risque réels
↓ véritable contrat de prestation
PT PMA DE MANAGEMENT OU DE SUPPORT
Pilotage des prix et de la demande
Support aux réservations centrales
Exécution marketing
Finance et reporting
Support achats
Technologie et systèmes
Support de direction
Personnes, livrables et preuves identifiables
Rémunération commercialement justifiée
Pourquoi 55901 est important
Le KBLI 55901 reconnaît expressément la gestion d'hébergements par un tiers.
La description officielle est exceptionnellement précise. Le gestionnaire peut être responsable de la performance commerciale et opérationnelle globale, participer directement aux opérations quotidiennes et aux décisions de gestion, agir pour le compte du propriétaire et recevoir des honoraires de gestion.
Cette classification exclut expressément deux autres activités :
la propriété et l'exploitation directe de l'hébergement ;
le conseil général en gestion sans gestion opérationnelle directe.
Cette distinction donne aux propriétaires un vocabulaire plus clair.
Lorsqu'une PT PMA contrôle les opérations quotidiennes, son activité enregistrée et sa position de licence doivent correspondre à une gestion opérationnelle, et non à un simple conseil général. À l'inverse, une intervention stratégique ponctuelle ne suffit pas à faire d'une société le gestionnaire opérationnel.
La difficulté propre à Bali
La matrice nationale publique de 55901 comprend une voie grande entreprise et des obligations particulières pour les PMA. C'est une différence matérielle avec 55203.
Mais Bali a fermé en mai 2026 les nouvelles demandes PMA portant sur 18 catégories à risque faible ou moyen-faible, dont l'ancien KBLI 55900, « autres hébergements ». Le KBLI 2025 a ensuite scindé la lignée de 55900 en plusieurs codes, dont 55901.
Les sources publiques n'établissent pas encore comment Bali applique la restriction portant sur l'ancien 55900 à chaque nouvelle demande relevant de 55901.
La formulation correcte côté propriétaire est :
55901 constitue nationalement une voie identifiable de grande entreprise pour la gestion opérationnelle d'hébergements. Une nouvelle demande à Bali exige encore un résultat OSS en direct et une confirmation écrite de la façon dont la restriction provinciale portant sur l'ancien 55900 est appliquée après la scission de KBLI 2025.
L'incertitude est donc limitée à la voie de dépôt en direct à Bali. Elle ne modifie pas la distinction nationale entre exploitation directe et gestion pour compte de tiers.
La PT PMA peut facturer un service. Elle ne peut pas « refacturer le bénéfice »
La question déterminante est de savoir si la PT PMA fournit une prestation autorisée, identifiable et économiquement utile.
Une PT PMA peut potentiellement facturer à l'opérateur local des prestations qu'elle est autorisée et capable de fournir. Cela peut inclure :
le pilotage des prix et de la demande ;
l’appui aux réservations centrales ;
le reporting financier ;
l’appui aux achats ;
l'exécution marketing ;
l'administration des systèmes ;
la supervision de la gestion ;
des droits de marque ou de technologie distinctement définis ;
des refacturations de coûts correctement documentées.
Mais la rémunération doit suivre une transaction réelle.
Elle ne doit pas être calculée ainsi :
Tout ce qui permet de ne laisser qu'un bénéfice symbolique dans la PT locale.
Exemple chiffré illustratif
Imaginons que l'opérateur local reçoive 1 milliard IDR de recettes clients pendant un mois.
Il paie les commissions OTA, les équipes, les charges, les consommables, la maintenance, la fiscalité locale, l'assurance et les autres coûts d'exploitation. La PT PMA fournit un véritable dispositif central de gestion avec six salariés identifiés, un travail mensuel de pilotage des prix et de la demande, la production de rapports financiers, des achats, du marketing et l’administration des systèmes.
La PT PMA peut facturer une rémunération soutenue par le périmètre réel et une méthode de pleine concurrence.
Elle ne doit pas attendre la fin de l'exercice, constater que la PT locale affiche 3,2 milliards IDR de bénéfice et émettre une facture de 3,1 milliards intitulée « honoraires de gestion » afin de ne laisser que 100 millions localement.
La seconde approche part du bénéfice résiduel souhaité et calcule la facture rétrospectivement. Elle n'établit pas un prix de pleine concurrence pour une prestation définie.
Où doit rester le bénéfice résiduel ?
Après les coûts d'exploitation réels et les charges intercompany réelles, le résultat résiduel reste dans la PT locale.
Économiquement, ce résultat appartient à la société et bénéficie à ses véritables actionnaires selon leurs droits.
Si l'objectif commercial est que le fondateur étranger reçoive presque toute cette valeur, la structure exige une autre base économique licite. La position de propriété ne peut pas changer selon que l'on examine la licence ou la répartition du bénéfice.
Qui exploite réellement ?
Posez dix questions :
Qui détient l'activité d'hébergement et le lieu dans OSS ?
Qui possède le droit contractuel d'exploiter le bien ?
Qui apparaît comme merchant ou fournisseur sur l'OTA ?
Qui contracte avec le client ?
Qui encaisse et rembourse ?
Qui emploie et dirige l'équipe du bien ?
Qui contrôle les prix, les réservations et le PMS ?
Qui déclare le PBJT et l'APOA ?
Qui supporte les réclamations, les pertes et le besoin de fonds de roulement ?
Qui conserve le résultat d'exploitation résiduel ?
Aucune réponse isolée ne prouve la position juridique. Ensemble, elles révèlent si le montage a de la substance.
Un dernier test est particulièrement utile :
Quelle société pourrait continuer à exploiter l'hébergement demain si l'autre arrêtait de l'aider ?
Si la PT locale ne peut ni fixer les prix, ni accéder à l'OTA, ni communiquer avec les clients, ni payer et diriger l'équipe, ni autoriser les remboursements, elle n'est peut-être pas l'opérateur indépendant décrit par les documents.
Ce que chaque voie exige par écrit
Pour toute exploitation directe
fiche complète de l'activité et de l'échelle dans OSS ;
activité et lieu, avec NKU ;
droit d'utiliser le bien ;
standards touristiques et autorisations complémentaires ;
dossier du bâtiment et de l'usage ;
conditions clients et identité du merchant OTA ;
organisation des équipes ;
fiscalité locale et APOA ;
assurances et répartition des responsabilités.
Pour un véritable opérateur local
acte et extrait AHU ;
preuve de souscription et de paiement des actions ;
droits des actionnaires et règles de gouvernance ;
déclaration du bénéficiaire effectif ;
droit d'exploiter le bien ;
licences et standards opérationnels ;
banque, comptabilité et décisions propres ;
relation clairement documentée avec la PT PMA.
Pour la PT PMA société de gestion ou prestataire
KBLI adéquat et résultat OSS en direct à Bali ;
contrat de gestion ou de prestation ;
matrice des droits de décision ;
salariés et systèmes identifiés ;
livrables mensuels ;
méthode de tarification ;
traitement PPh, TVA et comptable ;
preuve que l'opérateur local continue à exercer son propre rôle.
La décision en langage clair
Une nouvelle PT PMA ne devrait pas compter sur 55203 comme voie d'exploitation directe d'une villa. La matrice publique actuelle ne prévoit pas la catégorie grande entreprise dont elle aurait besoin.
Un véritable opérateur indonésien peut potentiellement fournir l'hébergement. Une PT PMA peut potentiellement fournir des prestations de gestion ou d’appui central séparément autorisées. Le KBLI 55901 clarifie cette distinction, même si son accessibilité en direct pour une nouvelle demande PMA à Bali doit encore être contrôlée au regard de la restriction provinciale.
Créer une PT locale avec deux salariés peut donc entrer dans une organisation légitime uniquement si ces personnes possèdent réellement la société et si la société exploite réellement l'activité.
Cette structure exige une propriété, une gouvernance et une économie réelles.
Une structure devient incohérente lorsque la licence, la facture et le registre des actionnaires attribuent les rôles d'une façon, tandis que le contrôle et la valeur économique suivent une autre logique.
La règle à retenir est simple :
Partez de l'activité réelle. Attribuez-la à la bonne société. Donnez à cette société les droits, autorisations, personnes, risques et moyens économiques nécessaires. Laissez ensuite chaque facture suivre cette réalité.
Parler à François
Sources principales et liens de vérification
OSS officiel, KBLI 55203, activité de villa
Matrice publique 55203, risques et échelles
OSS officiel, KBLI 55901, gestion d'hébergements
Matrice publique 55901, risque, échelle et voie PMA
Gouvernement provincial de Bali : restriction PMA sur 18 catégories
BPS : maintien des licences existantes lors d'une conversion KBLI non substantielle
Loi 25/2007 sur l'investissement
Loi 40/2007 sur les sociétés à responsabilité limitée
Règlement du ministère du Droit 2/2025 sur la vérification du bénéficiaire effectif
PMK 172/2023 sur les transactions entre parties liées
Les pages Unpad sont des outils publics de lecture de la matrice actuelle. Le système OSS émetteur et les règlements applicables contrôlent le résultat juridique.
Poursuivre à partir de la question en cours
Poursuivre à partir de la question en cours
Qui exploite réellement la villa ?
→
Une management fee rémunère une prestation. Elle ne déplace pas le bénéfice à elle seule.
→
Un dirigeant étranger peut-il travailler dans sa propre entreprise à Bali ?
→

## PT PMA, prête-nom ou bail à Bali | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/pt-pma-vs-nominee.html

← notes

conformité

7 juillet 2026

PT PMA, prête-nom ou bail à Bali : qui détient réellement vos droits ?

Financer un terrain ou des parts ne fait pas du payeur le titulaire inscrit. Avant d'investir, il faut identifier le droit, la personne ou la société qui le détient et les documents qu'un tribunal ou un futur acheteur pourra vérifier.

DALLEAU | Recherche et notes de terrain

Publié le

7 juillet 2026

Dernière vérification

20 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref

La distinction :

une société indonésienne à capitaux étrangers (PT PMA) permet de réaliser un investissement étranger éligible. Un bail accorde des droits contractuels pendant une durée définie. Un montage avec prête-nom place le droit foncier ou les parts au nom d'une autre personne, tandis que des documents privés tentent de donner le contrôle au financeur. Ces structures ne produisent pas les mêmes droits.

Avant toute décision.

Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la

base officielle des réglementations indonésiennes

et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée :

notes@dalleau.ai

. Les responsabilités imposées par la loi applicable restent inchangées.

Financer un terrain ou des parts ne fait pas du payeur le titulaire inscrit. Avant d'investir, il faut identifier le droit, la personne ou la société qui le détient et les documents qu'un tribunal ou un futur acheteur pourra vérifier.

La distinction :

une société indonésienne à capitaux étrangers (PT PMA) permet de réaliser un investissement étranger éligible. Un bail accorde des droits contractuels pendant une durée définie. Un montage avec prête-nom place le droit foncier ou les parts au nom d'une autre personne, tandis que des documents privés tentent de donner le contrôle au financeur. Ces structures ne produisent pas les mêmes droits.

Qui apparaît dans les registres

Dans une PT PMA, l'investisseur étranger est inscrit comme actionnaire d'une société indonésienne, sous réserve de l'activité autorisée, des limites de participation, des règles de capital et des licences. La société, et non l'actionnaire personnellement, peut détenir les droits accessibles à cette entité, par exemple un

Hak Guna Bangunan

(HGB), droit de construire et d'utiliser des bâtiments, lorsque les conditions sont remplies.

Dans un bail, le titulaire du terrain reste inscrit et l'investisseur reçoit les droits contractuels prévus par le contrat. La durée, le renouvellement, la cession, la transmission, les manquements et les recours dépendent du texte et du pouvoir de la personne qui accorde le bail.

Dans un montage avec prête-nom, une personne ou une entité indonésienne figure au registre foncier ou au registre des parts. Des actes annexes, procurations, reconnaissances de dette ou options tentent ensuite d'attribuer le bénéfice économique ou le contrôle à une autre personne. Le décalage entre le registre et l'accord privé constitue le risque principal.

Pourquoi les documents du prête-nom peuvent échouer

L'

article 33 de la loi 25/2007 sur l'investissement

interdit les accords ou déclarations selon lesquels des parts sont détenues pour le compte et au nom d'une autre personne, et les déclare nuls. En matière foncière, l'

article 26(2) de la loi agraire fondamentale

traite les transferts directs ou indirects de Hak Milik à des personnes qui ne peuvent pas détenir ce droit.

Les conséquences pratiques peuvent apparaître de plusieurs façons :

Contrôle :

le titulaire inscrit peut refuser de signer, donner le droit en garantie, le transférer ou devenir injoignable.

Événements personnels :

son décès, son divorce, son insolvabilité ou un conflit familial peuvent atteindre le bien.

Exécution :

un tribunal peut refuser d'appliquer des documents dont l'objet heurte une règle impérative.

Déclarations :

les contrôles du bénéficiaire effectif, des banques, de la fiscalité et de la lutte contre le blanchiment peuvent révéler le décalage.

Sortie :

un acheteur, un prêteur ou un notaire examine les droits inscrits et la chaîne des pouvoirs, pas seulement l'origine des fonds.

Deux décisions publiées à Bali montrent à quel point l'issue de ces litiges dépend des faits propres à chaque affaire :

cour d'appel de Denpasar 247/PDT/2021/PT DPS

et

tribunal de Gianyar 259/Pdt.G/2020/PN Gin

. Elles ne permettent pas de prédire le résultat d'un autre dossier.

Ce que le Perda Bali 4/2026 établit

Le règlement régional balinais de 2026 porte sur la conversion de certaines terres productives et sur les transferts par prête-nom dans ce périmètre. Le

résumé officiel de l'autorité d'urbanisme de Bali

décrit des mesures administratives pouvant progresser jusqu'à la suspension, la fermeture du site, le retrait de licence ou la démolition pour les infractions visées.

Ce résumé ne peut pas être appliqué comme si tout litige impliquant un prête-nom entraînait automatiquement toutes ces sanctions. La classification de la parcelle, les faits, les permis, les parties et le droit national applicable doivent être examinés dans le dossier concerné. Notre

note sur la construction et les terres productives

explique le contexte spatial distinct.

Ce qu'apporte réellement une PT PMA

Une PT PMA correctement constituée et exploitée inscrit l'actionnariat étranger dans une structure reconnue. Elle peut conclure des contrats, tenir une comptabilité, déclarer ses investissements et, lorsque la loi le permet, détenir un droit foncier accessible à la société. Les autorités et tribunaux peuvent reconnaître cette structure, sous réserve du titre, des pouvoirs, des licences, des contrats et des faits.

L'actionnaire étranger ne reçoit toujours aucun Hak Milik à titre personnel, et la société ne peut corriger un usage foncier interdit, une construction irrégulière, un hébergement sans licence ou une défaillance fiscale. Elle doit porter la bonne activité, respecter ses obligations de capital et d'investissement, tenir une comptabilité régulière et déposer ses déclarations.

Quatre vérifications restent distinctes. L'activité réelle doit correspondre à la définition du KBLI choisi. OSS doit admettre la catégorie de taille de l'entreprise. L'investissement étranger doit être autorisé ou respecter les conditions imposées. Enfin, le NIB, le certificat standard ou la licence requis doivent être valides. Le niveau de risque intervient surtout lors de cette dernière étape. Une activité à risque faible n'est donc pas automatiquement interdite à une PT PMA, pas plus qu'un parcours limité au NIB ne lui est automatiquement accessible.

Un ancien dossier de société ne permet pas de conclure qu'une activité reste accessible aujourd'hui. Une licence valable peut continuer à produire ses effets pendant une transition de classification, alors qu'un nouveau demandeur ne pourrait plus obtenir la même autorisation. Ce maintien d'un droit antérieur ne prouve pas qu'une voie demeure ouverte. Il faut contrôler le titulaire, l'actionnariat et la date d'origine, l'activité et l'adresse autorisées, les modifications intervenues depuis et la réalité de l'exploitation actuelle.

Le

règlement sur l'investissement de 2025

fixe un capital placé et libéré minimal de 2,5 milliards IDR par PT. Ses dispositions ne doivent pas être décrites comme un blocage général des fonds pendant douze mois : le texte prévoit expressément leur emploi pour les actifs de la société, la construction et les opérations autorisées. L'application exacte doit être vérifiée dans le portail indonésien d'autorisation des entreprises en ligne (OSS) et le dossier de la société.

La place du bail de longue durée

Le bail de longue durée est l'une des voies contractuelles reconnues lorsqu'un investisseur étranger recherche des droits d'usage définis sans acquérir de parts dans une PT PMA. Sa solidité dépend du titre du bailleur et de son pouvoir, de la durée, du renouvellement, de la cession, de la transmission, des formalités applicables, des cas de manquement et des recours.

Il reste un contrat, pas un titre de pleine propriété. Cette solution peut convenir à une résidence personnelle ou à un projet de taille limitée, si l'investisseur intègre la réduction progressive de la durée restante et le risque de renouvellement. Une activité d'hébergement commercial exige toujours un exploitant, un dossier de construction, une classification d'activité, des licences et des enregistrements fiscaux conformes.

Le risque de prête-nom peut aussi se trouver dans la société d'exploitation

La question du prête-nom ne concerne pas uniquement une personne qui détient un terrain ou des parts dans une société propriétaire. Elle peut aussi apparaître lorsque deux Indonésiens figurent comme actionnaires d'une PT domestique d'exploitation alors qu'une autre personne finance la société, nomme les dirigeants, contrôle les comptes, reçoit presque tout le bénéfice économique et peut écarter les actionnaires enregistrés à volonté.

Il n'existe que deux points de départ cohérents. Soit les actionnaires indonésiens possèdent réellement les actions et disposent de véritables droits de gouvernance et économiques, soit le montage doit affronter l'article 33 et les règles sur le bénéficiaire effectif. La fin de leur emploi ne met pas fin à leur actionnariat.

La Field Note distincte Une PT PMA peut-elle exploiter une villa à Bali ? examine les conséquences opérationnelles, de licence et de facturation de cette structure.

Une PT PMA peut-elle exploiter une villa à Bali ?

Questions fréquentes

Une personne étrangère peut-elle détenir un terrain en Hak Milik ?

Non. D'autres droits ou structures peuvent être accessibles selon la résidence, l'usage et le titulaire proposé, mais le Hak Milik est réservé aux titulaires indonésiens éligibles.

Un bail est-il plus sûr qu'un prête-nom ?

Un bail valable définit clairement les droits contractuels et permet donc de les examiner dans le texte signé. C'est une voie reconnue, pas une garantie. Le titre du bailleur, ses pouvoirs et le contrat doivent toujours faire l'objet d'un examen indépendant.

Une PT PMA autorise-t-elle la location de courte durée ?

Pas à elle seule. La société doit aussi porter la bonne classification d'activité et le bien doit respecter les règles d'urbanisme, de construction, de tourisme, de fiscalité et d'exploitation.

Un risque faible rend-il une PT PMA inéligible ?

Non. Niveau de risque, taille d'entreprise et accès à l'investissement étranger sont des tests distincts. Une PT PMA peut exercer une activité à risque faible lorsque les autres portes juridiques sont franchies.

Que faut-il vérifier avant de payer ?

La recherche foncière, le titulaire inscrit, le registre de la société, le bénéficiaire effectif, le pouvoir de signer, l'activité autorisée, les justificatifs de capital et d'investissement, le dossier du bâtiment et de l'exploitation, la fiscalité et les documents de sortie.

dernière relecture : 17 juillet 2026

Notes liées :

visa investisseur E28A

·

zonage des terrains à Bali

·

cadre actuel des licences de villas

·

règles de capital d'une PT PMA

Sources contrôlées le 20 juillet 2026 :

loi 25/2007 sur l'investissement

;

loi agraire fondamentale 5/1960

;

PP 28/2025

;

règlement présidentiel 49/2021

;

loi 20/2008, notamment la définition de la grande entreprise

;

règlement du ministère de l'Investissement/BKPM 5/2025

;

fiche officielle du Perda Bali 4/2026

;

résumé officiel de mise en œuvre

; les deux décisions judiciaires liées ci-dessus.

Cet article fournit une information générale et notre lecture des sources à la date de contrôle. Cette lecture peut être incomplète, dépassée ou erronée. Elle ne constitue pas un conseil juridique, foncier, fiscal, notarial ou d'investissement en Indonésie. Faites examiner le titre, les parties, la société et les documents exacts par un avocat ou un notaire indonésien agréé avant tout engagement.

Deux questions à explorer ensuite

Question liée

PT PMA : faut-il verser 10 milliards IDR dès la création ?

Question liée

Sept vérifications avant de verser un acompte immobilier à Bali

De l’information à la décision de projet

Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website

Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité.

En savoir plus

S'abonner

## Puits à Bali : autorisations et usage d’une villa | DALLEAU

URL: https://dalleau.ai/fr/notes/puits-villa-bali-permis-eau-souterraine.html

foncier et eau
Puits ou forage à Bali : faut-il un permis pour alimenter une villa ?
Un robinet qui fonctionne ne prouve pas qu'une villa peut légalement utiliser son puits. Le dossier doit identifier qui prélève l'eau, quel puits l'alimente, à quoi sert l'eau, quel volume est prélevé et quel suivi existe.
DALLEAU | Recherche et notes de terrain
Publié le
16 juillet 2026
Dernière vérification
16 juillet 2026
Vérifié | 16 juillet 2026 | sources primaires
Mis à jour le 16 juillet 2026
Prochaine revue prévue : 2026-10-15
Avant toute décision.
Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.
Sources et limites
Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.
Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la
base officielle des réglementations indonésiennes
et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.
Signaler une correction ou une source périmée :
notes@dalleau.ai
. Les responsabilités imposées par la loi applicable restent inchangées.
Un robinet qui fonctionne ne prouve pas qu'une villa peut légalement utiliser son puits. Le dossier doit identifier qui prélève l'eau, quel puits l'alimente, à quoi sert l'eau, quel volume est prélevé et quel suivi existe.
Le règlement 4/2026 du ministère de l'Énergie et des Ressources minérales distingue l'eau souterraine utilisée pour une activité économique de certains usages non commerciaux. Les opérateurs du tourisme, du logement et d'autres activités commerciales demandent une autorisation commerciale d'eau souterraine, appelée
Izin Pengusahaan Air Tanah
, via le portail indonésien d'autorisation des entreprises en ligne (OSS). Certains utilisateurs non commerciaux demandent à la place une approbation d'usage appelée
Persetujuan Penggunaan Air Tanah
. L'exception sous 100 m³ par mois vise dans ce texte les besoins essentiels quotidiens par ménage ou groupe ; elle ne doit pas servir à déclarer automatiquement exempt le puits exploité par une villa commerciale.
La confusion vient du mélange entre le bâtiment et son usage
Une villa peut ressembler à une maison tout en étant exploitée comme hébergement touristique. L'autorisation applicable dépend de l'usage réel et du demandeur, pas du style du bâtiment ni du nom figurant sur une facture d'électricité.
Le règlement cite expressément le tourisme, les zones touristiques et les autres services, ainsi que le logement, les bureaux et les zones commerciales parmi les activités qui relèvent de l'autorisation commerciale. Il traite séparément les approbations non commerciales et les rares situations où cette approbation n'est pas requise.
La première question est donc :
L'eau de ce puits sert-elle à une activité économique, aux besoins essentiels d'un ménage, à un autre usage non commercial, au drainage d'un chantier, au suivi ou à la recharge de la nappe ?
Ne commencez pas par le chiffre de 100 m³. Qualifiez d'abord l'usage. Par exemple, un forage qui alimente les chambres, la piscine et le personnel d'une villa reste lié à une activité d'hébergement commercial, même si le compteur affiche moins de 100 m³ pendant un mois. Ce seul chiffre ne prouve pas l'exemption domestique.
Ce que l'acheteur doit identifier avant de signer
Pour chaque puits, consignez :
position sur plan et coordonnées décimales ;
emplacement physique, profondeur, dessin de construction et état visible ;
date de forage et entreprise de forage si connues ;
titulaire/opérateur et entité qui paie les taxes ou redevances ;
usage réel : ménage, clients, personnel, piscine, irrigation, chantier/rabattement ou mixte ;
estimation en m³/jour et historique mensuel du compteur ;
numéro du permis/de l'approbation, autorité, émission et expiration ;
compteur, puits de recharge et preuves de suivi/déclaration ;
historique d'inspection, avertissement, amende ou plainte ;
solution d'approvisionnement de secours et mesures prévues en cas de fermeture ou de mise en conformité.
Si le vendeur ne sait pas localiser le puits ou identifier le titulaire du document, la mention « eau comprise » ne répond pas à la vérification préalable.
Les pièces et l'autorité compétente dépendent de l'usage
Pour l'approbation non commerciale décrite par le Permen ESDM 4/2026, le dossier comprend notamment l'identité, l'adresse, les coordonnées décimales, l'usage prévu, le débit en m³/jour, l'engagement de construire un puits de recharge lorsqu'il s'applique et le plan de construction. L'autorité peut limiter le volume de prélèvement autorisé selon la zone de conservation et les données hydrogéologiques.
Pour une activité économique, la demande passe par OSS, tandis que les exigences détaillées relèvent aussi des règles de licence sectorielle fondées sur le risque. Il n'existe donc pas une autorité, un document ou un délai unique que l'on puisse promettre pour tous les sites.
Un ancien puits irrégulier doit être examiné sans attendre
Le règlement crée des mécanismes de régularisation et d'amende administrative pour certaines utilisations d'eau souterraine sans autorisation ou avec un document expiré. Le délai de trois ans de son article 15 est formulé pour la
Persetujuan Penggunaan Air Tanah
relevant de l'usage non commercial ; il ne faut pas l'appliquer automatiquement à
l'Izin
d'une villa commerciale. Pour un puits exploité à des fins commerciales, l'autorité compétente et un spécialiste doivent confirmer la procédure de régularisation, l'amende éventuelle et les délais applicables.
À la date de cette revue,
il ne faut pas présenter l'article 15 comme une amnistie encore ouverte
. Un ancien puits irrégulier doit être confié sans attendre à un spécialiste afin de déterminer son statut, l'amende éventuelle et la marche à suivre : demande de régularisation, fermeture ou remplacement.
L'autorisation n'est pas la dernière étape
Pour la voie non commerciale, les obligations du règlement comprennent le respect des conditions techniques, la pose d'un compteur en sortie sauf pour un puits de suivi, la construction d'un puits de recharge, l'accès aux inspections, le signalement des dangers, la réparation des dommages et le paiement des charges applicables. Les approbations autres que celles couvrant les besoins essentiels quotidiens sont généralement accordées pour sept ans au maximum ; sans prolongation, une approbation expirée peut entraîner la fermeture du puits dans les 30 jours calendaires.
Le contrôle peut être périodique via les rapports techniques ou ponctuel sur site. Les sanctions administratives peuvent aller de l'avertissement à la suspension temporaire puis au retrait.
Les obligations d'une autorisation d'exploitation commerciale doivent être lues dans ce permis et ses règles sectorielles. Ne pas copier une liste de contrôle conçue pour un usage non commercial dans le dossier d'un opérateur sans validation.
Cinq questions qui évitent une mauvaise surprise
Quelle personne ou entité prélèvera l'eau après l'achat ?
L'usage est-il économique, non commercial ou mixte, et qui l'a confirmé ?
Le document vise-t-il ce puits, ses coordonnées, son usage et le volume de prélèvement autorisé ?
Le compteur, la recharge, les rapports, taxes et inspections sont-ils à jour ?
Que devient l'exploitation si le débit est réduit, suspendu ou si le puits doit fermer ?
Les réponses doivent se traduire dans le budget : raccordement au réseau ou citernes, stockage, filtration, analyses, compteur, recharge, renouvellement, honoraires et risque d'interruption de l'activité.
Questions fréquentes
Nous consommons moins de 100 m³ par mois : sommes-nous exemptés ?
Pas nécessairement. L'exception du règlement vise les besoins essentiels quotidiens, pas toutes les activités touristiques.
Le propriétaire indonésien a foré il y a longtemps : la société peut-elle l'utiliser ?
Il faut rapprocher titulaire, opérateur, usage, coordonnées et statut transitoire.
Nous payons une taxe sur l'eau : cela prouve-t-il l'autorisation ?
C'est un indice utile, mais pas un substitut au permis ou à l'approbation applicable.
Cette note peut-elle identifier l'autorité compétente ?
Elle peut aider à qualifier le cas et à préparer les preuves. L'autorité compétente et la procédure active doivent être confirmées pour le site.
sources vérifiées : 15 juillet 2026
Source primaire : Permen ESDM 4/2026. Information générale uniquement ; ce document ne constitue pas un conseil sur l'eau, l'environnement, le foncier, la construction ou les licences.
Références officielles complémentaires
Registre vérifié le 16 juillet 2026. La source officielle en vigueur et les faits du projet restent déterminants.
JDIH ESDM : règlement 4/2026
ESDM : PDF officiel du règlement 4/2026
Deux questions à explorer ensuite
Question liée
Profondeur, qualité de l’eau et traitement de l’aquifère au robinet
Question liée
Peut-on encore construire à Bali ? Le périmètre du moratoire de 2026
De l’information à la décision de projet
Cette question s’inscrit-elle dans un vrai projet de résidence à Bali ?
Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire ; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.
Soumettre un brief privé
Suivre les changements utiles
Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.
Website
Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité.
En savoir plus
S'abonner
Méthode
Sources et date de mise à jour
DALLEAU maintient cette synthèse bilingue à partir des sources officielles citées, avec des dates de vérification visibles et un canal de correction ouvert.
À lire ensuite
Sept vérifications avant de verser un acompte immobilier à Bali
cadre actuel des licences de villas
Contexte publié
cadre actuel des licences de villas

## Qui exploite réellement la villa ? | DALLEAU | DALLEAU

URL: https://dalleau.ai/fr/notes/reality-check-qui-exploite-reellement-la-villa/

Field Notes

/

Reality Check

Field Notes · Sociétés

Qui exploite réellement la villa ?

01

Annonce

02

Contrat client

03

Argent

04

Équipes

05

Systèmes

06

Droit sur le bien

07

Licence et fiscalité

08

Risque et bénéfice

Le nom inscrit sur la facture est un indice.

Ce n'est pas la réponse.

Une licence peut être dans une société. Le compte OTA peut être contrôlé par une autre. Le personnel peut recevoir ses instructions d'une troisième. Le fondateur étranger peut décider de tout pendant que deux anciens salariés indonésiens apparaissent comme actionnaires de l'opérateur local.

Des sociétés différentes peuvent légitimement exercer des fonctions différentes.

Le problème commence lorsque les documents et la semaine ordinaire décrivent des opérateurs différents.

Règle pratique

L'opérateur n'est pas la société qui porte le nom le plus commode. La réalité de l'exploitation apparaît dans les contrats, l'argent, les personnes, les systèmes, les décisions et le risque.

Posez dix questions

1. Qui apparaît sur l'annonce ?

Vérifiez le nom juridique du merchant ou du host, le titulaire du compte, le compte de paiement et les droits administrateur.

Une marque publique de management peut être différente de la société qui contracte avec le client. Cela fonctionne lorsque la relation est voulue et expliquée. Cela devient un problème lorsque la marque masque le fait que la société visible n'a aucun lien cohérent avec la licence ou le contrat client.

2. Qui contracte avec le client ?

Quelle société promet le séjour, accepte les conditions de réservation et porte l'obligation envers le client ?

Lisez plus que la facture :

confirmation de réservation ;

politique d'annulation ;

conditions de séjour ;

notice de confidentialité ;

libellé du paiement ;

société désignée lors d'une plainte ou d'un remboursement.

Le contrat client est un signal fort, car il identifie le fournisseur que le client peut poursuivre lorsque la prestation échoue.

3. Qui reçoit et rembourse l'argent ?

Le compte de paiement OTA constitue une preuve importante.

L'autorité pour décider de l'usage de cet argent l'est tout autant. Qui approuve les remboursements, compensations, remises, dépôts et chargebacks ?

Une société qui reçoit la trésorerie pendant quelques heures mais ne peut pas décider de son usage peut être un véhicule d'encaissement plutôt que l'opérateur économique.

4. Qui emploie et dirige l'équipe ?

Qui signe les contrats de travail ? Qui construit les horaires ? Qui donne les instructions quotidiennes ? Qui approuve les congés, sanctionne et organise la récupération du service ?

L'organisation qui contrôle les personnes exerce des fonctions opérationnelles importantes.

Considérez cette configuration :

La PT locale signe les contrats de travail

mais

le directeur de la PT PMA fixe chaque horaire

approuve les congés

dirige housekeeping

résout les plaintes des clients

et licencie le personnel

Le nom de l'employeur inscrit sur le contrat ne termine pas l'analyse. Le montage doit encore expliquer légalement qui dirige réellement l'équipe.

5. Qui fixe les prix et contrôle les réservations ?

Examinez les droits d'accès au PMS, au channel manager, aux OTA, au CRM et aux systèmes de paiement.

Qui peut :

ouvrir et fermer des dates ;

modifier le tarif ;

accepter ou refuser une réservation ;

accorder une remise ;

annuler un séjour ;

changer les règles de séjour minimum ;

consulter les données clients ;

libérer un paiement ;

créer un nouvel administrateur ?

Les mots de passe et droits d'approbation peuvent être plus révélateurs que la facture.

6. Qui détient l'activité et les autorisations ?

Vérifiez le dossier OSS en direct, le KBLI, le NKU, la localisation, l'échelle d'entreprise, le certificat standard et les permissions complémentaires.

Un NIB seul ne répond pas à la question.

Comparez la substance des activités :

fourniture directe d'hébergement ;

gestion opérationnelle de l'hébergement d'un autre propriétaire ;

conseil général en management ;

gestion résidentielle ;

intermédiation de réservation ;

services séparés de restauration, transport ou excursions.

Le même mot commercial,

management

, peut décrire plusieurs activités juridiquement distinctes.

7. Qui a le droit d'utiliser le bien pour cette activité ?

Une société peut détenir un KBLI plausible et ne pas avoir le droit contractuel d'exploiter cette villa.

Vérifiez :

titre, bail ou droit principal ;

convention d'exploitation ou de mise à disposition ;

restrictions du propriétaire ou bailleur ;

usage du bâtiment ;

situation PBG et SLF ;

compatibilité spatiale ;

éventuelle restriction de location courte durée dans la zone.

L'opérateur doit avoir un lien juridique avec le bien, pas seulement l'occuper physiquement.

8. Qui déclare la fiscalité locale et les clients étrangers ?

Quelle société gère le PBJT et l'APOA ?

Ces processus créent une trace documentaire régulière. Elle doit être compatible avec la société présentée comme opérateur.

Un montage dans lequel une société vend le séjour, une autre reçoit l'argent, une troisième déclare la fiscalité locale et une quatrième dépose l'APOA ne peut être cohérent que si les contrats et responsabilités expliquent cette répartition.

9. Qui porte le risque lorsque quelque chose se passe mal ?

Qui répond :

des remboursements et plaintes ;

des chargebacks ;

des dommages au bien ;

des incidents de sécurité ;

des litiges sociaux ;

des dettes fournisseurs ;

de l'assurance ;

des pertes lorsque l'occupation baisse ;

du fonds de roulement ;

des erreurs de déclaration ?

Le risque révèle souvent la réalité de l'opérateur.

Une société ne peut pas affirmer de manière convaincante qu'elle exploite si elle prend peu de décisions, possède peu de personnes et subit peu de conséquences.

10. Qui conserve le résultat résiduel ?

Après les coûts d'exploitation et les véritables services entre sociétés, quelle société conserve le bénéfice ou la perte de l'activité ?

Si la PT locale porte le contrat client, les salariés, la licence et le risque d'exploitation, mais ne conserve presque aucun résultat chaque année à cause d'une management fee, il faut expliquer pourquoi son rôle économique est aussi peu rémunéré.

Si la PT PMA reçoit presque toute la marge, elle doit démontrer les fonctions, personnes, autorisations, actifs, risques et preuves correspondants.

La répartition de bénéfice souhaitée ne doit pas être choisie d'abord puis transformée en facture après coup.

Lisez l'ensemble

ANNONCE

+ CONTRAT CLIENT

+ PAIEMENTS ET REMBOURSEMENTS

+ PERSONNES ET DÉCISIONS

+ SYSTÈMES ET MOTS DE PASSE

+ DROIT SUR LE BIEN

+ ACTIVITÉ ET LICENCE

+ PBJT ET APOA

+ RISQUE

+ RÉSULTAT RÉSIDUEL

= RÉALITÉ DE L'EXPLOITATION

Aucune réponse isolée ne décide du montage.

Les réponses doivent raconter la même histoire.

Structure cohérente

VÉRITABLE OPÉRATEUR LOCAL

activité et localisation correctes

véritable droit d'utiliser le bien

contrat client

merchant OTA et paiements

personnel opérationnel

remboursements et responsabilité client

PBJT et APOA

vraies décisions, bénéfice et risque

↓ véritable contrat de services

PT PMA DE MANAGEMENT OU DE SUPPORT

activité autorisée

équipe et systèmes réels

périmètre défini

livrables visibles

droits de décision clairs

rémunération commercialement défendable

Ce montage peut être expliqué au client, à la banque, à OSS, au conseil fiscal, à l'immigration et à l'auditeur sans changer d'histoire selon l'interlocuteur.

Structure contradictoire

PT LOCALE

deux anciens salariés au registre des actionnaires

licence

OTA

facture

compte bancaire de transit

peu de personnes, décisions ou risques

↓ presque toute l'économie

PT PMA OU FONDATEUR ÉTRANGER

financement

contrôle bancaire

prix

réservations

personnel

plaintes clients

achats

tous les systèmes

toutes les décisions importantes

presque tout le bénéfice économique

Les questions ne se limitent plus à la fiscalité ou au montant de la management fee.

Les mêmes faits peuvent soulever des questions sur :

le véritable opérateur ;

la licence de l'activité ;

le bénéficiaire effectif ;

le prête-nom ;

le fondement relatif au travail et à l’immigration du directeur étranger ;

les prix de transfert ;

la responsabilité envers le client.

Deux situations de propriété pour les anciens salariés

Lorsque deux salariés indonésiens deviennent actionnaires de la PT locale, la structure doit correspondre à l'une de deux situations juridiques et économiques.

Ils possèdent réellement les actions

Ils disposent alors de vrais droits, d'un intérêt économique et des conséquences de la propriété.

La fin du contrat de travail ne met pas fin à l'actionnariat. La sortie exige un mécanisme corporate et contractuel valable.

Ils ne possèdent pas réellement les actions

Le montage doit alors affronter l'article 33 de la loi sur l'investissement et les règles indonésiennes sur le bénéficiaire effectif.

La formule pratique est :

Un actionnaire sans droits réels peut créer un problème de prête-nom. Un actionnaire disposant de droits réels crée une véritable relation de gouvernance. « Utiliser deux salariés » ne supprime aucune de ces réalités.

Le test final le plus utile

Demandez :

Quelle société pourrait encore exploiter demain si l'autre arrêtait de l'aider ?

Si la PT locale ne pouvait pas fixer un prix, accepter une réservation, diriger l'équipe, payer les fournisseurs, rembourser un client ou effectuer les déclarations sans que le fondateur étranger reprenne personnellement le contrôle, son indépendance opérationnelle est peut-être plus faible que ne l'affirment les documents.

Si la PT PMA cessait son travail et que l'opérateur local conservait ses personnes, systèmes, contrats, trésorerie et responsabilités, la séparation des fonctions devient plus compréhensible.

Le résultat en langage clair

La société inscrite sur la facture constitue une preuve parmi d'autres. Elle n'est pas, à elle seule, la réalité de l'exploitation.

Un montage sérieux aligne :

le droit sur le bien ;

l'activité et la licence ;

le contrat client ;

l'argent ;

les personnes ;

les systèmes ;

les décisions ;

le PBJT et l'APOA ;

le risque ;

l'économie résiduelle ;

le contrôle effectif.

La règle à retenir est :

La facture doit suivre l'entreprise. Elle ne doit pas en créer une seconde version.

Parler à François

Sources principales et guides reliés

OSS officiel, KBLI 55203, activité de villa

OSS officiel, KBLI 55901, gestion d'hébergements

Loi 25/2007 sur l'investissement

PMK 172/2023 sur les transactions entre parties liées

Guides DALLEAU reliés :

Une PT PMA peut-elle exploiter une villa à Bali ?

,

Une management fee rémunère une prestation

,

Un dirigeant étranger peut-il travailler dans sa propre entreprise à Bali ?

et

Votre villa à Bali est publiée en ligne. Qu'est-ce que cela prouve réellement ?

## Repeindre une tache ne traite pas une infiltration. | DALLEAU Field Notes

URL: https://dalleau.ai/fr/notes/repeindre-tache-ne-traite-pas-infiltration.html

Field Notes / Reality Check / Eau, enveloppe et humidité

Field Notes · Reality Check · Eau, enveloppe et humidité

Repeindre une tache ne traite pas une infiltration.

Une nouvelle peinture peut donner l’apparence d’une réparation alors que le chemin de l’eau n’a pas changé.

Niveau de preuve

Principe d’investigation établi. La source reste spécifique au site.

Type d’application

Observation propriétaire et séquence d’investigation

Mis à jour

4 août 2026

Sources

4

Sur cette page

Reality Check

Pourquoi le point visible peut tromper

Une réparation cosmétique peut supprimer les indices

Une meilleure séquence

Questions avant d’accepter la réparation

Signaux d’alerte

Ce que cela ne démontre pas

Action propriétaire

Sources

Carte du système

Reality Check

Un diagramme natif rend le chemin de décision lisible sans transformer les critères projet en faux score.

01 Chronologie

Quand et dans quelles conditions

02 Cartographie

Point visible, diffusion et hauteur

03 Hypothèses

Une voie possible à la fois

04 Essai

Contrôlé et enregistré

05 Réparation

Source et matériau endommagé

06 Nouvel essai

Conditions comparables

Contexte illustratif

Reality Check

Une nouvelle peinture peut donner l’apparence d’une réparation alors que le chemin de l’eau n’a pas changé.

La tache est l’indice d’une condition. Elle n’est pas nécessairement le point d’entrée et ne constitue pas un diagnostic.

Pourquoi le point visible peut tromper

L’eau peut :

entrer par la toiture ou un parapet ;

suivre une armature, une canalisation ou une cavité ;

s’accumuler derrière un enduit ou du carrelage ;

ressortir plusieurs mètres plus loin ;

apparaître seulement après saturation ;

sécher avant l’inspection.

Une tache en bas de mur peut être liée au sol, à la pluie latérale, au paysage, à la plomberie, à une zone humide ou à la condensation. Une tache au plafond peut venir d’une toiture, d’une terrasse, d’une salle de bains, d’un condensat ou d’une pénétration technique.

Une réparation cosmétique peut supprimer les indices

Ponçage, peinture ou mastic immédiats peuvent faire disparaître :

forme et hauteur initiales ;

sels ;

cloques ou fissures ;

relation aux joints ;

chronologie ;

échantillons utiles.

Avant d’intervenir, documentez l’état.

Une meilleure séquence

1. Construire la chronologie

Pendant ou après la pluie ? Lors de l’usage d’une salle de bains ? Selon le vent ? Seulement dans une pièce froide ? Après quels travaux ?

2. Cartographier

Notez pièce, orientation, hauteur, étendue, matériau, odeur et services voisins.

3. Examiner les voies possibles

Toiture, façade, baie, seuil, terrasse, jardinière, salle d’eau, canalisation, condensat et niveaux extérieurs.

4. Tester une hypothèse à la fois

Un test ciblé est plus lisible qu’un arrosage simultané de plusieurs zones.

5. Ouvrir seulement lorsque les indices le justifient

Une ouverture ciblée peut être nécessaire. Elle doit suivre l’enquête.

6. Réparer la voie et le dommage

La cause ou le mécanisme et les matériaux endommagés doivent être traités séparément.

7. Retester

Reproduire la condition pertinente ou observer la prochaine pluie comparable.

Questions avant d’accepter la réparation

Quelle cause de travail a été retenue ?

Quelles preuves la soutiennent ?

Quelle interface a été réparée ?

Les matériaux humides ont-ils séché ou été remplacés ?

Comment la réparation a-t-elle été testée ?

Quel résultat rouvrirait l’enquête ?

Qui contrôlera lors de la prochaine saison humide ?

Signaux d’alerte

repeindre plusieurs fois sans cause écrite ;

siliconer toutes les fissures ;

traiter une mesure d’humidité isolée comme un diagnostic ;

refermer avant contrôle du séchage ;

aucune photo avant et après ouverture ;

aucun retest ;

aucune revue des niveaux et du drainage extérieur.

Ce que cela ne démontre pas

Une tache ne prouve pas à elle seule une remontée capillaire, une toiture défaillante, de la moisissure cachée ou la responsabilité d’une entreprise. Une photo à distance ne suffit pas à localiser la source.

Action propriétaire

Demandez une page qui relie :

```text Observation → voies possibles → test → réparation → retest → prochaine revue ```

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Ouvrir la source originale

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Ouvrir la source originale

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continuer depuis la question devant vous

Continuer depuis la question devant vous

Après une forte pluie : ce qu’un propriétaire doit vérifier avant que tout sèche. → L’étanchéité est une chaîne, pas une couche appliquée à la fin. → Dallage sur terre-plein ou plancher suspendu à Bali ? → Une membrane ne sauve pas une toiture plate sans pentes. →

Apporter la chronologie, les photos et les réparations précédentes.

Intégrer le chemin de l’eau, les interfaces et les preuves au brief avant que les finitions ne les masquent.

Parler à François

## Restrictions PMA à Bali : les 18 codes KBLI | DALLEAU

URL: https://dalleau.ai/fr/notes/restriction-pma-bali-18-kbli-oss-2026.html

Note de synthèse | Société et licences
Restriction PMA à Bali sur 18 activités : ce que confirment les sources publiques.
Bali a officiellement annoncé une restriction dans OSS visant les nouvelles demandes de licences professionnelles PMA pour 18 catégories d’activités. La mesure est réelle. La liste précise des codes est rapportée sous KBLI 2020, tandis qu’un projet actuel exige toujours une correspondance avec KBLI 2025 et une vérification dans OSS en direct.
Publié
27 juillet 2026
Vérifié
27 juillet 2026
Temps de lecture
12 minutes
État des sources
Annonce officielle de la province de Bali vérifiée. La liste des 18 codes KBLI 2020 rapportée par ANTARA a été recoupée. Le BPS confirme que plusieurs codes ont été scindés ou modifiés avec KBLI 2025. Aucune annexe numérotée publique ni aucun résultat OSS propre à une opération précise n’a été trouvé.
Mise à jour éditoriale
20 septembre 2026
En bref
Ce qui a changé
Le gouvernement provincial de Bali indique qu’OSS n’accepte plus les nouvelles demandes de licences professionnelles PMA pour 18 catégories d’activités désignées sur l’ensemble de Bali.
Ce que cela signifie
ANTARA a rapporté 18 codes KBLI 2020. Plusieurs ont changé ou été scindés avec KBLI 2025. Il faut donc encore vérifier l’activité actuelle et le résultat OSS en direct.
Ce que cela ne signifie pas
L’annonce officielle ne prononce ni une interdiction générale de l’investissement étranger, ni l’annulation automatique de toutes les licences existantes, de tous les baux ou de tous les droits fonciers.
Ce que les propriétaires doivent vérifier
Avant tout engagement, vérifiez l’activité KBLI 2025 actuelle, l’historique des licences, le résultat OSS en direct, les contrats, les flux de paiement, le dossier foncier et les rôles d’exploitation.
État des sources
Annonce officielle provinciale vérifiée. La liste numérotée des 18 codes est rapportée par ANTARA. Les tables de conversion du BPS confirment que les libellés KBLI 2020 ne peuvent pas être appliqués mécaniquement à KBLI 2025.
Dernière vérification
27 juillet 2026
Politique de mise à jour
Cette note sera mise à jour si une annexe numérotée, un texte du gouvernement central ou des instructions OSS plus précises deviennent publics.
Important
Explication générale uniquement. Une société ou une opération réelle exige un avis juridique et fiscal indonésien à jour ainsi qu’une vérification OSS en direct.
La distinction est pratique, pas sémantique.
Le 23 juillet 2026, le gouvernement provincial de Bali a publié une annonce officielle indiquant que, pour les établissements situés à Bali, l’accès OSS avait été fermé aux nouvelles demandes de licences professionnelles PMA dans 18 catégories d’activités à risque faible ou moyen-faible. La province précise que cette restriction est appliquée depuis la troisième semaine de mai 2026, après accord du gouvernement central.
Les sources publiques établissent une restriction administrative ciblée sur de nouvelles demandes de licences PMA. Elles ne permettent pas d’affirmer que Bali a interdit toute forme d’investissement étranger, toute structure immobilière ou tout projet de villa.
L’activité réelle, le KBLI, l’échelle de l’entreprise, le statut des licences, la structure immobilière et le modèle d’exploitation restent des questions distinctes.
Ce qui a changé
Un KBLI est le code utilisé pour classer une activité économique indonésienne. À lui seul, il ne constitue ni la société, ni le droit foncier, ni l’autorisation de construire, ni la licence d’exploitation.
ANTARA a rapporté les 18 codes KBLI 2020 suivants ainsi que leurs activités en indonésien. Les formulations françaises ci-dessous sont une adaptation éditoriale de ce reportage, pas une annexe officielle en français. ANTARA mentionne le seuil de 6 000 m² pour les deux codes hôteliers. Le communiqué officiel de Bali indique expressément ce seuil pour les hôtels classés, mais énumère les hôtels non classés sans publier d’annexe numérotée.
Attention à la version des codes.
La liste rapportée utilise KBLI 2020, alors que le gouvernement avait programmé l’application de KBLI 2025 dans OSS et AHU au plus tard le 18 juin 2026. Les tables de conversion du BPS montrent que la correspondance n’est pas toujours directe. Le code hôtelier 55110 a été réparti entre 55101 et 55105, 55120 est devenu 55106, le code immobilier général 68111 a été scindé entre plusieurs activités résidentielles et non résidentielles, 70204 a migré vers 70202 et 70209 a été réparti entre 70203 et 70209. Un dossier actuel doit donc être qualifié selon l’activité réellement exercée et vérifié dans OSS en direct.
KBLI 2020
Activité rapportée par ANTARA sous KBLI 2020
55110
Hôtel classé lorsque la surface de bâtiment concernée est inférieure à 6 000 m²
68111
Immobilier détenu ou loué
55120
Hôtel non classé lorsque la surface de bâtiment concernée est inférieure à 6 000 m²
70209
Autres activités de conseil en gestion
77100
Location de voitures, autobus, camions et véhicules similaires
47711
Commerce de détail de vêtements
47511
Commerce de détail de textiles
77311
Location de motos sans option d’achat
47249
Autres commerces de détail alimentaires
47991
Commerce ambulant de produits agricoles alimentaires
55900
Autres services d’hébergement
56303
Débits de boissons et cafés
56305
Établissements ou commerces de médecine traditionnelle
14120
Confection sur mesure et production de vêtements à la commande
93111
Installations de stade
93116
Installations de centre de fitness
93191
Promoteurs d’activités sportives
70204
Conseil en gestion industrielle
Note de correspondance KBLI 2025
La liste provinciale a été exprimée à partir des anciennes familles d'activités et comprend Penyediaan Akomodasi Lainnya, ancien KBLI 55900. Sous KBLI 2025, cette famille a été scindée en plusieurs activités, notamment 55901 pour la gestion d'hébergement et 55909 pour les autres hébergements. L'annonce publique ne fournit pas de matrice post-conversion code par code. Une nouvelle demande PMA portant sur l'une de ces activités exige donc un résultat OSS en direct et une confirmation écrite de l'application de la restriction à Bali.
Une PT PMA peut-elle exploiter une villa à Bali ?
Votre villa à Bali est publiée en ligne. Qu'est-ce que cela prouve réellement ?
Ce que cette mesure ne signifie pas automatiquement
01
Ce n’est pas une interdiction de tout investissement étranger à Bali
La restriction concerne des KBLI identifiés et de nouvelles demandes PMA via OSS. Les autres activités ne sont pas automatiquement couvertes par cette liste de 18 codes.
02
Elle n’annule pas automatiquement toutes les licences existantes
L’annonce publique ne dit pas que les licences existantes sont automatiquement annulées. Elle précise que les sociétés déjà titulaires de licences doivent continuer à déposer leurs LKPM. Elle ne tranche pas le traitement des modifications, extensions, renouvellements ou conversions vers KBLI 2025. Chaque dossier exige une vérification OSS en direct et un avis écrit.
03
Elle ne règle pas, à elle seule, les questions foncières ou immobilières
Rien dans l’annonce elle-même n’annule un bail ou un droit foncier. Le texte porte sur l’accès aux licences professionnelles. Il ne traite pas, en tant que tel, du droit des titres ou des contrats. La possibilité pour un projet précis de poursuivre son exploitation est une question distincte.
04
Choisir un KBLI de substitution ne rend pas la structure conforme
Le code doit correspondre à l’activité réelle. Les contrats, les revenus, les opérations quotidiennes et les services réellement fournis doivent tous être cohérents avec l’activité déclarée.
05
Risque faible ne signifie pas automatiquement ouverture à l’investissement étranger
La classification du risque et l’éligibilité à l’investissement étranger sont deux contrôles distincts. Une activité à faible risque peut suivre une procédure de licence simple tout en restant inaccessible à une PMA en raison des règles d’investissement, d’échelle d’entreprise, de localisation ou de secteur.
Pourquoi cela concerne les projets de villas et de résidences
La liste KBLI 2020 rapportée comprend des catégories de petits hôtels, d’autres formes d’hébergement, de l’immobilier détenu ou loué et du conseil en gestion. Ces activités peuvent être proches des structures utilisées pour la détention immobilière, le bail, l’exploitation d’hébergements, la gestion de résidences et les services de conseil.
Un projet immobilier peut réunir plusieurs rôles distincts : propriétaire, bailleur, développeur, exploitant d’hébergement, gestionnaire et consultant. Les considérer comme interchangeables peut créer un risque de non-conformité en matière de licences.
Pourquoi un résumé sur les réseaux sociaux ne suffit pas
La présentation publique a évolué pendant plusieurs mois. Le 9 juillet, ANTARA a cité un responsable provincial évoquant 56 KBLI à risque faible ou moyen-faible. L’annonce officielle de Bali publiée le 23 juillet identifie 18 catégories d’activités, tandis qu’ANTARA a rapporté séparément les 18 codes KBLI 2020 correspondants. Aucune source publique trouvée lors de cette vérification ne rapproche formellement la déclaration initiale sur 56 codes et l’annonce ultérieure sur 18 codes. Cet article n’affirme donc pas que l’un a définitivement remplacé l’autre.
Liste de contrôle du propriétaire
Ce qu’un propriétaire ou investisseur doit vérifier
Obtenir le NIB actuel et le profil complet des licences dans OSS.
Identifier l’activité qui génère réellement les revenus.
Faire correspondre chaque activité au KBLI actuel.
Déterminer si l’étape envisagée est une nouvelle demande, une modification, une extension ou la poursuite d’une licence existante.
Vérifier la disponibilité dans OSS en direct et obtenir une position écrite lorsque le résultat n’est pas clair.
Séparer les droits immobiliers, les autorisations de construire et les licences d’exploitation.
Examiner les contrats et les flux de paiement entre le propriétaire, l’exploitant, le gestionnaire et le client.
Obtenir un avis juridique et fiscal indonésien avant tout engagement.
La leçon pour l’investisseur
Cette évolution ne signifie pas que tout projet financé par des étrangers à Bali est devenu impossible. Elle signifie que les structures dont les activités, les licences et les contrats ne sont pas cohérents deviennent plus difficiles à défendre.
Pris ensemble, les communiqués suggèrent un contrôle administratif accru de l’activité réellement exercée, de sa relation avec l’économie locale et de la cohérence entre la licence et l’exploitation.
Le nom d’une société, un code de conseil général ou un NIB délivré automatiquement ne suffisent pas. L’activité, l’échelle de l’entreprise, les documents immobiliers, les licences, les contrats et l’exploitation réelle doivent être cohérents entre eux.
Ce que nous suivons maintenant
Nous surveillons la publication éventuelle d’une annexe numérotée ou d’un texte du gouvernement central, des indications plus précises sur les équivalents KBLI 2025, le fonctionnement d’OSS selon l’activité et le lieu du projet, ainsi que le traitement des modifications, expansions, extensions et autres changements apportés aux licences existantes. Ce sont des questions juridiques propres à chaque dossier, pas des raisons d’exagérer la portée de l’annonce publique.
Sources et historique des mises à jour
Sources officielles et publications concordantes.
Gouvernement provincial de Bali
Annonce officielle sur la restriction de l’accès OSS aux PMA dans certaines catégories d’activités
23 juillet 2026
Gouverneur de Bali
Lettre B.27.000/642/PM/DPMPTSP
28 janvier 2026
BKPM
Dispositif de supervision des investissements à Bali
22 janvier 2026
ANTARA Bali
Liste numérotée rapportée des 18 codes KBLI 2020 et position annoncée sur leur mise en œuvre
23 juillet 2026
ANTARA Bali
Demande antérieure et évolution du périmètre public
9 février 2026
ANTARA Bali
Déclaration antérieure portant sur un périmètre plus large
9 juillet 2026
OSS Indonesia
Fiche KBLI 2020 du code 68111
Vérifiée le 27 juillet 2026
OSS Indonesia
Fiche KBLI 2025 du code 68111
Vérifiée le 27 juillet 2026
OSS Indonesia
Guide de conversion de KBLI 2020 et des classifications antérieures vers KBLI 2025
2026
Badan Pusat Statistik
Table officielle de conversion KBLI 2020 vers KBLI 2025
Avril 2026
BKPM
Calendrier d’application de KBLI 2025 dans OSS et AHU
2026
Gouvernement indonésien
PP 28/2025 relatif aux licences professionnelles fondées sur le risque
2025
Gouvernement indonésien
PP 18/2021 relatif aux droits fonciers et à l’enregistrement des terres
2021
Cette Note de terrain reflète les informations publiques vérifiées le 27 juillet 2026. Elle explique les sources publiées et ne détermine pas la situation juridique d’une société, d’une licence, d’un droit foncier, d’un contrat ou d’une opération particulière. La disponibilité dans OSS et les pratiques administratives peuvent évoluer. Obtenez un avis juridique et fiscal indonésien avant tout engagement.
Notes de terrain associées
Société et licences
KBLI 2025 pour les villas à Bali
Droits immobiliers
PT PMA, nominee ou bail de longue durée
Avant engagement
Sept vérifications avant un dépôt immobilier
Vous préparez une résidence ou une structure d’exploitation à Bali ?
Clarifiez la société, la structure immobilière et le modèle d’exploitation avant d’engager le capital.
Parler à François

## Équipements partagés ou privatifs à Bali ? | DALLEAU

URL: https://dalleau.ai/fr/notes/shared-estate-amenities.html

← notes notes de développement 7 juillet 2026 Dans une résidence de villas à Bali, faut-il partager ou privatiser les équipements ?

Un équipement partagé n'a de valeur que si les clients l'utilisent, si la parcelle peut légalement l'accueillir et si les économies d'exploitation justifient l'investissement.

DALLEAU | Recherche et notes de terrain Publié le

7 juillet 2026

Dernière vérification

17 juillet 2026

Vérifié | 17 juillet 2026 | sources primaires

En bref Réponse pratique : plusieurs villas privées organisées autour de quelques équipements communs peuvent mieux utiliser le terrain et l'équipe qu'une seule grande maison. L'inverse peut aussi être vrai. Une parcelle trop compacte, une intimité mal protégée, une autorisation inadaptée ou un équipement sans valeur pour le client rendent la résidence plus chère et plus difficile à exploiter.

Avant toute décision. Nous citons nos sources et indiquons la date de notre dernière vérification. Malgré ces précautions, cette synthèse peut être incomplète, dépassée ou comporter des erreurs. Elle ne remplace pas l'avis d'un professionnel qui connaît votre situation.

Sources et limites

Cette page n'est ni un texte officiel, ni une traduction officielle, ni un conseil juridique, fiscal, comptable, migratoire, financier, foncier ou notarial. Sa lecture et l'envoi d'une question générale ne créent pas de relation professionnelle de conseil.

Les règles, interprétations administratives et critères d'éligibilité peuvent évoluer. Vérifiez la date de mise à jour, consultez le texte applicable en bahasa Indonesia sur la base officielle des réglementations indonésiennes et faites confirmer votre cas par l'autorité compétente ou un professionnel indonésien dûment habilité. Si notre synthèse diffère du texte officiel ou d'une confirmation propre à votre dossier, ne vous fondez pas sur notre synthèse. Aucun permis, titre, visa, traitement fiscal, rendement ou autre résultat n'est garanti.

Signaler une correction ou une source périmée : notes@dalleau.ai . Les responsabilités imposées par la loi applicable restent inchangées.

La comparaison doit donc commencer par le client visé, la capacité légale de la parcelle et le modèle d'exploitation complet. Elle ne doit pas partir d'une image de synthèse ni d'un nombre de logements décidé à l'avance.

Deux produits différents

Une grande villa indépendante accueille une seule réservation à la fois. Elle préserve l'intimité et affirme une identité claire. En revanche, cette réservation doit à elle seule financer la salle de sport, le spa, la cuisine de service et l'espace d'arrivée.

Une petite résidence peut vendre une villa, deux villas voisines ou l'ensemble du domaine. La blanchisserie, les réserves, les locaux du personnel, les équipements techniques et certains espaces destinés aux clients servent alors plusieurs séjours. Cela crée davantage de configurations commerciales, pas un revenu automatique. Il faut encore démontrer la demande et fixer un prix de privatisation qui ne déplace pas des réservations individuelles plus intéressantes.

Partir de l'expérience client

Le modèle convient surtout aux groupes qui veulent rester ensemble sans partager toutes les pièces : familles de plusieurs générations, deux familles voyageant ensemble, amis, petites retraites et célébrations. Chaque groupe a besoin d'une entrée privée, de chambres protégées du bruit, d'un espace extérieur utilisable et d'un chemin évident vers les lieux communs.

Chaque équipement doit répondre à un besoin précis. Une cuisine de petit-déjeuner peut servir toute la propriété. Une salle de soins peut être pertinente si elle est réservable et correctement exploitée. Un grand pavillon décoratif qui ne change ni le tarif ni l'expérience consomme surtout du terrain et du budget d'entretien.

La bonne question n'est pas « quels équipements paraissent haut de gamme ? », mais « quels moments du séjour deviennent meilleurs, et qu'est-ce qui montre que le client les valorisera ? »

L'intimité se décide dans le plan

La végétation ne répare pas un plan mal conçu une fois les bâtiments fixés. Il faut vérifier dès le départ :

les vues directes entre terrasses et chambres ;

l'isolation acoustique autour des piscines et espaces sociaux ;

la distance entre les jardins privés ;

les parcours des clients à l'arrivée et au départ ;

les circuits du personnel, des livraisons, du linge et des déchets ;

l'éclairage nocturne et la sécurité sans présence permanente dans le champ de vision.

Lorsque ces parcours se croisent, un espace partagé devient vite un espace exposé. Lorsqu'ils sont séparés, le client conserve la sensation d'une villa privée tout en utilisant des services qui seraient trop coûteux à dupliquer.

Les systèmes communs peuvent limiter les doublons

Une propriété peut partager le calendrier de maintenance, les réserves, la blanchisserie, une cuisine de service, le traitement de l'eau et l'équipe d'assistance. Cela peut réduire les équipements en double et les déplacements entre plusieurs sites. Le risque est également concentré : une panne d'eau, de mauvaises circulations ou une équipe défaillante touchent toutes les villas.

Le projet doit donc montrer l'efficacité et la solution de secours : vannes d'isolement, accès pour les réparations, capacité de réserve, contrôle des stocks, responsable de chaque système et budget d'entretien. Centraliser ne suffit pas à rendre l'exploitation robuste.

Urbanisme et autorisations avant la densité

La présence de plusieurs villas sur une même parcelle n'est pas automatiquement autorisée. Le plan spatial officiel, les caractéristiques du site, les autorisations du bâtiment, les exigences environnementales et l'activité d'hébergement envisagée doivent accepter la densité et l'usage prévus. Les couleurs commerciales employées par les agents ne remplacent pas le dossier officiel de la parcelle.

Consultez le portail provincial d'urbanisme de Bali , le portail indonésien d'autorisation des entreprises en ligne (OSS) et le dossier du bâtiment avant d'arrêter le programme. Notre note sur le zonage explique pourquoi le droit de construire et le droit d'exploiter un hébergement sont deux questions distinctes.

Comparer l'économie sur une page

Les mêmes lignes doivent être placées face à face :

Question

Villa isolée

Petite résidence

Configurations vendables

Une

Villas seules, combinaisons, privatisation

Coût des équipements privés

Supporté par une réservation

Certains coûts répartis entre plusieurs villas

Risque pour l'intimité

Plus faible si le terrain est généreux

Plus élevé sans séparation conçue en amont

Exploitation

Plus simple

Davantage de coordination, avec des économies possibles

Preuve de demande

Grandes villas comparables

Comparables pour chaque villa, combinaison et privatisation

Concentration des pannes

Souvent limitée à une villa

Un système commun peut toucher toute la résidence

Calculez ensuite le coût d'investissement par logement vendable, le supplément de tarif ou d'occupation nécessaire pour financer chaque équipement, le plan de personnel, la réserve d'entretien et l'effet d'une privatisation sur les disponibilités individuelles. Une configuration théorique ne doit produire aucun revenu dans le modèle sans client et sans prix crédibles.

Ce qu'Harmonie nous a appris

Notre expérience d'Harmonie nous conduit à mieux partager les infrastructures de service et à éviter certains équipements en double dans un futur projet. Il s'agit d'un jugement interne d'exploitation, pas de la preuve que chaque résidence doit adopter le même plan. Les résultats d'Harmonie sont internes, non audités et liés à son emplacement, sa conception, son équipe et son historique de réservations.

Nous retenons surtout une méthode : définir d'abord le client, protéger les espaces privés, choisir uniquement les équipements qui améliorent le séjour ou l'exploitation, puis confronter chaque mètre carré à son coût d'investissement et d'entretien. Notre retour d'expérience Harmonie distingue ce que nous referions de ce que nous changerions.

Cinq décisions avant le premier plan

Quel est le client principal, et quels autres groupes la propriété doit-elle encore accueillir ?

Combien de villas les documents officiels du site et du bâtiment permettent-ils ?

Quels équipements influencent la réservation ou le coût d'exploitation ?

Les circuits du personnel peuvent-ils fonctionner sans réduire l'intimité ?

La résidence reste-t-elle viable avec des hypothèses prudentes d'occupation, de tarif et d'entretien ?

Si les réponses sont fragiles, une seule villa bien résolue peut être le meilleur usage du terrain. Si elles sont documentées, une petite résidence peut offrir davantage de souplesse sans devenir un hôtel improvisé.

Mis à jour le 17 juillet 2026.

Notes liées : Construire Harmonie · Global Market Compass · Comprendre le zonage à Bali

Sources contrôlées le 17 juillet 2026 : bureau provincial de l'agence indonésienne de statistique (BPS Bali) pour le contexte touristique officiel ; portail provincial d'urbanisme de Bali et OSS comme points de départ officiels pour l'urbanisme et les autorisations ; données commerciales d'hébergement à titre de contexte tiers ; registres Harmonie comme éléments internes et non audités. Aucune source publique ne prouve qu'un modèle donnera un meilleur résultat que l'autre sur une parcelle précise.

Deux questions à explorer ensuite

Question liée Reprendre et achever un chantier à Bali : les leçons du projet Harmonie Question liée PP 28/2025 : qu'a-t-il réellement changé pour les licences de villas à Bali ?

Modéliser cette décision dans la Stay Matrix Ouvrir l'outil → De l’information à la décision de projet Cette question s’inscrit-elle dans un vrai projet de résidence à Bali&nbsp;?

Présentez le terrain, le budget et la décision à prendre dans un brief privé. DALLEAU identifiera la prochaine étape utile du côté du propriétaire&nbsp;; les sujets juridiques, fiscaux, migratoires et notariaux réglementés restent confiés aux professionnels autorisés.

Soumettre un brief privé

Suivre les changements utiles

Recevez un e-mail bref lorsqu'une Note de terrain est publiée ou substantiellement mise à jour.

Website Je souhaite recevoir les Notes de terrain et j'ai pris connaissance de la politique de confidentialité. En savoir plus S'abonner

## Outils de décision résidentielle à Bali | DALLEAU

URL: https://dalleau.ai/fr/outils/

DALLEAU Intelligence Commencez par les questions qui changent le projet.

Chaque outil aide à clarifier une première décision. Ensemble, ils permettent de cadrer le projet, de tester l'expérience des futurs résidents et de comparer les marchés avant un examen par un professionnel.

À Bali, les erreurs les plus coûteuses surviennent avant la première conversation avec un professionnel. Ces outils existent pour en éviter quelques-unes.

Accès intégralement gratuit. Aucun compte, aucune adresse électronique et aucun appel commercial requis.

Choisissez la question avant de choisir l’outil.

DÉCISIONS SUR LA RÉSIDENCE

Cadrez la résidence elle-même.

Commencez ici lorsque la décision concerne le brief, le foyer, les surfaces, la qualité, le coût ou l’usage prévu.

01 Interface revue · 18 juillet 2026

Cadrer le projet Évaluation de projet

Transformez les premières données du projet en un brief clair. Vos réponses restent sur cet appareil jusqu'au moment où vous décidez de les partager.

Commencer l'évaluation &#8599; 02 Outil revu · 16 juillet 2026

Programmer la résidence La Stay Matrix

Observez comment les besoins des résidents, les espaces, la qualité et le coût de construction se répondent, avec un budget toujours visible.

Ouvrir la Stay Matrix &#8599;

OUTILS DE CONTEXTE

Vérifiez le contexte extérieur au projet.

Utilisez-les lorsque la question immédiate concerne l’immigration ou la comparaison de plusieurs marchés.

03 Sources officielles vérifiées · 13 juillet 2026

Vérifier le parcours officiel Quel visa pour l'Indonésie ?

Partez de l'activité prévue et de la durée du séjour. Le parcours guidé indique le visa officiel à vérifier et distingue clairement l'entrée, le séjour, le travail et le statut d'investisseur.

Trouver un parcours de visa &#8599; 04 Sources de marché vérifiées · 18 juillet 2026

Comparer le contexte Global Market Compass

Comparez un même budget dans trois marchés selon des indicateurs homogènes, puis consultez trois analyses complémentaires, avec les hypothèses et les sources de chaque chiffre.

Ouvrir le Compass &#8599;

Pour aller au-delà des outils : soumettre un brief privé .

Avant de vous appuyer sur un résultat Ces outils préparent une première conversation. Ils ne remplacent pas un avis juridique, fiscal, financier, architectural ou technique. Les chiffres et les règles peuvent évoluer. Vérifiez la date de mise à jour et les sources citées avant de prendre une décision.

Conditions des outils

## Global Market Compass : comparer les marchés | DALLEAU

URL: https://dalleau.ai/fr/outils/comparateur-investissement-immobilier-international.html

Global Market Compass · comparer les marchés sur une même base Comparez un même budget immobilier sur trois marchés.

Comparez la surface estimée, les frais d'acquisition, le revenu locatif brut annuel et le rendement brut avec un même budget en USD.

Guide de lecture Le même budget, les mêmes colonnes et une seule devise. Chaque chiffre visible repose sur un scénario résidentiel défini et une source publiée. Les méthodes et valeurs en devise locale restent accessibles par les repères d'information.

Budget sélectionné 500 000 $US Indiquez le capital total disponible pour l'achat et les frais d'acquisition inclus dans cette comparaison.

Capital de comparaison

Devise d'affichage USD uniquement

Actualiser la comparaison

Ce qui est comparé Ce que comprennent les quatre colonnes

La grille retient Dubaï, Lisbonne et Paris, car les données actuelles permettent les quatre mêmes calculs. Bali, Phuket et Budapest restent hors de la grille tant que leurs données ne peuvent pas être normalisées sans mélanger les types de biens, les dates ou des cohortes de vente et de location non appariées. Le rendement brut n'est pas un rendement net.

Vue de marchés comparables Ce que le même budget peut permettre d'acquérir

Capital appliqué à cette grille 500 000 $US Chaque ligne utilise ce même capital.

Lisez chaque ligne ou comparez une colonne. Chaque grand chiffre utilise les mêmes unités et le même budget total. Les hypothèses, dates de source et valeurs en devise locale sont accessibles par les repères d'information.

Seuls les chiffres étayés sur une même base apparaissent dans cette grille.

Bali Équivalent indicatif de surface construite ≈ 181 à 302 m² Budget sélectionné divisé par une référence datée de surface construite à Bali. Il ne s'agit ni du terrain ni d'un budget de projet tout compris.

Bali reste spécifique au projet.

La zone, la durée du bail, les caractéristiques de la villa et le modèle d'exploitation modifient fortement le résultat. Les cohortes générales de vente et de location disponibles ne sont pas appariées. Le Compass ne les transforme donc pas en rendement Bali.

Ouvrir la Stay Matrix

Détail par marché Méthodes, hypothèses et recherches de marché complémentaires

Détention, hypothèses, fiscalité et courte durée.

Distinction importante Le rendement brut n'est pas le rendement net

Les charges d'exploitation récurrentes, le financement, la situation fiscale et les choix de gestion diffèrent trop pour publier un rendement net fiable et commun à ces marchés.

Méthode de comparaison Méthode, définitions et exclusions

La grille évite de comparer des indicateurs qui n'ont rien à voir

Chaque carte reste dans le périmètre étayé par ses sources. Une valeur n'apparaît que si le type de bien, la zone, la date et le mode de détention sont explicités. Une donnée partielle indique ce qu'elle exclut, et les résultats non étayés sont omis plutôt qu'affichés comme nuls.

Une lecture neutre, propre aux données de chaque marché

Aucun rendement brut présenté comme un rendement net investisseur

Aucune moyenne nationale utilisée discrètement comme règle locale

Guide de lecture Information importante

Cet outil fournit une information générale de recherche, pas un conseil juridique, fiscal ou d'investissement. Le bien, le mode de détention, la résidence fiscale et les autorisations d'exploitation doivent être vérifiés avant tout engagement de capital.

Ouvrir les données structurées de la comparaison

## Stay Matrix | DALLEAU

URL: https://dalleau.ai/fr/outils/stay-matrix/

The Stay Matrix

Contexte du projet facultatif

EN Enregistrer Quitter

→

Que doit devenir cette villa ?

→ →

Indications illustratives. Consultez les Conditions des outils et les Mentions légales et confidentialité avant de vous appuyer sur un résultat.

votre séjour Modifier

votre projet Modifier

fixé par vous

2 · tester un autre profil Cible principale. Testez d'autres profils.

Famille annuelle 5-14 nuits · ménage quotidien Famille budget Valeur d'abord · autonome Groupes / amis Court séjour convivial Jeunes cadres Design · courte escapade Résidents saisonniers 1-3 mois · vivre et travailler Multigénération Séjour long · service complet

·

enveloppe du projet

Stay Matrix Déplacez le Point Bronze sur deux axes : Confort vers Design, puis Coût de construction vers Qualité. REPÈRE Préparation des fourchettes en direct... La Matrix se déverrouille dès que les calculs sont prêts.

Position actuelle

Écart avec votre zone naturelle

Ajuster avec des contrôles accessibles

Confort vers Design Confort Design Coût de construction vers Qualité Coût de construction Qualité Utilisez les flèches du clavier pour un réglage précis.

Illustratif Zone naturelle &#9635; Voir l'image

Point de vigilance, pas le résultat visuel

conséquence architecturale Un projet que vous pouvez visualiser.

Conséquence architecturale illustrative, pas une proposition de design.

point de vue client à cette position Famille · vacances annuelles Cible principale

… /10

2 villas · surface totale du projet et surface par villa après calcul

Déplacez le point et complétez le projet pour révéler la réaction probable de ce profil.

Complétez la base, puis rapprochez-vous de la zone naturelle de ce profil.

Pourquoi cet avis : position et attentes du profil

Ce test lit la surface réellement disponible par villa, pas seulement le total de la résidence.

Simulation fondée sur ce projet et ce profil. Ce n'est ni un avis réel, ni une enquête, ni une note de plateforme.

&times;

réponse du projet en direct Déplacez le point. Conservez votre contrainte.

Réponse du projet

conséquences sur le projet

Examiner ce projet avec DALLEAU

## Partenaires à Bali : exigences et consultation | DALLEAU

URL: https://dalleau.ai/fr/partenaires-execution.html

Partenaires d’exécution
Un système d’exécution conçu pour collaborer dans la durée.
DALLEAU travaille avec des entreprises, des corps d’état spécialisés, des fournisseurs et des équipes de chantier structurées, capables d’exécuter un périmètre défini, de documenter correctement le travail et de progresser grâce aux retours d’expérience. Nous construisons des relations fiables sur des projets adaptés, pas une collection de devis isolés.
Pour le propriétaire, ce système rend visibles la sélection, les prix et le contrôle du chantier. Pour les partenaires qui ont fait leurs preuves, il clarifie les attentes, les décisions et les possibilités de retravailler ensemble.
Présenter votre équipe
Voir la méthode
Choisissez le parcours qui vous concerne
Pour les propriétaires et leurs conseillers
Voyez comment DALLEAU définit les lots, compare les offres, contrôle les ouvrages avant fermeture et étaye les recommandations de paiement.
Voir les contrôles côté propriétaire →
Pour les entreprises, corps d’état et fournisseurs
Voyez ce que DALLEAU attend, ce que les bons partenaires reçoivent en retour et comment se gagnent de futures invitations.
Voir le cadre de collaboration →
Contrôle côté propriétaire
Une entreprise est choisie au regard du lot, pas du carnet d’adresses.
Compétences, capacité, références, structure de prix et méthode d’exécution sont examinées à partir d’un même périmètre défini.
01
Définir le périmètre
Plans, quantités, spécifications, calendrier et responsabilités forment une base de prix commune.
02
Comparer à périmètre égal
Les offres sont rapprochées selon les inclusions, exclusions, taxes, délais, garanties et substitutions.
03
Contrôler avant fermeture
Les points d’arrêt maintiennent les ouvrages cachés visibles jusqu’au contrôle et à la consignation requis.
04
Recommander le paiement sur preuves
Les recommandations de paiement suivent le jalon contractuel, les travaux acceptés et les documents requis.
Un échange équilibré
Les bons partenaires ne doivent pas porter les risques évitables du projet.
DALLEAU exige des preuves parce que cette même discipline doit protéger le partenaire contre les périmètres flous, les instructions contradictoires, les changements silencieux et les décisions de paiement arbitraires.
01
Un lot défini avant le prix final
Plans, quantités, spécifications, base fiscale, exclusions et calendrier sont explicités.
02
Un responsable clairement identifié
Les instructions ne viennent pas de plusieurs interlocuteurs non coordonnés.
03
Des clarifications techniques consolidées
Les questions et décisions sont consignées avant de devenir des reprises.
04
Des essais physiques rémunérés
Les maquettes ou pilotes demandés ont un périmètre, des critères d’acceptation et des conditions de paiement écrits.
05
Des modifications écrites
Les travaux supplémentaires ne sont pas absorbés silencieusement dans le prix initial.
06
Des jalons contrôlés sur preuves
Les recommandations de paiement suivent le contrat du lot et les pièces justificatives acceptées.
07
La confidentialité commerciale
Les prix détaillés restent des informations de projet, pas des données diffusées sans nécessité.
08
Des retours et de futures opportunités
Les équipes qui ont fait leurs preuves passent moins de temps à se requalifier et peuvent être réinvitées lorsque l’adéquation, la capacité et la performance le justifient.
Intégrité commerciale
Un périmètre comparable avant un prix comparable.
L’offre initiale la moins chère n’est pas automatiquement retenue. Chaque équipe présélectionnée chiffre le même lot défini ; DALLEAU examine ensemble les quantités, prix unitaires, inclusions, exclusions, taxes, délais, garanties, sous-traitance, capacité et méthode d’exécution.
La nationalité du client n’est pas une variable de prix.
Toute substitution de matériau fait l’objet d’une revue technique et commerciale écrite.
Les relations entre parties apparentées doivent être déclarées.
Rabais fournisseurs, remises professionnelles et avoirs convenus suivent le contrat du projet et les règles de contrôle côté propriétaire.
DALLEAU n’accepte aucune commission non déclarée, rémunération d’apporteur ou avantage hors comptabilité du projet.
Les lots répétés peuvent utiliser des prix unitaires convenus ou comparés à des références lorsque le périmètre et le risque sont suffisamment stables.
Toute hausse doit reposer sur une base déclarée.
Trois documents qui permettent une décision commerciale.
01
Bordereau quantitatif
Insuffisant pour décider
Un montant forfaitaire unique
Des descriptions vagues
Aucune base fiscale, exclusion, délai ni garantie
Aucune déclaration de la sous-traitance
Prêt à examiner
Quantités et prix unitaires
Inclusions, exclusions et base fiscale
Délais, garantie, substitutions, sous-traitance et durée de validité
02
Modification
Insuffisant pour décider
« Ajoutez ceci. Nous réglerons plus tard. »
Prêt à examiner
Motif et périmètre révisé
Incidence sur le prix et le calendrier
Approbation avant exécution
03
Jalon de paiement
Insuffisant pour décider
« Les travaux sont réalisés à 70 %. »
Prêt à examiner
Jalon contractuel nommé
Zone acceptée et preuve de contrôle
Points ouverts et montant recommandé
Comparaisons de méthode illustrées
La netteté du résultat se décide avant la finition.
Ces exemples montrent pourquoi DALLEAU résout les interfaces critiques avant leur fermeture. La méthode retenue est coordonnée dans l’ensemble constructif, pas improvisée lorsque la pièce paraît terminée.
01
Coordonner le vitrage avant la pose du carrelage.
Intervention tardive — non acceptée
Une rainure est découpée dans le carrelage neuf une fois la salle de bains achevée.
Coordination avant les finitions
Le profilé F encastré retenu est implanté avant la pose du carrelage afin que le verre et le chant du carreau forment un seul détail.
02
Maintenir l’accès aux équipements sans les rendre dominants.
Intervention tardive — non acceptée
Une vanne cachée n’est accessible qu’en ouvrant la surface terminée.
Coordination avant les finitions
Une trappe affleurante suit le calepinage et maintient l’organe accessible.
03
Coordonner le drain et la trame du carrelage.
Intervention tardive — non acceptée
Le siphon arrive après le calepinage, avec des coupes étroites, asymétriques et des pentes incertaines.
Coordination avant les finitions
Position du siphon, module de carreau et pentes sont coordonnés comme une seule surface constructible.
04
Étancher la traversée, pas seulement le symptôme.
Intervention tardive — non acceptée
Une traversée terminée dépend d’un joint de surface épais ajouté après la finition.
Coordination avant les finitions
Collerette, renfort et membrane continue sont contrôlés avant la fermeture par le carrelage.
Processus de sélection
Ouvert aux nouveaux partenaires. Exigeant à chaque étape.
La qualification rend éligible à des lots adaptés. Chaque attribution reste spécifique au projet.
01
Candidature
Une courte manifestation d’intérêt précise le métier, la zone, l’expérience et la disponibilité actuelle.
02
Examen du dossier
Nous examinons l’identité de l’entreprise, l’expérience pertinente, le portfolio et l’équipe responsable proposée.
03
Échange technique
Le responsable explique la méthode, les effectifs, l’équipement, l’enchaînement, les risques et les contrôles.
04
Offre comparable
Les équipes présélectionnées chiffrent le même périmètre, les mêmes quantités, spécifications, taxes, exclusions et délais.
05
Références et visite
Avec autorisation, nous pouvons contacter des références et voir un ouvrage livré, un atelier ou un chantier en cours.
06
Essai rémunéré si utile
Tout essai demandé a un périmètre, des critères d’acceptation et un paiement écrits. DALLEAU ne demande pas de travaux gratuits.
07
Attribution du lot
Le lot fixe responsabilités, documents soumis à approbation, points d’arrêt, jalons, modifications, garanties et rapports.
08
Bilan d’exécution
Qualité, sécurité, délais, rapports, maîtrise commerciale et traitement des défauts éclairent les invitations futures.
Ce que DALLEAU évalue
Six informations rendent une candidature exploitable.
Un bon portfolio aide. La capacité actuelle, des prix vérifiables et une exécution contrôlable comptent tout autant.
01
Expérience pertinente
Années d’exercice dans le métier proposé et rôle réellement tenu par l’équipe.
02
Ouvrages réalisés
Type, lieu et échelle d’ouvrages comparables pouvant être vérifiés.
03
Références joignables
Les coordonnées sont demandées plus tard, avec consentement.
04
Engagements en cours
Charge active, allocation des équipes et disponibilité réaliste pour un nouveau lot.
05
Méthode d’exécution
Responsables, effectifs, équipement, contrôles qualité, sécurité et rapports.
06
Clarté commerciale
Prix unitaires, inclusions, exclusions, taxes, délais, garantie et sous-traitance.
Cadre de travail
Des preuves claires avant le mouvement des fonds.
DALLEAU combine des méthodes documentées de contrôle de projet avec les réalités du climat, de la chaîne d’approvisionnement et des chantiers à Bali. La conception approuvée, les exigences indonésiennes applicables, le système retenu et les instructions du fabricant régissent chaque lot.
01
Périmètre
Le contrat identifie plans, spécifications, quantités, inclusions, exclusions, calendrier et responsables.
02
Documents soumis à approbation
Matériaux, échantillons, modes opératoires et preuves requises sont approuvés avant les travaux concernés.
03
Vérification
L’avancement est contrôlé par rapport aux jalons définis et, si nécessaire, au périmètre du vérificateur mandaté.
04
Paiement
Une recommandation suit le jalon contractuel, les preuves acceptées et les vérifications requises.
05
Modification
Toute variation précise le périmètre, le prix et l’incidence sur le calendrier avant exécution, sauf urgence protégeant les personnes ou le site.
06
Clôture
Défauts, essais, documents de récolement, garanties et dossiers d’entretien sont clos avant que le paiement final ne soit recommandé.
Étape 1 · Manifestation d’intérêt
Dites-nous ce que votre équipe sait livrer de façon répétée.
Commencez par une courte manifestation d’intérêt. DALLEAU ne demande les références détaillées, documents sensibles et éléments complets de préqualification que lorsque le métier, la capacité et le besoin du projet justifient l’étape suivante.
Les candidatures sont examinées au regard des besoins présents et futurs. DALLEAU contacte les équipes lorsque l’adéquation, la capacité et le calendrier justifient la suite.
Website
Quelle description correspond le mieux à votre organisation ?
Entreprise générale
Corps d’état spécialisé ou installateur
Fournisseur ou distributeur
Fabricant ou atelier
Spécialiste technique ou intégrateur
Autre équipe d’exécution structurée
Partenaires d’exécution
Entreprise ou nom de l’équipe
Contact principal
Fonction
E-mail
Téléphone ou WhatsApp
Métier, lot ou catégorie de produit principale
Zone d’intervention à Bali
Années d’expérience pertinente
Site ou lien de portfolio en lecture seule
Disponibilité actuelle ou première date de démarrage réaliste
Un projet ou une fourniture comparable
Que votre équipe peut-elle livrer régulièrement et bien ?
Si pertinent
Taille de l’équipe ou effectif habituel
Marques représentées
Localisation de l’atelier
Langues du responsable
Catégorie de licence pertinente
Échelle de projet privilégiée
Étape 1 · Manifestation d’intérêt
Je confirme être habilité à transmettre cette manifestation d’intérêt et certifie l’exactitude des informations.
J’ai lu la notice de confidentialité et compris l’usage que DALLEAU fera de ces informations.
Confidentialité
Envoyer la manifestation d’intérêt
Si l’envoi sécurisé est temporairement indisponible, vous pouvez copier un résumé local et l’envoyer à hello@dalleau.ai.
Manifestation d’intérêt reçue
Votre référence figure ci-dessous. DALLEAU contactera votre équipe lorsque l’adéquation, la capacité et le calendrier justifient une suite.
Copier le résumé
Ouvrir un e-mail
Pour les propriétaires
Voyez comment les partenaires d’exécution rejoignent la même chaîne de preuves côté propriétaire que le reste du mandat.
Voir le mandat complet →
Pour les partenaires
La qualité du travail, des rapports sincères et un traitement efficace des défauts fondent les invitations futures.
Présenter votre équipe →
Mitra pelaksana
Sistem pelaksanaan untuk kerja sama jangka panjang.
DALLEAU bekerja dengan kontraktor, pelaksana spesialis, pemasok, dan tim lapangan terorganisir yang mampu menyelesaikan lingkup yang jelas, mendokumentasikan pekerjaan dengan baik, dan berkembang melalui evaluasi. Kami membangun hubungan yang dapat diandalkan untuk proyek yang sesuai, bukan sekadar mengumpulkan penawaran satu kali.
Bagi pemilik, sistem ini memperjelas seleksi, harga, dan kontrol lapangan. Bagi mitra yang terbukti, sistem ini memperjelas ekspektasi, keputusan, dan peluang kerja berikutnya.
Sampaikan minat Anda
Lihat metode
Pilih jalur yang relevan
Untuk pemilik dan penasihat
Lihat bagaimana DALLEAU mendefinisikan paket, membandingkan penawaran, memastikan pekerjaan yang akan tertutup tetap terbuka untuk diperiksa, dan mendukung rekomendasi pembayaran.
Lihat kontrol pihak pemilik →
Untuk kontraktor, pelaksana, dan pemasok
Lihat apa yang diharapkan DALLEAU, apa yang diterima mitra yang baik, dan bagaimana undangan berikutnya diperoleh.
Lihat kerangka mitra →
Kontrol pihak pemilik
Kontraktor dipilih berdasarkan paket, bukan daftar kontak.
Kemampuan, kapasitas, referensi, struktur harga, dan metode pelaksanaan dinilai terhadap satu lingkup yang jelas.
01
Tentukan lingkup
Gambar, kuantitas, spesifikasi, program, dan tanggung jawab menjadi satu dasar harga.
02
Bandingkan secara setara
Penawaran disetarakan menurut cakupan, pengecualian, pajak, waktu, garansi, dan substitusi.
03
Periksa sebelum ditutup
Titik tahan (hold point) menjaga pekerjaan yang akan tertutup tetap terbuka sampai pemeriksaan dan dokumentasi selesai.
04
Rekomendasikan pembayaran berdasarkan bukti
Rekomendasi pembayaran mengikuti tahap kontrak, pekerjaan yang diterima, dan dokumen yang diwajibkan.
Pertukaran nilai
Mitra yang baik tidak seharusnya menanggung risiko proyek yang dapat dihindari.
DALLEAU menuntut bukti karena disiplin yang sama harus melindungi mitra dari lingkup yang kabur, instruksi bertentangan, perubahan diam-diam, dan keputusan pembayaran sewenang-wenang.
01
Paket jelas sebelum harga final
Gambar, kuantitas, spesifikasi, dasar pajak, pengecualian, dan program dinyatakan dengan jelas.
02
Satu jalur instruksi yang jelas
Instruksi tidak datang dari beberapa orang yang tidak terkoordinasi.
03
Klarifikasi teknis terkonsolidasi
Pertanyaan dan keputusan dicatat sebelum menjadi pekerjaan ulang.
04
Uji fisik berbayar
Mock-up atau pilot yang diminta memiliki lingkup, penerimaan, dan pembayaran tertulis.
05
Variasi tertulis
Pekerjaan tambahan tidak diam-diam diserap ke harga awal.
06
Tinjauan tahap berdasarkan bukti
Rekomendasi pembayaran mengikuti kontrak paket dan dokumen yang diterima.
07
Kerahasiaan komersial
Rincian harga diperlakukan sebagai informasi proyek.
08
Umpan balik dan peluang berikutnya
Tim yang terbukti menghabiskan lebih sedikit waktu untuk kualifikasi ulang dan dapat diundang kembali ketika kecocokan, kapasitas, dan kinerja mendukungnya.
Integritas komersial
Lingkup yang sebanding sebelum harga yang sebanding.
Angka awal terendah tidak otomatis menang. Semua tim yang lolos seleksi memberikan harga untuk paket yang sama, sementara DALLEAU menilai kuantitas, harga satuan, cakupan, pengecualian, pajak, waktu, garansi, subkontrak, kapasitas, dan metode secara bersama.
Kebangsaan klien bukan variabel harga.
Substitusi material memerlukan tinjauan teknis dan komersial tertulis.
Hubungan pihak terafiliasi harus diungkapkan.
Rabat pemasok, diskon dagang, dan kredit yang disepakati mengikuti kontrak proyek dan aturan kontrol pihak pemilik.
DALLEAU tidak menerima komisi, pembayaran rujukan, atau manfaat proyek di luar pembukuan yang tidak diungkapkan.
Paket berulang dapat memakai harga satuan yang disepakati atau dibandingkan ketika lingkup dan risiko cukup stabil.
Kenaikan harga memerlukan dasar yang dinyatakan.
Tiga dokumen yang memungkinkan keputusan komersial.
01
BOQ
Belum cukup untuk memutuskan
Satu harga borongan
Deskripsi kabur
Tanpa dasar pajak, pengecualian, waktu, atau garansi
Subkontrak tidak diungkapkan
Siap ditinjau
Kuantitas dan harga satuan
Cakupan, pengecualian, dan dasar pajak
Waktu, garansi, substitusi, subkontrak, dan masa berlaku
02
Variasi
Belum cukup untuk memutuskan
“Tambahkan ini. Nanti kita selesaikan.”
Siap ditinjau
Alasan dan lingkup revisi
Dampak harga dan program
Persetujuan sebelum pelaksanaan
03
Tahap pembayaran
Belum cukup untuk memutuskan
“Pekerjaan sudah 70%.”
Siap ditinjau
Tahap kontrak yang disebutkan
Area yang diterima dan bukti pemeriksaan
Butir terbuka dan nilai yang direkomendasikan
Perbandingan metode ilustratif
Hasil yang rapi diputuskan sebelum finishing.
Contoh ini menunjukkan mengapa DALLEAU menyelesaikan detail sambungan dan titik temu kritis sebelum tertutup oleh pekerjaan finishing. Metode yang diterima dikoordinasikan sebagai bagian dari sistem konstruksi, bukan diimprovisasi setelah ruang terlihat selesai.
01
Koordinasikan kaca sebelum ubin dipasang.
Intervensi terlambat — tidak diterima
Alur dipotong pada ubin baru yang sudah selesai setelah kamar mandi lengkap.
Dikoordinasikan sebelum pekerjaan finishing
Profil F tanam yang diterima ditata sebelum ubin dipasang agar kaca dan tepi ubin terselesaikan sebagai satu detail.
02
Pertahankan akses servis tanpa membuatnya dominan.
Intervensi terlambat — tidak diterima
Katup tersembunyi hanya dapat dicapai dengan membuka permukaan yang sudah selesai.
Dikoordinasikan sebelum pekerjaan finishing
Panel akses rata mengikuti pola garis dan menjaga titik servis dapat dirawat.
03
Tentukan posisi drain dan pola ubin secara bersamaan.
Intervensi terlambat — tidak diterima
Penempatan drain diputuskan setelah pola ubin ditetapkan, sehingga menghasilkan potongan tipis, asimetri, dan kemiringan yang sulit dikendalikan.
Dikoordinasikan sebelum pekerjaan finishing
Posisi drain, modul ubin, dan kemiringan dikoordinasikan sebagai satu permukaan.
04
Lindungi penetrasi dengan waterproofing, bukan sekadar menutup gejalanya.
Intervensi terlambat — tidak diterima
Penetrasi yang sudah selesai bergantung pada sealant permukaan tebal setelah finishing.
Dikoordinasikan sebelum pekerjaan finishing
Collar pipa, penguatan, dan membran menerus diperiksa sebelum ditutup ubin.
Proses seleksi
Terbuka untuk mitra baru. Teliti pada setiap tahap.
Kualifikasi memberi kelayakan untuk paket yang sesuai. Setiap penunjukan tetap spesifik untuk proyek.
01
Pendaftaran
Pernyataan minat singkat menjelaskan bidang, wilayah, pengalaman, dan ketersediaan.
02
Tinjauan bukti
Kami meninjau identitas usaha, pengalaman relevan, portofolio, dan tim penanggung jawab.
03
Percakapan teknis
Penanggung jawab menjelaskan metode, tenaga, peralatan, urutan, risiko, dan pemeriksaan.
04
Penawaran sebanding
Tim terpilih menilai lingkup, kuantitas, spesifikasi, pajak, pengecualian, dan program yang sama.
05
Referensi dan kunjungan
Dengan izin, referensi dapat dihubungi dan pekerjaan selesai, workshop, atau proyek aktif dapat ditinjau.
06
Pilot berbayar bila berguna
Uji fisik yang diminta memiliki lingkup, penerimaan, dan pembayaran tertulis. DALLEAU tidak meminta pekerjaan konstruksi gratis.
07
Penunjukan proyek
Paket mengatur tanggung jawab, submittal, hold point, tahap, variasi, garansi, dan pelaporan.
08
Rekam jejak kinerja
Mutu, keselamatan, program, pelaporan, kontrol komersial, dan penanganan cacat memengaruhi kelayakan berikutnya.
Yang dinilai DALLEAU
Enam informasi membuat pendaftaran dapat ditindaklanjuti.
Portofolio yang kuat membantu. Kapasitas saat ini, harga yang dapat ditinjau, dan pelaksanaan yang dapat diverifikasi sama pentingnya.
01
Pengalaman relevan
Lama bekerja dalam bidang yang diajukan dan peran yang benar-benar dilakukan tim.
02
Pekerjaan selesai
Jenis, lokasi, dan skala pekerjaan sebanding yang dapat diperiksa.
03
Referensi yang dapat dihubungi
Kontak diminta kemudian dengan persetujuan.
04
Kontrak berjalan
Komitmen aktif, alokasi tim, dan ketersediaan realistis untuk paket baru.
05
Metode pelaksanaan
Penanggung jawab, tenaga, peralatan, kontrol mutu, keselamatan, dan pelaporan.
06
Kejelasan komersial
Harga satuan, cakupan, pengecualian, pajak, waktu, garansi, dan subkontrak.
Kerangka kerja
Bukti yang jelas sebelum pembayaran direkomendasikan.
DALLEAU menggabungkan metode kontrol proyek terdokumentasi dengan kebutuhan iklim, rantai pasok, dan pelaksanaan lapangan di Bali. Desain yang disetujui, ketentuan Indonesia yang berlaku, sistem terpilih, dan petunjuk produsen mengatur setiap paket.
01
Lingkup
Kontrak menentukan gambar, spesifikasi, kuantitas, cakupan, pengecualian, program, dan penanggung jawab.
02
Submittal
Material, sampel, metode, dan bukti yang diperlukan disetujui sebelum pekerjaan terkait.
03
Verifikasi
Kemajuan diperiksa terhadap tahap yang ditentukan dan lingkup peninjau yang ditunjuk bila diperlukan.
04
Pembayaran
Rekomendasi mengikuti tahap kontrak, bukti yang diterima, dan verifikasi yang diperlukan.
05
Perubahan
Variasi menyatakan lingkup, harga, dan dampak program sebelum pelaksanaan, kecuali tindakan darurat untuk melindungi orang atau lokasi.
06
Penutupan
Cacat, pengujian, as-built, garansi, dan rekaman pemeliharaan diselesaikan sebelum pembayaran akhir direkomendasikan.
Tahap 1 · Pernyataan minat
Ceritakan apa yang dapat tim Anda kerjakan secara konsisten dengan baik.
Mulai dengan pernyataan minat singkat. DALLEAU meminta referensi terperinci, dokumen rahasia, dan bukti prakualifikasi lengkap hanya ketika bidang, kapasitas, dan kebutuhan proyek mendukung tahap berikutnya.
Pendaftaran ditinjau terhadap kebutuhan paket saat ini dan mendatang. DALLEAU menghubungi tim ketika kecocokan, kapasitas, dan waktu mendukung tahap berikutnya.
Website
Apa yang paling tepat menggambarkan organisasi Anda?
Kontraktor utama
Pelaksana spesialis atau installer
Pemasok atau distributor
Fabrikator atau workshop
Spesialis teknis atau integrator
Tim pelaksana terorganisir lainnya
Mitra pelaksana
Nama perusahaan atau tim
Nama kontak utama
Peran
Email
Telepon atau WhatsApp
Bidang, paket, atau kategori produk utama
Area layanan di Bali
Tahun pengalaman relevan
Situs atau tautan portofolio yang hanya dapat dilihat
Ketersediaan saat ini atau waktu mulai realistis
Satu proyek atau pasokan sebanding
Apa yang dapat tim Anda kerjakan secara konsisten dengan baik?
Jika relevan
Ukuran tim atau tenaga kerja umum
Merek yang diwakili
Lokasi workshop
Bahasa penanggung jawab
Kategori izin yang relevan
Skala proyek yang disukai
Tahap 1 · Pernyataan minat
Saya mengonfirmasi bahwa saya berwenang mengirim pernyataan minat ini dan bahwa informasi yang diberikan akurat.
Saya telah membaca pemberitahuan privasi dan memahami penggunaan informasi ini oleh DALLEAU.
Privasi
Kirim pernyataan minat
Jika pengiriman aman sementara tidak tersedia, Anda dapat menyalin ringkasan lokal dan mengirimkannya ke hello@dalleau.ai.
Pernyataan minat diterima
Nomor referensi ditampilkan di bawah. DALLEAU akan menghubungi tim ketika kecocokan, kapasitas, dan waktu mendukung tahap berikutnya.
Salin ringkasan
Buka draf email
Untuk pemilik
Lihat bagaimana mitra pelaksana masuk ke rantai bukti pihak pemilik yang sama di seluruh mandat.
Lihat Full Development Mandate →
Untuk mitra
Pekerjaan baik, pelaporan jujur, dan penanganan cacat yang efektif menjadi dasar undangan berikutnya.
Sampaikan minat Anda →

## Harmonie | Du chantier à l’exploitation | DALLEAU

URL: https://dalleau.ai/fr/projets/harmonie/

Preuves documentaires de projet

Harmonie

Harmonie. L’image montre l’état. Le dossier explique pourquoi il compte.

← Work

Harmonie, Bali · Relevé de chantier montrant les ouvrages extérieurs, les ouvertures et les interfaces inachevées avant livraison.

Harmonie. L’image montre l’état. Le dossier explique pourquoi il compte.

Statut du projet et de la preuve

Statut actuel : livré et en exploitation. État documenté : phase de chantier, avant livraison.

Étape

Les ouvrages extérieurs et les interfaces inachevées restaient visibles pendant le chantier.

Question du propriétaire

Que faut-il consigner tant qu’une condition reste visible pour que les décisions demeurent exploitables après le départ des équipes de chantier ?

État observé

Ouvrages extérieurs, ouvertures et interfaces inachevées avant livraison.

Conséquence pour le propriétaire

Le relevé devient utile lorsque sa date, l’état observé, la décision associée, la mission concernée et le prochain contrôle restent reliés.

Décision ou action

Conserver l’observation comme relevé daté du chantier et distinguer clairement le statut actuel, livré et en exploitation.

Statut des preuves

Photographie existante en phase chantier ; le statut actuel provient du dossier projet existant.

Périmètre du relevé

Conditions du chantier à la date du relevé ; les preuves de livraison et d’exploitation sont documentées séparément.

Ce qui reste ouvert

Les observations d’exploitation et les dossiers des spécialistes mandatés constituent des niveaux de preuve séparés.

Prochaine étape

Enrichir le dossier avec les observations d’exploitation, les décisions de maintenance et les responsabilités attachées aux missions confiées.

Discuter de votre dossier projet

## Work | Preuves de projet aux côtés du propriétaire | DALLEAU

URL: https://dalleau.ai/fr/work/

Preuves documentaires de projet

Work

DALLEAU est un bureau de développement aux côtés du propriétaire. Work présente chaque projet comme un dossier de décision : l’état du projet, la question du propriétaire, les preuves disponibles, l’action et ce qui restait ouvert.

INDEX WORK

Commencer par le type de travail dont le projet a besoin.

Dossiers de projet

États de chantier et livrés conservés comme preuves bornées dans le temps.

↓ Études de design

Comment DALLEAU transforme le potentiel d'un site, une cible et un usage en direction produit et design.

↓ Dossiers d'exploitation

Ce qui reste utile après la livraison pour la maintenance, les responsabilités et les décisions ultérieures.

↓ Applied Notes

Observations de projet traduites en questions utiles pour un autre brief.

↓

Relevé vidéo original du chantier Harmonie, Bali · Séquence de chantier montrant l’organisation du site, les ouvrages extérieurs et les interfaces encore inachevées.

Harmonie · Vidéo originale du chantier · Stade : chantier · Statut actuel : livré et en exploitation

Harmonie. Le relevé montre l’état. Les preuves expliquent pourquoi il compte.

État du projet et source

État actuel : livré et en exploitation. Source : séquence vidéo originale enregistrée pendant le chantier, avant livraison.

Question du propriétaire

Que faut-il consigner tant qu’une condition reste visible, afin que les décisions prises pour le propriétaire demeurent utilisables après le départ des équipes de chantier ?

Décision ou action

Conserver la séquence comme un relevé de chantier daté et maintenir l’état livré et en exploitation comme un niveau de preuve distinct.

État des preuves

Séquence vidéo originale du chantier ; l’état actuel provient du dossier existant du projet.

Discuter du dossier de votre projet

Étape

Les ouvrages extérieurs et plusieurs interfaces inachevées restaient visibles pendant le chantier.

Condition observée

La séquence consigne l’organisation du site, les ouvrages extérieurs, les ouvertures et les interfaces inachevées avant livraison.

Conséquence pour le propriétaire

Le relevé reste utile lorsque sa date, la condition visible, la décision associée, le périmètre responsable et la vérification suivante demeurent reliés.

Périmètre du relevé

Conditions visibles pendant le chantier ; les preuves de livraison et d’exploitation sont documentées séparément.

Ce qui reste ouvert

Les observations en exploitation et les documents des spécialistes mandatés restent des niveaux de preuve distincts.

Prochaine étape

Poursuivre le dossier avec les observations en exploitation, les décisions de maintenance et les responsabilités des missions mandatées.

Preuves du projet

Un projet, plusieurs états documentés.

Chantier

Livré et en exploitation

Escalier et jardin central

Harmonie · Dossier photographique comparatif · Chantier → livré et en exploitation

Chantier

Livré et en exploitation

Structure de l’escalier courbe et vide central

Harmonie · Dossier photographique comparatif · Chantier → livré et en exploitation

Chantier

Livré et en exploitation

Volume intérieur et circulation

Harmonie · Dossier photographique comparatif · Chantier → livré et en exploitation

Chantier

Livré et en exploitation

Structure et usage de la piscine

Harmonie · Dossier photographique comparatif · Chantier → livré et en exploitation

Les points de vue disponibles les plus proches rapprochent les états de chantier et de livraison dans quatre zones d’Harmonie.

ÉTUDES DE DESIGN

Des sites réels traduits en concepts de produit, d'expérience et de design.

Photographie réelle du site · Visualisations de concept DALLEAU

SIDEMEN · ÉTUDE DE CONCEPTION

Un lieu qui vaut le voyage.

DALLEAU a défini la cible, le modèle de service et la direction de design d'une résidence privée avec services complets construite autour d'une vue singulière.

Photographie réelle du site · Visualisations de concept DALLEAU

Ouvrir l'étude de design

DOSSIER D’EXPLOITATION

La livraison est suivie par un dossier de continuité distinct.

Lire le dossier Harmonie

Projet

Harmonie

Stade

Livré et en exploitation

Type de preuve

Dossier de continuité côté propriétaire

Question du propriétaire

Que faut-il conserver après la livraison pour que la maintenance, les responsabilités et les décisions futures gardent leur contexte ?

Ce qui demeure

Après la livraison, les décisions de maintenance, les responsabilités et le contexte du projet restent reliés.

Poursuivre depuis le dossier projet

Choisir le niveau de preuve utile.

Dossier de terrain

Ce que nous referions, et ce que nous changerions.

Lire le dossier Harmonie et les décisions qu’il a rendues visibles.

Lire le dossier de terrain →

Atelier · Concept illustratif

Transformer une observation en question de projet.

Voir comment preuves, critères, prototypes et vérifications entrent dans le brief.

Explorer Atelier →

Applied Note

Une distribution d’eau qui reste maintenable.

Pourquoi l’isolement, l’accès et la documentation comptent avant la fermeture des finitions.

Lire l’Applied Note →

Parler à François

## Un lieu qui vaut le voyage | Concept de résidence à Sidemen | DALLEAU

URL: https://dalleau.ai/fr/work/concept-destination-sidemen/

← Retour à Work WORK · ÉTUDE DE CONCEPTION · SIDEMEN, BALI

Un lieu qui vaut le voyage.

À partir d'un terrain en hauteur à Sidemen, DALLEAU a imaginé une résidence privée avec services complets autour d'une idée simple : transformer un paysage exceptionnel en destination à part entière.

Étude de conception · Concept du site et direction de design par François Dalleau

Quand l'adresse ne crée pas à elle seule la demande, le concept doit créer la raison de faire le voyage.

Parler à François Voir le concept

Contexte réel du site · Sidemen, Bali

Site Terrain réel en hauteur à Sidemen

Cible Séjour privé haut de gamme avec services complets

DALLEAU Concept produit et direction de design par François Dalleau

Phase Étude de conception

L'emplacement peut capter une demande existante. Un concept fort peut créer une nouvelle raison de venir.

L'IDÉE PRODUIT

Être là où la demande existe déjà est une voie. Créer une destination en est une autre.

L'emplacement reste décisif. Certains projets achètent l'accès à un marché déjà établi. D'autres partent d'un site dont la force peut porter une expérience distincte, puis alignent la cible, la résidence, les services et l'arrivée autour de cet avantage.

À Sidemen, l'opportunité était de réunir un lieu rare et un concept suffisamment précis pour faire du déplacement une partie du désir.

LE SITE

La vue était le premier avantage du produit.

Le terrain domine les rizières et ouvre sur un vaste horizon volcanique. Au lieu de traiter le paysage comme un décor, le concept en fait l'élément qui organise l'arrivée, les moments partagés, l'intimité et le rythme du séjour.

La résidence a été imaginée pour préserver la sensation de distance et de calme tout en apportant l'abri, le confort et la qualité de service attendus par une clientèle internationale haut de gamme.

DIRECTION DE DESIGN

Une architecture minérale, un confort chaleureux, un horizon ouvert.

La direction joue volontairement sur le contraste entre une architecture contenue, presque monolithique, et la douceur du paysage. Cadres sombres, pierre, béton et bois chaud composent une limite protectrice sans rivaliser avec la vue.

Le séjour panoramique, la terrasse basse, la piscine et le sauna vitré transforment le paysage en succession d'expériences quotidiennes, pas en simple image.

Visualisation de concept · Terrasse, piscine et sauna vitré

Visualisation de concept · Séjour panoramique

EXPÉRIENCE SPATIALE

Quatre choix transforment la vue en expérience de séjour.

01 Arrivée et révélation

Le parcours retient le panorama, puis le libère au moment où la résidence s'ouvre sur la vallée.

02 Horizon partagé

Séjour, repas, piscine et lounge extérieur forment un même bord social pour une famille ou un groupe privé.

03 Intimité et retrait

Suites et espaces calmes protègent le sommeil, la vie privée et la distance avec l'activité commune sans perdre le paysage.

04 Service discret

Cuisine, personnel, réserves, lingerie, transport et maintenance soutiennent le séjour sans envahir le parcours des occupants.

SÉJOUR CIBLE

Pensé comme une destination privée avec services complets, pas comme une villa de location de plus.

La cible était une famille ou un groupe privé haut de gamme choisissant plusieurs jours de calme, d'intimité et de service autour d'un paysage singulier.

Le concept réunit hébergement privé, espaces partagés, piscine, sauna, repas, housekeeping, transport et présence sur place dans une même expérience de plusieurs jours.

Le service n'était pas un supplément ajouté à l'architecture. Il faisait partie du concept dès l'origine et influençait les circulations, les réserves, l'arrivée, l'intimité et la maintenance.

Promesse du séjour Une expérience privée de plusieurs jours construite autour de la distance, du calme et d'une vue singulière.

Modèle de service Présence sur place, repas, housekeeping, transport et maintenance organisés comme un seul système.

Expérience privée Moments partagés et retrait sont conçus comme des conditions complémentaires.

Valeur dans le temps Une identité forte est équilibrée avec discipline d'exploitation, maintenabilité et vieillissement crédible.

INTELLIGENCE PRODUIT

Le concept relie marché, expérience, architecture et exploitation.

01 Cible et demande

Définir le client qui choisira Sidemen pour l'expérience, et non comme simple alternative à une adresse plus connue.

02 Expérience distinctive

Utiliser le paysage, l'arrivée, l'horizon partagé et le contraste des matières pour créer un séjour propre à ce lieu.

03 Modèle d'exploitation

Organiser personnel, repas, housekeeping, transport et maintenance sans empiéter sur l'expérience privée.

04 Désirabilité dans le temps

Équilibrer une expérience capable de soutenir un positionnement premium avec une complexité de construction et d'exploitation proportionnée, une maintenance réaliste et des matériaux capables de bien vieillir à Bali.

RÔLE DE DALLEAU

De l'opportunité du site à un concept de résidence défini.

François Dalleau a identifié la vue comme l'actif central du produit, défini la cible du séjour et développé pour DALLEAU le concept initial du site, du produit, des services et de la direction de design.

Le travail présenté ici montre ce concept : ce qui rendrait la destination désirable, la manière dont l'architecture devait le mettre en scène et le modèle de service nécessaire pour le soutenir.

Localisation

Sidemen, Bali

Projet

Résidence privée avec services complets

Séjour cible

Séjour haut de gamme de plusieurs jours pour une famille ou un groupe privé

Phase

Étude de conception

Rôle de DALLEAU

Lecture du site, définition de la cible, concept produit et direction de design par François Dalleau

Sources

Photographie réelle du site et visualisations de concept dirigées par le fondateur

ÉQUATION DE DESIGN

Être assez distinctif pour attirer. Assez discipliné pour fonctionner et bien vieillir.

01 Avantage singulier du site

02 Cible clairement définie

03 Raison de faire le voyage

04 Architecture qui amplifie le paysage

05 Équilibre entre partage et intimité

06 Service et back-of-house discrets

07 Complexité de construction et d'exploitation proportionnée

08 Matériaux et systèmes pensés pour durer

Vous avez un site dont le potentiel dépasse le brief actuel ?

DALLEAU peut commencer par lire le site, définir la cible et former le concept avant que le programme, le coût et l'équipe mandatée ne se figent.

Parler à François Découvrir l'Étude de faisabilité

## Owner-side development management in Bali | DALLEAU

URL: https://dalleau.ai/mandate/

THE MANDATE · OWNER-SIDE PRIVATE DEVELOPMENT
One development office. Accountable to you from site selection to operational launch.
Delivered and operating
Construction-stage record
Harmonie · construction-stage and delivered states.
DALLEAU coordinates feasibility, design, engineering, tendering, construction, handover and readiness for use on the owner’s side. You keep control of the key decisions, costs and appointments.
Talk to François
See how the mandate works
A first conversation requires no complete dossier. It needs a clear site, intended use and owner question.
Founder-led
No more than three full mandates at a time
Open-book costs
Every quote and invoice visible
On this page
Ways to begin
Evidence
How the mandate works
Costs and control
Handover and continuity
Fit and next step
On this page
Ways to begin
Evidence
How the mandate works
Costs and control
Handover and continuity
Fit and next step
WHAT THE MANDATE CHANGES
Control matters when it leads to better decisions.
Architects, engineers and contractors retain their appointed roles. DALLEAU selects and coordinates them around the owner's brief, making their advice, costs and responsibilities clear before capital is committed.
01
One point of direction
You do not have to reconcile ten separate conversations. DALLEAU connects the brief, design, cost, schedule and intended use.
02
Visible costs
Quotes, invoices, rebates, variations and payments remain open to you. Our fee is stated and does not rise with ordinary third-party overruns.
03
Accountable specialists
Each professional is appointed for a defined role and remains responsible for their own work. DALLEAU coordinates the whole without blurring that responsibility.
04
Documented decisions
Before a major contract or payment, you can see what is proposed, why it matters, what it costs and which risk it carries.
THREE WAYS TO BEGIN
Begin with the decision in front of you.
You do not need to commit to a full mandate in order to speak with us. Start with the level of work your project actually needs.
01
Check the fit
The private brief
For an owner who wants to know whether the project and DALLEAU should move forward together.
You receive
A personal review of the site, intended use, budget and timing.
Complimentary · Reviewed personally
Share your project
Scope at this stage
When there is a clear fit, this is followed by an invitation to a first conversation.
The brief is a qualification step. It does not include a feasibility, valuation, legal or technical opinion.
02
Make the decision
The Feasibility Study
For deciding whether to build, buy, revise, renegotiate, wait or walk away before more capital is committed.
You receive
A documented recommendation on one defined project.
USD 15,000 · 15 working days from a complete file
Commission the study
Fee and capacity
It covers the site, investment logic, costs, risks and delivery strategy.
The study fee is credited in full against DALLEAU's fee on a later accepted mandate. Commissioning a study does not reserve full-mandate capacity or guarantee acceptance.
03
Deliver the project
The full development mandate
For an owner who wants one office to lead the development from feasibility to an asset that is ready to use.
You receive
A complete owner-side development office.
Managed budgets from USD 1,000,000 excluding land · Fees from USD 100,000
Discuss a full mandate
How the fee is set
It coordinates the programme, specialists, tendering, contracts, construction, handover and operational readiness.
Full-mandate fees generally equal 8 to 12 percent of the approved managed development budget. Phase one is fixed at appointment. The balance is fixed after the concept, scope and cost plan are approved. Ordinary third-party overruns do not increase DALLEAU's fee.
DALLEAU Atelier inside the mandate
The method strengthens the three existing ways to engage.
Atelier strengthens the existing brief, study and mandate. Relevant research, site, operating and evidence questions are activated according to the project and carried through the owner’s chosen engagement.
Private Brief
The first review may identify relevant evidence, site and operating questions. The conversation stays focused on fit, context and the owner’s immediate decision.
Start a Private Brief →
Feasibility Study
The study can activate the tropical site baseline, household use, privacy and flow, protected-bedroom and indoor-environment triggers, specialist triggers, evidence classification, decision recommendations and unresolved questions.
Commission the Feasibility Study →
Full Development Mandate
The evidence spine can carry protocol activation, owner targets, specialist scopes, mock-ups, hold points, commissioning preparation, the Owner’s Control Report, the Building Passport and later reviews.
Discuss a Full Development Mandate →
Explore DALLEAU Atelier
DELIVERED EVIDENCE · HARMONIE · DELIVERED AND OPERATING
Harmonie, from construction to operation.
We now see how every decision performs in daily use. François joined Harmonie at foundation stage, assumed full project direction during the second-floor structure and led completion and opening. He still leads its operation with the team. That continuity gives us a rare feedback loop between design, construction and daily use.
Construction-stage project record. The central interior remained unfinished and open to inspection.
Project record. The completed interior in operation, photographed from another viewpoint.
What we inherited
A three-villa estate with shared infrastructure and an active construction programme.
What we strengthened
Inspection gates, waterproofing and drainage controls, contractor responsibilities, warranties and the opening sequence.
What the owner received
A completed, operating residence and a project record built from our own work rather than a marketing case assembled later.
What carries forward
Clearer responsibilities, earlier testing and a more complete handover record on every later project.
Explore Harmonie
Read the field report
THE FULL MANDATE
Six decisions that protect the owner's capital.
At each stage, the facts are assembled, the options are compared and the decision remains with the owner.
Proceed
Revise
Stop
01
Validate the project and site
Owner's question
Is this the right project, on the right site and at a credible cost?
DALLEAU's work
We test the brief, site, investment logic, access, constraints and main delivery risks.
You receive
A documented recommendation, the key risks and the conditions required to proceed.
02
Freeze a buildable concept
Owner's question
Do the programme, design, cost, schedule and intended use form one coherent project?
DALLEAU's work
We align these elements before detailed engineering begins and changes become expensive.
You receive
An approved brief, a frozen concept, a cost plan and clear performance criteria.
03
Tender one defined project
Owner's question
Is every bidder pricing the same scope and the same quantities?
DALLEAU's work
We coordinate the drawings, scope, quantities and commercial rules used by every bidder.
You receive
A traceable tender package, comparable bids and a clear schedule of differences.
04
Appoint and contract
Owner's question
Who can actually deliver the project, on what terms and with which responsibilities?
DALLEAU's work
We assess capability, references, commercial terms, programme and contractual risk before appointment.
You receive
An award recommendation, a defined scope, a programme and a documented contractual basis.
05
Control what is built
Owner's question
Do the commitments and payments match the quality and progress on site?
DALLEAU's work
We coordinate inspections, records, changes, payment review, risk control and the decisions required from the owner.
You receive
A monthly Owner's Control Report covering cost, forecast, contingency, schedule, risks, decisions and photographs.
06
Handover a ready asset
Owner's question
Is the residence complete, tested, documented and ready to occupy or operate?
DALLEAU's work
We coordinate testing, snagging, warranties, manuals, training, handover and operational preparation.
You receive
Closed defects, commissioning records, warranties, the Building Passport and a maintenance plan.
How DALLEAU selects delivery partners
VISIBLE THROUGHOUT DELIVERY
The site, the budget and the next decision remain visible.
A private owner space keeps the project legible without reducing it to a dashboard.
Site cameras and room-by-room records
Weekly reports and video walkthroughs
Monthly cost, programme and risk reporting
Pending decisions shown with their consequences
Example owner access interface, configured for each mandate.
Example Owner’s Control Report, compiled from the mandate record.
AN HONEST COMPARISON
Three ways to acquire a residence. Three very different trade-offs.
A completed property prioritises speed. An off-plan purchase prioritises simplicity. Private development with DALLEAU prioritises control, delivery quality and a more transparent allocation of capital.
Completed property
Certainty over customisation
Compare details
Best suited to
Buying an existing, inspectable asset quickly and with limited involvement.
Main benefit
You can assess what has already been built.
Price and margins
The total price is known. Historic costs and the seller's margin may not be itemised.
Delivery team
Already appointed. Quality is judged from the completed work and available records.
Design
Existing, with limited scope for change.
Risk
Development risk has already been taken. Acquisition, compliance, defect and operating risks still require due diligence.
Potential value
Already reflected, at least in part, in the asking price.
Developer off-plan purchase
The simplicity of a packaged product
Compare details
Best suited to
Buying a defined product without managing its development directly.
Main benefit
One developer coordinates the commercial process and delivery.
Price and margins
The price is packaged. The developer's intended margin is built into the offer, while underlying costs may not be itemised.
Delivery team
Selected by the developer within its programme, constraints and contractual commitments.
Design
Defined in advance, with varying scope for customisation.
Risk
Depends on the contract, funding, site execution and the developer's ability to deliver.
Potential value
The developer's targeted margin is already incorporated in the sale price.
Qualified projects · Fee basis agreed in writing · Owner-side control
DALLEAU private development
Build for yourself, with an owner-side team
Compare details
Best suited to
Owners with a defined development budget who want an asset shaped around their site, intended use and objectives.
Main benefit
The owner retains control of the project, budget, appointments and key decisions.
Price and margins
Third-party costs are documented. DALLEAU's fee basis is written into the mandate and generally equals 8 to 12 percent of the approved managed development budget.
Delivery team
Tendered on quality, compliance, capacity to deliver and total cost, never on lowest price alone.
Design
Defined around the site, budget, intended use and owner objectives.
Risk
The owner carries development risk. Due diligence, contracts, decision gates and reporting make it visible and manageable, but do not remove it.
Potential value
Any value created accrues to the owner's asset. Future value and liquidity are not guaranteed.
WHERE THE CAPITAL GOES
With a comparable scope and total capital commitment, private development can direct more of the budget to the site, design and construction, rather than to a resale margin embedded in a packaged purchase.
A developer creates a product for sale at a price it sets. DALLEAU works for the owner. Quotes, invoices, appointments and key decisions remain documented.
Our fee basis is written into the mandate and generally equals 8 to 12 percent of the approved managed development budget. Once the concept, scope and cost plan are approved, the balance of our fee is fixed. Ordinary third-party overruns do not increase it.
Any value created through development accrues to the owner's asset. Its future value and liquidity still depend on the site, market, costs, compliance and delivery quality.
Assess my project's feasibility
For owners with a defined development budget. Full mandates start at USD 1,000,000 excluding land, whether the site is secured or still to be selected.
Developer economics vary from one project to another. This comparison uses no universal margin percentage. It distinguishes a packaged sale price from a private development model in which project costs and DALLEAU's fee are documented separately.
WHAT REMAINS WITH YOU
A readable project while work is underway. A complete record when it is finished.
DURING THE PROJECT
Open-book control
Every third-party quote and invoice is visible
Every discount and rebate is credited to the project
Every variation is documented and approved
Every payment follows an approved basis
Every related-party engagement is disclosed
DALLEAU is compensated only by the owner and accepts no undisclosed supplier or contractor benefits.
AT HANDOVER
The Building Passport
The residence leaves the project with one organised record of how it was designed, built, equipped and maintained.
As-built drawings and coordinated services plans
Photographs of concealed networks
Materials, finishes and equipment registers
Warranties, manuals and supplier contacts
Variation history, permit records and maintenance schedule
Example Building Passport archive.
What the managed development budget includes
The managed development budget includes the professional team, engineering, construction, external works, directly managed procurement, furniture, fixtures and equipment, and agreed operational-readiness costs. It excludes land acquisition, acquisition taxes, financing, the owner's independent legal and tax advice, DALLEAU's fee and applicable taxes.
A DELIBERATE FIT
This mandate is designed for owners who want responsibility made explicit.
It is demanding by design. That discipline is useful only when it matches the owner's priorities.
It is a strong fit when
The project deserves independent direction
You want to understand costs and trade-offs
Daily use matters as much as the image
The asset must remain documented and operable over time
It may not be the right fit when
The lowest initial price is the only criterion
Important decisions are expected to remain implicit
Competitive tendering, controls and documentation are considered unnecessary
THE NEXT USEFUL STEP
Tell us what you are considering. We will tell you whether there is a fit and what should happen next.
Share your project
Every brief is reviewed personally. A first conversation is proposed when the project, timing and role required match the DALLEAU mandate.
DALLEAU acts as the owner-side development manager and coordinates independently appointed architects, engineers, contractors and regulated professionals. Each retains responsibility for its appointed scope.

## Bali property, building and operating guides | DALLEAU

URL: https://dalleau.ai/notes/

DALLEAU | Field Notes
What changed.
What it means.
What owners should verify.
An editorial desk for decisions in Bali.
Briefings, reality checks, field records and decision guides for people building, buying or operating private residences in Bali.
Search the library
⌕
Use the up and down arrow keys to review suggestions, then press Enter to open one.
Suggested Field Notes
No matching notes. Try a broader question.
36 notes
Maintained
Library updated 20 September 2026
Free, in full, with sources.
Regulatory briefing
Verified 27 July 2026
Bali's reported 18-code PMA licensing restriction. What it means.
A targeted OSS restriction is not the same as a blanket ban on every foreign investment, property project or existing licence.
What changed
The provincial government says OSS is no longer accepting new PMA licence applications under 18 reported KBLI codes for business locations in Bali.
What it means
The actual activity, business scale, company structure, licence status and operating model must align.
What it does not mean
It is not an automatic cancellation of every existing licence, lease or foreign-backed project.
Read the briefing
Recommended reading
Three questions worth resolving first.
Start with the questions closest to your project. Each guide shows its sources and update date.
Company and licensing
Material update
KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business
Activity, enterprise scale, PT PMA access and licence status are separate questions.
Read the note
Land and planning
Monitoring
Can you still build in Bali? What the 2026 moratorium covers
Bali has not announced an island-wide construction ban. The actual scope and enforcement require a dated reading.
Read the note
Water and operations
Maintained
A well depth is not a water-quality specification
Source, construction, sampling, treatment and maintenance must be read as one system.
Read the note
Reality check
What is being said, and what the record actually supports.
We test circulating claims against the public record, without turning clarification into another headline.
Claim circulating
“Bali has banned foreign investment in 18 sectors.”
What the record says
The provincial announcement concerns new PMA licence applications under 18 reported KBLI codes. That is narrower than a ban on all foreign capital or every existing authorisation.
Read the record
Claim circulating
“Green zone, pink zone and yellow zone are official legal categories.”
What the record says
Those colours are market shorthand. The official planning instrument, parcel, sub-zone and permitted-use rules are what must be checked for the site.
Read the record
From the field
Project records, not just commentary.
Construction stages, operating evidence and decisions that can be traced to a real project archive.
Construction record
Delivered and operating
Field record | Harmonie
What we would repeat, and what we would change.
Harmonie is presented through original project records and operating experience. The record shows both what worked and what should have been decided earlier.
Read the field record
Water and maintenance
Water distribution that remains maintainable
Why isolation, access and documentation matter before finishes close.
Residence operations
A residence should keep working when the owner is away
Staffing, service circulation and maintenance are part of the brief, not an afterthought.
Reference library
Browse by the decision in front of you.
Subject
All subjects
Land & structure
Market & capital
Residence & operations
Life in Bali
Mobility & status
Format
All formats
Field Note
Briefing
Field Record
Decision Guide
Research Note
Project stage
All stages
Before land
Before design
Before commitment
During delivery
In operation
Clear
01
Residence & operations
Owner guide
DALLEAU
Comparing construction quotations in Bali: price the same project first
Compare Bali construction quotations on the same scope: quantities, exclusions, allowances, testing, handover and payment terms. Includes a free BOQ worksheet.
20 September 2026
8 min read
Share
02
Market & capital
Reality Check
DALLEAU
A €150,000 villa in Bali: good value or an incomplete budget?
A €150,000 Bali villa may be affordable or incomplete. Compare rights, lease term, construction, permissions, total cost and rental assumptions before committing.
20 September 2026
9 min read
Share
03
Residence & operations
Regulatory briefing
DALLEAU
Your Bali villa is listed online. What does that actually prove?
What an OTA listing, NIB, KBLI, NKU, property file, local tax and APOA each prove after Indonesia’s August 2026 accommodation enforcement changes.
11 August 2026
10 min read
Share
04
Residence & operations
Decision guide
DALLEAU
Can a PT PMA operate a Bali villa?
A practical guide to direct operation, a genuine Indonesian operator, a local PT with real shareholders and a separate PT PMA management company.
11 August 2026
12 min read
Share
05
Market & capital
Decision guide
DALLEAU
A management fee pays for a service. It does not move profit by itself.
How a PT PMA management fee can pay for a real service without becoming a device for moving the local operator’s residual profit.
11 August 2026
12 min read
Share
06
Mobility & status
Decision guide
DALLEAU
Can a foreign director work inside their own Bali business?
What a genuine foreign director can do, where another operational occupation begins and why a PT PMA appointment does not cover a separate local PT.
11 August 2026
10 min read
Share
07
Residence & operations
Reality Check
DALLEAU
Who is the real villa operator?
Ten questions linking the listing, guest contract, cash, staff, systems, property right, licence, tax, risk and residual profit to the real villa operator.
11 August 2026
3 min read
Share
08
Residence & operations
Reality Check
DALLEAU
After heavy rain: what an owner should check before everything dries.
A strong rain event can reveal information that disappears within hours. Water lines dry. stains fade. drains empty. staff clean the floor. A photograph taken the next day may show almost nothing.
4 August 2026
4 min read
Share
09
Residence & operations
Reality Check
DALLEAU
Repainting a stain does not fix water ingress.
A new coat of paint can make a wall look repaired while the water route remains unchanged.
4 August 2026
3 min read
Share
10
Market & capital
Briefing
DALLEAU
Just published
Bali's reported 18-code PMA licensing restriction. What it means
A targeted OSS restriction is not the same as a blanket ban on every foreign investment, property project or existing licence.
27 July 2026
11 min read
Share
11
Residence & operations
Field Note
DALLEAU
Just published
Bali villa wells: depth is not a water-quality specification
Why a well depth or seven-stage label proves little without bore construction, laboratory testing, treatment matched to the water and documented commissioning.
20 July 2026
14 min read
Share
12
Market & capital
Briefing
DALLEAU
Just published
Indonesia's 2026 home VAT incentive: eligibility and calculation
Finance Ministry Regulation PMK 90/2025 can reduce the VAT on a qualifying new home delivered in 2026. It does not change which property rights a foreign buyer may lawfully hold.
20 July 2026
6 min read
Share
13
Residence & operations
Decision Guide
DALLEAU
Material update
KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business
KBLI 55203 correctly describes owner-operated villas, but it has no large-enterprise OSS route. The correction separates activity, risk, enterprise scale, PT PMA access and legacy rights.
20 July 2026
11 min read
Share
14
Life in Bali
Decision Guide
DALLEAU
A second home in Bali: decisions to make before buying
Before looking at property listings, define the intended use, lawful tenure, immigration position and exit plan for a second home in Bali.
17 July 2026
5 min read
Share
15
Land & structure
Decision Guide
DALLEAU
Bali leasehold: what a foreign buyer acquires
Leasehold is the familiar search term, but the transaction is a long lease. The buyer receives contractual use of land or a property for a defined period while the Indonesian owner's registered land title stays with its holder.
17 July 2026
5 min read
Share
16
Residence & operations
Field Record
DALLEAU
Building Harmonie: what we would repeat and what we would change
Harmonie is the residence that shaped our current project method. Three duplex villas on a 1,100 m² leasehold plot in Seminyak opened in summer 2024. The record covers the decisions that worked, the defects that surfaced and the changes made since.
17 July 2026
5 min read
Share
17
Land & structure
Briefing
DALLEAU
Can you still build in Bali? What the 2026 moratorium covers
Bali has not imposed an island-wide construction ban. The tighter rules concern protected and productive land, the permitted use of each parcel, coastal constraints and nominee arrangements. A project must be checked against the official map and the rules that apply to its exact location.
17 July 2026
4 min read
Share
18
Land & structure
Decision Guide
DALLEAU
Green, pink and yellow zones in Bali: what the official plan says
Green, pink and yellow are market shorthand. Legal plans use specific zone and sub-zone names. Before paying for land, identify those classifications, read the permitted-use rules and obtain the spatial-compatibility result for the intended project.
17 July 2026
5 min read
Share
19
Market & capital
Research Note
DALLEAU
Is Bali still a good villa investment in 2026?
Bali remains a large tourism market, but an island-wide average cannot tell you whether a particular villa, location or operating model will work.
17 July 2026
5 min read
Share
20
Life in Bali
Field Note
DALLEAU
Moving to Bali with children: school, healthcare and daily life
A family move to Bali is easier to assess when the practical decisions come first. Choose the school before signing a long lease, confirm what the health policy will cover, plan transport without relying on a scooter, and build the budget from written quotes rather than online averages.
17 July 2026
4 min read
Share
21
Land & structure
Decision Guide
DALLEAU
PT PMA, nominee or long lease: where the investor's rights sit
Paying for land or shares does not make the payer the registered holder. Before investing, identify the right, the person or company that holds it, and the documents a court or future buyer can verify.
17 July 2026
4 min read
Share
22
Residence & operations
Field Note
DALLEAU
Shared amenities or isolated villas: how to compare the two models
A shared facility is valuable only when guests use it, the site can lawfully support it and the operating savings justify the extra capital.
17 July 2026
4 min read
Share
23
Land & structure
Briefing
DALLEAU
Villa licensing under PP 28/2025: a dated timeline
Government Regulation 28 of 2025 changed Indonesia's general risk-based licensing framework. It did not ban short stays or switch on an automatic platform check overnight. Tourism standards, supervision and platform verification have developed through separate measures on different dates.
17 July 2026
3 min read
Share
24
Market & capital
Decision Guide
DALLEAU
“8% guaranteed” on a Bali villa: who pays, from what money and under which contract?
A guaranteed return is not a feature of the property. It is a payment obligation owed by a named person or company.
16 July 2026
9 min read
Share
25
Land & structure
Briefing
DALLEAU
Bali villa wells: household use and commercial permits
A working tap does not prove that a villa may lawfully use its well. The file must identify who draws the water, which well supplies it, what the water is used for, how much is taken and what monitoring exists.
16 July 2026
5 min read
Share
26
Land & structure
Decision Guide
DALLEAU
Before the next construction payment: what evidence should you request?
A date can trigger a reminder. A payment should be tied to an obligation.
16 July 2026
8 min read
Share
27
Land & structure
Decision Guide
DALLEAU
Before your next off-plan payment in Bali: the documents to verify
Documents, confirmations and decisions required before your next payment.
16 July 2026
10 min read
Share
28
Market & capital
Decision Guide
DALLEAU
PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares
Three separate rules are often compressed into the same IDR 10 billion figure. They apply to different questions and should be tested separately.
16 July 2026
15 min read
Share
29
Land & structure
Decision Guide
DALLEAU
Seven checks before paying a deposit on Bali property
A certificate can be genuine and the deal can still fail. A villa can be finished and still be impossible to operate as planned. The file below should be complete before any money becomes non-refundable.
16 July 2026
17 min read
Share
30
Market & capital
Decision Guide
DALLEAU
Seven ways to receive or transfer value from a PT PMA, and how each is taxed
Owning a PT PMA, an Indonesian company with foreign investment, does not mean personally owning the cash in its bank account.
16 July 2026
10 min read
Share
31
Land & structure
Decision Guide
DALLEAU
Who owns, sells, builds, receives payment and operates your Bali villa?
“The developer” is not a complete counterparty map.
16 July 2026
8 min read
Share
32
Mobility & status
Decision Guide
DALLEAU
Bali electronic visa on arrival: All Indonesia and autogates
Prepare your Bali arrival with official guidance on the e-VOA, All Indonesia declaration, autogates, extensions and common mistakes.
13 July 2026
6 min read
Share
33
Mobility & status
Decision Guide
DALLEAU
Indonesia investor visa E28A: permitted activities and work limits
Official E28A rules on the IDR 10 billion shareholding, sponsor, permitted director or commissioner activity, stay length and work limits.
13 July 2026
6 min read
Share
36
Mobility & status
Decision Guide
DALLEAU
Indonesia remote worker visa E33G: who qualifies in 2026?
Check the official E33G requirements: foreign employer, USD 60,000 annual income, one-year stay, no sponsor and no Indonesian compensation.
13 July 2026
5 min read
Share
35
Mobility & status
Decision Guide
DALLEAU
Indonesia visas and work permits in 2026: the practical Bali guide
Compare official Indonesian visa routes for holidays, longer stays, business, local work, investment, remote employment and accompanying family.
13 July 2026
13 min read
Share
36
Mobility & status
Decision Guide
DALLEAU
Working legally in Bali: visa, stay permit and employment approval
Understand the visa, temporary stay permit, employer plan, levy and position rules required for lawful employment in Indonesia.
13 July 2026
7 min read
Share
No note matches this combination.
Remove a filter or try a broader question.
Show more notes
Watchlist
Developing subjects we are still verifying.
When the public record is incomplete or administrative practice is moving, we say so. Monitoring is not a conclusion.
Applying this to a specific project requires a review of the site, company, licence and intended use.
Talk to François
PMA access and the 18-KBLI restriction
Monitoring
Bali building and land-use enforcement
Monitoring
Short-stay licensing and platform checks
Under review
The Bali Brief
Receive the next sourced briefing.
A short email when a Field Note is published or materially revised.

## After heavy rain: what an owner should check before everything dries. | DALLEAU Field Notes

URL: https://dalleau.ai/notes/after-heavy-rain-owner-checks.html

Field Notes / Reality Check / Water, envelope and moisture

Field Notes · Reality Check · Water, envelope and moisture

After heavy rain: what an owner should check before everything dries.

A strong rain event can reveal information that disappears within hours. Water lines dry. stains fade. drains empty. staff clean the floor. A photograph taken the next day may show almost nothing.

Evidence level

Owner observation guidance. Site-specific cause remains unconfirmed.

Application type

Owner observation and investigation sequence

Updated

4 August 2026

Sources

4

On this page

Why this matters

First rule: protect people and electrical systems

Record the event before cleaning

Walk the exterior while the water route is still visible

Walk the interior by room and height

Do not erase the sequence

What different observations may suggest

What the owner should request next

Reality Check

Sources

System map

Reality Check

A native diagram keeps the decision path legible without turning project criteria into a false score.

01 Event

Rain, wind and operating state

02 Exterior

Ground, terraces and roof

03 Interior

Room, height and timing

04 Record

Plan, images and sequence

Illustrative context

Why this matters

A strong rain event can reveal information that disappears within hours. Water lines dry. stains fade. drains empty. staff clean the floor. A photograph taken the next day may show almost nothing.

The purpose of this check is not to diagnose a leak. It is to preserve the condition before evidence is lost and to identify where specialist investigation should begin.

First rule: protect people and electrical systems

Do not inspect a roof, wet ceiling, flooded plant room or live electrical area when conditions are unsafe. Isolate the affected zone and use the appropriate responsible contractor or specialist.

Record the event before cleaning

Capture:

date and approximate time;

when the rain started and stopped;

whether wind direction was unusual;

which doors and windows were open;

whether AC, pumps and extraction were operating;

photographs and short video before drying or cleaning;

the first visible location and the later spread;

whether the condition had occurred before.

A simple marked-up floor plan is more useful than twenty unlabelled close-ups.

Walk the exterior while the water route is still visible

Ground and landscape

Check whether water:

falls toward or away from the building;

collects beside external walls;

crosses door thresholds;

overflows from planters;

emerges from retaining walls;

bypasses channels or drains;

has nowhere visible to discharge.

Terraces and pool edges

Look for:

ponding at doors;

water trapped between tile falls;

channels filled with leaves or construction debris;

drains higher than the surrounding finish;

overflowing balance tanks or pool routes;

water moving under external doors.

Roofs and gutters

From a safe location, observe:

standing water after rain has reduced;

blocked strainers;

water overtopping gutters;

overflow paths;

discharge against walls or foundations;

staining below parapets, outlets and penetrations.

Do not walk onto a wet roof without safe access and authorisation.

Walk the interior by room and height

Record whether the first sign appears:

at the bottom of a wall;

below a window or door;

at a ceiling junction;

around a penetration;

below a bathroom or terrace;

inside a wardrobe or fixed joinery;

close to an AC drain or plumbing route;

at a floor joint or skirting.

The height and timing matter. A mark at the base of a wall does not automatically prove capillary rise. A ceiling stain does not automatically prove that the entry point sits directly above it.

Do not erase the sequence

Avoid immediate cosmetic repair. Before repainting, resealing or cutting open a wall, retain:

the event record;

photographs with room and orientation;

affected materials;

visible water path;

relevant roof, terrace, bathroom or landscape condition;

recent contractor work;

previous repairs;

weather relation.

A targeted temporary measure may be needed to limit damage. It should not destroy the evidence required to understand the source.

What different observations may suggest

These are investigation prompts, not diagnoses.

Appears only during wind-driven rain

Review exposed walls, openings, façade joints, parapets and penetrations on the windward side.

Appears after rain has stopped

Review stored water, saturated assemblies, drainage backup and water travelling within cavities.

Appears during bathroom use but not rain

Review wet-room and plumbing routes before assuming an envelope problem.

Appears in a cooled room during humid weather

Review condensation, surface temperature, air leakage and AC operation as well as bulk-water sources.

Appears at lower walls throughout the year

Review ground moisture, lateral water, landscaping, plumbing and wall construction. Do not assume one cause from the stain pattern alone.

What the owner should request next

For a recurring or material condition, request a written investigation plan that states:

the working hypotheses;

the sequence of non-destructive checks;

any controlled water testing;

areas to isolate;

conditions under which opening-up is justified;

how repairs will be tested;

how performance will be observed during the next comparable rain event.

Reality Check

Drying is not the same as resolution.

If the mark disappears but the water path remains, the next rain event starts the same sequence again.

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Open original record

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continue from the question in front of you

Continue from the question in front of you

Repainting a stain does not fix water ingress. → Waterproofing is a chain, not a coating. → Slab-on-ground or suspended floor in Bali? → A membrane cannot rescue a flat roof without falls. →

A useful first conversation needs the site, the event record and the owner question. It does not require a completed technical dossier.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François

## Bali construction moratorium: what it covers | DALLEAU

URL: https://dalleau.ai/notes/bali-building-moratorium.html

← field notes regulation 10 July 2026 Can you still build in Bali? What the 2026 moratorium covers

Bali has not imposed an island-wide construction ban. The tighter rules concern protected and productive land, the permitted use of each parcel, coastal constraints and nominee arrangements. A project must be checked against the official map and the rules that apply to its exact location.

DALLEAU | Research and field notes Published

10 July 2026

Last verified

17 July 2026

Verified | 17 July 2026 | primary sources

In brief Key point: Construction remains possible where the spatial plan allows the intended use and the project obtains the required approvals. Bali Provincial Regulation 4/2026 deals with productive-land conversion and nominee ownership. Its administrative sanctions belong to that defined scope. They should not be presented as a single criminal penalty for every planning, building or licensing problem.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Construction remains possible, parcel by parcel

The phrase "Bali banned construction" compresses several different measures into one alarming headline. It also hides the question that matters for an owner: what may be built and operated on this parcel?

The answer comes from the applicable spatial plan, the parcel record and the intended activity. A tourism project on land allocated for tourism does not start from the same position as a villa proposed on protected agricultural land. A seller's description, the colour used by an agent or the presence of another villa nearby is not official parcel evidence.

Three stages, three different instruments

The sequence matters because two regulations issued in February 2026 carry the number 4 but do different jobs.

The provincial instruction in 2025. After the September floods, Bali's governor announced tighter control of new commercial development on productive land and water-catchment areas. Governor Instruction 5/2025 then directed regents and mayors not to approve specified agricultural-land conversions, including protected food-agriculture land, known as LP2B.

The national rule on rice land. Presidential Regulation 4/2026 , or Perpres 4/2026, took effect on 4 February 2026. It replaces Presidential Regulation 59/2019 and sets the national framework for mapping and controlling the conversion of protected rice land.

Bali's regional rule. Bali Provincial Regulation 4/2026, or Perda 4/2026, concerns productive-land conversion and nominee ownership in the province. Bali's official spatial-planning authority describes its scope as productive land, control of conversion, supervision, administrative sanctions and the prohibition of nominee ownership. Bali Provincial Regulation 3/2026, signed in the same period, separately addresses beaches and coastal setback areas.

Perpres 4/2026 is national and focuses on protected rice land. Perda 4/2026 is a Bali regulation with a broader regional productive-land and nominee remit. Treating them as the same text leads to the wrong conclusion.

What the supported sanctions statement covers

The provincial authority's implementation summary describes an administrative enforcement ladder that can reach suspension, site closure, licence revocation and demolition of a building that violates spatial rules. A written warning comes first. The later measures are possible responses within this defined scope, not an automatic result for every case.

The summary supports neither treating every conversion as the same criminal offence nor assigning identical liability to every owner, intermediary or official. Criminal, civil, tax, building and business-licensing consequences arise under their own rules and depend on the documents and facts. A parcel-specific conclusion requires the official map, the full regulation and project-specific Indonesian legal advice.

What a buildable project must still prove

A project normally has to answer three separate questions:

Does the spatial plan permit the intended use? Indonesia calls this spatial-use compatibility Kesesuaian Kegiatan Pemanfaatan Ruang (KKPR). Government Regulation 21/2021 places KKPR within the national spatial-planning system.

May this building be constructed as designed? The Persetujuan Bangunan Gedung (PBG) is the building approval. It is governed by Government Regulation 16/2021 .

May the completed building be used? The Sertifikat Laik Fungsi (SLF) is the certificate of proper function issued at the completion stage where required. It is not a substitute for the PBG or the business licence.

The relevant detailed spatial plan can also regulate intensity, height, setbacks, access and protected areas. Coastal projects need a separate check against beach and cliff constraints. A tourism use then needs the correct business-licensing route after the land and building questions have been resolved.

Nominee ownership is a separate warning

A nominee arrangement puts the registered land right in an Indonesian person's name while private documents promise control or economic ownership to a foreign investor. Bali's Perda 4/2026 addresses this practice, but national land, investment, beneficial-ownership and contract law remain relevant as well.

Do not assume that a side agreement repairs a land-right structure that the law does not permit. The consequences depend on the full document set. Our note on PT PMA and nominee structures explains why this needs independent legal review before payment.

A practical order before paying a deposit

Match the land certificate and cadastral information to the seller and the physical parcel.

Check the applicable provincial, regency or city spatial plan and any detailed spatial plan.

Confirm productive-land, protected-rice-land, subak, water-catchment, coastal-setback and access constraints.

Obtain the KKPR result for the intended use rather than for a generic project description.

Confirm the PBG path for the proposed design and the SLF path for completion.

Check the land-right and contracting structure, including every party with authority to sign.

Review the business licence required for the planned operation.

This order is less expensive than trying to regularise a project after design work, construction or a deposit has already committed the owner.

Questions owners ask

Is there a total construction ban in Bali? No. The current framework restricts specified land conversion and requires parcel-specific spatial compliance. A compliant project may still proceed through the normal approval sequence.

Can a rice field be converted into a villa? Do not assume so. The official land and spatial records must show whether the parcel is protected, whether conversion is permitted and which authority decides the application.

Does an existing villa next door prove that my plot is buildable? No. The neighbouring building may have a different parcel classification, approval history or compliance problem.

What is the difference between Perpres 4/2026 and Perda 4/2026? Perpres 4/2026 is the national regulation on protected rice-land conversion. Perda Bali 4/2026 is the provincial regulation on productive-land conversion and nominee ownership.

Sources checked 16 July 2026: Presidential Regulation 4/2026 ; Bali's official implementation summary for Provincial Regulation 4/2026 ; Bali Provincial Spatial Plan 2023 to 2043 ; Government Regulation 21/2021 on spatial planning ; Government Regulation 16/2021 on buildings . This note is a general explanation, not a parcel opinion or legal advice. Check the current Bahasa Indonesia texts and obtain advice on the specific site and document set before acting.

Two questions to explore next

Related question Green, pink and yellow zones in Bali: what the official plan says Related question Bali villa wells: household use and commercial permits

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Bali e-VOA, All Indonesia and autogates | DALLEAU

URL: https://dalleau.ai/notes/bali-evoa-all-indonesia-autogates.html

Home / Field notes / Arrival desk

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Arrival desk Sources checked on 13 July 2026

Bali electronic visa on arrival: All Indonesia and autogates

A smooth arrival begins with a correctly issued electronic visa on arrival (B1 e-VOA), a completed All Indonesia declaration and, for eligible travellers, an electronic passport accepted by the autogate.

DALLEAU | Research and field notes Published

13 July 2026

Last verified

13 July 2026

Verified | 13 July 2026 | primary sources

Scope Independent information, no visa sales This page covers arrival mechanics only. The B1 visit category does not authorize employment or Indonesian compensation.

Before you fly Apply for the electronic visa on arrival (e-VOA) through the official portal before travel if your passport is eligible. Complete All Indonesia during the three days before arrival and carry the passport used for the application. An eligible foreign traveller may use an autogate with an electronic passport and a valid e-VOA or eVisa, but a queue or manual check can still occur.

B1 stay 30 days

Extension Once, to 60 days total

Initial B1 fee IDR 500,000

On this page Before you apply The clean arrival sequence All Indonesia is separate from the visa Who can use an autogate What B1 allows Extension and conflicting status-change guidance Mistakes that cost time or money

Before you apply

First check whether your nationality appears on the current official visa-on-arrival (VoA) eligibility list . Do not rely on an old screenshot or an agent's country list. Eligibility can change.

The current B1 page asks for a passport valid for at least six months, a recent photograph for the electronic application and a return or onward ticket. The e-VOA must be used within 90 days after issue. That 90-day period is the window in which to enter, not the permitted length of stay.

The clean arrival sequence

Create the application on the official eVisa portal .

Check every passport field before payment. A mismatch in the name, nationality or passport number can require a new application.

Pay the official B1 charge shown by the portal. The coded B1 page currently states IDR 500,000 for the first 30 days.

Save the portable document format (PDF) visa file and application reference offline.

Complete the All Indonesia arrival card during the three days before arrival.

Travel with the same passport used in the application and keep the onward ticket available.

The official B1 page says the system sends the e-VOA within 1 x 24 hours. That is a service statement, not a safe promise for a flight booked the same day. Apply early enough to solve a payment, upload or manual-review problem.

All Indonesia is separate from the visa

Since 1 October 2025, the government requires passengers arriving from abroad to complete the integrated All Indonesia declaration. The official launch notice describes one form combining immigration, customs, health and quarantine information.

It does not replace the visa. It does not extend a stay. It is the arrival declaration for that journey. Use the government domain and do not pay for the form.

Who can use an autogate

The Directorate General of Immigration says foreign nationals may use an autogate when they hold an electronic passport and an e-VOA or Indonesian eVisa . Its guidance also directs children aged 14 or younger to manual inspection. Read the current autogate eligibility notice before relying on the facility.

Even when those conditions are met, the safe wording is that the traveller may be eligible to use the autogate. A machine can refer a passport to an officer. A gate may be unavailable. Biometric matching can fail. A technical referral does not by itself invalidate the visa. The officer may still verify the document and admission conditions, and a visa does not guarantee entry.

What B1 allows

The current B1 page lists tourism, visiting family, transit and attendance at meetings, incentives, conventions and exhibitions. It does not turn participation into employment. It does not authorize selling goods or services or receiving pay, wages or compensation from an Indonesian person or company.

Situation

B1 reading

Holiday and family visit

Within the stated purpose

Attend a conference as a participant

Listed by the current page

Take a job in a villa

Not permitted

Sell consulting, photography or coaching in Indonesia

Not a B1 activity

Receive Indonesian compensation

Not permitted by the official FAQ framework

Extension and conflicting status-change guidance

B1 starts at 30 days and may be extended once, giving a maximum total of 60 days. The current coded page says an electronic extension may be initiated online.

The IDR 500,000 shown above is the initial B1 fee. Check the current extension charge in the official portal before applying for the additional 30 days.

Official guidance is less clear about changing status. The coded 2026 B1 page mentions a separate temporary change-of-status mechanism, while an eVisa FAQ says the status cannot be converted. Do not build a relocation plan around either statement. If a change of status matters, confirm the current procedure in the portal or with the issuing immigration office before the B1 expires.

Mistakes that cost time or money

Applying through a lookalike domain without comparing the final fee with the official portal.

Entering a passport number that does not match the travel document exactly.

Treating 90-day visa validity as 90 days in Indonesia.

Forgetting that the permitted stay begins on arrival.

Assuming that an e-VOA guarantees the autogate or removes every queue.

Using B1 for paid work, local services or daily business operations.

What this changes for a property project

Do not assume that B1 covers investment due diligence or a site inspection. The coded C1 page expressly lists inspecting a potential investment site, while C2 covers defined business visits. If land or investment inspection is a material purpose of the trip, compare C1 and C2 in the live portal. No visit visa makes the traveller the project's local employee, salesperson, site manager or villa operator.

Scope: This is general information, not legal, immigration, tax or employment advice. Check the official page for your passport and activity before paying or travelling.

Government sources

01 B1 Visa Kunjungan Wisata Directorate General of Immigration, Republic of Indonesia · B1 · checked on 13 July 2026

02 Daftar Negara Subjek VoA, BVK dan Calling Visa Directorate General of Immigration, Republic of Indonesia · VoA eligibility · checked on 13 July 2026

03 The Official e-Visa Website for Indonesia Directorate General of Immigration, Republic of Indonesia · Application portal · checked on 13 July 2026

04 All Indonesia Arrival Card Government of the Republic of Indonesia · Arrival declaration · checked on 13 July 2026

05 Mulai 1 Oktober, Deklarasi Kedatangan Penumpang Wajib Dilakukan di Aplikasi All Indonesia Directorate General of Immigration, Republic of Indonesia · Official press release · checked on 13 July 2026

06 Siapa Saja yang Bisa Menggunakan Autogate? Directorate General of Immigration, Republic of Indonesia · Official press release · checked on 13 July 2026

Source dates: page updated on 13 July 2026 . Next source check planned for 27 July 2026 .

Related decisions

Visa and residence desk Indonesia visas and work permits in 2026: the practical Bali guide Work authorization Working legally in Bali: visa, stay permit and employment approval Investor status Indonesia investor visa E28A: permitted activities and work limits

Property project Here for a holiday? Use the official links above.

DALLEAU does not provide visa applications. If the trip is also the start of a real land, villa or operating project, our Stay Matrix can help define the asset before a project conversation.

Open the Stay Matrix

Official sources 13 July 2026

The government links were checked on this date. Where official pages differ, the guide identifies the conflict and uses the more cautious reading.

See the sources

Two questions to explore next

Related question Indonesia visas and work permits in 2026: the practical Bali guide Related question A second home in Bali: decisions to make before buying

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Bali land zoning: green, pink and yellow | DALLEAU

URL: https://dalleau.ai/notes/bali-land-zoning-explained.html

← field notes compliance 7 July 2026 Green, pink and yellow zones in Bali: what the official plan says

Green, pink and yellow are market shorthand. Legal plans use specific zone and sub-zone names. Before paying for land, identify those classifications, read the permitted-use rules and obtain the spatial-compatibility result for the intended project.

DALLEAU | Research and field notes Published

7 July 2026

Last verified

17 July 2026

Verified | 17 July 2026 | primary sources

In brief Key point: A colour on an agent's map does not authorise a villa. The controlling evidence is the parcel's classification in the applicable regional and detailed spatial plans, followed by the official spatial-use compatibility process. Building permission and short-term accommodation licensing are separate questions.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Start with the language used by the plan

Indonesia's planning system works through a regional spatial plan, Rencana Tata Ruang Wilayah (RTRW), and more detailed local plans, Rencana Detail Tata Ruang (RDTR). Bali's official planning portal describes an RDTR as a detailed regency or city plan that includes binding zoning rules.

Those rules use named zones and sub-zones. Depending on the local plan, readers may see categories for tourism, housing, trade and services, agriculture, green open space, conservation, disaster risk or infrastructure. Bali's RDTR explainer confirms the basic distinction between protected areas and development areas, then explains that local zoning rules control use, intensity, height, setbacks and minimum infrastructure.

The exact name and code must come from the plan that covers the parcel. A colour nickname cannot replace it.

What the three colours usually mean

Green

Agents often use green for agricultural land, protected land, green open space or a mixture of those categories. These are not interchangeable. A food-agriculture sub-zone, a protected rice field and a landscaped open-space zone can carry different rules.

Protected food-agriculture land is often referred to as LP2B, from Lahan Pertanian Pangan Berkelanjutan . Bali now publishes an official LP2B information portal . If a parcel appears agricultural or protected, its precise status must be checked there and in the applicable RDTR before any design assumption is made.

Pink

Pink usually means land that an informal map treats as tourism-compatible. The official plan may use a tourism zone or another zone that permits certain accommodation uses. This can be a better starting point for a tourism project, although every other approval remains necessary.

The local rule may still restrict the type of accommodation, floor-area ratio, height, access, parking, wastewater treatment, beach or river setbacks and other site conditions. The proposed activity must also match the business licence used to operate it.

Yellow

Yellow commonly refers to residential land. A house may be allowed while nightly tourist accommodation is restricted, conditional or subject to a different business classification. Residential permission and tourism-operation permission should never be treated as synonyms.

Four questions for the official documents

For each parcel, ask:

Which RTRW, RDTR and local zoning rule apply? Use the regency or city that has authority over the exact coordinates.

What is the official zone and sub-zone? Record the Indonesian name and code, not only a translated colour.

Is the intended use permitted, conditional or prohibited? Check the specific activity, not just the word villa.

Which site limits apply? Height, building coverage, green area, setbacks, road access, parking, drainage, wastewater and disaster-risk rules can change the feasible design.

An attractive plot can pass the first question and still fail one of the next three.

How the spatial check works

The umbrella process is Kesesuaian Kegiatan Pemanfaatan Ruang (KKPR), meaning compatibility of spatial use. Government Regulation 21/2021 makes it a core part of Indonesia's spatial-planning system.

Where an electronic RDTR is integrated with the national Online Single Submission licensing system, known as OSS, the system can use the detailed plan for a confirmation route. Where that integration is not available, a separate assessment and approval route may be required. The official OSS spatial-requirements guide explains the available routes.

KKPR answers the spatial-use question. It does not replace the building approval, environmental requirements or the business licence for tourist accommodation.

RDTR coverage varies across Bali

The province's official RDTR status update reports the following coverage as at 2 February 2026:

Regency or city

Area covered by RDTR

Badung

100.00%

Denpasar

100.00%

Gianyar

100.00%

Jembrana

30.02%

Bangli

23.18%

Karangasem

22.75%

Tabanan

21.43%

Buleleng

9.21%

Klungkung

0.00%

These dated figures measure RDTR coverage rather than the legal suitability of each parcel. A 100 percent coverage figure confirms that a detailed plan exists for the whole regency or city, while permitted uses still vary by parcel.

Building and renting remain separate

A parcel may be spatially compatible with a house but not with short-term tourist accommodation. It may also support tourism use but still lack the required building or operational approvals.

Before construction, confirm the Persetujuan Bangunan Gedung (PBG), the building approval. At completion, establish whether a Sertifikat Laik Fungsi (SLF), the certificate of proper function, is required. The operator must then hold the business licence and tourism standard that match the activity shown to guests and booking platforms.

Checks before a deposit

Obtain the parcel number, coordinates and current land certificate.

Identify the current RTRW, RDTR and zoning regulation from an official source.

Save the official zone and sub-zone, permitted-use table and site-intensity rules.

Check agricultural protection, water catchment, subak, coastal, river, cliff and disaster-risk overlays.

Confirm lawful road access and utility constraints.

Run the KKPR route using the planned activity and scale.

Keep the spatial result, building path and operating-licence path as three separate entries in the file.

Questions owners ask

Is pink zone an official legal term? No. It is market shorthand. The official zone name and permitted-use table control.

Is yellow-zone land automatically legal for nightly rentals? No. Residential use and tourist accommodation are different uses. The local plan and business licence must both support the operation.

Is green-zone land always unbuildable? Green is not one legal category. Some agricultural or protected sub-zones can block normal villa development; others may allow limited uses. Only the official classification answers the question.

If no integrated RDTR covers the parcel, is the project impossible? Not necessarily. The spatial-compatibility route changes and usually requires more assessment. It does not remove the need to prove the intended use.

Sources checked 16 July 2026: Bali's official RTRW and RDTR portal ; official RDTR content guide ; official Bali RDTR coverage update ; Government Regulation 21/2021 ; official OSS KKPR and RDTR guide . This note is general information, not a zoning opinion. Verify the live plan, parcel record and KKPR result before relying on a colour or coverage figure.

Two questions to explore next

Related question Bali leasehold: what a foreign buyer acquires Related question Seven checks before paying a deposit on Bali property

Model this decision in the Stay Matrix Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Bali leasehold: what a foreign buyer acquires | DALLEAU

URL: https://dalleau.ai/notes/bali-leasehold-explained.html

← field notes
compliance
7 July 2026
Bali leasehold: what a foreign buyer acquires
Leasehold is the familiar search term, but the transaction is a long lease. The buyer receives contractual use of land or a property for a defined period while the Indonesian owner's registered land title stays with its holder.
DALLEAU | Research and field notes
Published
7 July 2026
Last verified
17 July 2026
Verified | 17 July 2026 | primary sources
In brief
Key point:
A long lease can be a lawful and useful structure when the parties, land right, permitted use, term, transfer rules and extension mechanism are clear. Its value reduces as the secure remaining term shortens. The contract must therefore be reviewed as carefully as the building and the land.
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Leasehold and Indonesian land titles are different instruments
Indonesia has several statutory land rights. They should not be grouped under the English words freehold and leasehold as if they were two certificates of the same type.
The
Basic Agrarian Law, Law 5/1960
provides, among other rights:
Hak Milik
, the ownership right reserved to Indonesian citizens;
Hak Guna Bangunan
(HGB), the registered right to build and use buildings on qualifying land;
Hak Pakai
, a registered right of use in the circumstances set by law; and
Hak Sewa untuk Bangunan
, a right to lease land for a building under Articles 44 and 45.
Article 45 allows Indonesian citizens, foreigners domiciled in Indonesia, Indonesian legal entities and foreign legal entities with an Indonesian representative to hold
Hak Sewa
. The exact eligibility and document route must still be checked for the parties and the proposed use.
What an ordinary long lease transfers
In the Bali property market, a leasehold sale usually means an agreement granting use of land, a building or both for a fixed term. The registered land right stays with its holder. The lessee receives the rights written into the contract.
This distinction has practical consequences:
the contract must identify the land certificate and the physical boundaries correctly;
only a person with authority over the land may grant the lease;
the lessee's use cannot exceed what the owner, the spatial plan or the licences permit;
transfer, subletting, construction and commercial operation require express drafting; and
expiry returns control according to the contract and applicable law.
A notarised agreement can improve evidence of the parties' intentions and signatures. It does not turn a private lease into ownership or put
Hak Milik
in a foreign lessee's name.
Hak Pakai follows a different legal route
Hak Pakai
, the statutory right of use, is a separate registered land right.
Government Regulation 18/2021
and
Minister of Agrarian Affairs and Spatial Planning Regulation 18/2021
contain the current framework for land rights and qualifying foreign residential ownership.
Eligibility for
Hak Pakai
still depends on immigration status, type of property, price thresholds, location, land status and intended use. A private long lease and a registered
Hak Pakai
should therefore be presented as different routes rather than interchangeable labels.
Term, extension and renewal must be written precisely
There is no universal 25-year or 30-year Bali lease created by statute. Those durations are commercial choices. The secure term is the period that the signed contract grants and that the lessor had authority to grant.
An extension clause should state:
when the option can be exercised;
who may exercise it and whether it can pass to a buyer;
the additional term;
how the price will be set, including the valuer, benchmark and date;
the payment timetable;
what documents the owner must sign; and
what happens after death, inheritance, sale, refusal or dispute.
"Extendable by mutual agreement" is not a priced option. It records the possibility of a future negotiation. Underwrite it as uncertain unless the contract gives an enforceable process that Indonesian counsel accepts.
Measure the cost against secure years
One useful comparison is:
effective land cost per secure year = total lease acquisition cost divided by the years of use that are already secured
This is an investment calculation, not a legal rule. It prevents a lower headline price from hiding a short remaining term.
Also model the term expected to remain at resale, the timing of major repairs and the extension price. A renovation late in the lease may benefit the property after the lessee's term ends. A profitable villa can still be a poor purchase if the remaining term and exit plan do not support the capital invested.
Financing is different from registered land security
Indonesia's registered land security is called
Hak Tanggungan
. Under
Law 4/1996
, it can attach to specified registered land rights, including
Hak Milik
,
Hak Guna Usaha
(right of cultivation),
Hak Guna Bangunan
and qualifying registered
Hak Pakai
.
An ordinary contractual lease is not the same collateral. A bank may still assess a borrower, other security or a wider transaction, but a buyer should not assume that a standard land mortgage will be available against the lease. Confirm financing before making the purchase dependent on later bank leverage.
Clauses that deserve line-by-line review
Parties and authority.
Identity, corporate authority, marital property, succession and every required consent.
Land and boundaries.
Certificate, survey, access, encumbrances, disputes and tax status.
Permitted use.
Residence, construction, subletting, tourist accommodation and any prohibited activity.
Construction and ownership of improvements.
Who may build, who obtains approvals and what happens to the building at expiry.
Transfer and sublease.
Whether the lessee may sell the remaining term, to whom and with what consent or fee.
Extension mechanism.
Notice, valuation, price, duration, signatures and remedies.
Default and termination.
Cure periods, repayment, possession, insurance and dispute resolution.
Death or sale by the owner.
Binding effect on heirs and successors, with the required supporting documents.
An Indonesian land lawyer and the appropriate notary or land-deed official should review the document and the underlying title. A translated summary is not enough.
The right to operate is separate
A lease may allow tourist accommodation in private-law terms while the parcel, building or operator remains non-compliant. Check zoning, the spatial-use result, building approval, completion certificate, environmental obligations and the tourism-business licence separately.
The contract should also allocate who obtains each approval and what happens if the intended operation is refused. "Villa" in a marketing brochure is not a licensing conclusion.
Questions buyers ask
Can a foreigner enter into a long lease in Indonesia?
The Basic Agrarian Law recognises
Hak Sewa
for eligible foreigners and foreign legal entities, but the parties, domicile, authority and use still require review.
Can I resell a leasehold villa?
Only if the contract allows assignment or transfer. The buyer receives the remaining term and the contract rights, not a new full term unless a valid extension is completed.
Can I run short-term rentals?
Not from the lease alone. The contract, zoning, building records and operating licence must all support the activity.
Does a long lease become ownership after enough years?
No. Time does not convert a contractual lease into
Hak Milik
.
Sources checked 16 July 2026:
Basic Agrarian Law, Law 5/1960
;
Government Regulation 18/2021 on land rights and land registration
;
Ministerial Regulation 18/2021
;
Government Regulation 24/1997 on land registration
;
Law 4/1996 on registered land security
. This note is general information, not legal, notarial or financial advice. Have the current title and the full Bahasa Indonesia contract reviewed for the specific transaction.
Price, scope and the next commitment
A €150,000 villa in Bali: good value or an incomplete budget?
Comparing construction quotations in Bali: price the same project first
Two questions to explore next
Related question
Green, pink and yellow zones in Bali: what the official plan says
Related question
Seven checks before paying a deposit on Bali property
Model this decision in the Stay Matrix
Open the tool →
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.

## Before your next off-plan payment in Bali | DALLEAU

URL: https://dalleau.ai/notes/bali-off-plan-development-file-before-next-payment.html

off-plan due diligence
Before your next off-plan payment in Bali: the documents to verify
Documents, confirmations and decisions required before your next payment.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
16 July 2026
Verified | 16 July 2026 | primary sources
Updated 16 July 2026
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Before you pay
Before releasing the next material payment on an off-plan project, you should be able to answer eight separate questions:
What transaction are you entering?
A house sale/PPJB, ordinary contractual lease, assignment of an existing lease, land lease plus construction, development-service contract, share deal or unresolved hybrid? If tourist accommodation is intended, assess the operating business separately; it does not change the legal form of the underlying property transaction.
Who owes you each promise?
The landholder, developer, seller/lessor, contractor, operator and agent may be different parties.
Does the promised site exist on the same land file?
Rights, boundaries, access, authority and encumbrances must reconcile.
Can the specific project be designed, built and used as planned and modelled?
Spatial, environmental, PBG/SLF and operating questions are different gates.
What exactly must be delivered?
Approved drawings, specifications, programme, furniture, utilities, commissioning and opening documents need a controlled baseline.
What evidence makes the next instalment due?
A date on a calendar is not evidence that the corresponding work exists and conforms.
What happens when the project changes or slips?
Variations, extensions of time, retention, defects, suspension, termination and refund mechanics must work before a dispute.
What will you control at handover and exit?
The secure term, asset/right, warranties, operating route and transfer rights must match the financial model.
The conclusion should not be “safe to buy”. It should be a dated list called:
Documents, confirmations and decisions required before your next payment.
First, identify the transaction
“Off-plan leasehold villa” describes a commercial story. It does not, by itself, identify the legal transaction.
The same phrase may be used for very different structures:
Possible structure
What the investor may receive
First professional question
Sale of a house/unit through a housing PPJB route
A future transfer or sale instrument for a qualifying house/unit
Does the housing and PPJB framework apply to this project and transaction?
Ordinary contractual lease
Contract rights granted by a lessor for a defined property and term
Does the lessor control the underlying land/right and have authority to grant the promised use and full term?
Assignment of an existing lease
The assignor's existing lease rights, subject to the original lease and any required consent
Is the lease valid, what remains of its term, is it assignable and has every required consent been obtained?
Land lease plus construction contract
A lease right plus a separately procured building
Who owns the work as it is built, who carries construction risk and what happens at lease end?
Development-service agreement
A promise to design/build/deliver for the investor
Is the scope a construction/development service rather than a property sale, and what licences and security apply?
Share acquisition
Shares in a project company
What assets, liabilities, licences, contracts and related-party balances sit inside that company?
Hybrid
Several of the above
Do all documents describe the same economics, dates, parties and remedies?
Connected tourist-accommodation layer
A proposed operating use attached to one of the primary routes above
Who is the operator, what authorises the location and activity, and who receives guest revenue and bears operating/tax obligations?
Indonesia has specific housing-development and PPJB rules. They matter when their scope applies. They must not be pasted automatically onto every Bali villa marketed as “leasehold”. A contractual label does not decide this question; counsel must test the substance, asset, parties and intended transfer.
Where the housing rules in
PP 12/2021
apply, they provide three separate protections that should not be blended together. First, the buyer must have at least
seven business days
to study the preliminary sale and purchase agreement (PPJB) before signing it as a notarial deed. Second, the PPJB stage depends on specified conditions, including land status, the agreed subject matter, the building approval (PBG), planned infrastructure and construction progress. For detached or row houses, the 20% construction test concerns at least 20% of all planned units
and
the availability of the planned infrastructure, facilities and utilities. For an apartment building, it concerns 20% of the building's construction volume. It is not 20% of the buyer's individual villa and it is not a universal payment milestone. Third, the developer may not collect more than
80%
before the relevant PPJB conditions are satisfied. That separate 80% limit is not a statutory escrow account. Indonesian transaction counsel should confirm that this housing regime applies to the exact product and contract before any of these thresholds is used.
Documents that answer different questions
What you are shown
What it may establish
What it does
not
establish
Architectural render
Design intention
Land authority, approval, buildability, specification or completion
Land certificate scan
A document to verify
That your counterparty controls it, that the plotted site matches it, or that your transaction is registrable/enforceable
Company deed or NIB
A company/registration starting point
That this company owns the land, is your seller, holds every project permission or can perform every promised activity
Developer registration result
A regulatory data point within its applicable system
A universal government whitelist, project guarantee or substitute for project due diligence
PBG
An approved building plan/function within its exact file
Construction completion, conformity of the as-built work or fitness for use
SLF
A fitness-for-use result for the building/function in its file
Title, seller authority, tourism licence or investment performance
Site photograph
Visible activity on a date
Percentage completion, concealed-work quality, title, approval or contractual compliance
“70% complete” message
A claim
The measurement method, approved baseline, quality, stored materials or cost to complete
Guaranteed yield
A payment promise of some kind
That the payer is solvent, the formula is gross/net, or the promise is secured and enforceable
Completion certificate
A document with a defined issuer and scope
Automatic handover, defect closure, SLF, operational readiness or right to withhold no further sums
PBG and SLF are especially easy to collapse into one reassuring word: “permit”. Under Indonesia's building framework they perform different functions. A project still needs an architect/engineer to match the exact approval file to the exact parcel, drawings, built work and intended function.
Eight document sets to request
Transaction:
reservation, draft and final agreement, document index and a written explanation of whether the deal is a sale, lease, assignment, construction arrangement, share deal or hybrid.
Parties and authority:
current company records, signatory powers, mandates, guarantees and the legal name of every entity that makes or receives a promise.
Land and access:
current land or lease evidence, parcel reconciliation, access rights, encumbrances, consents and the full chain supporting the promised term.
Planning and building:
zoning or spatial-use evidence, environmental requirements, building approval (PBG), the route to the certificate of proper function (SLF) and written confirmation of who must obtain each document.
Design and budget:
signed drawings, specifications, inclusions and exclusions, programme, priced scope, contingency and an updated estimate of the cost still needed to finish.
Payment and progress:
complete payment ledger, verified account details, cumulative progress report, photographs tied to dated inspections, approved variations and independent certification where the contract requires it.
Changes, delay and remedies:
variation register, delay notices, revised completion date, refund or termination rights, cure periods and the security supporting any advance.
Handover, operation and exit:
completion and inspection records, defects list, warranties, operating licences and contracts, guest-payment flow, transfer or extension rights and the documents needed at exit.
The point is not to collect a large folder. It is to obtain the documents that answer the decision due before the next payment.
Decide what must happen before payment
What you have
What it establishes
What to do before payment
No answer yet
No answer or supporting document has been provided
Ask the precise question; do not infer absence, compliance or non-applicability
Statement only
A marketing statement, answer, undated screenshot or self-certified percentage
Ask for the document or measurement that supports it; do not count the point as satisfied
Document mentioned but not provided
A document or check is referred to, but its contents cannot be examined
Obtain the document and have the appropriate professional examine it
Document received but not checked
You have the file, but its issuer, date, relevance and match to the property or entity remain unconfirmed
Ask the appropriate lawyer, architect, engineer, accountant or tax adviser to check it; possession alone proves only that the file was received
Checked for a defined question
A named professional has stated what was checked, for which property or entity, from which source and on what date
Use the conclusion only for the question examined; do not describe it as an independent verification
Independently checked
A suitably independent second check supports that defined conclusion
Continue with the remaining contract, technical, payment and dependency checks
Contradiction
Documents, parties, parcel details, promises or public records conflict
Identify who must resolve it, what evidence is required and by when; pause the affected payment or decision
Out of date
The document or professional conclusion is no longer current on the decision date
Obtain an updated document or confirmation before relying on it
Unavailable
A required item cannot presently be obtained
Keep the gap explicit; unavailable does not mean non-applicable
Not applicable
The appropriate professional confirms that the exact rule or document does not apply to this transaction and explains why
Keep the written reasoning, the professional's name and the date; never use this label merely to avoid a control
This is not a red-flag score. One unresolved right-to-build issue can matter more than twenty uploaded documents.
Example: a villa sold on plan under a 30-year lease
All names, entities, figures and facts in this worked example are fictional and illustrative.
An investor is offered a villa for USD 480,000. The deck says “30-year leasehold”, “8% guaranteed return for three years” and “handover in twelve months”. The payment schedule is 30% on signing, then 30%, 30% and 10% on dates four months apart.
The useful analysis is not whether the brand looks credible.
Transaction:
counsel determines that the investor is taking a contractual lease from one entity plus a build/delivery promise from another. It is not assumed to be a house-sale PPJB.
Term:
the lease starts on signing, so the twelve-month build consumes part of the marketed 30 years. Extension wording is an option to negotiate, not secured tenure.
Authority:
the lessor's authority over the land and the developer's authority to build must be separately evidenced.
Baseline:
the render omits the signed MEP specification, drainage design and furniture schedule. The second instalment cannot yet be tested against a complete scope.
Progress:
“foundation complete” is replaced with an agreed measurable milestone, engineer/QS inspection, test records and defect schedule.
Variation:
a retaining-wall redesign is priced and time-assessed before it is instructed; it does not disappear inside “site conditions”.
Return:
the 8% is traced to the actual payer, formula, start trigger, costs, tax treatment, shortfall funding and default remedy.
Handover:
the final 10% is split between practical completion, documentary/operating conditions and release of retained sums and defect provisions under the signed contract, after legal review.
This checklist does not tell the investor to proceed, withdraw or pay. It organises the documents, unanswered questions, responsibilities and decisions that the investor and their advisers must resolve. A polished render remains an illustration, not evidence.
Limits of this checklist
It does not:
certify that a project is legal, safe, investment-grade or profitable;
value the land, lease, shares or completed villa;
replace a current land search, survey, counsel opinion, technical inspection or tax analysis;
prove that a developer will remain solvent;
decide that housing/PPJB rules apply merely because the product is a villa;
treat the developer register as a whitelist;
make escrow, retention or a guarantee mandatory or effective in every transaction;
predict completion, occupancy, ADR, resale value or enforcement outcome;
rescue funds already paid under a weak agreement.
It does one important job: it turns a broad reassurance into a list of decisions that named professionals can verify.
Prepare the decision before the deadline
Start with the
Bali property due diligence guide
to organise the land, planning, building, operating and exit evidence. Review the
leasehold term and exit assumptions
when construction time, extension assumptions or resale rights affect the model. If a PT PMA or project company is proposed, verify its
business activities and licensing basis
.
If you already have a reservation, contract or next-payment notice, the useful next step is not a sales call. It is a one-page
project evidence brief
showing what is evidenced, what remains an assertion, who must review it and what must be resolved before the payment deadline.
Official sources and date consulted
Official sources consulted on 15 July 2026.
Primary sources used for the limited regulatory statements above:
Permen PKP No. 18/2025: official JDIH record
and
official PDF
: housing-sector risk-based standards, reporting, supervision and sanctions within scope.
Permen PUPR No. 24/PRT/M/2018
: housing-developer certification/registration framework; its current relationship with SIRENG requires expert confirmation.
SE Dirjen Kawasan Permukiman No. 05/SE/Dp/2026
: implementation of the developer-registration information service and its stated monitoring context.
SE Dirjen Kawasan Permukiman No. 06/SE/Dp/2026
: formats/mechanisms for obligations and administrative sanctions within scope.
PP No. 12/2021
: housing-development/marketing and PPJB framework; applicability must be determined, not assumed.
PP No. 16/2021
and
official SIMBG portal
: building framework, including distinct PBG and SLF functions.
Company Law No. 40/2007: official PDF
: company identity, organs, shares and authority baseline, as amended and subject to current counsel confirmation.
Permen PU No. 6/2025: official PDF
: current construction-business/workforce certification framework; exact SBU/SKK applicability is package-specific.
Before relying on this checklist, ask Indonesian counsel to classify the transaction and confirm the land rights and corporate authority. Obtain parcel-specific confirmation of the planning position, PBG and SLF. Agree the payment protocol with the architect, engineer or quantity surveyor and counsel. Identify the operating company, its OSS licences, taxes and payment flows. Reopen every official source on the decision date because the rules and public records may have changed.
Price, scope and the next commitment
A €150,000 villa in Bali: good value or an incomplete budget?
Comparing construction quotations in Bali: price the same project first
Two questions to explore next
Related question
Who owns, sells, builds, receives payment and operates your Bali villa?
Related question
Before the next construction payment: what evidence should you request?
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
Who owns, sells, builds, receives payment and operates your Bali villa?
Before the next construction payment: what evidence should you request?
“8% guaranteed” on a Bali villa: who pays, from what money and under which contract?
Published context
Bali property due diligence
Leasehold explained

## Who owns and operates your Bali villa? | DALLEAU

URL: https://dalleau.ai/notes/bali-off-plan-landowner-developer-seller-contractor-operator.html

project parties

Who owns, sells, builds, receives payment and operates your Bali villa?

“The developer” is not a complete counterparty map.

DALLEAU | Research and field notes Published

16 July 2026

Last verified

16 July 2026

Verified | 16 July 2026 | primary sources

Updated 16 July 2026

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Start with the named legal entities

“The developer” is not a complete counterparty map.

For an off-plan project, identify at least six roles separately:

landholder : controls the underlying land/right;

developer : assembles and directs the project;

seller, lessor or assignor : grants the right you acquire;

agent or marketer : introduces or markets the product within its mandate and applicable intermediary rules;

contractor : builds the defined work;

operator : sells stays and runs the completed property.

Then identify the project company, payment recipient, guarantor and each licensed professional. One company may hold several roles. Several companies may share one logo. What matters is not the number of entities; it is whether each promise has a named debtor, authority, evidence and remedy.

Roles a brochure may combine

Common assumption

Why it fails

Better question

“The brand owns the land.”

A brand is not a registered holder.

Which legal person holds which underlying right, and what current evidence confirms it?

“The developer is the seller.”

The project manager/developer may not be the entity granting your lease or transfer.

Which entity signs the acquisition instrument and has authority to grant it?

“I paid the agent, so the developer has my money.”

An agent's collection authority and onward-payment duty must be proven.

Whose account received the funds, as agent for whom, under what refund rule?

“The contractor guarantees the delivery date.”

The investor may have no direct contract with the contractor.

Who owes completion to the investor, and can contractor failure excuse that party?

“The operator guarantees the return.”

Operator, developer and landholder may be separate, with different balance sheets.

Which entity signs the income obligation, and who funds a shortfall?

“The parent group stands behind it.”

Affiliate responsibility does not arise from shared branding alone.

Is there an executed guarantee or direct obligation, approved and enforceable against the stated entity?

“The notary checked the whole project.”

A notarial role/instrument has a defined scope.

Who was instructed to investigate land, corporate, technical, licensing, tax and contract risk separately?

What each party does and what to request

Role

What it may do

Evidence to request

Do not assume

Landholder

Holds the registered/contractual land interest and may grant development/use rights

Current right/search evidence, identity, authority, encumbrance and parcel reconciliation

That it is your seller, developer or guarantor

Developer/project coordinator

Secures land access, design, approvals, finance, construction and delivery, depending on contract

Exact legal entity, NIB/KBLI and applicable sector records, project agreements, approvals, funding and reporting evidence

That a “developer” label proves ownership, permission, solvency or registration within every regime

Seller/lessor/assignor

Grants the sale, lease or assignment right the investor acquires

Executed instrument, underlying authority, corporate approval, conditions, term, permitted use, transfer and default terms

That it can promise rights extending beyond its own secure right

Agent/marketer

Introduces, communicates and may collect only within a valid mandate and applicable intermediary rules

Entity/licence/broker evidence where applicable, written appointment, representations authority, fee disclosure, collection/refund consent and account details

That it can amend the contract, bind an affiliate or validate the project

Main contractor and trades

Execute a defined construction scope

Contract, drawings/specification, licences/certifications where required, insurances, programme, QA and warranty

That the investor can enforce the building contract directly

Architect/engineer/QS/certifier

Design, inspect, measure or certify within an appointment

Appointment, competence, independence/conflicts, scope, professional responsibility and signed deliverables

That one certificate covers title, law, finance, all quality and operating permission

Operator/property manager

Markets and operates the property under a defined model

Management/lease agreement, licences/KBLI route, guest-payment collection and tax map, budgets, reporting, reserves, termination/handover

That operational responsibility transfers title or cures a building/licensing gap

Guarantor/security provider

Supports a stated obligation if conditions are met

Executed instrument, authority, cap, duration, demand/claim conditions, governing law, assets and releases

That a logo, comfort letter or director statement is a guarantee

Where the intermediary activity falls within Permendag 33/2025 and KBLI 68200 P4, the framework includes an Indonesian-domiciled legal entity, NIB, relevant verified Standard Certificate, competent/certified brokers and a written service agreement; receiving a deposit or down payment requires the seller/owner's consent within the applicable function. Broker compliance does not prove the developer's compliance or capacity, the land rights, project approvals, project finances, payment protection or delivery.

SIRENG and the related housing-developer rules are useful evidence within their proper scope, but a registry result is not government approval of a private villa project. It does not prove land rights, solvency, payment protection, delivery, quality or safety. The current coverage of SIRENG for a private Bali villa project should be confirmed with Indonesian housing counsel or the competent ministry. A business identification number (NIB) likewise confirms business registration only; it does not answer the land, contract, building or counterparty questions.

Map the promises and the money separately

Who made each promise?

For every material promise, fill one row:

Promise

Debtor

Source document

Due/trigger

Evidence

Remedy/security

Grant 30-year right

[legal entity]

Lease/assignment

Effective date/conditions

Land and authority file

Cure/refund/termination/other

Deliver specified villa

[legal entity]

Sale/development agreement

Milestones + longstop

Independent certification

Retention/guarantee/termination

Correct defects

[legal entity]

Construction/delivery terms

Defect periods

Inspection and notice

Withholding/repair/recovery

Pay fixed return

[legal entity]

Operator/guarantee instrument

Operational/payment dates

Revenue/shortfall statement

Reserve/guarantee/enforcement

Repurchase

[legal entity]

Option or repurchase agreement

Window + conditions

Price formula + valid exercise

Completion/security/default

An empty debtor cell is not a drafting detail. It means nobody has yet been identified as legally responsible for the promise.

Who receives and controls the money?

Draw the actual flow:

investor → reservation recipient → seller/lessor/developer → contractor and consultants → operator → guest or booking-platform payment recipient → revenue account → costs/tax/reserve → investor

For each transfer ask:

Why does this party receive the money?

Is it principal, rent, purchase price, construction advance, fee, deposit or revenue?

Who controls the account and release?

What invoice, receipt, tax and reporting treatment applies?

Is the recipient holding money for itself or on behalf of another?

What happens if the relevant condition is not met?

This map often reveals that the entity receiving the deposit is not the landholder, delivery obligor or future operator. That can be legitimate. It must be documented, not guessed.

When can one group company cover another?

Situation

What it proves

Decision response

Same trading name or founder

Commercial relationship

Treat entities separately until documents say otherwise

Same directors/shareholders

Possible control/common ownership

Still identify which company owes and owns each asset

Contract says “Developer Group” without legal identity

Ambiguous drafting

Insert full legal name, registration, address and capacity

Affiliate signs as “acknowledged”

Awareness, depending on wording

Do not treat as payment/performance liability without express obligation

Parent executes a reviewed guarantee

Potential direct support within its exact scope

Test authority, cap, expiry, claims, defences, assets and enforceability

Agent signs under documented power

Authority only within that power

Confirm scope, expiry and whether funds/representations are covered

Contractor warranty assigned to investor

Potential direct defect route

Test assignment, scope, term, exclusions and contractor solvency

Example: one brochure, four contracts

All names, entities and facts in this worked example are fictional and illustrative.

The Hypothetical Project Alpha deck carries one logo. The reservation form asks payment to PT Marketing A. The land is held by an Indonesian individual. PT Development B promises the design and handover. CV Contractor C builds. PT Operations D promises a three-year fixed return.

Calling all four “Project Alpha” hides the essential questions.

Land counsel confirms whether the individual can grant the exact right and term to the investor or project structure.

PT Marketing A's authority to collect, hold and refund the reservation is written rather than inferred from an email address.

PT Development B's delivery obligation contains the plans, price, milestones, longstop and remedies. Its rights to enter/build on the land are evidenced.

CV Contractor C's contract and qualification are reviewed, but the investor does not assume a direct claim unless an assignment/warranty creates one.

PT Operations D's fixed-return obligation is modelled on its own accounts and security. Development B's assets do not support it unless Development B expressly joins or guarantees it.

The brochure's “group guarantee” is removed unless a named entity executes a real instrument.

The project may be perfectly capable. The map simply ensures that capability sits behind the promises the investor is paying for.

Limits of this map

It does not:

decide the legal form of your transaction;

verify a land right, company, power of attorney, licence or signature;

make an affiliate responsible without a valid instrument;

confirm SBU, SKK or other construction requirements for a specific package;

decide who is the operator, the entity contractually responsible for collecting guest payments, or taxpayer without the contracts and facts;

value a guarantee or predict recovery;

replace conflict checks and independent professional appointments.

Name the parties before you map the payments

Use the Bali property due diligence guide to organise the land, company, project and operating evidence. Read operator and project-party roles before accepting an operator label. If the project company or PT PMA route is unclear, review its business activities and licensing basis .

A serious review does not begin by asking whether the people seem trustworthy. It begins by writing the full legal name beside every asset, promise, payment and remedy. Trust then has a structure it can safely sit on.

Official sources and date consulted

Official sources consulted on 15 July 2026. Limited official anchors: Permen PKP 18/2025 , Permen PUPR 24/2018 , SE 05/SE/Dp/2026 , SE 06/SE/Dp/2026 , Permendag 33/2025 official PDF , Company Law 40/2007 official PDF , PP 16/2021 building framework , and Permen PU 6/2025 construction framework .

Before relying on the role map, ask Indonesian counsel to identify the legal entity behind each role and examine every contract. Obtain current land, PPAT and company searches. Have the architect, engineer and construction lawyer check the technical appointments and qualifications for the relevant work package. Ask the licensing and tax professionals to state exactly which issues they examined, their conclusion and the date. Reopen the official sources and confirm that the rules still apply to the project.

Two questions to explore next

Related question Before your next off-plan payment in Bali: the documents to verify Related question Seven checks before paying a deposit on Bali property

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

Method

Sources and update date

DALLEAU maintains this multilingual synthesis from the cited official sources, with visible verification dates and an open correction channel.

Read next

Before your next off-plan payment in Bali: the documents to verify “8% guaranteed” on a Bali villa: who pays, from what money and under which contract?

Published context

operator and project-party roles KBLI 2025 activity map

## Evidence to request before a construction payment | DALLEAU

URL: https://dalleau.ai/notes/bali-off-plan-milestone-payments-progress-variations-retention.html

construction controls
Before the next construction payment: what evidence should you request?
A date can trigger a reminder. A payment should be tied to an obligation.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
16 July 2026
Verified | 16 July 2026 | primary sources
Updated 16 July 2026
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
A date on the calendar is not proof of progress
A date can trigger a reminder. A payment should be tied to an obligation.
For each material instalment, the file should show:
the contractual milestone;
the approved drawings/specification and measurable scope behind it;
current site evidence and measurement;
inspection by a competent architect, engineer or quantity surveyor whose appointment and possible conflicts have been checked;
the effect of defects, incomplete work, materials off site and previous overpayment;
approved variations and time consequences;
the correct invoice, tax, account and release authority;
the balance and security remaining for completion, handover and defects.
The investor is not trying to micromanage a building site. The objective is simpler:
do not let cash run materially ahead of verified value, control and remaining remedies.
Measurements that answer different questions
Term
What it should mean
What it is often confused with
Payment calendar
Forecast or fixed dates under a contract
Evidence of completed work
Physical progress
Measured work completed to an agreed baseline
Percentage of time elapsed or money spent
Cost incurred
Contractor/developer expenditure
Value correctly installed for the investor
Material on site
Identified material delivered, protected and allocated
Completed, conforming work
Practical completion
Defined level allowing agreed possession/use despite scheduled minor items
Perfect completion, SLF, opening or final account
Handover
Transfer of defined possession, control, documents and risk
Automatic release of every remaining sum
Retention
Contractually withheld amount with release rules
A universal statutory percentage or full protection
Warranty/defects period
Time and process for correcting covered defects
Proof the responsible party will remain solvent and perform
Independent certificate
Opinion within a named appointment and scope
Guarantee of title, legality, cost, all quality or future performance
Match each payment to evidence
Payment basis
Evidence quality
Main risk
Better release rule
Date only
No site condition
Cash can lead work substantially
Do not convert a date into progress; add a measurable condition or consciously price the advance risk and security
Developer's percentage
Self-reported
Method, conflicts and baseline unknown
Require supporting measurement and agreed independent review
Milestone name only (“structure complete”)
Ambiguous scope
Parties measure different work
Define inclusions, exclusions, tests, drawings and evidence
Measured work, no quality gate
Quantity evidenced
Defective work can still be paid in full
Add inspection, test and defect treatment
Measured conforming work
Stronger
Prior overpayment, variations and completion funding may remain
Reconcile cumulative earned value, amounts paid and cost to complete
Materials off site
Ownership/control risk
Double sale, loss, non-delivery or incompatibility
Treat as payable only if the signed contract permits a defined ownership, identification, insurance, storage and delivery mechanism and the buyer accepts it with full knowledge; otherwise exclude
Handover certificate
Delivery point evidenced
Missing documents/licences/retention may be overlooked
Split physical, documentary, operational and final-account releases
There is no universal “correct” percentage schedule. A bespoke villa, a multi-unit estate, a land lease plus build and a completed-unit sale do not carry the same risks. What can be universal is the discipline: define the trigger, evidence it, reconcile the money, preserve enough leverage to finish.
For a transaction that falls within the housing PPJB rules in
PP 12/2021
, keep two thresholds separate. The 20% construction test is one of the conditions that must be satisfied before the PPJB stage. For detached or row houses, it concerns at least 20% of all planned units plus the planned infrastructure, facilities and utilities; for an apartment building, it concerns 20% of the building's construction volume. It is not 20% of the buyer's villa and not a standard payment milestone. Separately, the developer may not collect more than 80% until the relevant PPJB conditions are satisfied. That limit is not a statutory escrow account. Counsel must first confirm that the housing PPJB rules apply to the transaction.
Agree the baseline before measuring progress
You cannot measure a render.
The payment baseline should include, as applicable:
signed contract and complete party/capacity details;
issued-for-construction architectural, structural and MEP drawings;
specification and approved material/equipment schedule;
bill of quantities, schedule of values or other measurement basis;
programme with critical approvals, utilities, procurement and commissioning;
responsibility matrix;
approved contract price and contingency treatment;
definition of each milestone and required evidence;
inspection, notice, payment and dispute timetable.
If the design remains intentionally incomplete, the contract must expose that uncertainty. It should not present a fixed price and fixed delivery date while leaving the most expensive details to later “client upgrades”.
Five checks before payment
Written request:
amount due, contractual milestone, invoice, payee, bank account, supporting documents and cumulative payment position.
Site evidence:
dated inspection record, photographs tied to locations, test results, delivery records and an updated schedule.
Independent review:
a competent architect, engineer or quantity surveyor checks only the work covered by their written appointment and states any exclusions or conflicts.
Contract check:
confirm the milestone, approved changes, delay notices, outstanding defects, security and the estimated cost and time still needed to finish.
Payment record:
pay only to the verified contractual account after the authorised decision-maker approves it, then retain the certificate, invoice, payment confirmation and conditions for the next instalment.
Changes: when a fixed budget stops being fixed
A variation should answer five questions before work, except under a tightly defined emergency procedure:
What changed, and why?
Who had authority to instruct it?
What drawing/specification replaces the old one?
What is the price basis and tax effect?
What is the programme and completion impact?
Maintain one register:
ID
Instruction
Scope
Price
Time
Status
Evidence
V-01
Drainage redesign
Revised civil drawing
Pending QS review
+? days
Not approved
Site/engineer note
V-02
Stone substitution
Named equivalent
IDR …
0
Approved
Sample + signed order
“Included in next invoice” is not a variation process. Nor should the investor be asked to approve price after the replacement is already concealed in the work.
Money withheld until completion, and other security
Retention can preserve money until defined completion and defect gates. It is only as good as its drafting:
percentage/base;
cap;
who holds it;
first release trigger;
second/final release trigger;
right to apply it to uncorrected defects;
insolvency and termination treatment;
interaction with bonds, guarantees and final account.
It is not always present and no percentage should be described as universally required.
Likewise, an advance-payment guarantee, performance bond, bank guarantee, escrow or parent guarantee must be read as an instrument, not as a label. Check issuer, beneficiary, amount, expiry, reduction, demand conditions, defences, governing law and whether the security survives the period when risk exists.
Handover has four separate parts
Release
Possible conditions
Why separate it?
Practical/physical completion
Inspected work substantially complete; punch list defined
Possession may be possible before every minor defect is fixed
Documentary completion
As-builts, manuals, warranties, test records, approvals/SLF route as applicable
An undocumented villa is expensive to operate, insure, repair and sell
Operational readiness
Utilities, staff/vendor handover, operator/licensing/tax/merchant dependencies
A finished building may not be a functioning accommodation business
Final account/defects release
Final variations settled; defects corrected; retention conditions met
Keeps the close-out dispute from contaminating possession and opening
The contract may structure these differently. The analytical point is that one signature should not accidentally certify four different things.
Example: replace six calendar payments with five evidenced stages
All entities, percentages, dates and facts in this worked example are fictional and illustrative.
The brochure proposes:
20% reservation/signing;
20% after 60 days;
20% after 120 days;
20% after 180 days;
15% at “completion”;
5% at key handover.
The reviewed structure might instead distinguish:
Initial release:
transaction/land authority, reviewed contract, baseline and essential pre-construction conditions satisfied; any true advance separately secured or consciously priced.
Substructure gate:
measured and tested foundations/substructure under approved structural documents, with cumulative certificate.
Weather-tight structure gate:
defined structure, roof and envelope complete to specification; concealed tests/inspections filed.
MEP and finishes gate:
first/second fix and finishes measured by package; commissioning dependencies and variations reconciled.
Handover and close-out:
physical completion release, separate documents/operational conditions, then retention/defect release.
Dates remain in the programme and longstop remedies. They stop pretending to be evidence of construction.
Limits of this payment check
It does not:
create a right to withhold, inspect, enter the site or terminate if the contract lacks it;
decide which housing/PPJB or construction rules apply to your transaction;
make the certifier independent or liable without a proper appointment;
detect hidden defects without the required inspections/tests;
guarantee completion, funding or contractor solvency;
make escrow, bonds, retention or milestone payments universally mandatory;
replace land, permit, tax, insurance or operating due diligence;
determine the tax invoice/withholding/VAT answer without the exact parties and supply.
Build a record for the next payment
Use the
Bali property due diligence guide
to organise the project evidence before assessing a payment request. Review
construction quotes and scope
, then test how the construction period and remaining
leasehold term affect the exit assumptions
.
Before the next transfer, ask for one complete, well-organised file containing the cumulative certificate, current site evidence, the approved variation register, payment reconciliation, an updated cost and completion forecast, and the conditions that must be met before the following payment. This is a standard request for evidence.
Official sources and date consulted
Official sources consulted on 15 July 2026.
Official anchors:
PP 16/2021
for the building system and distinct PBG/SLF functions;
Permen PU 6/2025
for the current construction-business/workforce certification framework;
Permen PKP 18/2025
for housing-sector business standards within scope;
Permen PUPR 24/2018
for its housing-developer certification/registration framework;
SE 05/SE/Dp/2026
for the SIRENG service and its stated government-assisted/financed/incentivised housing monitoring context;
SE 06/SE/Dp/2026
separately for formats/mechanisms of applicable housing-business obligations and sanctions;
PP 12/2021
for the housing/PPJB framework where it applies. The relationship between Permen PUPR 24/2018, SE 05/2026 and current SIRENG coverage requires confirmation from the relevant Indonesian professionals. No registry result should be treated as project approval, a whitelist or proof of title, solvency, payment protection, delivery, quality or safety.
The milestone, retention, variation, security and handover measures above are contractual safeguards, not a claim that Indonesian law imposes one universal model. Before using them, have Indonesian counsel examine the transaction and contract, agree the inspection and payment procedure with the appointed architect, engineer or quantity surveyor, confirm the construction qualifications required for each work package, obtain Indonesian tax advice on the payments, and have every bank instrument or security examined. Reopen the official sources on the decision date.
Price, scope and the next commitment
A €150,000 villa in Bali: good value or an incomplete budget?
Comparing construction quotations in Bali: price the same project first
Two questions to explore next
Related question
Before your next off-plan payment in Bali: the documents to verify
Related question
“8% guaranteed” on a Bali villa: who pays, from what money and under which contract?
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
Before your next off-plan payment in Bali: the documents to verify
Who owns, sells, builds, receives payment and operates your Bali villa?
Published context
Delivery Partners
Bali property due diligence

## Bali PMA restrictions: the 18 KBLI codes | DALLEAU

URL: https://dalleau.ai/notes/bali-pma-18-kbli-oss-restriction-2026.html

Briefing | Company and licensing
Bali's 18-KBLI PMA restriction: what the public record supports.
Bali has officially announced an OSS restriction on new PMA business-licensing applications across 18 activity categories. The announcement is real. The exact code list is reported under KBLI 2020, and a current project still requires KBLI 2025 mapping and a live OSS check.
Published
27 July 2026
Verified
27 July 2026
Reading time
12 minutes
Source status
Official Bali announcement verified. ANTARA's 18-code KBLI 2020 list cross-checked. BPS confirms that several codes split or changed under KBLI 2025. No public numbered annex or transaction-specific live OSS result was found.
Editorial update
20 September 2026
At a glance
What changed
The Bali Provincial Government says OSS has stopped accepting new PMA business-licensing applications for 18 designated activity categories across Bali.
What it means
ANTARA reported 18 KBLI 2020 codes. Several changed or split under KBLI 2025, so the current activity and live OSS result still need to be checked.
What it does not mean
The official announcement does not declare a blanket ban on foreign investment or automatic cancellation of every existing licence, lease or land right.
What owners should verify
Check the current KBLI 2025 activity, licence history, live OSS result, contracts, payment flows, land file and operating roles before commitment.
Source status
Official provincial announcement verified. The numeric 18-code list is reported by ANTARA. BPS conversion tables confirm that the KBLI 2020 labels cannot be applied mechanically to KBLI 2025.
Last checked
27 July 2026
Update policy
This note will be revised if a numbered annex, central-government instrument or clearer live OSS guidance becomes public.
Important
General explanation only. A real company or transaction requires current Indonesian legal and tax advice and a live OSS check.
The distinction is practical, not semantic.
On 23 July 2026, the Bali Provincial Government published an official announcement stating that, for business locations across Bali, OSS access had been closed to new PMA business-licensing applications in 18 designated low-risk and medium-low-risk activity categories. The province said the restriction had operated since the third week of May 2026 after central-government approval.
The public record supports a targeted administrative restriction on new PMA licensing applications. It does not support the broader claim that Bali has prohibited every form of foreign investment, property ownership structure or villa project.
A business's real activity, KBLI, enterprise scale, licence status, property structure and operating model remain separate questions.
What changed
A KBLI is the code used to classify an Indonesian business activity. It is not the company, the land title, the building approval or the operating licence by itself.
ANTARA reported the following 18 KBLI 2020 codes and Indonesian activity descriptions. The English wording below is an editorial translation of that report, not an official English annex. ANTARA reports the 6,000 m² threshold for both hotel codes. The official Bali release expressly states that threshold for star-rated hotels, but lists non-star hotels without publishing a numbered annex.
Important code-version warning.
The reported list uses KBLI 2020, while the government scheduled KBLI 2025 implementation across OSS and AHU by 18 June 2026. BPS conversion tables show that the mapping is not always one-to-one. Hotel code 55110 split into 55101 to 55105, 55120 became 55106, broad real-estate code 68111 split across multiple residential and non-residential activities, 70204 moved to 70202, and 70209 split between 70203 and 70209. A current file must therefore be mapped by actual activity and checked in live OSS.
KBLI 2020
Activity as reported by ANTARA under KBLI 2020
55110
Star-rated hotel, where the relevant building area is below 6,000 m²
68111
Real estate owned or leased
55120
Non-star hotel, where the relevant building area is below 6,000 m²
70209
Other management consulting activities
77100
Rental of cars, buses, trucks and similar vehicles
47711
Clothing retail
47511
Textile retail
77311
Motorcycle rental without a purchase option
47249
Other food retail
47991
Mobile retail of agricultural food commodities
55900
Other accommodation provision
56303
Drinking places and cafés
56305
Traditional medicine houses or shops
14120
Tailoring and made-to-order clothing production
93111
Stadium facilities
93116
Fitness centre facilities
93191
Sports activity promoters
70204
Industrial management consulting activities
KBLI 2025 mapping note
The provincial list was expressed using the older activity families and includes Penyediaan Akomodasi Lainnya, legacy KBLI 55900. Under KBLI 2025, that family was split into several activities, including 55901 accommodation-management services and 55909 other accommodation. The public announcement does not publish a code-by-code post-conversion matrix. A new PMA application involving one of those successor activities therefore requires a live OSS result and written confirmation of how the Bali restriction is being applied.
Can a PT PMA operate a Bali villa?
Your Bali villa is listed online. What does that actually prove?
What this does not automatically mean
01
It is not a ban on all foreign investment in Bali
The restriction concerns identified KBLI and new PMA applications through OSS. Other activities are not automatically covered by this 18-code list.
02
It does not automatically cancel every existing licence
The public announcement does not say that existing licences are automatically cancelled. It says companies that already hold licences must continue filing LKPM. That does not settle how amendments, expansions, renewals or conversion to KBLI 2025 will be treated. Each case requires a live OSS check and written advice.
03
It does not answer land or property-right questions by itself
Nothing in the announcement itself cancels a lease or land right. The announcement addresses access to business licensing. On its face, it does not address title or contract law. Whether a particular project can continue operating is a separate question.
04
Using a substitute KBLI does not make the structure compliant
The code should follow the real business. Contracts, revenue, daily operations and the service actually supplied all matter.
05
Low risk does not mean open to foreign investment
Risk classification and foreign-investment eligibility are separate tests. A low-risk activity may have a simple licensing pathway while still being unavailable to a PMA because of investment, enterprise-scale, location or sector-specific rules.
Why this matters for villa and residence projects
The reported KBLI 2020 list includes small hotel categories, other accommodation, owned or leased real estate and management consulting. Those activities can sit close to structures used around property holding, leasing, accommodation operation, residence management and advisory services.
A property project can involve several distinct roles: owner, lessor, developer, accommodation operator, property manager and consultant. Treating those roles as interchangeable can create licensing risk.
Why a social-media summary is not enough
The public account evolved over several months. On 9 July, ANTARA quoted a provincial official referring to 56 low-risk and medium-low-risk KBLI. The official Bali announcement published on 23 July identifies 18 activity categories, and ANTARA separately reported the corresponding 18 KBLI 2020 codes. No public source found in this review formally reconciles the earlier 56-code statement with the later 18-code announcement, so the article does not claim that one definitively superseded the other.
Owner checklist
What an owner or investor should verify
Pull the current NIB and complete OSS licensing profile.
Identify the activity that actually generates revenue.
Map each activity to the current KBLI.
Determine whether the proposed step is a new application, an amendment, an expansion or the continuation of an existing licence.
Verify the live OSS availability and obtain written guidance where unclear.
Separate property rights, building approvals and operating licences.
Review the contracting and payment flow between owner, operator, manager and guest.
Obtain Indonesian legal and tax advice before commitment.
The investor lesson
This change does not mean that every foreign-backed Bali project has become impossible. It does mean that structures whose activities, licences and contracts do not align are becoming harder to defend.
Taken together, the announcements suggest an administrative focus on the activity a business actually performs, its relationship to the local economy and whether its licence matches its operation.
A company name, a broad consulting code or an automatically issued NIB is not enough. The activity, enterprise scale, property documentation, licences, contracts and actual operation need to agree with one another.
What we are watching next
We are watching for a public numbered annex or central-government instrument, clearer guidance on the KBLI 2025 equivalents, live OSS behaviour by activity and project location, and the treatment of amendments, expansions, extensions and other changes to existing licences. These are case-specific legal questions, not reasons to overstate the public announcement.
Sources and update record
Official record and corroborating reporting.
Bali Provincial Government
Official announcement on restricting OSS access for PMA in selected activity categories
23 July 2026
Governor of Bali
Letter B.27.000/642/PM/DPMPTSP
28 January 2026
BKPM
Bali Investment Desk and investment supervision
22 January 2026
ANTARA Bali
Reported numeric list of 18 KBLI 2020 codes and announced implementation position
23 July 2026
ANTARA Bali
Earlier request and evolving public scope
9 February 2026
ANTARA Bali
Earlier wider-code statement
9 July 2026
OSS Indonesia
KBLI 2020 detail for code 68111
Checked 26 July 2026
OSS Indonesia
KBLI 2025 detail for code 68111
Checked 26 July 2026
OSS Indonesia
Guide to converting KBLI 2020 and earlier classifications to KBLI 2025
2026
Badan Pusat Statistik
Official KBLI 2020 to KBLI 2025 conversion table
April 2026
BKPM
Implementation timetable for KBLI 2025 in OSS and AHU
2026
Government of Indonesia
PP 28/2025 on risk-based business licensing
2025
Government of Indonesia
PP 18/2021 on land rights and land registration
2021
This Field Note reflects public information checked on 27 July 2026. It explains the published record and does not determine the legal position of a particular company, licence, land right, contract or transaction. OSS availability and administrative practice can change. Obtain Indonesian legal and tax advice before commitment.
Related Field Notes
Company and licensing
KBLI 2025 for Bali villas
Property rights
PT PMA, nominee or long lease
Before commitment
Seven checks before a property deposit
Planning a Bali residence or operating structure?
Clarify the company, property and operating model before capital is committed.
Talk to François

## Bali property due diligence: checks before a deposit | DALLEAU

URL: https://dalleau.ai/notes/bali-property-due-diligence-before-deposit.html

property due diligence
Seven checks before paying a deposit on Bali property
A certificate can be genuine and the deal can still fail. A villa can be finished and still be impossible to operate as planned. The file below should be complete before any money becomes non-refundable.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
21 July 2026
Editorial update
20 September 2026
Verified | 21 July 2026 | primary sources
Updated 21 July 2026
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
A certificate can be genuine and the deal can still fail. A villa can be finished and still be impossible to operate as planned. The file below should be complete before any money becomes non-refundable.
Before a deposit becomes non-refundable, you need seven separate answers:
what right exists; whether the parcel and access match it; what the spatial plan allows; whether the building file matches the building; whether the environmental, water and hazard file works; who will legally operate and pay tax; and whether the contract gives you a viable transfer and exit.
One good answer cannot repair a missing answer somewhere else.
The mistake is asking whether “the property is legal”
“Is this property legal?” is a reasonable question, but it is too broad to answer with one reassuring document. Each part of the transaction sits within a different legal, spatial, building, environmental, operational or tax system.
The certificate was real. The map looked pink. The villa was already accepting bookings. The agent said the owner had a Business Identification Number (NIB). A notary could prepare the agreement. Each statement sounded like an answer, but each belonged to a different system.
The right question is not whether one document exists. It is whether
seven files tell the same story about the same parcel, holder, building, use and operator
.
Check
The real question
Evidence you need before relying on it
1. Right and authority
What exactly are you acquiring, from whom, and can that party grant it?
Current land-office evidence, exact holder/right, authority and complete transaction chain
2. Parcel and access
Is the land you visited the land in the documents, with usable legal access?
Coordinates, cadastral/boundary work, access instrument and physical inspection
3. Spatial use
Does the exact intended project fit the exact official plan at those coordinates?
Applicable regional and detailed spatial plans (RTRW/RDTR), plus the current spatial-use confirmation (KKPR)
4. Building
Does the approved building match what exists and what you intend to use?
Current building approval (PBG), any valid older building permit (IMB), occupancy certificate (SLF), approved plans and an as-built comparison
5. Environment, water and hazards
Can the site be serviced and used without an unpriced environmental or physical constraint?
Environmental screening/approval, wastewater and well file, hazard/technical review
6. Operation and tax
Who sells the stay, receives the money, employs the team, holds the licences and reports tax?
Contract and money-flow map, current result in Indonesia's Online Single Submission licensing system (OSS), tax registrations and operating evidence
7. Transfer and exit
Can the right be transferred, assigned, extended or sold on the terms in your model?
Executable contract, consents, remaining secure term, tax/fee map and review of the exit assumptions
That table is the core of the review. The rest of this note explains how to test each answer.
Terms used in this note
NIB:
the Business Identification Number issued through Indonesia's online licensing system.
RTRW and RDTR:
the regional and detailed spatial plans.
KKPR:
the confirmation or approval that a proposed use conforms to spatial planning.
PBG and IMB:
the current building approval and the older permit it replaced.
SLF:
the certificate confirming that a completed building is fit for use.
OSS:
Indonesia's Online Single Submission business-licensing system.
PPAT:
the authorised land-deed official used for specified registered transactions.
MEP:
the mechanical, electrical and plumbing plans for the building.
AMDAL, UKL-UPL and SPPL:
environmental assessment, management or undertaking routes selected according to the activity and its scale.
OTA:
an online travel agency or booking platform.
PBB-P2 and BPHTB:
the local land and building tax, and the duty on acquiring land and building rights.
PBJT:
the local tax on specified goods and services, including defined accommodation services.
AHU:
the Ministry of Law's general legal administration system used for company records.
Check 1: identify the right, the holder and the authority to sign
“Freehold” and “leasehold” are useful market words, but neither is a complete legal description.
The document may concern Hak Milik, Hak Guna Bangunan (HGB), Hak Pakai, a strata/unit right, an ordinary contractual lease, shares in a company that holds a right, or something else. Those are not interchangeable assets. They have different eligible holders, durations, registration mechanics, financing possibilities and exit routes.
For a registered right, an independent review should reconcile at least:
the certificate/right and its number;
the registered holder and the person appearing before you;
the parcel identifiers, area and location;
the grant/expiry information where relevant;
mortgages, seizures, blocks or other registered burdens;
the holder's identity, marital/inheritance or corporate authority;
the transaction instrument that will move or grant the right.
Indonesia's land-registration framework treats certificates as strong evidence of the physical and juridical data they contain, and normally uses a PPAT deed as the basis for registering specified transfers. That is why a scan sent by WhatsApp is not the final check. Request a recent official certificate/land-registration search through the appropriate professional and resolve any inconsistency with the land office.
For a foreign buyer, this is where loose language becomes dangerous. A foreign individual cannot simply hold Hak Milik. PP 18/2021 provides defined foreign-residential routes involving eligible property rights and immigration conditions; it does not create a universal foreign-freehold route. A PT PMA may be able to hold a right available to an eligible Indonesian legal entity, but incorporating a company does not convert Hak Milik into “foreign freehold.”
If the proposed structure depends on an Indonesian friend, spouse, employee or nominee holding title while side documents promise the foreign investor the “real ownership,” stop. The due diligence file must not recommend or normalise a borrowed-name structure.
For a lease, the title review still comes first. You need to know that the lessor controls the underlying right and has authority to grant the full promised term and use. Then the contract itself becomes the asset: the exact parties, start date, end date, land/building scope, use, construction rights, assignment, sublease, extension, default, casualty and handback terms.
A real certificate can prove a real right and still fail to prove that the person in front of you can sell or lease what your model assumes.
Check 2: make the parcel, boundaries and access agree
The next failure is almost embarrassingly physical: the land shown to the buyer is not perfectly reconciled with the land described in the file.
A pin, fence, wall or neighbour's memory is not a cadastral conclusion. Overlay tools such as ATR/BPN's BHUMI are excellent for orientation, but BHUMI itself warns that its public information is provided without a guarantee of timeliness, accuracy or completeness. Use it to ask better questions, not to replace a certificate check and field survey.
The file should reconcile:
title/lease parcel references and coordinates;
measured boundaries and area;
existing walls, buildings and encroachments;
road access from the public network to the parcel;
every third-party parcel crossed by that access;
the legal instrument, consent and duration supporting the access;
usable road width, turning and construction logistics;
utility routes, drainage and any shared infrastructure.
“There is a road” is not enough. A lane may be physically open but cross private land under an informal tolerance. It may serve a scooter yet fail for construction trucks, emergency access or the traffic generated by the intended operation. It may also end when a neighbour sells.
This check belongs jointly to land counsel, the survey/cadastral professional and the project architect. The lawyer verifies the right; the technical team verifies whether that right works in the real project.
Check 3: test the exact use against the exact spatial plan
Bali property language is full of colours: green, yellow, pink. Those colours may be useful shorthand. They are not the legal answer.
The actual question is whether the proposed activity, at the parcel's exact coordinates, fits the applicable RTRW/RDTR and zoning provisions. The review can include:
the named zone and sub-zone;
whether the intended use is allowed, conditional or prohibited;
building intensity and site coverage;
floor-area, height and floor-count limits;
road, river, beach, ravine, temple/sacred-area or other setbacks;
protected agricultural, conservation and hazard overlays;
the applicable KKPR confirmation or approval path.
Under the national spatial framework, an integrated RDTR can support confirmation of spatial-use conformity. Where that detailed integrated plan is not available, a different approval path against the applicable spatial plan may be required. Bali's own planning authority reported that, using data at 2 February 2026, RDTR covered
31.49%
of the province and 28 RDTR had been integrated into OSS. That percentage is a warning against generalisation, not a shortcut: the only useful answer is the one for the subject parcel.
Three distinctions matter:
The neighbour is not evidence.
A finished villa next door may predate the current plan, have different coordinates, carry different documents or simply be non-compliant.
Residential is not automatically nightly accommodation.
Spatial permission to build a residence and business permission to sell short stays are separate checks.
A map screenshot is not a KKPR result.
Treat the screenshot as a lead, then obtain and read the current official outcome and its conditions.
If the intended revenue depends on tourist accommodation, the proposed use must be stated before the spatial check. Asking only whether “a villa can be built” can produce an answer to the wrong question.
Check 4: compare PBG, SLF, approved plans and the actual building
A beautiful finished building can have three very different histories:
it was approved, built to the approved plans and certified fit for use;
it began with a valid approval but was enlarged or changed later;
it was built first and left for a future buyer to solve.
PBG and SLF are not two names for the same document. PBG records the approved building plan and function. SLF certifies that the completed building is fit to be used. PP 16/2021 records building function/classification in those documents and requires a PBG change when the function or classification changes.
For a completed property, request:
PBG, or the relevant pre-2021 IMB history;
SLF and its details;
approved architectural, structural and MEP plans;
revisions and approvals for additions;
as-built drawings, if available;
professional inspection of the existing structure;
reconciliation of area, floor count, rooms, pools, retaining walls and ancillary buildings;
confirmation that the documented function fits the intended use.
The official SIMBG FAQ says a pre-PP 16/2021 IMB may remain valid when the building was completed and has not changed. It also describes an existing-building assessment route that can produce PBG and SLF together where prior IMB/PBG is missing. Neither statement means every existing building is curable. A route to assessment is not a promise of approval.
The pre-deposit question is therefore not “Can someone process a PBG later?” It is:
What would this exact as-built property have to change to satisfy the current technical and use requirements, how long could that take, and is the seller making completion a condition of the transaction?
If the answer is unknown, the model needs a cost, a delay scenario and a right to walk away.
Check 5: price the environmental, water and physical reality
Environmental paperwork is often treated as one more PDF to collect. That misses its purpose. This check asks whether the project's water, wastewater, drainage, waste and site conditions can support the proposed number of guests and staff without transferring an unpriced problem to the buyer or neighbours.
Indonesia's environmental framework screens activities and scale into AMDAL, UKL-UPL or SPPL routes. The word “villa” alone does not tell you which document applies. The file should show the activity/scale used in the screening, the issued approval or undertaking, its commitments, and evidence that those commitments exist on the site.
At minimum, investigate:
wastewater and septic/treatment capacity;
stormwater and off-site drainage route;
solid-waste storage and collection;
pool backwash and chemical handling;
source and capacity of water supply;
any well, bore, pump and water meter;
groundwater approval and reporting where applicable;
retaining walls, slope, erosion and soil conditions;
flood, flash-flood, landslide, tsunami, earthquake, liquefaction and coastal-abrasion screening where relevant;
insurance availability and exclusions.
Groundwater deserves special attention in 2026. ESDM Regulation 4/2026 covers approval, technical drilling, metering, recharge wells, monitoring and reporting, among other matters. A pipe and pump on the property prove that water can be extracted. They do not prove that commercial extraction is authorised, sustainable or fit for the intended use. Read the separate guides to
groundwater permits
and
water quality from aquifer to tap
.
Bali BPBD and BNPB provide official hazard-screening maps. Use them to identify the investigations and engineering questions required. Do not turn a low-resolution map into a site-specific “safe” badge. A coastal, riverside, ravine or steep-slope project may need a geotechnical, hydrological, structural and evacuation review that no document checklist can perform.
When ground investigation belongs before the deposit
A geotechnical study is often commissioned after acquisition, once the project is better defined. That timing can expose the buyer to material financial risk. If the site’s slope, fill, shallow groundwater, soft saturated ground, limestone or karst, retaining structures, coastal exposure or drainage could materially change the usable area, foundations, programme or cost, an independent preliminary assessment proportionate to the risk should be completed before the commitment becomes non-refundable or unconditional. It should be followed by the targeted investigation it recommends.
Pre-purchase ground decision
Reduce uncertainty before a non-refundable commitment
01 · Records and maps
Previous use, fill, slope, drainage, neighbours and dated regional information.
02 · Site walkover
Survey levels, visible water pathways, access, retaining structures and coastal exposure.
03 · Targeted investigation
Boreholes, SPT or CPT, coring, laboratory work, geophysics and groundwater observations as the risk requires.
04 · Project consequences
Translate the findings into foundations, earthworks, drainage, programme, cost and transaction conditions.
The scope depends on the intended development, the risks identified and access granted by the seller. It is not a standard package of tests for every parcel.
Indonesian
SNI 8460:2017
distinguishes preliminary ground investigation from investigation for design. Depending on the context, the programme may include boreholes, SPT or CPT, sampling, laboratory testing and groundwater observations. The standard does not require every purchaser to commission the same tests before every acquisition. The qualified geotechnical professional defines the programme; the transaction adviser structures access to the land and any conditions precedent; the buyer decides whether the remaining uncertainty is acceptable.
In Bali’s main investment areas, the priorities differ. In Denpasar, Seminyak and Canggu, they may include fill, drainage, the water table and coastal exposure. Ubud often adds volcanic slopes, cut and fill, and retaining structures. In Uluwatu and the Bukit, attention may turn to limestone, karst, possible cavities and cliff stability. These regional contexts guide the questions; they never establish the condition of a particular parcel.
Check 6: draw the operator, licence, money and tax chain
Now assume the land, use and building all work. You still have not proved that the projected revenue is lawful.
Draw this chain before discussing yield:
guest → booking/contract party → merchant of record → bank account → revenue owner → taxpayer
Then draw the operating chain:
property holder → accommodation operator → manager/intermediary → staff employer → licence holder → reporting party
For each arrow, name the person or company and point to the agreement that creates it.
The practical questions are:
Who lists and prices the stay?
Who contracts with the guest and handles refunds?
Who receives card, OTA and direct-booking payments?
Who issues the guest invoice?
Who employs and supervises staff?
Who holds the NIB, correct KBLI and risk-tier permissions?
Who satisfies tourism standards and guest-reporting duties?
Who registers, collects, files and pays each national or local tax?
If there is a manager, what is the manager's authority and fee?
KBLI 2025 makes the distinction sharper. Operating one's own villa, managing another owner's accommodation and merely intermediating bookings are different activity questions. A manager's licence does not regularise a non-compliant property it manages, and an owner's paperwork does not automatically license the manager's own business.
An NIB is the start of many OSS routes, not a universal finish line. The exact entity, KBLI, enterprise scale, address and risk tier must be tested in live OSS, along with the sector standards and supporting permissions.
Do not use the risk label as a shortcut for PT PMA eligibility. Low risk describes a lighter licensing route; it does not, by itself, close or open the activity to foreign investment. Separately confirm the activity description, available enterprise scale, foreign-investment conditions and effective licence. If an old licence is offered as proof, verify whether it is a genuinely valid prior authorisation preserved by transition rules rather than a route still available to a new applicant.
An active Airbnb or Booking.com page proves only that the listing is active. It is not licence evidence. A current compliance file must use the Tourism Ministry's dated position: the Tourism Ministry said on 26 May 2026 that the online-platform licensing API was
still under development
, with a June 2027 target. The ministry separately described a current list-based delisting and reinstatement mechanism. Do not present the API as already live.
Tax follows the same separation. The file may need to address PBB-P2, BPHTB, seller-side transfer income tax, land/building lease income tax, local PBJT on hotel/accommodation service and the ordinary income/corporate-tax position. There is no honest “one Bali property tax rate.” The transaction, contract, revenue stream, taxpayer and regency/city all matter.
For the operating structure, read these related guides:
KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business
;
A management agreement is not a licence: who is the operator, merchant of record and taxpayer?
;
the
documented company-route review
used for the actual entity and address.
Check 7: assess the contract, transfer and exit before entering the deal
The last check is the one most frequently postponed because it feels distant. It should be performed before entry because the acquisition document creates the exit asset.
For a contractual lease, record separately:
legal start and end dates;
possession/building/ramp-up period inside that term;
remaining secure operating years;
permitted personal, construction, rental and commercial use;
assignment and sublease rights;
owner consent requirements and response mechanics;
extension option, notice window and pricing formula;
what happens on death, inheritance or sale by the owner;
default, cure, termination and refund provisions;
casualty, compulsory acquisition and insurance proceeds;
ownership/removal of buildings, furniture and equipment at expiry;
restoration/handback obligations;
dispute language, governing law and forum;
taxes, fees and costs on entry, operation, assignment and exit.
“25 + 25 years” may describe 25 secure years plus a future negotiation. Unless the extension mechanism is enforceable and sufficiently defined, the financial model must not treat it as 50 secured years.
For a registered-right acquisition, confirm the transfer/registration route, right duration and renewal/extension conditions, burdens, consents and exit taxes. For a share deal, add a full corporate file: deeds and AHU history, shareholders and beneficial owners, financial statements, taxes, debt, litigation, employees, licences, related-party agreements and every liability that stays inside the company after closing.
The financial rule is simple even when the contract is not:
Do not assign terminal value beyond the secure right or term unless the extension assumption is visible, shown separately and tested under a less favourable scenario.
That is why the next phase of the due diligence file is a
Lease and Exit Review
, not a resale-price promise.
A normal-looking deal that fails all seven checks
Imagine a completed two-bedroom villa offered with “25 + 25 years,” a pink-zone screenshot, an active OTA page and a deposit requested within 48 hours.
The title is genuine, but the proposed lessor is one of several heirs and authority is unresolved.
The driveway crosses a neighbour's parcel under a verbal arrangement.
The screenshot shows a broad tourism area, but the exact sub-zone and setback conditions have not been extracted.
The old approval covers a smaller residence; the second floor and pool do not appear on the approved plans.
The well has no file and the wastewater capacity was sized for a household, not high occupancy.
The OTA account, guest payments, staff and NIB belong to four different parties.
The extra 25 years are “subject to mutual agreement at market price,” and assignment requires the owner's consent without a deadline.
Nothing in that example proves the deal is impossible. It proves the advertised price is not yet underwriting a defined asset.
What the deposit agreement should protect
A deposit should reserve a defined opportunity while diligence is completed. It should not force the buyer to discover material defects after the money becomes non-refundable.
Ask independent Indonesian counsel to draft transaction-specific conditions covering, where relevant:
satisfactory current title/land-registration and authority checks;
acceptable boundary and access confirmation;
written spatial/KKPR outcome for the stated use;
satisfactory PBG/SLF and as-built technical review;
environmental, wastewater, groundwater and hazard review;
confirmed entity/operator/licensing/tax route;
agreed lease/transfer/assignment and extension mechanics;
no new burden, disposal or material change before closing;
seller cooperation and document access;
a long-stop date and a clear refund mechanism if stated conditions fail.
That list is not a contract template. Its purpose is to make the lawyer's drafting brief precise.
Build an evidence register before the next payment
Use a simple spreadsheet or shared document to record four answers for each of the seven checks:
What have you received?
What is still missing or inconsistent?
Which professional must verify each unresolved point?
What conditions should be resolved before the next payment milestone?
Give each item a clear evidence status:
claimed by a party;
document received but not independently checked;
checked by a named professional;
checked against the issuing authority/system;
inconsistent or unresolved;
not applicable, with a recorded reason.
Keep the seven checks separate. A verified title does not resolve a prohibited use, and a valid PBG does not extend the remaining lease. Record the document, its date and issuer, the outstanding question, the professional responsible and the condition to resolve before payment.
Questions we get asked directly
What is the single most important check before paying a deposit?
There is no honest single-document answer. The most valuable first move is to define exactly what you intend to acquire, build and operate, then make the deposit conditional on the seven files supporting that same story.
Does a notary check everything?
Do not assume one professional's mandate covers title, contract, zoning, engineering, environment, licensing and tax. A PPAT has a specific land-deed/registration function; independent legal, technical, licensing and tax scopes should be named separately.
If the villa already has bookings, does that prove commercial use is allowed?
No. A listing and revenue history are commercial evidence, not spatial, building or business-licence evidence.
Can I fix missing PBG or SLF after buying?
SIMBG provides an assessment route for existing buildings, but that does not guarantee this building can be approved as-is. Obtain a technical feasibility assessment, cost, timeline and contractual risk allocation before purchase.
Is leasehold unsafe?
No. A lease whose essential terms are not defined is unsafe. A well-structured lease can be a rational investment when the secure term, use, extension, assignment and exit are priced honestly.
Does an evidence register replace a lawyer or notary?
No. It gives the appointed professionals a clear file to review and gives the owner a record of the questions still unresolved. It does not certify the transaction.
Related:
Leasehold in Bali: what foreigners buy
·
Green zone, pink zone, yellow zone
·
current villa licensing framework
We build the seven files before a site enters our feasibility conversation, and before the design is allowed to turn an unresolved parcel into an emotional commitment.
Primary sources:
Law 5/1960; PP 24/1997 as amended; PP 18/2021; ATR/BPN Regulation 18/2021; PP 21/2021 and ATR/BPN Regulation 13/2021; Bali Province TARU/RTRW/RDTR portal; PP 16/2021 and SIMBG; PP 22/2021 and Environment Regulation 4/2021; ESDM Regulation 4/2026; Bali BPBD and BNPB InaRISK; PP 28/2025; Tourism Regulation 6/2025; BPS KBLI 2025 and live OSS; Tourism Ministry release of 26 May 2026; Law 1/2022 and PP 35/2023; PP 34/2016 and PP 34/2017. The official documents used for these claims are linked below.
This article is educational and does not provide a title, zoning, building, environmental, tax, licensing or investment opinion for any property. Obtain independent Indonesian advice and issuer-verified evidence for the exact parcel, parties, structure and intended use before committing funds.
Additional official references
Government Regulation 18/2021: land rights and registration
ATR/BPN Regulation 18/2021
ATR/BPN BHUMI public map
Government Regulation 16/2021: PBG and SLF
Ministry of Public Works SIMBG
ESDM Regulation 4/2026: groundwater
Bali BPBD risk maps
BNPB InaRISK
Government Regulation 28/2025: business licensing
Tourism Ministry Regulation 6/2025
Ministry of Tourism compliance update: 26 May 2026
---
General information. Updated 21 July 2026. This page presents DALLEAU's good-faith reading of the official sources cited. It is not professional advice. Rules and administrative practice can change; the summary may be incomplete, outdated or mistaken. Check the current official text and your facts with the competent authority or appropriately authorised professional before acting.
Price, scope and the next commitment
A €150,000 villa in Bali: good value or an incomplete budget?
Comparing construction quotations in Bali: price the same project first
Two questions to explore next
Related question
Bali leasehold: what a foreign buyer acquires
Related question
Green, pink and yellow zones in Bali: what the official plan says
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business
operator and project-party roles
Seven ways to receive or transfer value from a PT PMA, and how each is taxed
Bali villa wells: household use and commercial permits
Published context
Bali zoning evidence
Leasehold explained

## Buying a second home in Bali | DALLEAU

URL: https://dalleau.ai/notes/bali-second-home.html

← field notes living in bali 10 July 2026 A second home in Bali: decisions to make before buying

Before looking at property listings, define the intended use, lawful tenure, immigration position and exit plan for a second home in Bali.

DALLEAU | Research and field notes Published

10 July 2026

Last verified

17 July 2026

Verified | 17 July 2026 | primary sources

In brief Start here: decide who will use the residence, for how long, and whether it will also operate as accommodation while the family is away. Then choose the tenure, immigration status and ownership structure that fit that use. Succession and resale should be documented before the first non-refundable payment.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Describe the use before choosing the house

A couple using a home for three months a year needs a different programme from a family arriving during school holidays with children, guests, household staff and a driver. A private residence also has a different compliance file from a villa offered for short stays for most of the year.

The distinction affects location, bedroom count, service circulation, staff space, storage, acoustics, security, maintenance and privacy. If paid accommodation is planned, it also changes the business and licensing analysis. The first brief should therefore describe how people will live in and operate the residence, not only its floor area and style.

Tenure must follow the project

A foreign individual cannot personally hold Hak Milik, the freehold title reserved for Indonesian citizens. A visa does not change that rule. Depending on the intended use and the buyer's structure, the routes to examine include:

a long lease, which creates contractual rights rather than a registered freehold title;

Hak Pakai, a registered right of use available to qualifying foreign residents under the applicable conditions;

an eligible Indonesian company, including a PT PMA whose activities and licences match the project, holding a land right available to that entity;

a separate operating structure when the residence will provide regulated accommodation.

Each route creates different rights and obligations. A PT PMA provides no universal shortcut to property ownership, while even a well-drafted lease remains time-limited. A nominee structure leaves the registered land right with the named Indonesian holder, and private agreements do not remove that structural risk. See PT PMA or nominee and Bali leasehold explained .

Separate immigration from ownership

Begin with the activity: personal residence, site visits, shareholder meetings, company management, operational work in Indonesia, local employment or remote work for an overseas employer. Immigration status permits a defined stay and specific activities. Land ownership, accommodation licensing and tax residence each follow separate rules.

What the official E33 Second Home page says

The official E33 Second Home page , checked on 17 July 2026, describes an initial stay of up to five years, extendable within a maximum total stay of ten years. It does not require a sponsor. Within 90 days of entry, the holder must meet and maintain one of the published immigration guarantees:

hold the rupiah equivalent of at least USD 130,000 in the holder's own account at an Indonesian state-owned bank; or

commit to purchasing a rumah susun or apartment in Indonesia worth at least USD 1,000,000, then submit the ownership evidence to the immigration office that issued the permit within 90 days of entry.

The published property route refers to a rumah susun or apartment and does not expressly include a detached villa. The page also leaves open the accepted title, valuation method and treatment of a unit already owned before the application. Confirm those points through the official eVisa portal before paying a deposit, committing to purchase or paying an intermediary.

Family members use the dependent routes linked to the principal holder. Their eligibility and documents should be checked individually rather than assumed from one application. Our Indonesia visa guide starts with the intended activity and length of stay before matching a visa code.

Prepare for tax residence before moving

Presence in Indonesia for more than 183 days within a twelve-month period is an important statutory indicator of Indonesian tax residence. Circumstances showing residence or an intention to reside may also matter, so the visa, property right and tax residence require separate analysis.

For someone who is tax resident elsewhere, the applicable treaty must then be read against the facts: days present, family home, income, company interests, dividends and Indonesian rental income. A personal tax outcome cannot be inferred from the visa or the day count alone. Obtain dated cross-border advice before changing residence or reorganising family assets.

Succession, governance and exit

The transfer of a lease depends first on its wording, the governing law, the landlord's identity and that person's authority to bind the landholder. Before signature, the family adviser should answer four questions in writing: can the lease pass to heirs; do renewal options transfer; what consent is required to assign the remaining term; and what happens on death or incapacity?

Where a company holds the relevant rights, the analysis moves to shares, voting rights, management powers, exit clauses and succession. In either case, organise the records a future buyer will need from the beginning: title or lease, planning, building approval, operating licences, tax filings, accounts, maintenance contracts and works history.

A lease loses remaining term every year. Its future value depends in part on the term left, the enforceability of renewal options and the quality of the file. Planning the exit at entry is basic investment discipline.

From structure to architectural programme

Once use, tenure, stay, tax and exit are defined, the design brief becomes more reliable. A staffed family residence may need service circulation, a production kitchen, storage, laundry, plant rooms, staff facilities, security, parking and contractor access in addition to the visible living spaces.

This is the stage at which land area, interior area, levels and budget can be tested without false precision. The Stay Matrix starts with the intended guest and owner experience, then shows how comfort, build quality, architectural expression and cost affect one another.

Common questions

Can a foreigner buy a residence in Bali to live in? A foreign individual cannot personally hold Hak Milik. Depending on the facts, a long lease, qualifying Hak Pakai or a right held by an eligible Indonesian company may be examined. Each route creates different rights and obligations.

Does an E33 permit allow me to own a villa outright? No. Immigration status and property law are separate. A residence permit may be relevant to certain rights such as Hak Pakai, but it does not make a foreign individual eligible for Hak Milik.

Can the residence be rented while the E33 holder is away? The E33 addresses the holder's stay. It does not authorise an accommodation business. Short-stay operation requires its own planning, building, activity, licensing, tax and operator analysis.

Can a USD 1,000,000 villa satisfy the property option? The official E33 page refers to a rumah susun or apartment in Indonesia. It does not confirm that a detached villa qualifies. Obtain written official confirmation for the exact property, title and value evidence before committing.

Where should the process begin? With one page covering intended use, occupants, time in Indonesia, activities on site, proposed tenure, land budget, development budget and exit horizon. Property visits come after that brief.

updated: 17 July 2026

Sources checked 17 July 2026: Directorate General of Immigration, E33 Second Home ; official eVisa portal ; Government Regulation 18/2021 on land rights ; Indonesian tax-residence rules and the applicable tax treaty.

Two questions to explore next

Related question Indonesia visas and work permits in 2026: the practical Bali guide Related question Indonesia investor visa E28A: permitted activities and work limits

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Guaranteed villa returns: who is obliged to pay? | DALLEAU

URL: https://dalleau.ai/notes/bali-villa-guaranteed-return-buyback-counterparty-waterfall.html

investment mechanics
“8% guaranteed” on a Bali villa: who pays, from what money and under which contract?
A guaranteed return is not a feature of the property. It is a payment obligation owed by a named person or company.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
16 July 2026
Verified | 16 July 2026 | primary sources
Updated 16 July 2026
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Identify the promise before counting the income
A guaranteed return is not a feature of the property. It is a payment obligation owed by a named person or company.
Before placing the promised amount in the base-case cash flow, identify:
the legal payer
and its balance sheet;
the contract or other document
creating the obligation;
the base
on which the percentage is calculated;
gross or net
, and every deduction before payment;
the start trigger
, payment dates and duration;
the order in which operating revenue pays costs, taxes and the investor
;
the shortfall mechanism
when the villa earns less;
security, reserve, guarantee and claim conditions
;
early termination, force majeure, suspension and sale effects
;
the remedy and realistic recovery path
.
If these are missing, the careful model does not label the promise “fraud”. It labels it
not yet sufficiently evidenced for the base case
.
Similar sales phrases can describe different obligations
Marketing phrase
It may mean
The missing question
Projected yield
Forecast from assumed occupancy, ADR and costs
Whose assumptions, and what happens if the assumptions prove wrong?
Fixed rent/lease payment
Operator/tenant owes a stated rent
Is it unconditional, indexed, net of what and supported by whom?
Minimum revenue guarantee
Operator/developer tops up revenue below a floor
Which revenue definition and what evidence/calculation period?
Guaranteed ROI
Contractual payment, profit share, rent or loosely used sales language
What legal instrument and payer create it?
Rental pool distribution
Share of pooled performance under allocation rules
Which properties/costs/reserves and who audits the allocation?
Developer subsidy
Price-funded or budgeted top-up during launch
Is it funded, ring-fenced and separate from buyer money?
Repurchase
Put option, repurchase covenant, best-efforts resale or marketing promise
Who must buy, when, at what price, subject to which conditions?
Personal/parent guarantee
Support by another legal person
Is there an executed, authorised and enforceable guarantee, or only a statement?
Insured return
Insurance policy may cover defined events
Which insurer, policy, exclusions, beneficiary and claim process?
One phrase can sit in several contracts: acquisition, lease, management, revenue guarantee and repurchase. Read them together. The weakest inconsistency or termination clause can control the outcome.
How to treat the promise in a financial model
What you have
What it establishes
What to do before payment
No answer yet
No answer or supporting document has been provided
Ask the precise question; do not infer absence, compliance or non-applicability
Statement only
A marketing statement, answer, undated screenshot or self-certified percentage
Ask for the document or measurement that supports it; do not count the point as satisfied
Document mentioned but not provided
A document or check is referred to, but its contents cannot be examined
Obtain the document and have the appropriate professional examine it
Document received but not checked
You have the file, but its issuer, date, relevance and match to the property or entity remain unconfirmed
Ask the appropriate lawyer, architect, engineer, accountant or tax adviser to check it; possession alone proves only that the file was received
Checked for a defined question
A named professional has stated what was checked, for which property or entity, from which source and on what date
Use the conclusion only for the question examined; do not describe it as an independent verification
Independently checked
A suitably independent second check supports that defined conclusion
Continue with the remaining contract, technical, payment and dependency checks
Contradiction
Documents, parties, parcel details, promises or public records conflict
Identify who must resolve it, what evidence is required and by when; pause the affected payment or decision
Out of date
The document or professional conclusion is no longer current on the decision date
Obtain an updated document or confirmation before relying on it
Unavailable
A required item cannot presently be obtained
Keep the gap explicit; unavailable does not mean non-applicable
Not applicable
The appropriate professional confirms that the exact rule or document does not apply to this transaction and explains why
Keep the written reasoning, the professional's name and the date; never use this label merely to avoid a control
Never add both the guaranteed payment and the same underlying net rental income unless the contract genuinely gives both. That is double counting.
1. Which legal entity must pay?
Write the full legal name, not the brand.
Then check:
incorporation and current status and authorised signatory;
whether the obligation is inside the acquisition, lease, operator or separate guarantee contract;
whether the payer owns the land, receives the purchase price, operates the villa or does none of those;
current accounts and liabilities appropriate to the size of the promise;
how many other units receive the same promise;
whether funding depends on future sales, operating revenue, a reserve or affiliate support;
whether any parent, shareholder or director is bound.
Under company-law analysis, companies in the same group remain distinct legal actors. Shared branding, shareholders or directors may explain a relationship; they do not replace an express obligation. Counsel must confirm the current Indonesian corporate-authority and guarantee mechanics for the exact document.
2. What amount is the 8% calculated on?
Possible bases include:
headline purchase price;
purchase price excluding tax/fees/furniture;
amounts paid;
construction component only;
net invested capital after incentives;
a fixed IDR amount translated from a foreign-currency price;
an independently valued amount;
depreciating or outstanding balance.
If a villa is marketed at USD 500,000 with an 8% return, the brochure implies USD 40,000 a year. The contract may instead apply 8% to USD 400,000 after excluding land, tax and furniture, then deduct management, maintenance, withholding and reserve. The cash result is no longer USD 40,000.
The correct summary must state:
rate × defined base = gross contractual amount → deductions/tax → cash paid
Currency matters too. A USD headline with an IDR payment obligation needs a conversion source, date and allocation of exchange risk.
3. When does the obligation start and end?
Common triggers are not equivalent:
contract signing;
full purchase-price payment;
practical completion;
handover;
SLF/required operating readiness;
first guest;
start of operator agreement;
a fixed date, even if construction is delayed.
If “three years guaranteed” starts only after operational opening, a construction delay may postpone both the income and the end date. The longstop or termination clause may also cancel the arrangement. If the guarantee starts on the scheduled handover date, who pays during a delay? The document must say.
Also test early sale, owner occupation, force majeure, licence suspension, major repair, operator default, change of operator and termination. A promise that disappears on the first commercially realistic event should not be priced like a fixed bond.
Follow the money before it reaches the investor
The contract should state, in ordinary language, the order in which revenue is received and then used:
who receives direct and platform bookings;
which taxes, platform fees and refunds are deducted;
which operating costs, management fees and reserves are paid;
how the amount due to the owner is calculated;
who covers any shortfall and when that obligation is payable.
The party collecting guest revenue may be different from the party promising the 8%. Map both entities and both contracts.
A promise is different from cash set aside or security
Support
What it can add
What still needs testing
Contractual covenant
A direct obligation
Solvency, defences, jurisdiction and remedy
Cash reserve
Pre-funded liquidity
Ownership/control, permitted use, amount, release, replenishment and insolvency
Escrow arrangement
Conditional third-party/control mechanics
Exact account, agent, conditions, fees, term and applicable law
Bank guarantee
Bank payment within instrument terms
Issuer, beneficiary, amount, expiry, demand wording and reductions
Parent/shareholder guarantee
Affiliate recourse
Authority, cap, duration, assets, defences and enforceability
Security over an asset/right
Potential recovery priority
Valid creation/perfection, eligible collateral, prior claims, valuation and enforcement
Insurance
Cover for named insured risks
Insurer, beneficiary, exclusions, deductibles and claim acceptance
No label makes the support automatic. A “reserve” held in the operating company's normal account may be spent. A guarantee expiring at scheduled completion may disappear before a delayed handover. An escrow arrangement may release funds on documents that do not prove construction quality. Read the release and claim mechanics.
A repurchase promise is an exit contract, not a resale value
A repurchase promise requires its own term sheet:
option holder and obligated buyer;
asset/right to be repurchased;
exercise window and notice mechanics;
price: fixed, indexed, original price, net book amount or formula;
currency and payment date;
required condition of villa and operating accounts;
treatment of furniture, leases, bookings and staff;
consents, assignment/transfer route and remaining term;
taxes, fees and withholding;
set-off, disputes and completion documents;
security and remedy if the buyer does not complete.
“We will help resell at 20% uplift” is brokerage/marketing support, not necessarily a repurchase obligation. “Repurchase at original price” may still produce a loss after inflation, taxes, fees, currency movement and years of lost use. Conversely, a carefully funded put can be valuable. The contract terms, not the label, determine what belongs in the model.
Example: 8% for three years and a repurchase in year five
All entities, figures, dates and facts in this worked example are fictional and illustrative.
An investor pays USD 500,000. The deck shows USD 40,000 per year and a repurchase at USD 600,000 in year five.
The file reveals:
PT Operator O, not the landholder or developer, owes the annual payment.
The base excludes USD 75,000 of tax, furniture and fees: 8% applies to USD 425,000, or USD 34,000 gross.
The promise starts on operational opening, not handover; there is no payment during construction delay.
Owner-paid insurance, major maintenance and a reserve are deducted before distribution.
The company tops up only after collected revenue is reconciled quarterly; the contract permits suspension if the operating licence is lost for reasons outside its control.
No cash reserve or affiliate guarantee is evidenced. The investor therefore models the payment as PT Operator O credit exposure, not as property yield.
PT Developer D owes the repurchase, but only in a 30-day exercise window and subject to no owner occupation or unapproved alteration.
The USD 600,000 is payable in IDR at a defined rate; taxes/transfer costs and remaining lease term still need advice.
This does not automatically make the offer good or bad. It turns two large numbers into two specific counterparties and two measurable risk cases.
Limits of this review
It does not:
classify your arrangement as rent, return, dividend, interest, service income or another legal/tax category;
prove that the promoter is authorised to offer a particular investment product;
verify accounts, reserves, security or signatures;
decide whether a guarantee or repurchase promise is enforceable;
predict occupancy, ADR, costs, regulation, tax, currency or resale value;
make housing/PPJB protections apply to every leasehold villa;
make any escrow or security universally required;
tell you to proceed, reject or assign a global risk score.
Check the payer before you count the percentage
Read
operator and project-party roles
before accepting an operator label. Keep the contractual guarantee separate from the villa's own operating scenario. Review the repurchase against the
remaining lease term and exit assumptions
, and organise the underlying evidence with the
Bali property due diligence guide
.
The key question is not “Is 8% high or low?” It is:
what cash must exist, in whose account, under which document, on which date, for this investor to receive the promised amount after costs and tax?
Official sources and date consulted
Official sources consulted on 15 July 2026.
Official anchors used only for framework boundaries:
Company Law 40/2007 official PDF
for distinct companies, corporate organs/authority and shares, subject to amendments/current counsel;
PP 12/2021
for the housing marketing/PPJB system where applicable;
Permen PKP 18/2025
and July 2026
SE 05
/
SE 06
for the relevant housing-sector business framework within scope;
PP 16/2021
for building/PBG/SLF distinctions.
Checks before relying on this framework:
transaction/investment-product classification by Indonesian counsel; corporate authority and enforceability; current financial evidence and security review; operator model and merchant flow; scoped Indonesian tax sign-off on tax character, withholding, invoices and cross-border payments; local licence/building applicability; the official sources must be checked again on the decision date. Do not treat a return “secured”, “insured” or “protected” without the exact instrument and written confirmation from the relevant qualified professional.
Price, scope and the next commitment
A €150,000 villa in Bali: good value or an incomplete budget?
Comparing construction quotations in Bali: price the same project first
Two questions to explore next
Related question
Is Bali still a good villa investment in 2026?
Related question
Before the next construction payment: what evidence should you request?
Model this decision in the Stay Matrix
Open the tool →
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
Before your next off-plan payment in Bali: the documents to verify
Who owns, sells, builds, receives payment and operates your Bali villa?
Published context
operator and project-party roles
Leasehold term and exit assumptions

## Is Bali still a good villa investment in 2026? | DALLEAU

URL: https://dalleau.ai/notes/bali-villa-investment-2026.html

← field notes
market intelligence
7 July 2026
Is Bali still a good villa investment in 2026?
Bali remains a large tourism market, but an island-wide average cannot tell you whether a particular villa, location or operating model will work.
DALLEAU | Research and field notes
Published
7 July 2026
Last verified
17 July 2026
Editorial methodology updated
20 September 2026
Verified | 17 July 2026 | primary sources
In brief
Bali is not one investment case. Assess the property, rights, full budget, comparable accommodation and operating structure, then test the assumptions that drive cash flow.
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Update · checked 17 July 2026:
Bali Perda 4/2026 addresses specified productive-land conversion and nominee transfers within that field. Its official summary does not make every parcel, project or nominee dispute subject to the same outcome. See
the dated land-use note
and verify the parcel in the official records.
What visitor arrivals can tell you
Visitor-arrival statistics describe travel flows. They do not establish how many nights a particular villa will sell, at what price or after which costs. Domestic and international visitors, repeat arrivals, length of stay and accommodation choices answer different questions.
Use
BPS Bali
for the regional context and the observation period. Then identify the guests your property is intended to serve and the alternatives they actually consider. A large destination market is a starting point, not a project forecast.
Build a comparison group, not an island-wide average
A commercial accommodation dataset may combine rooms, apartments and villas, active and lightly used listings, different bedroom counts and different locations. Its headline listing count does not define the competitive supply for one residence.
Select comparable properties by location, capacity, finish, service, access and stay pattern. Record the period and what each metric means. An asking rate is not necessarily a realised rate, and an unavailable calendar night is not necessarily a paid booking.
A dated market snapshot can inform this work. It should not supply one annual-revenue figure to be applied to villas of every size and budget.
Build the return from the property’s own assumptions
Start with the residence, operating model and full capital requirement. Build income and expenses from their underlying assumptions instead of dividing one island-wide revenue average by an unrelated purchase price.
Model input
Evidence to obtain
Why it matters
Sellable nights
Calendar, personal use, opening period and planned closures.
The denominator must match the period the property is available.
Paid occupancy
Dated comparable records, with exclusions and booking definitions.
A blocked calendar is not proof of a paid stay.
Realised accommodation rate
Seasonal rates after discounts, with stated treatment of taxes and fees.
Published nightly prices do not establish realised receipts.
Operating expenses
Staff, distribution, management, energy, maintenance, insurance, relevant taxes and other actual scopes.
Gross revenue is not the owner’s net cash flow.
Capital and working cash
Rights, acquisition, construction, equipment, transaction costs and opening cash, without double counting.
The headline price may not equal total funds committed.
Time and exit
Delivery, lease expiry, reinvestment and separately stated exit assumptions.
Annual operating yield does not measure the full investment outcome.
Show gross revenue, operating result, reserves and owner cash flow separately. State whether borrowing, tax and replacement expenditure are included. Test downside assumptions for rate, occupancy, opening delay and operating costs. The model should show which assumptions materially change the decision.
Future appreciation belongs in a separate exit analysis. A guaranteed payment requires its own counterparty and contract assessment; it is not an automatic extra layer of rental income.
Our
Reality Check on a €150,000 villa
explains the full-cost comparison. The
construction quotation guide
helps reconcile the works being priced.
Harmonie is delivered and operating. Its
field record
follows construction, handover and continuing operation.
Put compliance into the base case
Two regulatory notes on this site cover the mechanics in detail:
the PP 28/2025 licensing framework
and
PT PMA capital and company structure
. Indonesia has moved toward risk-based licensing with active supervision and sanctions. At Bingin Beach in mid-2025, Bali authorities demolished businesses they had assessed as unlawful. The affected structures and legal basis must be identified before using that enforcement event as a comparison for another villa. We examine that distinction in
Bali land zoning and planning controls
.
Land structure carries the same weight as licensing. Indonesian agrarian law does not allow a foreign individual to hold Hak Milik directly. Depending on the facts, routes to examine may include a
long lease
or rights held by an eligible
PT PMA
. Nominee disputes are document- and fact-specific. The published decisions discussed in the linked note illustrate the risk without establishing an automatic outcome for every arrangement.
What separates a good outcome from a bad one
Zoning and land-use match
, checked against the parcel's official spatial plan, not the colour an agent uses in conversation, covered in full in
our note on how Bali zoning is checked
.
Correct licensing from the start
, sequenced into the build timeline rather than rescued after opening.
An evidenced occupancy assumption.
Neither 47% nor 70% is a universal base case. Support the assumption with comparable properties, the same period and booking definitions, then test a downside case.
An identified operating model.
Document the operator, staffing, distribution, maintenance and responsibilities instead of assuming that publishing a listing creates a passive income stream.
An honest cost stack
, with management, maintenance, tax and vacancy treated as real numbers before anyone talks about yield.
A property decision, not a verdict on an island
The useful question is which property, under which rights and operating structure, at what complete cost, for which guests and over which period. A broad tourism statistic cannot answer all those questions.
Bring the site, offer and assumptions to a
conversation with François
. DALLEAU can frame the owner-side work and specialist questions needed before the next commitment.
References and review dates.
BPS Bali
provides tourism context, not a villa-specific forecast. The linked licensing and land-rights notes identify their own official references and review dates. The cost and comparison methodology was updated on 20 September 2026; this is not a new legal verification of every linked rule.
Two questions to explore next
Related question
Seven checks before paying a deposit on Bali property
Related question
“8% guaranteed” on a Bali villa: who pays, from what money and under which contract?
Model this decision in the Stay Matrix
Open the tool →
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.

## Bali villa well depth and water quality | DALLEAU

URL: https://dalleau.ai/notes/bali-villa-well-depth-water-quality-filtration.html

water · building systems · operations

Bali villa wells: why depth alone cannot specify water quality

A stated depth of 20 or 60 metres proves almost nothing by itself. Reliable villa water depends on the aquifer actually captured, the screened interval, bore construction, contamination pathways, pumping, laboratory results and operation of the complete system.

DALLEAU | Research and field notes Published

20 July 2026

Last verified

21 July 2026

Verified | 21 July 2026 | technical and primary sources

Updated 21 July 2026 Next scheduled review : 2026-10-20

Before making a decision, check the sources and verification date. Water conditions vary by site and season. This note explains a decision method; it is not a laboratory result, engineering design or statement that a particular source is potable.

The owner-side decision rule: do not rely on a stated depth or a “seven-stage” promise. Define the source to be captured, the bore construction, the treatment basis and the verification programme.

Deeper can be better protected: if the right interval is actually isolated

In a dense neighbourhood where on-site sanitation can leak into the ground, a shallow unconfined water table is generally more exposed to faecal bacteria and nitrate than a genuinely deeper, protected interval. That difference can matter greatly. It still does not establish that the source is safe or suitable: the continuity of protective layers, fractures, bore construction, pumping, salinity and the initial water quality must be verified for the site.

The meaningful questions are:

Which aquifer and geological layer does the bore reach?

At what interval is the well screened?

Are the casing, sanitary seal and wellhead properly constructed?

Where are nearby septic systems, drains and other pollution sources?

In which direction is groundwater likely to move?

Is the site exposed to coastal salinity or heavy groundwater abstraction?

What does an accredited laboratory find in the raw water?

“60 metres” is not a water-quality certificate. A 60 m bore may still draw shallow-origin groundwater when its screen is set too high; defective casing or annular sealing can bypass protective layers; and fractured ground can connect intervals rapidly. Near the coast, a deeper or more intensively pumped source may also encounter greater salinity. The useful comparison is the aquifer and screened interval, casing and seal, groundwater-flow direction, pumping rate, and laboratory results for raw and tap water: not depth alone.

Why developed neighbourhoods need closer attention

Dense development concentrates wells, on-site sanitation, drains and abstraction in the same subsurface. This makes cumulative loading and groundwater direction material design questions, even though no current survey allows every installation in Canggu or Seminyak to be characterised in the same way.

A Denpasar study published in 2019 from a 2016 to 2017 survey reported that only 30% of the sampled on-site sanitation structures were watertight, while 70% were non-watertight cubluk systems. The authors identified leakage as a potential route especially to shallow groundwater. Those figures describe a historical Denpasar sample, not the condition of Canggu in 2026; they nevertheless show that the pathway is locally credible rather than hypothetical.

A local study of shallow wells in Sanur Kauh reported moderate pollution at the sampled points and identified several nearby potential sources. Those wells were 4.5 to 10 metres deep, so the result does not prove that every shallow well, or every bore near 20 metres, is contaminated. It does show why clear-looking water in a developed area cannot be accepted on appearance alone.

The same caution applies near the coast. A 2025 North Kuta study detected varying degrees of seawater intrusion across sampled locations, including high salinity in part of Kerobokan Kelod. These results are location-specific, but they demonstrate an important point: going deeper does not automatically solve every water-quality problem.

Odour is not a diagnosis. Smelly water may involve microbial activity, sulphur compounds, stagnant storage, iron, plumbing or another cause. Water with no visible colour or smell can still contain microbiological or chemical contamination.

Bali does not have one subsurface profile

Technical orientation Three investment contexts, three investigation programmes Conceptual profiles · not to scale · no parcel-level conclusion

Context 01 · lowland and coast

Denpasar · Seminyak · Canggu

Young volcanic and alluvial deposits, with coastal conditions varying by parcel.

groundwater level and drainage

settlement and liquefaction screening

salinity and corrosion near the coast

Context 02 · volcanic terrain

Ubud and its slopes

Weathered volcanic formations, variable permeability, steep terrain and monsoon runoff.

slope stability

cut, fill and retaining structures

possible perched water or seepage

Context 03 · limestone and karst

Uluwatu · Bukit

Regional coral-limestone and karst context; rock may be fractured, irregular or locally contain voids.

variable rockhead depth

voids to investigate, never assume

cliff stability, drainage and wastewater

Regional information identifies questions. Only parcel history, inspection, survey, ground investigation, testing, groundwater observations and professional interpretation establish the site-specific ground model.

Regional geological and hydrogeological studies describe a predominantly volcanic island, with important alluvial deposits in lowlands and coral-limestone or karst settings in parts of the south. Even within one regional groundwater basin, the sequence, thickness, fractures, permeability and water level can change materially. A published regional section is therefore useful for deciding what to investigate; it is not a site section for a parcel.

Three recurring Bali contexts illustrate why the brief must remain site-specific:

Volcanic slopes and valleys may contain weathered volcanic materials, lava or pyroclastic sequences. The questions include slope stability, erosion, concentrated runoff, perched water and preferential flow through fractures or more permeable layers.

Alluvial or coastal lowlands may combine natural sediments, placed fill and a shallow water table. Depending on the exact site, the brief may need to address settlement, liquefaction screening, flooding, drainage, corrosion and saline intrusion.

Bukit limestone or karst settings can include fractured coral limestone, dissolution features and cavities. The investigation may need to test bearing conditions, variable rockhead, rapid infiltration, cliff or ravine stability and the consequences for wastewater disposal.

These scenarios orient the questions; they are not diagnoses. The parcel must be characterised from records, professional inspection, survey levels and observed drainage, followed by targeted hydrogeological or geotechnical investigation where the risks justify it.

Ground investigation can condition the purchase, not merely the design after it

Pre-purchase decision sequence Reduce uncertainty before a non-refundable commitment

01 · Records and maps Previous use, fill, slope, drainage, neighbours and dated regional screening.

02 · Site walkover Survey levels, visible water pathways, access, retaining structures and coastal exposure.

03 · Targeted investigation Boreholes, SPT or CPT, coring, laboratory work, geophysics and groundwater observations as risk requires.

04 · Project consequences Translate evidence into foundations, earthworks, drainage, programme, cost and transaction conditions.

Owner decision

continue with written assumptions make conditional or renegotiate investigate further pause or walk away

The pre-purchase scope depends on risk, intended development and seller access. Investigation rights and transaction conditions must be structured with the appropriate legal or notarial adviser.

A bore log for a water well and a geotechnical investigation are not interchangeable. The first records the water-source construction and encountered ground. The second must answer whether the proposed buildings, pools, retaining walls, roads, drainage and earthworks can be supported safely and at a credible cost.

Indonesian geotechnical guidance recognises phased investigation: a preliminary stage to establish the ground model and risks, followed by design investigation using tools such as boreholes, SPT or CPT testing, soil and rock samples, laboratory tests and groundwater observations as appropriate. The exact programme belongs to the qualified geotechnical professional; a generic number of boreholes or metres does not.

Before a deposit becomes unconditional, an independent owner-side team should at least ask whether ground risk could materially change:

foundation type, depth or settlement allowance;

retaining walls, excavation support or slope stabilisation;

drainage, dewatering or wet-season construction;

usable building area, access and construction logistics;

programme, insurance availability or total development cost.

If the answer could change the decision to buy, the investigation belongs before the commitment or inside an express technical condition. It should not be deferred merely because a contractor normally studies the soil after acquisition. See the separate independent property due-diligence note for the wider title, access, zoning, building, environmental and transaction gates.

Depth · bore construction · groundwater flow · evidence Deeper can be better protected: if the right interval is isolated

Surface and sanitation Runoff and on-site wastewater are potential pathways, not a diagnosis for every parcel.

Shallow groundwater An unconfined water table is generally more exposed where sanitation systems are dense or leaking.

Protected interval A deeper horizon may reduce recent surface exposure only where protective layers truly separate it.

Bore and proof Screen, casing, annular seal, flow, pumping and raw-to-tap laboratory results decide the case.

Conceptual section, not to scale. It represents one possible developed lowland or coastal context around Denpasar, Seminyak and Canggu, not a specific parcel. Layer type and depth, groundwater direction, water levels, salinity and screen interval must be established from records, investigation, the driller’s log and competent professional interpretation.

Water quality depends on a complete chain, not a filter cabinet

From aquifer to tap Four links, one accountable system

01 Source

Aquifer, local risks, salinity and sustainable yield

02 Bore

Depth, screen, casing, sanitary seal and protected wellhead

03 Treatment

Components selected for contaminants actually measured

04 Distribution and proof

Tanks, pipes, maintenance and testing at representative points of use

Performance is verified in raw water, after treatment and at representative taps.

A reliable villa water system has four connected layers:

Source : aquifer, local contamination risks and sustainable yield.

Bore : depth, screen, casing, seal, wellhead and pumping conditions.

Treatment : equipment selected for measured contaminants and required flow.

Distribution and verification : tanks, pipes, pressure, stagnation control, maintenance and testing at the taps.

Weakness in any one layer can compromise the result. A premium equipment list cannot repair a badly located or badly constructed bore, and correctly treated water can be re-contaminated in a dirty tank or poorly managed distribution network.

Test first. Specify treatment second.

The initial laboratory panel should be defined for the site and intended use. A practical baseline commonly considers:

total coliforms and E. coli ;

nitrate and other locally relevant indicators of sanitation or land-use impact;

turbidity;

pH;

conductivity, total dissolved solids and chloride;

hardness and alkalinity;

iron and manganese;

any additional parameters identified by the laboratory, hydrogeologist or applicable Indonesian requirements.

Sampling should distinguish between raw water at the bore , water after treatment and water at representative points of use . Testing should be repeated after commissioning, after repairs or flooding, when taste, smell or appearance changes, and periodically under an operations plan. Where seasonal conditions may materially change the source, wet- and dry-season results can be useful.

Clear water is not a laboratory result.

What the findings may change

Finding or risk

Evidence to obtain

Typical design response

What not to assume

Microbiological contamination

E. coli , total coliforms and sanitary inspection

Correct source or well defects; validated disinfection; clean storage and distribution

A carbon cartridge makes the water safe

Turbidity or sediment

Turbidity, particle load, bore and tank inspection

Settling or media pretreatment, sediment filtration and maintainable backwash arrangements

A finer cartridge alone solves a persistent source problem

Iron or manganese

Laboratory result, staining and deposit inspection

Oxidation and contaminant-specific media where justified

Activated carbon is the primary solution

Hardness and scale

Hardness, alkalinity and operating temperature

Conditioning or softening where lifecycle benefits justify it

Hard water is automatically unsafe

High TDS, chloride or salinity

Conductivity, TDS, chloride and seasonal comparison

Source review, blending or appropriately designed reverse osmosis

A deeper bore will always reduce salinity

Nitrate or other dissolved contaminants

Accredited laboratory panel

Source correction or validated contaminant-specific technology

UV removes dissolved chemicals

Taste or odour

Laboratory analysis plus tank and distribution inspection

Correct the cause; carbon or other treatment only where appropriate

Smell alone proves septic contamination

Low or aggressive pH

pH, alkalinity and material review

Conditioning and corrosion-control strategy

Visually clear water is harmless to pipes and fittings

These are design directions, not equipment prescriptions. The final treatment train must match the actual chemistry, microbiology, flow, pressure, maintenance capacity and applicable standard.

Why “seven stages” may still be the wrong system

Stage count is a marketing description, not a performance specification.

Carbon, sediment filtration, fine cartridges, reverse osmosis, ultraviolet treatment and ozone can each serve a purpose, but they do not remove the same contaminants and are not automatically appropriate together. Their order, capacity, contact time, pressure loss, monitoring and maintenance determine whether they work.

Not every component “backwashes.” Media vessels may backwash; disposable cartridges are replaced; RO membranes require their own operating and cleaning regime; UV lamps require verified dose and maintenance; ozone requires controlled contact and safety provisions. A single 4 a.m. description should therefore not be presented as if every stage performs the same self-cleaning cycle.

A robust design also addresses:

normal and peak villa demand;

pressure loss and bypass arrangements;

alarms or safe failure modes;

tank hygiene and stagnation;

backwash and RO reject-water disposal;

consumables, spare parts and local service capability;

post-treatment chemistry and material compatibility;

sampling points before treatment, after treatment and at the tap.

Seven well-chosen barriers can be useful. Seven poorly matched boxes can create cost, wasted water and false confidence.

Water quality affects the building as well as the user experience

Hardness can create scale in hot-water systems, pipes and heat exchangers. Sediment can affect valves, pumps and fittings. Chloride, high dissolved solids or unsuitable pH can increase corrosion risk. Iron and manganese can produce deposits and staining.

These effects can shorten equipment life, restrict flow, increase energy use and make maintenance more frequent.

Water composition can also change how water feels, how soap performs and whether fixtures, laundry or surfaces stain. Those are legitimate comfort and operations issues, but skin or hair sensations are not a water-safety test and should not be presented as medical evidence.

The DALLEAU owner-side water brief

DALLEAU treats water as a project system rather than a late equipment purchase.

1. Establish the source risk

Record the proposed well location, surrounding septic and drainage conditions, coastal exposure, expected demand and any available hydrogeological advice. Confirm zoning, the applicable permit and operating requirements through the relevant authorised professionals.

2. Preserve the bore record

Require the driller’s record: coordinates, total depth, geological observations, casing, screen interval, sanitary seal, yield test, pump details and completion date. “Approximately 60 metres” is not enough for future maintenance.

3. Build a laboratory baseline

Test raw water before freezing the treatment design. Keep the full report, sampling date, laboratory details and method: not only a message saying that the water “passed.”

4. Approve a basis of design

The specialist should state which measured risk each component addresses, the rated flow, pressure loss, contact time, reject or backwash volume, maintenance interval, consumables and response to failure.

5. Commission the complete chain

Verify operation and water quality at the raw source, after treatment and at representative taps. Confirm tank cleanliness, pressure, bypasses, alarms and maintenance access.

6. Hand over an operating system

The owner should receive drawings, equipment schedules, laboratory reports, settings, warranties, consumable references, service contacts, maintenance logs and a retesting schedule. That record is what allows a future operator, buyer or technical adviser to understand the system without guessing.

Harmonie: an approximately 60-metre bore, not a universal rule

In a densely developed setting, a deeper source may be better protected from infiltration associated with shallow sanitation systems, particularly where a lower-permeability layer separates it from near-surface water. That benefit must be demonstrated for the parcel: a deep bore with defective casing or sealing can connect intervals that should remain separate.

At Harmonie, the project team therefore chose a bore to approximately 60 metres and paired it with multi-barrier treatment. The choice responds to that site; it does not establish that all water captured at 60 metres is naturally pure. Evidence must cover the driller’s record, raw-water analysis, treatment basis, storage and distribution, commissioning results and maintenance plan.

Questions an owner should ask before approving the system

What contamination and salinity risks were considered?

Where are the casing, screen and sanitary seal shown?

Which raw-water laboratory results drive the treatment design?

Which component addresses each measured parameter?

What happens if the pump, UV lamp, dosing system or filter fails?

How much water is used or rejected during treatment and cleaning?

Who will maintain the system, using which consumables?

Where can raw, treated and point-of-use samples be taken?

Which commissioning result and future retest demonstrate performance?

Questions owners ask

Is water from a 60-metre well necessarily safe?

Not by depth alone. It may reach a better-protected aquifer, but safety depends on geology, construction, pumping conditions, surrounding risks and laboratory results.

Can a seven-stage system make any well water drinkable?

No. No single sequence treats every possible contaminant. The system must be selected and validated against the measured water, intended use and applicable Indonesian requirements.

Does a bad smell prove contamination from a septic tank?

No. It is a reason to investigate, not a diagnosis. Septic pathways, the bore, tanks, microbiology, chemistry and plumbing may all need to be checked.

Is reverse osmosis always necessary?

No. RO can address certain dissolved contaminants, including salinity, but it also creates reject water and needs appropriate pretreatment, maintenance and post-treatment consideration. It should be specified because the laboratory result justifies it.

Does UV solve the whole problem?

No. UV can inactivate susceptible microorganisms when properly sized and operated, but it does not remove dissolved chemicals, sediment or salt and provides no lasting disinfectant residual downstream.

When can treated water be described as potable?

Only when representative laboratory results demonstrate compliance with the applicable standard and the operational controls required to maintain that result are in place.

Sources and limits

Technical principles were checked on 21 July 2026. They do not replace Indonesian law, local hydrogeological advice or accredited laboratory results.

WHO Guidelines for Drinking-water Quality, Chapter 4 : groundwater vulnerability, bore protection, multiple barriers and distribution control.

WHO sanitary inspection package for boreholes : sanitary construction and risk inspection.

Denpasar isotopic groundwater study (2022) : local evidence that a well described as deep can still draw shallow-origin groundwater when its screened interval remains in the shallow aquifer.

Historical Denpasar on-site wastewater study : 2016 to 2017 survey evidence of non-watertight systems and a credible pathway to shallow groundwater; not a 2026 census of Canggu.

US EPA private-well construction guidance : casing and grouting prevent unwanted intervals from mixing; technical context, not Indonesian construction law.

CDC guidelines for testing well water : baseline and periodic testing.

US EPA on septic systems and drinking water : contamination pathways; technical context, not Bali setback law.

Udayana University study of shallow wells in Sanur Kauh : location-specific evidence, not a generalisation for all Bali wells.

Bali provincial research journal on seawater intrusion in North Kuta : location-specific salinity findings.

Permenkes No. 2 of 2023 : Indonesian health and environmental regulatory reference; the applicable parameter set must be confirmed at the time of testing.

CDC home water treatment systems : no single technology treats every contaminant.

US EPA secondary drinking-water guidance : scale, corrosion, staining, taste and odour.

NSF water-treatment standards : technology-specific certification and limitations.

Bali Province, groundwater basins in Bali : official regional aquifer context; not a parcel investigation.

Geological Agency research on the Denpasar to Tabanan groundwater basin : regional volcanic-aquifer framework and flow interpretation; not a universal Bali cross-section.

JICA, water-resources and geology study for Bali : regional volcanic, alluvial and limestone context and variable well conditions.

Directorate General of Highways, SNI 8460:2017 geotechnical design requirements : preliminary and design investigation framework, sampling, in-situ testing and groundwater observations.

JICA geological study of the Bukit Badung limestone context : regional coral-limestone, karst, doline and cavity context; not proof of a cavity under a parcel.

Bali disaster-risk assessment 2025 to 2029, Governor Regulation 25/2024 : official regional geology and multi-hazard screening context.

Three questions to explore next

Related question Groundwater permits for a Bali villa Related question Building Harmonie: the invisible systems that shape the stay Related question Property due diligence before paying a deposit

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

Owner-side method

Evidence before equipment

Record the source, bore construction, raw-water analysis, treatment basis, commissioning result and maintenance plan as one file.

Read next

Groundwater permits for a Bali villa Building Harmonie Property due diligence before a deposit

Key distinction

Clear, odour-free water can still fail a microbiological or chemical test. A filter count is not a performance standard.

## Bali villa groundwater permits: what owners need | DALLEAU

URL: https://dalleau.ai/notes/bali-villa-well-groundwater-permit.html

land and water
Bali villa wells: household use and commercial permits
A working tap does not prove that a villa may lawfully use its well. The file must identify who draws the water, which well supplies it, what the water is used for, how much is taken and what monitoring exists.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
16 July 2026
Verified | 16 July 2026 | primary sources
Updated 16 July 2026
Next scheduled review : 2026-10-15
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
A working tap does not prove that a villa may lawfully use its well. The file must identify who draws the water, which well supplies it, what the water is used for, how much is taken and what monitoring exists.
Energy and Mineral Resources Minister Regulation 4/2026 separates groundwater used for business from specified non-business uses. Tourism, housing and other commercial operators apply for a business groundwater permit, called
Izin Pengusahaan Air Tanah
, through Indonesia's Online Single Submission licensing system (OSS). Certain non-business users instead apply for a groundwater-use approval called
Persetujuan Penggunaan Air Tanah
. The under-100 m³/month exception in this regulation concerns basic daily needs per household or group; it should not be used to label water consumed by a commercial villa operation as automatically exempt.
The confusion comes from mixing the building with the use
A villa can look like a home and still be operated as tourist accommodation. The applicable permit follows the actual use and applicant, not the architectural appearance or the name on an electricity bill.
Permen ESDM 4/2026 expressly lists tourism, tourism areas and other services, as well as housing, offices and commercial areas, among the activities that require the business-groundwater permit. The regulation separately describes non-business approvals and limited situations in which a non-business approval is not required.
So the correct first question is:
Is water from this well used for a business, basic household needs, another non-business purpose, construction drainage, monitoring or aquifer recharge?
Do not start with the 100 m³ number. Start by classifying the use. For example, a bore well supplying guest rooms, a pool and villa staff remains connected to a commercial accommodation activity even if a meter shows less than 100 m³ in a month. That figure alone does not establish a household exemption.
What a buyer should identify before signing
For every bore or dug well, create a one-well record:
map pin and decimal-degree coordinates;
physical location, depth, construction drawing and visible condition;
construction date and drilling contractor, if known;
legal holder/operator and the entity that pays any groundwater tax or charge;
actual purpose: household, guest accommodation, staff, pool, irrigation, construction/dewatering or mixed;
abstraction estimate in m³/day and monthly meter history;
existing permit/approval number, issuing authority, issue and expiry date;
meter, recharge well and monitoring/reporting evidence;
inspection, warning, fine or complaint history; and
alternative supply and closure/remediation plan.
If the seller cannot locate the well or explain who holds the document, “water included” is not a due-diligence answer.
New application does not mean one universal form
For the non-business approval described in Permen ESDM 4/2026, the application data include identity, address, decimal-degree coordinates, intended use, planned abstraction in m³/day, an undertaking to build a recharge well where applicable, and a construction plan. The authority can limit the approved withdrawal volume according to the conservation zone and hydrogeological data.
For business abstraction, the application is through OSS, while the detailed requirements and obligations also depend on the risk-based licensing rules for the energy and mineral-resources sector. No single authority, document or processing time can therefore be promised for every site.
Existing unapproved wells require immediate classification
The regulation creates regularisation and administrative-fine mechanics for unapproved or expired groundwater use. Its Article 15 three-year filing period is stated for non-business
Persetujuan Penggunaan Air Tanah
; do not apply that period automatically to a commercial villa's
Izin
route. For a business well, confirm the applicable regularisation process, possible fine and deadlines with the competent authority and a groundwater specialist.
As of this article's review date,
do not market Article 15 as an open amnesty
. An old unapproved well should go directly to a specialist for status, fine, application, closure or replacement advice.
Approval is not the end of the file
For the non-business approval route, obligations in the regulation include following technical conditions, installing an outlet meter except for monitoring wells, building a recharge well, allowing inspections, reporting hazards, remediating environmental damage and paying applicable public charges. Approvals for uses other than basic daily needs are generally issued for no more than seven years; an expired approval not extended can trigger a duty to close the well within 30 calendar days.
Supervision can be periodic through technical reports or incidental through site inspection. Administrative sanctions can progress from written warnings to temporary suspension and revocation.
Read the exact obligations from the business permit and the applicable risk-based licensing rules. Do not copy a non-business checklist into a commercial operator's file without validation.
Five deal questions that prevent an expensive surprise
Which person or entity draws the water after the purchase?
Is the use business, non-business or mixed, and who confirmed that classification?
Does the document identify this exact well, its coordinates, its use and the approved withdrawal volume?
Are meter, recharge, reporting, tax and inspection records current?
What happens to operations if abstraction is reduced, suspended or the well must close?
The answer should feed the operating budget: connection or tanker alternatives, storage, filtration, testing, meter work, recharge, renewal, professional fees and downtime.
Questions owners ask
We use less than 100 m³ a month. Are we exempt?
Not necessarily. The exception cited in Permen ESDM 4/2026 is framed for basic daily needs, not as a blanket exemption for a tourism business.
The landowner drilled the well years ago. Can the villa company use it?
Do not assume so. Match the holder, actual operator, use, coordinate and transitional status.
We pay groundwater tax. Does that prove the well is licensed?
A payment record is useful evidence, but it is not a substitute for the applicable permit or approval.
Can this note determine which authority issues the document?
It can help classify the case and prepare the evidence file. The competent authority and current application process require site-specific confirmation by a specialist.
sources checked: 15 July 2026
Primary source: Permen ESDM 4/2026. General information only; not water, environmental, land, building or licensing advice.
Additional official references
Register checked 16 July 2026. The current official source and the project facts remain controlling.
ESDM JDIH: Regulation 4/2026
ESDM: official Regulation 4/2026 PDF
Two questions to explore next
Related question
Well depth, water quality and treatment from aquifer to tap
Related question
Can you still build in Bali? What the 2026 moratorium covers
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Website
I would like to receive Field Notes and have read the privacy notice.
Read more
Subscribe
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
Seven checks before paying a deposit on Bali property
current villa licensing framework
Published context
current villa licensing framework

## Indonesia visas and work permits for Bali | DALLEAU

URL: https://dalleau.ai/notes/bali-visa-guide.html

Home / Field notes / Visa and residence desk

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Visa and residence desk Sources checked on 13 July 2026

Indonesia visas and work permits in 2026: the practical Bali guide

Visa labels are not a plan. Start with the activity: holiday, due diligence, negotiation, employment, company governance or remote work for a foreign employer. This guide separates entry, stay, work and investment status, then links every material claim to an Indonesian government source.

DALLEAU | Research and field notes Published

13 July 2026

Last verified

13 July 2026

Verified | 13 July 2026 | primary sources

Scope Independent information, no visa sales DALLEAU does not sell visas. This desk is maintained because immigration status changes how a property project can be visited, directed and operated.

Start here For a short holiday, the electronic visa on arrival (B1 e-VOA) is usually the simplest route for eligible passports. The longer personal-visit visa (C1) starts at 60 days. Business meetings are not employment. Local employment normally requires a matching work-stay category and the Ministry of Manpower process. The investor visa (E28A) has defined conditions and does not cover every operational job. The remote worker visa (E33G) is for work assigned by a company established outside Indonesia.

Primary rule Choose by activity

Sources Government only

Source checks Every 14 days

On this page Start with the activity, not the nickname Five systems that are often confused Short visits: B1, C1, C2 and D2 A personal stay beyond 180 days: E33 Second Home Working in Indonesia Investor status Remote work What an agent can and cannot change Our source hierarchy

Questions adapted to your profile Which visa fits your real stay?

The path shows only relevant questions. It returns a specific official route, its conditions, limits, next steps and family plan. No answer is sent to a server.

What is your main purpose? Holiday or family No professional activity Stay longer or scout Personal stay, homes or sites Meetings or negotiation Business without local employment Work online For an activity based outside Indonesia Invest or direct my company Shareholder, director or commissioner Work for an Indonesian activity Employment, clients or local delivery

How long do you want to stay? Up to 30 days One short stay 31 to 60 days A longer personal stay 61 to 180 days With extensions when permitted 1 to 2 years A real residence basis is needed Up to 5 years A long-stay plan

Who is coming with you? I am coming alone One route to establish Family or relatives are coming Each person's route must be checked

What is your relationship to the accompanying people? Married spouse Documented legal marriage Child or children Age and the parent's status matter Spouse and children More than one dependant route Unmarried partner Do not presume dependant eligibility Other relative Parent, adult child or another relationship

How old are the accompanying children? All are under 18 Exact age and birth documents still need checking At least one is 18 or older An independent route may be required

Which family basis may support your own long stay? I am married to an Indonesian citizen Verify E31A My spouse holds a temporary or permanent stay permit (ITAS/ITAP) Verify E31B My parent holds a temporary or permanent stay permit (ITAS/ITAP) Verify E31E My child holds a temporary or permanent stay permit (ITAS/ITAP) Verify E31H The principal holds a Golden Visa or Second Home Family Dependant process None of these Test Second Home or retirement conditions

What is the principal applicant's age? Under 55 Retirement routes are not selected 55 or over E33E and E33F can be checked

Which financial condition can you document? USD 130,000 in a state-owned Indonesian bank E33 guarantee to maintain Buy an Indonesian apartment worth at least USD 1,000,000 E33 Second Home guarantee, not a home owned abroad USD 50,000 in bank and USD 3,000 monthly E33E for age 55 or over USD 3,000 monthly and a sponsor One-year E33F route to verify None of these Show the closest valid route instead

What does the USD 1,000,000 property option cover?

The E33 page refers to a rumah susun or apartment located in Indonesia. It does not refer to a home owned abroad and does not confirm that a detached villa qualifies. The application starts with a commitment to buy, then proof of ownership must be reported to the Immigration Office that issued the temporary stay permit (ITAS) within 90 days after entry. The public page does not define the accepted title, valuation evidence or treatment of an apartment already owned. Verify those points before paying or signing.

Official E33 page Government source checked on 14 July 2026

Who pays you for the activity carried out while here? No one No paid work or service An overseas employer Employment agreement with a company outside Indonesia Overseas clients or platforms Freelance, consulting or creator income My own foreign company Without a clear employment agreement An Indonesian person or company Salary, fee or other compensation

Which tasks will you perform each week? Work only for the foreign activity No Indonesian client or operation Meetings, visits and negotiation Preparation, not delivery Director or commissioner decisions Documented governance Supervise my invested company Production of goods or services Produce or deliver the service myself Photography, coaching, sales, building or operations Run a local activity day to day Staff, clients, suppliers or guests

Which function family best describes the real role? Management or specialist expertise The exact title and duties must align Photography, video or creative production Do not assume the operational function is open Hospitality or operations Separate management, expertise and operational work Construction or technical trade The position, skills and sector matter Sales, administration or human resources Some positions are reserved or prohibited for foreign workers Another function The exact position needs a documented check

Do you hold shares in the sponsoring company? No or not applicable No Indonesian sponsoring company At least IDR 10 billion Documented shares in the sponsor Less than IDR 10 billion With or without a company role I do not know yet Structure or valuation still to check

Show the route to verify Start again

Detailed guides available now

Arrival desk Bali electronic visa on arrival: All Indonesia and autogates

Prepare your Bali arrival with official guidance on the e-VOA, All Indonesia declaration, autogates, extensions and common mistakes.

Read the guide Work authorization Working legally in Bali: visa, stay permit and employment approval

Understand the visa, temporary stay permit, employer plan, levy and position rules required for lawful employment in Indonesia.

Read the guide Investor status Indonesia investor visa E28A: permitted activities and work limits

Official E28A rules on the IDR 10 billion shareholding, sponsor, permitted director or commissioner activity, stay length and work limits.

Read the guide Remote work Indonesia remote worker visa E33G: who qualifies in 2026?

Check the official E33G requirements: foreign employer, USD 60,000 annual income, one-year stay, no sponsor and no Indonesian compensation.

Read the guide

Start with the activity, not the nickname

The official Indonesian visa directory contains many categories because different activities carry different legal consequences. Start by writing down what you plan to do in Indonesia, then choose the category that covers that activity and duration.

Your main activity

Start your check here

What it does not settle

Holiday, family visit or transit

Electronic visa on arrival (B1 e-VOA) or visa on arrival (VoA), if your passport is eligible

Employment, local services or Indonesian compensation

A longer personal stay and site scouting

Personal-visit visa (C1)

Operating a business or taking a local job

Meetings, negotiations and contract discussions

C2 for one entry, D2 for repeated trips

Employment, direct sales or continuous operational supervision

Employment in Indonesia

The work category matching the actual role, which may be E23, E25 or another current code, plus the Manpower process

Permission to work outside the approved role, employer or location

Investing and acting within a qualifying company role

Investor visa (E28A), if its current conditions are met

A blanket right to perform every daily operational task

Working remotely for an overseas employer

Remote worker visa (E33G), if the employment and income tests are met

Indonesian clients, Indonesian compensation or a tax exemption

This table is an orientation tool. The exact category must be checked on the official eVisa portal before payment.

Five systems that are often confused

Entry permission. A visa or visa exemption determines whether and why a person may enter Indonesia.

Stay permission. A visit stay permit (ITK), temporary stay permit (ITAS) or permanent stay permit (ITAP) determines the person's immigration status after entry. KITAS is an older common name for the temporary stay permit. It is not, by itself, a universal work permit.

Employment authorization. Where a foreign national is employed in Indonesia, the employer normally follows a separate Ministry of Manpower process, including approval of the plan for using a foreign worker (RPTKA) when it applies.

Company and investment status. Owning shares, sitting on a board and carrying out day-to-day operational work are not automatically the same activity.

Property and operating rights. No visa determines who owns land, whether a lease is enforceable, whether a building is licensed or whether accommodation may be sold nightly.

A visa can make a stay lawful. It cannot repair a weak land structure, legalize an unlicensed villa or turn an investment title into every form of employment.

Short visits: B1, C1, C2 and D2

The current B1 page describes a single-entry visit of up to 30 days, extendable once to a total of 60 days, for eligible travellers. It covers tourism, family visits, transit and attendance at meetings, incentives, conventions and exhibitions. It is not an employment route.

The C1 page starts at 60 days and says extensions may take the total to 180 days. The current coded page also lists limited pre-commercial activities, including discussion, negotiation, signing agreements and inspecting a potential investment site. The eVisa FAQ associated with this route is narrower and does not list those business interactions. If business is the main purpose, C2 is the clearer category and the live portal should be checked before relying on C1. Neither page authorizes paid work or selling services in Indonesia.

For an explicitly business-led visit, C2 is single-entry and D2 is multiple-entry. A D2 valid for one, two or five years does not grant a continuous stay for that whole period. The current page states a maximum of 60 days on each arrival, subject to its extension rules.

A personal stay beyond 180 days: E33 Second Home

The official E33 Second Home page , checked again on 14 July 2026, currently describes a stay of up to five years. It provides two alternative Immigration Guarantee routes:

Keep at least USD 130,000 in an account in the applicant's own name at a state-owned Indonesian bank.

Commit to buy a rumah susun or apartment located in Indonesia worth at least USD 1,000,000.

The property option does not refer to a home owned in the applicant's country of residence. The published process starts with a commitment to buy. Proof of ownership must then be reported to the Immigration Office that issued the temporary stay permit (ITAS) within 90 days after entry. The guarantee value must be maintained while the stay permit remains valid.

The public page does not confirm that a detached villa qualifies. It also does not define the accepted property title, valuation evidence or treatment of an apartment already owned before the application. The E33 visa does not itself override Indonesian property ownership rules. Confirm those points in the live eVisa portal before paying, reserving or signing.

The E33 page says eligible family may accompany the principal subject to the immigration rules. This is not one application covering the whole household. The live portal displays a separate Family Dependant for Secondhome Visa process, so the principal route and every accompanying person's status must be matched separately.

Working in Indonesia

Immigration and employment law form two connected layers. The coded E23 page currently contains no detailed public data. A separate official employment FAQ lists stays of up to 180 days, one year or two years, but does not display a visa code and must not be mapped automatically to E23. The exact work category may be E23, E25 or another current code. The Manpower framework separately governs the employer's use of foreign workers.

Read the full explanation in Working legally in Bali: E23, ITAS and RPTKA .

Investor status

The current E28A page permits investment, business establishment and specified director or commissioner activities in the company in which the person invested. It currently asks for evidence of at least IDR 10 billion in shares in the sponsoring company. If the holding is below that amount and the person holds a director or commissioner position, the page directs the applicant to the work visa corresponding to the role.

That threshold is an immigration condition. It should not be repackaged as a universal Manpower exemption or permission to perform any task in a villa. Read Investor visa E28A: ownership is not every job .

Remote work

The E33G page currently provides a one-year temporary stay for tasks assigned by a company established outside Indonesia. It asks for a foreign employment agreement and proof of at least USD 60,000 in annual salary or income. The official FAQ excludes Indonesian compensation.

It does not say that every freelancer, consultant or person with foreign clients qualifies. It also says nothing about tax residence. Read Remote worker visa E33G: the published criteria .

What an agent can and cannot change

An agent may help prepare a file, operate a sponsor account where one is required and manage follow-up. An agent cannot expand the activities permitted by the chosen category. For B1, the government provides a direct application route. Always check the domain, application record, fee and visa code against the official portal before paying a third party.

Our source hierarchy

We use the current coded visa page first, the official eVisa FAQ second and the controlling regulation for employment questions. When official pages conflict, we publish the conflict and use the narrower interpretation until it is clarified. The date changes only after the linked sources have been checked again.

What this changes for a property project

If your immigration question is connected to buying land, building a villa or operating accommodation, treat it as one workstream inside a wider project review. Visa status does not settle tenure, zoning, company licensing, tax or the right to sell short stays.

Scope: This is general information, not legal, immigration, tax or employment advice. Check the official page for your passport and activity before paying or travelling.

Government sources

01 Daftar Visa Indonesia Directorate General of Immigration, Republic of Indonesia · Visa directory · checked on 13 July 2026

02 The Official e-Visa Website for Indonesia Directorate General of Immigration, Republic of Indonesia · Application portal · checked on 13 July 2026

03 B1 Visa Kunjungan Wisata Directorate General of Immigration, Republic of Indonesia · B1 · checked on 13 July 2026

04 C1 Visa Kunjungan Wisata Directorate General of Immigration, Republic of Indonesia · C1 · checked on 13 July 2026

05 Tourism Visit Visa General Information Directorate General of Immigration, Republic of Indonesia · C1-related eVisa FAQ · checked on 13 July 2026

06 C2 Visa Kunjungan Bisnis Directorate General of Immigration, Republic of Indonesia · C2 · checked on 13 July 2026

07 D2 Visa Kunjungan Bisnis Directorate General of Immigration, Republic of Indonesia · D2 · checked on 13 July 2026

08 E23 Visa Kerja Directorate General of Immigration, Republic of Indonesia · E23 · checked on 13 July 2026

09 Employment Visa General Information Directorate General of Immigration, Republic of Indonesia · General employment stay information, code not displayed · checked on 13 July 2026

10 E28A Visa Investor Directorate General of Immigration, Republic of Indonesia · E28A · checked on 13 July 2026

11 E31A Visa Keluarga Penyatuan Keluarga dengan Suami atau Istri WNI Directorate General of Immigration, Republic of Indonesia · E31A · checked on 13 July 2026

12 E31B Visa Keluarga Penyatuan Keluarga dengan Pemegang ITAS atau ITAP Directorate General of Immigration, Republic of Indonesia · E31B · checked on 13 July 2026

13 E31E Visa Keluarga Anak dari Pemegang ITAS atau ITAP Directorate General of Immigration, Republic of Indonesia · E31E · checked on 13 July 2026

14 E31H Visa Keluarga Orang Tua dari Pemegang ITAS atau ITAP Directorate General of Immigration, Republic of Indonesia · E31H · checked on 13 July 2026

15 E33 Visa Rumah Kedua Directorate General of Immigration, Republic of Indonesia · E33 · checked on 13 July 2026

16 E33E Visa Rumah Kedua Lansia Mancanegara Directorate General of Immigration, Republic of Indonesia · E33E · checked on 13 July 2026

17 E33F Visa Rumah Kedua Lansia Mancanegara dengan Penjamin Directorate General of Immigration, Republic of Indonesia · E33F · checked on 13 July 2026

18 E33G Visa Rumah Kedua Pekerja Jarak Jauh Directorate General of Immigration, Republic of Indonesia · E33G · checked on 13 July 2026

Source dates: page updated on 13 July 2026 . Next source check planned for 27 July 2026 .

Related decisions

Arrival desk Bali electronic visa on arrival: All Indonesia and autogates Work authorization Working legally in Bali: visa, stay permit and employment approval Investor status Indonesia investor visa E28A: permitted activities and work limits Remote work Indonesia remote worker visa E33G: who qualifies in 2026?

Property project Preparing a property project as well?

We do not sell visas. If your move also involves land, a villa or an operating asset, send the location, budget, intended use and timing. That lets us decide whether a first project conversation is useful.

Start a property conversation

Official sources 13 July 2026

The government links were checked on this date. Where official pages differ, the guide identifies the conflict and uses the more cautious reading.

See the sources

Two questions to explore next

Related question Indonesia investor visa E28A: permitted activities and work limits Related question Indonesia remote worker visa E33G: who qualifies in 2026?

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Building Harmonie: lessons from the project | DALLEAU

URL: https://dalleau.ai/notes/building-harmonie.html

← field notes field report 4 February 2026 Building Harmonie: what we would repeat and what we would change

Harmonie is the residence that shaped our current project method. Three duplex villas on a 1,100 m² leasehold plot in Seminyak opened in summer 2024. The useful account includes the decisions that worked, the defects that surfaced and the changes made since.

1,100 m² leasehold plot in Seminyak, also expressed locally as 11 ares

3 duplex villas within one residence

300 to 320 m² usable interior area per villa in the internal plans

15 months main construction period, followed by furnishing and setup

Summer 2024 first guest stays

Delivered and operating documented continuity from construction through handover and current operation

DALLEAU | Research and field notes Published

4 February 2026

Last verified

20 July 2026

Verified | 20 July 2026 | project records and primary sources

In brief Harmonie is delivered and operating. Its public value here is a bounded record of decisions from construction through handover and continuing operation, including defects and corrections. No measured or commercial performance is published.

François became involved with Harmonie at foundation stage and assumed full control of the project during the casting of the second-floor slab. He then led the remaining construction, the opening and its continuing operation with the team. This chronology matters: Harmonie was not conceived from a blank page under DALLEAU's direction.

The Harmonie plot was secured under a long-term lease in 2022. Construction and finishing took about fifteen months. Furnishing, setup and trial operations followed before the first guest stays in summer 2024. The residence has operated since then, giving us a record of what worked on paper and what held up in daily use.

Harmonie is delivered and operating. The public record is limited to documented continuity from construction through handover and current operation, including decisions, defects and corrections. No measured or commercial performance is published.

Decisions we would repeat

Three identities, one level of comfort

Villa Soluna, Concrete Serenity and Casa Diplomatico were designed with distinct interiors: quiet minimalism, exposed concrete and Mediterranean colour. Each villa nevertheless follows the same practical brief, including enclosed air-conditioned living areas, a private pool, generous shared spaces, staff support and a multi-barrier water system documented beyond its stage count . Guests choose the atmosphere, while the basic comfort remains consistent.

Private villas that can become one residence

Each villa has its own entrance. A guest can book one villa, while a larger group can reserve the full residence. The common lobby, arrival sequence and operating team serve both formats. This flexibility has proved more valuable than duplicating every support space for each building.

Infrastructure that guests feel even when they do not see it

Water source, treatment and verification , cooling, storage, housekeeping routes and maintenance access rarely lead the photography. They shape the stay every day. Harmonie reinforced a simple design rule: specify the invisible systems early, then test how staff and guests will use them.

Problems that changed our process

Waterproofing was inconsistent across parts of the site, and drainage did not receive enough attention at the start of the project. Both issues appeared after handover, once heavy rain and daily operation tested the buildings. Remedial work cost more and caused more disruption than a clearer design, inspection and warranty process would have required.

We do not identify the contractor publicly. The lesson is procedural. References now need to be checked with former clients; waterproofing and drainage require defined inspection points; warranties must be explicit; and payments should follow accepted work at each stage rather than the calendar alone.

Changes we would make on the next residence

Plan water first. Drainage, waterproofing, rainwater collection and maintenance access should be resolved before finishes are selected.

Share the facilities that benefit every villa. Depending on the site and demand, a spa room, sauna, cold bath, café, lounge or coworking area may serve several villas more efficiently than separate amenities. The business case still needs its own cost, staffing and demand test.

Give arrival and parking more space. Harmonie's lobby works, but the first impression and vehicle access could better match the groups the residence now receives.

Test operations before the public opening. A short trial phase reveals housekeeping routes, check-in delays, maintenance access and training gaps before full-rate stays begin.

Build verification into the contract. Independent inspections and documented acceptance criteria now sit beside design intent and price.

Land cost: an internal comparable, not a market index

The lease file records an annual rate of about IDR 18 million per are when the plot was secured in 2022. A nearby 2025 comparable in the project file was discussed at IDR 32 million to IDR 35 million per are per year. That implies a nominal increase of about 78% to 94%. It is one local comparison, not an independent valuation or evidence that every Seminyak plot moved by the same amount.

Currency changes narrow the comparison for an owner measuring capital in euros. The European Central Bank's annual EUR/IDR series averaged roughly IDR 15,600 per euro in 2022. Bank Indonesia's non-USD reference-rate series was around IDR 20,666 per euro on 10 July 2026. On those two reference points, IDR 18 million is about EUR 1,154 and IDR 32 million to IDR 35 million is about EUR 1,549 to EUR 1,694. The illustrative change in euro terms is therefore about 34% to 47%, before tax, transaction costs and differences between the plots.

This calculation compares an internal lease record with one nearby internal comparable using public exchange rates. It does not measure the capital appreciation of a registered asset and should not be presented as a Bali land index.

Compliance must be part of the build programme

The current national framework includes Government Regulation 28/2025 and Tourism Ministry Regulation 6/2025 . The correct sequence depends on the company, location, building and activity. Harmonie's practical lesson is to align zoning, building approvals, business classification and operating permissions before construction decisions make a correction expensive.

Every later mandate has inherited the same controls: verified contractor references, early water planning, stage inspections, a trial opening and a clear distinction between the guest-facing design and the systems that keep the residence working.

Sources checked on 20 July 2026: internal Harmonie lease, design and construction records; Government Regulation 28/2025 ; and Tourism Ministry Regulation 6/2025 . Harmonie is delivered and operating. No measured or commercial performance is published. Report a correction .

Explore the visual record: see Harmonie during construction, after delivery and in operation .

Two questions to explore next

Related question Shared amenities or isolated villas: how to compare the two models Related question Is Bali still a good villa investment in 2026?

Model this decision in the Stay Matrix Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Can a foreign director work inside their own Bali business? | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/can-a-foreign-director-work-in-their-bali-business/

Field Notes

/

Decision guide

Field Notes · Immigration

Can a foreign director work inside their own Bali business?

What genuine direction covers, where another job begins, and why a PT PMA appointment does not automatically cover a local PT

01

Shareholder

02

Director

03

Commissioner

04

Employer

05

Authorised work

06

Actual activity

Yes. A genuine foreign director can actively manage and supervise the Indonesian company in which they hold the relevant corporate position and immigration or manpower basis.

No. The word

Director

on a deed does not authorise every job, every location or every connected company.

The practical answer depends on five things aligning:

Corporate appointment

+ shareholding

+ RPTKA approval or valid exemption

+ visa and ITAS

+ employer, work location and actual activity

The real question is not whether the foreigner is present every day.

It is:

Are they directing the company, or are they occupying another recurring operational job under a director title?

Boundary of this note

This note explains the distinction. It does not select a visa or manpower route for a particular person. The live deed, shareholding, manpower file, visa, ITAS, employer and actual work need to be reviewed together.

Two common but incomplete answers

The first is:

You are an investor. You cannot do anything inside the business.

That is too broad. Indonesian company law gives directors a real management function, and the immigration system has specific routes for company directors and qualifying investors.

The second is:

You are a director. You can do anything.

That is also too broad. Manpower and immigration rules still care about the position, employer, work locations and activity actually performed.

A useful answer needs to distinguish ownership, corporate authority and personal work authorisation.

Five roles that should not be confused

Role

What it gives

What it does not give by itself

Shareholder

Economic and voting rights as an investor.

It does not automatically make the person a director or employee.

Beneficial owner

Recognition of ultimate control or economic benefit.

It does not create a corporate appointment or work permission.

Director

Corporate authority to manage and represent the company within its purpose and articles.

It does not authorise every occupation in every related company.

Commissioner

Supervision and advice to the board of directors.

It is not the same as executive management.

Employee or foreign worker

A role performed under the relevant employer and manpower structure.

It must still match the permitted position, visa, ITAS and location.

A person can hold more than one of these roles. The file should show which one supports each activity.

What a genuine director can do

A real director is not confined to signing one resolution each quarter.

Recognisable director activity can include:

approving the business plan and budget;

setting pricing and commercial strategy;

appointing and directing senior managers;

reviewing occupancy, revenue and operating performance;

approving major procurement and supplier appointments;

negotiating material contracts;

setting controls and policies;

inspecting property and service standards;

deciding how the company responds to a serious incident;

supervising delivery of the company's goods or services;

representing the company with banks, partners and authorities within the corporate mandate.

Daily involvement is not automatically a problem. A founder-led business can have an active director.

The question is whether the recurring work still looks like direction and supervision.

Where another job begins

Consider the continuum:

Shareholder decision

↓

Board decision

↓

Executive supervision

↓

Operational management

↓

Line-level service work

The boundary is fact-sensitive. Indonesian rules do not provide a simple number of hours that turns management into another job.

The strongest clues are repetition, responsibility and how the business would describe the role if the person were not the owner.

Example A: recognisable director activity

The director arrives at the property twice a week.

They review the GM's performance, approve a new pricing policy, inspect service standards, negotiate a laundry contract, review a serious guest complaint and decide whether to replace the operations manager.

That is readily intelligible as direction and supervision.

Example B: a different recurring occupation

The “director” works the reception desk every day, answers all booking messages, performs check-in and check-out, sells transport, prepares staff rosters, drives guests and personally runs the villa-manager shift.

The issue is not that a director may never greet a guest or solve an urgent problem.

The issue is that the recurring occupation now looks like another job.

A director title does not automatically cover that job if the manpower and immigration file does not.

E25B and E28A answer different questions

The current immigration list includes:

E25B

, a work-visa category for a company director;

E28A

, an investor category that can allow a qualifying investor to undertake business and investment activities, serve as director or commissioner in the company in which they invested, and supervise production of its goods or services.

These labels are not interchangeable.

The appropriate route depends on:

the person's shareholding;

the deed appointment;

the manpower position;

whether an RPTKA approval or exemption applies;

the intended work;

the employer and locations.

“Investor KITAS” is not a complete legal analysis.

KITAS is not the work description

KITAS remains common everyday language. The formal stay permit is ITAS.

More importantly, a stay permit does not describe every activity the person may perform.

A coherent file should align:

Deed appointment

+ shareholding evidence

+ RPTKA approval or statutory exemption

+ visa index

+ ITAS

+ permitted position

+ employer

+ work locations

+ actual daily activity

A mismatch at one layer can matter even when the other documents exist.

The employer matters

This point becomes critical in the PT PMA and local PT structure.

Assume:

the foreign founder is director and shareholder of PT PMA A;

PT local B appears on the OTA;

B contracts with guests and receives the money;

B holds the accommodation-operating role;

A invoices B for management services.

The founder personally gives daily instructions to B's team, controls B's reservations and prices, approves B's refunds and acts as B's villa manager.

The director appointment in A does not automatically authorise work for B.

The companies are separate legal persons.

The management agreement can explain why A provides a service to B. It does not automatically transfer the foreign individual's personal work authority from A to B.

The right questions are:

Is the foreign director genuinely directing A's management service?

Does A employ the people and operate the systems through which the service is delivered?

Is the individual actually acting as B's manager or employee in practice?

Which company benefits from the daily work?

Which employer and locations appear in the manpower and immigration file?

A concrete two-company example

Coherent version

PT PMA A employs a revenue manager, finance manager and operations director.

The foreign director supervises that team, approves A's management policies, reviews property performance and attends a monthly operating meeting with B's Indonesian directors.

PT local B employs the villa staff, controls the guest contract, pays the team, handles check-in and carries the customer obligation. B's Indonesian GM gives daily instructions on site.

The foreign director may inspect and challenge performance, but the people, systems and authority show that A provides a management service and B operates the accommodation.

Contradictory version

A has no management team.

The foreign director personally logs into B's OTA, sets every price, answers guests, gives instructions to housekeepers, approves leave, handles refunds and disciplines B's staff.

The only evidence of A's service is an invoice.

In that version, the personal activity may look less like directing A and more like working inside B.

Multiple-company roles need their own basis

Indonesian rules contemplate some situations where a foreign worker can work for more than one employer in the same position, including certain director or commissioner arrangements.

That is not a general permission to work across a group.

Each role needs support from:

the corporate appointment;

the relevant employer relationship;

the manpower framework;

the visa and ITAS;

the recorded work locations;

the actual function.

Common ownership or a management contract does not merge two employers into one.

Commissioner is not another word for director

A commissioner supervises and advises the directors.

A director manages the company.

A foreign person appointed only as commissioner should not assume that the title authorises ordinary executive management.

The same substance test applies. What does the person actually do, for which company, and under which authority?

HR remains a restricted area

Foreign workers do not have an unrestricted right to occupy personnel or human-resources positions.

A director can approve an organisation design, appoint senior leaders and set policy.

That is different from functioning as the company's recurring HR officer, administering employee files or occupying another restricted personnel role.

The title on the email signature does not change the function.

What an inspector can see on site

A paper file matters. So do operating facts.

An inspector can ask:

who gives instructions to the team;

whose WhatsApp account runs the staff group;

who approves rosters and leave;

who controls the OTA and PMS;

who handles guest complaints;

which company employs the person;

where the person works;

what position appears in the file;

whether the stated investment and corporate role have substance.

A deed is weak protection when the daily business shows another occupation.

A practical activity matrix

Activity

Usually recognisable as director-level

Requires closer review

Often looks like another recurring job

Approve annual budget

Yes

Set pricing policy

Yes

Direct the GM

Yes

Inspect standards

Yes

When it becomes daily line supervision

Negotiate major contract

Yes

Resolve exceptional guest incident

Yes

If this becomes the ordinary service role

Answer reservation messages daily

Yes

Perform check-in and check-out as routine

Yes

Build staff rosters every week

Depends on authorised executive scope

Often

Drive guests

Yes

Sell tours at the property

Yes

Perform recurring HR administration

Restricted area requiring specific caution

This is not a statutory whitelist. It is a practical way to identify when a director title may be covering another job.

What a foreign owner should verify in writing

What exact position appears in the deed?

Is the person shareholder, director, commissioner or more than one?

What share value and percentage are personally registered?

What is the legal basis for any RPTKA exemption?

Which visa index is held?

What activities does that route expressly support?

What ITAS has been issued?

Which company appears as employer or sponsor?

What position is approved where RPTKA applies?

Which work locations are recorded?

Is the person active in a second company?

What corporate appointment supports that second role?

What manpower and immigration basis supports it?

Which recurring operational tasks are performed?

Which company benefits from those tasks?

Who signs instructions to the staff?

Who controls the systems used each day?

Do the company KBLI and the individual's function fit together?

What reporting and DKPTKA obligations apply?

What would an inspector see during an ordinary week?

The decision in plain language

A foreign director can work actively inside their own Indonesian business when the corporate, manpower and immigration structure supports the role.

The director can set strategy, supervise management, inspect standards, make material decisions and respond to serious operating issues.

The title does not authorise every line-level job or automatically extend to a separate local PT.

The rule to keep is:

The deed, visa, manpower basis, employer, locations and ordinary week should all describe the same job.

Talk to François

Sources and direct verification links

Law 40/2007 on Limited Liability Companies

Immigration: E25B company-director work visa

Immigration: E28A investor visa

PP 34/2021 on the use of foreign workers

Permenaker 8/2021 implementing PP 34/2021

Immigration Bali: 2026 Dharma Dewata patrol and accommodation-provider duties

Law 25/2007 on Investment

Official OSS KBLI 55901, accommodation-management services

The live visa, ITAS, RPTKA or exemption file, employer, position and work location control a real individual's answer. A company deed or familiar word “KITAS” is not enough by itself.

## Can a PT PMA operate a Bali villa? | DALLEAU

URL: https://dalleau.ai/notes/can-a-pt-pma-operate-a-bali-villa/

Field Notes
/
Decision guide
Field Notes · Companies
Can a PT PMA operate a Bali villa?
The practical routes for direct operation, a genuine local operator and a separate management company
01
Direct PMA
02
Independent operator
03
Genuine local PT
04
PMA management
Format
Decision guide
Subject
Companies and licensing
Editorial revision
13 August 2026
Sources checked
13 August 2026
Reading time
15 min read
On this page
Start with a real owner situation
The four routes at a glance
Route 1: direct operation by a new PT PMA under 55203
Route 2: appoint an independent Indonesian operator
Route 3: create a genuine local PT with two Indonesian shareholders
When the local PT does not match its stated role
Route 4: local operator plus PT PMA management company
The PT PMA can invoice a service. It cannot invoice “the profit”
Who is the real operator?
What each route requires in writing
The decision in plain language
Sources and direct verification links
Here is the practical answer first.
A new PT PMA has no visible large-enterprise route under KBLI 55203, Aktivitas Vila, in the current public licensing matrix.
The code is written for private homes rented to tourists and managed by their owners. The current matrix shows micro, small and medium business rows, but no
Usaha Besar
row. A new PT PMA should therefore not be structured on the assumption that 55203 is available to it.
Indonesia now has a separate code for third-party operational accommodation management: KBLI 55901.
It covers a manager that participates in daily operations and managerial decisions on behalf of the property owner for a management fee. Nationally, the current matrix includes a large-enterprise route. In Bali, however, live OSS access still needs to be checked because the province closed new PMA access to the old KBLI 55900 category, from which 55901 was later split.
A genuine Indonesian PT can potentially be the accommodation operator.
But a foreign investor cannot hold shares in that company while continuing to call it a domestic PT. If two Indonesian employees become its shareholders, they become real owners with real rights.
A PT PMA can potentially provide genuine management or support services to that operator.
It cannot make the arrangement defensible simply by issuing an invoice, and it cannot turn the operator's residual profit into a management fee after the fact.
These four points define the practical decision. The sections below set out what each route can resolve, the conditions it requires and the questions that remain project-specific.
Boundary of this note
This is DALLEAU's reading of public sources available on 13 August 2026. It does not select a company, KBLI or contract structure for a specific project. A live OSS result and review of the actual corporate, property and operating file remain necessary.
Start with a real owner situation
Assume the following.
You have three villas in Bali. A PT PMA holds the leases or another lawful interest in the properties. You want to advertise short stays, receive bookings, employ the on-site team, perform check-in and check-out, provide housekeeping and breakfast, sell some guest services, collect the money and retain control of the operating business.
You are then told:
Create a local PT with two employees. Let the local PT invoice the guests. Your PT PMA can invoice the local PT and recover the profit.
That advice compresses at least five separate questions into one sentence:
Which company may supply the accommodation?
Which company may manage the accommodation for somebody else?
Who owns and controls the local PT?
What can the PT PMA legitimately invoice?
Under which company is the foreign founder personally authorised to work?
Moving the invoice answers none of them by itself.
The four routes at a glance
Route 1
Route 2
Route 3
Route 4
01
1. New PT PMA operates directly under 55203
Current practical reading
No visible route in the current matrix.
55203 has no current
Usaha Besar
row.
What it solves
Nothing for a new PMA under that code.
What it does not solve
It does not become available because the property is marketed as a villa.
02
2. Independent Indonesian operator
Current practical reading
Potentially coherent.
A genuinely licensed operator contracts with guests and carries the operation.
What it solves
Separates property ownership or investment from hospitality operation.
What it does not solve
The operator still needs the correct activity, property rights, permits, people, tax and reporting chain.
03
3. Genuine local PT owned by Indonesian shareholders
Current practical reading
Potentially coherent, but it is genuinely their company.
What it solves
Creates a domestic operator able to access activities available to domestic business.
What it does not solve
It does not preserve hidden foreign ownership. Shareholder rights, exit, disputes and beneficial ownership must be real.
04
4. Local operator plus PT PMA manager or service company
Current practical reading
Potentially coherent if both sides are real.
55901 is the relevant management direction, subject to live Bali access and project-specific licensing.
What it solves
Allows central management capabilities to sit in a separate company.
What it does not solve
A management contract does not make an empty local PT a real operator or transfer the foreign director's work authority to it.
A fifth route sometimes appears in practice: using a hotel, aparthotel or another accommodation classification instead of 55203. That can be legitimate only when the physical property, service model and operating standard genuinely fit that classification. A company cannot convert a villa into a hotel in law by changing the wording on its website.
Route 1: direct operation by a new PT PMA under 55203
KBLI 55203 is not a general code for every property advertised as a villa.
Its official description covers short-term accommodation in private homes rented specifically to tourists and
managed by their owners
. The current public matrix linked to the OSS framework shows micro, small and medium business rows. It does not show a large-enterprise row.
A PT PMA is treated under the foreign-investment and large-enterprise framework. The practical result is clear:
A new PT PMA has no current visible route to register 55203 as its direct villa activity.
This conclusion is stronger and more useful than saying only that the code is “not expressly closed.” A business field can appear open in the abstract while remaining unusable by a new PT PMA because the licensing matrix does not provide the required business scale.
What about old licences?
An existing company may have a licence history created under KBLI 2020, an earlier OSS configuration or a transitional record. That file must be read on its own terms.
The conversion from 55193 to 55203 does not automatically cancel an existing licence, but it also does not prove that a new applicant can obtain the same position today.
For an owner, the rule is simple:
do not copy an older company's NIB and assume the same route remains available;
obtain the complete current OSS sheet, not only the five-digit code;
verify the business scale, risk level, location, standard certificate and licence history;
separate continuation of an old right from availability of a new application.
Route 2: appoint an independent Indonesian operator
A property owner or rights holder can potentially appoint a separate company to operate the accommodation.
The operator should not be selected because it owns a convenient KBLI in a screenshot. It should be able to show the complete operating chain.
A real operator normally has or controls:
the contractual right to use the property for the accommodation business;
the correct accommodation activity in OSS;
the relevant location and business-activity record;
the required tourism standard and supporting permissions;
the OTA merchant relationship;
the guest terms and cancellation policy;
the guest payout and refund process;
the operating staff or a clearly authorised management arrangement;
local tax registration and reporting;
APOA reporting for foreign guests;
insurance and customer-liability arrangements;
the operating risk when occupancy falls or a guest claim arises.
What this route resolves
It can allow the foreign-owned property or investment vehicle to remain separate from the company that supplies the stay.
The PT PMA may receive a contractually justified return through a lease, property-use agreement, management service, financing arrangement or another real transaction, depending on the actual rights and tax position.
What it does not resolve
An operator with one KBLI does not automatically legalise every property it touches.
The site, building use, PBG or SLF position, spatial compatibility, tourism requirements and local tax file still matter. The property cannot borrow compliance from the manager's company name.
The distinction is important:
Appointing a licensed company can solve the operator question. It does not automatically solve the property question.
Route 3: create a genuine local PT with two Indonesian shareholders
This route is often considered when an investor needs a domestic operating company for activities that are not available to the PT PMA.
The foreign investor is not a shareholder in the local PT. Two Indonesian employees subscribe for or receive the shares. They may later stop being employees, but they remain shareholders unless the shares are lawfully transferred or otherwise dealt with under the company documents and applicable law.
The phrase “I create my local PT with two employees” therefore obscures the legal and economic position.
If the share ownership is genuine, the company belongs to the Indonesian shareholders in accordance with the rights attached to their shares. It is not an asset of the foreign investor.
What genuine ownership means
Depending on the share class and company documents, the shareholders may have:
voting rights;
dividend rights;
rights to the value of the shares;
rights to attend and vote at general meetings;
influence over appointment or removal of directors and commissioners;
transfer rights or restrictions;
rights that continue after the employment relationship ends;
interests that can be affected by death, inheritance, divorce, creditors or a personal dispute.
A lawful shareholder agreement can regulate governance. It cannot preserve domestic ownership in form while transferring the full substance of ownership, control and economic benefit to the foreign founder.
The practical dilemma is unavoidable:
A shareholder with no real rights can create a nominee problem. A shareholder with real rights creates a genuine governance and economic relationship. “Use two employees” does not make either issue disappear.
A concrete governance example
Suppose Ayu and Budi each own 50% of the local PT.
The company operates three villas. Ayu and Budi later leave their employment with the PT PMA. The foreign founder cannot simply remove them from the shareholder register because they no longer work for the group.
A pre-agreed transfer mechanism may exist, but it must be legally valid and cannot merely neutralise their ownership from the first day. A transfer also raises valuation, tax, consent and corporate-procedure questions.
This is why the decision to use employees as shareholders cannot be treated as an administrative formality.
When the local PT does not match its stated role
The structure becomes difficult to defend when the local PT exists mainly in the following places:
the shareholder register;
the NIB or licence;
the OTA merchant name;
the guest invoice;
the bank account through which cash briefly passes.
Meanwhile, the PT PMA or foreign founder:
funds all equity and working capital;
controls the bank accounts;
appoints every director in practice;
sets prices and availability;
owns the OTA and PMS credentials;
recruits and directs the team;
approves every refund;
controls procurement and budgets;
retains almost all economic benefit;
can remove the Indonesian shareholders whenever desired.
The issue is not simply that the companies are related. Related companies can transact legitimately.
The issue is that the corporate ownership story, the beneficial-owner filing, the tourism-licensing story and the daily operating facts may describe different businesses.
Article 33 of the Investment Law directly addresses shares held for and on behalf of another person. Indonesia's beneficial-ownership framework also looks beyond the shareholder register to control, appointment rights and economic benefit.
No single indicator decides the case. The complete arrangement does.
Route 4: local operator plus PT PMA management company
This structure is most coherent when each company genuinely performs the role, bears the risks and retains the economics attributed to it.
GENUINE LOCAL OPERATOR
Guest contract
OTA merchant and payouts
Operating activity and location
On-site staff
Check-in and check-out
Housekeeping and maintenance delivery
Refunds and guest claims
PBJT and APOA responsibilities
Real decisions, working capital, profit and risk
↓ real service agreement
PT PMA MANAGEMENT OR SUPPORT COMPANY
Revenue management
Central reservations support
Marketing execution
Finance and reporting
Procurement support
Technology and systems
Senior management support
Named people, deliverables and evidence
Commercially supported fee
Why 55901 matters
KBLI 55901 now expressly recognises third-party accommodation management.
The official description is unusually specific. The manager can be responsible for overall business and operational performance, participate directly in daily operations and managerial decisions, act on behalf of the property owner and receive a management fee.
The classification also expressly excludes two different activities:
direct ownership and operation of accommodation;
general management consultancy without direct operational management.
That gives owners a clearer vocabulary.
If a PT PMA controls daily accommodation operations, its registered activity and licence position should reflect operational management rather than generic consultancy. Conversely, periodic strategic advice does not, by itself, make a company the operational manager.
The Bali complication
The national public matrix for 55901 includes a large-enterprise route and PMA-specific obligations. That is a material difference from 55203.
But Bali closed new PMA access in May 2026 to 18 low and medium-low risk categories, including the old KBLI 55900, “Other Accommodation.” KBLI 2025 later split the old 55900 lineage into several codes, including 55901.
The public sources do not yet establish how Bali applies the former 55900 restriction to every new 55901 application.
The correct owner-side statement is:
55901 is a nationally identifiable large-enterprise route for operational accommodation management. A new Bali application still requires a live OSS result and written confirmation of how the provincial restriction on old 55900 is being applied after the KBLI 2025 split.
The uncertainty is therefore limited to the live Bali application route; it does not alter the national distinction between direct operation and third-party management.
The PT PMA can invoice a service. It cannot invoice “the profit”
The determining question is whether the PT PMA provides an authorised, identifiable and economically valuable service.
A PT PMA can potentially invoice the local operator for services it is authorised and capable of providing. Examples may include:
revenue management;
central reservations support;
financial reporting;
procurement support;
marketing execution;
systems administration;
management supervision;
brand or technology rights, where separately defined;
properly documented cost recharges.
But the fee must follow a real transaction.
It should not be calculated as:
Whatever amount leaves only a token profit in the local PT.
Illustrative example
Assume the local operator receives IDR 1 billion of guest revenue in a month.
It pays OTA commissions, property staff, utilities, consumables, maintenance, local tax, insurance and other operating costs. The PT PMA supplies a real central-management package with six named employees, monthly revenue-management work, finance reporting, procurement, marketing and systems support.
The PT PMA may charge a fee supported by the actual scope and an arm's-length method.
It should not wait until year-end, calculate that the local PT has IDR 3.2 billion of profit, and issue an invoice for IDR 3.1 billion labelled “management fee.”
The second approach starts from a desired residual profit and calculates the invoice retrospectively. It does not establish an arm's-length price for a defined service.
Where the residual profit belongs
After genuine operating expenses and genuine intercompany charges, the residual result remains in the local PT.
Economically, that result belongs to the company and ultimately benefits its real shareholders according to their rights.
If the commercial objective is for the foreign founder to receive nearly all of that value, the structure requires a separate lawful economic basis. The ownership position cannot change depending on whether licensing or profit distribution is being examined.
Who is the real operator?
Ask ten questions:
Who holds the accommodation activity and location in OSS?
Who has the contractual right to operate the property?
Who appears as merchant or supplier on the OTA?
Who contracts with the guest?
Who receives and refunds the money?
Who employs and directs the property team?
Who controls pricing, reservations and the PMS?
Who files PBJT and APOA?
Who bears guest claims, operating losses and working-capital risk?
Who keeps the residual operating result?
No single answer proves the legal position. Together, the answers reveal whether the structure has substance.
A useful final test is:
Which company could still operate the accommodation tomorrow if the other company stopped helping?
If the local PT would be unable to price, reserve, staff, pay, refund or deliver the stay without the foreign founder personally taking over, it may not be the independent operator the documents claim it is.
What each route requires in writing
Direct operation by any company
complete OSS activity and scale sheet;
location and NKU record;
property-use right;
tourism standard and supporting permissions;
building and spatial file;
guest terms and OTA merchant identity;
staff and operating organisation;
local tax and APOA process;
insurance and liability allocation.
Genuine local operator
deed and AHU record;
evidence of real share subscription and payment;
shareholder rights and governance rules;
beneficial-owner filing;
lawful property operating right;
operating licences and standards;
independent bank, accounting and decision records;
clear relationship with the PT PMA.
PT PMA manager or service company
correct KBLI and live Bali OSS result;
management or service agreement;
decision-right matrix;
named employees and systems;
monthly work products;
pricing method;
PPh, VAT and accounting treatment;
evidence that the local operator still performs its own role.
The decision in plain language
A new PT PMA should not rely on 55203 as its direct villa-operating route. The current public matrix does not provide the large-enterprise path it would need.
A genuine Indonesian operator can potentially supply the accommodation. A PT PMA can potentially provide separately authorised management or support services. KBLI 55901 makes that distinction clearer, although its live availability for a new PMA application in Bali still needs to be confirmed against the provincial restriction.
Creating a local PT with two employees can therefore be part of a legitimate structure only when those people genuinely own the company and the company genuinely operates the business.
That structure requires real ownership, real governance and real economics.
A structure becomes inconsistent when the licence, invoice and shareholder register allocate roles one way while control and economic value follow another.
The rule to keep is simple:
Start with the real activity. Assign it to the right company. Give that company the rights, permissions, people, risk and economics needed to perform it. Let every invoice follow that reality.
Talk to François
Sources and direct verification links
Official OSS KBLI 55203, villa activity
Public 55203 risk and scale matrix
Official OSS KBLI 55901, accommodation-management services
Public 55901 risk, scale and PMA matrix
Bali Provincial Government: 18-category PMA OSS restriction
BPS: existing licences remain valid through non-substantive KBLI conversion
Law 25/2007 on Investment
Law 40/2007 on Limited Liability Companies
Ministry of Law Regulation 2/2025 on beneficial-owner verification
PMK 172/2023 on related-party transactions
The Unpad pages are public search aids for reading the current matrix. The issuing OSS system and applicable regulations control the legal result.
Continue from the question in front of you
Continue from the question in front of you
Who is the real villa operator?
→
A management fee pays for a service. It does not move profit by itself.
→
Can a foreign director work inside their own Bali business?
→

## Taking money out of a PT PMA: routes and taxes | DALLEAU

URL: https://dalleau.ai/notes/how-money-leaves-pt-pma.html

company and tax
Seven ways to receive or transfer value from a PT PMA, and how each is taxed
Owning a PT PMA, an Indonesian company with foreign investment, does not mean personally owning the cash in its bank account.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
16 July 2026
Verified | 16 July 2026 | primary sources
Updated 16 July 2026
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Owning a PT PMA, an Indonesian company with foreign investment, does not mean personally owning the cash in its bank account.
The company owns that cash. The shareholder owns shares in the company.
Money can move from one to the other, but only through a transaction with a real legal basis: dividend, repayment of a genuine debt, remuneration for work, payment for a genuine service, formal capital reduction or liquidation distribution. A shareholder can also receive money by selling the shares. In that case, the buyer, not the company, normally pays the purchase price.
Changing the label in the bank-transfer description does not change the legal or tax answer.
Lawful payment routes
Before asking “What is the tax rate?”, ask four questions:
Who owns the money now?
The PT PMA, the shareholder or a buyer?
Why is it being paid?
Profit distribution, debt, work, service, asset purchase, share purchase or return of capital?
What corporate act authorises it?
Contract, shareholder resolution adopted at a general meeting (RUPS), payroll, share-transfer deed, capital-reduction process or liquidation?
What evidence existed before the payment?
Accounts, retained earnings, loan ledger, invoice, valuation, residency certificate and withholding filing?
If the answers are unclear, do not make the transfer and try to document it afterwards.
The seven routes at a glance
Route
Who receives the first payment?
Corporate basis
Indonesian tax starting point
Dividend
Shareholder
Positive retained earnings and proper RUPS/use-of-profit decision
Nonresident statutory PPh 26 baseline 20% gross; treaty may reduce if qualified and documented
Shareholder-loan repayment
Lender/shareholder
Genuine prior loan, outstanding principal, repayment under agreement
Principal and interest must be separated; interest has withholding and deductibility analysis
Salary/director pay/service fee
Individual or service provider
Valid appointment/approval, actual work/service, arm's-length amount
PPh 21, PPh 23 or PPh 26 may apply depending on status and service; immigration/work rules separate
Company asset sale
PT PMA
Company sells its asset
Tax applies at company/transaction level; land/building transfer generally starts with PP 34 final-tax analysis
Share sale
Selling shareholder
Share-transfer documents and corporate updates
Foreign seller of unlisted Indonesian shares: domestic baseline may be effectively 5% gross, subject to treaty and mechanics
Capital reduction
Shareholder
Formal RUPS, creditor process and ministerial steps
Tax character depends on capital/profit history and legal implementation; not automatically tax-free
Liquidation
Shareholder after creditors
Formal dissolution and liquidation
Residue above paid-in capital can enter dividend treatment; company and transaction taxes settled first
PPh 21, PPh 23 and PPh 26 are Indonesian income-tax mechanisms for different recipients and payments. The table gives starting points only. The correct outcome depends on the accounts, parties, residence, treaty, documents, timing and exact transaction.
1. Dividend: distributing profit, not withdrawing cash
A dividend is the clean route when the company has distributable profit and the shareholders decide to distribute it correctly.
The Company Law distinguishes profit from cash. The RUPS determines how net profit is used, statutory reserves must be considered, and a dividend is available only where the company has a positive profit balance. A well-funded bank account does not create retained earnings. Cash may have come from share capital, a loan, a customer advance or the sale of an asset.
For a dividend paid to a nonresident shareholder, the Indonesian statutory withholding starting point is PPh 26 at 20% of gross. An applicable tax treaty may reduce that rate, but only if the recipient qualifies, satisfies beneficial-ownership and anti-abuse conditions, and supplies the current documentation through the Indonesian withholding agent.
An interim dividend is possible only under guarded Company Law conditions and can become repayable if the year ends in a loss. It should never be treated as an informal owner draw.
Evidence:
approved accounts, retained-earnings and reserve schedule, RUPS resolution, shareholder register, treaty/DGT documents, withholding and bank proof.
2. Shareholder loan: repay the debt that exists
If the shareholder previously lent money to the PT PMA under a genuine agreement and the company records an outstanding liability, repayment of principal is economically and legally different from paying interest or distributing profit.
Separate the payment:
principal
reduces the recognised loan balance;
interest
is income to the lender and can trigger Indonesian withholding, treaty and deductibility rules.
For interest paid to a nonresident, the statutory PPh 26 starting point is 20% of gross unless treaty relief applies. Related-party interest must be priced as independent parties would price it. Indonesia's debt-to-equity rule can limit the tax deductibility of borrowing costs, generally using a 4:1 maximum ratio for ordinary companies within scope. That rule does not mean that a company is legally unable to repay principal above 4:1.
The red flag is a “loan repayment” where no signed agreement, original transfer, loan ledger, interest terms or outstanding balance existed before the payment. Tax authorities and auditors look at substance, not the payment memo.
Evidence:
dated loan agreement, corporate approval where required, inbound bank evidence, ledger and confirmations, principal/interest schedule, arm's-length support, withholding and treaty documents.
3. Salary, director remuneration and service fees: pay for real work
A shareholder may also be a director, employee or service provider. That does not make every payment deductible or interchangeable with a dividend.
Director remuneration requires the corporate approval provided by the Company Law. Employment compensation enters the payroll/PPh 21 framework according to the person's tax status. Genuine domestic management, technical or consulting services can fall within PPh 23; payments for Indonesian-source services to a nonresident can fall within PPh 26, subject to permanent-establishment and treaty analysis.
The questions are factual:
Was real work performed?
Is there a valid appointment, work permit/immigration basis or service contract?
Is the amount arm's length?
Who performed the service, where and with what substance?
Does the invoice describe the same service as the company's KBLI and records?
A round-number “management fee” charged by an offshore shareholder with no people, deliverables or evidence is not a safe dividend substitute.
Evidence:
appointment/RUPS approval, employment or service contract, work product, time/deliverables, invoice, transfer-pricing support, payroll/withholding and immigration documents.
4. Asset sale: the company receives the price
If the PT PMA sells an asset it owns, the sale proceeds belong to the PT PMA. The fact that one shareholder funded the original purchase does not redirect the buyer's payment to that shareholder.
For a transfer of land/building rights within Government Regulation No. 34 of 2016, the general final income-tax starting point is 2.5% of gross transfer value, with different rates and exceptions for specified transactions. VAT, the exact legal right transferred, valuation, related-party pricing and other transaction charges also need review. For other assets, gains ordinarily enter the company's taxable income unless a special or final regime applies.
After the sale, the company may pay taxes and creditors, repay a genuine outstanding loan, or distribute eligible retained profit as a dividend. Each is a separate step with separate documents.
The unsafe version is: “The company sold the villa, therefore the shareholder can receive the Rp20 billion sale price.” The safe version traces the money through the company and then identifies the lawful route for every payment out.
5. Share sale: the shareholder receives the price
In a share sale, the shareholder sells shares to a buyer. The purchase price normally belongs to the selling shareholder; it is not revenue or new cash for the PT PMA.
The Company Law requires transfer documentation, updating the shareholder register and notification to the Ministry. The articles may require an offer to existing shareholders or corporate/authority approval. Beneficial-owner records may also need updating.
For a foreign shareholder selling unlisted Indonesian-company shares, the default domestic PPh 26 treatment commonly described by Indonesia's Directorate General of Taxes (DJP) is 20% of deemed net income equal to 25% of the gross selling price, effectively 5% of gross. That is not the final answer. A treaty may allocate taxing rights differently, and property-rich-company clauses can be decisive for a company whose value comes mainly from Indonesian real estate. The buyer and collection mechanism also need to be checked.
6. Capital reduction: a formal corporate event
Paid-in capital is not a wallet that the shareholder can refill and empty at will.
A reduction of issued/paid capital requires a formal RUPS decision and creditor-protection process under the Company Law, including announcement, objection periods and the required ministerial steps. It can be structured through cancellation/withdrawal of shares or a reduction in nominal value, depending on the legally approved process.
Tax character does not follow the bank label. Indonesia's dividend definition can capture certain profit-funded “capital returns”, while a valid statutory reduction requires tracing the actual paid-in capital and equity history. Share premium, accumulated profit, prior reorganisations and shareholder basis can all matter.
This route therefore requires corporate counsel and a qualified Indonesian tax adviser before the resolution, not only before the wire.
7. Liquidation: creditors first, shareholders last
Dissolution does not allow shareholders to sweep the account. The company enters liquidation. The liquidator inventories assets and liabilities, notifies creditors, realises assets, settles taxes and debts, then distributes the remaining residue and completes the closing process.
For tax, liquidation proceeds above paid-in capital can fall within the dividend concept. Asset disposals during liquidation can create their own company-level or final transaction taxes before the shareholder receives anything.
Liquidation can be the correct route for a company that has completed its purpose. It is not a shortcut around dividend, debt or capital rules.
Worked example 1: the PT PMA sells a property-related asset for Rp20 billion
The buyer pays the PT PMA because the PT PMA is the seller.
The company determines whether PP 34 final tax applies to the legal right transferred; the general baseline is 2.5% of gross where the rule applies, subject to the precise category and other taxes.
The company pays transaction liabilities and creditors and records the disposal.
It can repay verified loan principal to the extent genuinely outstanding, with interest treated separately.
It can distribute only eligible profit through a properly approved dividend, with withholding/treaty documentation.
The Rp20 billion does not become shareholder money at step one.
Worked example 2: the foreign shareholder sells shares for Rp20 billion
The buyer pays the selling shareholder because the shareholder is the seller.
The share-transfer deed, register, approvals and Ministry/beneficial-owner records are updated.
The domestic baseline for an unlisted PT share sale by a foreign holder may be effectively 5% of gross, but treaty entitlement and any property-rich-share rule are reviewed before closing.
The PT PMA does not receive the Rp20 billion unless the transaction separately includes new funding to the company.
Same headline price; different seller, money owner, documents, tax base and creditor position.
A treaty is not a rate lookup table
“The shareholder is in Singapore/France/the UAE, so the rate is X%” is not a complete analysis.
The current Indonesian treaty procedure asks who the recipient really is and whether treaty use is abusive. Relevant variables can include:
tax residence and current residence certification/Form DGT;
legal form and beneficial owner;
people, management, premises/assets and active business;
shareholding percentage and, where relevant, holding period;
whether the income is connected with an Indonesian permanent establishment;
whether company value is derived principally from Indonesian immovable property;
limitation-on-benefits and principal-purpose tests.
The treaty review belongs in the transaction timetable before payment. Missing documentation can force statutory withholding even where relief might later be claimed or refunded.
Repatriation is the final payment step, not the legal route
Indonesia's Investment Law recognises rights to transfer or repatriate foreign currency for categories including capital, profit/dividends, loan repayments, fees and sale or liquidation proceeds. Those rights remain subject to Indonesian law, tax and reporting obligations, creditor protection and specified legal holds.
The bank will also perform its own customer-identity and anti-money-laundering checks (KYC/AML), as well as a payment review. The exact document request is bank- and transaction-specific, but the company should expect to evidence the corporate basis, tax treatment and recipient.
A management fee is not a profit distribution method
A PT PMA can receive payment from another Indonesian company for a real service, asset right, loan or other lawful transaction. The amount must follow that transaction. The residual profit of the payer cannot be converted into a deductible management fee merely because the parties would prefer the money to sit in the PT PMA.
A management fee pays for a service. It does not move profit by itself.
The pre-payment checklist
Before any material transfer to a shareholder or related party, prepare one page answering:
Payer and legal owner of funds.
Recipient and tax residence.
Legal character and amount, with principal/interest split if relevant.
Corporate approval and contract.
Accounting entry and source account.
Indonesian tax base, rate and withholding agent.
Treaty article, entitlement variables and DGT/residency evidence.
Transfer-pricing support.
Immigration/work authorisation if services or remuneration are involved.
Bank document pack and filing/receipt owner.
If one transfer seems to fit two routes, stop. The correct answer is not to choose the cheaper label; it is to establish what happened.
Official sources
Company Law No. 40 of 2007
;
consolidated Indonesian Income Tax Law
;
PMK 112 of 2025 treaty procedure
;
DJP PPh 26 guidance
;
PMK 169/2015 debt-to-equity rule
;
PMK 172/2023 transfer-pricing rules
;
current PPh 21 framework
;
DJP PPh 23/26 guidance
;
PP 34 of 2016
;
Investment Law No. 25 of 2007
.
General educational information only. This is not legal, tax, accounting, treaty, immigration, banking or investment advice. Obtain transaction-specific Indonesian advice before approving or sending a payment.
Two questions to explore next
Related question
PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares
Related question
PT PMA, nominee or long lease: where the investor's rights sit
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Website
I would like to receive Field Notes and have read the privacy notice.
Read more
Subscribe
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares
PT PMA capital and reporting context
Seven checks before paying a deposit on Bali property

## Indonesia's 2026 home VAT incentive | DALLEAU

URL: https://dalleau.ai/notes/indonesia-2026-home-vat-incentive-foreign-buyers.html

2026 tax update

Indonesia's 2026 home VAT incentive: eligibility and calculation

Finance Ministry Regulation PMK 90/2025 can reduce the VAT on a qualifying new home delivered in 2026. It does not change which property rights a foreign buyer may lawfully hold.

DALLEAU | Research and field notes Published

16 July 2026

Last verified

20 July 2026

Verified | 20 July 2026 | primary sources

Just published PMK 90/2025 can reduce the VAT on a qualifying new home delivered in 2026.

Updated 20 July 2026 Current window to 2026-12-31 Next scheduled review : 2026-08-15

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Finance Ministry Regulation PMK 90/2025 can reduce the VAT on a qualifying new home delivered in 2026. It does not change which property rights a foreign buyer may lawfully hold.

A foreign individual can potentially use Indonesia's 2026 government-borne VAT incentive on one qualifying new house or residential apartment if the buyer has an Indonesian taxpayer number (NPWP) and is legally entitled to hold that type of property. The unit must be new, ready to occupy, first delivered by the taxable developer, carry the required identity code, cost no more than Rp5 billion and be legally handed over in 2026. The government bears 100% of the VAT attributable to the first Rp2 billion of price. It does not bear all the VAT on a Rp5 billion purchase. This does not give a foreigner Hak Milik freehold title. An ordinary Bali lease assignment would not normally be the first taxable developer delivery of a new ready-to-occupy home described by PMK 90/2025; that conclusion is transaction-specific and should be confirmed in writing.

Answer two separate questions first

The first question is can this buyer lawfully acquire this right over this asset?

The second is does this particular developer delivery qualify for the 2026 VAT incentive?

Meeting the tax conditions does not create a land right. PMK 90/2025 expressly includes a foreign citizen with an NPWP only insofar as the person satisfies Indonesia's separate rules for foreign ownership of a house or apartment. That sentence is a condition, not a shortcut.

If the proposed transaction is a private leasehold transfer, a resale villa, a land lease plus construction contract, shares in a PT PMA or an unfinished project without qualifying handover, do not assume this incentive applies merely because someone calls the asset “property”.

The actual 2026 conditions

The regulation is narrower than the headline:

the buyer is one individual, for one house or one residential apartment unit;

a foreign buyer has an NPWP and a lawful ownership route for that asset;

the sale price is no more than Rp5 billion ;

the asset is new and ready to occupy ;

it is the first transfer by the taxable developer that built it;

the unit has the required official property identity code;

the sale deed or fully paid binding sale agreement, and the actual handover recorded in a formal handover certificate (BAST), occur between 1 January and 31 December 2026 ;

no deposit or first instalment was paid before 1 January 2026;

the developer issues and reports the required tax invoice and registers the handover;

the buyer does not transfer the unit during the first year.

Miss one of those conditions and the VAT can be collected under the normal rules.

What “100% VAT borne by government” really means

It means 100% of the VAT attributable to the first Rp2 billion of selling price , provided the total selling price does not exceed Rp5 billion.

For a qualifying Rp1.8 billion unit, that can cover the VAT on the full price. For a qualifying Rp4 billion unit, the incentive applies only to the first Rp2 billion; VAT on the balance remains outside the facility. The exact invoice must be produced by the taxable developer. This is not a rebate the buyer should estimate informally and deduct from the final payment.

Worked invoice example

Assume an eligible new home has a selling price before VAT of Rp4 billion . Let V be the total VAT shown on the taxable developer's valid invoice. The covered price portion is Rp2 billion, or half of the selling price. If the invoice allocates VAT proportionately across that price, the purchase calculation is:

Invoice line

Amount

Selling price before VAT

Rp4 billion

Total VAT on the developer's invoice

V

VAT potentially borne by the government

V × Rp2 billion ÷ Rp4 billion = V ÷ 2

VAT payable by the buyer

V − (V ÷ 2) = V ÷ 2

Final cash paid by the buyer

Rp4 billion + (V ÷ 2)

This example explains only how the covered portion is allocated. It does not set the VAT rate or replace the developer's tax invoice. The developer and an Indonesian tax adviser must confirm the taxable base, rate, eligibility, invoice and handover before the buyer includes the benefit in the purchase budget.

Why many Bali transactions will not fit

The common Bali investor transaction is often not a first developer delivery of a qualifying residential unit. It may be:

an assignment of remaining lease time;

a lease from an Indonesian landholder;

a resale of an existing villa;

a construction mandate on separately secured land;

a company or share transaction;

tourist accommodation rather than a qualifying residential product.

Those distinctions matter. A beautiful finished villa and a tax-defined qualifying rumah tapak are not automatically the same transaction.

Five documents to obtain before counting the tax benefit

Ask the developer, the land-deed official or notary (PPAT), and the tax adviser to put these on one page:

the exact right and lawful holder after closing;

the developer's taxable status and confirmation that this is the first delivery;

the unit identity code and ready-to-occupy evidence;

the 2026 deed/fully paid agreement, handover timetable and BAST responsibility;

a draft split of the tax invoice showing the subsidised and non-subsidised portions.

If the answer is “the notary will arrange it later”, do not include the incentive in the purchase calculation yet.

Questions we get asked directly

Does this let a foreigner buy a Bali villa freehold? No. The regulation explicitly preserves the separate foreign-ownership rules. It is a VAT facility, not a land-law amendment.

Does it apply to leasehold? An ordinary lease assignment would not normally be the first taxable developer delivery of a new ready-to-occupy house or residential apartment described by PMK 90/2025. This is an inference from the transaction conditions, not a universal lease rule. Do not include the benefit without a transaction-specific written opinion.

Is the whole Rp5 billion price VAT-free? No. The total qualifying price may be up to Rp5 billion, but the government-borne VAT applies only to the first Rp2 billion of price.

Can I sell immediately? A transfer within one year of delivery disqualifies the facility under the regulation.

sources checked: 20 July 2026 · facility window ends 31 December 2026

Sources: PMK 90/2025, Ministry of Finance JDIH and Directorate General of Taxes, checked 20 July 2026. General information only; not tax, land, title or transaction advice.

Additional official references

Register checked 20 July 2026. The current official source and the project facts remain controlling.

PMK 90/2025: official JDIH text, in force since 1 January 2026, Articles 3 to 9

DJP: PMK 90/2025

Government Regulation 18/2021: foreign residential rights

Basic Agrarian Law 5/1960

Two questions to explore next

Related question Is Bali still a good villa investment in 2026? Related question Seven checks before paying a deposit on Bali property

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

Method

Sources and update date

DALLEAU maintains this multilingual synthesis from the cited official sources, with visible verification dates and an open correction channel.

Read next

Seven checks before paying a deposit on Bali property PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares

## Indonesia investor visa E28A | DALLEAU

URL: https://dalleau.ai/notes/indonesia-investor-visa-e28a.html

Home / Field notes / Investor status

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Investor status Sources checked on 13 July 2026

Indonesia investor visa E28A: permitted activities and work limits

The investor visa (E28A) covers more than a visit visa, but less than the broad promises sometimes attached to an investor stay permit. Its scope depends on the documented shareholding, sponsoring company and activities performed.

DALLEAU | Research and field notes Published

13 July 2026

Last verified

13 July 2026

Verified | 13 July 2026 | primary sources

Scope Independent information, no visa sales This guide distinguishes the official E28A wording from the broader claims often made in investor-visa sales material.

Core rule The current E28A page allows investment, company establishment and specified director or commissioner activities in the company invested in. It currently requires evidence of at least IDR 10 billion in shares in the sponsoring company. That immigration threshold does not create an unlimited right to perform any job in Indonesia.

Stay 1 or 2 years

Shareholding test At least IDR 10 billion

Sponsor Required

On this page Activities listed on the current E28A page The IDR 10 billion condition Documents and timing Investor activity against employment The villa-owner problem Company status does not settle the property Questions to ask before paying an agent

Activities listed on the current E28A page

The official E28A visa page says the holder may invest, carry out activities related to business, investment and company establishment, act as a director or commissioner in the company in which the person invested, and supervise the production of goods or services in that company. It also says the holder may bring eligible family members, subject to their own appropriate immigration status, and covers travel, tourism and education through the additional-activity mechanism.

That is a meaningful scope. It is still not the same as "an investor may do any work anywhere".

The permission is connected to:

the company in which the person invested;

the person's documented shareholding;

the company role and activities;

the limits printed on the stay permission;

the separate Manpower rules where they apply.

The IDR 10 billion condition

The current page asks for proof of at least IDR 10 billion in shares in the sponsoring company registered with the Ministry of Investment or BKPM. It then states that a director or commissioner holding less than that amount must apply for the work visa corresponding to the position.

This should be read as an immigration condition for E28A. It is not a shortcut around every corporate, investment or Manpower rule. A company agent should be able to show where the shareholding appears in the corporate documents and how it satisfies the current portal requirement.

Documents and timing

The official page currently lists one-year and two-year options. It requires a sponsor or guarantor and an eVisa application. The stated documents include:

passport valid for at least six months;

proof of at least USD 2,000 in living funds;

recent photograph, curriculum vitae (CV) and itinerary;

application letter;

company establishment approval;

proof of the qualifying shares;

two months of company current-account records.

For a company established less than two months earlier, the page says the company bank statement may be delivered to Immigration within 90 days after the temporary stay permit (ITAS) is issued. That specific accommodation should not be generalized to the other documents or to Manpower compliance.

Investor activity against employment

The practical question is not whether the person is "an investor" in ordinary language. It is what that person does each day.

Activity

E28A reading to test

Approve company strategy and investment

Aligned with the investor purpose

Act as a documented director or commissioner in the invested company

Expressly listed, subject to the current conditions

Supervise production of the invested company's goods or services

Listed on the current coded page, but role and Manpower treatment still need checking

Work for another Indonesian company

Not covered by the investment in the sponsoring company

Take an unrelated operational job

Not automatically covered

Perform or invoice services outside the permitted activity

Not covered by E28A. Do not do so unless a separately verified authorization covers it

Minister of Manpower Regulation 8/2021 contains defined exceptions from the foreign-worker plan approval (RPTKA) for certain shareholders serving as directors or commissioners. The criteria and duties performed matter. The IDR 10 billion E28A immigration threshold should not be marketed as proof that every shareholder-director is exempt from every Manpower obligation.

The E28A page also prohibits work outside the stay permission and restricts selling goods or services to what is necessary in the permitted activity.

The villa-owner problem

Villa investors often use one vague verb: "manage". In practice, that can mean very different things:

reviewing an owner report;

approving a budget;

directing Indonesian management;

supervising staff on site;

handling guest check-in;

selling accommodation or services;

carrying out maintenance or construction tasks.

The first two look like governance. The later examples become increasingly operational. The correct status cannot be chosen from the job title alone.

Company status does not settle the property

E28A does not decide whether the company may hold the relevant land right, whether a lease is enforceable, whether the location permits accommodation, whether the building has a building approval (PBG) and certificate of proper function (SLF), or whether the operator has the correct business licensing and tax registrations.

The visa follows a qualifying company and role. It does not validate the asset.

Questions to ask before paying an agent

Which current visa code will appear in the application?

Which company will be the sponsor?

Where is the IDR 10 billion shareholding evidenced?

Which exact activities are being described to Immigration?

Does the role require a separate Manpower approval or rely on a defined exception?

What must be completed after arrival, by which deadline?

Can the application be checked in the official eVisa account?

What this changes for a property project

A credible villa investment separates ownership, board governance, project supervision and day-to-day hospitality operations. The organizational chart should show which responsibilities belong to the foreign investor and which belong to the licensed company, Indonesian management and independent professionals.

Scope: This is general information, not legal, immigration, tax or employment advice. Check the official page for your passport and activity before paying or travelling.

Government sources

01 E28A Visa Investor Directorate General of Immigration, Republic of Indonesia · E28A · checked on 13 July 2026

02 Peraturan Menteri Ketenagakerjaan Nomor 8 Tahun 2021 Ministry of Manpower, Republic of Indonesia · Permenaker 8/2021 · checked on 13 July 2026

03 Peraturan Pemerintah Nomor 34 Tahun 2021 tentang Penggunaan Tenaga Kerja Asing Government of the Republic of Indonesia · PP 34/2021 · checked on 13 July 2026

04 The Official e-Visa Website for Indonesia Directorate General of Immigration, Republic of Indonesia · Application portal · checked on 13 July 2026

Source dates: page updated on 13 July 2026 . Next source check planned for 27 July 2026 .

Related decisions

Visa and residence desk Indonesia visas and work permits in 2026: the practical Bali guide Arrival desk Bali electronic visa on arrival: All Indonesia and autogates Work authorization Working legally in Bali: visa, stay permit and employment approval

Property project An investor visa is one line in the project structure.

If you are evaluating land, a villa or a foreign-owned limited company (PT PMA) operating model, we can review the commercial and operational brief while independent legal and immigration advisers validate the regulated parts.

Present the property brief

Official sources 13 July 2026

The government links were checked on this date. Where official pages differ, the guide identifies the conflict and uses the more cautious reading.

See the sources

Two questions to explore next

Related question PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares Related question Working legally in Bali: visa, stay permit and employment approval

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Indonesia remote-worker visa E33G | DALLEAU

URL: https://dalleau.ai/notes/indonesia-remote-worker-visa-e33g.html

Home / Field notes / Remote work

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Remote work Sources checked on 13 July 2026

Indonesia remote worker visa E33G: who qualifies in 2026?

Indonesia has a published remote worker category. It is narrower than the phrase 'digital nomad visa': the current text asks for an employment agreement with a company established outside Indonesia and a documented annual income threshold.

DALLEAU | Research and field notes Published

13 July 2026

Last verified

13 July 2026

Verified | 13 July 2026 | primary sources

Scope Independent information, no visa sales E33G is an immigration status. It does not answer tax residence, permanent establishment or personal tax liability.

Published criteria E33G currently grants a one-year temporary stay, requires no sponsor and is applied for through an eVisa account. The applicant must show a work agreement with a company established outside Indonesia and at least USD 60,000 in annual salary or income. The official FAQ excludes compensation from Indonesian people or companies.

Stay 1 year

Foreign income test At least USD 60,000 a year

Sponsor Not required

On this page The published eligibility test Three applicant profiles What E33G allows What it does not allow Application and official fee Immigration status is not tax status Remote work against local operations Before applying

The published eligibility test

The current E33G page describes a temporary stay for carrying out tasks assigned by a company established outside Indonesia. Its special requirements are:

a work agreement with a company established outside Indonesia;

bank evidence of salary or income of at least USD 60,000 a year.

The page also asks for a passport valid for at least six months, three months of bank statements showing at least USD 2,000 in living funds, a recent photograph, curriculum vitae (CV) and itinerary.

This is why "I work online" is not a complete eligibility answer. The current wording is built around an employment relationship with a foreign company.

Three applicant profiles

Profile

Reading of the published criteria

Employee of a company established outside Indonesia, with a foreign employment agreement and at least USD 60,000 in documented annual income

Aligned with the core published case, subject to the complete file

Freelancer, sole trader, founder without an employment agreement, project-based consultant or platform-funded creator

Uncertain. The page asks for an employment agreement with a foreign company, so confirm the evidence before paying

Person paid by an Indonesian individual or company, or selling services to Indonesian clients

Not aligned with the official E33G FAQ

What E33G allows

The official page allows the holder to live in Indonesia while carrying out the overseas company's assignment, enter and leave while the re-entry permission remains valid, travel and visit family or friends.

The current stay is one year. The coded Immigration page says the status may be extended and converted, while the live eVisa selector checked on 13 July 2026 marks this route as not extendable. We publish the conflict and use the stricter reading: plan on one year without assuming an extension. The visa itself must be used within 90 days after issue.

What it does not allow

The official E33G FAQ says the holder may not receive wages, pay or similar compensation from an Indonesian individual or company. It also prohibits selling goods or services.

Scenario

Conservative reading

Employee of a French company, working on that employer's assignments

Fits the published core purpose if the documents and income test are met

Paid by an Indonesian company

Excluded by the official FAQ

Selling services to Indonesian clients

Not permitted under the strict published reading

Foreign employer sends the holder to manage its Indonesian subsidiary

Requires a different analysis because the real work and beneficiary may be Indonesian

Operating a Bali villa day to day

Not remote work for a foreign employer

The coded page contains a narrow exception in its sales wording, while the FAQ is stricter. We use the stricter interpretation: no sale of goods or services in Indonesia and no Indonesian compensation.

Application and official fee

The current page says the applicant creates an account and applies directly through the official electronic visa portal . No sponsor is required. The stated government charge is IDR 7 million for the one-year package, composed of the visa, verification, temporary stay permit (ITAS) and re-entry permission fees.

The page announces five working days after payment. That should be treated as the published processing target, not a guarantee for incomplete, inconsistent or manually reviewed applications.

Immigration status is not tax status

The official E33G immigration materials do not create or describe a tax exemption. They do not answer the holder's personal tax position or the foreign employer's Indonesian tax exposure. Obtain a separate, dated tax review from a qualified adviser before relying on any tax outcome.

Remote work against local operations

A person can work remotely from a Bali villa without operating that villa. The distinction matters.

Working on the overseas employer's files from a rented home is the published core case. Hiring villa staff, selling nights, supervising guests, managing Indonesian suppliers or directing a local accommodation company are different activities. They should not be hidden under the label "remote work".

Before applying

Identify the legal employer named in the contract.

Confirm that it is established outside Indonesia.

Match the annual income evidence to the USD 60,000 requirement.

Identify every source of Indonesian compensation or local client activity.

Review tax residence separately.

Use the official portal and retain the full application record.

What this changes for a property project

E33G can solve a residence question for a qualifying overseas employee. It does not authorize that person to operate a Bali villa or replace the local company, licenses, staff and management needed for an accommodation business.

Scope: This is general information, not legal, immigration, tax or employment advice. Check the official page for your passport and activity before paying or travelling.

Government sources

01 E33G Visa Rumah Kedua Pekerja Jarak Jauh Directorate General of Immigration, Republic of Indonesia · E33G · checked on 13 July 2026

02 Remote Worker Visa General Information Directorate General of Immigration, Republic of Indonesia · E33G · checked on 13 July 2026

03 The Official e-Visa Website for Indonesia Directorate General of Immigration, Republic of Indonesia · Application portal · checked on 13 July 2026

Source dates: page updated on 13 July 2026 . Next source check planned for 27 July 2026 .

Related decisions

Visa and residence desk Indonesia visas and work permits in 2026: the practical Bali guide Arrival desk Bali electronic visa on arrival: All Indonesia and autogates Work authorization Working legally in Bali: visa, stay permit and employment approval

Property project Living in Bali and operating a villa are different projects.

If you are also considering land, a second home or an income-producing villa, we can help define the asset and operating model. Immigration and tax status should then be validated by independent specialists.

Define the property project

Official sources 13 July 2026

The government links were checked on this date. Where official pages differ, the guide identifies the conflict and uses the more cautious reading.

See the sources

Two questions to explore next

Related question Indonesia visas and work permits in 2026: the practical Bali guide Related question Working legally in Bali: visa, stay permit and employment approval

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## Your Bali villa is listed online. What does that actually prove? | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/indonesia-short-term-accommodation-enforcement-2026/

Field Notes

/

Regulatory briefing

Field Notes · Regulation

Your Bali villa is listed online. What does that actually prove?

How NIB, KBLI, NKU, the property file, local tax and foreign-guest reporting fit together after August 2026

01

OTA listing

02

Business identity

03

Activity & scale

04

Property & building

05

Tax & reporting

06

Actual operator

It proves that a platform accepted a listing.

It does not prove that the accommodation business, company, property, building and guest operation form a complete Indonesian compliance chain.

That distinction is becoming harder to ignore.

In May 2026, Indonesia's Ministry of Tourism said it had identified about 1,600 accommodation businesses marketed through online travel agents without business licensing. Operators were given time to regularise, with unresolved listings announced for delisting from 1 August 2026. New OTA merchants were also expected to provide core business data, including NIB and KBLI information.

The Ministry is separately developing an API system intended to connect OTA verification with OSS data using NIB, KBLI and NKU. The publicly announced target is June 2027. That system is not yet a universal real-time licence gate.

The practical change is still clear:

Online distribution is moving from “the platform accepted me” toward “the platform can identify and verify the operating business.”

Boundary of this note

This note explains the public enforcement architecture as at 13 August 2026. It does not confirm the compliance of a particular property. The complete operating and property file must be checked in the relevant location.

The answer in one screen

Item

What it supports

What it does not prove

OTA listing

The accommodation is commercially visible on a platform.

The operator is licensed, the property use is lawful, the building is suitable or tax and guest-reporting duties are complete.

NIB

Identity and registration of the business actor in OSS.

That every activity, location and supporting requirement is correct.

KBLI

The type of economic activity declared.

That the activity is available to this company, at this scale, in this location, or that the real operation matches the description.

NKU

The specific business-activity record used in OSS, commonly linking activity and location.

That the full property and sector permission chain is complete.

Standard certificate or permit

A required layer for the classified activity, depending on risk and sector.

That land use, building approval, tax, immigration reporting and actual operation all align.

PBG or SLF

Building-control evidence within the stated building use and file.

That a residential building is automatically authorised as tourist accommodation.

Local tax registration

The operation is visible to the relevant local tax system.

That paying tax cures a wrong activity, missing licence or building problem.

APOA reporting

Foreign-guest data are being reported through the accommodation process.

That the company is the correct licensed operator or that all other requirements are satisfied.

The compliance story is cumulative. One document does not replace the others.

A concrete example

A villa in Canggu is professionally photographed and listed on Airbnb.

The host profile uses a management brand. Guest payments are deposited into Company A. The property has an NIB belonging to Company B. The registered KBLI is general management consulting. The building file still describes a private residence. Staff are employed informally by Company C. A foreign founder controls pricing and reservations. Local accommodation tax is reported under another name.

Each isolated fact may look plausible.

Together, they create a basic question:

Which company is actually supplying the stay, and which file gives it the right to do so at this property?

The platform listing does not answer that.

What changed in 2025

Several changes are often described as though Indonesia suddenly banned short-term rentals. That is not what happened.

The more accurate story is an updated regulatory architecture.

PP 28/2025

replaced the previous national risk-based licensing framework.

Tourism Ministry Regulation 6/2025

updated tourism standards, supervision and administrative sanctions.

Law 18/2025

amended the Tourism Law.

These instruments matter because tourism supervision does not stop at the five-digit KBLI. The operating file can involve business licensing, sector standards, spatial compatibility, environmental requirements, PBG or SLF, local tax and the activity actually performed.

The direction is not “one new villa law.”

It is “more systems can now be read together.”

What changed in 2026

The 1,600-business announcement

The Tourism Minister said the Ministry had identified and internally verified about 1,600 accommodation businesses marketed through OTAs without business licensing.

That figure was national. It was not a count of 1,600 Bali villas.

The announced process was:

identify the businesses;

notify them through OTA channels;

allow a cure period;

begin delisting unresolved cases from 1 August 2026;

allow compliant merchants to return after verification.

As of 13 August 2026, no complete official post-deadline list or audited platform-by-platform removal count had been published. It would therefore be inaccurate to state that all 1,600 were removed, or that none were.

New merchant onboarding

The Ministry also stated that new merchants should provide NIB and KBLI information rather than enter the OTA market unidentified.

This is already a material change in behaviour even before the future API is fully deployed.

The planned API

The announced API is intended to check three data points:

NIB;

KBLI;

NKU.

If the data align with OSS, the merchant can be verified. If they do not, onboarding can be blocked or stopped.

The announced target is June 2027. Until then, owners should not describe the system as a universal live connection across every OTA.

The policy direction, however, is unambiguous: machine-readable consistency will matter more.

Why NIB is not “the villa licence”

A NIB identifies the business actor.

That is important. It is not the same as proving that:

the correct accommodation activity is registered;

the activity is available to that company and business scale;

the correct property location appears in OSS;

the relevant standard certificate or permit is complete;

the land use supports the activity;

the building is approved and fit for the use;

local tax registration is correct;

foreign guests are reported;

the company shown in the records is the company actually operating.

The sentence “the villa has an NIB” is usually incomplete because a building does not hold a business identity in the same way a company does.

The better question is:

Which legal entity holds which NIB, for which activity and location, and how does that connect to this property and this guest contract?

Why KBLI is not merely a keyword

KBLI is the classification of the activity.

It should follow what the business actually does.

A company that supplies short-term accommodation directly is not necessarily performing the same activity as a company that manages another owner's accommodation. A company that administers residential property is not necessarily licensed to sell tourist stays. A consultant is not automatically an operational manager.

KBLI 2025 makes some of these boundaries clearer.

For example:

55203 concerns villa activity in private homes managed by their owners;

55901 concerns third-party operational accommodation management for a fee;

hotel and aparthotel activities sit in other classifications;

general management consultancy is distinct from direct operational management;

property management and accommodation intermediation are separate questions.

The property name on Instagram does not determine the code.

Why NKU matters

NKU is the business activity number used in the OSS record.

For an owner, the practical importance is that the same company can have several activities and locations. The relevant question is not only whether the company has an NIB somewhere, but whether the activity and property being examined correspond to the correct live record.

A future OTA verification system based on NIB, KBLI and NKU is therefore checking identity, activity and the specific business-activity record, not simply the existence of one company certificate.

The property still needs its own due diligence

Even a well-structured operator cannot erase a property defect.

The property review can include:

spatial and zoning compatibility;

land or lease rights;

access;

PBG and SLF position;

environmental requirements;

building use;

water and wastewater arrangements;

fire, health or tourism requirements shown by the applicable classification;

neighbourhood and operational restrictions;

local tax registration;

insurance.

A management company with a valid NIB cannot lend a compliant building file to an unrelated house.

Who is the operator?

The operator is not always the owner and not always the manager.

A useful distinction is:

Role

Typical responsibility

Property owner or rights holder

Owns or lawfully controls the asset.

Accommodation operator

Supplies the stay, contracts with the guest and carries the guest-facing business.

Accommodation manager

Manages operations on behalf of the owner or operator under a defined mandate.

OTA or intermediary

Distributes the accommodation or connects supply with demand.

Service provider

Provides a limited function such as marketing, finance, maintenance or transport.

These roles can sit in different entities.

They should not be collapsed into one company name only when an inspector asks.

The fastest diagnostic remains:

who appears on the OTA;

who signs with the guest;

who receives the money;

who employs the team;

who controls pricing and reservations;

who approves refunds;

who files tax and APOA;

who bears the loss and customer claim.

APOA is not only a hotel issue

Indonesia's foreign-guest reporting framework applies to owners or managers of accommodation and is operationalised through APOA.

Official immigration outreach has included hotels, villas and individual accommodation providers.

For an owner, this matters because APOA creates another traceable operating fact.

Which company or manager performs the report? Under whose property and guest records? Does that role match the OTA, guest contract and licence?

APOA does not prove the entire structure. It can reveal whether the day-to-day compliance process matches the declared operator.

Bali is adding a local compliance layer

Bali has separately increased pressure on unlicensed and non-tax-compliant accommodation.

The provincial government asked Airbnb to support removal of businesses that lacked licensing or tax compliance. Bali's tourism authorities also announced the Bali Kerthi compliance-audit programme for accommodation and other tourism businesses.

This does not create a new category of property right.

It does mean that national OSS data, local tourism supervision, tax records and OTA distribution are becoming less isolated from each other.

What an owner should verify this week

The company

current deed and AHU record;

NIB;

complete OSS activity sheets, not only a screenshot of the code;

business scale and risk level;

KBLI and NKU for the actual activity and location;

directors, shareholders and beneficial-owner filing.

The property

title or lease;

right granted to the operator;

zoning and spatial compatibility;

PBG and SLF position;

applicable environmental and tourism requirements;

local tax registration;

insurance.

The operation

OTA merchant name and payout account;

guest terms and invoice;

cancellation and refund authority;

staff employer and manager;

PMS and channel-manager control;

PBJT process;

APOA process;

guest complaints and liability.

The links between them

management agreement;

lease or operating concession;

service agreements;

payment flows;

staff and decision-right matrix;

transition records where an operator changed.

Three common false conclusions

“Airbnb approved the listing, so it is legal.”

No. Platform acceptance is a distribution decision, not a legal opinion on the property and operator.

“The company has an NIB, so the villa is licensed.”

No. The activity, scale, location, sector standard, property file and actual operation still need to align.

“The government is banning OTAs.”

No. The public policy is to strengthen verification of accommodation merchants and remove unresolved unlicensed supply, not to prohibit online travel agents as a category.

The decision in plain language

The 2026 enforcement programme does not make every Bali villa illegal.

It makes one old assumption increasingly unsafe:

Being visible online is not evidence that the operating business is complete.

A serious owner should identify the real operator first, then verify the company, activity, location, property, building, tax, staff and guest-reporting chain around that operator.

The rule to keep is:

The listing should be the public face of a coherent operating file, not the substitute for one.

Talk to François

Sources and direct verification links

Ministry of Tourism: OTA and OSS API system

ANTARA: approximately 1,600 identified accommodation businesses and the announced 1 August process

PP 28/2025 on risk-based business licensing

Official OSS KBLI 55203, villa activity

Official OSS KBLI 55901, accommodation-management services

Bali Provincial Government: 18-category PMA OSS restriction

Immigration Bali: APOA and accommodation-provider outreach

The official live OSS record controls a real application. The ANTARA article supports the attributed ministerial statement, not a final post-cure count of delisted properties.

## Working in Bali: E23, ITAS and RPTKA | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/indonesia-work-visa-rptka.html

Home

/

Field notes

/

Work authorization

Check the sources and update date before acting.

We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the

official Indonesian regulations database

, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source:

notes@dalleau.ai

. Any responsibility imposed by applicable law remains unchanged.

Work authorization

Sources checked on

13 July 2026

Working legally in Bali: visa, stay permit and employment approval

The common phrase 'work stay permit' hides two legal layers. Immigration grants a visa and temporary stay permit. The Ministry of Manpower regulates the employer, position, period and location in which a foreign national may work.

DALLEAU | Research and field notes

Published

13 July 2026

Last verified

13 July 2026

Verified | 13 July 2026 | primary sources

Scope

Independent information, no visa sales

The public page for employment stay category E23 currently contains no detailed data. The frequently asked questions used below provide general employment-stay information and must not be mapped to a specific code without checking the live portal.

Key distinction

A temporary stay permit is not a free-standing permission to take any job. For local employment, the employer normally validates the relevant Manpower route and applies for the matching immigration category before work begins. The authorization is tied to real facts: employer, role, term, location and worker qualifications.

Immigration

Visa plus temporary stay permit (ITAS)

Employment

Foreign-worker plan (RPTKA) when applicable

Role

Employer and position specific

On this page

The two-layer test

The employer's foreign-worker plan (RPTKA)

The safe sequence

Duration and cost are not one number

Which positions are open or restricted

What changes in a villa business

Common high-risk shortcuts

The two-layer test

The first layer is immigration. The coded

E23 page

currently displays no detailed public data. A separate official

employment visa FAQ

lists options of up to 180 days, one year or two years, but shows no visa code. It must not be mapped automatically to E23. The exact work category may be E23, E25 or another current code. The FAQ allows activities related to the approved employment and warns against work that does not match the stay permission.

The second layer is employment law.

Government Regulation 34/2021 (PP 34/2021)

and

Minister of Manpower Regulation 8/2021 (Permenaker 8/2021)

govern authorized employers using foreign workers in Indonesia within the statutory categories. The Ministry's register still marks both instruments as in force on 13 July 2026.

That is why calling the temporary stay permit, commonly known as KITAS, "the work permit" creates risk. The temporary stay permit (ITAS) describes immigration status. The approved employment facts also matter.

Director is a real function, not a universal permission

A foreign director can actively manage and supervise the company under the correct corporate, manpower and immigration structure. The title does not automatically cover every recurring operational job, nor does a director appointment in PT PMA A authorise work for PT Local B.

Can a foreign director work inside their own Bali business?

The employer's foreign-worker plan (RPTKA)

The plan for using a foreign worker (RPTKA) identifies the position and period approved for an employer. Under Minister of Manpower Regulation 8/2021, an employer using a foreign worker generally needs an approved RPTKA unless a defined exception applies.

The application records information such as:

the authorized employer using the foreign worker in Indonesia;

the position and duration;

the work location;

the identity of the foreign worker;

the Indonesian counterpart responsible for knowledge transfer, where required.

The regulation says the foreign worker must have education aligned with the position, competence or at least five years of relevant experience, and must transfer expertise to an Indonesian counterpart, subject to the stated framework.

The safe sequence

The official sources are not perfectly aligned on sequence. The eVisa FAQ asks for a commitment to provide a Ministry of Manpower Notification within 90 days after arrival. Permenaker 8/2021 describes RPTKA approval as the recommendation used for the work visa and stay permit process.

The safe conclusion is not "arrive and regularize later". It is:

Define the real employer, role, work location and term.

Confirm whether RPTKA approval or a defined exception applies.

Complete the Manpower and Immigration sequence required by the exact category.

Begin work only when the permissions required for that activity are effective.

Where the public pages conflict, the employer should confirm the current portal sequence before the employee travels or starts work.

Duration and cost are not one number

The employment FAQ currently displays immigration options and official charges for up to 180 days, one year and two years. These immigration charges are not the whole employer cost.

Minister of Manpower Regulation 8/2021 also provides for the compensation fund for the use of foreign workers (DKPTKA), generally USD 100 per position, worker and month, paid by the employer, with defined institutional exemptions. It is a regulatory payment, not an agency fee.

Layer

What it controls

What to verify

Immigration visa

Entry for the employment purpose

Correct category and use-by date

Temporary stay permit (ITAS) and re-entry permission

Stay and re-entry

Validity matching the assignment

Foreign-worker plan approval (RPTKA)

Employer's use of the worker

Position, term, location and worker

Employment contract

Actual duties and compensation

Consistency with approved role

Foreign-worker compensation fund (DKPTKA)

Regulatory payment

Amount, period and any valid exemption

Which positions are open or restricted

Indonesia does not operate a simple rule that every non-HR job is open to a foreign national. The Ministry maintains a sectoral list of positions that may be occupied by foreign workers in

Minister of Manpower Decision 228/2019 (Kepmenaker 228/2019)

, still marked in force when the sources were checked.

It also maintains a list of 18 prohibited positions in

Minister of Manpower Decision 349/2019 (Kepmenaker 349/2019)

. The prohibited list is concentrated in human resources, recruitment, industrial relations, job analysis, personnel development and certain work-safety functions.

The official list contains these titles: Personnel Director; Industrial Relations Manager; Human Resources Manager; Personnel Development Supervisor; Personnel Recruitment Supervisor; Personnel Placement Supervisor; Employee Career Development Supervisor; Personnel Declare Administrator; Personnel and Careers Specialist; Personnel Specialist; Career Advisor; Job Advisor; Job Advisor and Counseling; Employee Mediator; Job Training Administrator; Job Interviewer; Job Analyst; and Occupational Safety Specialist.

Photographer is not on that national prohibited list.

It is also absent from the standard sectoral list in Kepmenaker 228/2019, but the same instrument provides a route for the competent authority to approve an unlisted position when the employer requires it. Absence from the standard list is therefore not proof of an absolute ban. Commercial filming may also involve a C14 or D14 filming category and separate permits. The safe conclusion is that the exact role, sector, employer, RPTKA route and filming authorization must be checked. The common claim that a foreign production-company owner may manage local photographers but can never hold a camera is not supported by these two national position lists.

A job title invented for a visa file is not a solution. Authorities can compare the approved title with the duties performed.

What changes in a villa business

Activities need to be mapped honestly. Strategic oversight, board decisions, daily property management, guest reception, sales, maintenance supervision and staff management are not interchangeable labels.

A foreign founder who spends every day directing staff, checking guests in and selling services should not assume that share ownership or an investor stay status automatically covers those activities. The correct route depends on the corporate position, shareholding, actual work and any applicable Manpower exception.

Common high-risk shortcuts

Entering on a visit visa and beginning work because the employer says the file is "in process".

Holding an ITAS but working for another entity, in another role or at another location without checking the approval.

Using an investor title for duties that are really a local operational job.

Treating an agency receipt as proof that government approval exists.

Referring only to the former foreign-worker permit (IMTA) or old C312 visa code without asking which current category and approval appear in the file.

What this changes for a property project

For an investor-operated villa, document the boundary between shareholder governance, development oversight and daily hospitality work before choosing a status. The operating model should be designed with Indonesian employment and management capacity, not retrofitted after opening.

Scope:

This is general information, not legal, immigration, tax or employment advice. Check the official page for your passport and activity before paying or travelling.

Government sources

01

E23 Visa Kerja

Directorate General of Immigration, Republic of Indonesia · E23 · checked on 13 July 2026

02

Employment Visa General Information

Directorate General of Immigration, Republic of Indonesia · General employment stay information, code not displayed · checked on 13 July 2026

03

Peraturan Pemerintah Nomor 34 Tahun 2021 tentang Penggunaan Tenaga Kerja Asing

Government of the Republic of Indonesia · PP 34/2021 · checked on 13 July 2026

04

Peraturan Menteri Ketenagakerjaan Nomor 8 Tahun 2021

Ministry of Manpower, Republic of Indonesia · Permenaker 8/2021 · checked on 13 July 2026

05

Keputusan Menteri Ketenagakerjaan Nomor 228 Tahun 2019

Ministry of Manpower, Republic of Indonesia · Kepmenaker 228/2019 · checked on 13 July 2026

06

Keputusan Menteri Ketenagakerjaan Nomor 349 Tahun 2019

Ministry of Manpower, Republic of Indonesia · Kepmenaker 349/2019 · checked on 13 July 2026

Source dates:

page updated on

13 July 2026

. Next source check planned for

27 July 2026

.

Related decisions

Visa and residence desk

Indonesia visas and work permits in 2026: the practical Bali guide

Arrival desk

Bali electronic visa on arrival: All Indonesia and autogates

Investor status

Indonesia investor visa E28A: permitted activities and work limits

Property project

This is not an employment-permit service.

If the work question sits inside a villa development or operating mandate, we can map the operating roles the project needs and identify where independent immigration and employment advice must be obtained.

Discuss the property project

Official sources

13 July 2026

The government links were checked on this date. Where official pages differ, the guide identifies the conflict and uses the more cautious reading.

See the sources

Two questions to explore next

Related question

Indonesia investor visa E28A: permitted activities and work limits

Related question

Indonesia remote worker visa E33G: who qualifies in 2026?

Test the activity in the visa decision guide

Open the tool →

From information to a project decision

Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website

I would like to receive Field Notes and have read the privacy notice.

Read more

Subscribe

## KBLI 2025 for Bali villas: 55203 vs 55901 | DALLEAU

URL: https://dalleau.ai/notes/kbli-2025-bali-villa-rental-property-management.html

licensing
KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business
KBLI 2025 separates villa operation, third-party accommodation management, booking intermediation and residential management. The decisive point: the right activity code is not automatically available to every enterprise.
DALLEAU | Research and field notes
Published
16 July 2026
Last verified
20 July 2026
Verified | 20 July 2026 | primary sources
Material update
KBLI 55203 has no large-enterprise OSS route: the note now explains why it is not a new PT PMA option and how legacy licences differ.
Updated 20 July 2026
Next scheduled review : 2026-08-15
Check the sources and update date before acting.
We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.
Sources and limitations
This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.
Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the
official Indonesian regulations database
, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.
Report a correction or outdated source:
notes@dalleau.ai
. Any responsibility imposed by applicable law remains unchanged.
Indonesia's 2025 Standard Classification of Business Fields, known as KBLI, now separates four activities that Bali proposals often blur together. It also exposes a common mistake: finding the code that describes an activity does not prove that the chosen company is allowed to use it.
KBLI 2025 itself took effect in December 2025. The BPS publication of 14 July 2026 clarifies tourism-sector implementation and OSS integration; it does not enact a new version of KBLI.
If an eligible Indonesian micro, small or medium enterprise operates its own villa for short tourist stays,
55203, Aktivitas Vila
, describes that activity. A new PT PMA cannot use 55203 under the current OSS matrix because that code has no large-enterprise route. If a company genuinely manages another owner's accommodation, controls daily operations on that owner's behalf and earns a management fee,
55901, Aktivitas Jasa Manajemen Akomodasi
, may be the closer fit. A booking intermediary, residential property manager and long-term landlord each sit somewhere else. The code follows the activity, but access to the code follows a second set of rules.
Start with five facts, not five digits
“Property management” can describe almost anything in Bali: replying to guests, collecting rent, supervising repairs, running staff, marketing a villa, managing an estate, or taking the entire commercial risk under a lease. KBLI does not classify the label on the proposal. It classifies what the company does.
Before anyone recommends a code, answer these questions:
Who signs or is legally responsible for the guest stay?
Who receives the room revenue?
Who bears vacancy, refund and operating risk?
Who controls rates, staff, check-in and daily decisions?
Is the company paid rent, room revenue, commission or a management fee?
Those answers matter more than whether the website calls the business a villa operator, asset manager or hospitality platform.
The practical 2026 position
KBLI 55203 currently shows no large-enterprise route in the public licensing matrix. A new PT PMA should therefore not treat it as a direct-villa operating option. KBLI 55901 separately recognises third-party operational accommodation management and includes a national large-enterprise/PMA path. A new application in Bali still requires a live OSS result because the provincial restriction covers the old KBLI 55900 category from which 55901 was split.
Can a PT PMA operate a Bali villa?
Who is the real villa operator?
A management fee pays for a service. It does not move profit by itself.
The decision table
The real activity
KBLI 2025 starting point
What it means, and what it does not
An eligible Indonesian micro, small or medium enterprise operates its own private villa for short tourist stays
55203
Owner-managed villa accommodation. The current OSS matrix has no large-enterprise route, so this is not a new PT PMA option
You run another owner's accommodation, including daily operations and managerial decisions, for a management fee
55901
Third-party accommodation management. OSS currently includes a large-enterprise line, but the facts and PMA position still require confirmation
You introduce guests and providers or process reservations for a commission, without running the property
55400
Accommodation intermediation
You coordinate residential maintenance, repairs, budgets, charges and rules for another owner or community
68292
Residential real-estate management for a fee/contract
You rent owned or leased housing for durable residential occupation
68112
Long-term residential rental and operation
You develop and sell residential property
68111
Residential real-estate development
This is a starting map, not a licence opinion. A lease-plus-management contract, guaranteed owner return, mixed revenue share or split staff arrangement can change the answer and needs to be read as a whole.
55203: operating your own villa
The official definition of
KBLI 55203, Aktivitas Vila
, is unusually clear. It covers short-term accommodation for the public in private houses specifically rented to tourists, with their facilities,
managed by the owner
. The old
55193 Vila
maps directly to 55203 under the official BPS conversion table.
The legal answer appears only when four official records are read together:
The activity.
The official KBLI and OSS description says 55203 covers short-term tourist accommodation in a private house, with its facilities, managed by the owner.
The enterprise scale.
The current public OSS matrix for 55203 contains micro, small and medium lines. It contains no large-enterprise line.
The investor's status.
Article 1(4) of Law 20/2008 includes foreign businesses and joint ventures within the definition of a large enterprise. A PT PMA therefore does not enter through a micro, small or medium line.
The allocation and conversion.
Appendix II of Presidential Regulation 49/2021 placed old 55193 Vila among activities allocated to cooperatives and UMKM. The official BPS table then converts 55193 directly into 55203.
Plain-language conclusion:
KBLI 55203 is a valid activity, but it is not available as a new registration route for a PT PMA. It can describe an eligible domestic micro, small or medium enterprise operating its own villa. The missing large-enterprise line is decisive for a new PT PMA.
How a careful reader can still reach the wrong answer
The texts answer different questions. Reading only one of them produces a plausible but incomplete conclusion.
“The code exists, so my company can use it.”
No. KBLI defines the activity; OSS and the investment rules determine which enterprise scale can register it.
“The activity is medium-low risk, so it is open to foreign investment.”
No. Risk determines the licensing pathway. It does not create an enterprise scale or remove an investment restriction.
“My investment exceeds Rp10bn, so I qualify as a large operator.”
No. A high investment value cannot create a large-enterprise line that OSS does not provide for that activity.
“BPS converted 55193 to 55203, so the old UMKM allocation disappeared.”
No. The conversion changes the classification number; it does not, by itself, enlarge who may use the activity.
“An old licence remains valid, so a new PT PMA can obtain the same one.”
No. A transition rule can preserve an existing valid authorisation without opening the route to a new applicant.
The point is not that villa activity is prohibited in absolute terms. The point is that
the correct activity description and the correct applicant eligibility are separate gates
. This is precisely why a five-digit code should never be presented as a complete licence opinion.
55901: managing accommodation for another owner
The genuinely useful addition is
KBLI 55901, Aktivitas Jasa Manajemen Akomodasi
.
It covers a third party responsible for the business and operational performance of accommodation, directly involved in daily operations and managerial decisions, acting on behalf of the property owner and receiving a management fee.
That description is much closer to a real villa-management company than a generic consultancy or real-estate code. Unlike 55203, the current public OSS matrix for 55901 includes a large-enterprise line. That makes 55901 capable of being tested for a large company, but it is not automatic PT PMA approval: the actual service, investment access, location, risk tier and licence path must still be confirmed for the applicant. Save a dated OSS result before making project-specific claims.
This makes 55901 a candidate classification to test for a genuine third-party accommodation manager. It is not a project-specific licensing recommendation, and the facts must match:
there should be a real management mandate;
the company should act for the owner rather than pretend to be an agent while trading entirely for its own account;
daily authority and reporting should be documented;
the management fee, guest revenue, payroll and expense flows should match the contract;
the party shown to guests, online travel agencies (OTAs), staff, tax authorities and OSS should be consistent across every record.
If the company leases the villa, sells stays in its own name and bears the entire commercial risk, it may no longer be merely managing accommodation for the owner. Calling the payment a “management fee” does not decide the classification.
A management company is not automatically the principal supplier of the guest stay. The operator, property right, guest contract, OTA merchant, staff, tax, APOA and customer risk still need to be assigned coherently.
A manager's licence does not regularise the villa it manages
This is the point most likely to be lost in the excitement around 55901.
A properly licensed manager does not automatically cure an owner's wrong zoning, missing PBG or SLF, unlicensed accommodation activity, tax gap or invalid commercial use of the property. The official definition says the manager acts on the owner's behalf. It does not say the underlying accommodation disappears from the compliance chain.
The questions still include:
Is tourist accommodation allowed at that parcel?
Do the building approval and fit-for-use certificate match the completed asset and its use?
Is the underlying accommodation/operator correctly licensed for the actual model?
Which entity is legally responsible for collecting guest revenue?
Who registers and pays the applicable taxes?
Who employs staff and reports foreign guests?
Our full
PP 28/2025 villa-licensing note
covers those physical, operating and tax layers. The management KBLI is one layer, not the whole stack.
55400 and 68292: two businesses often called management, but not the same one
KBLI 55400
is accommodation intermediation. It covers matching clients and providers for a fee or commission, including booking services through digital or non-digital channels. That fits a marketplace or introducer. It does not fit a company that controls staff, guest service and the daily operation.
KBLI 68292
is residential real-estate management for a fee or contract. Its official definition is about maintenance, repairs, budgets, charges and residential rules. Think estate or residential management, not nightly hospitality.
One group may genuinely perform more than one activity. If each activity earns revenue, it needs to be reflected correctly in the company objects, OSS projects, contracts, accounts and investment reporting. Multiple codes do not turn overlapping paperwork into permission to do anything.
68112: residential rental is not short-stay accommodation
KBLI 2025 separates residential development/sale under
68111
from rental and operation of owned or leased residential property under
68112
.
The broader division 68 definition excludes hotels, holiday homes and other accommodation for stays of less than one year, sending them to division 55. That makes 68112 a poor answer to a nightly or weekly tourist-villa business, even if “property rental” sounds right in English.
That missing matrix is itself a reason for caution. The current public OSS page for 68112 shows the definition, but it does not provide a usable risk and business-licence matrix. A reader should therefore not treat the code as automatically “NIB only” or automatically available to a PT PMA. The applicant’s actual profile and live OSS result still need to be checked.
Why a hotel or apart-hotel code is not a workaround
A real non-star hotel, apart-hotel or cottage business can have a different classification. That does not make those codes substitutes for a private villa.
The classification follows the premises, service model, standards and operation. A large-business line on one hotel code does not allow an investor to relabel a villa to solve a restriction. The same principle applies to “other short-term accommodation.” A code chosen against the facts tends to survive only until a serious bank, buyer, platform or regulator compares the paperwork with the asset.
The Rp10 billion myth, in three separate numbers
The market is currently combining three unrelated tests.
1. Paid-up capital: generally Rp2.5 billion per PT PMA
Since Investment Ministry/BKPM Regulation 5/2025, the general minimum placed and paid-up capital is
Rp2.5bn per PT PMA
, unless a sector requires more. Company-law rules also require at least 25% of authorised capital to be subscribed and fully paid.
So the practical minimum is the highest of Rp2.5bn, 25% of authorised capital and any higher sector minimum. If authorised capital is Rp20bn, 25% is Rp5bn: paying only Rp2.5bn would not be enough.
2. Project investment: generally more than Rp10 billion
Separately, a PMA project generally needs a planned investment
strictly greater than Rp10bn
per five-digit KBLI and project location. For property operation and short- or long-term accommodation, land and buildings can enter the calculation under the detailed rules.
This is an investment plan, not a universal instruction to park Rp10bn cash in the bank on incorporation. The regulation recognises equity, loans, reinvested profit and share premium as funding sources, and recognises relevant assets, construction, equipment, project costs and working capital as uses.
A pure management company cannot casually count villas owned by its clients as its own investment.
3. E28A investor visa: at least Rp10 billion of the applicant's shares
Immigration applies a separate threshold for the E28A investor visa: the applicant currently needs evidence of at least
Rp10bn in shares
in the sponsoring company. A Rp10bn shareholder loan is debt, not shares. A Rp10.5bn OSS project plan is not proof that the individual owns Rp10bn of equity.
The differences between owning the company, supervising it and working in its daily operation are covered in our
E28A note
and
work-permit note
.
Can the acquisition funds pass through the company?
Yes, provided that “pass through” describes a real company transaction rather than a temporary bank balance.
A clean structure can involve shareholders contributing documented equity and/or a shareholder loan, the PT acquiring the relevant asset or right in its own name, and the PT paying the project costs from its bank account. The deed, shareholder register, bank trail, purchase documents, invoices, accounts and LKPM reporting should agree.
The paid-up capital carries a 12-month retention commitment, but the current regulation expressly allows it to be used for company asset purchases, building construction and company operations. The money is not required to sit idle.
What does not work is sending money into the PT, taking a screenshot and returning it the next day without a legitimate asset purchase, operation, loan basis or corporate record. A transfer is not automatically capital. Cash in the bank is not automatically realised investment. Substance and documentation matter.
What happens to an existing 55193 or 68111 company?
BPS says existing licences remain valid. When only the KBLI number changes and the underlying activity does not, OSS/AHU performs the conversion automatically; no new licence or constitutional amendment is required merely for the code change.
If the actual purpose, scope or activity changes, the business must update OSS/AHU and, where applicable, its deed and licences.
This transition protection must not be read backwards. It preserves an authorisation that was already valid; it does not prove that the same route is available to a new PT PMA, and it does not cure a licence that was never valid for the holder or activity. A legacy file should be checked for its issue date, original holder and shareholding, authorised activity and address, later ownership changes, and any change from owner-operation to third-party management. A change of substance requires more than an automatic code conversion.
That distinction is important:
old 55193 to new 55203 is a direct villa recoding;
old 68111 is split into more specific 2025 activities, so the correct successor depends on what the company really does;
moving from operating your own accommodation to managing third-party accommodation is a substantive business-model question, not clerical renumbering.
The practical review before taking a booking
Ask the adviser to provide a written table with:
actual activity and contract model;
old and new KBLI mapping;
business sizes available in the company's current OSS record;
PMA restriction or condition;
risk tier and required Business Licence/Standard Certificate;
supporting zoning, environmental, building, sanitation and tourism requirements;
investment-plan unit and whether land/buildings count;
paid-up capital and funding documents;
guest revenue, management fees, payroll, tax and investment-activity reports (LKPM);
named responsibility for each action and renewal.
If one written review cannot reconcile those records, the structure is not ready.
Questions we get asked directly
Can my PT PMA use KBLI 55203 to rent its own villa nightly?
Not as a new registration route under the current OSS matrix. 55203 provides micro, small and medium lines but no large-enterprise line, while a PT PMA is treated as a large enterprise. A genuinely pre-existing licence is a separate transition question and must be reviewed on its own record.
Does an old 55193 or automatically converted 55203 record prove that new PT PMAs can use the code?
No. Continuity protects an existing valid authorisation when the activity has not substantively changed. It does not create a new entitlement for another company, address, ownership structure or business model.
Can I solve that by hiring a 55901 management company?
Not automatically. 55901 can license the genuine management activity of the manager. It does not erase the underlying accommodation, owner, property, building, tax or operating requirements.
Is 55901 the new property-management code?
It is the explicit code for operational management of accommodation on behalf of an owner for a management fee. Residential property management, booking intermediation and rental for the operator's own account remain different activities.
Do I need to deposit Rp10bn on day one?
Not as a universal current capital rule. The general paid-up-capital floor is Rp2.5bn per PT PMA, subject to 25% of authorised capital and higher sector rules. The more-than-Rp10bn figure is generally the project investment plan. E28A uses a separate Rp10bn personal shareholding threshold.
Does a low or medium-low risk code mean it is open to PT PMA?
No. Risk tier determines the licensing pathway. Enterprise scale and foreign-investment eligibility are separate tests.
sources checked: 20 July 2026
Related:
Bali property due diligence before a deposit
·
PT PMA vs nominee
·
What PP 28/2025 does
·
E28A investor visa
Sources:
BPS KBLI 2025
;
official KBLI 2020 to 2025 conversion table
;
BPS tourism and OSS clarification, 14 July 2026
; OSS pages for
55203
,
55901
,
55400
,
68112
and
68292
;
Presidential Regulation 49/2021
and its
official Appendix II
;
Law 20/2008, including the large-enterprise definition in Article 1(4)
;
Investment Ministry/BKPM Regulation 5/2025
;
Government Regulation 28/2025
;
Tourism Ministry Regulation 6/2025
; and
Immigration E28A
. Checked 20 July 2026. This note provides general information, not Indonesian legal, tax, investment, land or immigration advice. Confirm the exact company, contract, asset, address and current OSS result before acting.
Additional official references
BPS Regulation 7/2025: the formal KBLI 2025 instrument
BPS transition guidance, 27 April 2026
BPS tourism and OSS clarification, 14 July 2026
---
General information. Updated 20 July 2026. This page presents DALLEAU's good-faith reading of the official sources cited. It is not professional advice. Rules and administrative practice can change; the summary may be incomplete, outdated or mistaken. Check the current official text and your facts with the competent authority or appropriately authorised professional before acting.
Two questions to explore next
Related question
PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares
Related question
Villa licensing under PP 28/2025: a dated timeline
From information to a project decision
Is this question part of a real Bali residence project?
Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.
Start a private brief
Follow material changes
Receive a short email when a Field Note is published or materially revised.
Website
I would like to receive Field Notes and have read the privacy notice.
Read more
Subscribe
Method
Sources and update date
This guide identifies its sources and update date. Corrections can be sent to the DALLEAU editorial desk.
Read next
PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares
Operator and project-party roles
Current villa licensing framework
Published context
PP 28 licensing note

## Moving to Bali with children: everyday family life | DALLEAU

URL: https://dalleau.ai/notes/living-in-bali-family.html

← field notes living in bali 10 July 2026 Moving to Bali with children: what everyday family life really involves

Our honest view as parents on schools, getting around, healthcare, household help and what an ordinary week actually looks like, based on life with two young children and our experience of family life in Budapest, France and Bali.

DALLEAU | Research and field notes Published

10 July 2026

Last verified

23 July 2026

Verified | 23 July 2026 | primary sources

In brief Young children can thrive in Bali. They may spend more time outdoors, enjoy a warm social environment and benefit from more accessible household help. That does not make family life effortless. Parents still need to make several practical decisions: choose the school before the neighbourhood, test the school run at busy times, identify reliable healthcare, understand exactly what the insurance covers, and choose a home and budget that work for an ordinary week rather than a holiday.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Our family view Our children adapted faster than we did. The real work was rebuilding the adult side of family life: school, transport, healthcare and the rhythm of an ordinary week.

Start with the child's week, not the villa

We are a French-Russian family raising two young children, with family-life reference points in Budapest, France and Bali. One of our children had attended a private Montessori setting in Budapest before experiencing preschool in Bali. The clearest sign of adaptation was not a ranking or a brochure. She wanted to go back to school and was often in no hurry to leave when we collected her.

That does not prove that schools in Bali are better, or that another child will react in the same way. Our experience is strongest with babies and preschool-age children. It does show why we no longer judge a family move by the climate, the villa or the monthly budget alone. We look at the week the child will actually live.

What can feel better A lighter childhood rhythm

In the preschools we tried, play, nature, movement and varied activities occupied a real place in the day.

What needs planning The practical arrangements

School routes, medical contacts, insurance, transport and household help all need to be organised.

Our limit This is not a school ranking

We can describe what our family observed. Every child, school, age and return plan requires its own decision.

Choose the school before the address

A school that looks close on a map may create an exhausting daily journey. Traffic changes by time, weather and route, so the practical sequence matters: shortlist the school, visit it, test the journey during real drop-off and collection hours, then look for a home.

For preschool, we would pay more attention to the actual group than to the brand. Observe how adults speak to the children, how separation is handled, whether the group suits your child, how the day is communicated to parents and whether a trial period is possible. For older children, add curriculum continuity, teaching language, examinations and the route back into another education system.

Ask what the child will do during a normal week, not only what the school philosophy promises.

Request the complete fee schedule, including registration, meals, transport, uniforms, exams and optional activities.

Confirm availability and admissions timing before making a housing commitment.

Drive the route in both directions at the hours your family will use it.

One dated reference, not a market benchmark The Lycée Français de Bali publishes its 2026 to 2027 fees . When checked on 17 July 2026, annual tuition ranged from IDR 70.2 million to IDR 168.2 million depending on level, with some additional charges possible. It describes one school only. Ask every shortlisted school for its current written offer.

Ordinary life is not a permanent holiday

Life in Bali can be wonderful for young children. Warm weather, a welcoming culture and a broad choice of early-years schools create many opportunities to play, learn and spend time outdoors. Daily family life still includes work, naps, meals, laundry, heat, rain, mosquitoes and traffic. A trip to the beach with small children can still feel like an expedition. Many working parents also discover that they spend more time at home than they expected before moving.

What becomes easier Play, nature and practical support

Outdoor school activities, a welcoming social atmosphere and more accessible household help can give parents more time and children more room to play.

What becomes harder Walking, familiar routines and distance

Walking independently, seeing grandparents and long-standing friends, navigating familiar administration and reaching some specialist care can all become more difficult.

This changes how we assess a house. Bedrooms and a pool are not enough. Can young children reach the pool without an adult? Is there a shaded place to play? Are the bedrooms properly screened against insects? Is the laundry practical? Can household staff do their work without intruding on the family's privacy?

Water Pool safety

Visibility, controlled access and an age-appropriate barrier plan belong in the design discussion.

Climate Shade and insects

Covered play, mosquito protection and rooms that remain comfortable matter every day.

Operations Laundry and storage

Young children generate a household rhythm that beautiful photographs rarely reveal.

Privacy Family and staff flows

Support works best when the house gives everyone a clear and respectful place.

Transport changes the map

For our family, this is one of the clearest differences from European life. It is harder to step outside with a stroller, walk to a park or rely on public transport. A short distance can still require a car, and the school route can define the whole day.

Official French guidance describes motorcycles as a very high-risk mode of transport in Indonesia, while British guidance reports a substantial increase in serious and fatal motorcycle accidents in Bali. For young children, our practical recommendation is to prioritise a car with an age and size appropriate child restraint, then choose the school and home around the daily journey.

Test the route, not the map Make the journey on a normal weekday, in both directions, at the real hours. Check the vehicle, the child seat, the insurance and the alternative plan for rain or an unavailable driver.

Healthcare is a plan, not a list of hospitals

The useful question is not how many hospitals appear on a map. It is where you would go at 2 a.m., what your insurer will authorise, and what happens if treatment is unavailable on the island.

Bali's private healthcare offer expanded when Bali International Hospital was officially inaugurated in Sanur on 25 June 2025. The hospital lists women's and children's health, travel medicine and vaccination, 24-hour emergency care, pediatric and neonatal emergency care, and obstetric and gynecological emergency services. Families should still verify the relevant specialist, facilities, insurance acceptance and evacuation arrangements for their own circumstances.

Identify a pediatrician, a routine clinic and the facility you would use at night.

Check outpatient care, hospitalisation, maternity, pediatrics, pre-existing conditions and annual limits.

Confirm direct billing, pre-authorisation, the provider network and what must be paid in advance.

Write down the evacuation process, contact numbers and the destination covered by the policy.

Keep prescriptions, generic medicine names and an accessible family medical file.

Official British and French guidance both recommend cover for local treatment and unexpected evacuation. Mosquito-borne disease also belongs in the routine. Indonesia's Ministry of Health issued a national dengue preparedness circular on 18 February 2026. Its figures are national, not a Bali incidence rate. The practical response is year-round prevention, protection from bites and prompt medical advice for high fever or warning signs.

Household help can buy time, but it still needs management

A nanny, housekeeper, cook or driver can change the family's quality of life. This is one of Bali's real advantages for households with stable international income: the same budget may buy more time and practical support than it would in Europe. It should not be described simply as cheap labour.

Trial days and references matter more than a polished CV. Watch how the person speaks to the child, handles tiredness and responds when the plan changes. Agree in writing who may collect the child, whether photographs are allowed, what happens during illness, how transport is handled and how working time and rest are organised.

Indonesia's Law No. 2 of 2026, in force since 30 April 2026, provides a legal framework for domestic workers and employer responsibilities. Families should obtain current local advice and use clear terms covering duties, pay, working time, rest, leave, religious holiday allowance, social protection, safety and suitable accommodation where staff live in.

Build the budget around the life you want

A generic monthly figure is not useful if it omits school, insurance, transport or annual trips home. Build four envelopes from current written quotes and keep annual costs separate before converting them to a monthly figure.

01 Home

Rent, deposit, utilities, internet, maintenance, laundry and the cost of a house that works for children.

02 Children

School, registration, meals, activities, childcare and the supplies that sit outside tuition.

03 Protection

Health insurance, deductibles, evacuation, transport safety and an emergency reserve.

04 Mobility

Visas, professional advice, vehicle or driver, trips home and document renewals.

The point is not to prove that Bali is cheaper. It is to understand what a given household budget can provide in terms of space, time, practical help, education and financial resilience.

Live a normal month before committing

Before a long lease, purchase or development decision, try to live the routine rather than the holiday. A reversible month can reveal more than weeks of online comparison.

Visit the shortlisted schools and confirm that a suitable place is actually available.

Test the school journey during normal weekday traffic.

Choose the vehicle and child restraint the family will use every day.

Confirm healthcare, insurance and night-time emergency contacts in writing.

Test any nanny or household arrangement before relying on it.

Only then decide whether the house and neighbourhood support the whole week.

Bali can be a very good place for a family. Much of our own experience has been happier and easier than we expected. It is still a personal decision. The strongest plan is the one built around a real child, a real week and protections that have been checked before they are needed.

Updated and fact-checked: 23 July 2026.

Sources for the verifiable claims

Indonesian State Secretariat, official inauguration of Bali International Hospital .

Bali International Hospital, listed services and emergency services . These are provider statements, not independent outcome data.

UK FCDO health advice and France Diplomatie health advice .

UK FCDO road advice , France Diplomatie safety advice and WHO child road-safety guidance .

Indonesian Ministry of Health, 2026 dengue circular .

Indonesian Ministry of Manpower, Law No. 2 of 2026 .

Lycée Français de Bali, 2026 to 2027 admissions and fees .

This article combines one family's disclosed experience with dated sources. Personal observations are not a ranking of countries, schools or medical providers. Verify current availability, prices, rules and coverage for your own family.

Two questions to explore next

Related question A second home in Bali: decisions to make before buying Related question Indonesia visas and work permits in 2026: the practical Bali guide

Test the activity in the visa decision guide Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## A management fee pays for a service. It does not move profit by itself. | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/management-fee-pt-pma-local-operator-indonesia/

Field Notes

/

Decision guide

Field Notes · Tax

A management fee pays for a service. It does not move profit by itself.

How a PT PMA can charge an Indonesian accommodation operator without turning the invoice into the business model

01

Need

02

Service

03

Evidence

04

Price

05

Tax

06

Invoice

A management fee between an Indonesian local PT and a PT PMA can be entirely legitimate.

It can also be the weakest part of the structure.

The difference is not the percentage printed on the invoice. It is whether the service, people, authority, evidence, pricing and tax treatment exist before the invoice is issued.

Here is the answer first.

A local accommodation operator can pay a related PT PMA for genuine services.

The fee must correspond to work that was actually performed, needed and beneficial to the operator.

A service cannot be charged twice, and shareholder oversight is not automatically a service.

There is no universal safe percentage for a management fee.

Five, ten or fifteen percent can each be appropriate or indefensible depending on the work and risk.

The local operator does not have a statutory minimum margin, but it cannot carry the guest contract, staff, licence and operating risk while being emptied of almost all economics without a strong explanation.

The PT PMA cannot simply “refacture the profit.”

Residual profit is not a service description.

PPh 23, VAT, PBJT and any brand or software rights need separate treatment.

Bundling everything into one line creates avoidable risk.

Boundary of this note

This note explains the structure of the analysis. It does not calculate a fee or tax treatment for a particular company. The contracts, tax status, local jurisdiction, KBLI, accounts and actual work need to be reviewed together.

The structure people have in mind

The arrangement usually sounds like this:

LOCAL PT

Guest bookings

Guest invoices

Guest revenue

On-site staff

Local accommodation activity

↓ management fee

PT PMA

Founder oversight

Marketing

Reservations

Finance

Technology

Procurement

Management

On paper, it looks tidy.

The local PT appears to operate the villas. The PT PMA appears to provide management. Money is moved from the operator to the PT PMA through a service invoice.

The hard question is:

What did the PT PMA actually do that an independent operator would have paid for?

Until that question is answered, the fee has no reliable foundation.

The invoice is the last step

A defensible sequence runs in this direction:

Real operating need

↓

Defined service

↓

Permitted business activity

↓

People, systems and authority

↓

Work performed during the period

↓

Benefit received by the operator

↓

Evidence of delivery

↓

Arm's-length pricing method

↓

PPh, VAT, PBJT and accounting treatment

↓

Invoice and payment

A weak structure starts from the opposite end:

Desired amount of profit in the PT PMA

↓

Percentage selected after the result is known

↓

Broad invoice labelled “management fee”

↓

Contract created to explain it

The second sequence starts with the desired transfer and constructs the service rationale afterward.

A worked example

Assume a local PT operates three villas.

In one month it receives IDR 1 billion in guest revenue. It contracts with the guests, appears as OTA merchant, employs the property team, pays local operating costs, handles refunds, files local accommodation tax and bears the risk of weak occupancy.

A related PT PMA employs six people who provide:

daily revenue management;

channel and reservation supervision;

monthly financial reporting;

group procurement;

paid-media execution;

systems administration;

senior operating review.

The PT PMA produces monthly reports, pricing decisions, campaign records, procurement savings, system logs and meeting minutes. Its people are employed by the PT PMA and their work can be traced to the three properties.

That is recognisable as a service relationship.

Now change the facts.

The PT PMA has no dedicated employees. The foreign founder checks WhatsApp, gives occasional instructions and reviews the bank account. At year-end the local PT has IDR 3.2 billion of profit, so the PT PMA issues a IDR 3.1 billion “management fee” to leave IDR 100 million locally.

That is not the same structure. The invoice amount was chosen to remove profit, not to pay for measured work.

The seven tests before pricing

1. Was the work actually performed?

The provider should be able to answer:

who did the work;

when it was done;

for which property or entity;

what decisions were made;

what output was produced;

how the work can be verified.

A signed agreement is not proof that the work happened.

2. Did the operator need the service?

An independent company does not buy a service simply because its shareholder wants to charge for it.

The need should be commercially intelligible. Examples include a central reservation team, revenue management, group procurement, accounting consolidation, systems administration or a management capability that the local operator does not maintain itself.

3. Did the operator receive an identifiable benefit?

Benefit does not mean guaranteed profit.

It can mean access to expertise, systems, staff, purchasing leverage, reporting, distribution or decision support that helps the operator perform its business.

The operator should be able to explain why it would have paid an unrelated provider for the same work.

4. Is the work duplicated?

Suppose the local PT already employs:

a general manager;

an accountant;

a revenue manager;

a marketing team;

a procurement manager.

A second company cannot charge for the same functions without identifying a distinct scope.

“Group management” is not a sufficient distinction by itself.

5. Is it really shareholder activity?

Some activities arise because a person owns or invests in the business.

Examples may include monitoring the investment, deciding whether to inject capital, reviewing shareholder returns or protecting the owner's position.

An independent operator would not necessarily pay a shareholder to behave like a shareholder.

The line is not always obvious. The question is whether the activity serves the operating company as a customer or primarily serves the investor as an owner.

6. Is the PT PMA authorised and capable of providing it?

The contract may call the work “consultancy.” The daily facts may show direct operational management.

KBLI 55901 now distinguishes third-party operational accommodation management from general management consultancy. If the PT PMA controls pricing, reservations, staff and daily decisions, the activity and live OSS position should reflect that reality.

Capability also matters. A company invoicing a broad management package should have the people, systems, organisation and costs needed to deliver it.

7. Is the price arm's length?

Only after the service passes the first six tests does pricing become the main question.

The method should follow the transaction.

A back-office support service may be analysed from its relevant cost base and a supported mark-up.

A full operational management mandate may use a revenue-related fee if comparable independent arrangements and the functions support it.

A defined project may justify a fixed fee.

A brand or technology right may require a different method from management work.

There is no percentage that is safe merely because it is common in conversation.

Why the percentage is not the first question

Owners often ask whether five, ten or fifteen percent of revenue is acceptable.

That question skips the substance.

A ten-percent fee paid to a capable manager responsible for distribution, revenue strategy, senior operations, systems and procurement across a complex portfolio can be commercially understandable.

The same ten percent paid to an empty company with no employees and no work products can be indefensible.

A two-percent fee can also be wrong if it pays for work that never occurred or was already done by the local team.

The percentage does not validate the service.

The local operator must remain economically real

There is no general rule requiring an accommodation operator to retain a fixed margin.

But the functions and risks still need to be rewarded somewhere.

If the local PT:

contracts with guests;

receives the revenue;

employs the property team;

pays operating costs;

bears occupancy risk;

handles complaints and refunds;

carries working capital;

holds the operating permissions;

bears customer liability;

then it is performing economically significant work.

A recurring fee that leaves it with almost no profit raises a simple question:

Why does the company carrying the operation receive almost no return for doing so?

There may be a defensible answer. The PT PMA may genuinely perform most higher-value management functions and bear important risks. But the contracts, licences, employees, systems and comparables need to prove that division.

The residual profit is not an invoice category

After the operator pays:

third-party costs;

staff;

OTA commissions;

local tax;

property-use charges;

genuine service fees;

other lawful expenses;

whatever remains is the operator's result.

That result belongs to the company. It ultimately benefits the company's real shareholders according to their rights.

A PT PMA can receive value through a real transaction. It cannot rename the entire residual result “management” merely because the foreign founder would prefer the money to sit there.

This distinction is especially important when the local PT is owned by two Indonesian employees or former employees. If they are genuine shareholders, the economic consequences of ownership are real. If every remaining benefit is contractually swept away from them from the first day, the ownership and beneficial-control story needs close review.

Separate the invoice components

One line reading:

Management, brand, marketing and technology fee

can hide several different transactions.

A stronger agreement separates at least:

Component

What needs to be shown

Why separation matters

Operational management

Decision rights, named managers, operating reports, property records

May align with accommodation-management activity rather than generic consulting.

Revenue management

Pricing actions, forecasts, channel work, occupancy strategy

Can be measured property by property.

Marketing execution

Campaigns, assets, media records, leads and invoices

Third-party media spend should not be confused with the provider's own fee.

Finance and reporting

Monthly accounts, budgets, reconciliations, controls

Avoids duplicating the local accountant.

Technology or software

Rights, users, licences, support and system ownership

May differ from a service and can have different tax treatment.

Brand or trademark

Actual IP rights and permission to use them

A royalty is not a management service.

Procurement

Purchase orders, negotiated terms, supplier trail

Savings or buying leverage should be visible.

Staff recharge or secondment

Employment, time, role and allocation

People cannot be moved between companies only through a journal entry.

Reimbursement

Third-party cost, no hidden mark-up unless justified

Keeps pass-through costs separate from remuneration.

The cleaner the economic categories, the easier it is to explain the tax and evidence.

The tax layers in practical language

PPh 23 withholding

Current Indonesian tax guidance generally applies a two-percent PPh 23 withholding to gross domestic remuneration for management and other covered services.

That withholding is generally a tax credit for the Indonesian recipient. It is not the final corporate income tax on the PT PMA.

Royalty treatment

A genuine domestic royalty is generally subject to a fifteen-percent PPh 23 withholding on the gross amount.

That is one reason brand, trademark or software rights should not be buried inside a management line without analysis.

VAT

Hotel-type accommodation sits within the local PBJT framework rather than ordinary central VAT.

A PT PMA that is a PKP and supplies a taxable management service may issue a VAT-bearing invoice. Input VAT linked to non-VAT accommodation revenue may not be fully creditable and can therefore become a real cost to the operator.

The result can be counterintuitive:

Guest revenue under PBJT

↓

Local operator

↓

Management service purchased from PT PMA

↓

VAT charged on the service

↓

Potentially non-creditable cost

A structure designed only around corporate income tax can become more expensive once indirect tax is included.

Local accommodation tax

The local operator's PBJT rate, registration and procedure depend on the relevant regency or city and the actual supply.

The management invoice does not replace that obligation.

What good evidence looks like each month

A defensible service file can include:

named personnel and responsibilities by company;

employment contracts;

PMS, OTA, finance and procurement permissions;

revenue-management decisions;

monthly operating and finance reports;

marketing plans and campaign outputs;

budgets and forecasts;

procurement records;

property-specific support logs;

meeting records and decisions;

issue and escalation registers;

cost centres and allocation keys;

contemporaneous pricing support;

tax invoices and withholding records;

proof of payment;

evidence of the local operator's own functions and decisions.

The service should be visible before an audit begins.

Three operating pictures

Comparatively coherent

The local PT is a real operator. It holds the guest-facing activity, contracts with guests, employs property staff, carries customer obligations and retains a result consistent with its work.

The PT PMA has real management people and systems. It provides clearly defined functions, produces evidence and charges under a method selected before the final profit is known.

Possible, but documentation-heavy

The local PT is the operator, but major functions are shared. The PT PMA controls central reservations and marketing, participates heavily in pricing and staff decisions, and shares systems with the local company.

This can work, but the decision rights, people, licences, costs and evidence need to be unusually clear.

High risk

The local PT exists mainly on the licence, OTA and invoice. It has little staff, control or economics.

The PT PMA or foreign founder controls the bank accounts, pricing, team, reservations, complaints, procurement and budgets, then invoices away nearly all margin.

The questions then extend beyond transfer pricing to business activity, beneficial ownership, nominee control, immigration and manpower.

A decision checklist before signing the agreement

Which company is the real accommodation operator?

Which exact service will the PT PMA provide?

Which KBLI permits that service in the actual location?

Who will perform each function?

Who will employ those people?

Which systems and decision rights are required?

What work product will exist each month?

What benefit does the operator receive?

Which local functions would otherwise duplicate the service?

Which activities are shareholder oversight rather than services?

Which pricing method fits each component?

Which comparables are genuinely comparable?

How will shared costs be allocated?

What result should the operator earn for its functions and risks?

Which components attract PPh 23 at two percent?

Is any component a royalty or another type of payment?

Does VAT apply and can the operator credit it?

What PBJT rules apply to the accommodation revenue?

Do the agreement, invoice, accounts and bank payment tell the same story?

Could the service be proven without relying on the founder's oral explanation?

The decision in plain language

A management fee is neither a safe harbour nor inherently suspect.

It is payment for a service.

The PT PMA needs the right activity, capable people, real work, evidence, a commercial benefit and an arm's-length price. The local operator needs to remain a real operator, with the rights, responsibilities and economics that match its role.

The rule to keep is:

Price the work. Do not price the amount of profit you want to move.

Talk to François

Sources and direct verification links

PMK 172/2023 on the arm's-length principle and related-party transactions

Official OSS KBLI 55901, accommodation-management services

DJP guidance on PPh Article 23

PMK 70/2022 on hotel services outside ordinary VAT

Law 25/2007 on Investment

Ministry of Law Regulation 2/2025 on beneficial-owner verification

The exact PPh, VAT, PBJT and deductibility result depends on the transaction, taxpayer status, local jurisdiction and contemporaneous evidence.

## Villa licensing under PP 28/2025: a dated timeline | DALLEAU

URL: https://dalleau.ai/notes/pp-28-2025-villa-licensing.html

← field notes compliance 12 April 2026 Villa licensing under PP 28/2025: a dated timeline

Government Regulation 28 of 2025 changed Indonesia's general risk-based licensing framework. It did not ban short stays or switch on an automatic platform check overnight. Tourism standards, supervision and platform verification have developed through separate measures on different dates.

DALLEAU | Research and field notes Published

12 April 2026

Last verified

20 July 2026

Verified | 17 July 2026 | primary sources

In brief Owners need to separate three questions. What licence applies to the business today? Which tourism standard must it meet? What checks can a booking platform or authority perform now? A message that treats all three as a single new “villa law” is likely to mislead.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Government Regulation 28 of 2025 changed Indonesia's general risk-based licensing framework. It did not ban short stays or switch on an automatic platform check overnight. Tourism standards, supervision and platform verification have developed through separate measures on different dates.

Owners need to separate three questions. What licence applies to the business today? Which tourism standard must it meet? What checks can a booking platform or authority perform now? A message that treats all three as a single new “villa law” is likely to mislead.

5 June 2025: the general licensing framework changed

Government Regulation 28 of 2025 , usually cited as PP 28/2025, took effect on 5 June 2025 and replaced PP 5/2021. It governs Indonesia's risk-based business licensing system across sectors. Its scope includes basic requirements, business licences, supporting licences, the Online Single Submission system, supervision and sanctions.

This is not a villa-only regulation. It provides the general machinery through which an activity's risk level and business permissions are handled. The result still depends on the business carried on, the applicant, scale, location and the current record in the licensing system.

Risk level and PT PMA eligibility are different tests. A low-risk activity is not automatically closed to a PT PMA: foreign investment must still be permitted and the activity must offer a route for the appropriate enterprise scale, normally large enterprise. The reverse is equally important. A code requiring only an NIB does not override an MSME allocation, a foreign-ownership condition, a missing large-enterprise route or property-specific requirements.

10 October 2025: tourism standards followed

Tourism Ministry Regulation 6 of 2025 took effect on 10 October 2025. It sets business standards, supervision procedures and administrative sanctions for the tourism sector under PP 28/2025.

Do not assume that every business described as a villa has the same risk classification or evidence requirement. The Tourism Ministry's SISUPAR standards directory publishes villa standards across more than one risk tier. The live licensing result must be checked for the precise business rather than copied from another property.

26 May 2026: platform verification was still being built

In its 26 May 2026 briefing , the Ministry of Tourism said that its automated interface with online travel agencies was under internal development. The planned check would use three items:

the Business Identification Number, or NIB;

the Indonesian business classification, or KBLI;

the Business Activity Number, or NKU.

The ministry stated that it aimed to launch the interface by June 2027. That is a target recorded in a dated press release, not a guarantee that the system will launch on that day or with unchanged rules.

The same briefing describes action that does not depend on the future interface. The ministry said it had identified unlicensed accommodation and would send official lists to platforms, which would suspend sales within two months of official notification. A compliant business could then be reinstated. Automated verification was future work; licensing duties and manual enforcement were not.

What a property owner should check now

A listing on a platform proves neither that the accommodation is licensed nor that the underlying property, entity and operations align. Before accepting bookings, assemble one current file:

Describe the service offered, who operates it and who receives the guest's payment.

Confirm the appropriate activity classification in the live Online Single Submission result.

Confirm the enterprise scale offered for that activity and whether the applicant's foreign investment is permitted or conditional.

Check the NIB and every licence or standard certificate required for that risk level.

Match the land use and building file, including the building approval and certificate of proper function where applicable, to the intended operation.

Confirm the tourism standard, local tax registration, staff obligations and guest reporting process.

Record renewal, reporting and supervision dates instead of treating the first licence as permanent clearance.

The NIB identifies the business but does not, by itself, establish that every property and activity may open. A paid tourist accommodation business remains regulated whether guests arrive through Airbnb, another platform or a direct booking. The exact route depends on the facts. Our KBLI 2025 villa activity map separates owner operation, third-party management, intermediation and residential rental.

A genuinely pre-existing valid licence raises a separate transition question. Its continued validity may be preserved when only the classification number changes, but that does not prove that the same activity is open to a new PT PMA today. Verify the original holder and shareholding, issue date, authorised activity and address, later changes and whether the current operation is still substantively the same.

Six claims to avoid

“PP 28/2025 made short stays illegal.” It did not create a general ban. It replaced the national risk-based licensing framework.

“Every villa is low risk.” The official tourism directory shows villa standards in different risk tiers. Check the live result for the specific activity and scale.

“A PT PMA cannot carry any low-risk activity.” Risk determines the licensing pathway, not foreign-investment eligibility. Test the activity, enterprise scale and investment conditions separately.

“An old licence proves that a new PT PMA can obtain the same code.” A valid prior authorisation may benefit from a transition rule without opening the route to a new applicant.

“The future platform interface is already active nationwide.” The ministry described it as under development on 26 May 2026 and gave June 2027 as a target.

“No interface means no enforcement.” The same ministry briefing describes official identification and platform suspension procedures outside the future automated check.

Updated: 17 July 2026.

Sources checked 20 July 2026: PP 28/2025 ; Presidential Regulation 49/2021 and its investment schedules ; Law 20/2008, including the definition of large enterprise ; Tourism Ministry Regulation 6/2025 ; Tourism Ministry SISUPAR villa standards ; Tourism Ministry platform-verification briefing, 26 May 2026 . Check the live Online Single Submission record and current Indonesian text before acting.

This note presents our interpretation of sources available on the review date. It may be incomplete, outdated or mistaken. It is general information, not legal, tax or licensing advice.

Two questions to explore next

Related question Is Bali still a good villa investment in 2026? Related question PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## PT PMA capital, investment and the E28A visa | DALLEAU

URL: https://dalleau.ai/notes/pt-pma-capital-idr-10-billion-investment-e28a.html

company and investment

PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares

Three separate rules are often compressed into the same IDR 10 billion figure. They apply to different questions and should be tested separately.

DALLEAU | Research and field notes Published

16 July 2026

Last verified

16 July 2026

Verified | 16 July 2026 | primary sources

Updated 16 July 2026

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

Three separate rules are often compressed into the same IDR 10 billion figure. They apply to different questions and should be tested separately.

For years, I heard the same number from notaries, lawyers, visa agents and incorporation providers: IDR 10 billion . Yet each conversation seemed to use it for something different. Was it capital? Cash that had to sit in a bank? The value of the business? The cost of the villa? A requirement for every activity? Or the shares needed by every foreign shareholder?

Three different rules are often presented as the same IDR 10 billion requirement. They answer different questions:

the general current PT PMA placed and paid-up-capital floor is IDR 2.5 billion , subject to the 25% rule and any higher sector-specific minimum expressly applicable to placed/paid-up capital;

the OSS investment plan is generally strictly more than IDR 10 billion for each applicable business activity and project location;

an E28A applicant separately needs evidence of at least IDR 10 billion in shares in the sponsoring company.

The regulation imposing the former general IDR 10 billion placed/paid-up-capital floor was repealed for the current general regime on 2 October 2025. Legacy deed or licence parameters may remain relevant in specified transitional cases. That history is why old and new answers continue to collide.

The distinction is easier to see in a villa project. Assume a PT PMA is being considered to hold the project rights, build and operate one lawful accommodation villa with a documented IDR 12 billion budget. The project budget, the company funding and the investor's shares still have to be tested separately.

That example does not assume that every land right, business classification or villa operating model is available. It simply shows why the three amounts cannot be treated as interchangeable.

First, stop calling all three amounts “capital”

The question you are asking

Current headline test

Unit

Main evidence

This is not

How much placed and paid-up capital must the PT PMA have?

Generally at least IDR 2.5bn , plus the 25% rule and any higher sector floor measured on placed/paid-up capital

The company

Deed, AHU record, shareholder register and contribution proof

The OSS plan or an E28A decision

How large must the business project be in OSS?

Generally more than IDR 10bn

Usually five-digit KBLI × project location, subject to sector exceptions

OSS plan and later LKPM realisation evidence

A bank deposit or anyone's shares

What shareholding must I document for E28A?

At least IDR 10bn in shares , subject to Immigration's accepted valuation basis and documents

Each visa applicant

Corporate records plus Immigration evidence

The project plan, debt or cash balance

These numbers can interact, but they are not substitutes.

An IDR 10.5bn project plan does not mean one person owns IDR 10.5bn of shares. An IDR 10bn shareholder loan is not shares. And IDR 2.5bn of paid-up capital does not, by itself, satisfy E28A.

One villa budget, three separate tests

Start with the IDR 12 billion development budget. It covers the project rights, design, construction, fit-out and opening costs for the proposed villa, subject to the categories that the current rules allow the company to count.

For the OSS investment plan, the relevant five-digit business classification, project location and admissible cost categories must together support planned investment strictly above IDR 10 billion. Land and buildings can be counted for defined property and accommodation activities under specific rules; they do not count automatically for every structure described as a villa project.

Now consider a first funding structure: IDR 2.5 billion in paid-up capital and IDR 9.5 billion as a shareholder loan. Subject to legal, banking and accounting review, those funds may finance company expenditure. The loan remains debt, however, so this structure does not document IDR 10 billion of shares for an E28A applicant.

Under a second structure, the company receives IDR 10 billion in shares and IDR 2 billion as a shareholder loan. That may address the current E28A shareholding threshold for one applicant if Immigration accepts the valuation and evidence. It does not by itself establish that the activity is licensed, the site right is valid or every project cost belongs in the OSS plan.

The villa has not changed between the two structures. What changes is the legal character of the money and the test it can satisfy: project expenditure, company capital or an individual investor's documented shares.

Rule 1: company capital is generally IDR 2.5 billion today

Since 2 October 2025, the general minimum placed and paid-up capital for a PT PMA is IDR 2.5bn per limited company , unless a sector expressly imposes a higher minimum on placed/paid-up capital. Other sector metrics must be tested separately.

Company law adds another rule: at least 25% of the company's authorised capital must be subscribed and fully paid.

The practical general placed/paid-up minimum is therefore the highest of:

IDR 2.5bn;

25% of authorised capital; and

any higher sector-specific minimum expressly applicable to placed/paid-up capital.

A sector rule expressed as authorised capital, investment value or another metric must be tested on that separate metric; it cannot simply be dropped into this formula.

The three corporate terms

Indonesian term

Plain English

What it means

modal dasar

authorised capital

The nominal ceiling of shares the articles allow the company to issue

modal ditempatkan

placed/subscribed capital

The shares issued or allocated to shareholders

modal disetor

paid-up capital

The value contributed for those shares

Authorised capital is not a bank balance. It is a statutory ceiling.

Examples:

Authorised capital

25%

General minimum placed/paid-up result

IDR 2.5bn

IDR 625m

IDR 2.5bn because the PMA floor is higher

IDR 10bn

IDR 2.5bn

IDR 2.5bn

IDR 20bn

IDR 5bn

IDR 5bn

IDR 40bn

IDR 10bn

IDR 10bn

An IDR 10bn authorised / IDR 2.5bn placed-and-paid structure was consistent under some pre-2021 rules and is again arithmetically consistent for a new company under the current general rule. It was not the general PT PMA structure from 2021 through 1 October 2025. Simply choosing a much larger authorised-capital number can also increase the amount that must be placed and paid.

“But the company can be registered without showing all that cash in the bank”

This procedural point causes enormous confusion.

The current corporate filing rules recognise different forms of valid capital evidence. Depending on the incorporation facts, Ministry of Law Regulation 49/2025 provides for bank evidence in the PT's name or a joint founders' account, or an original payment declaration signed by all directors together with all founders and commissioners. Government Regulation 8/2021 gives 60 days from the incorporation deed to transmit valid proof electronically.

That does not mean the capital can be fictional.

It means the incorporation filing, the bank evidence and the economic deployment of the company are not always shown to the founder in one simple screen at one moment. The shares must still be fully paid. The deed, shareholder register, declaration, bank trail and accounting records must tell the same story.

The safe way to say it is:

Not seeing an IDR 10 billion bank balance during online incorporation is not evidence that no capital or investment obligation exists. It is evidence that incorporation formalities, corporate capital and project funding are different processes.

That 60-day period is a deadline for filing proof, not an instalment plan or permission to invent paid-up capital.

The 12-month rule is not an instruction to leave the money idle

The 2025 investment regulation contains a 12-month self-declaration concerning placed/paid capital. It also expressly allows the money to be used for:

buying company assets;

constructing buildings; and

company operations.

If the shareholders pay IDR 2.5bn in cash into the PT and the PT then buys a legitimate IDR 2bn company asset, the cash balance falls, but the capital does not disappear. Cash has become another asset on the company's balance sheet.

Article 27 and Annex I describe a 12-month commitment not to move the placed and paid-up capital out of the company account, with stated exceptions for company asset purchases, building construction and company operations.

There is an important drafting problem: Article 27(1) points to Article 26(6), not the capital paragraph in Article 26(10). Confirm the declaration currently displayed in OSS and the applicable BKPM treatment before relying on the exact scope for a withdrawal, capital reduction or unusual non-cash structure.

Rule 2: the OSS project plan is generally more than IDR 10 billion

The IDR 10bn figure did not disappear. It belongs primarily to a different test.

The general rule requires a PMA project to show planned total investment strictly greater than IDR 10bn , generally excluding land and buildings, for each:

five-digit KBLI × project location

Two details matter immediately:

IDR 10bn exactly is not enough when the text says more than IDR 10bn;

the rule is not generally one IDR 10bn plan for the entire company, regardless of activities and addresses.

If one company has two unrelated five-digit business activities in two locations, it may have several plan units. The same asset or invoice cannot be counted in full in every unit.

The regulation has sector exceptions

Wholesale, food and beverage services, construction, certain industrial production lines, public EV charging and activities in Special Economic Zones follow specific aggregation rules. For food and beverage services, the amount is grouped by the first two KBLI digits within one kabupaten/kota, excluding land and buildings. It is not recalculated for every outlet address; a different kabupaten/kota creates a different calculation unit.

For a property or accommodation project, the main exception concerns how assets and construction work are counted.

Does buying a villa count toward the IDR 10 billion plan?

Sometimes, but saying that the villa counts is too broad to be useful.

The current regulation includes land and buildings for:

property development/operation, including development, sale and/or rental; and

short- or long-term accommodation.

It then draws a specific property distinction:

an entire building or integrated residential complex can use a test including land/buildings;

property in the form of one or more units that do not constitute one whole building or one integrated residential complex faces a test excluding land/buildings.

Article 26(6) creates this split specifically for property development/operation. It must not automatically be applied to short- or long-term accommodation, which is addressed separately by Article 26(5).

The correct answer therefore depends on:

the actual KBLI and activity;

whether that activity is available to a PT PMA at the relevant scale;

whether the project is accommodation, property operation, management or something else;

which company owns or legally holds the asset/right;

the project location and grouping;

the contract, title/right and accounting treatment.

A villa owned personally by a shareholder does not become the PT's investment because the PT manages it. A manager cannot count the market value of client-owned villas. And a hotel or accommodation code cannot be selected merely because its investment calculation is more convenient.

An investment plan is a budget, not a single cash deposit

OSS asks how the project will use and finance its investment.

The plan can include, where applicable:

land acquisition/preparation;

buildings and infrastructure;

machinery, equipment and spare parts;

vehicles, office equipment, studies, surveys, permits and construction-period costs;

one operating-cycle turnover of working capital.

The regulation recognises financing from:

own capital;

loans;

reinvested profit; and

share premium.

That gives us a simple example.

Example: IDR 10.6bn project, IDR 2.5bn share capital

paid-up capital: IDR 2.5bn;

shareholder or bank loan: IDR 8.1bn;

planned qualifying project costs: IDR 10.6bn.

The company can potentially satisfy its general capital floor and finance a larger project. But:

the IDR 8.1bn remains debt if documented as a loan;

the transfer is not automatically realised investment;

qualifying expenditure must occur and be supported;

the shareholder still owns only the shares shown in the corporate records.

Related-party loans may create tax, transfer-pricing, interest-withholding, currency and documentation issues; review the terms before funds move. Turning a loan into equity later is also a corporate action, not a ledger relabelling: it requires a valid claim, RUPS approval, sufficient authorised-capital capacity, the applicable shareholder/pre-emption process, fully paid shares and the required deed/AHU filings.

The clean acquisition-money flow

The sequence below separates the relevant decision points:

shareholder → documented capital / share premium / loan → PT bank account → PT buys the asset or pays the project cost → asset or expense recorded by the PT → realisation reported in the correct LKPM

For a valid non-cash contribution, use a separate branch:

non-cash contribution → valuation and legal transfer → PT asset

At every arrow, ask: what is this payment legally?

The company issues shares in exchange for a valid capital contribution.

Share premium is equity paid above nominal share value.

A shareholder loan creates debt.

A company purchase creates an asset or expense for the company.

LKPM reports qualifying project realisation.

Routing money through the company's bank account does not automatically turn it into share capital. Leaving cash in the account does not automatically turn it into realised investment. Paying a seller personally does not automatically give the PT ownership.

Rule 3: E28A requires IDR 10 billion in shares per applicant

Immigration asks a different question: how many shares does this person own in the sponsoring company?

The current official E28A page requires evidence of at least IDR 10bn in shares, or equivalent, in the sponsor registered with BKPM.

This is not:

the value of the OSS project;

the company's cash balance;

the applicant's shareholder loan;

the value of a villa owned by the applicant;

the company's total capital divided informally among several applicants.

One applicant versus two

If A holds IDR 10bn in documented shares, A may meet the published shareholding figure, subject to the rest of the immigration file.

If A and B both want E28A, each needs to meet the personal test. One company-level IDR 10bn project cannot be reused as IDR 10bn of shares for A and IDR 10bn of shares for B.

The corporate capital structure may therefore need to be much larger than the general IDR 2.5bn minimum when visa strategy requires it.

What about share premium?

Suppose A subscribes IDR 2.5bn of nominal shares and pays another IDR 7.5bn as share premium. The company receives IDR 10bn of equity funding. Because the IDR 7.5bn is expressly share premium, A's nominal shareholding remains IDR 2.5bn; it can increase only through a separate valid capitalisation or new-share corporate action.

The public E28A page says shares. It does not clearly say that share premium can replace nominal/documented share ownership. Do not promise eligibility without written, application-specific immigration confirmation.

The same caution applies to buying existing shares from another shareholder: that can change ownership without putting new money into the company or project.

Plan, realisation and LKPM

The OSS plan is forward-looking. LKPM records what the company realises.

A PT PMA, as a large enterprise, generally reports quarterly for every activity and location:

Quarter

Deadline

January to March

15 April

April to June

15 July

July to September

15 October

October to December

15 January of the following year

The report covers investment realisation, labour, production/services, licensing obligations and constraints. It should reconcile with contracts, invoices, bank movements, the fixed-asset register, accounts and tax records.

Article 373 identifies three relevant triggers: no LKPM for two consecutive periods; no additional investment realisation in the four periods after the first LKPM; or no additional realisation during four consecutive preparation-stage periods. The sequence then comprises three successive warnings, temporary suspension, an administrative fine and, only if the later statutory conditions remain unmet, revocation of the relevant business activity licence. Regulation 5/2025 does not itself state one universal fine amount.

What if my old PT PMA already has IDR 10 billion of paid-up capital?

The new IDR 2.5bn minimum does not rewrite an existing deed.

Reducing paid-up capital is a formal corporate process involving a shareholder decision, creditor notice and objection period, ministerial approval, notarial/AHU filings, accounting and tax review. Existing licensing and transitional rules must also be checked.

The post-reduction structure must still satisfy the IDR 2.5bn general floor, 25% of authorised capital and any higher sector rule measured on placed/paid-up capital. For example, authorised capital of IDR 40bn produces a 25% result of IDR 10bn; reaching IDR 2.5bn paid-up would also require authorised capital of no more than IDR 10bn, plus all other approvals. Recheck every E28A applicant before reducing shares.

Do not simply withdraw IDR 7.5bn and call it “excess capital.” That can make the deed, shareholder rights, bank trail, balance sheet, OSS, LKPM and visa files contradict one another.

The one-page test before you fund the company

Ask your notary, OSS adviser, accountant and immigration adviser to complete one shared table:

Question

Answer required

What is the authorised, placed and paid-up capital?

Amount, shareholders, dates and proof

What is the minimum capital formula?

IDR 2.5bn, 25% and sector check

What is each OSS investment unit?

KBLI, location, inclusion/exclusion of land/building

How is each project financed?

Capital, share premium, loan or retained profit

Who owns each asset/right?

Company, shareholder, seller, lessor or client

What has been realised?

Evidence and LKPM category

Who wants E28A?

IDR value of documented shares per applicant

What work will each foreigner perform?

Immigration/work-permission check

If the advisers' answers cannot fit into one coherent table, the structure is not ready for the money.

Questions we get asked directly

Do I need to deposit IDR 10bn immediately to create a PT PMA? Not as a universal current paid-up-capital rule. The general current floor is IDR 2.5bn per PT PMA, subject to 25% of authorised capital and any higher sector minimum expressly measured on placed/paid-up capital. Other sector metrics, the project plan and E28A use separate tests.

Can the IDR 2.5bn be used? The investment regulation expressly lists company asset purchases, building construction and operations as permitted uses within its 12-month framework. Confirm the live OSS declaration because Article 27 contains an inconsistent internal reference.

Can a shareholder loan fund the project? Yes, loans are a recognised financing source. The loan remains debt, does not issue shares and does not by itself meet E28A.

Does the price of my villa count? Only if the company's actual activity, legal right, project location and applicable property/accommodation calculation support it. A personal or client-owned villa does not automatically count.

Can I use the same IDR 10bn for two KBLI codes? Not automatically. The general test is per five-digit KBLI and project location, with specific sector exceptions. Shared assets must be allocated without double counting.

If I put IDR 10bn into the company, do I qualify for E28A? Only if the amount is documented as at least IDR 10bn of shares held by that applicant and Immigration accepts the evidence. A loan, project budget or bank balance is not enough.

Why did my old adviser say the capital was IDR 10bn? Because that was the general rule under BKPM Regulation 4/2021. The regulation imposing that former general floor was repealed for the current general regime on 2 October 2025, while specified legacy deed or licence parameters may remain relevant under transitional rules.

sources checked: 15 July 2026

Sources: Investment Ministry/BKPM Regulation 5/2025 , Articles 25 to 27, 37, 285 to 286, 373 to 376, 394 to 395 and 398 to 400; Government Regulation 8/2021 , Articles 3 to 5; Company Law 40/2007 , Articles 31, 33 to 35 and 41 to 47; Ministry of Law Regulation 49/2025 ; former BKPM Regulation 4/2021 , Article 12; official Immigration E28A page ; and official OSS preparation-stage and operational-stage LKPM guides. Checked 15 July 2026. This note provides general information, not Indonesian legal, tax, accounting, land, investment or immigration advice. Confirm the exact company, deed, activity, asset/right, address and live OSS/Immigration result before acting.

Two questions to explore next

Related question Seven ways to receive or transfer value from a PT PMA, and how each is taxed Related question PT PMA, nominee or long lease: where the investor's rights sit

From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

Method

Sources and update date

DALLEAU maintains this multilingual synthesis from the cited official sources, with visible verification dates and an open correction channel.

Read next

KBLI 2025 for Bali villas: owning, operating and managing for others are not the same business PT PMA capital and reporting context Seven ways to receive or transfer value from a PT PMA, and how each is taxed

Published context

PT PMA versus nominee E28A investor status

## PT PMA, nominee or long lease? | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/pt-pma-vs-nominee.html

← field notes

compliance

7 July 2026

PT PMA, nominee or long lease: where the investor's rights sit

Paying for land or shares does not make the payer the registered holder. Before investing, identify the right, the person or company that holds it, and the documents a court or future buyer can verify.

DALLEAU | Research and field notes

Published

7 July 2026

Last verified

20 July 2026

Verified | 17 July 2026 | primary sources

In brief

The distinction:

a PT PMA is a recognised Indonesian company through which eligible foreign investment may be made. A long lease grants contractual use rights for a stated term. A nominee structure places the registered land right or shares in another person's name while private documents try to give the economic backer control. These structures create different legal rights and should not be marketed as equivalents.

Check the sources and update date before acting.

We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the

official Indonesian regulations database

, and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source:

notes@dalleau.ai

. Any responsibility imposed by applicable law remains unchanged.

Paying for land or shares does not make the payer the registered holder. Before investing, identify the right, the person or company that holds it, and the documents a court or future buyer can verify.

The distinction:

a PT PMA is a recognised Indonesian company through which eligible foreign investment may be made. A long lease grants contractual use rights for a stated term. A nominee structure places the registered land right or shares in another person's name while private documents try to give the economic backer control. These structures create different legal rights and should not be marketed as equivalents.

What the records show

In a PT PMA, the foreign investor is recorded as a shareholder of an Indonesian company, subject to the permitted activity, ownership limits, capital rules and licences. The company, not the shareholder personally, may hold rights available to that entity, such as Hak Guna Bangunan when the conditions are met.

In a land lease, the landholder remains registered and the investor receives the contractual rights written into the lease. Term, renewal, assignment, inheritance, default and remedies depend on that contract and the authority of the person granting it.

In a nominee structure, an Indonesian person or entity appears in the land or share register, while side agreements, powers of attorney, debt acknowledgements or options attempt to give another person the economic benefit or control. The mismatch between the register and the private arrangement is the central risk.

Why nominee documents can fail

Article 33 of Investment Law 25/2007

prohibits agreements or statements that shares are held for and in the name of another person and declares such arrangements null and void. For land,

Article 26(2) of the Basic Agrarian Law

addresses direct or indirect transfers of Hak Milik to persons who are not eligible to hold it.

The practical consequences can surface in several ways:

Control:

the registered holder can refuse to sign, grant security, transfer the right or become unreachable.

Personal events:

death, divorce, insolvency or family conflict involving the registered holder can affect the asset.

Enforcement:

a court may refuse to enforce documents whose purpose conflicts with mandatory law.

Disclosure:

beneficial-ownership, banking, tax and anti-money-laundering checks may expose the mismatch.

Exit:

a buyer, lender or notary will examine the registered rights and the chain of authority, not only who originally provided the money.

Published Bali decisions illustrate the fact-specific nature of these disputes. See

Denpasar High Court 247/PDT/2021/PT DPS

and

Gianyar District Court 259/Pdt.G/2020/PN Gin

. They should not be read as an automatic outcome for every set of documents.

What Bali Perda 4/2026 covers

Bali's 2026 regional rule addresses the conversion of specified productive land and nominee transfers within that field. The

official Bali spatial-planning summary

describes administrative measures that can progress to suspension, site closure, licence revocation or demolition for the covered breaches.

The summary cannot be applied as if every nominee dispute led automatically to every sanction. The parcel classification, conduct, permits, parties and applicable national law must be reviewed for the specific file. Our

construction and productive-land note

explains the separate spatial context.

What a PT PMA solves

A properly incorporated and operated PT PMA records foreign share ownership in a recognised company structure. It can enter contracts, keep accounts, report investment and, where permitted, hold a land right available to the company. Authorities and courts can recognise those rights subject to the title, corporate powers, licences, contracts and facts.

The foreign shareholder still receives no personal Hak Milik, and the company structure cannot cure prohibited land use, missing building approval, unlicensed accommodation or tax failure. The company must carry the correct business activity, meet its capital and investment requirements, keep proper accounts and file the required reports.

The activity must pass four separate gates: the facts must match the KBLI description; OSS must offer the appropriate enterprise scale; foreign investment must be permitted or its conditions met; and the required NIB, standard certificate or licence must be effective. The risk label answers mainly the fourth question. A low-risk activity is not automatically forbidden to a PT PMA, and an NIB-only route is not automatically open to one.

Do not infer current availability from an old company record. A valid licence may remain effective through a classification transition even when a new applicant could not obtain the same activity today. That is a grandfathering question, not proof of a present route. Review the original holder, shareholding, issue date, authorised activity and address, later changes and current operation.

The

2025 investment regulation

sets a minimum placed and paid capital of IDR 2.5 billion per PT. Its provisions on the use of paid capital should not be described as a blanket twelve-month freeze: the regulation expressly contemplates use for company assets, building construction and authorised operations, while the exact application should be checked in the active OSS and company file.

Where a long lease fits

A long lease is one recognised contractual route for a foreign investor who wants defined use rights without acquiring shares in a PT PMA. Its strength depends on the landholder's title and authority, the term, renewal mechanism, assignment and inheritance clauses, registration or notarisation where applicable, default provisions and remedies.

It remains a contract, not a freehold title. That can suit a finite personal-use project or a smaller residence, provided the investor prices the declining term and renewal risk. Commercial accommodation still requires its own compliant operator, building file, business classification, licences and tax registrations.

Nominee risk can also appear in the operating company

The nominee question is not limited to a person holding land or shares in a property company. It can also arise when two Indonesians appear as shareholders of a domestic operating PT while another person funds the company, appoints management, controls the bank accounts, takes substantially all economic benefit and can remove the registered shareholders at will.

There are only two coherent starting points. Either the Indonesian shareholders genuinely own the shares and possess real governance and economic rights, or the structure must confront Article 33 and beneficial-owner rules. Their employment ending does not by itself end their shareholding.

The separate Field Note Can a PT PMA operate a Bali villa? examines the operating, licensing and invoicing consequences of that structure.

Can a PT PMA operate a Bali villa?

Common questions

Can a foreign individual own land under Hak Milik?

No. Other rights and structures may be available depending on residence, use and the proposed holder, but Hak Milik is reserved for eligible Indonesian holders.

Is a long lease safer than a nominee arrangement?

A valid lease states the contractual rights openly and can therefore be assessed on its terms. It is one recognised route, not a guarantee. The land title, lessor's authority and contract still require independent review.

Does a PT PMA authorise short-term villa rentals?

Not by itself. The company also needs the correct activity classification and the property must satisfy the applicable planning, building, tourism, tax and operating requirements.

Does low risk mean a PT PMA is ineligible?

No. Risk tier, enterprise scale and foreign-investment access are separate tests. A PT PMA can carry a low-risk activity when the other legal gates are satisfied.

What should be checked before paying?

The land search, registered holder, corporate register, beneficial ownership, authority to sign, permitted activity, investment and capital records, building and operating file, tax position, and the proposed exit documents.

Last reviewed: 17 July 2026.

Related:

Investor visa E28A

·

Bali land zoning

·

current villa licensing framework

·

PT PMA capital rules

Sources checked 20 July 2026:

Investment Law 25/2007

;

Basic Agrarian Law 5/1960

;

PP 28/2025

;

Presidential Regulation 49/2021

;

Law 20/2008, including the definition of large enterprise

;

Investment Ministry/BKPM Regulation 5/2025

;

Bali Perda 4/2026 record

;

official Bali implementation summary

; the two court decisions linked above.

This article provides general information and our reading of the sources on the review date. It may be incomplete, outdated or mistaken. It is not Indonesian legal, land, tax, notarial or investment advice. Have a licensed Indonesian lawyer or notary review the exact title, parties, company and documents before any commitment.

Two questions to explore next

Related question

PT PMA capital explained: IDR 2.5 billion, the IDR 10 billion investment plan and E28A shares

Related question

Seven checks before paying a deposit on Bali property

From information to a project decision

Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website

I would like to receive Field Notes and have read the privacy notice.

Read more

Subscribe

## Who is the real villa operator? | DALLEAU | DALLEAU

URL: https://dalleau.ai/notes/reality-check-who-is-the-real-villa-operator/

Field Notes

/

Reality Check

Field Notes · Companies

Who is the real villa operator?

01

Listing

02

Guest contract

03

Cash

04

People

05

Systems

06

Property right

07

Licence & tax

08

Risk & profit

The name on the invoice is one clue.

It is not the answer.

A licence can sit in one company. The OTA can be controlled by another. Staff can take instructions from a third. The foreign founder can make every decision while two Indonesian former employees appear as shareholders of the local operator.

Different companies can legitimately perform different functions.

The problem begins when the documents and the ordinary week describe different operators.

Practical rule

The operator is not the company with the most convenient label. Operating reality appears across the contracts, cash, people, systems, decisions and risk.

Ask ten questions

1. Who appears on the listing?

Check the legal merchant or host name, account owner, payout account and administrator rights.

A public management brand can differ from the company contracting with the guest. That is workable when the relationship is deliberate and disclosed. It becomes a problem when the brand hides the fact that the company on the listing has no coherent connection to the licence or guest contract.

2. Who contracts with the guest?

Which company promises the stay, accepts the booking terms and carries the customer obligation?

Read more than the invoice:

booking confirmation;

cancellation policy;

accommodation terms;

privacy notice;

payment descriptor;

company named in a complaint or refund process.

The guest contract is a strong operator signal because it identifies the supplier the customer can pursue when the stay fails.

3. Who receives and refunds the money?

The OTA payout account is important evidence.

So is the authority to decide what happens to the money. Who approves refunds, compensation, discounts, deposits and chargebacks?

A company that receives cash for a few hours but cannot decide how it is used may be a collection vehicle rather than the economic operator.

4. Who employs and directs the team?

Who signs employment contracts? Who builds schedules? Who gives the daily instructions? Who approves leave, disciplines staff and handles service recovery?

The organisation controlling the people performs material operating functions.

Consider this pattern:

Local PT signs the employment contracts

but

PT PMA director sets every shift

approves leave

instructs housekeeping

resolves guest complaints

and dismisses staff

The employer name on paper does not finish the analysis. The structure still needs a lawful explanation for who actually directs the workforce.

5. Who sets prices and controls reservations?

Inspect access rights to the PMS, channel manager, OTA, CRM and payment systems.

Who can:

open and close dates;

change the rate;

accept or decline a booking;

apply a discount;

cancel a stay;

change minimum-night rules;

see guest data;

release a payout;

create a new administrator?

Passwords and approval rights can reveal more than the invoice.

6. Who holds the activity and permissions?

Check the live OSS record, KBLI, NKU, location, business scale, standard certificate and supporting permissions.

A NIB alone is not the complete answer.

Compare the substance of the activity:

direct accommodation supply;

operational management of another owner's accommodation;

general management consultancy;

residential property management;

booking intermediation;

separate food, transport or tour services.

The commercial word

management

can describe several legally different businesses.

7. Who has the right to use the property for this business?

A company can hold a plausible KBLI and still lack the contractual right to operate the particular villa.

Check:

title, lease or underlying property right;

operating concession or use agreement;

owner or landlord restrictions;

building use;

PBG and SLF position;

spatial compatibility;

any restriction on short-stay activity at the location.

The operator needs a legal connection to the property, not merely physical possession.

8. Who files local tax and foreign-guest reports?

Which company handles PBJT and APOA?

These processes create recurring documentary evidence. They should be compatible with the company presented as operator.

A structure in which one company sells the stay, another receives the cash, a third reports local tax and a fourth files APOA can be coherent only when the contracts and responsibilities explain why.

9. Who carries the risk when something goes wrong?

Who is responsible for:

refunds and guest claims;

chargebacks;

property damage;

safety incidents;

employment disputes;

supplier liabilities;

insurance;

operating losses when occupancy falls;

working capital;

reporting failures?

Risk often reveals whether the declared operator is real.

A company cannot convincingly claim to operate when it makes few decisions, has few people and suffers few consequences.

10. Who keeps the residual result?

After operating costs and genuine intercompany services, which company keeps the profit or loss from the accommodation business?

If the local PT carries the guest contract, employees, licence and operating risk but is left with almost no return every year because of a management fee, the structure needs to explain why its economic role is valued so lightly.

If the PT PMA receives nearly all of the margin, it needs corresponding functions, people, permissions, assets, risk and evidence.

The desired profit split should not be selected first and converted into an invoice afterward.

Read the complete picture

LISTING

+ GUEST CONTRACT

+ PAYMENT AND REFUNDS

+ PEOPLE AND DECISIONS

+ SYSTEMS AND PASSWORDS

+ PROPERTY RIGHT

+ ACTIVITY AND LICENCE

+ PBJT AND APOA

+ RISK

+ RESIDUAL RESULT

= OPERATING REALITY

No single answer determines the structure.

The answers should support the same story.

Coherent structure

GENUINE LOCAL OPERATOR

correct activity and location

real right to use the property

Guest contract

OTA merchant and payouts

operating staff

refunds and customer responsibility

PBJT and APOA

real decisions, profit and risk

↓ real service agreement

PT PMA MANAGEMENT OR SUPPORT COMPANY

permitted activity

real team and systems

defined scope

visible work products

clear decision rights

commercially supported fee

This structure can be explained to a guest, bank, OSS reviewer, tax adviser, immigration officer and auditor without changing the story for each audience.

Contradictory structure

LOCAL PT

two former employees on the shareholder register

licence

OTA

invoice

transit bank account

few people, decisions or risks

↓ nearly all economics

PT PMA OR FOREIGN FOUNDER

funding

bank control

pricing

reservations

staff

complaints

procurement

all systems

all important decisions

nearly all economic benefit

The concerns are not limited to tax or the size of the management fee.

The same facts can raise questions about:

the real operator;

business-activity licensing;

beneficial ownership;

nominee shareholding;

the foreign director's manpower and immigration basis;

transfer pricing;

liability to the guest.

Two ownership outcomes for former employees

When two Indonesian employees become shareholders of the local PT, the structure must correspond to one of two legal and economic positions.

They genuinely own the shares

Then they have real rights, economic interests and consequences of ownership.

Ending their employment does not end their shareholding. Exit requires a valid corporate and contractual mechanism.

They do not own the shares in substance

Then the structure needs to confront Article 33 of the Investment Law and Indonesia's beneficial-owner rules.

The practical line is:

A shareholder with no real rights can create a nominee problem. A shareholder with real rights creates a real governance relationship. “Use two employees” does not remove either reality.

The most useful final test

Ask:

Which company could still operate the accommodation tomorrow if the other company stopped helping?

If the local PT could not set a price, accept a booking, direct the team, pay suppliers, refund a guest or complete reporting without the foreign founder personally taking over, its independent operating role may be weaker than the documents claim.

If the PT PMA stopped working and the local operator retained its people, systems, contracts, cash and responsibilities, the division of roles is easier to understand.

The result in plain language

The company on the invoice is one piece of evidence. It is not the operating reality by itself.

A serious structure aligns:

the property right;

activity and licence;

guest contract;

cash;

people;

systems;

decisions;

tax and APOA;

risk;

residual economics;

effective control.

The rule to keep is:

The invoice should follow the business. It should not create a second version of it.

Talk to François

Core sources and connected guides

Official OSS KBLI 55203, villa activity

Official OSS KBLI 55901, accommodation-management services

Law 25/2007 on Investment

PMK 172/2023 on related-party transactions

Related DALLEAU guides:

Can a PT PMA operate a Bali villa?

,

A management fee pays for a service

,

Can a foreign director work inside their own Bali business?

and

Your Bali villa is listed online. What does that actually prove?

## Repainting a stain does not fix water ingress. | DALLEAU Field Notes

URL: https://dalleau.ai/notes/repainting-a-stain-does-not-fix-water-ingress.html

Field Notes / Reality Check / Water, envelope and moisture

Field Notes · Reality Check · Water, envelope and moisture

Repainting a stain does not fix water ingress.

A new coat of paint can make a wall look repaired while the water route remains unchanged.

Evidence level

Established investigation principle. The source remains site-specific.

Application type

Owner observation and investigation sequence

Updated

4 August 2026

Sources

4

On this page

Reality Check

Why the visible point can mislead

Cosmetic repair can destroy useful evidence

A better investigation sequence

Questions to ask before accepting a repair

Red flags

What this does not prove

Owner action

Sources

System map

Reality Check

A native diagram keeps the decision path legible without turning project criteria into a false score.

01 Timeline

When and under which conditions

02 Map

Visible point, spread and height

03 Hypotheses

One possible route at a time

04 Test

Controlled and recorded

05 Repair

Source and damaged material

06 Retest

Comparable conditions

Illustrative context

Reality Check

A new coat of paint can make a wall look repaired while the water route remains unchanged.

The stain is evidence of a condition. It is not necessarily the location where water entered, and it is not a diagnosis of the cause.

Why the visible point can mislead

Water may:

enter at a roof or parapet;

travel along reinforcement, pipes or a cavity;

accumulate behind render or tile;

emerge at a joint several metres away;

appear only after the assembly becomes saturated;

dry before the next inspection.

A lower-wall mark may be related to ground moisture, lateral rain, landscaping, plumbing, a wet room or condensation. A ceiling stain may be related to a roof, a terrace, a bathroom, condensate or a service penetration.

Cosmetic repair can destroy useful evidence

Immediate sanding, repainting or resealing can remove:

the original shape and height of the mark;

salt deposits;

cracking or blister patterns;

the relation to joints and penetrations;

the timeline after rain or use;

material samples required for investigation.

A temporary protective measure may still be necessary. Record the condition before changing it.

A better investigation sequence

1. Build the timeline

Ask:

Did the mark appear during rain, after rain or during bathroom use?

Does it change with wind direction?

Does it appear only when the room is cooled?

Is it seasonal or continuous?

What repair or installation happened before it appeared?

2. Map the visible condition

Record the room, wall orientation, height, spread, material, odour and nearby services. Mark it on a drawing or simple plan.

3. Review likely water routes

Inspect roof, façade, sill, threshold, terrace, planter, wet room, pipe, condensate and external level conditions connected to the area.

4. Test one hypothesis at a time

Controlled water testing or isolation can be useful when performed by an appropriate specialist with a defined sequence. Flooding several areas at once makes the result harder to interpret.

5. Open only when justified

A small, targeted opening may become necessary. It should follow the evidence rather than replace investigation with random demolition.

6. Repair the route and the damage

The repair should address both the entry or moisture mechanism and the damaged finish or material.

7. Retest

Where possible, repeat the relevant water condition or observe the next comparable rain event. “The wall looks dry today” is not the same as a verified repair.

Questions to ask before accepting a repair

What was the working cause?

What evidence supported it?

Which interface was repaired?

Was wet material removed or allowed to dry?

How was the repair tested?

What result would trigger reopening the investigation?

Who will inspect it during the next wet-season event?

Red flags

repeated repainting without written cause;

sealant applied to every visible crack without checking the water route;

one moisture-meter reading treated as a diagnosis;

the affected area closed before drying is verified;

no photographs before and after opening;

no retest;

no review of external levels or drainage.

What this does not prove

A stain alone does not prove rising damp, roof failure, hidden mould or one contractor’s responsibility. A remote photograph cannot establish the source. Moisture instruments need context, material knowledge and an investigation plan.

Owner action

Before accepting another cosmetic repair, ask for one page that connects:

```text Observation → likely routes → test → repair → retest → next review ```

Sources

Sources

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Open original record

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Open original record

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Continue from the question in front of you

Continue from the question in front of you

After heavy rain: what an owner should check before everything dries. → Waterproofing is a chain, not a coating. → Slab-on-ground or suspended floor in Bali? → A membrane cannot rescue a flat roof without falls. →

Bring the chronology, photographs and previous repair record.

Bring the water path, interfaces and evidence into the brief before finishes conceal them.

Talk to François

## Shared amenities or private facilities? | DALLEAU

URL: https://dalleau.ai/notes/shared-estate-amenities.html

← field notes development notes 7 July 2026 Shared amenities or isolated villas: how to compare the two models

A shared facility is valuable only when guests use it, the site can lawfully support it and the operating savings justify the extra capital.

DALLEAU | Research and field notes Published

7 July 2026

Last verified

17 July 2026

Verified | 17 July 2026 | primary sources

In brief The practical answer: several private villas around carefully chosen shared facilities can use land and staff more efficiently than one large house. The opposite can also be true. A compact site, weak privacy, the wrong licence or an amenity that guests will not pay for can make the estate model more expensive and harder to operate.

Check the sources and update date before acting. We identify both on every note, but rules and interpretations can change. This summary may become incomplete or outdated and does not replace advice based on your circumstances.

Sources and limitations

This page is not an official text or translation and is not legal, tax, accounting, immigration, financial, land/title or notarial advice. Reading it or sending a general enquiry does not create a professional-adviser relationship.

Rules, administrative interpretations and eligibility criteria can change. Check the update date, consult the applicable Bahasa Indonesia text in the official Indonesian regulations database , and obtain confirmation for your facts from the competent authority or an appropriately authorised Indonesian professional. If our summary differs from the official text or a confirmation for your file, do not rely on our summary. No permit, title, visa, tax treatment, return or other outcome is guaranteed.

Report a correction or outdated source: notes@dalleau.ai . Any responsibility imposed by applicable law remains unchanged.

The comparison should therefore begin with the intended guest, the lawful capacity of the parcel and the complete operating model. It should not begin with a rendering or with a target number of “keys”.

The two products are not interchangeable

A large standalone villa offers one booking at a time. It can provide strong privacy and a clear identity, but every private gym, spa room, service kitchen or arrival space is funded by that one booking.

A small estate may sell an individual villa, two adjoining villas or the whole property. Shared laundry, storage, staff facilities, plant rooms and selected guest amenities can then serve several bookings. This creates more selling options, not automatic revenue. The operator still needs demand for each configuration and a clear way to price the full-estate buyout without displacing better individual bookings.

Start with the guest experience

The estate model is most convincing for groups that want to stay together without sharing every room: multi-generational families, two families travelling together, friends, small retreats and celebrations. Each group needs a private entrance, bedrooms protected from noise, usable outdoor space and a clear route to the social areas.

Shared facilities should answer a specific need. A breakfast kitchen may support morning service across the property. A wellness room may be viable if it is bookable and staffed. A large decorative pavilion that rarely affects the room rate may simply consume land and maintenance budget.

The useful question is not “which amenities look premium?” It is “which moments of the stay become better, and what evidence suggests guests will pay for them?”

Privacy is a planning decision

Privacy cannot be repaired with landscaping after the buildings are fixed. Test it in the site plan:

direct sightlines between terraces and bedrooms;

acoustic separation around pools and social spaces;

distance between private outdoor areas;

guest circulation during arrivals and departures;

staff, delivery, laundry and waste routes;

night lighting and security without constant staff visibility.

If these paths overlap, “shared” quickly feels exposed. If they are separated, the guest can keep the feeling of a private villa while using services that would be uneconomic to duplicate.

Shared systems can reduce operating duplication

One property can use a common maintenance schedule, storage area, laundry workflow, service kitchen, water-treatment plan and guest-support team. This may reduce duplicated equipment and travel between sites. It also concentrates risk. A failed water system, poor staff circulation or one weak operating team can affect every unit at once.

The design should therefore show both the efficiency and the fallback: isolation valves, access for repairs, spare capacity, stock control, responsibility for each system and a maintenance budget. “Centralised” is not the same as resilient.

Planning and licensing come before density

More villas on one parcel are not automatically permitted. The official spatial plan, site conditions, building approvals, environmental requirements and intended accommodation activity must support the proposed density and use. Commercial colour labels used by agents are not a substitute for the official parcel record.

Check the Bali provincial spatial-planning portal , the live OSS licensing system and the project-specific building file before fixing the programme. Our zoning note explains why permission to build and permission to operate accommodation are separate questions.

Compare the economics on one page

For both options, place the same lines side by side:

Question

Standalone villa

Small estate

Sellable configurations

One

Individual units, combinations, full buyout

Private amenity cost

Funded by one booking

Selected costs shared across units

Privacy risk

Lower if the site is generous

Higher unless separation is designed early

Operating structure

Simpler

More moving parts, with possible central efficiencies

Demand evidence needed

Comparable large villas

Comparables for units, combinations and buyouts

Failure concentration

Usually limited to one villa

Shared systems can affect the whole estate

Then calculate the capital cost per sellable unit, the additional room rate or occupancy needed to pay for each shared amenity, the staffing plan, maintenance reserve and the effect of a full-estate booking on individual availability. Do not count a theoretical configuration as revenue unless it has a credible guest and price.

What Harmonie taught us

Our experience with Harmonie supports more deliberate sharing of service infrastructure and fewer duplicated facilities in a future project. That is an internal operating judgement, not proof that every estate should use the same layout. Harmonie's results are internal, unaudited and tied to its own location, design, team and booking history.

The lesson we carry forward is a method: define the guest first, protect private space, choose only the shared facilities that improve the stay or the operation, and test every square metre against its capital and maintenance cost. Our Harmonie field note separates the decisions we would repeat from those we would change.

Five decisions before the first plan

Who is the main guest, and which other groups should the property still serve?

How many private units can the official site and building evidence support?

Which facilities affect willingness to book or the cost of operation?

Can staff and service routes work without weakening privacy?

Does the estate still work under conservative occupancy, rates and maintenance costs?

If the answers are weak, one well-resolved villa may be the better use of the site. If they are documented, a small estate may offer greater flexibility without turning into an improvised hotel.

Updated: 17 July 2026.

Sources checked 17 July 2026: BPS Bali for official tourism context; Bali provincial spatial-planning portal and OSS for the official planning and licensing starting points; commercial accommodation data as third-party context; our own Harmonie records as internal, unaudited operating evidence. No public source proves that one model will outperform the other on a particular parcel.

Two questions to explore next

Related question Building Harmonie: what we would repeat and what we would change Related question Villa licensing under PP 28/2025: a dated timeline

Model this decision in the Stay Matrix Open the tool → From information to a project decision Is this question part of a real Bali residence project?

Share the site, capital and decision context in a private brief. DALLEAU will identify the most useful owner-side next step; regulated legal, tax, immigration and notarial matters remain with authorised advisers.

Start a private brief

Follow material changes

Receive a short email when a Field Note is published or materially revised.

Website I would like to receive Field Notes and have read the privacy notice. Read more Subscribe

## François Dalleau and the Bali development team | DALLEAU

URL: https://dalleau.ai/people/

The people
The people behind the work.
Every residence depends on people. What matters is not the number of names beneath a logo, but who stays close to each decision and who carries it into daily operation.
DALLEAU · Principal responsibility
François Dalleau
Founder
François Dalleau began investing privately in property in 2012. He founded Investissement Budapest in 2015, where his work spanned some sixty projects, including multi-unit schemes. Since 2022, he has focused on private-residence development and operations in Bali. He personally directs each DALLEAU mandate and remains accountable within its agreed scope.
How responsibility is separated
DALLEAU
Owner-side direction and controls
Defines the owner question, coordinates decisions and keeps approvals, costs, evidence and responsibilities connected.
Bee My Guest · when appointed
Residence operations
Provides staffing, maintenance and hospitality only under a separate operating appointment.
Independent appointments
Project-specific specialists
Architects, engineers, contractors and regulated advisers retain responsibility for their own appointed scopes.
DALLEAU · OWNER-SIDE OFFICE
Direction stays with the owner’s question.
DALLEAU coordinates the mandate without replacing the appointed architect, engineer, contractor or regulated adviser. Shared support functions enter only where their scope is stated.
Finance records, Indonesian tax and accounting coordination, and procurement support are connected to the mandate or operating record only within their stated assignments.
Intan
Shared support · scope stated
Finance Manager
Intan coordinates cash-flow records, financial controls, reconciliations and reports for owners. She keeps the operating record clear and current, giving owners a coherent view rather than disconnected paperwork.
Tio
Shared support · scope stated
Indonesian Tax & Accounting Coordination
Tio coordinates Indonesian tax records, filings and accounting documentation across the operating portfolio, working with appointed advisers where specialist sign-off is required.
Lystia
Shared support · scope stated
Procurement & Operations
Lystia coordinates operational purchasing, from linens to daily supplies. When project procurement is separately assigned, she also tracks approved materials and deliveries. She supports quotations, inventory and delivery schedules.
BEE MY GUEST · WHEN SEPARATELY APPOINTED
Operations are a distinct appointment.
Bee My Guest provides residence operations, staffing, maintenance, housekeeping and hospitality only when separately appointed. That operating role does not replace DALLEAU’s owner-side development mandate.
Amar
Bee My Guest · when appointed
Residence Operations Manager
Amar coordinates day-to-day operations for the residences to which he is assigned, bringing together service, maintenance and on-site teams. He ensures that operating standards are reflected in daily practice.
Betty
Bee My Guest · when appointed
People & HR
Betty supports hiring, contract administration, training and team wellbeing. Her work creates the human continuity behind consistent service.
Sheva
Bee My Guest · when appointed
Content Manager
Sheva produces the photography, scripts and editorial material used to present the villas online. She documents the houses and the life around them with clarity and restraint.
Ibu Ketut
Bee My Guest · when appointed
Housekeeping & Butler Lead
Ibu Ketut leads housekeeping and butler service for the residences to which she is assigned. She coordinates room standards, daily care and breakfast service with consistency and warmth.
Independent appointments
Independent, project-specific specialists.
Architects, engineers, contractors, legal advisers, tax advisers and other regulated professionals are appointed for defined scopes and remain responsible for their own professional work.
Start with the project, not the pitch.
Start a private brief

## Harmonie | From construction to operation | DALLEAU

URL: https://dalleau.ai/projects/harmonie/

Documentary project evidence

Harmonie

Harmonie. The image shows the state. The record explains why it matters.

← Work

Harmonie, Bali · Construction-stage record showing exterior works, openings and unfinished interfaces before delivery.

Harmonie. The image shows the state. The record explains why it matters.

Project and source status

Current project status: delivered and operating. Documented state: construction stage, before delivery.

Stage

Exterior works and unfinished interfaces remained visible during construction.

Owner question

What must be recorded while a condition remains visible so owner-side decisions stay usable after construction teams leave?

Observed condition

Exterior works, openings and unfinished interfaces before delivery.

Owner consequence

The record is useful when its date, condition, related decision, responsible scope and next verification remain connected.

Decision or action

Preserve the observation as a time-bounded construction record and keep the delivered-and-operating status separate.

Evidence status

Existing construction-stage photograph; current status comes from the existing project record.

Record scope

Construction-stage conditions visible in the record; delivered-and-operating evidence is documented separately.

What remains open

Future operating observations and appointed specialist records remain separate evidence layers.

Next step

Continue the record through operating observations, maintenance decisions and the responsibilities of appointed scopes.

Discuss your project record

## Девелопмент частных резиденций на Бали | DALLEAU

URL: https://dalleau.ai/ru/

Девелоперское бюро на стороне владельца · Частные резиденции и комплексы с сервисом · Бали
Одно девелоперское бюро, подотчётное владельцу.
Иллюстративная концепция резиденции.
Даже сильная команда специалистов может потерять логику проекта между отдельными зонами ответственности.
Обсудить проект с Франсуа
Work
Для первого разговора не нужен полный комплект документов. Достаточно обозначить участок, предполагаемое использование и вопрос владельца.
Люди, зоны ответственности и этапы меняются.
Замысел владельца, решения и подтверждающие материалы должны оставаться связанными.
Роль в интересах владельца
Единая линия ответственности при смене этапов и зон работ.
Каждый специалист сохраняет ответственность в рамках порученной ему работы. DALLEAU поддерживает связь между вопросами владельца, решениями, подтверждениями и следующими контрольными точками проекта.
Вопрос владельца формулируется до того, как специалисту поручается соответствующая задача.
Для каждого решения сохраняются основание, полномочия, подтверждения и следующая контрольная точка.
За профильное проектирование, соблюдение требований и приёмку отвечают привлечённые специалисты.
Строительная фиксация
Лестница, центральный проём и прилегающие узлы до завершения отделки.
Сдано и эксплуатируется
То же пространство после сдачи, в эксплуатации.
Реализованный проект
Harmonie: от строительства к эксплуатации.
Проектное досье с чётко обозначенными границами связывает условия, зафиксированные на стройке, с принятыми на их основе решениями и зонами ответственности, при этом последующее состояние объекта в эксплуатации фиксируется как отдельный уровень подтверждения.
Открыть досье проекта
Начните с решения, которое нужно принять
Три способа начать.
Конфиденциальный бриф
Без оплаты · по заявке
Конфиденциальная первая оценка участка, предполагаемого использования, текущего положения проекта и решения, которое владельцу предстоит принять.
Начать конфиденциальный бриф →
Оценка реализуемости проекта
15 000 USD · 15 рабочих дней после получения полного комплекта материалов
Оценка исходной концепции проекта, критических ограничений, необходимого состава специалистов и следующего решения в интересах владельца.
Заказать оценку →
Полный девелоперский мандат
Для проектов с управляемым бюджетом от 1 млн USD, без стоимости земли
Непрерывная координация в интересах владельца: от подготовки брифа и привлечения специалистов до готовности к сдаче и эксплуатации.
Обсудить полный мандат →
Как работает DALLEAU
Вместе с привлечённой командой. Но не вместо неё.
DALLEAU формулирует вопросы владельца, координирует взаимодействие привлечённой команды и ведёт историю решений. Архитекторы, инженеры, консультанты, подрядчики и операторы сохраняют ответственность в рамках порученной им работы.
Разделы DALLEAU
Четыре направления продолжения, каждое со своей задачей.
Проектные доказательства
Показывать проект, а не только результат.
Строительные записи, состояние после сдачи и решения между ними.
Открыть Work
→
Прикладные исследования · Иллюстративная концепция
Превращать данные в вопрос для проекта.
Как исследование становится брифом, целью, макетом или проверкой.
Открыть Atelier
→
Текущие сигналы и Reality Checks
Понимать изменения до того, как они повлияют на проект.
Регулирование, рыночные сигналы и практические проверки для Бали.
Читать Field Notes
→
Инструменты решений
Структурировать вопрос до того, как решение закрепится.
Использовать DALLEAU Intelligence, не подменяя им проектный анализ.
Открыть DALLEAU Intelligence
→
Ответственность основателя
Франсуа лично отвечает за непрерывность owner-side мандата.
Франсуа Далло лично ведёт каждый мандат DALLEAU и отвечает за него в согласованных пределах. Назначенные специалисты сохраняют свои зоны ответственности, а он связывает цели владельца, решения, доказательства и следующие действия.
Прочитать заметку основателя
→
Как разделена ответственность
DALLEAU
Управление и контроль со стороны владельца
Формулирует вопрос владельца, координирует решения и связывает согласования, затраты, доказательства и ответственность.
Bee My Guest · при отдельном назначении
Эксплуатация резиденции
Обеспечивает персонал, обслуживание и гостеприимство только в рамках отдельного операционного назначения.
Независимые назначения
Специалисты конкретного проекта
Архитекторы, инженеры, подрядчики и регулируемые консультанты отвечают за собственный назначенный объём.
Люди за работой
Команда на Бали переносит решения в повседневную практику.
Финансы, закупки, люди, операционная работа резиденций, уход за домом и контент поддерживают назначенные задачи.
Познакомиться с командой
→
Начнём с решения, которое вам предстоит принять.
Для первого разговора не нужен полный комплект документов. Достаточно обозначить участок, предполагаемое использование и вопрос владельца.
Обсудить проект с Франсуа

## DALLEAU Atelier | Прикладные исследования резиденций

URL: https://dalleau.ai/ru/atelier/

Посмотреть, что меняется в резиденции

Изучить восемь тем

Понять систему протоколов

Открыть базовую библиотеку

Посмотреть оценку доказательств

Разделы Atelier

Посмотреть, что меняется в резиденции

Изучить восемь тем

Понять систему протоколов

Открыть базовую библиотеку

Посмотреть оценку доказательств

DALLEAU Atelier

Та же комната. Другой бриф.

Обе версии могут хорошо выглядеть на фотографиях. В версии с методикой Atelier свет, воздух, тишина, приватность, материалы, управление и эксплуатация согласованы до того, как изменения становятся дорогими.

Прикладные исследования и разработка решений для частных резиденций: как они воспринимаются, работают и адаптируются.

Выберите маршрут

Перейдите прямо к той части Atelier, которая отвечает на ваш текущий вопрос.

01 Посмотреть, что меняется в резиденции ↓

02 Изучить восемь тем ↓

03 Понять систему протоколов ↓

04 Открыть базовую библиотеку ↓

05 Посмотреть оценку доказательств ↓

Обычный бриф виллы Бриф с методикой Atelier

Обычный бриф виллы Бриф с методикой Atelier ↔ 01 02 03 04 05 06

Дневной свет Прямые встраиваемые светильники Поле зрения с кровати Свет из ванной

Отражение потолка Блики на стенах Иерархия фактур Контраст пола

Режим открывания Зона гардероба Закрытый режим / отсутствие

Путь через проём Оборудование Защищённая зона кровати

Вид от кровати Буфер гардероба Маршрут движения

Локальная команда Ручное приоритетное управление Точка макета Паспорт здания

Перемещайте разделитель или используйте клавиши со стрелками. Иллюстративная концепция

Шесть изменений в одной комнате

Свет и темнота Материалы и визуальное поле Воздух и влага Тишина Приватность и движение Управление и доказательство

Обычный бриф

Один общий сценарий освещения.

Белый потолок, прямые встраиваемые светильники и отсутствие отдельно решённых вечерних и ночных условий.

Ответ Atelier

Четыре условия, а не одна сцена.

Дневной, рабочий, вечерний и ночной свет задаются отдельно, координируются со специалистами и проверяются в использовании.

Почему это важно

Тёплый свет сам по себе не стратегия.

Время, интенсивность, направление, длительность и источники в поле зрения с кровати меняют результат.

Обычный бриф

Фотогеничный белый объём по умолчанию.

Поверхности выбираются отдельно без общей оценки бликов, контраста, фактуры и старения.

Ответ Atelier

Контролируемое визуальное поле.

Отражение, зерно, контраст, повтор, блики и уход рассматриваются из реальных точек комнаты.

Почему это важно

Материал — не только отделка.

Он меняет свет, читаемость, обслуживание и ежедневное восприятие пространства.

Обычный бриф

Охлаждение принимается за качество воздуха.

Температура, наружный воздух, влажность, вытяжка, фильтрация и отсутствие разделены по дисциплинам.

Ответ Atelier

Резиденция работает в режимах.

Открытый, смешанный, закрытый, ночной режим и отсутствие связывают оболочку, инженерные системы — вентиляцию, кондиционирование, электрику и сантехнику —, управление и процедуры.

Почему это важно

Прохладная комната может оставаться влажной.

Контроль зависит от источников, путей, высыхания, обслуживания и наружных условий.

Обычный бриф

Индекс стены и среднее dBA.

План фиксируется раньше, чем решены дождь, оборудование, сервис, речь и ночные события.

Ответ Atelier

Тишина проектируется как система.

Расположение, оболочка, проёмы, оборудование, детали и эксплуатация координируются вокруг реальных событий.

Почему это важно

Тихое среднее может скрывать повторные нарушения.

Время, частота, тон и путь звука важны не меньше среднего уровня.

Обычный бриф

Открытая циркуляция решится позже.

Виды, персонал, гости, ванная и уединение остаются последствиями плана.

Ответ Atelier

Приватность становится градиентом.

Можно быть вместе, уединяться, принимать гостей и двигаться без нежелательной открытости.

Почему это важно

Приватность зависит от контроля, а не изоляции.

Пороги, линии обзора и выбор маршрута определяют, кто, что и когда видит.

Обычный бриф

Автоматизация добавляется поздно.

Сцены, облачные зависимости, восстановление и процедуры персонала настраиваются после основных решений.

Ответ Atelier

Критические функции остаются понятными.

Локальное управление, ручной приоритет, сценарии, испытания, обучение и документация определяются вместе с брифом.

Почему это важно

Передано — не значит проверено.

Намерение заслуживает доверия, когда есть критерий, ответственный, тест и запись.

Метод за различием

Видимое различие начинается с более точных вопросов.

Исследование важно только тогда, когда меняет бриф, цель, задание специалиста, макет, испытание или план эксплуатации.

01 Исследование

02 Вопрос проекта

03 Цель

04 Задание специалиста

05 Макет

06 Проверка

07 Обучение после заселения

Открыть Atelier Обсудить проект с Франсуа

Проектные решения подтверждаются назначенными специалистами, полноразмерными макетами и commissioning.

Доказательства и проектное применение

Три пары вопросов разделяют данные, интерпретацию и решение.

Что мы знаем?

Что может решить этот проект?

Отделяйте вывод от брифа. Обоснованное направление может стать вопросом проекта, целью или полноразмерным макетом.

Что показало исследование?

Чего оно не доказало?

Укажите контекст, выборку и метод, затем ясно обозначьте предел. Контролируемый результат не становится автоматически долговременным эффектом в резиденции.

Что установлено?

Что ещё нужно проверить на месте?

Используйте более сильные доказательства там, где это уместно. Климат, использование, задачи специалистов и commissioning всё равно определяют ответ проекта.

Где действуют протоколы

На каждом этапе решается свой вопрос владельца.

Проект движется дальше, когда соответствующее решение, доказательство и ответственность зафиксированы.

01 Участок и реализуемость

Данные участка, эксплуатационные предположения и существенные риски фиксируются до рекомендации.

02 Бриф домохозяйства

Использование, гости, приватность, маршруты персонала, уединение и сервис определяются до фиксации программы.

03 Концепция и координация

Вопросы производительности становятся критериями, задачами специалистов и требованиями к макетам.

04 Закупки и строительство

Тендеры, согласования, изменения и контрольные точки сохраняют основание решения видимым.

05 Commissioning и открытие

Резиденция тестируется, настраивается, документируется и готовится к эксплуатации до выпуска.

06 30-дневное, сезонное и ежегодное обучение

Эксплуатационные наблюдения, обслуживание и POE обновляют Building Passport и будущие решения.

Восемь связанных тем

Реальная резиденция не разделяет дисциплины.

Темы организуют исследование. В проекте они встречаются в одной комнате, одном решении и одном режиме.

Основная тема

Свет и темнота

День, работа, вечер и ночные условия.

Открыть → Открыть связанный протокол Основная тема

Воздух и влага

Источники, наружный воздух, охлаждение, вытяжка, высыхание и обслуживание.

Открыть → Открыть связанный протокол Study Notes по этой теме

Гидроизоляция: непрерывная система, а не финишное покрытие.

Плита по грунту или подвесной пол на Бали?

Мембрана не спасёт плоскую кровлю без уклонов.

Наружный дренаж является частью резиденции.

Основная тема

Тепловой комфорт в тропиках

Температура, излучение, влажность, скорость воздуха, активность и одежда.

Открыть → Открыть связанный протокол Основная тема

Управление с локальной автономией

Критические функции, ручной приоритет, приватность и работа без интернета.

Открыть → Открыть связанный протокол Направление

Тишина и акустика

События, оборудование, дождь, речь и пути звука.

Открыть → Открыть связанный протокол Направление

Материалы и визуальное поле

Отражение, контраст, фактура, старение и уход.

Открыть → Открыть связанный протокол Направление

Приватность и понятность

Пороги, линии обзора, уединение, гости и нейроразнообразие.

Открыть → Открыть связанный протокол Направление

Адаптивная резиденция

Возраст, самостоятельность, изменения семьи и непрерывность.

Открыть → Открыть связанный протокол

Три формата работы

Atelier усиливает существующие способы работы с DALLEAU.

Это не четвёртая услуга. Глубина метода зависит от решения и мандата.

Частный бриф

Определить соответствие, первые вопросы и риски для изучения.

Определить проект, полномочия принятия решений, предполагаемое использование, текущую стадию и наиболее вероятную отправную точку.

Открыть → Оценка реализуемости

Проверить участок, программу, стоимость, специалистов и критерии решения.

Подключить необходимые проверки участка, резиденции и специалистов, чтобы проверить основу для решения.

Открыть → Полный мандат

Провести цели, ответственность, макеты, контрольные точки, commissioning и непрерывность.

Провести применимые протоколы через всю цепочку доказательств со стороны владельца, от брифа до сопровождения после сдачи.

Открыть →

Внутренний метод

Девять протоколов. Не девять продуктов.

P01, P03, P04 и P08 подробно раскрыты при запуске. Остальные пять остаются видимыми частями общей архитектуры проекта.

P01

Тропическая база участка

Вода, шум, экспозиция, доступ, сети и устойчивость.

Открыть → Полный протокол P03

Защищённая спальня

Свет, тишина, воздух, приватность, управление и ночь.

Открыть → Полный протокол P04

Внутренняя среда

Влага, воздух, вытяжка, охлаждение и обслуживание.

Открыть → Полный протокол P08

Наладка, проверка и POE

Испытания, исправление, передача и обучение.

Открыть → Полный протокол P02 · P05 · P06

Семья, свет, акустика

Разворачиваются по требованиям проекта.

Открыть → Открыть связанный протокол P07 · P09

Управление и Building Passport — паспорт здания

Локальная непрерывность, данные, эксплуатация и актив.

Открыть → Открыть связанный протокол

Прикладное исследование

Исследование, которое меняет бриф.

Study Notes объясняют, что могут поддержать данные. Methods Notes показывают, как это может войти в проектный бриф.

Study Notes

Разобрать конкретный вопрос

Первоисточники, уровень, пределы и применимость.

Открыть → Methods Notes

Перейти к проекту

Цели, ответственность, макеты, испытания и контрольные точки.

Открыть → Открыть связанный протокол Доказательства и исправления

Понять дисциплину Atelier

Что известно, неопределённо, исправлено или оставлено вопросом.

Открыть →

Уровни доказательности

Зрелость данных остаётся видимой.

Atelier может обсуждать новое исследование или позицию DALLEAU, не выдавая их за установленное правило.

Устоявшиеся данные

Прямая формулировка в реальных границах источника.

Официальные рекомендации, стандарты, систематические обзоры или несколько согласующихся исследований с участием людей.

Накапливающиеся данные

Несколько результатов указывают в одном направлении.

Несколько надёжных исследований, результаты которых всё ещё зависят от выборки, контекста, длительности или метода.

Формирующееся исследование

Интересный результат с методом и ограничениями.

Многообещающие результаты с существенными ограничениями.

Исследовательский вопрос

Гипотеза для наблюдения или теста, не универсальное правило.

Правдоподобная гипотеза для наблюдения или проверки в проекте.

Следующий шаг

Начните с вопроса, который стоит перед вами.

Посмотрите реализованные объекты, разберитесь в изменениях на Бали, используйте инструмент решения или обсудите проект.

Проекты

Построенные доказательства и реальные статусы.

Завершённые объекты, текущие проекты и доказательства с площадки.

Открыть → Материалы

Изменения, последствия и полезные проверки.

Актуальные правила, их последствия и интерпретация со стороны владельца.

Открыть → DALLEAU Intelligence

Инструменты без смешения прогноза и результата.

Структурировать вопрос до того, как проектное решение станет трудно изменить.

Открыть → Обсудить с Франсуа

Участок, использование, бюджет и текущее решение.

Обсудить участок, состав семьи, стадию проекта и решение, которое сейчас нужно принять.

Открыть →

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Как DALLEAU оценивает доказательства

## Доказательства, метод и исправления | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/evidence-and-review/

DALLEAU / Atelier / Доказательства и метод

DALLEAU Atelier · Доказательства и метод

Что нам известно. Что остаётся неопределённым. Что проект может обоснованно использовать.

DALLEAU Atelier переводит опубликованные исследования в вопросы для частной резиденции, проектные критерии и способы проверки. Источник может отражать устоявшееся, накапливающееся или новое знание — важно, чтобы исходный документ, поддерживаемый вывод и его ограничения были ясны.

Принцип

Исследование — не готовое правило проектирования.

Сначала мы устанавливаем, какой вопрос был задан, как было устроено исследование, кто и в каких условиях участвовал, какое воздействие изучалось и что именно измерялось. Затем рассматриваем ограничения, возможные конфликты и то, чего работа не доказала.

Только после этого вывод может войти в проект: как требование, рекомендация, проектная цель или гипотеза для проверки.

Публичные уровни

Четыре уровня позволяют говорить точно.

Устоявшиеся данные

Официальное руководство, признанный стандарт или достаточно согласованный массив результатов, позволяющий прямо сформулировать вывод в его реальных границах.

Накапливающиеся данные

Несколько работ указывают в одном направлении, но величина эффекта ещё зависит от контекста, выборки и метода.

Формирующееся исследование

Значимое направление, представленное вместе с методом, размером выборки и ограничениями. Оно может изменить вопрос брифа, не становясь универсальным правилом.

Исследовательский вопрос

Правдоподобная гипотеза для наблюдения, макета или измерения в проекте. Она не выдаётся за установленный факт.

Тип утверждения

Источник и позиция DALLEAU всегда разделены.

Официальное руководство

Требование, рекомендация или справочный документ признанного органа либо организации по стандартизации.

Рекомендация на основе данных

Практическая интерпретация, поддержанная текущим массивом знаний, с явно указанными пределами.

Позиция DALLEAU

Наша интерпретация жилого контекста и конкретного проекта, прямо обозначенная как таковая. Она может быть определённой, не претендуя на универсальную научную истину.

Условие проекта

Наблюдение или измерение, документированное при заданных условиях. Оно не переносится автоматически на другой участок.

Локальная применимость

Данные должны выдержать проверку условиями Бали.

Жаркий влажный климат, косой дождь, микролокация, наружное загрязнение, насекомые, коррозия, перебои электроснабжения, обслуживание и режимы проживания меняют практический ответ. Вывод из офиса умеренного климата или лаборатории не становится автоматически целью для виллы на Бали.

Поэтому Atelier формулирует переносимый вопрос, указывает, что нужно подтвердить на месте, и определяет необходимого специалиста, макет, измерение или момент проверки.

Публичная рамка

Читателю достаточно пяти ориентиров.

На длинных страницах видны уровень доказательности, тип применения, дата публикации или обновления, то, чего данные не доказали, и источники. Более подробные реестры остаются внутренними: сайт должен объяснять решение, а не демонстрировать производственный процесс.

Рецензент указывается только тогда, когда реальная рецензия состоялась. Его имя не используется как общее разрешение на публикацию.

Визуальные материалы

Иллюстративные концепции отделены от доказательств проекта.

Некоторые иллюстративные концепции на этом сайте созданы или доработаны с помощью цифровых инструментов, включая генеративный искусственный интеллект, под руководством DALLEAU. Они обозначены как иллюстративные концепции и не выдаются за фотографии реализованных объектов или за доказательство измеренных характеристик.

Сравнительное изображение может объяснять замысел брифа. Оно не доказывает характеристики, результат для здоровья или применение метода в реализованном объекте. Строительные фотографии, визуализации проекта и завершённые объекты сохраняют свои отдельные статусы.

Исправления

Ошибка исправляется именно там, где она возникла.

Неверный DOI, ошибочно сопоставленное название или чрезмерно широкая формулировка исправляются, переназначаются, заменяются либо удаляются. Это не делает остальные источники непригодными.

Дата обновления остаётся видимой. Существенные изменения фиксируются во внутренней истории и, если они важны читателю, поясняются на соответствующей странице.

Ограничения

Этот подход не превращает Atelier в медицинскую консультацию или сертификацию.

Atelier не ставит диагнозов, не лечит и не гарантирует сон, снижение стресса, когнитивный эффект, здоровье или долголетие. Регулируемые заключения, инженерные расчёты и профессиональные мнения остаются ответственностью назначенных специалистов.

Дисциплина Atelier — ясно говорить, что мы знаем, что считаем обоснованным, что проверяем и почему это важно для реальной резиденции.

Источники

Вывод первоисточника и интерпретация DALLEAU для частной резиденции приведены раздельно. Ссылки ведут на документ издателя или официального органа.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

WHO guidelines for indoor air quality: dampness and mould Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Thermal Environmental Conditions for Human Occupancy Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Environmental noise guidelines for the European Region Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

IoT Device Cybersecurity Capability Core Baseline Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

The Commissioning Process and commissioning requirements for new buildings and systems Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Исследование — не готовое правило проектирования. Четыре уровня позволяют говорить точно. Источник и позиция DALLEAU всегда разделены. Данные должны выдержать проверку условиями Бали. Читателю достаточно пяти ориентиров. Иллюстративные концепции отделены от доказательств проекта. Ошибка исправляется именно там, где она возникла. Этот подход не превращает Atelier в медицинскую консультацию или сертификацию.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## Протоколы | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/protocols/

DALLEAU / Atelier / Протоколы / Протоколы

DALLEAU Atelier · Внутренний метод

Метод внутри мандата, а не меню дополнительных услуг.

Девять протоколов связывают вопросы, ответственность, контрольные точки и доказательства на протяжении проекта. Они усиливают частный бриф, оценку реализуемости и полный мандат, но не являются девятью отдельными продуктами.

Архитектура

Три публичных формата работы. Один внутренний метод.

Частный бриф проверяет соответствие и выявляет первые вопросы. Оценка реализуемости тестирует конкретный проект. Полный мандат охватывает решения, специалистов, тендер, строительство, передачу и начало эксплуатации. Протоколы активируются только тогда, когда этого требуют участок, семья или решение.

До концепции

P01–P03 · Понять условия, которые нужно защитить.

P01 · Тропическая база участка и устойчивости

Рассматривать участок как рабочую среду: вода, шум, доступ, сервис, экспозиция, обслуживание и открытые либо закрытые режимы.

P02 · Бриф семьи, понятность и приватность

Перевести ритмы жизни, приём гостей, уединение, работу, сервис, возраст и самостоятельность в пространственные связи и сценарии.

P03 · Протокол характеристик защищённой спальни

Координировать свет, темноту, тишину, воздух, влажность, температуру, приватность, управление и ночные процедуры как единую систему.

Проектирование и строительство

P04–P07 · Превратить намерения в проверяемые критерии.

P04 · Внутренняя среда и контроль влаги

Связать источники загрязнений, наружный воздух, влажность, вытяжку, охлаждение, фильтрацию, материалы и режимы использования по помещениям.

P05 · Свет, темнота и визуальное поле

Разделить дневные, рабочие, вечерние и ночные условия, а затем проверить их в масштабе 1:1.

P06 · Тишина, акустика и управление звуком

Рассматривать пути звука, оборудование, дождь, сервис, разборчивость речи и ночные события как одну систему.

P07 · Локальное управление, конфиденциальность и цифровая устойчивость

Критические функции должны оставаться понятными, управляемыми локально и восстанавливаемыми без постоянной зависимости от облака.

До и после передачи

P08 и P09 · Проверить, передать и учиться.

P08 · Наладка, проверка и обучение после заселения

Определить испытания до закупки, документировать результат, исправить отклонения и проверить работу после открытия.

P09 · Building Passport — паспорт здания — и непрерывность актива

Сохранить замыслы, версии, испытания, настройки, ответственность, обслуживание и решения, чтобы здание оставалось понятным с течением времени.

Активация

Нужный протокол определяется текущим решением.

Матрица активации связывает каждый вопрос со стадией проекта, ответственным, необходимым доказательством и контрольной точкой. Ничто не активируется ради научного антуража.

Четыре подробно разработанных протокола запуска — P01, P03, P04 и P08 — показывают требуемую глубину. Остальные пять остаются видимыми в общей структуре и разворачиваются, когда этого требует мандат.

Управление

До прохождения контрольной точки должно существовать доказательство.

Цель владельца и критерий успеха документированы.

Ответственный специалист и границы его задания определены.

Необходимые макет, осмотр, измерение или испытание заданы заранее.

Отклонение, исправление и повторное испытание прослеживаются.

Решение входит в Owner’s Control Report и, где уместно, в Building Passport.

Непрерывность

История решения и история актива — не одно и то же.

Owner’s Control Report объясняет, что следует решить, почему и какой остаточный риск сохраняется. Building Passport хранит сведения о том, что спроектировано, установлено, испытано, настроено и передано. Оценка после заселения наблюдает реальную работу, не выдавая ограниченный опыт за универсальную истину.

Три публичных формата работы. Один внутренний метод. P01–P03 · Понять условия, которые нужно защитить. P04–P07 · Превратить намерения в проверяемые критерии. P08 и P09 · Проверить, передать и учиться. Нужный протокол определяется текущим решением. До прохождения контрольной точки должно существовать доказательство. История решения и история актива — не одно и то же.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## P04 · Внутренняя среда и влажность | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/protocols/indoor-environment-and-moisture-control-protocol/

DALLEAU / Atelier / Протоколы / P04

Протокол Atelier

P04 · Внутренняя среда и контроль влаги

В резиденции может быть прохладно, а влажность, загрязнения и периоды отсутствия всё равно оставаться без контроля. P04 связывает источники, наружный воздух, вентиляцию, охлаждение, вытяжку, материалы, измерения и обслуживание для каждого помещения.

Для Бали недостаточно навсегда выбрать открытую или закрытую модель дома.

Как читать эту страницу

Пять публичных ориентиров показывают уровень доказательности, возможное применение и границы выводов.

Уровень доказательности

Официальные рекомендации и метод DALLEAU; цели утверждают назначенные специалисты

Тип применения

Проектирование, инженерные системы — вентиляция, кондиционирование, электрика и сантехника —, оболочка, управление, наладка и проверка (commissioning), затем эксплуатация

Опубликовано или обновлено

29 июля 2026

Чего это не доказывает

Протокол не доказывает отсутствие плесени или загрязнений и не гарантирует качество воздуха либо комфорт каждому человеку.

Источники

Открыть первоисточники

Связанная задача

Охладить воздух недостаточно для контроля внутренней среды.

Температура, влажность, точка росы, жидкая вода, давление, наружный воздух, внутренние источники, фильтрация, вытяжка, высыхание ванной, холодные поверхности и обслуживание взаимодействуют. Отдельное решение может лишь переместить риск.

Карта помещений

Одна норма не применяется ко всей резиденции.

Спальни и гардеробные

Ночная занятость, закрытые двери, текстиль, шкафы, холодные поверхности, наружный воздух, тишина и отсутствие должны работать вместе.

Ванные

Пар, вытяжка, переток воздуха, время высыхания, уборка и риски в стыках рассматриваются как цикл.

Кухня и гостиные

Приготовление пищи, запахи, частицы, открытость наружу, кондиционирование и меняющееся число людей требуют явных режимов.

Технические и сервисные помещения

Стирка, хранение, химия, отходы, оборудование, фильтры и обслуживание не должны переносить нагрузку в приватные зоны.

Режимы

Открытый, смешанный, закрытый режим и отсутствие — разные условия.

Для каждого режима заданы проёмы, охлаждение, возможное осушение, наружный воздух, вытяжка и управление. Переходы не менее важны: открытие после дождя, возвращение, внезапное заселение или сбой сети.

Иерархия

Сначала контролировать источники, затем пути распространения.

Не допускать протечек и жидкой воды.

Сокращать источники и выбирать подходящие материалы.

Удалять влагу и загрязнения локально.

Определять наружный воздух и фильтрацию по участку.

Координировать охлаждение и контроль влажности.

Делать режимы и предупреждения понятными.

Планировать осмотр, обслуживание и замену.

Полезное измерение

Датчик не заменяет диагностику и контекст.

Температура и влажность показывают тенденцию, но нужно знать положение, точность, дрейф, длительность, режим помещения и события. Специализированные измерения нужны для оболочки, расхода воздуха, давления, воды, загрязнителей или микробиологической оценки.

Контрольные точки

Экологические допущения проверяются до того, как станут скрытыми.

До фиксации концепции

Карта рисков и режимов помещений утверждена. Специалисты и измерения запланированы.

До закупки

Мощности, последовательности, доступ, фильтры, дренаж, команды и критерии испытаний вошли в документы.

До закрытия

Герметичность, изоляция, проходки, уклоны, отводы, пути воздуха и технический доступ осмотрены.

До открытия

Расходы, вытяжка, дренаж, режимы, восстановление после сбоя и начальные тенденции проверены.

Результаты

План контроля, связывающий проект, обслуживание и измеренные условия.

Карта рисков и режимов помещений.

Матрица источник–путь–контроль.

Цели, методы и ответственность.

Реестр осмотров и испытаний.

План датчиков и правила интерпретации.

Регламенты очистки, фильтров и обслуживания.

Эскалация отклонений и график проверки.

Недостаточные решения

Упрощения остаются видимыми.

Низкая температура не доказывает контроль влажности.

Очиститель не заменяет вентиляцию или устранение источника.

Разовая проверка не описывает сезон.

Всегда открытый дом подходит не для всех внешних условий.

Всегда закрытый дом не становится автоматически здоровым или устойчивым.

Бали

Ответ определяется микролокацией и реальной эксплуатацией.

Близость моря, дождь, ветер, растительность, соседние функции, пыль, трафик, вода, длительность отсутствия, навыки обслуживания и стабильность электричества меняют приоритеты. P04 не предлагает универсальный порог вне контекста проекта.

Ограничения

Протокол организует контроль, но не сертифицирует отсутствие риска.

Скрытые условия, сезон, обслуживание, поведение и внешние события меняют результат. Диагностика плесени, анализ загрязнений, инженерные расчёты и регулируемые заключения остаются у компетентных специалистов.

Источники

Вывод первоисточника и интерпретация DALLEAU для частной резиденции приведены раздельно. Ссылки ведут на документ издателя или официального органа.

WHO global air quality guidelines Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

WHO guidelines for indoor air quality: dampness and mould Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

WHO guidelines for indoor air quality: selected pollutants Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

ASHRAE position document on limiting indoor mold and dampness in buildings Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

ASHRAE position document on indoor carbon dioxide Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Low-cost air pollution monitors and indoor air quality Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Enhanced Air Sensor Guidebook Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Охладить воздух недостаточно для контроля внутренней среды. Одна норма не применяется ко всей резиденции. Открытый, смешанный, закрытый режим и отсутствие — разные условия. Сначала контролировать источники, затем пути распространения. Датчик не заменяет диагностику и контекст. Экологические допущения проверяются до того, как станут скрытыми. План контроля, связывающий проект, обслуживание и измеренные условия. Упрощения остаются видимыми.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## P08 · Commissioning и оценка после заселения | DALLEAU

URL: https://dalleau.ai/ru/atelier/protocols/performance-commissioning-and-post-occupancy-learning-plan/

DALLEAU / Atelier / Протоколы / P08

Протокол Atelier

P08 · Наладка, проверка и обучение после заселения

Переданный комплект документов и включённое оборудование не доказывают, что резиденция работает как задумано. P08 заранее определяет доказательства, испытания, ответственность, исправления и последующие проверки.

То, что будет проверяться, нужно определить до закупки и строительства.

Как читать эту страницу

Пять публичных ориентиров показывают уровень доказательности, возможное применение и границы выводов.

Уровень доказательности

Официальные рекомендации, накапливающиеся данные и проектный метод DALLEAU

Тип применения

Требования, тендер, строительство, передача, открытие и эксплуатация

Опубликовано или обновлено

29 июля 2026

Чего это не доказывает

Наладка и проверка (commissioning) не гарантируют постоянную работу, результат для человека или отсутствие будущих дефектов.

Источники

Открыть первоисточники

До закупки

План доказательств начинается с требований владельца.

Каждая важная функция связана с намерением, наблюдаемым критерием, ответственным, методом, моментом и форматом доказательства. Иначе проект не отличит установленное оборудование от подтверждённого результата.

Пять моментов

Резиденция проверяется тогда, когда проявляются разные отказы.

01 · Проектирование и тендер

Требования владельца, стратегия наладки и проверки (commissioning), контрольные точки, ответственность, образцы, испытания и формат доказательств входят в документы.

02 · Монтаж и закрытие

Скрытые элементы, сети, доступ, уклоны, швы, настройки, маркировка и готовность к испытаниям осматриваются до закрытия.

03 · До открытия

Функциональные испытания, режимы, тревоги, восстановление после сбоя, локальное управление, интерфейсы, обучение и открытые дефекты проверяются.

04 · Через 30 дней

Первый опыт, процедуры персонала, дрейф, повторные дефекты, фильтры, влажность, энергия и понимание управления рассматриваются после реальной эксплуатации.

05 · В значимый сезон и ежегодно

Дождь, влажность, жара, занятость, отсутствие, старение и обслуживание показывают условия, которых не было при передаче.

План испытаний

Набор доказательств следует брифу и реально установленным системам.

Оболочка, вода, дренаж и стыки.

Воздух, влажность, охлаждение, вытяжка и фильтрация.

Свет, темнота и управление.

Акустика, оборудование и события.

Резервирование, восстановление и локальная работа.

Цифровые интерфейсы, доступ, приватность и резервные копии.

Эксплуатационные процедуры и доступ для обслуживания.

Независимость

Там, где важна независимость, установщик не должен быть единственным источником доказательства.

План определяет, кто устанавливает, измеряет, наблюдает, принимает и решает. Самопроверка подходит некоторым пунктам; другие требуют owner-side свидетеля или независимого специалиста. Уровень соразмерен риску и договору.

Реестр

Полезное доказательство отвечает на конкретный вопрос.

Какое требование или гипотеза проверяется?

В каком режиме и при каких условиях?

Каким прибором, где и как долго?

Какой результат и допуск?

Какое отклонение, ответственный и срок?

Какое повторное испытание закрывает вопрос?

Какое ограничение или неопределённость остаётся?

Контрольные точки

Неудачный тест полезен, если ясны ответственность и повторная проверка.

До тендера

Требования владельца и план доказательств утверждены.

До закрытия

Осмотры, фотографии, положения и сведения о скрытых элементах собраны.

До приёмки

Критические тесты, открытые дефекты, ответственность и даты повторных проверок приняты владельцем.

После открытия

Решения через 30 дней, в значимый сезон и через год записаны вместе со статусом и областью.

Передача

Система не передана, пока пользователи не понимают предусмотренный режим.

Владелец и команда получают понятные команды, нормальные и аварийные процедуры, обслуживание, контакты, правила эскалации и практическую демонстрацию. Полезный протокол заменяет папку несвязанных инструкций производителя.

Результаты

Запись о том, что было задумано, испытано, исправлено и изучено.

Owner’s Project Requirements.

План и реестр наладки и проверки (commissioning).

Отчёты осмотров и испытаний.

Журнал дефектов, исправлений и повторных тестов.

Обучение и эксплуатационные процедуры.

Обновлённый Building Passport.

Проверки через 30 дней, в сезон и ежегодно.

Решение о допустимой публичной информации.

Данные и приватность

Резиденция — не продукт для извлечения данных.

Собирается только то, что отвечает определённому вопросу. Чувствительные данные по возможности остаются локальными, доступ ограничен, срок хранения определён, обратная связь добровольна. Публикацию решает владелец с учётом договоров и приватности.

Ограничения

Наладка и проверка (commissioning) фиксируют наблюдаемое состояние, а не вечную гарантию.

Климат, использование, обслуживание, обновления, отказы и старение меняют результат. P08 повышает прозрачность, качество исправления и обучения, но не заменяет договорную гарантию, обслуживание или регулируемую экспертизу.

Источники

Вывод первоисточника и интерпретация DALLEAU для частной резиденции приведены раздельно. Ссылки ведут на документ издателя или официального органа.

The Commissioning Process and commissioning requirements for new buildings and systems Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Lessons learned from 20 years of CBE's occupant surveys Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Post-occupancy evaluation in residential buildings: a systematic literature review of current practices in the EU Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Enhanced Air Sensor Guidebook Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

План доказательств начинается с требований владельца. Резиденция проверяется тогда, когда проявляются разные отказы. Набор доказательств следует брифу и реально установленным системам. Там, где важна независимость, установщик не должен быть единственным источником доказательства. Полезное доказательство отвечает на конкретный вопрос. Неудачный тест полезен, если ясны ответственность и повторная проверка. Система не передана, пока пользователи не понимают предусмотренный режим. Запись о том, что было задумано, испытано, исправлено и изучено.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## P03 · Защищённая спальня | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/protocols/protected-bedroom-performance-protocol/

DALLEAU / Atelier / Протоколы / P03

Протокол Atelier

P03 · Протокол характеристик защищённой спальни

Каждая дисциплина может корректно спроектировать свою часть, а спальня всё равно будет работать посредственно. P03 рассматривает её как единую ночную систему: свет, тишина, воздух, влажность, температура, приватность, управление и эксплуатация.

Бриф связывает архитектуру, свет, инженерные системы — вентиляцию, кондиционирование, электрику и сантехнику —, акустику, управление и эксплуатацию.

Как читать эту страницу

Пять публичных ориентиров показывают уровень доказательности, возможное применение и границы выводов.

Уровень доказательности

Рекомендации на основе данных и метод DALLEAU; требуется междисциплинарная проверка

Тип применения

Бриф, проектирование, полноразмерный макет, наладка и проверка (commissioning), затем эксплуатация

Опубликовано или обновлено

29 июля 2026

Чего это не доказывает

Протокол не доказывает результат для сна, стресса, здоровья или когнитивных функций и не гарантирует тишину или комфорт.

Источники

Открыть первоисточники

Единая система

Ночные условия нельзя разделить по дисциплинам.

Свет и темнота

Дневной свет, рабочий свет, вечер, ночной маршрут, источники в поле зрения с кровати и утечки света задаются отдельно.

Тишина и события

Коридоры, дождь, оборудование, проёмы, сервис, речь и прерывистые события рассматриваются вместе со средними акустическими показателями.

Воздух, влажность и температура

Охлаждение, наружный воздух, фильтрация, вытяжка ванной, высыхание, холодные поверхности и режим отсутствия координируются для комнаты.

Приватность и движение

Виды от кровати, порог ванной и гардероба, маршрут персонала, совместное использование и возможность уединиться без изоляции формулируются явно.

Управление и эксплуатация

Локальные команды, ручной ручной приоритет, понятные сцены, восстановление после отключения, настройки персонала и эскалация неисправностей должны быть читаемыми.

Сначала использование

Протокол начинается с проживаемой ночи, а не с оборудования.

Семья описывает ритмы, совместное или раздельное использование, известные предпочтения без медицинского опросника, чтение, ночное движение, сервис и отсутствие. DALLEAU переводит эти ситуации в наблюдаемые критерии, конфликты и решения.

Цели проекта

У каждой цели должны быть тип и момент проверки.

Требование официального органа или стандарта.

Рекомендация на основе текущих данных.

Цель DALLEAU для конкретного проекта.

Гипотеза или предпочтение для теста.

Ответственный и метод проверки.

Режим, длительность и момент испытания.

Масштаб 1:1

Спальню нужно испытать до того, как изменения станут дорогими.

Полноразмерный макет позволяет проверить линии обзора, затемнение, блики, расположение команд, тон оборудования, двери, движение и связь с ванной. Всё, что нельзя оценить на макете, переходит в план наладки и проверки (commissioning).

Контрольные точки

Критические решения выпускаются вместе с доказательствами.

До фиксации концепции

Ночной сценарий, границы приватности и основные риски утверждены.

До закупки

Проверяемые критерии, допуски, образцы, управление и ответственность вошли в тендерные документы.

До закрытия конструкций

Проходки, изоляция, швы, сети, дренаж, вытяжка и доступ для обслуживания осмотрены.

До открытия

Темнота, ночные маршруты, шумовые события, среда, управление и процедуры испытаны в предусмотренных режимах.

Результат для владельца

Бриф, который переживает проектирование, закупку, стройку и открытие.

Бриф спальни и карта ночных сценариев.

Матрица ответственности и целей.

Реестр макетов, образцов и решений.

План наладки и проверки (commissioning) и результаты испытаний.

Простые инструкции для владельца и персонала.

Записи для Owner’s Control Report и Building Passport.

Ответственность

DALLEAU координирует, не присваивая профессиональную ответственность.

Архитектор, светодизайнер, инженеры технических систем, акустик, специалист по управлению, подрядчик и операционная команда сохраняют свои роли. DALLEAU поддерживает цельность брифа, показывает конфликты и требует запланированное доказательство вовремя.

После передачи

Спальня остаётся наблюдаемым вопросом проекта.

Проверки через 30 дней, в соответствующий сезон и после изменения использования могут рассматривать утечки света, удобство команд, шумовые события, тенденции влажности, высыхание ванной и добровольную обратную связь о комфорте и контроле. Они не доказывают клинический эффект.

Ограничения

Защищённая спальня — не обещание сна.

Предпочтения, поведение, медицинские условия, внешние события и эксплуатация индивидуальны и меняются. Протокол повышает качество брифа, координации и проверки, но не гарантирует одинаковый опыт каждому человеку.

Источники

Вывод первоисточника и интерпретация DALLEAU для частной резиденции приведены раздельно. Ссылки ведут на документ издателя или официального органа.

CIE System for Metrology of Optical Radiation for ipRGC-Influenced Responses to Light Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

What to document and report in studies of ipRGC-influenced responses to light Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Recommendations for daytime, evening, and nighttime indoor light exposure to best support physiology, sleep, and wakefulness in healthy adults Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

WHO guidelines for indoor air quality: dampness and mould Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Thermal Environmental Conditions for Human Occupancy Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Environmental noise guidelines for the European Region Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Ночные условия нельзя разделить по дисциплинам. Протокол начинается с проживаемой ночи, а не с оборудования. У каждой цели должны быть тип и момент проверки. Спальню нужно испытать до того, как изменения станут дорогими. Критические решения выпускаются вместе с доказательствами. Бриф, который переживает проектирование, закупку, стройку и открытие. DALLEAU координирует, не присваивая профессиональную ответственность. Спальня остаётся наблюдаемым вопросом проекта.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## P01 · Тропический участок и устойчивость | DALLEAU

URL: https://dalleau.ai/ru/atelier/protocols/tropical-site-and-resilience-baseline/

DALLEAU / Atelier / Протоколы / P01

Протокол Atelier

P01 · Тропическая база участка и устойчивости

Участок может выглядеть привлекательным и не подходить для задуманной резиденции. P01 делает видимыми воду, шум, экспозицию, доступ, инженерные сети и условия эксплуатации до того, как их скроет концептуальная визуализация.

Участок рассматривается как рабочая среда, а не только как вид или адрес.

Как читать эту страницу

Пять публичных ориентиров показывают уровень доказательности, возможное применение и границы выводов.

Уровень доказательности

Официальные рекомендации, локальные данные и проектный метод DALLEAU

Тип применения

Оценка реализуемости и полный мандат

Опубликовано или обновлено

29 июля 2026

Чего это не доказывает

Базовая оценка не гарантирует отсутствие подтопления, шума или отказов и не устанавливает универсальную будущую устойчивость участка.

Источники

Открыть первоисточники

До концепции

Участок оценивается как функционирующая система.

Климат и экспозиция

Солнце, тень, ветер, наружная влажность, косой дождь, высота, теплопритоки и практическая разница между открытым, смешанным и закрытым режимами.

Вода и дренаж

Отметки, пути ливневой воды, источник воды, допущения по дренажу, наблюдения в сезон дождей и необходимость инженерных, геотехнических или лабораторных исследований.

Шум и приватность

Дневные и ночные события, дороги, соседние функции, оборудование, церемонии, риск строительства и возможность расположить спальни на тихой стороне.

Доступ и обслуживание

Прибытие владельца, маршруты персонала и поставщиков, отходы, ремонт, аварийный доступ и возможность добраться до технических зон в будущем.

Инженерные сети и устойчивость

Электроснабжение, связь, вода, резервирование, стабильность сети, доступность сервиса и последствия перерыва.

Ландшафт, насекомые и коррозия

Посадки, корни, удержание воды, условия для комаров, солёная среда, уязвимость материалов и нагрузка по уходу за ландшафтом.

Owner-side последовательность

Наблюдать. Классифицировать. Назначить. Зафиксировать.

01 · Наблюдать в подходящее время

Доступные съёмки, структурированные визиты, фотографии и журналы событий рассматриваются в значимые периоды. Дневной визит не устанавливает ночной шум, работу во время дождей или состояние при отсутствии людей.

02 · Классифицировать данные

Каждый вывод отмечается как официальная рекомендация, рекомендация на основе данных, цель проекта DALLEAU или вопрос для локальной проверки.

03 · Назначить нужного специалиста

Когда нужен геодезист, инженер, геотехник, акустическое измерение, анализ воды или юридическое заключение, DALLEAU координирует работу, а не присваивает себе профессиональный вывод.

04 · Зафиксировать решение владельца

Рекомендация, нерешённые риски, инварианты, ответственные и принятые условия входят в Owner’s Control Report.

Решения

База может изменить намного больше, чем положение здания.

Купить, отказаться или продолжить с условиями.

Расположить спальни и тихий фасад.

Определить открытые, смешанные и закрытые режимы.

Задать отметки, дренаж и управление водой.

Организовать сервисный край и доступ для обслуживания.

Определить ландшафтные отступы и приоритеты резервирования.

Назначить специалистов и учесть остаточный риск.

Контрольные точки

Проект не проходит вопросы участка на одних предположениях.

HP1 · До рекомендации по земле

Минимальный набор данных собран, нерешённые красные флаги записаны. Результат — go, условный go или no-go, а не обещание удалить все будущие риски.

HP2 · До фиксации концепции

Карта рабочих режимов и карта рисков помещений утверждены. Конфликты между открытостью, шумом, влагой, дождём, приватностью и обслуживанием остаются видимыми.

HP3 · До разработанной концепции

График привлечения специалистов принят. У каждой существенной неизвестной есть ответственный, метод и дата проверки.

Результаты

База, способная управлять последующими решениями.

Пакет наблюдений и фотожурнал.

Карта рисков и режимов.

Реестр источников и неопределённостей.

Записка с решением владельца.

График привлечения специалистов.

Базовые записи в Building Passport.

Ответственность

DALLEAU формулирует риск. Регулируемые выводы дают специалисты.

DALLEAU организует owner-side вопросы, реестр доказательств, наблюдения, сравнение вариантов и путь решения. Сертифицированные съёмки, расчёты, геотехнические выводы, формальные акустические измерения, анализ воды, экологические и юридические заключения остаются у назначенных профессионалов.

Ограничения

База не может предсказать будущее.

Будущая соседняя застройка, точное поведение в сезон дождей, долгосрочное качество воды, редкие шумовые события, скрытые условия грунта и реальная эксплуатация остаются частично неизвестными до исследований, дождей, строительства, commissioning или заселения.

Бали

Бали — не единый климат и не единый режим эксплуатации.

Микролокация, высота, пути воды, косой дождь, наружная влажность, ночная активность, насекомые, морская коррозия, стабильность сетей и доступность сервиса меняют ответ проекта. P01 сохраняет вопросы конкретного участка вместо единой тропической формулы.

Непрерывность

Решение по земле остаётся видимым после покупки.

Owner’s Control Report хранит рекомендацию, риски, инварианты и решения. Building Passport объединяет съёмки, версии, карты, допущения по сетям и даты проверок. Оценка в эксплуатации рассматривает дренаж, шум, открытые и закрытые режимы, перебои и уход за ландшафтом.

Источники

Вывод первоисточника и интерпретация DALLEAU для частной резиденции приведены раздельно. Ссылки ведут на документ издателя или официального органа.

Bali climate bulletins Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

WHO guidelines for indoor air quality: dampness and mould Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Thermal Environmental Conditions for Human Occupancy Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Environmental noise guidelines for the European Region Первоисточник. По ссылке можно проверить документ, область его применения и ограничения.

Участок оценивается как функционирующая система. Наблюдать. Классифицировать. Назначить. Зафиксировать. База может изменить намного больше, чем положение здания. Проект не проходит вопросы участка на одних предположениях. База, способная управлять последующими решениями. DALLEAU формулирует риск. Регулируемые выводы дают специалисты. База не может предсказать будущее. Бали — не единый климат и не единый режим эксплуатации.

Продолжить знакомство с Atelier

Обзор Atelier Доказательства и метод Протоколы

Контекст проекта

Применение к конкретной резиденции требует анализа участка, состава семьи и предполагаемого использования.

Обсудить проект с Франсуа Оценка реализуемости

## Наружный дренаж является частью резиденции. | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/study-notes/external-drainage-part-of-residence/

Atelier / Study Note / Вода, ограждающие конструкции и влага

Atelier · Study Note · Вода, ограждающие конструкции и влага

Наружный дренаж является частью резиденции.

Резиденция не заканчивается наружной стеной. Отметки грунта, террасы, кашпо, подпорные стены, бассейны, каналы, кровли, колодцы и выпуски определяют, уйдёт ли дождь от помещений или останется у них.

Вопрос владельца

Где заканчивается каждый основной путь воды и что произойдёт при частичном засоре главного трапа?

Уровень доказательности

Устоявшиеся принципы. Пропускная способность и выпуск определяются локальным проектом.

Тип применения

Проектные критерии, зона ответственности специалиста, контрольные точки и проверка

Обновлено

4 августа 2026 г.

Источники

5

На этой странице

Трап не является стратегией дренажа

Начать с отметок

Источники воды

Куда вода уходит дальше

Три режима

Типичные интерфейсы

Обслуживание должно быть спроектировано

Что DALLEAU запросит

Контрольные точки

Что эта заметка не доказывает

Источники

Карта системы

Вода, ограждающие конструкции и влага

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

Кровля Терраса Ландшафт Основной путь Путь превышения Безопасный выпуск

Иллюстративный контекст

Трап не является стратегией дренажа

Дренаж представляет полный путь от дождя до безопасной, обслуживаемой и разрешённой точки сброса.

Ландшафт может изменить этот путь после завершения проектирования: уровень земли поднимается, корни перекрывают выпуск, листья заполняют канал, новое мощение меняет уклон, полив держит стену влажной, а водосток подключается к слишком малой трубе.

Начать с отметок

Небольшая разница уровней решает, пересечёт ли вода порог, останется ли у стены, войдёт ли в техническое помещение, накопится ли за подпорной стеной или уйдёт к выпуску.

Нужно согласовать:

внутренний пол;

террасу;

дно канала;

наружный грунт;

землю в кашпо;

перелив бассейна;

дорогу и въезд;

дренаж подпорной стены;

конечный выпуск.

Источники воды

кровля и водостоки;

террасы и балконы;

дворы;

подъездные пути;

ландшафт и полив;

бассейны;

подпорные стены и подземный дренаж;

конденсат кондиционирования;

наружные души;

вода с вышележащей территории.

У этих источников разный поток, загрязнение и обслуживание. Объединение без проверки может вызвать перегрузку или обратный ток.

Куда вода уходит дальше

Отвести её от одной стены недостаточно, если выпуск затапливает другую часть участка, размывает склон, влияет на соседа, перегружает дорожный дренаж, возвращает воду к зданию, выходит на нестабильный грунт или не соответствует местным требованиям.

Назначенная команда должна проверить реальную конечную точку.

Три режима

Нормальная работа

Обычный дождь проходит через проектные трапы и каналы.

Ограниченная работа

Один трап частично забит. Система должна показать проблему без немедленного затопления помещений.

Превышение

Поток превышает расчётное условие. Нужен безопасный поверхностный маршрут, ограничивающий последствия для людей, конструкции, оборудования и соседей.

Типичные интерфейсы

Терраса и помещение

Наружная отделка поднимается, порог уменьшается, канал расположен далеко от двери или ветер толкает воду под навес.

Кашпо и стена

Грунт, полив и корни остаются у чувствительной стены без проверенного дренажа и перелива.

Подпорная стена

Давление воды растёт из-за неполного, забитого или не имеющего выхода дренажа.

Водосток и грунт

Труба заканчивается у фундамента или подключается к скрытой забитой линии без видимого перелива.

Бассейн и дождь

Перелив бассейна, вода с настила и ливневый поток попадают в одну систему без проверки пропускной способности.

Въезд и дорога

Дорожная вода входит на участок, если порог ворот и канал не согласованы с внешним стоком.

Обслуживание должно быть спроектировано

Можно ли безопасно снять каждую решётку?

Достаточен ли колодец для очистки?

Можно ли прочистить подземную трубу?

Видны ли сетки и переливы?

Доступна ли конечная точка?

Кто проверяет систему до сезона дождей?

Где хранятся схема и история обслуживания?

Красивый щелевой канал без доступа для очистки не является полной системой.

Что DALLEAU запросит

топографическую съёмку;

известные условия стока и подтопления;

геотехнические и водные данные при необходимости;

источники воды кровли, террас, бассейна, ландшафта и подпорных стен;

концепцию дренажа и предполагаемый выпуск;

основные и аварийные пути;

доступ для обслуживания;

согласование порогов;

условия для гидравлического расчёта, накопления, насосов или склонового дренажа;

решение владельца о допустимом остаточном риске и обслуживании.

Контрольные точки

уровни участка до фиксации концепции;

подземные сети до засыпки;

пороги и каналы;

финальные уровни ландшафта;

контролируемая проверка потока;

осмотр после реального дождя.

Что эта заметка не доказывает

Она не рассчитывает ливень, не подбирает диаметр труб и не утверждает выпуск. Она не заменяет гражданское, гидравлическое, геотехническое, ландшафтное, бассейновое или административное проектирование. Она не обещает отсутствие ущерба при экстремальном событии.

Источники

Источники

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Открыть исходный материал

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Продолжить с актуального вопроса

Продолжить с актуального вопроса

Гидроизоляция: непрерывная система, а не финишное покрытие. → Плита по грунту или подвесной пол на Бали? → Мембрана не спасёт плоскую кровлю без уклонов. → После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. →

Спросить, где заканчивается вода, до утверждения того, где начинаются стены.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа Узнать о Feasibility Study

## Мембрана не спасёт плоскую кровлю без уклонов. | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/study-notes/flat-roof-falls-drainage-membranes/

Atelier / Study Note / Вода, ограждающие конструкции и влага

Atelier · Study Note · Вода, ограждающие конструкции и влага

Мембрана не спасёт плоскую кровлю без уклонов.

Плоская кровля работает, когда структура, уклоны, выпуски, аварийные переливы, мембрана, примыкания, проходки, деформации, защита и обслуживание согласованы. Дополнительные слои не компенсируют воду, которой некуда уходить.

Вопрос владельца

Если основной выпуск замедлится или забьётся во время сильного дождя, куда пойдёт вода дальше?

Уровень доказательности

Устоявшиеся принципы отвода воды. Система выбирается под проект.

Тип применения

Проектные критерии, зона ответственности специалиста, контрольные точки и проверка

Обновлено

4 августа 2026 г.

Источники

5

На этой странице

«Плоская» не означает горизонтальная

Кровля как система водоотвода

Почему застой воды важен

Основного выпуска может быть недостаточно

Критические детали

Семейства систем

Армирование

Контрольные точки

Обслуживание

Что эта заметка не доказывает

Источники

Карта системы

Вода, ограждающие конструкции и влага

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

Уклоны Основной выпуск Видимый перелив Примыкание Безопасный сброс

Иллюстративный контекст

Иллюстративные сравнения

Трап, раскладка плитки и уклоны

Позднее вмешательство

Согласовано до отделки

«Плоская» не означает горизонтальная

Архитектурно плоская кровля всё равно нуждается в заданных уклонах. Непредусмотренные низкие точки появляются из-за:

прогиба конструкции;

неровной стяжки;

оснований оборудования;

порогов и парапетов;

трапов выше окружающей поверхности;

ремонта, создающего препятствие;

защитного слоя или плитки, меняющих уклон.

Нужно проверять и проектный, и фактический уклон.

Кровля как система водоотвода

Проект должен объединять:

движение и прогиб структуры;

уклоны и низкие точки;

основные выпуски;

аварийные пути;

гидроизоляцию;

примыкания и завершения;

проходки и опоры;

защиту и отделку;

безопасный доступ;

испытания и сезонное наблюдение.

Мембрана представляет один элемент, а не всю кровлю.

Почему застой воды важен

Временная вода после интенсивного дождя не всегда означает отказ. Длительный застой остаётся предупреждением, потому что он может показывать плохой уклон или засор, увеличивать время воздействия на швы, собирать грязь и растительность, добавлять нагрузку и затруднять ремонт.

Ожидаемое поведение дренажа должна определить и проверить назначенная команда.

Основного выпуска может быть недостаточно

Один выпуск работает на чистой кровле и может перестать работать из-за листьев, пыли или строительного мусора.

В зависимости от проекта следует проверить:

несколько точек водоотвода;

аварийный перелив ниже завершения мембраны;

видимый и безопасный сброс;

отсутствие пути к окнам и электрооборудованию;

доступные сетки;

последствия забитой трубы;

способность системы ниже по потоку принять воду.

Перелив ограничивает последствия и делает засор видимым. Он не заменяет основной водоотвод.

Критические детали

Парапеты и примыкания

Мембрана должна подниматься, завершаться и защищаться в соответствии с системой, возможным уровнем воды и отделкой. Верх парапета также должен отводить воду.

Выпуски

Трап интегрируется в мембрану, ставится в реальной низкой точке и остаётся доступным. Фланец, мембрана, стяжка и финиш проектируются вместе.

Проходки

Трубы, опоры, ограждения, солнечные системы, кондиционирование и поздние крепления создают повторяющиеся риски. Силикон по контуру не заменяет долговечную деталь.

Швы

Движение должно восприниматься деталью и системой, рассчитанными на него. Покрытие активного шва как неподвижного переносит движение в мембрану.

Пороги

Отметка кровли, подъём гидроизоляции, доступ и дверь должны быть согласованы до фиксации проёма.

Семейства систем

Наплавляемые битумные мембраны

Они могут быть долговечными при правильном основании, праймере, сварке, деталях, защите и учёте движения. Отслоение может быть связано с влажным или загрязнённым основанием, швами, завершениями, движением, проколом или поздними работами. Систему нельзя автоматически считать плохой или выбирать только по привычке.

Жидкие армированные системы

Они удобны для сложной геометрии. Результат зависит от подготовки, сухой толщины, армирования, отверждения, УФ, пригодности к застойной воде и защиты. «Три слоя» без толщины и деталей не являются спецификацией.

Синтетические рулонные мембраны

Толщина материала контролируется производством, но швы, углы, проходки, завершения и качество монтажа остаются критическими.

Цементные системы

Они могут подходить для некоторых защищённых минеральных оснований. Нужно понимать допустимое движение, воздействие и совместимость. Материал для ванной не становится автоматически системой для открытой кровли.

Армирование

Некоторые системы требуют сплошного армирования. Другие усиливают углы, трещины, швы, трапы, проходки и подвижные основания.

Правильное публичное правило:

Армирование должно соответствовать утверждённой системе, основанию и ожидаемому движению. Критические детали проверяются до закрытия.

Контрольные точки

структура, уклоны и отметки;

готовность основания;

mock-up или типовая деталь;

завершённая мембрана;

безопасное испытание водой или дренажом;

защита и осмотр после смежных работ.

Испытание не должно создавать непроверенную конструктивную нагрузку.

Обслуживание

Кровля высокого уровня всё равно требует безопасного доступа, регулярной очистки, проверки перед и во время сезона дождей, истории ремонтов и проходок, видимых переливов и понятной ответственности.

Что эта заметка не доказывает

Она не рассчитывает водосток, не выбирает мембрану и не определяет допустимую нагрузку конкретного проекта. Она не утверждает, что одно семейство систем всегда работает или всегда отказывает. Она не гарантирует отсутствие протечек.

Источники

Источники

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

S10 ASHRAE Position Document on Limiting Indoor Mold and Dampness in Buildings

ASHRAE

Открыть исходный материал

S11 Roof drainage and overflow guidance

Внутренняя база DALLEAU

Открыть исходный материал

Продолжить с актуального вопроса

Продолжить с актуального вопроса

Гидроизоляция: непрерывная система, а не финишное покрытие. → Плита по грунту или подвесной пол на Бали? → Наружный дренаж является частью резиденции. → После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. →

Сначала определить путь воды, затем выбирать мембрану.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа Узнать о Feasibility Study

## Плита по грунту или подвесной пол на Бали? | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/study-notes/slab-on-ground-or-suspended-floor-bali/

Atelier / Study Note / Вода, ограждающие конструкции и влага

Atelier · Study Note · Вода, ограждающие конструкции и влага

Плита по грунту или подвесной пол на Бали?

Отделить первый этаж от грунта иногда полезно. Но в жарком и влажном климате вентилируемое подполье не становится сухим автоматически. Выбор зависит от грунта, грунтовых вод, заполнения, подтопления, конструкции, инженерных сетей и эксплуатации.

Вопрос владельца

Должна ли резиденция опираться на подготовленную плиту по грунту, на контролируемое техническое подполье или на приподнятую конструкцию?

Уровень доказательности

Устоявшиеся принципы. Решение зависит от конкретного участка.

Тип применения

Проектные критерии, зона ответственности специалиста, контрольные точки и проверка

Обновлено

4 августа 2026 г.

Источники

6

На этой странице

Четыре разных вопроса

Вариант 1: качественная плита по грунту

Вариант 2: подвесной пол над закрытым техническим подпольем

Вариант 3: приподнятое здание с открытым пространством снизу

Почему вентилируемое подполье может быть влажным

Грунт и вода до выбора системы

Принцип выбора

Контрольные точки

Что эта заметка не доказывает

Источники

Карта системы

Вода, ограждающие конструкции и влага

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

Плита по грунту Закрытое подполье Открытая приподнятая система Грунт + вода + конструкция + эксплуатация определяют выбор

Четыре разных вопроса

Что несёт основное здание, а что несёт пол?

Может ли грунт или насыпь оседать, набухать или усаживаться?

Как остановить жидкую воду и водяной пар от грунта?

Что произойдёт при внешнем подтоплении или перегрузке дренажа?

Мембрана не исправляет осадку. Воздушный зазор не решает влажность автоматически.

Вариант 1: качественная плита по грунту

Она может быть рациональной на устойчивом, приподнятом и дренируемом участке.

Принцип конструкции:

```text Финишное покрытие Совместимая стяжка или клеевая система Армированная бетонная плита Непрерывный пароизолирующий слой Гранулированный капиллярный разрыв Инженерная насыпь с послойным уплотнением Подготовленный естественный грунт ```

Точная последовательность определяется проектом. Главное, чтобы бетон не укладывался на грунт, выровненный только визуально.

Что проверять

удаление органического и слабого материала;

источник и состав насыпи;

послойное уплотнение и испытания;

отметка платформы;

дренаж и уровень грунтовых вод;

гранулированный слой;

мембрана, нахлёсты и проходки;

связь со стенами и балками;

швы и трещинообразование;

скрытые коммуникации;

влажность бетона до чувствительной отделки.

Преимущества

Простая система, мало скрытого объёма, знакомая технология, потенциально эффективная стоимость и надёжность при контролируемой подготовке.

Риски

Скрытая плохая насыпь, обход мембраны на примыканиях, сложный ремонт труб, разное движение плиты и структуры, ранняя укладка отделки.

Вариант 2: подвесной пол над закрытым техническим подпольем

Такой пол отделяет помещения от насыпи и может сохранить доступ к сетям. Но влажный наружный воздух способен конденсироваться на охлаждённых поверхностях.

Техническое подполье может требовать:

сплошную мембрану по грунту;

герметичные примыкания;

отвод воды в безопасную точку;

определённую вентиляцию или осушение;

датчики утечки;

безопасный доступ и свет;

защиту от термитов и вредителей;

достаточную высоту для обслуживания;

понятный режим при отключении электричества.

Высота 600 мм создаёт физический разрыв, но не обязательно удобство обслуживания. Если доступ является аргументом, пространство должно быть настоящим техническим объёмом.

Вариант 3: приподнятое здание с открытым пространством снизу

На склоне или участке с риском воды приподнятая конструкция может уменьшить объём насыпи и сохранить пути потока. Она требует геотехнического, конструктивного и сейсмического проектирования, защиты от коррозии и согласованных инженерных сетей.

Иногда это рациональнее, чем низкое закрытое подполье, способное заполниться водой.

Почему вентилируемое подполье может быть влажным

влажный наружный воздух входит внутрь;

пол над ним охлаждается;

нижняя поверхность или трубы оказываются ниже точки росы;

появляется конденсат;

металл, пыль, изоляция или древесина остаются влажными;

состояние скрыто от обычной уборки.

Нужно проектировать режим работы, а не просто добавлять отверстия.

Грунт и вода до выбора системы

Фраза «глинистый грунт Бали» недостаточна. Необходимо знать естественный это грунт или насыпь, слои и глубину, осадку, несущую способность, набухание, сезонную воду, сток, склон и объём заполнения.

Принцип выбора

Плита по грунту вероятнее подходит при понятном устойчивом грунте, высокой и дренируемой платформе, ограниченной насыпи и проверяемой защите от капиллярной воды и пара.

Техническое подполье рассматривается, если доступ к коммуникациям имеет реальную ценность, глубокая насыпь нежелательна и пространство можно дренировать, контролировать и обслуживать.

Открытая приподнятая конструкция может быть уместна, если топография и вода требуют меньшего контакта с грунтом.

Контрольные точки

геотехническая база до фиксации концепции;

платформа и дренаж;

насыпь и уплотнение;

капиллярный разрыв и мембрана;

скрытые сети;

контроль до отделки;

проверка во влажный сезон.

Что эта заметка не доказывает

Она не рекомендует одну систему для всех участков, не определяет свойства конкретной глины и не заменяет геотехническое, конструктивное, гидравлическое, термитное или отделочное проектирование. Она не утверждает, что подполье всегда сухое или плита всегда влажная.

Источники

Источники

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Открыть исходный материал

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Открыть исходный материал

S06 DR14, DALLEAU Bali Applied Research Framework

DALLEAU

S07 SNI 8460:2017, Persyaratan perancangan geoteknik

Indonesian geotechnical standard published through PUPR/Bina Marga record

Открыть исходный материал

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

Продолжить с актуального вопроса

Продолжить с актуального вопроса

Гидроизоляция: непрерывная система, а не финишное покрытие. → Мембрана не спасёт плоскую кровлю без уклонов. → Наружный дренаж является частью резиденции. → После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. →

Определить отношения здания с грунтом до фиксации архитектуры.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа Узнать о Feasibility Study

## Гидроизоляция: непрерывная система, а не финишное покрытие. | DALLEAU Atelier

URL: https://dalleau.ai/ru/atelier/study-notes/waterproofing-continuous-system/

Atelier / Study Note / Вода, ограждающие конструкции и влага

Atelier · Study Note · Вода, ограждающие конструкции и влага

Гидроизоляция: непрерывная система, а не финишное покрытие.

Резиденция остаётся сухой не потому, что подрядчик нанёс три слоя известного продукта. Она остаётся сухой, когда рельеф участка, уклоны, водоотводы, мембраны, примыкания, проходки, защита, испытания и обслуживание работают как одна непрерывная система.

Вопрос владельца

Куда должна уходить вода, где система обязана оставаться непрерывной и что будет проверено до закрытия работ?

Уровень доказательности

Устоявшиеся принципы, выбор системы и проверка зависят от проекта

Тип применения

Проектные критерии, зона ответственности специалиста, контрольные точки и проверка

Обновлено

4 августа 2026 г.

Источники

7

На этой странице

Основная мысль

Почему это особенно важно на Бали

Шесть звеньев системы

Почему «три слоя» не являются спецификацией

Четыре типичных сценария отказа

Контрольные точки до закрытия

Что DALLEAU попросит показать

Что эта заметка не доказывает

Значение для проекта

Источники

Карта системы

Вода, ограждающие конструкции и влага

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

01 Отвести

Участок, отметки и разделение

02 Направить

Уклоны, низкие точки и выпуски

03 Перелив

Безопасный резервный путь

04 Непрерывность

Края, трапы и проходки

05 Защитить

Последующие работы и повторная проверка

06 Обслуживать

Доступ, очистка и записи

Иллюстративный контекст

Иллюстративные сравнения

Узел душевого стекла

Позднее вмешательство

Согласовано до отделки

Доступ для обслуживания

Позднее вмешательство

Согласовано до отделки

Проход трубы

Позднее вмешательство

Согласовано до отделки

Основная мысль

Гидроизоляция является результатом согласованного управления водой. Мембрана или покрытие представляет только один слой этой системы.

Почему это особенно важно на Бали

Резиденция может одновременно испытывать сильный дождь, косой дождь, высокую наружную влажность, влажные строительные материалы, частое открывание помещений и длительные периоды отсутствия владельца. Кровли, террасы, ванные, бассейны, кашпо, фасады, пороги и полы часто распределены между разными подрядчиками. Вода не следует границам договоров.

Дефект может проявиться пятном на потолке, влажным низом стены, высолами, отслоившимся покрытием, разбухшей мебелью или запахом в гардеробной. Видимое место может находиться далеко от точки входа воды.

Шесть звеньев системы

1. Отводить воду от здания там, где это возможно

Первая защита начинается с формы и уровней проекта: отметки платформы, наружные уклоны, отделение кашпо, связь террасы с порогом и вывод воды с кровли.

Мембрана получает лишнюю нагрузку, если проект направляет воду к зданию вместо того, чтобы отводить её.

2. Создать понятный основной путь

Вода должна попадать в трап, канал, жёлоб, водосток или проницаемый грунт по заданному уклону. Наличие трапа само по себе ничего не гарантирует, если он расположен выше окружающей поверхности.

Нужно согласовать:

уклоны и низкие точки;

расположение и пропускную способность выпусков;

переходы между покрытиями;

листья и строительный мусор;

возможность очистки;

конечную точку сброса.

3. Предусмотреть безопасный путь при ограничении основного стока

Трапы засоряются. Интенсивность дождя меняется. Обслуживание может запаздывать.

В зависимости от проекта могут потребоваться:

видимые аварийные переливы кровли;

вторичные выпуски;

защищённые пороги;

поверхностные пути, отводящие избыточную воду от помещений;

доступные смотровые точки.

Аварийный путь не заменяет основной. Он уменьшает последствия отказа.

4. Сохранить непрерывность водозащитного слоя

Наиболее сложные места находятся на примыканиях:

пол и стена;

изменение плоскости;

внутренние и наружные углы;

трапы;

проходки труб;

дверные и оконные пороги;

парапеты;

строительные и деформационные швы;

крепления, добавленные после гидроизоляции;

границы между пакетами работ.

Проект должен уделять этим местам больше внимания, чем простой открытой поверхности.

5. Защитить систему до и после испытаний

Даже правильно выполненную гидроизоляцию могут повредить стяжка, плитка, ограждения, остекление, опоры оборудования, освещение, кашпо и инженерные проходки.

Нужно заранее определить:

кто может работать поверх готовой системы;

какие крепления допустимы;

как мембрана защищается;

как фиксируется и ремонтируется повреждение;

какие зоны подлежат повторной проверке.

6. Сохранить доступ и обслуживание

Трапы собирают мусор. Герметики стареют. Швы двигаются. Растительность растёт.

Система должна предусматривать:

доступ к трапам и сеткам;

безопасный доступ на кровлю;

очищаемые каналы;

видимые переливы;

периодичность осмотра;

сведения о продуктах и ремонтах;

ответственную сторону;

записи в Building Passport, где это уместно.

Почему «три слоя» не являются спецификацией

Количество слоёв само по себе не определяет результат. Спецификация может включать:

подготовку и влажность основания;

праймер;

общую сухую толщину;

армирование;

обработку трещин и швов;

допустимые деформации;

детали трапов и проходок;

время отверждения и защиту;

совместимость со стяжкой, клеем и финишем;

устойчивость к УФ, нагреву и застойной воде;

метод ремонта;

критерии проверки и испытаний.

Некоторые жидкие системы требуют сплошного армирования. Другие предусматривают усиление только на деталях. Битумные, синтетические, жидкие и цементные системы имеют разные условия применения. Публичная статья не должна объявлять один универсальный продукт.

Четыре типичных сценария отказа

Хороший продукт, неподготовленное основание

Пыль, цементное молочко, загрязнение, остаточная влага, слабая стяжка или активная трещина нарушают сцепление и непрерывность.

Хорошая мембрана, неправильный уклон

Застой воды увеличивает продолжительность воздействия и усиливает последствия небольшого дефекта.

Хорошая основная поверхность, слабые примыкания

Реальным путём воды становится трап, порог, парапет или проходка.

Хороший монтаж, повреждение после приёмки

Позднее крепление или незадокументированная проходка может нарушить ранее проверенный слой.

Контрольные точки до закрытия

В зависимости от пакета работ и назначенных ответственных сторон:

готовность основания;

проверка деталей до заполнения основной площади;

осмотр завершённой системы;

согласованное испытание;

повторный осмотр после смежных работ;

закрывающий комплект с фотографиями, ремонтами, испытаниями, гарантиями и обслуживанием.

Короткое испытание не подтверждает сезонную работу всех примыканий.

Что DALLEAU попросит показать

цель владельца и последствия отказа;

утверждённую систему и ответственного специалиста;

согласованные уклоны и пути воды;

основные и аварийные выпуски, где они нужны;

детали всех переходов;

доступ для осмотра и очистки;

mock-up сложных условий;

фотографии hold points;

метод и результат испытания;

ремонты и повторные тесты;

инструкции по обслуживанию.

Что эта заметка не доказывает

Она не определяет источник конкретной протечки, не объявляет один тип мембраны лучшим для всех проектов на Бали и не заменяет геотехническое, конструктивное, гидравлическое, кровельное или производственное проектирование. Она не гарантирует отсутствие будущих протечек.

Значение для проекта

Если гидроизоляцию рассматривают как поздний отдельный пакет, владелец получает названия продуктов и счета. Если её рассматривают как owner-side систему, владелец видит путь воды, ответственных за примыкания, контрольные точки и доказательства, которые должны остаться после передачи.

Источники

Источники

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Открыть исходный материал

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S03 ACI 302.1R-15, Guide to Concrete Floor and Slab Construction, Chapter 5

American Concrete Institute

Открыть исходный материал

S04 ACI 302.2-22, Concrete slabs that receive moisture-sensitive flooring materials

American Concrete Institute

Открыть исходный материал

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S08 DR15, DALLEAU Atelier Applied Protocol, Service and Offer Architecture

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Продолжить с актуального вопроса

Продолжить с актуального вопроса

Плита по грунту или подвесной пол на Бали? → Мембрана не спасёт плоскую кровлю без уклонов. → Наружный дренаж является частью резиденции. → После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. →

Зафиксировать путь воды до того, как его скроют отделочные работы.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа Узнать о Feasibility Study

## Партнёры на Бали: требования и закупки | DALLEAU

URL: https://dalleau.ai/ru/delivery-partners.html

Подрядчикам и поставщикам
Система реализации, рассчитанная на долгую совместную работу.
DALLEAU работает с генеральными подрядчиками, специализированными бригадами, поставщиками и организованными командами, способными выполнить чётко определённый объём, правильно документировать работу и совершенствоваться по результатам проверок. Нам нужны надёжные отношения для подходящих проектов, а не набор разовых предложений.
Для владельца система делает прозрачными отбор, цены и контроль площадки. Для проверенных партнёров она проясняет ожидания, решения и перспективы дальнейшего сотрудничества.
Представить свою команду
Посмотреть метод
Выберите нужный маршрут
Владельцам и их советникам
Посмотрите, как DALLEAU определяет пакеты, сравнивает предложения, проверяет скрываемые работы и обосновывает рекомендации по оплате.
Контроль со стороны владельца →
Подрядчикам, специалистам и поставщикам
Посмотрите, чего ожидает DALLEAU, что получают хорошие партнёры и как заслужить новые приглашения.
Условия сотрудничества →
Контроль со стороны владельца
Подрядчика выбирают под пакет работ, а не по знакомству.
Компетенции, ресурсы, опыт, структура цены и метод выполнения оцениваются относительно одного определённого объёма.
01
Определить объём
Чертежи, объёмы, спецификации, график и ответственность создают единую основу для цены.
02
Сравнить сопоставимое
Предложения приводятся к одной базе по включениям, исключениям, налогам, срокам, гарантии и заменам.
03
Проверить до закрытия
Контрольные точки сохраняют скрываемые работы доступными до завершения проверки и фиксации.
04
Рекомендовать оплату на основании подтверждений
Рекомендация по оплате следует договорному этапу, принятой работе и необходимой документации.
Взаимная ценность
Сильный партнёр не должен нести устранимые риски проекта.
DALLEAU требователен к доказательствам, потому что эта же дисциплина защищает партнёра от размытого объёма, противоречивых указаний, незафиксированных изменений и произвольных решений об оплате.
01
Пакет определён до финальной цены
Чертежи, объёмы, спецификации, налоговая база, исключения и график изложены явно.
02
Единый канал инструкций
Команда не получает несогласованные инструкции от нескольких людей.
03
Сводные технические уточнения
Вопросы и решения фиксируются до того, как превратятся в переделку.
04
Оплачиваемые пробные работы
Запрошенные макеты и пилоты имеют письменный объём, критерии приёмки и оплату.
05
Письменные изменения
Дополнительная работа не растворяется молча в исходной цене.
06
Проверка этапа по доказательствам
Рекомендации по оплате следуют договору пакета и принятым записям.
07
Коммерческая конфиденциальность
Детальные цены остаются информацией проекта и не распространяются без необходимости.
08
Обратная связь и новые возможности
Проверенным командам требуется меньше времени на повторную квалификацию; новые приглашения возможны, когда подходят задача, ресурсы и результаты.
Коммерческая добросовестность
Сначала сопоставимый объём, затем сопоставимая цена.
Самая низкая исходная сумма не выигрывает автоматически. Все участники, прошедшие предварительный отбор, оценивают один пакет, а DALLEAU вместе рассматривает объёмы, единичные расценки, включения, исключения, налоги, сроки поставки, гарантию, субподряд, ресурсы и метод выполнения.
Национальность клиента не является фактором цены.
Замена материала требует письменной технической и коммерческой проверки.
Связи между аффилированными сторонами раскрываются.
Скидки поставщиков, торговые скидки и согласованные зачёты обрабатываются по договору проекта и правилам контроля владельца.
DALLEAU не принимает нераскрытые комиссии, выплаты за рекомендации или внеучётные выгоды проекта.
Для повторяемых пакетов возможны согласованные или сопоставленные единичные расценки, если объём и риск достаточно стабильны.
Повышение цены требует указанного основания.
Три документа, с которыми можно принять коммерческое решение.
01
Ведомость объёмов
Недостаточно для решения
Одна общая сумма
Размытые описания
Нет налоговой базы, исключений, срока или гарантии
Не раскрыт субподряд
Готово к проверке
Объёмы и единичные расценки
Включения, исключения и налоговая база
Сроки, гарантия, замены, субподряд и период действия
02
Изменение
Недостаточно для решения
«Добавьте это, рассчитаемся позже».
Готово к проверке
Причина и изменённый объём
Влияние на цену и график
Согласование до выполнения
03
Этап оплаты
Недостаточно для решения
«Работа выполнена на 70 %».
Готово к проверке
Конкретный этап договора
Принятая зона и доказательство проверки
Открытые вопросы и рекомендуемая сумма
Иллюстрированные сравнения методов
Качественный результат определяется до начала отделки.
Примеры показывают, почему DALLEAU решает критические сопряжения до их закрытия. Принятый метод координируется как часть конструкции, а не импровизируется после завершения помещения.
01
Согласовать стекло до укладки плитки.
Позднее вмешательство — не принято
Паз прорезают в только что уложенной готовой плитке, когда ванная комната уже завершена.
Согласовано до отделочных работ
Утопленный F-профиль принятого решения размечают до укладки плитки, чтобы стекло и кромка плитки образовали единый узел.
02
Сохранить доступ к инженерным узлам, не делая их заметными.
Позднее вмешательство — не принято
К скрытому клапану можно добраться только после вскрытия готовой поверхности.
Согласовано до отделочных работ
Люк заподлицо следует раскладке и сохраняет доступ к обслуживаемому узлу.
03
Согласовать трап и раскладку плитки одновременно.
Позднее вмешательство — не принято
Трап появляется после раскладки: остаются узкие подрезки, асимметрия и ненадёжные уклоны.
Согласовано до отделочных работ
Положение трапа, модуль плитки и уклоны координируются как единая поверхность.
04
Гидроизолировать проходку, а не маскировать последствия.
Позднее вмешательство — не принято
Готовый проход зависит от толстого поверхностного слоя герметика, добавленного после отделки.
Согласовано до отделочных работ
Манжета, усиление и непрерывная мембрана проверяются до закрытия плиткой.
Процесс отбора
Мы открыты новым партнёрам и внимательны на каждом этапе.
Квалификация даёт право участвовать в подходящих пакетах. Каждое назначение относится к конкретному проекту.
01
Заявка
Короткое представление фиксирует специализацию, территорию, опыт и текущую доступность.
02
Проверка материалов
Мы рассматриваем данные компании, релевантный опыт, портфолио и предлагаемую ответственную команду.
03
Техническая беседа
Ответственный сотрудник описывает методику, состав команды, оборудование, последовательность, риски и проверки.
04
Сопоставимое предложение
Участники, прошедшие предварительный отбор, оценивают одинаковый объём, количества, спецификацию, налоги, исключения и график.
05
Рекомендации и посещение
С разрешения мы можем связаться с рекомендателями и посмотреть готовую работу, мастерскую или действующий объект.
06
Оплачиваемый пилот, если полезен
Запрошенная пробная работа имеет письменный объём, критерии и оплату. DALLEAU не просит бесплатных строительных работ.
07
Назначение на проект
Пакет определяет ответственность, согласования, контрольные точки, этапы, изменения, гарантию и отчётность.
08
История выполнения
Качество, безопасность, график, отчётность, коммерческий контроль и устранение дефектов влияют на будущие приглашения.
Что оценивает DALLEAU
Для содержательной заявки нужны шесть групп сведений.
Сильное портфолио помогает. Текущие ресурсы, проверяемые цены и подтверждаемое выполнение не менее важны.
01
Релевантный опыт
Сколько лет команда работает в заявленной области и какую роль выполняла.
02
Выполненные работы
Тип, место и масштаб сопоставимых работ, которые можно проверить.
03
Доступные рекомендации
Контакты запрашиваются позже и только с согласия.
04
Текущие договоры
Активная загрузка, распределение команды и реалистичная доступность для нового пакета.
05
Метод выполнения
Ответственные лица, персонал, оборудование, контроль качества, безопасность и отчётность.
06
Коммерческая ясность
Единичные расценки, включения, исключения, налоги, сроки, гарантия и субподряд.
Рабочая система
Проверяемые основания до перечисления средств.
DALLEAU сочетает документированные методы контроля проекта с климатом, цепочкой поставок и практикой площадок на Бали. Каждый пакет регулируют утверждённый проект, применимые требования Индонезии, выбранная система и инструкции производителя.
01
Объём
Договор определяет чертежи, спецификации, количества, включения, исключения, график и ответственных.
02
Согласования
Материалы, образцы, методы и требуемые доказательства утверждаются до соответствующей работы.
03
Проверка
Прогресс сопоставляется с этапами и, когда требуется, с областью назначенного проверяющего.
04
Оплата
Рекомендация следует договорному этапу, принятым доказательствам и необходимой проверке.
05
Изменение
До выполнения фиксируются объём, цена и влияние на график, кроме срочных действий для защиты людей или площадки.
06
Закрытие
Дефекты, испытания, исполнительная документация, гарантии и записи по обслуживанию должны быть завершены до рекомендации окончательного платежа.
Этап 1 · Выражение интереса
Расскажите, что ваша команда умеет стабильно выполнять хорошо.
Начните с короткого выражения интереса. Детальные рекомендации, конфиденциальные документы и полный комплект предквалификации DALLEAU запрашивает только тогда, когда специализация, ресурсы и задача проекта оправдывают следующий этап.
Заявки рассматриваются относительно текущих и будущих пакетов. DALLEAU связывается с командами, когда специализация, ресурсы и сроки оправдывают следующий этап.
Website
Как лучше всего описать вашу организацию?
Генеральный подрядчик
Специализированная бригада или монтажник
Поставщик или дистрибьютор
Производство или мастерская
Технический специалист или интегратор
Другая организованная команда
Подрядчикам и поставщикам
Компания или название команды
Основное контактное лицо
Должность
Электронная почта
Телефон или WhatsApp
Основная специализация, пакет или категория продукта
Зона работы на Бали
Лет релевантного опыта
Сайт или ссылка на портфолио только для просмотра
Текущая доступность или ближайший реалистичный срок начала
Один сопоставимый проект или поставка
Что ваша команда умеет стабильно выполнять хорошо?
Если применимо
Размер команды или обычный состав
Представляемые бренды
Местонахождение мастерской
Языки ответственного сотрудника
Соответствующая категория лицензии
Предпочтительный масштаб проекта
Этап 1 · Выражение интереса
Подтверждаю, что уполномочен направить это выражение интереса и что сведения точны.
Я прочитал уведомление о конфиденциальности и понимаю, как DALLEAU использует эти данные.
Конфиденциальность
Отправить выражение интереса
Если защищённая отправка временно недоступна, можно скопировать локальную сводку и отправить её на hello@dalleau.ai.
Выражение интереса получено
Ниже указан номер заявки. DALLEAU свяжется с командой, когда специализация, ресурсы и сроки оправдывают следующий этап.
Скопировать сводку
Открыть письмо
Для владельцев
Посмотрите, как партнёры входят в ту же цепочку доказательств владельца, что и весь мандат.
Посмотреть полный мандат →
Для партнёров
Качественная работа, честная отчётность и эффективное устранение дефектов создают основу для будущих приглашений.
Представить свою команду →

## Управление проектом резиденции на Бали | DALLEAU

URL: https://dalleau.ai/ru/mandate/

ФОРМАТ РАБОТЫ · ДЕВЕЛОПМЕНТ В ИНТЕРЕСАХ ВЛАДЕЛЬЦА
Единое девелоперское бюро. Подотчётное владельцу от выбора участка до начала эксплуатации.
Сдано и эксплуатируется
Строительная стадия
Harmonie · этап строительства и готовый объект.
DALLEAU на стороне владельца координирует оценку реализуемости, проектирование, инженерные решения, тендеры, строительство, передачу объекта и подготовку к эксплуатации. Ключевые решения, затраты и выбор исполнителей остаются под вашим контролем.
Обсудить проект с Франсуа
Как устроена работа
Для первого разговора не нужен полный комплект документов. Достаточно обозначить участок, предполагаемое использование и вопрос владельца.
Личное участие основателя
Не более трёх проектов на полном сопровождении одновременно
Прозрачная структура затрат
Доступ ко всем предложениям и счетам
На этой странице
Способы начать
Доказательства
Как работает мандат
Затраты и контроль
Сдача и непрерывность
Соответствие и следующий шаг
На этой странице
Способы начать
Доказательства
Как работает мандат
Затраты и контроль
Сдача и непрерывность
Соответствие и следующий шаг
ЧТО ПОЛУЧАЕТ ВЛАДЕЛЕЦ
Контроль имеет смысл, когда ведёт к более обоснованным решениям.
Архитекторы, инженеры и подрядчики сохраняют свои назначенные роли. DALLEAU выбирает и координирует их на основе брифа владельца, делая рекомендации, стоимость и зоны ответственности понятными до принятия финансовых обязательств.
01
Единая точка управления
Владельцу не приходится сводить воедино десять отдельных диалогов. DALLEAU соединяет бриф, проектирование, стоимость, график и предполагаемое использование объекта.
02
Прозрачные затраты
Коммерческие предложения, счета, скидки, изменения и платежи остаются прозрачными для владельца. Наше вознаграждение зафиксировано и не растёт из-за обычных перерасходов сторонних исполнителей.
03
Ответственные специалисты
Каждый специалист назначается на чётко определённую роль и отвечает за собственный объём работ. DALLEAU координирует весь проект, не размывая эту ответственность.
04
Документированные решения
До подписания крупного договора или проведения платежа владелец видит, что предлагается, зачем это нужно, сколько это стоит и какие риски несёт.
ТРИ СПОСОБА НАЧАТЬ
Выберите тот уровень работы, который нужен для вашего следующего решения.
Для первого разговора не нужно сразу переходить к полному мандату. Начните с того объёма работы, который действительно нужен проекту сейчас.
01
Понять, подходим ли мы друг другу
Конфиденциальный бриф
Для владельца, которому важно понять, подходят ли проект и DALLEAU друг другу.
Что вы получаете
Личное рассмотрение участка, предполагаемого использования, бюджета и сроков.
Без оплаты · После рассмотрения заявки
Рассказать о проекте
Что входит в этот этап
Если проект соответствует формату DALLEAU, мы пригласим владельца на первую конфиденциальную беседу.
Бриф помогает проверить, подходим ли мы друг другу. На этом этапе DALLEAU не даёт заключений о реализуемости, стоимости, юридической структуре или техническом состоянии проекта.
02
Принять решение
Оценка реализуемости проекта
Чтобы решить, строить, покупать, пересматривать проект, пересогласовывать условия, ждать или отказаться — до новых капитальных вложений.
Что вы получаете
Обоснованная документами рекомендация по одному конкретному проекту.
15 000 долларов США · 15 рабочих дней после получения полного комплекта материалов
Заказать оценку проекта
Оплата и загрузка DALLEAU
Оценка охватывает участок, инвестиционную логику, затраты, риски и стратегию реализации.
Если DALLEAU впоследствии принимает проект на полное сопровождение, стоимость оценки полностью засчитывается в счёт нашего вознаграждения. Заказ оценки не резервирует место и не гарантирует принятия проекта.
03
Реализовать проект
Полный мандат на девелопмент
Для владельца, которому нужен один офис, ведущий девелопмент от оценки реализуемости до готового к использованию объекта.
Что вы получаете
Полноценное девелоперское бюро в интересах владельца.
Бюджет девелопмента под управлением DALLEAU от 1 000 000 долларов США без стоимости земли · Вознаграждение от 100 000 долларов США
Обсудить полный мандат
Как определяется вознаграждение
Мандат охватывает программу, координацию специалистов, тендеры, договоры, строительство, передачу объекта и подготовку к эксплуатации.
Обычно вознаграждение составляет от 8 до 12 процентов утверждённого бюджета девелопмента под управлением DALLEAU. Стоимость первого этапа фиксируется при заключении договора. Остальная часть фиксируется после утверждения концепции, состава работ и плана затрат. Обычные перерасходы сторонних исполнителей не увеличивают вознаграждение DALLEAU.
DALLEAU Atelier внутри мандата
Метод усиливает три существующих формата работы.
Atelier усиливает существующие бриф, оценку и мандат. Вопросы исследования, участка, эксплуатации и доказательств активируются по проекту и проходят через выбранный владельцем формат работы.
Частный бриф
Первый разговор выявляет соответствие, полезные вопросы и риски. Он остаётся сосредоточенным на контексте и ближайшем решении владельца.
Начать Private Brief →
Оценка реализуемости
Оценка может активировать тропическую базу, сценарии семьи, приватность, защищённую спальню, внутреннюю среду, специалистов и открытые вопросы.
Заказать Feasibility Study →
Полный мандат
Метод проводит цели, задания, полноразмерные макеты, контрольные точки, наладку и проверку систем — commissioning —, Owner’s Control Report, затем Building Passport — паспорт здания — и последующие проверки.
Обсудить полный мандат →
Открыть DALLEAU Atelier
РЕАЛИЗОВАННЫЙ ПРОЕКТ · HARMONIE · ОБЪЕКТ СДАН И ЭКСПЛУАТИРУЕТСЯ
Harmonie: от строительства к эксплуатации.
Франсуа подключился к Harmonie на стадии фундамента и взял на себя полное руководство проектом во время устройства перекрытия второго этажа. Он довёл объект до завершения и открытия, а сегодня продолжает руководить его эксплуатацией вместе с командой. Такая непрерывность создаёт редкую обратную связь между проектированием, строительством и повседневной эксплуатацией.
Запись строительного этапа. Центральный интерьер оставался незавершённым и доступным для осмотра.
Архив проекта. Завершённое пространство в действующей резиденции, снятое с другой точки.
Точка входа
Фундамент и устройство перекрытия второго этажа.
Что было усилено
Контроль гидроизоляции и дренажа, этапы проверок, ответственность подрядчиков, гарантии и последовательность открытия.
Результат
Завершённый и открытый комплекс из трёх вилл, который продолжает работать сегодня.
Что перенесено в следующие проекты
Более чёткое распределение ответственности, ранние испытания систем и полный комплект документов при приёмке.
Посмотреть проект Harmonie
Читать материал о Harmonie
МЕТОД DALLEAU
Шесть решений, которые защищают капитал владельца.
На каждом этапе мы собираем факты, сопоставляем варианты, а решение остаётся за владельцем.
Продолжить
Пересмотреть
Остановиться
01
Инвестиционное решение и участок
Главный вопрос
Подходит ли этот проект для выбранного участка и реалистична ли его стоимость?
Работа DALLEAU
Мы проверяем задачу, участок, инвестиционную логику, доступ, ограничения и основные риски реализации.
Что получает владелец
Документированную рекомендацию, перечень основных рисков и условия перехода к следующему этапу.
02
Концепция и план затрат
Главный вопрос
Согласованы ли назначение объекта, архитектурная концепция, бюджет, сроки и будущая эксплуатация?
Работа DALLEAU
Мы сводим эти элементы в единое целое до начала детального инженерного проектирования.
Что получает владелец
Утверждённое задание, зафиксированную концепцию, план затрат и чёткие требования к характеристикам объекта.
03
Подготовка тендера
Главный вопрос
Рассчитывают ли все участники один и тот же объём работ по единым исходным данным?
Работа DALLEAU
Мы согласовываем чертежи, состав работ, объёмы и коммерческие правила для всех участников тендера.
Что получает владелец
Единый комплект тендерных документов, сопоставимые предложения и перечень различий.
04
Выбор исполнителя и договор
Главный вопрос
Кто способен выполнить проект в заявленном объёме, в установленный срок и с понятной ответственностью?
Работа DALLEAU
До назначения мы проверяем возможности, опыт, коммерческие условия, график и договорные риски.
Что получает владелец
Рекомендацию по выбору, точный состав работ, согласованный график и документированную основу договора.
05
Контроль строительства
Главный вопрос
Соответствуют ли обязательства и платежи качеству и фактическому ходу работ на площадке?
Работа DALLEAU
Мы координируем проверки, документирование, изменения, проверку платежей, контроль рисков и вопросы, требующие решения владельца.
Что получает владелец
Ежемесячный контрольный отчёт для владельца: бюджет, прогноз, резерв, график, риски, решения и фотографии.
06
Приёмка и подготовка к эксплуатации
Главный вопрос
Завершён ли объект, испытаны ли его системы, собраны ли документы и готов ли он к использованию?
Работа DALLEAU
Мы координируем испытания, устранение замечаний, гарантии, инструкции, обучение, приёмку и подготовку к эксплуатации.
Что получает владелец
Закрытие замечаний, результаты пусконаладки, гарантии, Паспорт здания и план обслуживания.
Как DALLEAU выбирает партнёров по реализации
КОНТРОЛЬ СТРОИТЕЛЬСТВА · ДОСТУП ВЛАДЕЛЬЦА
Вы видите площадку, бюджет и следующее решение.
Закрытое пространство владельца делает проект понятным, не сводя его к панели показателей.
Камеры на площадке, фотографии и видео по помещениям
Еженедельные отчёты и видеообходы
Ежемесячный отчёт по бюджету, срокам и рискам
Ожидающие решения и их возможные последствия
Пример интерфейса владельца, настроенного для конкретного мандата.
Пример Owner’s Control Report, составленного по документам мандата.
ЧЕСТНОЕ СРАВНЕНИЕ
Три пути к собственной резиденции. Три разных соотношения скорости, контроля и стоимости.
Покупка готового объекта выигрывает в скорости. Покупка объекта до завершения строительства упрощает процесс. Собственный проект с DALLEAU даёт владельцу больше контроля над качеством, решениями и распределением бюджета.
Готовый объект
Определённость вместо индивидуального проектирования
Открыть детали сравнения
Кому подходит
Тем, кто хочет быстро приобрести существующий объект, осмотреть его и начать пользоваться им без участия в строительстве.
Главное преимущество
Можно оценить то, что уже построено.
Цена и маржа
Общая цена известна. Историческая себестоимость и маржа продавца могут не раскрываться.
Выбор исполнителей
Уже сделан. Качество оценивается по готовому объекту и доступной документации.
Проектирование
Архитектура и планировка уже заданы, возможности изменений ограничены.
Риск
Девелоперский этап уже пройден. Объект всё равно необходимо проверить на соответствие требованиям, скрытые дефекты и эксплуатационные риски.
Потенциальная стоимость
Уже отражена, по крайней мере частично, в запрашиваемой цене.
Покупка у девелопера до завершения строительства
Простота пакетного решения
Открыть детали сравнения
Кому подходит
Тем, кто хочет приобрести заранее определённый продукт и не управлять его созданием самостоятельно.
Главное преимущество
Коммерческий процесс и строительство координирует один девелопер.
Цена и маржа
Цена предлагается единым пакетом. Маржа девелопера включена в предложение, а структура себестоимости может не раскрываться.
Выбор исполнителей
Команду подбирает девелопер с учётом своей программы, ограничений и договорных обязательств.
Проектирование
Решения заданы заранее. Возможности индивидуализации зависят от конкретного проекта.
Риск
Зависит от договора, финансирования, хода строительства и способности девелопера завершить проект.
Потенциальная стоимость
Планируемая маржа девелопера уже заложена в цену продажи.
Для отобранных проектов · Условия вознаграждения закреплены письменно · Контроль остаётся у владельца
Собственный проект с DALLEAU
Строить для себя с командой, которая представляет ваши интересы
Открыть детали сравнения
Кому подходит
Тем, кто располагает определённым бюджетом и хочет создать объект под свои цели, условия участка и будущий сценарий использования.
Главное преимущество
Владелец сохраняет контроль над проектом, бюджетом, выбором исполнителей и ключевыми решениями.
Цена и маржа
Затраты третьих сторон документируются. Условия вознаграждения DALLEAU закрепляются в мандате и обычно составляют от 8 до 12 процентов утверждённого бюджета девелопмента под управлением DALLEAU.
Выбор исполнителей
Конкурс проводится по качеству, соответствию требованиям, способности выполнить работы и полной стоимости, а не только по самой низкой цене.
Проектирование
Определяется с учётом участка, бюджета, будущего использования и целей владельца.
Риск
Девелоперский риск несёт владелец. Комплексная проверка, договоры, контрольные этапы и отчётность делают его видимым и управляемым, но не устраняют.
Потенциальная стоимость
Если проект создаёт дополнительную стоимость, она остаётся в активе владельца. Будущая стоимость и ликвидность не гарантированы.
КУДА НАПРАВЛЯЕТСЯ КАПИТАЛ
При сопоставимых объёме проекта и общей сумме вложений собственный девелопмент может направить большую часть капитала непосредственно в участок, проектирование и строительство, а не в маржу перепродажи, заложенную в пакетное предложение.
Девелопер создаёт продукт для продажи по установленной им цене. DALLEAU работает на стороне владельца. Коммерческие предложения, счета, выбор исполнителей и ключевые решения документируются.
Условия нашего вознаграждения закрепляются в мандате и обычно составляют от 8 до 12 процентов утверждённого бюджета девелопмента под управлением DALLEAU. После согласования концепции, объёма работ и плана затрат оставшаяся сумма вознаграждения фиксируется. Обычные перерасходы сторонних исполнителей не увеличивают это вознаграждение.
Если развитие проекта создаёт дополнительную стоимость, она остаётся в активе владельца. Её размер и будущая ликвидность зависят от участка, рынка, затрат, соответствия требованиям и качества реализации.
Оценить реализуемость проекта
Для владельцев с определённым бюджетом девелопмента. Полный мандат доступен для проектов с бюджетом от 1 000 000 USD без учёта земли, независимо от того, выбран участок или его ещё предстоит найти.
Экономика каждого проекта зависит от конкретного девелопера и условий реализации. В этом сравнении не используется универсальный процент маржи. Здесь сопоставляются пакетная цена продажи и собственный проект, в котором затраты на реализацию и вознаграждение DALLEAU документируются отдельно.
ЧТО ОСТАЁТСЯ У ВЛАДЕЛЬЦА
Понятный проект во время строительства. Полный архив после приёмки.
ВО ВРЕМЯ ПРОЕКТА
Прозрачный контроль
Владелец видит все предложения и счета третьих лиц
Все скидки и возвраты зачисляются в пользу проекта
Каждое изменение фиксируется и утверждается
Каждый платёж проводится на документированном основании
Любое привлечение связанной стороны раскрывается
DALLEAU получает вознаграждение только от владельца и не принимает от подрядчиков или поставщиков никаких нераскрытых выгод.
ПОСЛЕ ПРИЁМКИ
Паспорт здания
У владельца остаётся организованный архив, который объясняет, как резиденция была спроектирована, построена и оснащена, а также как её обслуживать.
Исполнительные чертежи и схемы инженерных систем
Фотографии скрытых коммуникаций до их закрытия
Реестры материалов, отделки и оборудования
Гарантии, инструкции и контакты поставщиков
История изменений, разрешительные документы и график обслуживания
Пример архива Building Passport.
Что входит в бюджет девелопмента под управлением DALLEAU
Бюджет девелопмента под управлением DALLEAU включает профессиональную команду, инженерное проектирование, строительство, наружные работы, закупки под прямым управлением, мебель, комплектацию и оборудование, а также согласованные расходы на подготовку объекта к эксплуатации. Он не включает приобретение земли, налоги и сборы при покупке, финансирование, расходы владельца на независимые юридические и налоговые консультации, вознаграждение DALLEAU и подлежащие уплате налоги.
СООТВЕТСТВИЕ ПРОЕКТА
Этот мандат создан для владельцев, которым нужна чётко распределённая ответственность.
Такой формат намеренно требует дисциплины и оправдан лишь тогда, когда соответствует приоритетам владельца.
Подходит, если
Проекту нужно независимое руководство девелопментом
Вы хотите понимать затраты и компромиссы
Качество повседневного использования не менее важно, чем внешний образ
Объект должен оставаться документированным и пригодным к эксплуатации в долгосрочной перспективе
Скорее не подходит, если
Минимальная начальная цена является единственным критерием
Предполагается, что важные решения останутся неформализованными
Конкурентный тендер, контроль и документация считаются излишними
СЛЕДУЮЩИЙ ПОЛЕЗНЫЙ ШАГ
Опишите проект таким, какой он есть сейчас.
Мы честно скажем, подходит ли он DALLEAU и какой следующий шаг действительно нужен.
Рассказать о проекте
Каждый бриф рассматривается лично. Мы предлагаем первую беседу, когда сам проект, его сроки и ожидаемая роль DALLEAU соответствуют нашему формату работы.
DALLEAU работает как менеджер по развитию на стороне владельца и координирует независимо назначенных архитекторов, инженеров, подрядчиков и регулируемых специалистов. Каждый отвечает за свою назначенную область.

## Недвижимость, строительство и эксплуатация на Бали | DALLEAU

URL: https://dalleau.ai/ru/notes/

DALLEAU | Материалы
Что изменилось.
Что это означает.
Что должен проверить владелец.
Редакционный раздел для тех, кто принимает решения на Бали.
Брифинги, разбор распространённых утверждений, материалы с площадки и практические руководства для тех, кто строит, покупает или эксплуатирует частные резиденции на Бали.
Поиск по материалам
⌕
Используйте стрелки вверх и вниз, затем нажмите Enter, чтобы открыть материал.
Рекомендуемые материалы
Подходящих материалов нет. Попробуйте сформулировать вопрос шире.
36 материала
Обновляется
Раздел обновлён 20 сентября 2026 года
Бесплатно, без сокращений и со ссылками на источники.
Регуляторный брифинг
Проверено 27 июля 2026 года
Бали ограничил новые заявки PMA по 18 видам деятельности. Что это означает на практике.
Точечное ограничение в OSS не означает общий запрет иностранного капитала, всех проектов недвижимости или действующих лицензий.
Что изменилось
Правительство провинции сообщает, что OSS больше не принимает новые заявки PMA по 18 указанным кодам KBLI для деятельности на Бали.
Что это означает
Фактическая деятельность, масштаб бизнеса, структура компании, статус лицензий и операционная модель должны соответствовать друг другу.
Чего из этого не следует
Это не автоматическая отмена всех действующих лицензий, договоров аренды или проектов с иностранным капиталом.
Читать брифинг
С чего начать
Три вопроса, которые стоит прояснить сначала.
Начните с вопросов, наиболее близких вашему проекту. В каждом материале указаны источники и дата обновления.
Компания и лицензии
Существенное обновление
KBLI 2025 для вилл на Бали: владение, эксплуатация и управление чужим объектом являются разными видами деятельности
Вид деятельности, масштаб предприятия, доступность для PT PMA и статус лицензии проверяются отдельно.
Читать материал
Участок и планирование
Наблюдаем
Можно ли продолжать строить на Бали? Что действительно охватывает мораторий 2026 года
Бали не объявлял общий запрет строительства на всей территории острова. Реальный охват и практика применения требуют проверки на конкретную дату.
Читать материал
Вода и эксплуатация
Обновляется
Глубина скважины не определяет качество воды
Источник, конструкцию скважины, анализы, водоподготовку и обслуживание нужно рассматривать как единую систему.
Читать материал
Проверка утверждений
Что говорят и что действительно подтверждают источники.
Мы сверяем распространяющиеся утверждения с публичными источниками и не превращаем разъяснение в очередной громкий заголовок.
Распространённое утверждение
«Бали запретил иностранные инвестиции в 18 секторах».
Что подтверждают источники
Объявление провинции касается новых заявок PMA по 18 указанным кодам KBLI. Это значительно уже, чем запрет всего иностранного капитала или всех действующих разрешений.
Читать разбор
Распространённое утверждение
«Зелёная, розовая и жёлтая зоны являются официальными юридическими категориями».
Что подтверждают источники
Это лишь упрощённые обозначения, принятые на рынке. Для конкретного участка нужно проверять официальный план, участок, подзону и разрешённые виды использования.
Читать разбор
С площадки
Архив проекта, а не только комментарии.
Этапы строительства, свидетельства эксплуатации и решения, которые можно проследить по реальному архиву проекта.
Строительная запись
Сдано и эксплуатируется
Материал с площадки | Harmonie
Что мы повторили бы, а что изменили.
Проект Harmonie представлен через оригинальные материалы проекта и опыт эксплуатации. Архив отражает и удачные решения, и то, что следовало определить раньше.
Читать материал
Вода и обслуживание
Водоснабжение, которое остаётся удобным для обслуживания
Почему изоляция ветвей, доступ и документация нужно предусмотреть до того, как инженерные системы будут закрыты отделкой.
Эксплуатация резиденции
Резиденция должна продолжать работать в отсутствие владельца
Персонал, сервисные маршруты и обслуживание должны входить в бриф с самого начала.
Библиотека материалов
Выберите материал исходя из решения, которое вам предстоит.
Тема
Все темы
Участок и право
Капитал и модель проекта
Строительство и эксплуатация
Семья и жизнь на Бали
Визы, проживание и работа
Формат
Все форматы
Практический материал
Разбор
Практический опыт
Руководство по принятию решений
Исследование
Этап решения
Все этапы
До выбора участка
До проектирования
До договора или платежа
Во время реализации
Во время эксплуатации
Сбросить фильтры
01
Резиденция и эксплуатация
Руководство для собственника
DALLEAU
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Как сравнить строительные сметы на Бали: объёмы, исключения, предварительные суммы, испытания, передача и платежи. Бесплатная таблица BOQ.
20 сентября 2026
6 мин чтения
Поделиться
02
Рынок и капитал
Reality Check
DALLEAU
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Вилла на Бали за 150 000 €: как сравнить права, срок аренды, строительство, разрешения, полную стоимость и предпосылки арендного дохода.
20 сентября 2026
8 мин чтения
Поделиться
03
Резиденция и эксплуатация
Регуляторный разбор
DALLEAU
Вилла на Бали размещена на OTA. Что это на самом деле доказывает?
Что реально подтверждают объявление OTA, NIB, KBLI, NKU, документы объекта, местный налог и APOA после августа 2026 года.
11 августа 2026 г.
9 мин чтения
Поделиться
04
Резиденция и эксплуатация
Руководство по принятию решений
DALLEAU
Может ли PT PMA эксплуатировать виллу на Бали?
Практическое руководство по прямой эксплуатации, настоящему индонезийскому оператору, реальной местной PT и отдельной управляющей PT PMA.
11 августа 2026 г.
11 мин чтения
Поделиться
05
Рынок и капитал
Руководство по принятию решений
DALLEAU
Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе.
Когда плата за управление соответствует реальной услуге, а когда лицензии, доказательства, трансфертное ценообразование, удержания и НДС ей противоречат.
11 августа 2026 г.
11 мин чтения
Поделиться
06
Мобильность и статус
Руководство по принятию решений
DALLEAU
Может ли иностранный директор работать в собственной компании на Бали?
Что может делать настоящий иностранный директор, где начинается другая профессия и почему назначение в PT PMA не покрывает отдельную местную PT.
11 августа 2026 г.
9 мин чтения
Поделиться
07
Резиденция и эксплуатация
Reality Check
DALLEAU
Кто на самом деле эксплуатирует виллу?
Десять вопросов, связывающих объявление, договор, деньги, персонал, системы, объект, лицензию, налоги, риск и прибыль с реальным оператором виллы.
11 августа 2026 г.
3 мин чтения
Поделиться
08
Резиденция и эксплуатация
Reality Check
DALLEAU
После сильного дождя: что владельцу стоит проверить до того, как всё высохнет.
Сильный дождь может показать информацию, которая исчезает через несколько часов. Линии воды высыхают, пятна бледнеют, трапы освобождаются, персонал моет пол.
4 августа 2026 г.
3 мин чтения
Поделиться
09
Резиденция и эксплуатация
Reality Check
DALLEAU
Закрасить пятно не значит устранить путь воды.
Новая краска может создать видимость ремонта, хотя путь воды не изменился.
4 августа 2026 г.
3 мин чтения
Поделиться
10
Капитал и модель проекта
Разбор
DALLEAU
Новый разбор
Бали ограничил новые заявки PMA по 18 видам деятельности. Что это означает на практике
Точечное ограничение в OSS не означает общий запрет иностранного капитала, всех проектов недвижимости или действующих лицензий.
27 июля 2026 года
11 мин чтения
Поделиться
11
Участок и право
Разбор
DALLEAU
Что означает слово «мораторий» для проекта на Бали
Как отделить заявление, действующий акт, пространственный режим, разрешение проекта, контроль и условия сделки.
17 июля 2026
4 мин чтения
Поделиться
12
Визы, проживание и работа
Руководство по принятию решений
DALLEAU
Въезд на Бали с семьёй: B1, All Indonesia и паспортный контроль
Как отдельно проверить B1 e-VOA, декларацию All Indonesia и прохождение паспортного контроля для каждого члена семьи.
13 июля 2026
6 мин чтения
Поделиться
13
Участок и право
Руководство по принятию решений
DALLEAU
Зонирование участка на Бали: почему цвета на карте недостаточно
Как проверить точные координаты, официальный план, здание, деятельность, право и экономику проекта.
17 июля 2026
5 мин чтения
Поделиться
14
Участок и право
Руководство по принятию решений
DALLEAU
Leasehold на Бали: какие права действительно получает владелец
Что может скрываться под словом leasehold и как проверить право, срок, строительство, передачу, платежи и исполнение договора.
17 июля 2026
5 мин чтения
Поделиться
15
Участок и право
Руководство по принятию решений
DALLEAU
Следующий платёж начинается с проверки, а не с даты
В графике off-plan проекта указаны даты и проценты. Когда наступает очередной срок, перевод кажется автоматическим.
16 июля 2026
10 мин чтения
Поделиться
16
Участок и право
Руководство по принятию решений
DALLEAU
Один бренд может скрывать несколько разных сторон
Покупатель off-plan виллы обычно общается с одним менеджером и видит один логотип. Из переписки легко сделать вывод, что все обещания даёт одна компания.
16 июля 2026
8 мин чтения
Поделиться
17
Участок и право
Руководство по принятию решений
DALLEAU
Дата наступила, счёт выставлен. Этого ещё недостаточно
Дата счёта, фактический ход работ и договорный этап отвечают на разные вопросы. Разбираем документы, измерения, изменения и условия следующего транша.
16 июля 2026
8 мин чтения
Поделиться
18
Участок и право
Руководство по принятию решений
DALLEAU
Проверка участка на Бали до предварительного платежа
Какие выводы по праву, зонированию, зданию, инженерным условиям и платежу нужны до перевода денег.
16 июля 2026
17 мин чтения
Поделиться
19
Семья и жизнь на Бали
Руководство по принятию решений
DALLEAU
E33 Second Home: что семья должна подтвердить и поддерживать
Как оценивать E33 по капиталу, срокам подтверждения, отдельным основаниям семьи и допустимой деятельности.
17 июля 2026
5 мин чтения
Поделиться
20
Строительство и эксплуатация
Практический материал
DALLEAU
Новая публикация
Грунт, вода и дренаж до покупки участка на Бали
Когда грунт, вода, склон и дренаж должны влиять на решение о покупке и какие данные нужны по конкретной площадке.
20 июля 2026
14 мин чтения
Поделиться
21
Капитал и модель проекта
Руководство по принятию решений
DALLEAU
Процент в презентации ещё не показывает, откуда придут деньги
Рекламный процент является обещанием конкретного плательщика. Разбираем формулу, источник выплат, обратный выкуп, обеспечение и риск взыскания.
16 июля 2026
9 мин чтения
Поделиться
22
Строительство и эксплуатация
Практический материал
DALLEAU
Новая публикация
Почему одной глубины скважины недостаточно
Опасение владельца понятно. В плотно застроенном районе с септиками неглубокая и плохо защищённая скважина может быть уязвима для загрязнения с поверхности.
20 июля 2026
14 мин чтения
Поделиться
23
Участок и право
Разбор
DALLEAU
Вода в кране ещё не подтверждает право использовать скважину
При покупке готовой виллы продавец может показать работающий насос, старую квитанцию или налоговый платёж.
16 июля 2026
5 мин чтения
Поделиться
24
Визы, проживание и работа
Руководство по принятию решений
DALLEAU
Как выбрать основание для пребывания в Индонезии по реальной деятельности
Как отдельно проверить въезд, работу, PT PMA, недвижимость и налоги для жизни или проекта на Бали.
13 июля 2026
13 мин чтения
Поделиться
25
Строительство и эксплуатация
Практический опыт
DALLEAU
Harmonie: разбор проекта с обозначенными границами
Фотографии готового объекта показывают результат, но не объясняют, с какого момента команда участвовала в проекте, какие решения принимала и как проверяла их…
17 июля 2026
5 мин чтения
Поделиться
26
Капитал и модель проекта
Руководство по принятию решений
DALLEAU
Как законно получить деньги из своей PT PMA
Остаток на счёте компании принадлежит самой компании, даже если все её акции контролирует один человек.
16 июля 2026
10 мин чтения
Поделиться
27
Капитал и модель проекта
Разбор
DALLEAU
Новая публикация
Льгота по НДС не даёт иностранцу право купить любую виллу
В рекламе индонезийской недвижимости в 2026 году встречается формулировка «льгота в размере 100 процентов НДС». Она звучит как скидка на всю стоимость дома.
20 июля 2026
6 мин чтения
Поделиться
28
Визы, проживание и работа
Руководство по принятию решений
DALLEAU
E28A: доля заявителя, роль в компании и фактическая работа
Почему порог E28A относится к доле конкретного заявителя и почему роль, ежедневные задачи и RPTKA проверяются отдельно.
13 июля 2026
6 мин чтения
Поделиться
29
Визы, проживание и работа
Руководство по принятию решений
DALLEAU
E33G для удалённой работы: сначала проверьте трудовые отношения
E33G может подойти тем, кто работает удалённо на иностранного работодателя. Важно проверить трудовой договор, уровень дохода и границы допустимой деятельности…
13 июля 2026
5 мин чтения
Поделиться
30
Визы, проживание и работа
Руководство по принятию решений
DALLEAU
Работа в Индонезии: что проверяется до рабочей визы
Как связаны индонезийский работодатель, должность, RPTKA, трудовой сбор и иммиграционная категория иностранца.
13 июля 2026
7 мин чтения
Поделиться
31
Строительство и эксплуатация
Руководство по принятию решений
DALLEAU
Существенно обновлено
KBLI выбирают по деятельности, а не по слову «вилла»
Как разделить владение, бронирование, управление и посредничество, а затем проверить KBLI и OSS для каждого участника.
20 июля 2026
11 мин чтения
Поделиться
32
Семья и жизнь на Бали
Практический материал
DALLEAU
С маленькими детьми на Бали: наш семейный опыт
Перед переездом я больше всего переживала из-за климата, медицины, дорог и бытовых вопросов.
17 июля 2026
4 мин чтения
Поделиться
33
Участок и право
Разбор
DALLEAU
Что подтверждает NIB и какие документы всё равно нужны
При проверке проекта на Бали собственнику часто показывают NIB и говорят, что компания может работать. NIB действительно важен, но это лишь часть проверки.
17 июля 2026
3 мин чтения
Поделиться
36
Капитал и модель проекта
Руководство по принятию решений
DALLEAU
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
Как разделить капитал компании, план OSS, деньги на счёте, финансирование проекта и долю заявителя E28A.
16 июля 2026
15 мин чтения
Поделиться
35
Участок и право
Руководство по принятию решений
DALLEAU
PT PMA и nominee: где находятся права иностранного инвестора
Как различаются зарегистрированный держатель, доля в компании, экономическое требование и фактический контроль.
17 июля 2026
4 мин чтения
Поделиться
36
Строительство и эксплуатация
Практический материал
DALLEAU
Общий бассейн: что именно получает владелец виллы
В презентации небольшой резиденции всё выглядит как единый продукт. Рядом с виллой показаны бассейн, парковка, прачечная, кухня, охрана и водоподготовка.
17 июля 2026
4 мин чтения
Поделиться
Для такого сочетания материалов не найдено.
Снимите один из фильтров или задайте более общий вопрос.
Показать ещё
В поле внимания
Темы, по которым меняются данные и нужна проверка.
Если публичных данных недостаточно или административная практика меняется, мы прямо об этом говорим. Наблюдение за темой не означает, что вывод уже сделан.
Применение этих принципов к конкретному проекту требует проверки участка, компании, лицензий и предполагаемого использования.
Обсудить проект с Франсуа
Доступ PMA и ограничение по 18 KBLI
Обновляется
Контроль строительства и использования земли на Бали
Наблюдаем
Лицензии краткосрочного размещения и проверки платформ
На проверке
The Bali Brief
Получайте новые брифинги со ссылками на источники.
Короткое письмо, когда выходит новый материал или существенно обновляется существующий.

## После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. | DALLEAU Field Notes

URL: https://dalleau.ai/ru/notes/after-heavy-rain-owner-checks.html

Field Notes / Reality Check / Вода, ограждающие конструкции и влага

Field Notes · Reality Check · Вода, ограждающие конструкции и влага

После сильного дождя: что владельцу стоит проверить до того, как всё высохнет.

Сильный дождь может показать информацию, которая исчезает через несколько часов. Линии воды высыхают, пятна бледнеют, трапы освобождаются, персонал моет пол.

Уровень доказательности

Руководство по фиксации наблюдений. Причина устанавливается на объекте.

Тип применения

Наблюдение владельца и последовательность расследования

Обновлено

4 августа 2026 г.

Источники

4

На этой странице

Почему важно действовать быстро

Сначала безопасность

Зафиксировать событие до уборки

Наружный обход

Внутренний обход

Не стирать последовательность

Возможные направления проверки

Что запросить у специалиста

Reality Check

Источники

Карта системы

Reality Check

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

01 Событие

Дождь, ветер и режим работы

02 Снаружи

Грунт, террасы и кровля

03 Внутри

Помещение, высота и время

04 Запись

План, фото и последовательность

Иллюстративный контекст

Почему важно действовать быстро

Сильный дождь может показать информацию, которая исчезает через несколько часов. Линии воды высыхают, пятна бледнеют, трапы освобождаются, персонал моет пол.

Цель проверки не в дистанционной диагностике. Нужно сохранить состояние до исчезновения признаков и подготовить полезное расследование.

Сначала безопасность

Не выходите на мокрую кровлю и не обследуйте опасный потолок, техническое помещение или электрическую зону. Ограничьте доступ и привлеките назначенную ответственную сторону.

Зафиксировать событие до уборки

Запишите:

дату и примерное время;

начало и окончание дождя;

необычное направление ветра;

открытые двери и окна;

работу кондиционирования, насосов и вытяжки;

первое видимое место и дальнейшее распространение;

фотографии и короткое видео;

предыдущие случаи.

Простой план с отметками полезнее множества неидентифицированных крупных планов.

Наружный обход

Грунт и ландшафт

Проверьте, уходит ли вода от здания, собирается ли у стен, пересекает ли пороги, переливается ли из кашпо, выходит ли из подпорных стен и имеет ли понятный конечный путь.

Террасы и бассейн

Ищите воду у дверей, обратные уклоны, забитые каналы, трапы выше покрытия, переполнение бассейна и движение воды под наружными дверями.

Кровля и водостоки

Из безопасного места отметьте застой воды, забитые сетки, перелив жёлобов, работу аварийных выпусков и сброс воды к стенам или фундаменту.

Внутренний обход

Зафиксируйте высоту и первое место проявления:

низ стены;

окно или дверь;

стык потолка и стены;

инженерная проходка;

зона под ванной или террасой;

шкаф или встроенная мебель;

дренаж кондиционера или сантехника;

шов пола или плинтус.

Нижнее пятно не доказывает капиллярный подъём. Пятно на потолке не доказывает, что вода вошла прямо над ним.

Не стирать последовательность

До покраски, герметизации или вскрытия сохраните фотографии, помещение и ориентацию, затронутые материалы, связь с дождём, недавние работы и предыдущие ремонты.

Временная мера может быть нужна для ограничения ущерба, но она не должна уничтожить данные для расследования.

Возможные направления проверки

Это гипотезы, не диагноз.

Только при косом дожде: открытые фасады, оконные швы, парапеты и проходки.

После окончания дождя: насыщенный слой, перегруженный дренаж или движение воды в полости.

При использовании ванной: мокрая зона и сантехника до вывода о кровле.

В охлаждаемой комнате при высокой влажности: конденсация и подсос воздуха вместе с источниками жидкой воды.

Внизу стен круглый год: грунт, боковая вода, ландшафт, трубы и конструкция стены.

Что запросить у специалиста

Письменный план с рабочими гипотезами, неразрушающими проверками, последовательностью целевых водных тестов, условиями для вскрытия, способом повторной проверки и наблюдением во время следующего сопоставимого дождя.

Reality Check

Высохло не значит исправлено.

Если след исчез, а путь воды остался, следующий дождь повторит проблему.

Источники

Источники

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Открыть исходный материал

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Продолжить с актуального вопроса

Продолжить с актуального вопроса

Закрасить пятно не значит устранить путь воды. → Гидроизоляция: непрерывная система, а не финишное покрытие. → Плита по грунту или подвесной пол на Бали? → Мембрана не спасёт плоскую кровлю без уклонов. →

Для первого разговора нужны участок, запись события и вопрос владельца. Полный технический пакет не требуется.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа

## Мораторий на строительство на Бали: что проверять | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-building-moratorium.html

Ко всем материалам Материалы DALLEAU 10 июля 2026 Что означает слово «мораторий» для проекта на Бали

Как отделить заявление, действующий акт, пространственный режим, разрешение проекта, контроль и условия сделки.

DALLEAU | Исследования и практические материалы Опубликовано

10 июля 2026

Последняя проверка

17 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ В новостях можно увидеть сообщение о моратории на строительство на Бали. Продавец участка может ответить, что общего запрета нет, а рядом уже идёт стройка. Но ни заголовок, ни заверение продавца, ни соседний объект не позволяют сделать вывод по конкретным координатам.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Словом мораторий часто называют разные события. Перед решением нужно установить, о каком уровне идёт речь и какой документ его подтверждает.

Шесть уровней, которые важно разделить

Публичное заявление или заявленный курс. Оно показывает, на какую проблему власти обратили внимание. До появления действующего текста из него нельзя выводить территорию, адресатов, исключения и санкции.

Принятый нормативный акт. Значение имеют точное название, дата вступления в силу, юрисдикция, предмет и аутентичный текст с приложениями. Стратегическое положение не всегда действует как прямой отказ по участку.

Пространственный режим участка. Действующие RTRW или RDTR и применимые защитные наложения описывают территорию. Брокерский цвет или публичный скриншот не заменяют официальный результат для предполагаемого использования.

Разрешения для проекта. Пространственное соответствие, разрешение здания и лицензия на деятельность проходят отдельные проверки. Положительный результат одной проверки автоматически не подтверждает остальные.

Контроль и меры по конкретному делу. Установленное нарушение, полномочия органа, процедура и решение зависят от обстоятельств конкретного объекта. Общее заявление об усилении контроля само по себе не означает, что санкции автоматически применяются к каждому владельцу.

Условия сделки. Владелец может связать предварительный платёж и продолжение проекта с получением конкретных документов. Это договорное решение нужно готовить с индонезийским юристом.

Что подтверждено на дату доказательной базы

2 декабря 2025 года была издана Инструкция губернатора Бали 5/2025. Она направила органам власти указания по недопущению определённых переводов сельскохозяйственных земель и сохранению использования по пространственному назначению на период подготовки постоянной региональной основы.

4 февраля 2026 года вступило в силу Президентское постановление 4/2026 о национальном контроле преобразования и картировании охраняемых рисовых земель.

Региональное постановление Бали 4/2023 определяет долгосрочные ориентиры развития с 2025 по 2125 год. В нём говорится об ограничении развития туристических услуг. Однако последствия для конкретного проекта определяются действующими правилами зонирования, разрешениями и лицензиями.

Официальные страницы пространственного ведомства Бали называют принятыми Региональное постановление 3/2026 по защите пляжей и прибрежных отступов и Региональное постановление 4/2026 по контролю продуктивных земель и nominee-схем.

На дату проверки использованные официальные аналитические страницы подтверждают существование и название этих актов, но не заменяют их полные аутентичные тексты и приложения. До получения таких текстов нельзя уверенно публиковать номера статей, точные районы, виды использования, исключения, переходные правила и санкции.

Как проверить конкретный участок

Зафиксировать координаты и актуальные зарегистрированные данные.

Проверить текущие RTRW или RDTR и возможные сельскохозяйственные, прибрежные и иные защитные наложения.

Получить применимый пространственный результат для точного использования, включая путь KKPR, когда он требуется.

Сопоставить проект здания с разрешительным путём.

Проверить деятельность оператора, KBLI и лицензии.

Отдельно оценить доступ, воду, стоки и технические ограничения.

Так можно системно организовать проверку для решения владельца. Это не единая государственная форма.

Само наличие здания ничего не гарантирует

Фразы «сосед уже построил», «разрешение старое, но действующее», «вилла уже сдаётся» и «участок всегда считался туристическим» нужно подтверждать документами.

Для ранее построенного объекта важны дата и содержание разрешений, соответствие фактического здания, текущая деятельность, изменения проекта и переходные положения применимого акта. Нельзя обещать ни автоматическое сохранение прежнего положения, ни его автоматическую утрату.

Усиление контроля и конкретная мера

Политическое решение усилить контроль, факт нарушения и мера по определённому объекту являются разными этапами. Возможные последствия зависят от применимого акта, полномочий органа, установленной ситуации, процедуры и документов дела.

Без полных текстов новых региональных актов статья не перечисляет предполагаемую лестницу санкций и не обещает владельцу предварительное предупреждение.

Что сделать до следующего платежа

С индонезийским юристом следует письменно определить документы, сроки, право отказаться, порядок удержания или возврата и момент перечисления средств дальше. Формулировка «возвратный депозит», нотариальная форма или счёт эскроу сами по себе не создают универсальной гарантии.

Сведения о моратории могут быть достаточной причиной обновить проверку. Само слово не решает судьбу участка. Проект продолжают только на основании действующих документов, относящихся к его координатам и фактическому использованию.

Связанные материалы

Зонирование участка на Бали: почему цвета на карте недостаточно

Что подтверждает NIB и какие документы всё равно нужны

Проверка участка на Бали до предварительного платежа

Источники и границы

Инструкция губернатора Бали 5/2025 .

Президентское постановление 4/2026 .

Региональное постановление Бали 4/2023 .

Официальные аналитические материалы TARU Bali о Perda 3/2026 и Perda 4/2026 . Они не заменяют аутентичные тексты актов.

Материал не является заключением по участку или юридическим советом. Источники, пространственный режим и переходные положения нужно обновить непосредственно перед решением.

Что изучить дальше

Связанный вопрос Зонирование участка на Бали: почему цвета на карте недостаточно Связанный вопрос Что подтверждает NIB и какие документы всё равно нужны

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Въезд на Бали: B1, All Indonesia и автогейты | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-evoa-all-indonesia-autogates.html

Главная / Материалы / Прибытие в Индонезию

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Материалы DALLEAU Источники проверены 13 июля 2026

Въезд на Бали с семьёй: B1, All Indonesia и паспортный контроль

Как отдельно проверить B1 e-VOA, декларацию All Indonesia и прохождение паспортного контроля для каждого члена семьи.

DALLEAU | Исследования и практические материалы Опубликовано

13 июля 2026

Последняя проверка

13 июля 2026

Проверено | 13 июля 2026 | первичные источники

Границы материала Независимая информация, не продажа услуг Проверьте применимость правил к вашей ситуации у компетентного органа или уполномоченного специалиста.

С чего начать Одна семейная поездка включает несколько отдельных проверок. Виза определяет основание для въезда и срок пребывания. All Indonesia: это декларация прибытия. Автоматический паспортный контроль, который часто называют автогейтом, лишь один из возможных способов пройти границу. Ни один из этих элементов не заменяет остальные.

Принцип Выбирать по реальной деятельности

Источники Официальные и первичные

Проверка Перед подачей или платежом

На этой странице Что означают 90, 30 и 60 дней для B1 All Indonesia заполняется отдельно Когда ребёнок может пройти через автогейт B1 не подходит для любой деятельности Календарь перед вылетом Связанные материалы Источники и границы

Если у членов семьи разные гражданства или паспорта, проверку нужно проводить по каждому человеку. Удобно заранее составить простую таблицу: имя, паспорт, гражданство, выбранная категория визы, дата выдачи, крайняя дата въезда и документы, которые будут доступны без интернета. Детей следует включать в такую таблицу наравне со взрослыми.

Что означают 90, 30 и 60 дней для B1

На дату проверки официальная страница B1 указывает три разных срока:

выданную визу нужно использовать для въезда в течение 90 дней;

первоначальный разрешённый срок пребывания составляет 30 дней с даты въезда;

опубликована возможность одного продления, после которого общий срок может достигать 60 дней.

Таким образом, 90 дней не означают, что человек может находиться в Индонезии три месяца. Это срок, в течение которого необходимо совершить въезд по уже выданной визе. Дни пребывания считаются отдельно, начиная с фактического пересечения границы.

Доступность B1 зависит от паспорта. Официальный список стран меняется, поэтому его следует проверять перед подачей и ещё раз перед поездкой. Постоянная таблица гражданств в статье быстро устарела бы.

На той же официальной странице сейчас указаны сбор 500 000 IDR, базовый комплект документов и заявленный срок рассмотрения 1 × 24 часа . Это текущая информация на сайте, а не гарантия срока, выдачи визы или допуска в страну.

All Indonesia заполняется отдельно

С 1 октября 2025 года All Indonesia обязательна для международных прибытий. Она объединяет несколько деклараций, которые раньше заполнялись отдельно. Сервис доступен в течение трёх дней до прибытия.

All Indonesia не является визой и не продлевает пребывание. Заполнение декларации также не гарантирует прохождение через автогейт. После отправки стоит сохранить подтверждение и QR-код на телефоне так, чтобы они открывались без подключения к сети.

Когда ребёнок может пройти через автогейт

Официальная иммиграционная служба сообщила, что с 26 августа 2024 года дети от шести лет могут пользоваться автогейтами в аэропортах Soekarno-Hatta и Ngurah Rai, если выполнены остальные условия. Для иностранного гражданина важны совместимый электронный паспорт и электронная запись о визе или разрешении на пребывание.

Возраст от шести лет означает возможность, а не гарантированный проход. Система или сотрудник могут направить любого путешественника на обычный паспортный контроль. Это не следует воспринимать как отказ во въезде. Семье полезно заранее договориться, что делать, если взрослых и детей попросят пройти контроль у сотрудника вместе.

B1 не подходит для любой деятельности

B1 используется для туризма и перечисленных на официальной странице посещений. Она не становится рабочим статусом только потому, что поездка связана с недвижимостью или бизнесом.

Осмотр участка, встреча с подрядчиком, подписание документов, руководство сотрудниками и фактическое управление объектом: это разные действия. Если основная цель поездки связана с переговорами, инспекцией проекта или компанией, нужно заранее проверить, соответствует ли ей B1 либо следует рассматривать действующую категорию делового визита. Визовый код не стоит выбирать по бытовому описанию поездки.

Календарь перед вылетом

Проверить каждый паспорт в официальном списке VoA.

Подать документы через официальный иммиграционный сервис и сверить данные в выданной визе.

Записать отдельно крайнюю дату въезда и предполагаемую дату окончания пребывания.

В течение трёх дней до прилёта заполнить All Indonesia.

Сохранить офлайн визы, номера заявок, подтверждения All Indonesia, билеты из Индонезии и семейные документы.

Для ребёнка проверить возраст, электронный паспорт и электронную визовую запись, но сохранить обычный контроль как основной резервный вариант.

После въезда сверить поставленный срок пребывания и не считать его по дате покупки визы.

Если поездка нужна для выбора участка, школы или проекта, сначала полезно записать фактические действия каждого взрослого. Так можно отдельно проверить подходящую визовую категорию и не переносить туристические правила на работу или управление объектом.

Связанные материалы

Как выбрать основание для пребывания в Индонезии по реальной деятельности

E33 Second Home: что семья должна подтвердить и поддерживать

С маленькими детьми на Бали: наш семейный опыт

Источники и границы

Иммиграционная служба Индонезии, страница B1 , проверено 22 июля 2026 года.

Официальный список паспортов для VoA , проверено 22 июля 2026 года; перед поездкой требуется новая проверка.

Объявление об обязательной All Indonesia , опубликовано 2 октября 2025 года.

Официальное сообщение об автогейтах для детей от шести лет , опубликовано 31 августа 2024 года.

Материал содержит общую информацию. Он не гарантирует выдачу визы, въезд, продление, смену статуса или прохождение через автогейт. Изменяемые сервисные сведения нужно перепроверить непосредственно перед подачей.

Официальные источники 13 июля 2026

Ссылки на государственные источники проверены на указанную дату. Если официальные страницы расходятся, материал показывает расхождение и использует более осторожное толкование.

Перейти к источникам

Что изучить дальше

Связанный вопрос Как выбрать основание для пребывания в Индонезии по реальной деятельности Связанный вопрос E33 Second Home: что семья должна подтвердить и поддерживать

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Зонирование на Бали: цвет не равен разрешению | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-land-zoning-explained.html

Ко всем материалам Материалы DALLEAU 7 июля 2026 Зонирование участка на Бали: почему цвета на карте недостаточно

Как проверить точные координаты, официальный план, здание, деятельность, право и экономику проекта.

DALLEAU | Исследования и практические материалы Опубликовано

7 июля 2026

Последняя проверка

17 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ Участок часто присылают в мессенджере вместе с цветным фрагментом карты. К изображению добавляют короткий комментарий: в этой зоне можно строить или сдавать виллу. Такой скриншот помогает сформулировать первый вопрос, но не даёт проектного заключения.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Одинаковый цвет в разных планах может иметь разное значение. Иногда цвет добавлен брокером или платформой. Разговорные обозначения зелёная , жёлтая , оранжевая и розовая зоны объединяют официальные категории и подзоны, которые различаются по месту и документу.

Для решения нужны точные координаты, действующий пространственный план, официальное название зоны на bahasa Indonesia, её код, легенда и правила для конкретного использования.

Пять частей проверки проекта

Пространство. Проверяются региональный план RTRW, детальный план RDTR и применимый официальный результат соответствия использования пространства, включая KKPR, когда он необходим.

Здание. Существующее или проектируемое здание сопоставляется с разрешительной документацией и фактическим использованием.

Деятельность. Важно описать, что именно будет происходить на участке. Частное проживание, долгосрочная аренда, краткосрочное размещение и работа гостиничного оператора требуют разных проверок. Затем уточняются KBLI и действующий порядок получения лицензий.

Право и стороны. Отдельно устанавливаются земельное право или договор, держатель, полномочия, ограничения и обременения.

Экономика. Даже допустимый сценарий может потерять смысл из-за ограничений по плотности, высоте, отступам, доступу, парковке, воде, стокам, грунту и стоимости необходимых работ.

Положительный ответ по одной части не заменяет остальные проверки. KKPR не заменяет PBG, PBG не подтверждает лицензию оператора, NIB не устраняет риски, связанные с землёй.

Что означает покрытие RDTR

На 2 февраля 2026 года официальное обновление провинции Бали сообщало о 34 RDTR, покрытии 31,49 процента территории провинции и 28 планах, интегрированных с OSS. Для Badung, Denpasar и Gianyar было указано полное покрытие территории детальными планами.

Эта статистика говорит о наличии планов. Она не означает, что любой проект на любой координате разрешён. Внутри покрытой территории остаются разные зоны, параметры, условия и наложения.

Последовательность проверки

Зафиксировать координаты и идентификатор участка.

Описать предполагаемое использование без общего слова вилла .

Открыть действующий RTRW или RDTR и его официальную легенду.

Записать название и код зоны или подзоны на bahasa Indonesia.

Проверить разрешённые, условные и запрещённые использования и параметры участка.

Получить применимый официальный пространственный результат для координат и масштаба проекта.

Отдельно проверить здание, деятельность, право и экономику.

Повторить проверку перед предварительным платежом и подачей разрешений, если проект или данные изменились.

Публичные интерфейсы OSS, Bali spatial portal и BHUMI полезны для первоначальной ориентации. Их скриншоты не являются заключением компетентного специалиста или органа по конкретному проекту.

Почему один и тот же цвет даёт разные результаты

Представим три условных участка, которые продавцы называют одинаково.

На первом участке подтверждается частное жилое использование, но возможность краткосрочного размещения гостей не установлена.

На втором туристическая деятельность выглядит пространственно допустимой, однако доступ, отступы и схема стоков оставляют слишком мало полезной площади.

На третьем уже стоит вилла, но фактическое здание расходится с документами, а оператор не подтвердил лицензионный путь.

Во всех трёх случаях цвет остаётся прежним. Решение меняется после проверки проекта.

Изменения 2025 и 2026 годов

PP 28/2025 действует с 5 июня 2025 года и определяет основной порядок риск-ориентированного лицензирования бизнеса, заменив PP 5/2021.

Инструкция губернатора Бали 5/2025 касается контроля определённых переводов сельскохозяйственных земель. Президентское постановление 4/2026 установило национальную рамку контроля преобразования охраняемых рисовых земель.

Официальные материалы Бали сообщают также о принятии региональных постановлений 3/2026 по защите побережья и береговой полосы и 4/2026 по продуктивным землям и nominee-схемам. На дату доказательной базы доступные аналитические страницы не заменяют аутентичные полные тексты и приложения. Поэтому статья не приводит точные статьи, отступы, санкции, исключения или переходные положения этих двух актов.

Из перечисленных изменений нельзя вывести единый запрет на строительство на всём Бали. Отсутствие такого запрета также ничего не разрешает на конкретном участке.

Что должно быть готово до концепции и платежа

координаты и идентификатор участка;

официальные название, код и легенда зоны;

правила для точного сценария использования;

применимый пространственный результат;

список защитных и иных наложений;

сверка здания и разрешительной истории;

описание оператора, KBLI и лицензирования;

актуальные документы на землю или договорное право;

проектная записка о доступе, сетях, воде, стоках и экономике.

DALLEAU может координировать эти вопросы и сводить противоречия. Компания не выдаёт KKPR, не подтверждает титул и не заменяет индонезийского юриста, специалиста по пространственному планированию, архитектора или инженера.

Связанные материалы

Проверка участка на Бали до предварительного платежа

Что означает слово «мораторий» для проекта на Бали

Что подтверждает NIB и какие документы всё равно нужны

Источники и границы

PP 21/2021 о пространственном планировании .

Руководство OSS по KKPR и RDTR .

Официальное обновление статуса RDTR Бали , опубликовано 6 февраля 2026 года.

Публичная карта BHUMI и её собственные ограничения использования.

PP 28/2025 , Perpres 4/2026 и официальные материалы Бали о Perda 3/2026 и 4/2026.

Материал не является заключением по зонированию или возможности получить разрешения для конкретного участка. Для решения требуются действующие документы и проверка специалистов.

Что изучить дальше

Связанный вопрос Проверка участка на Бали до предварительного платежа Связанный вопрос Что означает слово «мораторий» для проекта на Бали

Смоделировать решение в Stay Matrix Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Leasehold на Бали: срок, права и условия договора | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-leasehold-explained.html

Ко всем материалам
Материалы DALLEAU
7 июля 2026
Leasehold на Бали: какие права действительно получает владелец
Что может скрываться под словом leasehold и как проверить право, срок, строительство, передачу, платежи и исполнение договора.
DALLEAU | Исследования и практические материалы
Опубликовано
7 июля 2026
Последняя проверка
17 июля 2026
Проверено | 17 июля 2026 | первичные источники
Короткий ответ
В объявлении о недвижимости обычно указаны цена, срок и слово extendable. Этого достаточно для первого сравнения вариантов. Для сделки нужно понять, какое право или договор передаётся, кто вправе его предоставить и что произойдёт с вложениями при продаже земли, споре или окончании срока.
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
На балийском рынке
leasehold
служит удобным общим названием. В индонезийском праве это не один стандартный сертификат с одинаковыми условиями для всех объектов.
Что рынок может называть leasehold
Под одним словом могут находиться:
частный договор аренды участка;
аренда участка вместе с существующим зданием;
уступка оставшегося срока чужого договора;
договор аренды вместе с отдельным договором на строительство или улучшения;
зарегистрированное право, которое в рекламе назвали английским словом;
несколько договоров с разными сторонами и сроками.
Поэтому сначала определяется исходное земельное право.
Hak Milik
,
Hak Pakai
,
Hak Guna Bangunan
(HGB),
Hak Sewa
и частный договор имеют разные функции. Их нельзя считать взаимозаменяемыми или переводить одним российским юридическим термином.
Девять вопросов к сделке
1. Что зарегистрировано сегодня.
Нужно получить актуальные данные по участку, держателю права, границам и обременениям. Договор аренды не исправляет ошибку в исходном праве.
2. Кто вправе подписать договор.
Проверяются личность или компания арендодателя, полномочия представителя, согласия супругов, органов компании или иных лиц, если они нужны в конкретной ситуации.
3. Когда начинается и заканчивается срок.
В договоре должны совпадать дата начала, дата окончания, момент передачи и уже прошедший срок. При уступке покупатель получает остаток, а не первоначальное количество лет.
4. Как устроено продление.
Формула
по взаимному согласию
означает будущие переговоры. Нужно знать срок уведомления, метод определения цены, процедуру, необходимые согласия и последствия отказа.
5. Что разрешено делать.
Частное проживание, строительство, субаренда и туристическое размещение являются разными вопросами. Согласие арендодателя не заменяет зонирование, PBG, SLF, KBLI или лицензию оператора.
6. Кому принадлежат улучшения.
Договор должен описывать строительство, согласования, оплату, страхование, ремонт и судьбу здания в конце срока или при досрочном прекращении.
7. Можно ли передать договор.
Проверяются уступка, субаренда, согласие арендодателя, плата за передачу и документы, которые получит следующий владелец.
8. Что происходит с деньгами при нарушении.
Важны график платежей, предварительные условия, срок исправления, расторжение, удержание и возврат. Слово
депозит
не создаёт универсального права на возврат.
9. Где и как защищать договор.
Следует определить применимое право, язык, порядок разрешения спора, сторону, к которой предъявляется требование, и активы, за счёт которых решение можно исполнить.
Продление не нужно включать в защищённый срок заранее
Если первые 25 лет зафиксированы, а ещё 25 зависят от будущего согласия или цены, экономику лучше считать по первоначальному защищённому периоду. Дополнительный срок можно учитывать как отдельный сценарий после анализа механики продления.
Особое внимание требуется, когда продление зависит от наследников, нового держателя земли или будущего договора. Обещание текущей стороны не всегда связывает человека, который станет собственником или руководителем позже.
Стоимость капитальных работ зависит от оставшегося срока
Дом, бассейн и инженерные системы продолжают физически существовать после окончания договора. Владелец должен знать, кому они переходят, можно ли их демонтировать, положена ли компенсация и что происходит при досрочном прекращении.
Цена сделки оценивается вместе со сроком, состоянием здания, расходами на ремонт и возможностью законной эксплуатации. Низкая цена за год ничего не говорит, если важные права зависят от будущего согласия.
Нотариальная форма и регистрационные данные
PPAT занимается определёнными действиями с зарегистрированными земельными правами, а нотариус удостоверяет и оформляет документы в пределах своих полномочий. Нотариальная форма сама по себе не подтверждает титул, полномочия стороны, зонирование, лицензию и последующую исполнимость.
Проверяется также возможность и значение регистрации или отметки для конкретного инструмента. Нельзя заранее считать её всегда обязательной, доступной или равной собственности.
Исходный текст на bahasa Indonesia должен быть прочитан независимым индонезийским юристом. Двуязычная версия помогает сторонам понимать договор, но расхождения между языками требуют отдельного правила приоритета.
Паспорт сделки
Перед оплатой полезно собрать одну страницу с ключевыми фактами:
исходное право и его держатель;
стороны и полномочия;
точные даты срока;
механизм продления;
разрешённое использование;
права на строительство и улучшения;
уступка и субаренда;
платежи, нарушение и возврат;
нотариальные и регистрационные доказательства;
налоги, спор и исполнение.
Если важный ответ существует только в устном обещании продавца, он ещё не стал частью сделки.
Связанные материалы
Проверка участка на Бали до предварительного платежа
PT PMA и nominee: где находятся права иностранного инвестора
Источники и границы
UUPA, Law 5/1960
, включая статьи 21, 26 и с 41 по 45.
PP 18/2021
и
ATR/BPN Regulation 18/2021
.
PP 24/1997 о регистрации земли
и
Law 4/1996 о Hak Tanggungan
.
Материал не является юридическим, нотариальным, налоговым или финансовым заключением. Конкретный титул и полный договор на bahasa Indonesia должен проверить независимый специалист.
Цена, состав работ и следующее обязательство
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Что изучить дальше
Связанный вопрос
Проверка участка на Бали до предварительного платежа
Связанный вопрос
PT PMA и nominee: где находятся права иностранного инвестора
Смоделировать решение в Stay Matrix
Открыть инструмент (EN) >
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.

## Проверка досье перед следующим платежом | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-off-plan-development-file-before-next-payment.html

Материалы DALLEAU
Следующий платёж начинается с проверки, а не с даты
В графике off-plan проекта указаны даты и проценты. Когда наступает очередной срок, перевод кажется автоматическим.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
16 июля 2026
Проверено | 16 июля 2026 | первичные источники
Обновлено 16 июля 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
В графике off-plan проекта указаны даты и проценты. Когда наступает очередной срок, перевод кажется автоматическим. Однако каждый транш уменьшает контроль владельца и увеличивает сумму, которую придётся возвращать при споре.
Перед оплатой нужно заново проверить договор, состояние проекта, стоимость завершения и доступные способы защиты.
Четыре части проверки
Применимое право
Определите юридическую структуру сделки и правила, которые к ней относятся. Цифры 20%, 80% и семь рабочих дней из PP 12/2021 нельзя переносить на каждую off-plan виллу без подтверждения, что конкретный инструмент входит в этот режим.
Подписанный договор
Именно договор устанавливает этап, условия оплаты, процедуру проверки, изменения, дефекты, приостановку и последствия нарушения.
Фактические доказательства
Сюда входят чертежи, спецификация, отчёты, фото с датой и местом, измерения, испытания, накладные, протоколы и список замечаний.
Решение владельца
Все материалы сводятся в короткую записку: что проверено, чего не хватает, кто отвечает за каждый недостающий элемент и как это влияет на платёж.
Шесть папок перед траншем
Стороны и полномочия.
Действуют ли компании, подписанты, доверенности и согласия?
Земля, здание и эксплуатация.
Не изменился ли порядок получения разрешений?
Согласованный объём работ.
Какая версия чертежей и спецификации является основной?
Прогресс и качество.
Что завершено, измерено и принято?
Деньги.
Сколько уже оплачено, какова стоимость выполненного результата и сколько нужно для завершения?
Защита и выход.
Какие действующие права есть при задержке, дефекте или прекращении проекта?
Что доказывают фотографии и сертификаты
Фотография показывает видимое состояние в определённый момент. Она не подтверждает скрытые работы, качество материалов и соответствие утверждённой версии проекта.
Счёт показывает требование оплаты. Процент готовности зависит от базы измерения. Профессиональный сертификат полезен в пределах назначения, осмотра и метода, которые в нём указаны.
Ни один документ не может отвечать на вопросы, которые в нём не рассматривались.
Изменения меняют основу расчёта
Если площадь, материал, инженерное решение или объём меняются, старый процент готовности может потерять смысл. До выполнения изменения фиксируют описание, цену, срок, влияние на разрешения и порядок согласования.
Сводная платёжная таблица должна показывать согласованную основу расчёта, выполненный объём, прошлые платежи, изменения, дефекты и актуальную стоимость завершения.
Материалы вне площадки
Оплата заказанного оборудования требует отдельной проверки. Кто владеет материалом, где он хранится, застрахован ли, промаркирован ли для проекта и что произойдёт при несостоятельности поставщика?
Один инвойс не подтверждает наличие и сохранность.
Удержание части оплаты, счёт эскроу и гарантии
Удержание части оплаты работает только в рамках договора. Отдельный проектный счёт не становится счётом эскроу без юридически действующего режима контроля. Гарантия полезна после проверки гаранта, текста, суммы, срока и условий требования.
Старый перечень гарантий из статьи 57 Закона 2/2017 нельзя представлять как универсальный действующий набор для каждой частной виллы.
Пять возможных решений
По итогам проверки владелец может:
одобрить перевод;
одобрить его после выполнения указанного условия;
временно не платить на основании действующего договора и рекомендации юриста;
передать вопрос на специальную техническую или юридическую проверку;
исправить документы и базу измерения до решения.
Итоговый документ должен содержать дату, имя автора и описание влияния решения на график.
Практический вывод
Дата в календаре напоминает о платеже. Основание для перевода дают договор, принятый результат и подтверждающие документы. Такой комплект позволяет владельцу принять решение до того, как деньги покинут счёт.
Соберите доказательства до следующего транша.
Связанные материалы
Дата наступила, счёт выставлен. Этого ещё недостаточно
Один бренд может скрывать несколько разных сторон
Проверка участка на Бали до предварительного платежа
Источники и границы
https://jdih.pkp.go.id/produk-hukum/permen-18-2025
https://jdih.pkp.go.id/produk-hukum/permen-24prtm2018-2018
https://peraturan.go.id/id/pp-no-16-tahun-2021
https://simbg.pu.go.id/dashboard
Цена, состав работ и следующее обязательство
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Что изучить дальше
Связанный вопрос
Дата наступила, счёт выставлен. Этого ещё недостаточно
Связанный вопрос
Один бренд может скрывать несколько разных сторон
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Один бренд может скрывать несколько разных сторон
Дата наступила, счёт выставлен. Этого ещё недостаточно
Процент в презентации ещё не показывает, откуда придут деньги
Связанные материалы
Проверка участка на Бали до предварительного платежа
Leasehold на Бали: какие права действительно получает владелец

## Один бренд может скрывать несколько разных сторон | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-off-plan-landowner-developer-seller-contractor-operator.html

Материалы DALLEAU

Один бренд может скрывать несколько разных сторон

Покупатель off-plan виллы обычно общается с одним менеджером и видит один логотип. Из переписки легко сделать вывод, что все обещания даёт одна компания.

DALLEAU | Исследования и практические материалы Опубликовано

16 июля 2026

Последняя проверка

16 июля 2026

Проверено | 16 июля 2026 | первичные источники

Обновлено 16 июля 2026 года

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Покупатель off-plan виллы обычно общается с одним менеджером и видит один логотип. Из переписки легко сделать вывод, что все обещания даёт одна компания.

В договорной цепочке земля может принадлежать одному лицу, аренду предоставляет второе, строит третье, эксплуатацию ведёт четвёртое, а платежи принимает ещё одна компания. Общий бренд не создаёт общую ответственность.

Сначала определите, что вы подписываете

Термины off-plan villa , leasehold villa и вилла под управлением описывают продукт для рынка. Юридическая структура может включать долгосрочную аренду, уступку договора, аренду земли вместе со строительным контрактом, услуги девелопера, PPJB, акции компании или несколько документов одновременно.

Название продукта не показывает, кто обязан передать землю, построить дом и заплатить обещанный доход.

Шесть вопросов к каждой стороне

Для любого участника проекта запишите:

Документ или право. В каком договоре участвует эта сторона и какое право она предоставляет или получает?

Полномочие. Кто вправе подписывать и какие согласия нужны?

Обязательство. Что именно сторона должна сделать?

Деньги. Какие суммы она получает или выплачивает?

Доказательство. Как подтверждается исполнение и на какую дату?

Взыскание. К кому будет предъявлено требование при нарушении?

Эти вопросы повторяют для каждой роли, даже если один бренд объединяет сразу несколько участников.

Основные роли

Правообладатель участка

Нужно проверить само право, срок, границы, согласия и возможность предоставить его по выбранной структуре.

Продавец, арендодатель или цедент

Эта сторона передаёт покупателю конкретное право. Её обязательства зависят от инструмента и могут не включать строительство.

Девелопер

Девелопер координирует проект в объёме своего договора. Его бренд или управленческая роль не подтверждают право на землю и не делают его подрядчиком автоматически.

Подрядчик

Подрядчик отвечает за установленный объём строительных работ. Важно знать, кто заключил с ним договор и вправе ли покупатель напрямую предъявить ему требование.

Оператор

Оператор занимается запуском и эксплуатацией. Его лицензии и договор не исправляют документы земли, здания или продавца.

Агент

Агент организует продажу или знакомит стороны. Он может не отвечать за исполнение основного договора.

Плательщик дохода или сторона обратного выкупа

Обещание относится к юридическому лицу, которое его подписало. Финансовое состояние других компаний группы не становится обеспечением без отдельного обязательства.

Получатель банковского перевода

Счёт должен совпадать с договором, счётом-фактурой и налоговым документом. Платёж сторонней компании или физическому лицу требует письменного основания и дополнительной проверки.

Полномочия нельзя определять по визитке

Сведения в AHU и данные о бенефициаре помогают проверить компанию. Они не подтверждают право конкретного директора подписать любой договор или распорядиться чужим участком.

Проверяются действующие корпоративные документы, назначение подписанта, доверенность, решения органов компании и необходимые согласия третьих лиц.

Две языковые версии договора

Если договор представлен на индонезийском и другом языке, версии нужно сверить по суммам, срокам, обязанностям, основаниям расторжения и средствам защиты. Индонезийский юрист определяет применимые требования и последствия расхождений.

Что означает реальная защита

Обещание вернуть деньги ещё не показывает, за счёт каких активов будет произведён возврат. Для анализа нужны названный должник, принадлежащие ему активы, действительное обеспечение, его регистрация, очерёдность удовлетворения требования и расходы на процедуру.

Счёт эскроу, банковская гарантия, удержание части оплаты и корпоративная гарантия работают по-разному. Ни один механизм нельзя предполагать по рекламной строке.

Схема сторон перед платежом

На одной странице соедините:

все юридические лица и подписантов;

договоры между ними;

землю и разрешительные документы;

банковские счета и получателей;

строительные и операционные обязанности;

обещания дохода или выкупа;

обеспечение и способы защиты.

Любое несоответствие становится отдельным вопросом, который нужно решить до перевода денег.

Практический вывод

Логотип помогает узнать проект. Ответственность возникает из конкретного договора конкретного лица. Карта сторон показывает, где обещание связано с исполнителем и где связь ещё нужно оформить.

Получите карту контрагентов до первого или следующего платежа.

Связанные материалы

Следующий платёж начинается с проверки, а не с даты

Дата наступила, счёт выставлен. Этого ещё недостаточно

Проверка участка на Бали до предварительного платежа

Источники и границы

https://jdih.pkp.go.id/produk-hukum/permen-18-2025

https://jdih.pkp.go.id/produk-hukum/permen-24prtm2018-2018

https://peraturan.go.id/files/permendag-no-33-tahun-2025.pdf

https://peraturan.go.id/files/uu40-2007.pdf

Что изучить дальше

Связанный вопрос Следующий платёж начинается с проверки, а не с даты Связанный вопрос Дата наступила, счёт выставлен. Этого ещё недостаточно

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

Метод

Источники и дата обновления

DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.

Читать дальше

Следующий платёж начинается с проверки, а не с даты Процент в презентации ещё не показывает, откуда придут деньги

Связанные материалы

Один бренд может скрывать несколько разных сторон KBLI выбирают по деятельности, а не по слову «вилла»

## Проверка следующего платежа за виллу | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-off-plan-milestone-payments-progress-variations-retention.html

Материалы DALLEAU
Дата наступила, счёт выставлен. Этого ещё недостаточно
Дата счёта, фактический ход работ и договорный этап отвечают на разные вопросы. Разбираем документы, измерения, изменения и условия следующего транша.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
16 июля 2026
Проверено | 16 июля 2026 | первичные источники
Обновлено 16 июля 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
На площадке есть рабочие, стены стали выше, менеджер прислал новые фотографии и очередной счёт. Так часто выглядит проект, который продают до завершения строительства, или off-plan. В такой ситуации легко решить, что платёж подтверждён самим ходом стройки.
На практике у проекта одновременно идут три процесса. Первый связан с календарём и уведомлениями. Второй отражает фактическое состояние работ. Третий определяется договором: какой результат должен быть достигнут, какие документы должны его подтвердить и когда возникает обязанность платить.
Эти процессы могут совпадать по времени. Иногда дата наступает раньше, чем достигнут предусмотренный договором результат. Бывает и наоборот: работа выполнена, но акт, испытание или согласование ещё не оформлены. Поэтому очередной транш нужно проверять по действующему договору и актуальному комплекту документов проекта.
Сначала уточните, что именно считается этапом
Формулировка вроде
фундамент завершён
оставляет слишком много вопросов. Для осмысленной проверки этапа нужно знать:
какие работы и какая часть объекта входят в этап;
по какой версии чертежей и спецификации их оценивают;
какие объёмы и показатели качества должны быть достигнуты;
какие испытания, осмотры и документы обязательны;
допускаются ли незавершённые элементы и как они учитываются;
кто подтверждает выполнение и в пределах каких полномочий;
какое последствие это подтверждение имеет по договору.
Основой измерения могут служить утверждённые рабочие чертежи, спецификация, ведомость объёмов или другая согласованная структура стоимости, график работ и реестр одобренных изменений. Рендер, коммерческое предложение и первоначальная смета редко дают достаточную основу для точного измерения.
Если проект ещё меняется, это тоже должно быть видно в договоре. Фиксированная цена и дата завершения плохо сочетаются с ситуацией, когда дорогие технические решения остаются открытыми и позже оформляются как дополнительные пожелания владельца.
Физический прогресс, расходы и договорный результат
В проектном отчёте полезно разделять несколько показателей:
выполненный физический объём;
соответствие утверждённым чертежам и качеству;
расходы подрядчика или девелопера;
стоимость правильно выполненного результата;
сумму, уже перечисленную владельцем;
текущую стоимость завершения проекта.
Эти цифры не должны подменять друг друга. Проект может выглядеть продвинутым, но требовать дорогих инженерных работ на поздней стадии. Значительная часть бюджета может быть потрачена без эквивалентного результата на объекте. Также возможна обратная ситуация, когда закуплены материалы, но их принадлежность проекту, состояние и страхование ещё не подтверждены.
Поэтому новый счёт проверяют накопительно. К текущему объёму добавляют предыдущие платежи, возможную переплату, одобренные и спорные изменения, дефекты, неоплаченные обязательства, резерв и обновлённую оценку затрат до завершения.
Какие доказательства действительно помогают
Фотографии полезны, если известны дата, место съёмки и показанный участок работ. Они подтверждают видимое состояние в конкретный момент. По фотографиям обычно нельзя установить качество скрытых работ, точное количество, соответствие чертежам, право на материалы и достаточность бюджета.
Для существенного платежа обычно нужны согласованные для этого проекта доказательства:
датированный осмотр площадки;
измерения по согласованной основе расчёта;
результаты испытаний и записи о скрытых работах;
документы на материалы и оборудование;
перечень незавершённых или дефектных элементов;
обновлённый график работ;
актуальный реестр изменений;
сверка выставленного счёта, предыдущих платежей и получателя денег;
прогноз затрат и сроков до завершения.
Точный набор зависит от договора, стадии и характера работ. Он не является универсальным нормативным чек-листом для всех вилл на Бали.
Что означает подпись архитектора или инженера
Профессиональное заключение может быть важным основанием решения. Его значение определяется назначением специалиста и условиями договора.
Перед тем как полагаться на сертификат или акт, проверьте:
кто назначил специалиста и кто оплачивает его работу;
что именно он осматривал;
по какой методике измерял объём;
какие документы и испытания изучил;
какие элементы исключил;
отразил ли дефекты и незавершённые работы;
является ли его документ условием платежа по конкретному договору.
Сам по себе профессиональный статус специалиста не подтверждает право на участок, наличие лицензии, платёжеспособность девелопера или будущую готовность объекта. В то же время узкий объём задания не обесценивает заключение. Он показывает, на какой именно вопрос отвечает специалист.
Изменение проекта нужно оформлять до включения в счёт
Изменение объёма, дефект и незавершённая работа требуют разных процедур.
Для каждого изменения следует зафиксировать инициатора, полномочие на согласование, новый чертёж или спецификацию, цену, налоговый эффект, влияние на срок, разрешения и стоимость завершения. Если решение принимается в срочном порядке, договор должен описывать такую процедуру заранее.
Сообщение в мессенджере может зафиксировать обсуждение. Полный реестр изменений должен показывать, что именно одобрено, кем, когда и на каких финансовых условиях. Стоимость, впервые появившаяся в счёте после выполнения или закрытия работ, почти всегда усложняет проверку.
Передача ключей не закрывает все вопросы
Физическая готовность, передача владения, закрытие дефектов, получение документов, SLF, эксплуатационная готовность и окончательный расчёт могут наступать в разные даты.
Договору стоит разделять как минимум:
осмотр и перечень замечаний;
физическую передачу объекта;
чертежи фактического исполнения, инструкции, гарантии и протоколы испытаний;
ввод инженерных систем и подключение коммунальных услуг;
применимый порядок получения SLF;
готовность оператора и лицензий;
окончательный расчёт и освобождение удержанной суммы, если такой механизм согласован.
Получение ключей само по себе не подтверждает отсутствие дефектов и готовность бизнеса к работе.
Удержание части оплаты зависит от договора
В частном проекте на Бали нет одного универсального процента удержания, который автоматически применяется к каждой вилле. Если стороны согласовали такой механизм, договор должен определить базу расчёта, размер и предел, держателя денег, условия использования, этапы освобождения, работу с дефектами и последствия расторжения или несостоятельности.
Удержанная сумма не становится счётом эскроу только из-за названия. Она также не гарантирует, что средств хватит на завершение проекта и исправление всех дефектов. Аналогично отдельный проектный счёт не считается юридически обособленным без проверки владельца счёта, подписантов, правил списания, доступа кредиторов и режима при несостоятельности.
Право приостановить или удержать платёж определяется действующим договором и применимым правом. При серьёзном расхождении владелец должен до одностороннего действия сверить процедуру уведомления и защиты с индонезийским юристом.
Отдельно проверьте получателя денег
В одном платеже должны сходиться договорная обязанность, выставитель счёта, владелец банковского счёта, налоговый документ и сторона, которая обязана предоставить результат.
Изменение банковских реквизитов требует независимого подтверждения по известному каналу. Личный счёт, счёт агента или другой компании группы нельзя принимать на основании устного объяснения. Сначала нужны письменное основание, проверка полномочий и бухгалтерско-налоговое подтверждение.
Проценты 20 и 80 относятся только к определённому режиму PPJB
В PP 12/2021 есть требования, связанные с жилищным режимом PPJB. При его применимости условие 20% относится к установленной стадии проекта в определённом законом объёме. Для отдельных или рядных домов речь идёт как минимум о 20% всех запланированных единиц вместе с предусмотренной инфраструктурой, объектами и коммунальными сетями. Для многоквартирного здания используется 20% строительного объёма.
Это условие нельзя превращать в утверждение, что конкретная вилла готова на 20% или что наступил стандартный платёжный этап покупателя. Ограничение на получение более 80% до выполнения применимых условий PPJB также не создаёт счёт эскроу и не означает, что такую сумму безопасно перечислять.
Сначала индонезийский юрист должен определить, входит ли конкретная сделка в этот жилищный режим. Обычная аренда земли, уступка, договор строительства, покупка долей или смешанная структура могут требовать другого анализа.
Как оформить решение по очередному траншу
Результат проверки лучше записать с датой и перечнем использованных документов. Возможны разные выводы:
одобрить перевод в соответствии с договором;
одобрить после получения конкретного документа или устранения указанного расхождения;
отложить решение до технической, финансовой или юридической проверки;
передать спорный объём назначенному специалисту по предусмотренной процедуре;
согласовать изменение платёжного механизма или обеспечение до следующего этапа.
Такой документ не подтверждает законность всего проекта и не гарантирует возврат средств. Он показывает, какие пункты уже подтверждены, что ещё требует решения и как каждый открытый вопрос влияет на текущий платёж.
Что предусмотреть до появления проблем
Условия уведомления, срок исправления, доступ к площадке и документам, защита работ и материалов, замена подрядчика, зачёт, возврат, обеспечение, приостановка, расторжение и спор должны быть продуманы до кризиса.
Расторжение договора не передаёт владельцу автоматически участок, разрешения, субподряды, материалы или контроль над проектом. При финансовых трудностях результат зависит от конкретных сторон, активов, договоров и действительного обеспечения. Универсальную очередь взыскания для владельца виллы определить заранее нельзя.
Связанные материалы
Досье проекта перед следующим платежом
Кто отвечает по договору строящегося проекта
Проверка объекта до первого депозита
Гарантированный доход, обратный выкуп и риск плательщика
Конфиденциальный проектный бриф
Источники и границы
https://jdih.pkp.go.id/produk-hukum/permen-18-2025
https://jdih.pkp.go.id/produk-hukum/permen-24prtm2018-2018
https://peraturan.go.id/id/pp-no-16-tahun-2021
https://www.peraturan.go.id/files/permenpkp-no-6-tahun-2025.pdf
Фактическая база проверена 22 июля 2026 года. Основные официальные источники: PP 12/2021 для определённого жилищного режима PPJB; Закон 2/2017 о строительных услугах с действующими поправками; PP 22/2020 и PP 14/2021; PP 16/2021 и SIMBG; Закон 40/2007 о компаниях; Закон 24/2009 и Президентское положение 63/2019 о языковом слое договоров; Закон 37/2004 о несостоятельности; Законы 4/1996 и 42/1999 об отдельных видах обеспечения.
Материал описывает метод контроля со стороны владельца. Он не является юридическим, техническим, финансовым, налоговым или бухгалтерским заключением и не создаёт право удерживать платёж, входить на площадку, менять подрядчика или расторгать договор. Действующий текст норм, договор, назначение специалистов и документы проекта нужно повторно проверить на дату решения.
Исправления и новые официальные источники:
notes@dalleau.ai
.
Цена, состав работ и следующее обязательство
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Что изучить дальше
Связанный вопрос
Следующий платёж начинается с проверки, а не с даты
Связанный вопрос
Один бренд может скрывать несколько разных сторон
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Следующий платёж начинается с проверки, а не с даты
Один бренд может скрывать несколько разных сторон
Связанные материалы
Подрядчикам и поставщикам
Проверка участка на Бали до предварительного платежа

## Недвижимость на Бали: проверка до внесения задатка | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-property-due-diligence-before-deposit.html

Материалы DALLEAU
Проверка участка на Бали до предварительного платежа
Какие выводы по праву, зонированию, зданию, инженерным условиям и платежу нужны до перевода денег.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
21 июля 2026
Редакционное обновление
20 сентября 2026
Проверено | 21 июля 2026 | первичные источники
Обновлено 21 июля 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
Пока предварительный платёж остаётся у владельца, недостающий документ можно сделать условием сделки. После перевода тот же вопрос может превратиться в спор о возврате. Поэтому до перевода денег проверка участка должна дать понятный вывод.
Слово
депозит
в этой статье используется как рыночное обозначение платежа до основной сделки. Оно не означает автоматически российский задаток, аванс или обеспечительный платёж. Юридический результат зависит от конкретного соглашения, сторон, получателя, условий и применимого права.
Папка документов ещё не означает, что объект проверен
Копия земельного сертификата, скриншот карты, договор, PBG на здание и NIB компании отвечают на разные вопросы. Даже если каждый документ выглядит убедительно, между ними могут быть расхождения по участку, площади, владельцу, использованию или оператору.
Проверка должна связать документы с точными координатами и предполагаемым проектом. Для этого удобно разделить работу на пять групп.
1. Право, личность и полномочия
Нужно установить, какое право или договор существует, кто указан держателем, совпадает ли участок с зарегистрированными данными и вправе ли конкретный человек подписывать сделку.
Проверяются актуальные записи, границы, обременения, споры, доступ и корпоративные полномочия. Фотография сертификата или подпись представителя без проверки полномочий не дают достаточного вывода.
2. Пространственный режим участка
Проверка начинается с точных координат и действующих RTRW или RDTR, то есть регионального и детального пространственных планов. Затем определяется, как официально подтвердить пространственное соответствие, включая KKPR, если он требуется.
Цвет на брокерской карте подходит для первого отбора. Он не заменяет официальное название зоны, код, легенду, возможные защитные наложения и письменный результат по предполагаемому использованию.
3. Здание и деятельность
Право использовать участок, возможность построить конкретное здание и право вести в нём определённую деятельность проверяются отдельно.
PBG относится к разрешительной документации на строительство и утверждённому проекту. SLF подтверждает пригодность здания в пределах соответствующего регулирования. NIB и KBLI описывают компанию и её деятельность. Наличие одного документа не подтверждает остальные.
Для существующей виллы нужно сопоставить фактическое здание, утверждённые планы, документы и предполагаемую модель эксплуатации. Размещение объекта на туристической платформе не является доказательством законности краткосрочной аренды.
4. Инженерные условия и среда
Проверяются физический доступ, электричество, дренаж, бытовые сточные воды, отходы, источник воды и ограничения участка. Наличие скважины ничего не говорит само по себе о разрешении на использование, дебите или качестве воды.
Глубина скважины и количество фильтров также не доказывают безопасность. Нужны отдельные результаты по праву использования воды, производительности источника, анализу качества и системе обработки.
5. Условия платежа и завершения сделки
Соглашение о предварительном платеже должно письменно отвечать на следующие вопросы:
какие результаты проверки считаются приемлемыми;
кто и к какому сроку предоставляет доказательства;
кто держит деньги до выполнения условий;
когда средства можно перечислить дальше;
какое расхождение позволяет отказаться;
кому, как и в какой срок возвращаются деньги;
что происходит при проблеме с площадью, правом, доступом, зонированием, зданием или предполагаемой деятельностью.
Формулировка «возвратный депозит» без этих условий не означает, что платёж обязательно будет возвращён. В Индонезии нельзя исходить из наличия обязательного счёта эскроу, срока, в течение которого можно отказаться от сделки, или автоматической защиты нотариальной формы.
Таблица решения до перевода
Вопрос
Нужное доказательство
Причина остановиться
Условие продолжения
Кто вправе передать право?
Актуальная запись, полномочия, идентификация участка
Несовпадение стороны, границ или права
Независимое подтверждение и устранение расхождения
Подходит ли пространство?
Действующий план и применимый результат по координатам
Скриншот вместо официального вывода
Письменное подтверждение для точного использования
Соответствуют ли здание и деятельность?
Сверка факта, PBG/SLF и лицензионного пути
Документы относятся к другому зданию или оператору
Обновлённый согласованный путь
Работает ли инженерная схема?
Технические проверки и понятные ограничения
Нет законного доступа, отвода или источника
Проектное решение с бюджетом и ответственными
Защищён ли платёж?
Соглашение с условиями выпуска и возврата
Деньги уходят до результатов
Выпуск только после выполнения записанных условий
Как оформить итог проверки
DALLEAU фиксирует проектную гипотезу владельца, распределяет вопросы между специалистами, собирает актуальные ответы и отмечает противоречия. Юридическое заключение, удостоверение права, пространственное подтверждение и инженерные выводы дают соответствующие независимые специалисты.
Результатом может быть решение продолжить, продолжить после выполнения условий или не переводить деньги. Положительный вывод не означает отсутствия всех рисков. Он показывает, какие факты подтверждены и какие условия владелец принимает осознанно.
Составьте реестр документов до следующего платежа
Для каждого из семи направлений проверки укажите в таблице документ, дату и орган выдачи, нерешённый вопрос, ответственного специалиста и условие, которое необходимо выполнить до платежа.
Различайте утверждение продавца, полученный документ и сведения, проверенные независимым специалистом или органом выдачи. Реестр помогает организовать проверку, но не заменяет заключения юриста, нотариуса или технического специалиста.
Связанные материалы
Зонирование участка на Бали: почему цвета на карте недостаточно
Leasehold на Бали: какие права действительно получает владелец
Грунт, вода и дренаж до покупки участка на Бали
Источники и границы
Основные источники:
UUPA, Law 5/1960
,
PP 18/2021
,
PP 24/1997 о регистрации земли
,
PP 21/2021 о пространственном планировании
,
PP 28/2025 о риск-ориентированном лицензировании
и официальный
инструмент OSS/RDTR
.
Материал содержит общую информацию. Он не является заключением по участку, договору, возврату платежа, лицензии, воде или технической пригодности. Все выводы должны быть проверены для конкретной сделки.
Визуальные материалы
Решение о грунтах до покупки
Снизить неопределённость до невозвратного платежа
01 · Документы и карты
Предыдущее использование, насыпной грунт, уклон, дренаж, соседние участки и региональные данные с указанной датой.
02 · Осмотр участка
Высотные отметки, видимые пути движения воды, доступ, подпорные конструкции и влияние побережья.
03 · Целевые изыскания
Скважины, SPT или CPT, отбор керна, лабораторные исследования, геофизика и наблюдения за грунтовыми водами в объёме, соответствующем риску.
04 · Последствия для проекта
Учесть результаты при выборе фундаментов, земляных работ, дренажа, графика, бюджета и условий сделки.
Объём зависит от задуманного проекта, выявленных рисков и доступа, предоставленного продавцом. Единого набора испытаний для каждого участка не существует.
Цена, состав работ и следующее обязательство
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Что изучить дальше
Связанный вопрос
Зонирование участка на Бали: почему цвета на карте недостаточно
Связанный вопрос
Leasehold на Бали: какие права действительно получает владелец
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
KBLI выбирают по деятельности, а не по слову «вилла»
Один бренд может скрывать несколько разных сторон
Как законно получить деньги из своей PT PMA
Вода в кране ещё не подтверждает право использовать скважину
Связанные материалы
Зонирование участка на Бали: почему цвета на карте недостаточно
Leasehold на Бали: какие права действительно получает владелец

## E33 Second Home: гарантия, семья и границы | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-second-home.html

Ко всем материалам Материалы DALLEAU 10 июля 2026 E33 Second Home: что семья должна подтвердить и поддерживать

Как оценивать E33 по капиталу, срокам подтверждения, отдельным основаниям семьи и допустимой деятельности.

DALLEAU | Исследования и практические материалы Опубликовано

10 июля 2026

Последняя проверка

17 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ E33 часто описывают через максимальный срок проживания. Для семьи важнее другой вопрос: что придётся подтвердить после получения статуса, сохранять в течение его действия и оформлять отдельно для каждого человека.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

На дату проверки официальная страница E33 указывает первоначальное пребывание до пяти лет. Продление возможно так, чтобы общий срок не превышал десяти лет. Это предельный срок, а не автоматическая гарантия для конкретного заявителя.

Два опубликованных варианта гарантии

Текущая страница предлагает две альтернативы:

не менее 130 000 USD или эквивалента на собственном счёте заявителя в индонезийском государственном банке;

покупка квартиры rumah susun в Индонезии стоимостью не менее 1 000 000 USD или эквивалента.

Rumah susun означает квартиру в многоэтажном объекте в рамках соответствующего индонезийского регулирования. Эту формулировку нельзя распространять на отдельно стоящую виллу, leasehold или любой объект с ценой выше миллиона долларов.

Для банковского варианта важны имя владельца счёта, банк, валюта, способ подтверждения и обязанность поддерживать гарантию. Деньги компании, супруга или иного лица не следует считать подходящими без прямого подтверждения.

Срок в 90 дней требует письменного уточнения

Официальная страница говорит, что гарантию нужно выполнить и подтвердить в течение опубликованного 90-дневного периода. При этом формулировка не позволяет безопасно определить, от какого именно события начинается отсчёт во всех ситуациях.

До подачи следует получить письменный ответ о начале срока, форме доказательства и последствиях задержки. После подтверждения гарантию нельзя считать свободной от дальнейших условий. Страница требует её поддерживать.

В официальном описании есть противоречие по гаранту

Та же страница указывает, что гарант не требуется, но инструкция по подаче упоминает аккаунт гаранта. Выбирать удобную формулировку нельзя. Фактический порядок подачи нужно проверить в действующем портале до оплаты и зафиксировать письменно.

Такое расхождение не означает, что подача обязательно самостоятельная или что агент всегда необходим. Оно означает, что публичная страница недостаточна для окончательного ответа.

Семья не оформляется одной строкой

Упоминание сопровождения семьи не даёт полного списка категорий для членов семьи. Для супруга, ребёнка и другого родственника нужно отдельно проверить:

паспорт и гражданство;

связь с основным заявителем;

действующий код в системе;

перечень документов;

срок пребывания;

право на работу или отсутствие такого права;

зависимость статуса от основного заявителя.

Страницу E31E нельзя использовать по аналогии. Она прямо исключает присоединение к держателю Golden Visa, поэтому возможность оформления членов семьи по категории E33 нужно подтверждать отдельно.

E33 не заменяет право на работу

Проживание, работа у индонезийской компании, управление собственной PT PMA и удалённая занятость у иностранного работодателя: это разные вопросы. E33 сама по себе не даёт универсального права на работу.

Если один супруг собирается работать удалённо, а второй ежедневно руководить индонезийским бизнесом, каждому потребуется собственная проверка. Корпоративные лицензии, RPTKA и иммиграционные основания должны соответствовать фактическим действиям.

Покупка квартиры не решает весь имущественный вопрос

Даже если объект подходит для иммиграционной гарантии, отдельно проверяются право на него, продавец, полномочия, регистрация, ограничения, налоги и порядок выхода. Иммиграционная страница не является заключением о сделке.

Обратное тоже верно: законный имущественный договор не подтверждает E33. Документы по недвижимости и по E33 должны совпасть по объекту, цене, заявителю и срокам, однако проверяются они отдельно.

Что получить до блокировки денег или объекта

текущий скрин и номер действующей категории E33;

подтверждение выбранного варианта гарантии;

письменное начало 90-дневного срока;

требования к банку, счёту или квартире;

правило поддержания гарантии;

фактический путь подачи и роль гаранта;

отдельную таблицу оснований для семьи;

письменную границу допустимой деятельности взрослых;

независимую проверку имущественной сделки и отдельную налоговую оценку.

Срок до пяти лет полезен только тогда, когда семья понимает связанные обязательства и может выполнять их без противоречия со своей работой, компанией и имущественной структурой.

Связанные материалы

Как выбрать основание для пребывания в Индонезии по реальной деятельности

С маленькими детьми на Бали: наш семейный опыт

E28A: доля заявителя, роль в компании и фактическая работа

Источники и границы

Официальная страница E33 , проверено 22 июля 2026 года.

Официальная страница E31E , используется только для границы по зависимой категории Golden Visa.

Материал не обещает срок, одобрение, семейный код, самостоятельную подачу, право на работу или пригодность конкретной недвижимости. Перед подачей нужно заново проверить действующий портал и профессионально оценить выбранную схему.

Что изучить дальше

Связанный вопрос Как выбрать основание для пребывания в Индонезии по реальной деятельности Связанный вопрос С маленькими детьми на Бали: наш семейный опыт

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Грунт и дренаж до покупки участка на Бали | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-soil-drainage-before-land-purchase.html

Ко всем материалам Материалы DALLEAU 10 июля 2026 Грунт, вода и дренаж до покупки участка на Бали

Когда грунт, вода, склон и дренаж должны влиять на решение о покупке и какие данные нужны по конкретной площадке.

DALLEAU | Исследования и практические материалы Опубликовано

10 июля 2026

Последняя проверка

17 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ Участок, осмотренный в сухой день, может выглядеть ровным и плотным. Такой осмотр помогает заметить доступ, уклон и явные следы воды. Он не показывает состав насыпи, сезонный уровень грунтовых вод, поведение склона или направление ливневого стока.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Эти вопросы иногда меняют не только фундамент. Они могут уменьшить полезную площадь, потребовать подпорных конструкций, изменить отметки дома, затронуть бассейн и септик, увеличить срок или сделать цену земли неразумной. Поэтому часть технической проверки стоит проводить, пока от участка ещё можно отказаться.

Грунт оценивают вместе с проектом

Один и тот же участок может подходить для лёгкого одноэтажного дома и требовать другой оценки для нескольких вилл, бассейнов, подземных помещений, глубоких выемок или высокой насыпи.

Специалисту нужна хотя бы предварительная схема проекта: расположение и этажность зданий, нагрузки, бассейны, подпорные стены, предполагаемые земляные работы и схема доступа. Без этого невозможно объяснить, какую неопределённость должно снять исследование.

Предварительная работа для сделки не заменяет полные геотехнические изыскания и расчёты рабочего проекта. Цель: вовремя увидеть риск, способный изменить решение владельца.

Три уровня информации

Региональные данные. Карты, геологические исследования и история района помогают составить вопросы. Они не определяют слои, воду, несущую способность, пустоты и устойчивость конкретного участка.

Модель площадки. Она формируется из истории участка, осмотра, топографии, границ, следов насыпи и воды, полевых и лабораторных данных, наблюдений за грунтовыми водами и профессиональной интерпретации.

Проектное решение. Фундаменты, земляные работы, подпорные конструкции, водозащита и дренаж выбираются после сопоставления модели площадки с архитектурой и нагрузками.

Переход от региональной карты сразу к типу фундамента пропускает главный этап.

Какие вопросы задаёт география Бали

Denpasar, Seminyak и Canggu

На низинном или прибрежном участке, в зависимости от координат, проверяют происхождение грунта и возможной насыпи, сезонное поведение воды, осадки, предварительный риск разжижения, затопление, отметки и направление ливневого стока. У побережья отдельно учитывают солёную среду и коррозию.

Из этого нельзя заключить, что весь Canggu стоит на мягком грунте или что любой прибрежный участок непригоден для строительства.

Ubud и вулканические склоны

На склоне могут иметь значение выветрелые и неоднородные вулканические слои, трещины, различная водопроницаемость, поверхностный сток, временное просачивание, происхождение выемки или насыпи и будущие подпорные конструкции.

Слово вулканический само по себе не гарантирует прочного основания. Результаты исследования в другом районе Бали также нельзя переносить на участок в Ubud.

Uluwatu и Bukit

Для участка на известняке или в карстовой зоне нужно проверить глубину кровли скалы, трещины, следы растворения, возможные пустоты, устойчивость края и движение воды. Особого внимания требуют сточные воды и предполагаемые пути их просачивания.

Наличие известняка не доказывает пещеру под каждым участком. Скала также не исключает локальные деформации или сложный доступ к строительству.

Любая схема этих трёх типов местности должна сопровождаться пометкой: концептуальная схема, не в масштабе, выводов по конкретному участку не содержит .

Почему одного sondir недостаточно как аргумента

На балийском рынке словом sondir обычно называют статическое зондирование. Это один метод получения данных, а не название всей геотехнической проверки.

BSN указывает SNI 8460:2017 как действующий стандарт по требованиям к геотехническому проектированию. Публичная карточка стандарта не устанавливает универсальное число зондирований, скважин или метров для каждой виллы.

Программу определяет квалифицированный специалист. Для каждого метода нужно понимать, на какое решение повлияет результат. Один тест без привязки к плану зданий и условиям участка не отвечает на все вопросы.

Вода связывает несколько дисциплин

Грунтовые воды влияют на выемки, фундамент, бассейн, подпорные стены и водозащиту. Их нельзя смешивать с запасом воды в эксплуатационной скважине.

Ливневая вода требует топографических отметок, определения водосборов, расчёта ёмкости, безопасного пути при переполнении и подтверждённой конечной точки отвода или размещения.

Бытовые сточные воды требуют отдельной технологии, расчёта мощности, порядка получения разрешений и обслуживания. На дату проверки текущие требования включают Permen LH/BPLH 11/2025, которое заменило старое P.68/2016 с 9 сентября 2025 года.

Гидроизоляция, дренаж и обработка сточных вод решают разные задачи. Наличие одной системы ничего не доказывает о двух других.

Что получить до покупки

Объём зависит от участка и проекта, но результат для решения обычно должен содержать:

актуальную топографию, границы и предварительную проектную схему;

задание на исследование с объяснением выбранных методов;

подписанный предварительный технический вывод с исходными данными и ограничениями;

наблюдения за грунтовыми водами в объёме, достаточном для этой стадии;

схему ливневой воды с отметками, водосборами, ёмкостью, аварийным отводом и конечной точкой;

отдельную концепцию бытовых сточных вод;

последствия для планировки, земляных работ, конструкций, срока и бюджета;

список открытых вопросов и ответственных специалистов.

Если неизвестность способна изменить решение, доступ на участок, объём проверки, срок и последствия неприемлемого результата нужно согласовать с индонезийским юристом до предварительного платежа. Универсальной гарантии возврата, обязательного счёта эскроу или стандартного периода отказа не существует.

После проверки владелец может продолжить с зафиксированными предпосылками, изменить проект или цену, заказать дополнительное исследование либо остановить сделку.

DALLEAU может сформулировать вопросы владельца, координировать задания и сводить противоречия. Геотехнические, гидрогеологические, строительные, экологические и юридические заключения остаются за профильными специалистами.

Связанные материалы

Проверка участка на Бали до предварительного платежа

Зонирование участка на Бали: почему цвета на карте недостаточно

Почему одной глубины скважины недостаточно

Источники и границы

BSN: SNI 8460:2017 .

PP 16/2021 о зданиях .

Permen PU 12/PRT/M/2014 о городском дренаже .

Permen PUPR 04/PRT/M/2017 о бытовых сточных водах и Permen LH/BPLH 11/2025 .

Региональные исследования JICA по Бали и официальный разбор случая внутренней эрозии грунта в Tabanan используются только для формирования вопросов, а не как модель конкретного участка.

Материал не назначает фундамент, число или глубину испытаний, размер дренажа, септические расстояния или пригодность участка. Требуется проверка квалифицированных специалистов по конкретной площадке и проекту.

Что изучить дальше

Связанный вопрос Проверка участка на Бали до предварительного платежа Связанный вопрос Зонирование участка на Бали: почему цвета на карте недостаточно

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Гарантированный доход: кто и из чего платит | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-villa-guaranteed-return-buyback-counterparty-waterfall.html

Материалы DALLEAU
Процент в презентации ещё не показывает, откуда придут деньги
Рекламный процент является обещанием конкретного плательщика. Разбираем формулу, источник выплат, обратный выкуп, обеспечение и риск взыскания.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
16 июля 2026
Проверено | 16 июля 2026 | первичные источники
Обновлено 16 июля 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
Фраза
гарантированный доход
звучит так, будто риск уже кем-то снят. Рядом обычно стоит понятная цифра, например 8% в год, а детали занимают несколько строк мелким шрифтом.
Для владельца важна другая последовательность вопросов. Кто обязан платить? В каком документе закреплена обязанность? Как рассчитывается сумма? Из какого источника она поступает? Что происходит при задержке? Есть ли действительное обеспечение?
Гарантированная выплата не является физическим свойством виллы. Это денежное обязательство конкретной стороны. Его качество зависит от договора, финансового положения плательщика и средств защиты при нарушении.
Девять пунктов, которые должны быть раскрыты
Перед тем как учитывать обещанный процент в расчёте, составьте сводку по обязательству:
точное юридическое лицо, которое обязано платить;
подписанный документ и полномочия подписанта;
ставка и база расчёта;
период, дата начала и график выплат;
все условия и исключения;
полный список вычетов и налоговый режим;
источник денег и механизм контроля;
обеспечение, срок его действия и порядок обращения;
последствия задержки, дефолта и несостоятельности.
Название бренда, имя основателя или общий логотип группы не создают ответственность всех связанных компаний. Договор, счёт, банковский получатель и сторона, которая обещала доход, должны быть сопоставлены по юридическим наименованиям и полномочиям.
Сначала разберите формулу
Одинаковая ставка может описывать совершенно разные выплаты. Нужно установить:
рассчитывается ли процент от цены покупки или от всего вложенного капитала;
указана сумма до или после расходов;
зависит ли она от загрузки и фактической выручки;
входят ли в вычеты управление, комиссии платформ, персонал, коммунальные расходы, обслуживание, ремонт, резерв и налоги;
в какой валюте считается и перечисляется сумма;
как рассчитываются неполные периоды, задержка и курсовая разница;
когда начинается срок при задержке строительства, отсутствии SLF или неготовности оператора;
что меняется при личном использовании владельцем, ремонте, смене оператора, продаже или расторжении.
Формулировка
8% после вычетов
мало помогает без полной базы и перечня вычетов. Также нельзя складывать одну сумму дважды: как чистый доход виллы и как дополнительную гарантированную выплату, если договор не создаёт два действительно отдельных денежных потока.
Юридическая и налоговая квалификация выплаты зависит от структуры. Её нельзя автоматически называть арендой, процентом, дивидендом или доходом от инвестиционного продукта.
У виллы и плательщика разные денежные потоки
Экономика объекта зависит от допустимого использования, даты открытия, спроса, цены, загрузки и полного набора расходов. Способность плательщика выполнить обещание зависит от его договора, источника средств, других обязательств и платёжеспособности.
Эти два анализа ведут отдельно. Успешная вилла не гарантирует, что выручка поступает именно на счёт должника и может использоваться для выплат владельцу. Слабая загрузка также не всегда отменяет фиксированную обязанность, если договор прямо требует доплаты из другого источника.
Для финансовой модели полезны три уровня:
результат самой виллы без договорной поддержки;
выплата плательщика при выполнении всех условий;
стрессовый сценарий при задержке, прекращении выплат или споре.
Так видно, какую часть результата создаёт объект и какую часть должен финансировать контрагент.
Проверьте источник выплат
Деньги могут поступать из операционной выручки, заранее сформированного резерва, взноса спонсора, поддержки связанной компании, кредита или дальнейших продаж. Каждый источник имеет свой риск.
Если заявлен резерв, нужны данные о владельце счёта, сумме, допустимом использовании, подписантах, правилах списания, пополнении и доступе кредиторов. Название
резервный счёт
или
проектный счёт
не доказывает юридическое обособление денег.
Если выплаты зависят от операционной выручки, следует видеть отчётность оператора, порядок поступления платежей гостей, списание расходов и правило покрытия дефицита. Поддержка материнской или аффилированной компании должна быть оформлена отдельным обязательством с проверенными полномочиями.
История своевременных выплат полезна, но она описывает прошлые периоды. Она не подтверждает, что источник останется устойчивым до конца срока.
Обратный выкуп: отдельная будущая сделка
Под словом
buyback
в презентациях обычно понимают обязательство или право на обратный выкуп. Для владельца важно определить механизм целиком:
кто именно обязан купить;
имеет ли инвестор право потребовать покупку или только обратиться с запросом;
что передаётся: остаток аренды, допустимое право, права и обязанности по договору, доли компании или другой актив;
в какой период владелец может потребовать выкуп и как направляется уведомление;
как определяется цена, валюта, налог и расходы;
какие согласия и документы потребуются;
какое состояние объекта и оставшийся срок допустимы;
откуда покупатель получит деньги;
когда сделка должна завершиться;
какое средство защиты действует при отказе или просрочке.
Обещание помочь с перепродажей, найти нового покупателя или содействовать выходу не создаёт обязанности выкупить актив. Прогноз роста цены также не заменяет договорную формулу и подтверждение финансирования.
Проверку нужно повторить перед окном исполнения. К этому моменту могут измениться сторона, полномочия, состояние объекта, срок права, согласия и финансовое положение покупателя.
Обязательство и обеспечение нельзя объединять в одно слово
Корпоративное обещание без обеспечения даёт требование к компании. Личная гарантия, гарантия акционера или материнской компании создаёт другой круг обязанностей. Банковская гарантия, зарегистрированное обеспечение допустимого земельного права и зарегистрированное фидуциарное обеспечение также работают по разным правилам.
Для любого инструмента проверяют:
кто его выдал и имел ли полномочие;
какое обязательство он покрывает;
кто является бенефициаром;
сумму, валюту, срок и условия уменьшения;
подлинность и необходимую регистрацию;
актив, его собственника, стоимость и существующие обременения;
очерёдность требования и условия обращения взыскания;
применимое право и процедуру взыскания.
Фраза
обеспечено землёй
не показывает, кому принадлежит участок и создано ли зарегистрированное обеспечение допустимого права. Заявление о первоочередном требовании нуждается в официальном подтверждении. Логотип банка на PDF не подтверждает банковскую гарантию без проверки у эмитента.
Универсальной очереди возврата денег нет
При нарушении обязательства результат зависит от должника, принадлежащих ему активов, действительности обеспечения, его регистрации и очерёдности, обязательных приоритетов, расходов на процедуру, зачёта и текущего состояния договора.
Закон Индонезии о банкротстве признаёт определённые права обеспеченных кредиторов с установленными ограничениями. Из этого нельзя сделать общий вывод, что покупатели вилл всегда находятся в начале или конце очереди. Даже действительное обеспечение не означает полного возврата.
Отрицательный поиск в корпоративной или судебной базе тоже имеет границы. Отсутствие найденного дела не доказывает отсутствие спора, залога или финансовых трудностей. Поиск проводят по всем юридическим именам и идентификаторам, фиксируют дату и сверяют результат с индонезийским юристом.
Для оценки возможного взыскания требуется датированное заключение специалиста по индонезийской несостоятельности, основанное на актуальных данных о сторонах, активах и документах.
Какие доказательства запросить
До подписания и каждого существенного платежа полезно получить:
подписанный договор о выплате со всеми приложениями;
корпоративные документы плательщика и полномочия подписанта;
точную формулу и пример расчёта;
банковские и финансовые данные по заявленному источнику;
документы на резерв или механизм контроля счёта;
отчётность оператора, если источник связан с эксплуатацией;
оригиналы инструментов обеспечения и подтверждение эмитента;
документы о регистрации, активе, стоимости и очерёдности обеспечения;
полный договор обратного выкупа и порядок передачи;
доказательства финансирования будущего выкупа;
актуальные проверки споров, обременений и финансовых затруднений.
Статус каждого пункта следует записывать точно: заявлено, документ получен, проверен для конкретного вопроса, обнаружено противоречие, устарело или остаётся неизвестным. Слово
проверено
без обозначения вопроса и границ проверки создаёт ложное ощущение завершённости.
Как отражать обещание в финансовой модели
Базовый сценарий сначала строят на экономике самой виллы. Договорную выплату добавляют отдельной строкой после проверки формулы и документов. В стрессовом сценарии учитывают задержку, возможное прекращение выплаты, валюту, налог, затраты и время взыскания, а также доступность обеспечения.
Обратный выкуп моделируют как будущую сделку с отдельной ценой, датой, расходами и риском финансирования. Его нельзя автоматически включать в стоимость виллы или считать гарантированной ликвидностью.
Универсальный процент вероятности исполнения или возврата здесь неприменим. Такие допущения должны опираться на конкретного плательщика, срок, обеспечение и профессиональный анализ.
Связанные материалы
Кто отвечает по договору строящегося проекта
Досье перед следующим платежом
Как устроена долгосрочная аренда на Бали
Проверка до первого депозита
Конфиденциальный проектный бриф
Источники и границы
https://jdih.pkp.go.id/produk-hukum/permen-18-2025
https://jdih.pkp.go.id/produk-hukum/se-5-2026-1
https://peraturan.go.id/files/uu40-2007.pdf
https://peraturan.go.id/id/pp-no-16-tahun-2021
Фактическая база проверена 22 июля 2026 года. Основные официальные источники: Закон 40/2007 о компаниях; сервисы AHU для корпоративного профиля и данных о бенефициарах; Закон 8/1999 о защите потребителей в пределах его фактической применимости; Закон 37/2004 о банкротстве и PKPU; Закон 4/1996 о Hak Tanggungan; Закон 42/1999 о фидуциарном обеспечении и AHU Fiduciary Online; предупреждение Satgas PASTI/OJK от 23 февраля 2026 года; Закон 24/2009 и Президентское положение 63/2019 о требованиях к языку договоров; PP 12/2021 только при подтверждённой применимости соответствующего жилищного режима.
Предупреждение OJK поддерживает общую рекомендацию проверять законность и логическую правдоподобность предложения. Оно не квалифицирует автоматически каждую схему дохода от недвижимости как регулируемый финансовый продукт или незаконное предложение.
Материал объясняет основные риски. Он не квалифицирует сделку как заём, ценную бумагу или иной финансовый продукт, не определяет налоговый режим и не прогнозирует результат взыскания. Реальную структуру должны проверить уполномоченные индонезийские специалисты.
Исправления и новые официальные источники:
notes@dalleau.ai
.
Цена, состав работ и следующее обязательство
Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Что изучить дальше
Связанный вопрос
Проверка участка на Бали до предварительного платежа
Связанный вопрос
Один бренд может скрывать несколько разных сторон
Смоделировать решение в Stay Matrix
Открыть инструмент (EN) >
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Следующий платёж начинается с проверки, а не с даты
Один бренд может скрывать несколько разных сторон
Связанные материалы
Один бренд может скрывать несколько разных сторон
Leasehold на Бали: какие права действительно получает владелец

## Почему одной глубины скважины недостаточно | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-villa-well-depth-water-quality-filtration.html

Материалы DALLEAU

Почему одной глубины скважины недостаточно

Опасение владельца понятно. В плотно застроенном районе с септиками неглубокая и плохо защищённая скважина может быть уязвима для загрязнения с поверхности.

DALLEAU | Исследования и практические материалы Опубликовано

20 июля 2026

Последняя проверка

21 июля 2026

Проверено | 21 июля 2026 | первичные источники

Обновлено 21 июля 2026 года Следующая плановая проверка: 20 октября 2026 года

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Опасение владельца понятно. В плотно застроенном районе с септиками неглубокая и плохо защищённая скважина может быть уязвима для загрязнения с поверхности. Более глубокий водоносный интервал, изолированный подходящими слоями и правильно построенной скважиной, иногда даёт лучшую защиту.

Из этого нельзя сделать правило, что вода на глубине 60 метров всегда лучше воды на глубине 20 метров. Цифра не показывает, из какого слоя поступает вода, где установлена фильтровая часть, как загерметизирован ствол и в каком направлении движутся подземные воды.

Что может происходить в плотной застройке

Неисправный или неправильно устроенный септик может стать источником попадания микроорганизмов и соединений азота в грунт и воду. Риск зависит от конструкции системы, расстояния до скважины, грунта, трещин, осадков, рельефа и направления подземного потока.

В вулканических породах вода может двигаться по трещинам и обходить слой, который на простой схеме выглядит защитным. В прибрежной зоне глубокая откачка способна усиливать поступление солёной воды. Поэтому глубина оценивается вместе с геологией и режимом эксплуатации.

Что на самом деле означает 20 или 60 метров

Общая глубина бурения не равна глубине забора воды. Скважина может принимать воду из нескольких интервалов. Старый или повреждённый ствол способен соединять слои, которые в естественном состоянии были разделены.

Для анализа нужны как минимум:

журнал бурения;

описание грунтов и пород;

глубина и диаметр обсадной трубы;

положение фильтрового интервала;

санитарное уплотнение верхней части;

уровень воды до и во время откачки;

дебит и восстановление уровня;

координаты соседних скважин, септиков и возможных источников загрязнения.

Без этих данных сравнение двух чисел остаётся предположением.

Количество воды и её качество проверяют отдельно

Пробная откачка показывает, может ли скважина поддерживать нужный расход и как меняется уровень воды. Лабораторный анализ отвечает на другой вопрос: что содержится в воде.

Хороший дебит не означает хорошее качество. Чистый на вид образец тоже ничего не говорит о бактериях, нитратах, растворённых солях и металлах.

Где брать пробы

Для виллы полезны три группы образцов:

сырая вода прямо из скважины;

вода после системы очистки;

вода из нескольких обычных кранов после резервуаров и внутренней разводки.

Так можно разделить проблему источника, работу оборудования и возможное загрязнение в накопительном баке или трубах.

Результат действует на дату отбора и для указанной точки. После сильных дождей, ремонта, изменения режима откачки или длительного простоя анализ повторяют.

Систему очистки подбирают по анализу

Семь ступеней фильтрации могут быть полезны, если каждая решает измеренную проблему. Само число ступеней не подтверждает результат.

Осадочный фильтр, активированный уголь, умягчение, мембрана, ультрафиолет и озон выполняют разные задачи. Некоторые решения меняют вкус и запах, другие снижают минерализацию или микробиологический риск. Неправильно подобранная система расходует воду и электричество, требует обслуживания и может давать владельцу ложное чувство безопасности.

В проекте фиксируют исходный анализ, расчёт оборудования, настройки, график замены материалов, порядок промывки и результаты повторных проб.

Вода влияет на дом

Жёсткость, железо, марганец, солёность и осадок могут оставлять налёт, портить сантехнику, нагреватели, насосы и бытовую технику. Этот риск оценивают по параметрам воды и истории оборудования.

Запах, цвет и раздражение кожи важны для комфорта, но по ним нельзя определить источник проблемы. Пригодность воды для питья оценивают отдельно по всем применимым показателям и предполагаемому использованию.

Что проверить до покупки или бурения

Соберите сведения о соседних септиках, скважинах, дренажах и береговой линии.

Проверьте, сможет ли предполагаемый пользователь получить необходимые разрешения.

Попросите буровую компанию описать конструкцию скважины и отдельно указать цену за метр.

Запланируйте пробную откачку и анализ сырой воды.

Подберите очистку после получения результатов.

Проверьте воду после очистки и в кранах.

Заложите обслуживание и резервный источник в эксплуатационный бюджет.

Практический вывод

Более глубокий защищённый источник может оказаться лучше неглубокого. Для конкретного участка это подтверждают геология, конструкция скважины и анализы. Глубина служит исходным параметром, но не сертификатом качества.

Проверьте источник, очистку и воду в кране как одну систему.

Связанные материалы

Вода в кране ещё не подтверждает право использовать скважину

Грунт, вода и дренаж до покупки участка на Бали

Общий бассейн: что именно получает владелец виллы

Источники и границы

https://cdn.who.int/media/docs/default-source/wash-documents/water-safety-and-quality/dwq-guidelines-4/gdwq4-with-add1-chap4.pdf

https://www.epa.gov/septic/septic-systems-and-drinking-water

https://www.cdc.gov/drinking-water/safety/guidelines-for-testing-well-water.html

https://jdih.baliprov.go.id/uploads/produk-hukum/peraturan/2024/pergub/2024pg0051025.pdf

Визуальные материалы

Технический обзор Три инвестиционных контекста, три программы изысканий Концептуальные профили · не в масштабе · без выводов по конкретному участку

Контекст 01 · низменность и побережье

Денпасар · Семиньяк · Чангу

Молодые вулканические и аллювиальные отложения; прибрежные условия зависят от конкретного участка.

Уровень грунтовых вод и дренаж

Предварительная оценка осадки и разжижения грунта

Солёность и коррозия вблизи побережья

Контекст 02 · вулканический рельеф

Убуд и его склоны

Выветрелые вулканические породы, переменная водопроницаемость, крутые склоны и муссонный сток.

Устойчивость склонов

Выемка, насыпь и подпорные конструкции

Возможные верховодка или фильтрация воды

Контекст 03 · известняк и карст

Улувату · Букит

Региональный контекст кораллового известняка и карста; порода может быть трещиноватой, неоднородной или местами содержать пустоты.

Переменная глубина кровли скальных пород

Пустоты нужно исследовать, а не предполагать

Устойчивость обрыва, дренаж и сточные воды

Региональные данные помогают сформулировать вопросы. Модель грунтов конкретного участка устанавливают только его история, осмотр, съёмка, инженерные изыскания, испытания, наблюдения за грунтовыми водами и профессиональная интерпретация.

Последовательность решений до покупки Снизить неопределённость до невозвратного платежа

01 · Документы и карты Предыдущее использование, насыпной грунт, уклон, дренаж, соседние участки и актуальные региональные данные.

02 · Осмотр участка Высотные отметки, видимые пути движения воды, доступ, подпорные конструкции и влияние побережья.

03 · Целевые изыскания Скважины, SPT или CPT, отбор керна, лабораторные исследования, геофизика и наблюдения за грунтовыми водами в объёме, соответствующем риску.

04 · Последствия для проекта Учесть подтверждённые данные при выборе фундаментов, земляных работ, дренажа, графика, бюджета и условий сделки.

Решение владельца

продолжить, письменно зафиксировав допущения установить условия или пересмотреть договорённости провести дополнительные изыскания приостановить сделку или отказаться

Объём проверки до покупки зависит от рисков, задуманного проекта и доступа, предоставленного продавцом. Право на проведение изысканий и условия сделки следует оформить вместе с подходящим юридическим или нотариальным консультантом.

Глубина · конструкция скважины · движение грунтовых вод · подтверждения Более глубокий интервал может быть лучше защищён, если он правильно изолирован

Поверхность и санитарные источники Поверхностный сток и локальные сточные воды являются возможными путями загрязнения, но не подтверждают проблему на каждом участке.

Неглубокие грунтовые воды Безнапорный водоносный слой обычно уязвимее там, где санитарные системы расположены плотно или имеют утечки.

Защищённый интервал Более глубокий горизонт может быть меньше подвержен свежему загрязнению с поверхности только при наличии действительно изолирующих слоёв.

Скважина и подтверждения Решение определяют фильтр, обсадная колонна, герметизация затрубного пространства, направление потока, откачка и лабораторные результаты от исходной воды до крана.

Концептуальный разрез не в масштабе. Он показывает один из возможных сценариев для застроенной низменной или прибрежной зоны в районе Денпасара, Семиньяка и Чангу, а не конкретный участок. Состав и глубину слоёв, направление движения и уровень грунтовых вод, солёность и положение фильтрового интервала устанавливают по документам, результатам изысканий, журналу бурения и профессиональной интерпретации.

От водоносного слоя до крана Четыре звена, одна управляемая система

01 Источник

Водоносный слой, местные риски, солёность и устойчивый дебит

02 Скважина

Глубина, фильтр, обсадная колонна, санитарная герметизация и защищённое устье

03 Водоподготовка

Компоненты выбирают по фактически выявленным загрязнителям

04 Распределение и контроль

Резервуары, трубы, обслуживание и анализы в репрезентативных точках потребления

Работу системы проверяют по исходной воде, после водоподготовки и в репрезентативных точках потребления.

Что изучить дальше

Связанный вопрос Вода в кране ещё не подтверждает право использовать скважину Связанный вопрос Грунт, вода и дренаж до покупки участка на Бали

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

Метод в интересах владельца

Сначала подтверждения, потом оборудование

Объедините в одном досье данные об источнике, конструкции скважины, анализе исходной воды, основании для выбора водоподготовки, результатах пусконаладки и плане обслуживания.

Читать дальше

Вода в кране ещё не подтверждает право использовать скважину Harmonie: разбор проекта с обозначенными границами Проверка участка на Бали до предварительного платежа

Ключевое различие

Прозрачная вода без запаха всё равно может не соответствовать микробиологическим или химическим показателям. Количество ступеней фильтрации не является стандартом качества.

## Скважина на Бали: разрешения для владельца виллы | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-villa-well-groundwater-permit.html

Материалы DALLEAU
Вода в кране ещё не подтверждает право использовать скважину
При покупке готовой виллы продавец может показать работающий насос, старую квитанцию или налоговый платёж.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
16 июля 2026
Проверено | 16 июля 2026 | первичные источники
Обновлено 16 июля 2026 года
Следующая плановая проверка: 15 октября 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
При покупке готовой виллы продавец может показать работающий насос, старую квитанцию или налоговый платёж. Эти документы полезны, но каждый отвечает на свой вопрос. Для подземных вод нужно установить, кто пользуется скважиной, для какой деятельности, в каком объёме и на основании какого действующего документа.
Особенно внимательно проверяют объекты, где собственник земли, компания-оператор и фактический пользователь не совпадают.
Сначала определяют пользователя и деятельность
Permen ESDM 4/2026 различает использование подземных вод для бизнеса и определённые случаи использования не для бизнеса. Коммерческая вилла не становится обычным домохозяйством только потому, что вода идёт в душ, кухню или бассейн.
Упоминание объёма менее
100 м³ в месяц
относится только к определённым случаям, связанным с основными повседневными нуждами домохозяйства или группы. Это не общее освобождение для любого коммерческого объекта.
Подходящий порядок оформления определяют по фактическому пользователю, деятельности, координатам, цели и ожидаемому объёму.
Что должен связывать документ
Для каждой скважины полезно собрать отдельную карточку:
точные координаты;
земельный участок и основание доступа;
фактический пользователь;
вид деятельности;
цель водозабора;
разрешённый объём;
срок действия;
требования к счётчику, отчётности и платежам;
обязанности при изменении или закрытии источника.
Если документ относится к другому пользователю, месту или назначению, его нельзя считать подтверждением текущей эксплуатации.
Старые скважины требуют новой проверки
OSS объявляла период упорядочения существующих скважин, который завершился 31 марта 2026 года. После этой даты его нельзя описывать как действующую амнистию.
Для старого или плохо документированного источника текущий статус проверяют индивидуально. Это лучше сделать до депозита за объект и до продолжения коммерческой эксплуатации.
Какие документы не заменяют разрешение на воду
Следующие документы сами по себе не подтверждают право на водозабор:
договор на землю;
PBG или SLF здания;
NIB компании;
лицензия управляющей компании;
квитанция налога на воду;
счёт за электричество насоса;
старый анализ качества.
Они остаются частью комплекта документов. Для права на водозабор нужен документ, применимый к самой скважине и её фактическому пользователю.
Разрешение, дебит и качество воды
Это три разных результата.
Разрешение определяет правовой режим использования. Пробная откачка показывает доступное количество воды. Лабораторные анализы оценивают качество в выбранных точках.
Наличие разрешения не подтверждает устойчивый дебит и не делает воду безопасной для питья. Хороший лабораторный результат также не заменяет право на водозабор.
Что происходит при продаже или смене оператора
При смене владельца земли право на использование подземных вод не всегда переходит автоматически. Новый оператор, новая деятельность, другой объём, насос или схема снабжения могут потребовать обновления документов.
В договоре покупки стоит указать:
какие документы передаются;
кто отвечает за обновление;
что произойдёт при отказе или задержке;
какой альтернативный источник воды доступен;
кто несёт расходы на приведение системы в соответствие.
Эксплуатация после оформления
Разрешение не должно лежать в папке до следующей продажи. Назначьте ответственного за счётчик, журнал водозабора, отчётность, платежи, обслуживание и сроки продления.
Фактический расход сравнивают с разрешённым объёмом и проектной потребностью. При росте числа вилл, бассейнов или загрузки расчёт обновляют заранее.
Практический вывод
Для каждой скважины нужен отдельный комплект актуальных документов. В нём должны быть связаны пользователь, деятельность, место, объём, разрешение и текущие обязанности. Дебит и качество воды подтверждаются отдельными испытаниями.
Включите скважину в комплексную проверку до покупки готовой виллы.
Связанные материалы
Почему одной глубины скважины недостаточно
Проверка участка на Бали до предварительного платежа
Что подтверждает NIB и какие документы всё равно нужны
Источники и границы
https://jdih.esdm.go.id/dokumen/download?id=2026pmesdm4.pdf
https://jdih.esdm.go.id/dokumen/view?id=2665
Что изучить дальше
Связанный вопрос
Почему одной глубины скважины недостаточно
Связанный вопрос
Проверка участка на Бали до предварительного платежа
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Сайт
Я хочу получать Field Notes и ознакомился с
информацией о конфиденциальности (EN)
.
Подписаться
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Проверка участка на Бали до предварительного платежа
Что подтверждает NIB и какие документы всё равно нужны
Связанные материалы
Что подтверждает NIB и какие документы всё равно нужны

## Виза в Индонезию: выбор по реальной деятельности | DALLEAU

URL: https://dalleau.ai/ru/notes/bali-visa-guide.html

Главная / Материалы / Визы и основания для пребывания

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Материалы DALLEAU Источники проверены 13 июля 2026

Как выбрать основание для пребывания в Индонезии по реальной деятельности

Как отдельно проверить въезд, работу, PT PMA, недвижимость и налоги для жизни или проекта на Бали.

DALLEAU | Исследования и практические материалы Опубликовано

13 июля 2026

Последняя проверка

13 июля 2026

Проверено | 13 июля 2026 | первичные источники

Границы материала Независимая информация, не продажа услуг Проверьте применимость правил к вашей ситуации у компетентного органа или уполномоченного специалиста.

С чего начать Фраза «я буду следить за своей виллой» звучит просто, но может описывать совершенно разные действия. Владелец может раз в несколько месяцев осматривать объект, обсуждать смету с подрядчиком, ежедневно ставить задачи персоналу, принимать оплату от гостей или руководить индонезийской компанией. Для иммиграционной и трудовой проверки эти действия нельзя считать одинаковыми.

Принцип Выбирать по реальной деятельности

Источники Официальные и первичные

Проверка Перед подачей или платежом

На этой странице Подбор визовой категории по вашей ситуации Пять проверок, которые нельзя заменить одной визой С какой категории начать проверку Короткие визиты Инвестор и фактическая работа Удалённая работа Проживание по E33 Second Home Основание проверяется отдельно для каждого члена семьи Что получить до оплаты консультанту Связанные материалы Источники и границы

Вопросы, которые учитывают вашу ситуацию Какой визовый статус подходит для вашей ситуации?

Подборщик показывает только те вопросы, которые относятся к вашей ситуации. В результате вы получите конкретную официальную категорию, её условия и ограничения, следующие шаги и отдельный план для сопровождающих членов семьи. Ответы не отправляются на сервер.

Какова основная цель вашей поездки? Отдых или поездка к семье Без профессиональной деятельности Продолжительный личный визит или изучение вариантов Личное пребывание, поиск жилья или осмотр объектов Встречи или переговоры Деловая поездка без работы в Индонезии Удалённая работа Для деятельности, ведущейся за пределами Индонезии Инвестиции или управление своей компанией Акционер, директор или комиссар Работа на индонезийскую компанию или клиентов Трудовые отношения, местные клиенты или оказание услуг

Как долго вы планируете находиться в Индонезии? До 30 дней Одна короткая поездка От 31 до 60 дней Более продолжительное личное пребывание От 61 до 180 дней С продлением, если оно допускается От 1 до 2 лет Нужно законное основание для проживания До 5 лет План долгосрочного проживания

Кто едет вместе с вами? Я еду один или одна Нужно определить статус одного заявителя Со мной едут члены семьи или родственники Статус каждого человека нужно проверить отдельно

Кем вам приходятся сопровождающие вас люди? Супруг или супруга в зарегистрированном браке Брак подтверждён официальными документами Ребёнок или дети Важны возраст детей и статус родителя Супруг или супруга и дети Для каждого члена семьи нужен отдельный статус Партнёр без зарегистрированного брака Нельзя заранее считать, что доступен статус члена семьи Другой родственник Родитель, совершеннолетний ребёнок или другой родственник

Сколько лет детям, которые едут с вами? Всем детям меньше 18 лет Точный возраст и документы о рождении нужно проверить Хотя бы одному ребёнку уже исполнилось 18 лет Может потребоваться самостоятельный визовый статус

Какое семейное основание может дать вам право на долгосрочное проживание? Я состою в браке с гражданином или гражданкой Индонезии Проверьте категорию E31A У моего супруга или супруги есть временный или постоянный вид на жительство (ITAS/ITAP) Проверьте категорию E31B У моего родителя есть временный или постоянный вид на жительство (ITAS/ITAP) Проверьте категорию E31E У моего ребёнка есть временный или постоянный вид на жительство (ITAS/ITAP) Проверьте категорию E31H У основного заявителя есть Golden Visa или статус Second Home Проверьте процедуру Family Dependant Ни одно из этих оснований Проверьте условия Second Home или пенсионных категорий

Сколько лет основному заявителю? Меньше 55 лет Пенсионные категории не рассматриваются 55 лет или больше Можно проверить категории E33E и E33F

Какое финансовое условие вы можете подтвердить документами? 130 000 USD в государственном банке Индонезии Гарантию по E33 нужно поддерживать в течение срока действия статуса Покупка апартамента в Индонезии стоимостью не менее 1 000 000 USD Гарантия для E33 Second Home, а не недвижимость за пределами Индонезии 50 000 USD в банке и доход 3 000 USD в месяц Категория E33E для заявителей от 55 лет Доход 3 000 USD в месяц и гарант Проверьте годовую категорию E33F Ни одно из этих оснований Показать ближайший вариант, который можно проверить

Что именно входит в условие о недвижимости стоимостью 1 000 000 USD?

На официальной странице E33 указаны rumah susun или апартаменты, расположенные в Индонезии. Недвижимость за пределами страны не подходит, а возможность использовать отдельную виллу не подтверждена. Сначала заявитель принимает обязательство купить объект, затем в течение 90 дней после въезда сообщает выдавшему ITAS иммиграционному управлению о регистрации права собственности. На публичной странице не уточняются допустимый вид права, способ подтверждения стоимости и порядок учёта уже принадлежащего заявителю апартамента. Проверьте эти вопросы до оплаты или подписания договора.

Официальная страница E33 Государственный источник проверен 14 июля 2026 года

Кто оплачивает работу, которую вы выполняете во время пребывания в Индонезии? Никто Нет оплачиваемой работы или услуг Иностранный работодатель Трудовой договор с компанией за пределами Индонезии Иностранные клиенты или платформы Доход от фриланса, консультаций или создания контента Моя собственная иностранная компания Без однозначного трудового договора Физическое или юридическое лицо в Индонезии Зарплата, гонорар или иное вознаграждение

Какие задачи вы будете выполнять каждую неделю? Работать только на иностранную компанию или проект Без индонезийских клиентов и местной операционной деятельности Встречи, визиты и переговоры Подготовка проекта без оказания услуг на месте Решения в качестве директора или комиссара Полномочия оформлены документально Контролировать компанию, в которую я инвестировал Производство товаров или оказание услуг Лично выполнять работу или оказывать услуги Фотосъёмка, обучение, продажи, строительство или операционная работа Ежедневно управлять местной деятельностью Сотрудники, клиенты, поставщики или гости

Какая категория точнее всего описывает вашу реальную должность? Руководство или специализированная экспертиза Название должности и фактические обязанности должны совпадать Фото, видео или креативное производство Нельзя заранее считать, что такая практическая работа разрешена иностранцу Гостеприимство или операционное управление Разделяйте руководство, экспертизу и практическую работу Строительство или техническая специальность Имеют значение должность, квалификация и отрасль Продажи, администрирование или работа с персоналом Некоторые должности доступны только гражданам Индонезии или запрещены иностранным работникам Другая функция Нужно документально проверить конкретную должность

Есть ли у вас доля в компании, которая выступает гарантом? Нет или вопрос не применим Нет индонезийской компании-гаранта Не менее 10 млрд IDR Доля в компании-гаранте подтверждена документами Менее 10 млрд IDR Независимо от наличия должности в компании Пока не знаю Структуру владения или стоимость доли нужно проверить

Показать категорию для проверки Начать заново

До выбора визового кода полезно составить одно точное предложение о деятельности каждого взрослого:

Кто платит этому человеку, для какой организации он действует, что именно делает, где выполняет эти задачи и как долго находится в Индонезии?

Ответ часто показывает, что у одной семьи будет несколько разных оснований для пребывания и работы.

Пять проверок, которые нельзя заменить одной визой

Въезд и пребывание. Иммиграционная категория определяет допустимую цель приезда и срок нахождения в стране. Она не подтверждает автоматически трудовые, корпоративные или имущественные права.

Работа у индонезийского работодателя. Здесь проверяются работодатель, должность, место работы и применимость RPTKA, то есть плана использования иностранного работника. Возможное исключение нужно подтверждать по конкретной роли и норме.

Компания и лицензии. У PT PMA должны соответствовать фактической деятельности её KBLI, место проекта и действующие документы OSS. Доля в компании не устраняет эти требования.

Участок и объект. Отдельно проверяются право или договор, зонирование, разрешительная история здания и возможность предполагаемой эксплуатации. Иммиграционный статус участника компании ничего из этого не подтверждает.

Налоги. Продолжительность пребывания, источник дохода, договоры и структура работы рассматриваются отдельно. По одному визовому коду нельзя определить налоговое резидентство или право на освобождение от налога.

С какой категории начать проверку

Фактическая ситуация

Разумная первая проверка

Что остаётся отдельным

Короткий туристический визит

B1, если паспорт входит в действующий список

Работа, управление компанией, налоговый статус

Переговоры или инспекция проекта

Текущая деловая категория C2; для повторных поездок может иметь значение D2

Работа у местной организации и ежедневное управление

Работа у индонезийского работодателя

Действующая рабочая категория и RPTKA работодателя

Лицензии компании, должность, место и налоги

Директор или комиссар собственной PT PMA

E28A как одна из возможных отправных точек при выполнении условий доли и роли

Фактические задачи, RPTKA, KBLI, объект и лицензии

Работа по трудовому договору с компанией за пределами Индонезии

E33G при выполнении опубликованных условий

Индонезийские клиенты, местная деятельность и налоги

Проживание без работы

E33 Second Home при выполнении требований к гарантии

Семья, работа, недвижимость и налоговый анализ

Таблица не может определить подходящую категорию для конкретного человека. Официальные страницы, сборы, сроки и перечни документов меняются, а точный выбор зависит от фактической роли.

Короткие визиты

Для подходящего паспорта B1 сейчас предусматривает 30 дней пребывания и одно продление, после которого общий срок может достигать 60 дней. Отдельные 90 дней относятся к сроку, в течение которого выданную визу нужно использовать для въезда.

Официальные материалы по C1 содержат расхождение: кодовая страница перечисляет более широкий круг действий, чем связанный FAQ. Если основная цель поездки связана с деловой деятельностью, безопаснее начать с проверки C2 в действующей системе. D2 относится к повторным деловым поездкам, но длительный срок действия многократной визы не означает непрерывное проживание на весь этот период.

Инвестор и фактическая работа

На дату проверки страница E28A связывает категорию с инвестиционной деятельностью, ролью директора или комиссара и надзором в компании, в которую заявитель инвестировал. Опубликованный порог относится к документированной доле конкретного заявителя на сумму не менее 10 млрд IDR. Бюджет проекта, деньги компании или заём участника не заменяют долю.

Даже при выполнении этого условия нужно отдельно описать рабочий день человека. Руководство другой компанией, прямые продажи, повседневные задачи вне заявленной должности или работа в ином месте могут требовать другой оценки. E28A сама по себе не доказывает освобождение от RPTKA.

Удалённая работа

E33G описывает трудовые отношения с компанией, созданной за пределами Индонезии. На дату проверки опубликованы трудовой договор, годовой доход не менее 60 000 USD и личная банковская выписка с суммой не менее 2 000 USD.

Фрилансер с несколькими клиентами, владелец собственной компании без трудового договора и автор, получающий доход с платформ, не соответствуют этому описанию автоматически. Индонезийские клиенты и местная оплата требуют отдельной проверки.

Проживание по E33 Second Home

E33 оценивается по гарантии и семейной структуре, а не только по максимальному сроку. Текущая страница указывает средства не менее 130 000 USD на собственном счёте заявителя в индонезийском государственном банке либо покупку квартиры rumah susun стоимостью не менее 1 000 000 USD. Отдельно проверяются порядок подтверждения гарантии, основание для каждого родственника и возможная деятельность взрослых.

Основание проверяется отдельно для каждого члена семьи

В семейной таблице нужны паспорт, цель пребывания, длительность, предполагаемые действия и связь с основным заявителем. Нельзя считать, что супруг и дети автоматически входят в одну заявку. Для каждого человека следует получить текущий код и перечень документов непосредственно в системе подачи.

Если один супруг работает на иностранную компанию, а второй управляет индонезийским бизнесом, их основания, скорее всего, будут разными. Общий адрес проживания этого не меняет.

Что получить до оплаты консультанту

точный код в действующей заявке;

письменное описание разрешённых действий;

срок, в течение которого визой нужно воспользоваться, отдельно от срока пребывания;

официальный счёт и государственный сбор;

перечень документов и роль гаранта для выбранной категории;

отдельный ответ по RPTKA, если присутствует работа у индонезийской организации;

отдельную строку для каждого родственника;

список вопросов, которые визовая услуга не решает: налоги, компания, участок, здание и эксплуатация.

Если вопрос связан со строительством, PT PMA или управлением резиденцией, сначала следует описать реальную модель проекта. Это не заявка на визу. Такой бриф нужен, чтобы выбранная визовая схема не противоречила реальным действиям владельца.

Связанные материалы

E28A: доля заявителя, роль в компании и фактическая работа

E33G для удалённой работы: сначала проверьте трудовые отношения

Работа в Индонезии: что проверяется до рабочей визы

Источники и границы

Основные источники: действующие страницы B1, C1, C2, D2, E28A, E33, E33G и визовый каталог Иммиграционной службы Индонезии ; PP 34/2021 ; Permenaker 8/2021 . Дата доказательной базы: 22 июля 2026 года.

Это общий ориентир, а не индивидуальная иммиграционная, трудовая, налоговая или корпоративная консультация. Все изменяемые данные и подходящую категорию для каждого человека нужно проверить перед подачей.

Официальные источники 13 июля 2026

Ссылки на государственные источники проверены на указанную дату. Если официальные страницы расходятся, материал показывает расхождение и использует более осторожное толкование.

Перейти к источникам

Что изучить дальше

Связанный вопрос E28A: доля заявителя, роль в компании и фактическая работа Связанный вопрос E33G для удалённой работы: сначала проверьте трудовые отношения

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Harmonie: разбор проекта с обозначенными границами | DALLEAU

URL: https://dalleau.ai/ru/notes/building-harmonie.html

Ко всем материалам Материалы DALLEAU 4 февраля 2026 Harmonie: разбор проекта с обозначенными границами

Фотографии готового объекта показывают результат, но не объясняют, с какого момента команда участвовала в проекте, какие решения принимала и как проверяла их…

1 100 м² участок в Семиньяке по долгосрочной аренде, в местных единицах площади это 11 аров

3 двухэтажные виллы в составе одной резиденции

от 300 до 320 м² полезная внутренняя площадь каждой виллы по рабочим планам

15 месяцев основной период строительства, затем меблировка и подготовка к открытию

Лето 2024 года первые заезды гостей

Сдано и эксплуатируется документированная непрерывность от строительства и приёмки до текущей эксплуатации

DALLEAU | Исследования и практические материалы Опубликовано

4 февраля 2026

Последняя проверка

20 июля 2026

Проверено | 20 июля 2026 | первичные источники

Короткий ответ Harmonie сдана и эксплуатируется. Публичный материал ограничен документированной цепочкой решений от строительства и приёмки до текущей эксплуатации, включая выявленные дефекты и исправления. Измеренные или коммерческие показатели не публикуются.

Поэтому разбор Harmonie строится не вокруг эффектных кадров или одной цифры, а вокруг подтверждаемой цепочки решений. Мы отдельно показываем факты конкретного проекта, уроки рабочего процесса и общие проектные принципы.

Такое разделение не позволяет выдать опыт одного объекта за обещание результата для другого.

Три уровня выводов

Факт проекта

Такое утверждение относится только к Harmonie. Для него нужны исходный документ, дата, автор, определение показателя и разрешение на публикацию.

Урок для рабочего процесса

Команда могла изменить свой подход после конкретного события. Урок описывает изменение процесса и не обещает того же результата в другом проекте.

Общий проектный принцип

Он основан на внешних технических или нормативных источниках и применим не только к одному объекту. Примером может быть необходимость испытать водоснабжение до открытия. Факты о Harmonie при этом подтверждаются отдельно.

Смешение этих уровней создаёт красивый рассказ, которому трудно доверять.

С чего начинается проверяемый разбор проекта

Сначала нужно зафиксировать условия, в которых команда начала работу:

дата начала участия;

состояние проекта на эту дату;

уже принятые решения;

переданные документы;

открытые обязательства и известные проблемы;

полномочия на изменение проекта;

ограничения ответственности.

Это особенно важно, если работа началась после проектирования или строительства. Новая команда не должна приписывать себе прежние решения и отвечать за них без оговорок.

Решения фиксируют по мере работы

Для каждого изменения нужен автор, дата, причина, влияние на бюджет и срок, согласование и подтверждение исполнения.

Такой реестр помогает спустя год понять, почему оборудование выбрали именно так, кто одобрил замену и какие данные были доступны в тот момент.

Оплата и приёмка

Календарная дата сама по себе не подтверждает выполненный объём. Этапный платёж полезно связывать с результатом, документами, испытаниями и перечнем замечаний.

Конкретные права на удержание, возврат или вмешательство существуют только в договоре и применимом праве. В разборе проекта нельзя добавлять их задним числом ради более убедительной истории.

Вода, дренаж и эксплуатация

Инженерные системы затрагивают архитектуру, конструкцию, отделку и дальнейшее обслуживание. Их проверяют до того, как конструкции будут закрыты отделкой, а затем ещё раз перед полноценным открытием объекта.

Для воды отдельно рассматривают разрешение, конструкцию скважины, дебит, качество сырой воды, очистку и анализ в кранах. Глубина или количество фильтров не заменяют эту цепочку.

При тестовом запуске проверяют уборку, заезд гостей, перемещение персонала, доступ к оборудованию, работу во время дождя и пикового потребления, хранение и действия при отказе системы.

Границы публичного материала

Harmonie сдана и эксплуатируется. Публичный материал показывает документированную непрерывность от строительства и приёмки до текущей эксплуатации. Измеренные или коммерческие показатели не публикуются.

Что этот кейс не должен доказывать

Даже после документальной проверки Harmonie не станет доказательством:

отсутствия дефектов;

универсальной глубины скважины;

одинаковой эффективности систем очистки;

общего роста цен на землю;

повторяемого результата при другой команде и договоре.

Такой разбор полезен, когда показывает ход решений и пределы применимости каждого вывода.

Как читать презентацию любого девелопера

Перед тем как доверять цифре или фотографии, спросите:

Какую роль выполняла команда и с какой даты?

Что существовало до её участия?

Как определён показатель?

Каким документом он подтверждён?

Отделена ли причина от совпадения?

Какие ограничения и неудачные решения раскрыты?

Какие выводы относятся к рабочему процессу, а какие только к этому объекту?

Что владелец должен увидеть в разборе проекта

Хороший разбор показывает исходную ситуацию, роль каждой стороны, принятые решения, документы о выполненных работах и границы сделанных выводов. Он не превращает один удачный результат в универсальное обещание.

Для Harmonie публикуются только сведения, которые можно подтвердить и раскрыть. Если факт нельзя связать с документом, датой и понятной ответственностью, он не должен становиться маркетинговым тезисом.

Оценивайте проект по доказательствам и границам ответственности.

Связанные материалы

Проверка участка на Бали до предварительного платежа

Следующий платёж начинается с проверки, а не с даты

Общий бассейн: что именно получает владелец виллы

Что изучить дальше

Связанный вопрос Проверка участка на Бали до предварительного платежа Связанный вопрос Следующий платёж начинается с проверки, а не с даты

Смоделировать решение в Stay Matrix Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Может ли иностранный директор работать в собственной компании на Бали? | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/can-a-foreign-director-work-in-their-bali-business/

Field Notes

/

Руководство по принятию решений

Field Notes · Иммиграция

Может ли иностранный директор работать в собственной компании на Бали?

Что охватывает настоящая функция директора, где начинается другая профессия и почему назначение в PT PMA не покрывает автоматически местную PT

01

Акционер

02

Директор

03

Комиссар

04

Работодатель

05

Разрешённая работа

06

Фактическая деятельность

Да. Настоящий иностранный директор может активно управлять и контролировать индонезийскую компанию, если его корпоративная функция, трудовое регулирование и иммиграционный статус поддерживают эту работу.

Нет. Слово

директор

в учредительном акте не разрешает любую профессию, любую локацию и любую связанную компанию.

Практический ответ зависит от согласованности пяти элементов:

Корпоративное назначение

+ доля участия

+ RPTKA или действительное освобождение

+ виза и ITAS

+ работодатель, места работы и фактическая деятельность

Главный вопрос не в том, находится ли иностранец на работе каждый день.

Главный вопрос:

Он управляет компанией или регулярно выполняет другую работу под титулом директора?

Граница этой заметки

Текст объясняет различие. Он не выбирает визовую категорию или основание по трудовому регулированию для конкретного человека. Нужна совместная проверка акта, долей, пакета документов по трудовому регулированию, визы, ITAS, работодателя и реальных обязанностей.

Два распространённых, но неполных ответа

Первый:

Вы инвестор. Вы не можете ничего делать в компании.

Это слишком широко. Индонезийское корпоративное право даёт директору настоящую функцию управления, а иммиграционная система предусматривает отдельные маршруты для директоров и квалифицированных инвесторов.

Второй:

Вы директор. Значит, можете делать всё.

Это тоже слишком широко. Трудовые и иммиграционные правила продолжают учитывать должность, работодателя, места работы и фактическую деятельность.

Полезный ответ должен разделять собственность, корпоративные полномочия и личное разрешение на работу.

Пять разных ролей

Роль

Что она даёт

Чего она не даёт сама по себе

Акционер

Экономические и голосующие права инвестора.

Не назначает автоматически директором или сотрудником.

Бенефициарный владелец

Признание окончательного контроля или экономической выгоды.

Не создаёт корпоративную должность или право на работу.

Директор

Полномочия управлять и представлять компанию в рамках её цели и устава.

Не разрешает любую работу во всех связанных компаниях.

Комиссар

Надзор и совет директорам.

Не равен исполнительному управлению.

Работник или иностранный работник

Выполнение роли для соответствующего работодателя в рамках правил привлечения иностранных работников.

Должен соответствовать разрешённой должности, визе, ITAS и месту.

Один человек может совмещать роли. Документы должны показывать, какая роль поддерживает каждое действие.

Что может делать настоящий директор

Директор не обязан ограничиваться ежеквартальной подписью.

К узнаваемым функциям директора относятся:

утверждение бюджета и бизнес-плана;

определение ценовой и коммерческой стратегии;

назначение и руководство старшими менеджерами;

анализ загрузки, выручки и операционной эффективности;

утверждение крупных закупок и поставщиков;

переговоры по существенным договорам;

создание политик и контролей;

инспекция стандартов объектов и сервиса;

решение по серьёзным инцидентам;

надзор за поставкой товаров или услуг компании;

представление компании перед банками, партнёрами и властями.

Ежедневное участие не является автоматически незаконным. Бизнес, которым лично руководит основатель, может иметь очень активного директора.

Нужно смотреть, остаётся ли повторяющаяся работа управлением и надзором.

Где начинается другая профессия

Континуум выглядит так:

Решение акционера

↓

Решение совета директоров

↓

Исполнительный надзор

↓

Операционное управление

↓

Работа первой линии

Граница зависит от фактов. Нет простого количества часов, после которого управление превращается в другую работу.

Важны повторяемость, ответственность и то, как компания описала бы роль, если бы человек не был собственником.

Пример A: узнаваемая функция директора

Директор приезжает на объект два раза в неделю.

Он оценивает работу генерального менеджера (GM), утверждает новую ценовую политику, инспектирует стандарты, ведёт переговоры по договору прачечной, рассматривает серьёзную жалобу и решает, менять ли операционного менеджера.

Это понятно как управление и надзор.

Пример B: другая работа под титулом директора

«Директор» ежедневно работает на стойке приёма, отвечает на все бронирования, заселяет и оформляет выезд гостей, продаёт транспорт, составляет графики, возит гостей и лично закрывает смену управляющего виллой.

Проблема не в том, что директор никогда не может встретить гостя или решить срочную ситуацию.

Проблема в том, что постоянная работа выглядит как другая профессия.

Титул директора не покрывает её автоматически, если пакет документов по трудовому регулированию и иммиграции не соответствуют.

E25B и E28A не являются взаимозаменяемыми

В актуальном перечне виз есть:

E25B

, рабочая виза директора компании;

E28A

, инвесторская категория, которая может позволять квалифицированному инвестору вести инвестиционную и деловую деятельность, быть директором или комиссаром компании, в которую он инвестировал, и контролировать производство её товаров или услуг.

Правильный маршрут зависит от:

доли участия;

назначения в акте;

должности, предусмотренной трудовым разрешением;

необходимости RPTKA или освобождения;

планируемой работы;

работодателя и локаций.

Фраза «инвесторский KITAS» не является полным анализом.

KITAS не описывает всю работу

KITAS остаётся бытовым термином. Формальный вид на жительство называется ITAS.

Главное: вид на жительство сам по себе не описывает все разрешённые действия.

Согласованный пакет документов должен связывать:

Назначение в акте

+ подтверждение доли

+ RPTKA или законное освобождение

+ индекс визы

+ ITAS

+ разрешённая должность

+ работодатель

+ места работы

+ реальная ежедневная деятельность

Несоответствие на одном уровне может иметь значение, даже если остальные документы существуют.

Работодатель имеет значение

Это критично в структуре PT PMA и местной PT.

Предположим:

иностранный основатель является директором и акционером PT PMA A;

местная PT B указана на OTA;

B заключает договоры и получает деньги;

B считается оператором размещения;

A выставляет B плату за управление.

Основатель лично каждый день даёт инструкции сотрудникам B, контролирует её цены и бронирования, одобряет возвраты и выполняет функцию управляющего виллой.

Назначение директором A не разрешает автоматически работу для B.

Компании являются отдельными юридическими лицами.

Договор управления может объяснить, почему A оказывает B услугу. Он не переносит личное разрешение на работу иностранца из A в B.

Правильные вопросы:

Действительно ли директор руководит услугой управления компании A?

Нанимает ли A людей и контролирует ли системы, через которые оказывается услуга?

Не действует ли человек фактически как управляющий или сотрудник компании B?

Какая компания получает пользу от ежедневной работы?

Какой работодатель и какие места работы указаны в трудовом и иммиграционном досье?

Практический пример с двумя компаниями

Логичная версия

PT PMA A нанимает специалиста по управлению доходностью, финансового менеджера и операционного директора.

Иностранный директор руководит этой командой, утверждает правила компании A, анализирует объекты и участвует в ежемесячной встрече с индонезийскими директорами B.

Местная PT B нанимает команду виллы, контролирует договор с гостем, платит персоналу, проводит заезды и несёт обязательства перед клиентом. Индонезийский генеральный менеджер B даёт ежедневные инструкции на объекте.

Директор может инспектировать и требовать результат, но люди, системы и полномочия показывают, что A оказывает услугу, а B эксплуатирует размещение.

Противоречивая версия

У A нет управленческой команды.

Иностранный директор лично входит в OTA B, устанавливает все цены, отвечает гостям, руководит горничными, утверждает отпуска, обрабатывает возвраты и дисциплинирует персонал B.

Единственное доказательство услуги A: счёт.

Такая деятельность меньше похожа на руководство A и больше на работу внутри B.

Работа в нескольких компаниях требует отдельного основания

Индонезийские правила допускают некоторые случаи работы иностранца у нескольких работодателей в той же позиции, включая определённые роли директора или комиссара.

Это не общее разрешение работать во всей группе.

Каждую роль должны поддерживать:

корпоративное назначение;

отношения с работодателем;

правила привлечения иностранных работников;

виза и ITAS;

зарегистрированные места работы;

реальная функция.

Общий собственник или договор управления не объединяет двух работодателей.

Комиссар не является другим словом для директора

Комиссар контролирует и консультирует директоров.

Директор управляет компанией.

Иностранец, назначенный только комиссаром, не должен считать, что титул разрешает обычное исполнительное управление.

Применяется та же проверка реального содержания: что человек делает, для какой компании и на каком основании.

Кадровые функции остаются ограниченной зоной

Иностранные работники не имеют неограниченного права занимать кадровые должности и выполнять функции по управлению персоналом.

Директор может утверждать структуру организации, назначать старших руководителей и определять правила.

Это отличается от регулярного ведения кадровых файлов и работы как специалист по кадрам.

Подпись в электронной почте не меняет функцию.

Что увидит инспектор

Бумаги важны. Операционные факты тоже.

Инспектор может спросить:

кто даёт инструкции персоналу;

чей WhatsApp ведёт рабочую группу персонала;

кто утверждает графики и отпуска;

кто контролирует OTA и PMS;

кто обрабатывает жалобы;

какая компания нанимает человека;

где он работает;

какая должность записана;

имеет ли заявленная инвестиция и роль реальное содержание.

Бумажный титул директора мало помогает, если обычная неделя показывает другую работу.

Практическая матрица

Действие

Обычно похоже на функцию директора

Требует более точной проверки

Часто похоже на другую постоянную работу

Утвердить годовой бюджет

Да

Определить ценовую политику

Да

Руководить генеральным менеджером

Да

Инспектировать стандарты

Да

Если превращается в ежедневный операционный надзор

Заключить крупный договор

Да

Решить исключительную жалобу

Да

Если становится обычной сервисной функцией

Ежедневно отвечать на бронирования

Да

Регулярно заселять гостей

Да

Каждую неделю составлять график персонала

Зависит от разрешённого объёма исполнительных функций

Часто

Возить гостей

Да

Продавать экскурсии

Да

Регулярно вести кадровое администрирование

Ограниченная зона

Это не законодательный перечень разрешённых должностей. Матрица помогает увидеть, когда титул директора может прикрывать другую профессию.

Что нужно подтвердить письменно

Какая должность указана в акте?

Человек является акционером, директором, комиссаром или совмещает роли?

Какая стоимость и доля акций зарегистрированы лично?

На каком основании действует освобождение от RPTKA?

Какой индекс визы используется?

Какие действия прямо разрешены этим маршрутом?

Какой ITAS выдан?

Какая компания указана работодателем или спонсором?

Какая должность одобрена, если применяется RPTKA?

Какие места работы зарегистрированы?

Работает ли человек во второй компании?

Какое назначение поддерживает вторую роль?

Какое основание по трудовому и иммиграционному регулированию поддерживает эту роль?

Какие повторяющиеся операционные задачи выполняются?

Какая компания получает от них пользу?

Кто подписывает инструкции персоналу?

Кто контролирует ежедневные системы?

Соответствуют ли KBLI компаний и функция человека?

Какие обязанности по отчётности и DKPTKA применяются?

Что увидит инспектор в обычную неделю?

Решение простыми словами

Иностранный директор может активно работать в своей индонезийской компании, если корпоративная, трудовая и иммиграционная структура поддерживает эту роль.

Он может определять стратегию, руководить управленческой командой, инспектировать стандарты, принимать существенные решения и реагировать на серьёзные инциденты.

Титул не разрешает любую линейную работу и не распространяется автоматически на отдельную местную PT.

Главное правило:

Учредительный акт, виза, основание по трудовому регулированию, работодатель, места работы и обычная рабочая неделя должны описывать одну и ту же работу.

Обсудить проект с Франсуа

Основные источники и прямые ссылки для проверки

Закон 40/2007 об обществах с ограниченной ответственностью

Иммиграционная служба: E25B, рабочая виза директора компании

Иммиграционная служба: E28A, инвесторская виза

PP 34/2021 об использовании иностранной рабочей силы

Permenaker 8/2021 о применении PP 34/2021

Иммиграционная служба Бали: патруль Dharma Dewata 2026 и обязанности поставщиков размещения

Закон 25/2007 об инвестициях

Официальный OSS, KBLI 55901, управление размещением

Для конкретного человека решающими являются действующая виза, ITAS, RPTKA или освобождение, работодатель, должность и место работы. Одного акта компании или привычного слова «KITAS» недостаточно.

## Может ли PT PMA эксплуатировать виллу на Бали? | DALLEAU

URL: https://dalleau.ai/ru/notes/can-a-pt-pma-operate-a-bali-villa/

Field Notes
/
Руководство по принятию решений
Field Notes · Компании
Может ли PT PMA эксплуатировать виллу на Бали?
Практические варианты: прямая эксплуатация, настоящий индонезийский оператор и отдельная управляющая компания
01
Прямая PT PMA
02
Независимый оператор
03
Настоящая местная PT
04
Управление через PT PMA
Формат
Руководство для принятия решения
Тема
Компании и лицензирование
Редакционная версия
13 августа 2026 года
Источники проверены
13 августа 2026 года
Время чтения
14 мин чтения
На этой странице
Начнём с реальной ситуации собственника
Четыре маршрута в одной таблице
Маршрут 1: новая PT PMA как прямой оператор по 55203
Маршрут 2: назначить независимого индонезийского оператора
Маршрут 3: настоящая местная PT с двумя индонезийскими акционерами
Когда фактическая роль местной PT не соответствует заявленной
Маршрут 4: местный оператор и PT PMA как управляющая компания
PT PMA может выставить счёт за услугу. Она не может выставить счёт «за прибыль»
Кто действительно эксплуатирует объект?
Что необходимо иметь в письменном виде
Решение простыми словами
Основные источники и прямые ссылки для проверки
Сначала практический ответ.
Для новой PT PMA в действующей публичной матрице KBLI 55203, Aktivitas Vila, не видно маршрута уровня крупного бизнеса.
Этот код описывает частные дома, сдаваемые туристам и управляемые собственником. В матрице присутствуют микро-, малый и средний бизнес, но нет строки
Usaha Besar
. Поэтому новую PT PMA нельзя проектировать исходя из предположения, что 55203 ей доступен.
В Индонезии появился отдельный код для операционного управления размещением третьей стороной: KBLI 55901.
Он охватывает управляющего, который участвует в ежедневной работе и управленческих решениях от имени собственника и получает плату за управление (management fee). На национальном уровне публичная матрица содержит маршрут для крупного бизнеса. На Бали доступ необходимо проверять непосредственно в OSS, поскольку провинция закрыла новые заявки PMA по прежнему коду 55900, из которого 55901 был выделен при переходе на KBLI 2025.
Настоящая индонезийская PT с внутренним капиталом потенциально может быть оператором.
Однако иностранный инвестор не может владеть её акциями и одновременно сохранять за ней статус внутренней компании. Если два индонезийских сотрудника становятся акционерами, они становятся реальными собственниками с реальными правами.
PT PMA потенциально может оказывать этому оператору реальные услуги управления или поддержки.
Одна счёт не делает структуру обоснованной. Остаточную прибыль местной PT нельзя задним числом превратить в плату за управление.
Эти четыре положения определяют практическую развилку. Ниже показано, что решает каждый вариант, какие условия он требует и какие вопросы зависят от конкретного проекта.
Граница этой заметки
Ниже изложено прочтение публичных источников по состоянию на 13 августа 2026 года. Текст не выбирает компанию, KBLI или договорную схему для конкретного проекта. Нужны актуальный результат OSS и проверка реальных корпоративных, имущественных и операционных документов.
Начнём с реальной ситуации собственника
Предположим, что PT PMA владеет правами аренды или иным законным правом на три виллы на Бали.
Вы хотите продавать краткосрочное размещение, принимать бронирования, нанимать команду, организовывать заезды и выезды, уборку и завтрак, продавать дополнительные услуги, принимать деньги и сохранять контроль над операционным бизнесом.
Вам советуют:
Создайте местную PT с двумя сотрудниками. Пусть она выставляет счета гостям. Затем PT PMA выставит счёт местной компании и заберёт прибыль.
В одной фразе смешаны как минимум пять разных вопросов:
Какая компания имеет право продавать размещение гостю?
Какая компания может управлять размещением для третьего лица?
Кто действительно владеет и управляет местной PT?
Что PT PMA вправе реально выставлять в счёте?
В какой компании иностранный основатель лично имеет право работать?
Перенос фактуры не отвечает ни на один из этих вопросов.
Четыре маршрута в одной таблице
Маршрут 1
Маршрут 2
Маршрут 3
Маршрут 4
01
1. Новая PT PMA напрямую работает по 55203
Практическая позиция сегодня
В текущей матрице маршрут не виден.
У 55203 нет строки
Usaha Besar
.
Что он может решить
Для новой PMA по этому коду ничего.
Чего он не решает
Код не становится доступным из-за того, что объект рекламируется как вилла.
02
2. Независимый индонезийский оператор
Практическая позиция сегодня
Потенциально логично.
Настоящий лицензированный оператор заключает договоры с гостями и несёт операционную ответственность.
Что он может решить
Отделяет имущественный инвестиционный контур от гостиничной деятельности.
Чего он не решает
Оператору всё равно нужны правильная деятельность, права на объект, разрешения, персонал, налоги и отчётность.
03
3. Настоящая местная PT с индонезийскими акционерами
Практическая позиция сегодня
Потенциально возможно, но юридически это действительно их компания.
Что он может решить
Создаёт внутреннего оператора для видов деятельности, доступных индонезийскому бизнесу.
Чего он не решает
Не сохраняет скрытое иностранное владение. Права акционеров, выход и бенефициарный контроль должны быть реальными.
04
4. Местный оператор плюс PT PMA как управляющий или поставщик услуг
Практическая позиция сегодня
Потенциально логично, если обе компании реальны.
Направление 55901 относится к управлению, но доступ на Бали нужно проверить в живом OSS.
Что он может решить
Позволяет разместить центральные управленческие компетенции в отдельной компании.
Чего он не решает
Договор управления не превращает пустую местную PT в реального оператора и не переносит автоматически личное разрешение на работу иностранного директора.
Иногда предлагается пятый маршрут: выбрать отель, апарт-отель или другую категорию размещения вместо 55203. Это допустимо только тогда, когда сам объект, набор услуг и модель эксплуатации действительно соответствуют выбранной категории. Юридический статус не меняется от нового маркетингового названия.
Маршрут 1: новая PT PMA как прямой оператор по 55203
KBLI 55203 не является универсальным кодом для любого объекта, который называют виллой.
Официальное описание относится к краткосрочному размещению в частных домах, сдаваемых туристам и
управляемых собственником
. В текущей публичной матрице присутствуют микро-, малый и средний бизнес. Строки крупного бизнеса нет.
PT PMA относится к режиму иностранного инвестирования и крупного бизнеса. Практический вывод прямой:
Для новой PT PMA сегодня не видно пути регистрации 55203 как прямой деятельности по эксплуатации виллы.
Это полезнее, чем расплывчатая фраза «код формально не закрыт». Вид деятельности может выглядеть открытым в общем перечне, но оставаться недоступным новой PT PMA, если матрица лицензирования не предусматривает необходимый масштаб бизнеса.
Что происходит со старыми лицензиями?
У существующей компании может быть история разрешений по KBLI 2020, старой конфигурации OSS или переходному проекту. Такой файл нужно читать отдельно.
Переход с 55193 на 55203 не аннулирует старую лицензию автоматически. Он также не доказывает, что новый заявитель может получить такую же позицию сегодня.
Для собственника правило простое:
не копируйте NIB старой компании и не предполагайте, что маршрут всё ещё открыт;
запрашивайте полный лист OSS, а не только пятизначный код;
проверяйте масштаб, риск, локацию, стандартный сертификат и историю лицензии;
отделяйте продолжение старого права от доступности новой заявки.
Маршрут 2: назначить независимого индонезийского оператора
Собственник или владелец права на объект потенциально может назначить отдельную компанию оператором размещения.
Не следует выбирать оператора только потому, что у него есть удобный KBLI на скриншоте. Он должен показать полную операционную цепочку.
Настоящий оператор обычно имеет или контролирует:
договорное право использовать объект для размещения;
правильную деятельность в OSS;
нужную локацию и запись деятельности;
применимые туристические стандарты и вспомогательные разрешения;
отношения с OTA как продавец;
договорные условия для гостей;
получение выплат и процесс возвратов;
операционный персонал или чётко разрешённый договор управления;
регистрацию и отчётность по местному налогу;
APOA для иностранных гостей;
страхование и ответственность перед клиентом;
риск снижения загрузки и требований гостей.
Что решает этот маршрут
Он может отделить иностранный имущественный или инвестиционный контур от компании, которая продаёт проживание.
PT PMA может получать обоснованную плату по договору аренды, использования имущества, управления, финансирования или другой реальной сделке, в зависимости от прав и налоговой позиции.
Чего он не решает
Оператор с одним KBLI не легализует автоматически каждый объект, который он берёт в управление.
Зонирование, назначение здания, PBG или SLF, туристические требования и местная налоговая регистрация остаются отдельными вопросами. Объект не может «одолжить» соответствие у названия управляющей компании.
Ключевое различие:
Назначение лицензированного оператора может решить вопрос оператора. Оно не решает автоматически вопрос самого объекта.
Маршрут 3: настоящая местная PT с двумя индонезийскими акционерами
Этот вариант часто рассматривают, когда для отдельных операционных функций требуется самостоятельная индонезийская компания, отличная от PT PMA.
Иностранный инвестор не является акционером местной PT. Два индонезийских сотрудника вносят капитал или иным законным образом получают акции. Позже они могут перестать быть сотрудниками, но остаются акционерами, пока акции не будут законно переданы или погашены по действительной корпоративной процедуре.
Формулировка «я создаю свою местную PT с двумя сотрудниками» скрывает юридическую и экономическую реальность.
Если владение акциями действительно, компания принадлежит индонезийским акционерам в объёме прав, связанных с их акциями. Она не является активом иностранного инвестора.
Что означает настоящее владение акциями
В зависимости от класса акций и корпоративных документов акционеры могут иметь:
право голоса;
право на дивиденды;
право на стоимость акций;
право участвовать в общих собраниях;
влияние на назначение и снятие директоров и комиссаров;
права или ограничения на передачу акций;
права, сохраняющиеся после окончания трудового договора;
интересы, которые затрагиваются смертью, наследованием, разводом, кредиторами или личным спором.
Законный акционерный договор может регулировать управление. Он не может сохранять внутреннее владение лишь формально, одновременно передавая иностранному основателю всю полноту собственности, контроля и экономической выгоды.
Дилемма неизбежна:
Акционер без реальных прав может создать проблему номинального владения. Акционер с реальными правами создаёт настоящую собственность и настоящее корпоративное управление. Формула «поставьте двух сотрудников» не устраняет ни одну из этих сторон.
Практический пример
Предположим, что Аю и Буди владеют по 50 процентов местной PT.
Компания эксплуатирует три виллы. Позже Аю и Буди уходят с работы в группе. Иностранный основатель не может просто удалить их из реестра акционеров, потому что они больше не работают в PT PMA.
Заранее согласованный механизм передачи может существовать, но он должен быть юридически действительным и не иметь единственной целью обнулить их собственность с первого дня. Передача также вызывает вопросы оценки, налогов, согласий и корпоративной процедуры.
Поэтому сотрудники-акционеры не являются административной формальностью.
Когда фактическая роль местной PT не соответствует заявленной
Структуру трудно защищать, если местная PT существует главным образом в следующих местах:
реестр акционеров;
NIB или лицензия;
юридическое имя продавца на OTA;
счёт гостю;
банковский счёт, через который деньги проходят на короткое время.
При этом PT PMA или иностранный основатель:
финансирует весь капитал и оборотные средства;
контролирует банковские счета;
фактически назначает всё руководство;
устанавливает цены и доступность;
имеет контрольные доступы к OTA и PMS;
нанимает и руководит командой;
одобряет все возвраты;
контролирует закупки и бюджеты;
получает почти всю экономическую выгоду;
может по своему решению убрать индонезийских акционеров.
Проблема не в самой связанности компаний. Связанные компании вправе заключать реальные сделки.
Проблема возникает, когда история акционерного капитала, данные о бенефициарном владельце, туристическая лицензия и ежедневная деятельность описывают разные компании.
Статья 33 закона об инвестициях касается акций, которыми владеют для и от имени другого лица. Правила бенефициарного владения также смотрят за пределы реестра на контроль, права назначения и экономическую выгоду.
Ни один признак не решает вопрос отдельно. Оценивается вся система.
Маршрут 4: местный оператор и PT PMA как управляющая компания
Такая структура наиболее последовательна, когда каждая компания действительно выполняет заявленную роль, несёт соответствующие риски и сохраняет экономический результат, относящийся к этой роли.
НАСТОЯЩИЙ МЕСТНЫЙ ОПЕРАТОР
Договор с гостем
Продавец на OTA и выплаты
Деятельность и локация в OSS
Персонал на объекте
Заезд и выезд
Уборка и техническая эксплуатация
Возвраты и требования гостей
PBJT и APOA
Реальные решения, оборотный капитал, прибыль и риск
↓ реальный договор услуг
PT PMA УПРАВЛЕНИЯ ИЛИ ПОДДЕРЖКИ
Управление ценами и доходностью
Центральная поддержка бронирований
Исполнение маркетинга
Финансы и отчётность
Поддержка закупок
Технологии и системы
Поддержка руководства
Именованные сотрудники, результаты и доказательства
Коммерчески обоснованная плата
Почему важен 55901
KBLI 55901 прямо признаёт управление размещением третьей стороной.
Официальное описание необычно конкретно. Управляющий может отвечать за общую коммерческую и операционную эффективность, непосредственно участвовать в ежедневной работе и управленческих решениях, действовать от имени собственника и получать плату за управление.
Эта классификация также прямо исключает две другие деятельности:
прямое владение и эксплуатацию размещения;
общий управленческий консалтинг без непосредственного операционного управления.
Это даёт собственникам более точный язык.
Если PT PMA контролирует ежедневную работу объекта размещения, её зарегистрированная деятельность и лицензионная позиция должны отражать операционное управление, а не общий консалтинг. Периодические стратегические консультации сами по себе не делают компанию операционным управляющим.
Сложность на Бали
Национальная публичная матрица 55901 содержит маршрут крупного бизнеса и специальные обязательства для PMA. Это существенное отличие от 55203.
Но в мае 2026 года Бали закрыл новые заявки PMA по 18 категориям низкого и средне-низкого риска, включая прежний KBLI 55900, «прочее размещение». В KBLI 2025 линия 55900 была разделена на несколько кодов, включая 55901.
Публичные источники пока не устанавливают, как Бали применяет ограничение прежнего 55900 к каждой новой заявке по 55901.
Корректная позиция для собственника:
55901 на национальном уровне является видимым маршрутом крупного бизнеса для операционного управления размещением. Новая заявка на Бали всё равно требует живого результата OSS и письменного подтверждения того, как провинциальное ограничение прежнего 55900 применяется после разделения KBLI 2025.
Неопределённость ограничена практической доступностью подачи на Бали и не меняет национального различия между прямой эксплуатацией и управлением для третьего лица.
PT PMA может выставить счёт за услугу. Она не может выставить счёт «за прибыль»
Определяющий вопрос состоит в том, оказывает ли PT PMA разрешённую, идентифицируемую и экономически полезную услугу.
PT PMA потенциально может выставлять местному оператору счета за услуги, которые она вправе и способна оказывать. Это могут быть:
управление ценами и доходностью;
поддержка центрального бронирования;
финансовая отчётность;
закупки;
маркетинговое исполнение;
администрирование систем;
управленческий надзор;
отдельно определённые права на бренд или технологию;
документированные перевыставления расходов.
Но плата должна следовать реальной сделке.
Она не должна рассчитываться как:
Всё, что оставит в местной PT только символическую прибыль.
Иллюстративный пример с цифрами
Предположим, что местный оператор получает 1 миллиард IDR выручки от гостей за месяц.
Он платит комиссии OTA, персонал, коммунальные услуги, расходные материалы, ремонт, местный налог, страхование и другие операционные затраты. PT PMA предоставляет реальный пакет центрального управления с шестью сотрудниками, ежемесячной работой по ценам, отчётности, закупкам, маркетингу и системам.
PT PMA может выставить плату, основанную на реальном объёме и методе вытянутой руки.
Она не должна ждать конца года, увидеть прибыль местной PT в размере 3,2 миллиарда IDR и выписать счёт за управление на 3,1 миллиарда, чтобы оставить 100 миллионов.
Второй подход исходит из желаемой остаточной прибыли и рассчитывает счёт ретроспективно. Он не определяет цену вытянутой руки для конкретной услуги.
Где остаётся остаточная прибыль?
После реальных расходов и реальных внутригрупповых платежей остаточный результат остаётся в местной PT.
Экономически он принадлежит компании и приносит выгоду её настоящим акционерам в соответствии с их правами.
Если коммерческая цель состоит в том, чтобы иностранный основатель получил почти всю эту стоимость, структуре требуется иное законное экономическое основание. Позиция владения не может меняться в зависимости от того, проверяется лицензия или распределяется прибыль.
Кто действительно эксплуатирует объект?
Задайте десять вопросов:
У какой компании в OSS зарегистрированы деятельность и локация размещения?
У кого есть договорное право эксплуатировать объект?
Кто указан продавцом или поставщиком на OTA?
Кто заключает договор с гостем?
Кто получает и возвращает деньги?
Кто нанимает и руководит командой объекта?
Кто контролирует цены, бронирования и PMS?
Кто подаёт PBJT и APOA?
Кто несёт требования гостей, убытки и риск оборотного капитала?
Кто сохраняет остаточный операционный результат?
Ни один ответ не доказывает юридическую позицию. Вместе они показывают, имеет ли структура содержание.
Особенно полезен последний тест:
Какая компания смогла бы продолжить работу завтра, если другая перестала помогать?
Если местная PT не может назначать цены, входить в OTA, общаться с гостями, платить и руководить командой, одобрять возвраты и покупать материалы, она может не быть независимым оператором, которым её называют документы.
Что необходимо иметь в письменном виде
Для любой прямой эксплуатации
полный лист OSS с деятельностью и масштабом;
KBLI, NKU и локация;
право использования объекта;
туристические стандарты и дополнительные разрешения;
файл здания и назначения;
условия для гостей и данные продавца на OTA;
организация персонала;
местный налог и APOA;
страхование и распределение ответственности.
Для настоящего местного оператора
учредительный акт и AHU;
доказательство подписки и оплаты акций;
права акционеров и правила управления;
регистрация бенефициарного владельца;
право эксплуатировать объект;
лицензии и стандарты;
собственные банковские, бухгалтерские и управленческие записи;
чёткие отношения с PT PMA.
Для PT PMA как управляющего или поставщика услуг
правильный KBLI и живой результат OSS на Бали;
договор управления или услуг;
матрица прав решений;
именованные сотрудники и системы;
ежемесячные результаты работы;
метод ценообразования;
PPh, НДС и бухгалтерское отражение;
доказательство того, что местный оператор продолжает выполнять свою роль.
Решение простыми словами
Новая PT PMA не должна рассчитывать на 55203 как на маршрут прямой эксплуатации виллы. В текущей публичной матрице отсутствует необходимая ей категория крупного бизнеса.
Настоящий индонезийский оператор потенциально может продавать размещение. PT PMA потенциально может предоставлять отдельно разрешённые услуги управления или поддержки. KBLI 55901 делает это различие яснее, хотя его фактическая доступность для новой PMA на Бали требует проверки провинциального ограничения.
Создание местной PT с двумя сотрудниками может быть частью законной структуры только тогда, когда эти люди действительно владеют компанией, а компания действительно ведёт операционный бизнес.
Такая структура требует реальной собственности, реального управления и реальной экономики.
Структура становится противоречивой, когда лицензия, счёт и реестр акционеров распределяют роли одним образом, а контроль и экономическая ценность следуют другой логике.
Правило, которое стоит сохранить:
Начните с реальной деятельности. Передайте её правильной компании. Дайте этой компании права, разрешения, людей, риск и экономику, необходимые для работы. Пусть все счета следуют этой реальности.
Обсудить проект с Франсуа
Основные источники и прямые ссылки для проверки
Официальный OSS, KBLI 55203, деятельность виллы
Публичная матрица 55203 по риску и масштабу
Официальный OSS, KBLI 55901, управление размещением
Публичная матрица 55901 по риску, масштабу и PMA
Правительство провинции Бали: ограничение PMA по 18 категориям
BPS: сохранение действительности существующих лицензий при несубстантивной конверсии KBLI
Закон 25/2007 об инвестициях
Закон 40/2007 об обществах с ограниченной ответственностью
Постановление Министерства права 2/2025 о проверке бенефициарного владельца
PMK 172/2023 о сделках между взаимозависимыми сторонами
Страницы Unpad являются публичным инструментом чтения текущей матрицы. Юридический результат определяется системой OSS и применимыми нормативными актами.
Продолжить с текущего вопроса
Продолжить с текущего вопроса
Кто на самом деле эксплуатирует виллу?
→
Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе.
→
Может ли иностранный директор работать в собственной компании на Бали?
→

## Выплаты из PT PMA: основания, документы и налоги | DALLEAU

URL: https://dalleau.ai/ru/notes/how-money-leaves-pt-pma.html

Материалы DALLEAU
Как законно получить деньги из своей PT PMA
Остаток на счёте компании принадлежит самой компании, даже если все её акции контролирует один человек.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
16 июля 2026
Проверено | 16 июля 2026 | первичные источники
Обновлено 16 июля 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
Остаток на счёте компании принадлежит самой компании, даже если все её акции контролирует один человек. Прежде чем переводить деньги владельцу, нужно определить правовое основание выплаты и оформить необходимые документы. К банковскому переводу переходят только после этого.
Вопрос «как вывести деньги?» полезно заменить более точным: почему компания должна заплатить эту сумму конкретному получателю именно сейчас?
Деньги компании учитываются отдельно
PT PMA является самостоятельным юридическим лицом. Её выручка, прибыль, капитал и заёмные средства имеют разное происхождение. Смена банковского счёта не меняет их характер.
До выплаты нужно установить:
источник суммы;
лицо, которому она причитается;
корпоративное решение или договор;
налоговый режим;
подтверждающие документы;
банковские и валютные требования.
Если получатель также работает в Индонезии, отдельно проверяют его должность и иммиграционное основание.
Management fee не является способом распределения прибыли
PT PMA может получать платёж от другой индонезийской компании за настоящую услугу, право на актив, финансирование или другую законную сделку. Сумма должна следовать за этой сделкой. Остаточная прибыль плательщика не превращается в расход на управление только потому, что стороны хотят переместить деньги в PT PMA.
Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе.
Распределение прибыли
Дивиденд выплачивается из прибыли после выполнения корпоративных требований. Наличие денег на счёте ещё не подтверждает наличие распределяемой прибыли.
Для иностранного участника также проверяют удержание налога и возможное применение соглашения об избежании двойного налогообложения. Справки о налоговом резидентстве бывает недостаточно. Значение имеют процедура, фактический получатель дохода и антизлоупотребительные условия.
Возврат займа участника
Если участник действительно предоставил компании заём, основная сумма и проценты рассматриваются отдельно. Договор, поступление средств, бухгалтерский учёт, условия возврата и применимые налоги должны совпадать.
Нельзя задним числом называть вклад в капитал займом только ради перевода. Такой подход создаёт противоречия в корпоративных и налоговых документах.
Оплата работы и возмещение расходов
Компания может платить за реально оказанные услуги или труд. Нужны договор, фактическая работа, разумный размер оплаты и корректный налоговый учёт.
Вознаграждение директора или сотрудника не заменяет дивиденд. Назначение на должность также не даёт автоматически право работать в Индонезии.
Подтверждённые расходы можно возмещать в соответствии с политикой компании и документами. Личные расходы владельца не становятся расходами бизнеса после одной пометки в банковском назначении.
Продажа актива компанией
Если PT PMA продаёт виллу, землю, договорное право или другой актив, выручку получает компания. Затем учитываются расходы, налоги, обязательства и финансовый результат.
Владелец не получает цену продажи напрямую только потому, что контролирует акции. Для дальнейшей выплаты снова нужно отдельное основание.
Продажа акций участником
При продаже акций продавцом выступает участник, а объектом сделки являются акции. Это другая операция, чем продажа имущества компанией.
Налоговый результат зависит от продавца, покупателя, налогового резидентства, вида акций, цены и применимых соглашений. Ставка
5% от валовой цены
может служить базовым ориентиром для некоторых продаж некотируемых индонезийских акций нерезидентом, но не позволяет заранее определить затраты при любом выходе из компании.
Уменьшение капитала и ликвидация
Возврат капитала требует установленной корпоративной процедуры. Обычный банковский перевод не заменяет решение, уведомления, регистрацию и проверку прав кредиторов.
При ликвидации сначала закрывают обязательства компании. Остаток распределяют после завершения процедуры. Он не обязан совпадать с суммой, когда-то внесённой участником.
Как читать налоговые ставки
Ставка
20%
по PPh 26 может служить базовым ориентиром для некоторых выплат нерезиденту. Итоговая ставка может измениться при наличии действующего налогового соглашения и выполнении всех его условий.
Ставку
2,5%
нельзя переносить на любую сделку с недвижимостью или договорным правом. Название актива и юридическая структура имеют значение.
Любой расчёт «чистыми» должен начинаться с полного описания операции. Без него одна ставка создаёт ложную точность.
Документы перед выплатой
До распоряжения банку соберите:
письменное объяснение экономической причины и правового основания платежа;
договор или корпоративное решение;
расчёт суммы;
налоговый анализ и документы для применяемой льготы;
подтверждение личности и статуса получателя;
бухгалтерские записи;
банковские документы и назначение платежа.
Если один документ описывает дивиденд, другой заём, а банковское назначение услугу, перевод лучше остановить до исправления.
Практический вывод
У PT PMA есть несколько законных оснований для выплат владельцу. Выбор зависит от того, что произошло в бизнесе на самом деле. Правильная последовательность начинается с фактов и документов, после чего рассчитываются налоги и оформляется перевод.
Разберите движение денег до покупки, продажи или распределения прибыли.
Связанные материалы
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
PT PMA и nominee: где находятся права иностранного инвестора
E28A: доля заявителя, роль в компании и фактическая работа
Источники и границы
https://peraturan.bpk.go.id/Details/288349/pmk-172-tahun-2023
https://www.pajak.go.id/index.php/id/pemotongan-pajak-penghasilan-pasal-26
https://pajak.go.id/id/peraturan/tata-cara-penerapan-persetujuan-penghindaran-pajak-berganda-2
https://www.peraturan.go.id/id/uu-no-25-tahun-2007
Что изучить дальше
Связанный вопрос
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
Связанный вопрос
PT PMA и nominee: где находятся права иностранного инвестора
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Сайт
Я хочу получать Field Notes и ознакомился с
информацией о конфиденциальности (EN)
.
Подписаться
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
Проверка участка на Бали до предварительного платежа

## Льгота по НДС и покупка виллы иностранцем | DALLEAU

URL: https://dalleau.ai/ru/notes/indonesia-2026-home-vat-incentive-foreign-buyers.html

Материалы DALLEAU

Льгота по НДС не даёт иностранцу право купить любую виллу

В рекламе индонезийской недвижимости в 2026 году встречается формулировка «льгота в размере 100 процентов НДС». Она звучит как скидка на всю стоимость дома.

DALLEAU | Исследования и практические материалы Опубликовано

16 июля 2026

Последняя проверка

20 июля 2026

Проверено | 20 июля 2026 | первичные источники

Новая публикация PMK 90/2025 может сократить НДС при первой передаче подходящего нового жилья в 2026 году.

Обновлено 20 июля 2026 года Льгота действует до 31 декабря 2026 года Следующая плановая проверка: 15 августа 2026 года

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

В рекламе индонезийской недвижимости в 2026 году встречается формулировка «льгота в размере 100 процентов НДС». Она звучит как скидка на всю стоимость дома. У PMK 90/2025 гораздо более узкая область применения.

Мера может сократить НДС при определённой первой передаче нового жилого объекта. Отдельно проверяется, имеет ли покупатель право приобрести именно такой объект и именно такое право на него.

Что означает 100 процентов

Речь идёт о НДС, который государство принимает на себя в пределах, установленных программой. Это не денежная выплата покупателю и не скидка в размере первых IDR 2 млрд .

Для подходящего объекта стоимостью не более IDR 5 млрд мера покрывает НДС, относящийся к первым IDR 2 млрд цены. НДС с оставшейся части рассчитывается по применимым правилам.

Точный эффект нельзя определить по рекламному баннеру. Нужны цена, налоговый счёт, статус продавца, документы объекта и хронология платежей и передачи.

Какие объекты рассматриваются

PMK 90/2025 относится к соответствующим новым домам rumah tapak и жилым единицам satuan rumah susun . Объект должен быть готов к заселению, иметь требуемый идентификационный код и впервые передаваться застройщиком, зарегистрированным как PKP.

Земельный участок, переуступка права долгосрочной аренды, доли PT PMA, перепродажа готовой виллы, ремонт старого дома, строительные работы или услуги управления сами по себе под это описание не подпадают.

Дата бронирования не определяет льготу

Для программы 2026 года в установленный период должны попасть документы сделки и фактическая передача готового объекта. В зависимости от структуры это может быть AJB либо полностью оплаченный нотариальный PPJB, а также BAST, который фиксирует передачу.

Депозит или форма бронирования в 2026 году не гарантируют льготу. Значение имеют фактические документы, платёжная история и дата передачи.

Что проверяют у продавца

Застройщик должен выполнить требования по BAST, налоговой накладной и отчётности. Обещание оформить документы позднее создаёт риск для покупателя, даже если коммерческая цена уже согласована.

До депозита стоит запросить:

юридическое наименование продавца и его статус PKP;

идентификационные данные объекта;

проект AJB или нотариального PPJB;

план платежей;

предполагаемую дату BAST;

расчёт НДС с отдельным указанием части, которую покрывает программа;

подтверждение того, что объект ранее не передавался.

Отдельная проверка для иностранца

PMK 90/2025 предусматривает применение меры к иностранному физическому лицу при выполнении налоговых условий, включая NPWP. Это не означает, что NPWP создаёт право собственности или отменяет ограничения для иностранцев.

Право покупателя проверяют по земельному и жилищному законодательству отдельно. Важны тип объекта, доступное иностранцу право, минимальные ценовые и иные требования, место и фактическая структура сделки.

Если покупателю предлагают долгосрочную аренду, доли компании или иную схему сделки, нужно сначала установить, подпадает ли передаваемый объект под программу и возникает ли при такой передаче НДС.

Почему типичная сделка с виллой может не подойти

На Бали словом «вилла» называют разные сделки. Это может быть новый дом от застройщика, долгосрочная аренда земли с подрядом на строительство, переуступка действующего права долгосрочной аренды, покупка долей компании или вторичная продажа.

Одинаковая фотография дома не означает одинаковый налоговый режим. У каждой структуры свой продавец, объект передачи, комплект документов и дата возникновения прав.

Проверка до депозита

Попросите продавца письменно ответить на семь вопросов:

Что именно передаётся покупателю?

Кто является продавцом для целей НДС?

Новый ли это объект и кто его построил?

Какова полная цена и какая часть облагается НДС?

Какие документы подпишут и когда?

Когда произойдёт фактическая передача по BAST?

На каком основании иностранный покупатель может получить выбранное право?

После этого налоговый консультант и специалист по правам на недвижимость смогут проверить одну конкретную структуру, а не рекламное обещание.

Практический вывод

Фраза «льгота в размере 100 процентов НДС» описывает только часть возможной налоговой льготы. В бюджете проекта её следует учитывать после подтверждения объекта, продавца, документов, дат и права покупателя.

Проверьте структуру сделки и реальную сумму к оплате до внесения депозита.

Связанные материалы

Leasehold на Бали: какие права действительно получает владелец

Проверка участка на Бали до предварительного платежа

Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

Источники и границы

https://jdih.kemenkeu.go.id/dok/pmk-90-tahun-2025

https://pajak.go.id/id/peraturan/pajak-pertambahan-nilai-atas-penyerahan-rumah-tapak-dan-satuan-rumah-susun-yang-3

https://peraturan.bpk.go.id/Details/51310/uu-no-5-tahun-1960

https://www.peraturan.go.id/id/pp-no-18-tahun-2021

Что изучить дальше

Связанный вопрос Leasehold на Бали: какие права действительно получает владелец Связанный вопрос Проверка участка на Бали до предварительного платежа

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

Метод

Источники и дата обновления

DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.

Читать дальше

Проверка участка на Бали до предварительного платежа Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

## Виза E28A в Индонезии: доля и границы деятельности | DALLEAU

URL: https://dalleau.ai/ru/notes/indonesia-investor-visa-e28a.html

Главная / Материалы / Статус инвестора

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Материалы DALLEAU Источники проверены 13 июля 2026

E28A: доля заявителя, роль в компании и фактическая работа

Почему порог E28A относится к доле конкретного заявителя и почему роль, ежедневные задачи и RPTKA проверяются отдельно.

DALLEAU | Исследования и практические материалы Опубликовано

13 июля 2026

Последняя проверка

13 июля 2026

Проверено | 13 июля 2026 | первичные источники

Границы материала Независимая информация, не продажа услуг Проверьте применимость правил к вашей ситуации у компетентного органа или уполномоченного специалиста.

С чего начать Вопрос о E28A начинается с доли конкретного человека в компании. Название должности, общий бюджет проекта и сумма на банковском счёте PT PMA отвечают на другие вопросы.

Принцип Выбирать по реальной деятельности

Источники Официальные и первичные

Проверка Перед подачей или платежом

На этой странице Какие суммы не заменяют долю Что официальная страница связывает с E28A E28A и RPTKA проверяются отдельно Сроки и сервисные данные Что собрать до подачи Связанные материалы Источники и границы

На дату проверки официальная страница E28A требует документированную долю заявителя в компании-гаранте стоимостью не менее 10 млрд IDR или эквивалента. Если в компании два иностранных участника, условие нужно проверять отдельно по каждому из них. Общая стоимость бизнеса не распределяется между заявителями автоматически.

Какие суммы не заменяют долю

Сумма или документ

Что они могут показывать

Почему этого недостаточно для личного теста E28A

Бюджет строительства

Предполагаемую стоимость проекта

Он не подтверждает количество и стоимость акций заявителя

Инвестиционный план OSS

План по конкретным KBLI и месту проекта

Это корпоративный план, а не личный реестр доли

Деньги на счёте PT PMA

Ликвидность компании в определённый день

Владельцем средств является компания

Заём участника

Долг компании перед участником

Заём сам по себе не создаёт долю в капитале

Стоимость земли или виллы

Цену актива или договорного права

Актив может принадлежать компании или другой стороне, но не превращается в долю заявителя

Доля другого участника

Его участие в капитале

Она не переносится на второго заявителя

До формирования капитала следует получить письменное объяснение, каким документом и по какой оценке иммиграционная служба примет долю каждого заявителя.

Что официальная страница связывает с E28A

Текущая страница описывает инвестиционную деятельность, создание бизнеса, роль директора или комиссара и контроль производства товаров или оказания услуг в компании, в которую заявитель инвестировал.

Но это не означает, что разрешена любая деятельность. Под словом «управление» могут скрываться переговоры с подрядчиком, руководство сотрудниками, прямые продажи, приём платежей от гостей или работа на другую компанию. Фактический рабочий день нужно описать до подачи, а не после получения статуса.

Важны также место работы, лицензии PT PMA, действующий KBLI и то, от имени какой компании ведётся деятельность. E28A, выданная участнику одной компании, не даёт разрешение работать на другую организацию.

E28A и RPTKA проверяются отдельно

RPTKA представляет собой план использования иностранного работника, который в обычной ситуации оформляет индонезийский работодатель. В правилах существуют ограниченные исключения. Их применение зависит от роли и обстоятельств.

Доля, должность директора или комиссара и наличие E28A сами по себе не доказывают освобождение. Чтобы подтвердить освобождение, нужны применимая норма, точное описание роли и документы, подтверждающие её условия.

Сроки и сервисные данные

На дату проверки официальный профиль публикует варианты на один и два года, соответствующие сборы, отсутствие отдельного гаранта помимо компании, 90-дневный срок для использования выданной визы и специальную возможность позднее предоставить банковскую выписку для новой компании. Эти данные могут измениться.

Срок использования визы нельзя путать со сроком разрешённого пребывания. Указанный срок рассмотрения: это ориентир, а не гарантия.

Что собрать до подачи

актуальный акт PT PMA и реестр участников;

документированную долю каждого заявителя и способ её оценки;

подтверждение оплаты и бухгалтерскую проводку по капиталу;

описание должности и ежедневных задач;

действующий KBLI и место деятельности;

отдельный анализ RPTKA и возможного исключения;

перечень лицензий для фактической деятельности;

актуальный список документов, сбор и сроки в официальной системе.

Если компания связана с виллой, E28A не подтверждает право на участок, соответствие здания или возможность краткосрочной эксплуатации. Для этого нужна отдельная проверка проекта.

Связанные материалы

Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

Работа в Индонезии: что проверяется до рабочей визы

Как выбрать основание для пребывания в Индонезии по реальной деятельности

Источники и границы

Официальная страница E28A , проверено 22 июля 2026 года.

PP 34/2021 об использовании иностранных работников .

Permenaker 8/2021 .

Материал не подтверждает право конкретного человека на E28A или освобождение от RPTKA. Иммиграционную оценку доли, роль и трудовые документы нужно проверять для действующей структуры.

Официальные источники 13 июля 2026

Ссылки на государственные источники проверены на указанную дату. Если официальные страницы расходятся, материал показывает расхождение и использует более осторожное толкование.

Перейти к источникам

Что изучить дальше

Связанный вопрос Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A Связанный вопрос Работа в Индонезии: что проверяется до рабочей визы

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## E33G для удалённой работы в Индонезии: условия | DALLEAU

URL: https://dalleau.ai/ru/notes/indonesia-remote-worker-visa-e33g.html

Главная / Материалы / Удалённая работа

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Материалы DALLEAU Источники проверены 13 июля 2026

E33G для удалённой работы: сначала проверьте трудовые отношения

E33G может подойти тем, кто работает удалённо на иностранного работодателя. Важно проверить трудовой договор, уровень дохода и границы допустимой деятельности…

DALLEAU | Исследования и практические материалы Опубликовано

13 июля 2026

Последняя проверка

13 июля 2026

Проверено | 13 июля 2026 | первичные источники

Границы материала Независимая информация, не продажа услуг Проверьте применимость правил к вашей ситуации у компетентного органа или уполномоченного специалиста.

С чего начать Работа с ноутбуком из дома на Бали ещё не означает соответствия E33G. В официальном описании определяющими являются трудовые отношения с компанией, созданной за пределами Индонезии.

Принцип Выбирать по реальной деятельности

Источники Официальные и первичные

Проверка Перед подачей или платежом

На этой странице Опубликованные условия Четыре распространённые ситуации Индонезийские клиенты и местная деятельность Иммиграционный статус и налоги Почему важно совпадение документов и действий Что проверить перед подачей Связанные материалы Источники и границы

Перед подачей стоит письменно ответить на четыре вопроса:

Какая компания является работодателем?

Есть ли с ней действующий трудовой договор?

За какую работу и в какой сумме она платит?

Кому фактически оказываются услуги?

Если ответы не совпадают с документами, название профессии или регулярные поступления на счёт проблему не решают.

Опубликованные условия

На дату проверки официальная страница E33G указывает:

трудовой договор с компанией, созданной за пределами Индонезии;

подтверждённый годовой доход не менее 60 000 USD;

личную банковскую выписку с суммой не менее 2 000 USD;

срок пребывания один год;

отсутствие требования к гаранту;

государственный сбор 7 000 000 IDR;

указанный срок рассмотрения пять рабочих дней;

обязанность использовать выданную визу для въезда в течение 90 дней.

Сроки, сбор и перечень документов являются текущими данными сервиса. Они могут измениться и не гарантируют одобрение или фактический срок рассмотрения.

Четыре распространённые ситуации

Сотрудник иностранной компании. Если работодатель зарегистрирован за пределами Индонезии, есть трудовой договор и подтверждается необходимый доход, ситуация в целом соответствует опубликованным условиям E33G. Остальные документы всё равно проверяются по действующим требованиям.

Независимый консультант. Договоры с несколькими клиентами не становятся трудовым договором с иностранным работодателем автоматически. Нужно установить, какую юридическую модель действительно подтверждают документы.

Владелец собственной иностранной компании. Само владение компанией не доказывает трудовые отношения. Важны отдельный договор, реальная оплата и соответствие фактических задач заявленной роли.

Автор или специалист, получающий деньги через платформу. Платёж от платформы или рекламной сети не обязательно означает наличие работодателя. Такой случай нужно анализировать отдельно.

Индонезийские клиенты и местная деятельность

E33G не следует использовать как общий ответ на работу с клиентами в Индонезии. Местные договоры, оплата из Индонезии, управление персоналом на Бали и ежедневная эксплуатация виллы затрагивают другие иммиграционные, трудовые, корпоративные и налоговые вопросы.

Проживание в собственном доме тоже не меняет эту границу. Человек может работать по иностранному трудовому договору и одновременно иметь долю в проекте. Эти обстоятельства проверяются отдельно.

Иммиграционный статус и налоги

Из E33G нельзя делать вывод об отсутствии налогов. Для налогового анализа имеют значение продолжительность присутствия, источник дохода, договоры, место фактического управления и применимые правила или соглашения. Визовый код является лишь одним из факторов.

Почему важно совпадение документов и действий

17 сентября 2025 года иммиграционная служба опубликовала сообщение о депортации держателя E33G после того, как служба установила местную деятельность, которая не соответствовала заявленному основанию. Случай относится к конкретным обстоятельствам и не позволяет предсказывать решения по другим заявителям. Он показывает, насколько важно, чтобы фактическая работа совпадала с документированными трудовыми отношениями.

Что проверить перед подачей

юридическое наименование и страну регистрации работодателя;

трудовой договор и описание должности;

источник, период и доказательства дохода;

банковскую выписку в форме, принимаемой текущей системой;

отсутствие индонезийских клиентов и местных задач, для которых требуется иное оформление;

отдельную налоговую оценку;

действующие сбор, сроки и список документов непосредственно в заявке.

Если переезд связан также с PT PMA, строительством или эксплуатацией резиденции, эти вопросы нужно разбирать отдельно. E33G не даёт права выполнять работу для индонезийского проекта.

Связанные материалы

Как выбрать основание для пребывания в Индонезии по реальной деятельности

Работа в Индонезии: что проверяется до рабочей визы

С маленькими детьми на Бали: наш семейный опыт

Источники и границы

Официальная страница E33G , проверено 22 июля 2026 года.

Сообщение иммиграционной службы от 17 сентября 2025 года , используется только как пример конкретного правоприменения.

Материал не подтверждает соответствие конкретного заявителя E33G и не даёт налогового заключения. Перед подачей нужны актуальная проверка сервиса и профессиональная оценка пограничных моделей занятости.

Официальные источники 13 июля 2026

Ссылки на государственные источники проверены на указанную дату. Если официальные страницы расходятся, материал показывает расхождение и использует более осторожное толкование.

Перейти к источникам

Что изучить дальше

Связанный вопрос Как выбрать основание для пребывания в Индонезии по реальной деятельности Связанный вопрос Работа в Индонезии: что проверяется до рабочей визы

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Вилла на Бали размещена на OTA. Что это на самом деле доказывает? | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/indonesia-short-term-accommodation-enforcement-2026/

Field Notes

/

Регуляторный разбор

Field Notes · Регулирование

Вилла на Бали размещена на OTA. Что это на самом деле доказывает?

Как после августа 2026 года связаны NIB, KBLI, NKU, документы объекта, местный налог и отчётность об иностранных гостях

01

Объявление OTA

02

Юридическое лицо

03

Вид и масштаб деятельности

04

Объект и здание

05

Налоги и отчётность

06

Реальный оператор

Это доказывает, что платформа приняла объявление.

Это не доказывает, что компания, вид деятельности, объект, здание и работа с гостями образуют полную и согласованную цепочку соответствия требованиям Индонезии.

Игнорировать эту разницу становится всё сложнее.

В мае 2026 года Министерство туризма Индонезии сообщило, что выявило около 1 600 объектов размещения, продвигаемых через онлайн-платформы без лицензии на ведение бизнеса. Операторам дали срок для приведения документов в порядок. Для нерешённых случаев было объявлено начало удаления объявлений с 1 августа 2026 года. Для новых продавцов на OTA также ожидалось предоставление основных данных компании, включая NIB и KBLI.

Отдельно Министерство разрабатывает API, который должен связать проверку OTA с данными OSS по NIB, KBLI и NKU. Публично заявленная целевая дата для интегрированной системы, июнь 2027 года. На дату этой заметки это ещё не универсальный автоматический контроль лицензии в реальном времени.

Практическое направление уже очевидно:

Онлайн-размещение переходит от логики «платформа меня приняла» к логике «платформа может установить и проверить реального оператора».

Пределы этой заметки

Здесь изложено наше чтение публичной системы контроля по состоянию на 13 августа 2026 года. Заметка не подтверждает соответствие конкретного объекта требованиям. Для этого необходимо проверить фактического оператора, документы компании и полный файл объекта по соответствующей локации.

Ответ на одном экране

Элемент

Что он подтверждает

Чего он не доказывает

Объявление на OTA

Объект коммерчески виден на платформе.

Что оператор лицензирован, использование объекта законно, здание подходит для этой деятельности, а налоги и отчётность по гостям оформлены правильно.

NIB

Личность и регистрацию хозяйствующего субъекта в OSS.

Что каждый вид деятельности, каждая локация и все дополнительные требования оформлены правильно.

KBLI

Заявленную классификацию экономической деятельности.

Что эта деятельность доступна именно этой компании, в этом масштабе и в этой локации, либо что фактическая работа соответствует описанию.

NKU

Конкретную запись о деятельности в OSS, обычно связывающую вид деятельности и локацию.

Что вся цепочка разрешений по объекту и отрасли завершена.

Сертификат стандарта или разрешение

Один из требуемых уровней лицензирования в зависимости от риска и отрасли.

Что землепользование, здание, налоги, миграционная отчётность и фактическая эксплуатация согласованы.

PBG или SLF

Элементы строительного контроля в рамках заявленного назначения и документации здания.

Что жилое здание автоматически разрешено использовать как туристическое размещение.

Регистрация местного налога

Что операция известна местной налоговой системе.

Что уплата налога исправляет неверный KBLI, отсутствующую лицензию или проблему здания.

Отчётность APOA

Что данные об иностранных гостях передаются через процесс объекта размещения.

Что отчитывающаяся компания является правильным лицензированным оператором и выполнила все остальные требования.

Система работает накопительно. Один документ не заменяет остальные.

Конкретный пример

Вилла в Чангу профессионально сфотографирована и размещена на Airbnb.

В профиле хоста используется бренд управляющей компании. Выплаты гостей поступают в компанию A. NIB принадлежит компании B. В OSS у неё зарегистрирована общая консультационная деятельность. В документах здания объект всё ещё описан как частная резиденция. Команда получает инструкции от компании C. Иностранный основатель лично управляет ценами и бронированиями. Местный налог декларируется под другим именем.

Каждый отдельный факт может казаться правдоподобным.

Вместе они создают основной вопрос:

Какая компания фактически продаёт проживание, и какой документ даёт ей право делать это именно на этом объекте?

Объявление на платформе не отвечает на этот вопрос.

Что изменилось в 2025 году

Несколько изменений часто описывают так, будто Индонезия внезапно запретила краткосрочную аренду. Это неверное чтение.

Точнее говорить об обновлении всей регуляторной архитектуры.

PP 28/2025

заменил прежнюю национальную систему риск-ориентированного лицензирования.

Постановление Министерства туризма 6/2025

обновило стандарты туризма, надзор и административные санкции.

Закон 18/2025

внёс изменения в Закон о туризме.

Эти акты важны потому, что контроль туристической деятельности не заканчивается пятизначным кодом KBLI. В проверку могут входить лицензирование бизнеса, отраслевые стандарты, пространственная совместимость, экологические требования, PBG или SLF, местное налогообложение и реальная деятельность компании.

Это не «один новый закон о виллах».

Это движение к тому, что разные части файла можно сопоставлять друг с другом.

Что изменилось в 2026 году

Заявление о 1 600 компаниях

Министр туризма сообщил, что Министерство выявило и внутренне проверило около 1 600 объектов размещения, продвигаемых через OTA без лицензии на ведение бизнеса.

Это национальная цифра. Она не означает 1 600 нелегальных вилл только на Бали.

Объявленная последовательность была следующей:

выявить компании;

уведомить их через каналы OTA;

предоставить срок для исправления;

начать удаление нерешённых объявлений с 1 августа 2026 года;

разрешить соответствующим требованиям продавцам вернуться после проверки.

По состоянию на 13 августа 2026 года не был опубликован полный официальный список удалённых компаний или проверенное количество фактических удалений по каждой платформе. Поэтому неточно утверждать как то, что были удалены все 1 600, так и то, что не было удалено ни одного объявления.

Подключение новых продавцов

Министерство также заявило, что новые продавцы должны предоставлять данные NIB и KBLI, а не входить на рынок OTA без идентификации оператора.

Это уже меняет практику, даже до полного запуска будущего API.

Планируемый API

Объявленный API должен проверять три элемента:

NIB;

KBLI;

NKU.

При совпадении данных с OSS продавец может пройти проверку. При несовпадении подключение может быть остановлено или отклонено.

Публично заявленная цель, июнь 2027 года. До этого владельцам не следует описывать систему так, будто все OTA уже подключены к OSS в реальном времени.

Но направление политики однозначно. Машиночитаемая согласованность документов будет иметь всё большее значение.

Почему NIB не является «лицензией виллы»

NIB идентифицирует хозяйствующего субъекта.

Это важно. Но NIB сам по себе не доказывает, что:

зарегистрирован правильный вид размещения;

эта деятельность доступна компании в нужном масштабе;

в OSS указана правильная локация объекта;

завершён требуемый сертификат стандарта или разрешение;

землепользование допускает деятельность;

здание одобрено и пригодно для заявленного использования;

корректно оформлен местный налог;

иностранные гости декларируются;

компания в документах совпадает с компанией, которая реально управляет объектом.

Фраза «у виллы есть NIB» обычно неполна. NIB принадлежит хозяйствующему субъекту, а не зданию как таковому.

Правильный вопрос звучит иначе:

Какая компания имеет какой NIB, для какого вида деятельности и какой локации, и как это связано с данным объектом и договором с гостем?

Почему KBLI не является просто ключевым словом

KBLI классифицирует деятельность.

Код должен следовать за тем, что компания реально делает.

Компания, которая напрямую предоставляет краткосрочное проживание, не обязательно выполняет ту же деятельность, что компания, управляющая чужим объектом за вознаграждение. Компания, администрирующая жилую недвижимость, не обязательно имеет право продавать туристические ночёвки. Консультант не становится операционным менеджером только из-за формулировки в договоре.

KBLI 2025 делает некоторые границы яснее.

Например:

55203 относится к деятельности вилл в частных домах, управляемых владельцами;

55901 относится к операционному управлению размещением третьей стороной за плату за управление;

гостиницы и апарт-отели относятся к другим классификациям;

общая управленческая консультация отличается от прямого операционного управления;

управление недвижимостью и посредничество в размещении также являются отдельными вопросами.

Название объекта в Instagram не определяет код.

Почему важен NKU

NKU представляет конкретную запись о хозяйственной деятельности в OSS.

Практически это важно потому, что одна компания может иметь несколько видов деятельности и несколько локаций. Недостаточно узнать, что у компании где-то существует NIB. Нужно проверить, соответствует ли изучаемый объект и деятельность правильной действующей записи.

Будущая проверка OTA по NIB, KBLI и NKU будет сопоставлять не только существование компании, но также её деятельность и конкретную запись в OSS.

Объект всё равно требует отдельной проверки

Даже хорошо структурированный оператор не может устранить дефект самого объекта.

Проверка объекта может включать:

совместимость с пространственным планированием и зонированием;

титул, аренду или иное право пользования;

законный доступ;

положение PBG и SLF;

экологические требования;

назначение здания;

системы воды и сточных вод;

требования по пожарной безопасности, санитарии и туризму, применимые к классификации;

ограничения района и эксплуатации;

регистрацию местного налога;

страхование.

Управляющая компания с действующим NIB не может передать свой корректный файл здания другому дому.

Кто является оператором

Оператор не всегда является владельцем и не всегда является менеджером.

Полезно разделить роли:

Роль

Типичная ответственность

Владелец объекта или носитель права

Владеет активом либо законно контролирует его использование.

Оператор размещения

Предоставляет проживание, заключает договор с гостем и несёт клиентскую часть бизнеса.

Менеджер размещения

Управляет операциями от имени владельца или оператора в рамках определённого мандата.

OTA или посредник

Распространяет предложение либо соединяет поставщика и спрос.

Поставщик услуг

Выполняет ограниченную функцию, например маркетинг, финансы, техническое обслуживание или транспорт.

Эти роли могут принадлежать разным компаниям.

Они не должны объединяться в одну историю только в момент проверки.

Самая быстрая диагностика:

кто указан на OTA;

кто заключает договор с гостем;

кто получает деньги;

кто нанимает и руководит командой;

кто контролирует цены и бронирования;

кто утверждает возвраты;

кто декларирует налог и APOA;

кто несёт убыток и отвечает по претензии гостя.

APOA касается не только гостиниц

Индонезийская система отчётности об иностранных гостях применяется к владельцам или управляющим объектов размещения и реализуется через APOA.

Официальные разъяснения и проверки иммиграции охватывают гостиницы, виллы и индивидуальных поставщиков размещения.

Для владельца это важно, потому что APOA создаёт ещё один проверяемый след операционной реальности.

Какая компания или управляющий подаёт данные? Под каким объектом и записями гостей? Совпадает ли эта роль с OTA, договором с гостем и лицензией?

APOA не доказывает всю структуру. Но он может показать, соответствует ли повседневная практика заявленному оператору.

Бали добавляет собственный уровень контроля

Бали отдельно усиливает давление на нелицензированное размещение и налоговые несоответствия.

Правительство провинции просило Airbnb поддержать удаление компаний без необходимых лицензий или налогового соответствия. Туристические органы Бали также объявили программу аудита Bali Kerthi для объектов размещения и других туристических предприятий.

Кроме того, в июле 2026 года провинция публично подтвердила закрытие доступа новых PT PMA в OSS по 18 категориям KBLI с низким и средне-низким риском. Политика действует с третьей недели мая 2026 года.

Это не создаёт новый вид права на недвижимость.

Это означает, что национальные данные OSS, местный туристический надзор, налоги и онлайн-дистрибуция становятся менее изолированными друг от друга.

Что владельцу следует проверить сейчас

Компания

действующий учредительный акт и запись AHU;

NIB;

полные листы деятельности OSS, а не только скриншот кода;

масштаб бизнеса и уровень риска;

KBLI и NKU для реальной деятельности и локации;

директоров, акционеров и декларацию бенефициарного владельца.

Объект

титул или аренду;

право, переданное оператору;

зонирование и пространственную совместимость;

положение PBG и SLF;

применимые экологические и туристические требования;

регистрацию местного налога;

страхование.

Эксплуатация

юридическое имя продавца на OTA и счёт выплат;

условия для гостя и счёт;

правила отмены и право утверждать возврат;

работодателя и руководителя команды;

контроль PMS и система управления каналами продаж;

процесс PBJT;

процесс APOA;

ответственность за претензии гостей.

Связи между элементами

договор управления;

договор аренды или право эксплуатации;

договоры услуг;

денежные потоки;

матрицу сотрудников и прав принятия решений;

историю перехода, если оператор менялся.

Три частые ошибочные вывода

«Airbnb принял объявление, значит всё законно»

Нет. Решение платформы о публикации является решением о дистрибуции, а не юридическим заключением по объекту и оператору.

«У компании есть NIB, значит вилла лицензирована»

Нет. Деятельность, масштаб, локация, отраслевой стандарт, файл объекта и фактическая эксплуатация должны совпадать.

«Правительство запрещает OTA»

Нет. Публичная политика направлена на проверку продавцов размещения и устранение нерешённого нелицензированного предложения, а не на запрет онлайн-платформ как категории.

Решение простыми словами

Программа контроля 2026 года не делает каждую виллу на Бали незаконной.

Она делает всё менее безопасным одно старое предположение:

Видимость в интернете не является доказательством полноты операционного файла.

Серьёзный владелец сначала определяет реального оператора. Затем он проверяет вокруг этого оператора компанию, деятельность, локацию, объект, здание, налоги, персонал и отчётность по гостям.

Правило, которое стоит сохранить:

Объявление должно быть публичным лицом согласованной операционной системы, а не её заменой.

Обсудить проект с Франсуа

Основные источники и прямые ссылки для проверки

Министерство туризма: система API между OTA и OSS

ANTARA: около 1 600 выявленных предприятий и объявленный процесс с 1 августа

PP 28/2025 о лицензировании на основе риска

Официальный OSS, KBLI 55203, деятельность виллы

Официальный OSS, KBLI 55901, управление размещением

Правительство провинции Бали: ограничение PMA по 18 категориям

Иммиграционная служба Бали: APOA и работа с поставщиками размещения

Для реальной заявки решающим остается актуальный результат в OSS. Материал ANTARA подтверждает приписанное министру заявление, а не итоговое число объектов, фактически удаленных после периода исправления.

## Работа в Индонезии: работодатель, RPTKA и виза | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/indonesia-work-visa-rptka.html

Главная

/

Материалы

/

Разрешение на работу

Перед решением проверьте источники и дату обновления.

Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в

официальной базе нормативных актов Индонезии

и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике:

notes@dalleau.ai

.

Материалы DALLEAU

Источники проверены

13 июля 2026

Работа в Индонезии: что проверяется до рабочей визы

Как связаны индонезийский работодатель, должность, RPTKA, трудовой сбор и иммиграционная категория иностранца.

DALLEAU | Исследования и практические материалы

Опубликовано

13 июля 2026

Последняя проверка

13 июля 2026

Проверено | 13 июля 2026 | первичные источники

Границы материала

Независимая информация, не продажа услуг

Проверьте применимость правил к вашей ситуации у компетентного органа или уполномоченного специалиста.

С чего начать

Оформление иностранного сотрудника начинается с индонезийского работодателя. Сначала определяются должность, задачи, место и срок работы. После этого проверяются трудовые документы и подходящая иммиграционная категория.

Принцип

Выбирать по реальной деятельности

Источники

Официальные и первичные

Проверка

Перед подачей или платежом

На этой странице

Что такое RPTKA

Как описать реальную роль

Исключение нужно подтвердить точно

DKPTKA оплачивает работодатель отдельно

Разрешённые и закрытые должности меняются

Последовательность проверки

Связанные материалы

Источники и границы

Разговорное выражение «рабочий KITAS» скрывает несколько связанных процедур. Само разрешение на пребывание не отвечает на вопрос, вправе ли конкретная организация использовать труд иностранца на этой должности и в этом месте.

Что такое RPTKA

RPTKA представляет собой план использования иностранного работника, который обычно должен получить работодатель. В документе указываются организация, должность, срок и место работы. Изменение одного из этих элементов может потребовать новой проверки.

Применимые правила также затрагивают квалификацию иностранца. В зависимости от основания проверяются образование и компетенция либо не менее пяти лет соответствующего опыта. Работодатель должен учитывать назначение индонезийского сотрудника для передачи знаний и саму программу такой передачи.

Как описать реальную роль

До оплаты услуг по оформлению работодателю полезно подготовить краткое описание роли:

юридическое наименование компании;

точная должность;

ежедневные задачи и полномочия;

адрес или территория работы;

продолжительность и режим занятости;

требуемые лицензии компании;

образование и опыт иностранца;

индонезийский сотрудник, которому передаются знания, если это требуется.

Общая формулировка «управляет виллами» для проверки недостаточна. Руководство компанией, продажи, работа с гостями, техническое обслуживание и контроль подрядчика: это разные функции.

Исключение нужно подтвердить точно

Правила предусматривают ограниченные случаи, в которых RPTKA может не требоваться. Вывод зависит от конкретной роли и документов. Доля в PT PMA, должность директора или комиссара и статус E28A не подтверждают исключение автоматически.

В подтверждении исключения должны быть номер применимой нормы, объяснение её условий и доказательства того, что фактическая роль им соответствует.

DKPTKA оплачивает работодатель отдельно

Когда сбор DKPTKA применим, правила устанавливают 100 USD за человека, должность и месяц. Неполный месяц считается полным. Это не визовый сбор и не общая цена пакета.

Отдельно оплачиваются иммиграционные процедуры и услуги специалистов. Поэтому одна рекламная сумма без разбивки не позволяет понять, какие государственные платежи действительно включены.

Разрешённые и закрытые должности меняются

Для иностранцев существуют перечни доступных и запрещённых позиций. Их нужно сверять с действующими решениями Министерства труда и конкретным сектором. Перевод названия должности на английский не меняет её фактического содержания.

Публичный иммиграционный каталог показывает семейства рабочих категорий, но его недостаточно для постоянной таблицы точных кодов, сборов и сроков. Надёжный ответ получают из действующей спонсорской заявки после согласования роли.

Последовательность проверки

Описать фактическую работу.

Проверить, вправе ли компания вести соответствующую деятельность.

Сопоставить должность с актуальными ограничениями.

Определить необходимость RPTKA или документировать точное исключение.

Сверить квалификацию, место и срок.

Получить расчёт DKPTKA и других государственных платежей.

Открыть действующую иммиграционную заявку и подтвердить код, документы и сбор.

В проекте резиденции трудовые документы иностранца проверяются отдельно от права на землю, разрешений здания и лицензии оператора. Соответствие в одной области не исправляет недостаток в другой.

Связанные материалы

E28A: доля заявителя, роль в компании и фактическая работа

E33G для удалённой работы: сначала проверьте трудовые отношения

Как выбрать основание для пребывания в Индонезии по реальной деятельности

Источники и границы

PP 34/2021

.

Permenaker 8/2021

.

Kepmenaker 228/2019

и

Kepmenaker 349/2019

, статус проверен 22 июля 2026 года.

Материал не заменяет оформление разрешения на работу и не подтверждает применимость исключения. Точный код, должность и расчёт проверяются для конкретного работодателя.

Официальные источники

13 июля 2026

Ссылки на государственные источники проверены на указанную дату. Если официальные страницы расходятся, материал показывает расхождение и использует более осторожное толкование.

Перейти к источникам

Что изучить дальше

Связанный вопрос

E28A: доля заявителя, роль в компании и фактическая работа

Связанный вопрос

E33G для удалённой работы: сначала проверьте трудовые отношения

Проверить ситуацию в подборщике виз

Открыть инструмент (EN) >

От информации к решению по проекту

Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт

Я хочу получать Field Notes и ознакомился с

информацией о конфиденциальности (EN)

.

Подписаться

## KBLI 2025 для вилл на Бали: 55203 и 55901 | DALLEAU

URL: https://dalleau.ai/ru/notes/kbli-2025-bali-villa-rental-property-management.html

Материалы DALLEAU
KBLI выбирают по деятельности, а не по слову «вилла»
Как разделить владение, бронирование, управление и посредничество, а затем проверить KBLI и OSS для каждого участника.
DALLEAU | Исследования и практические материалы
Опубликовано
16 июля 2026
Последняя проверка
20 июля 2026
Проверено | 20 июля 2026 | первичные источники
Существенно обновлено
Для KBLI 55203 нет маршрута OSS для крупного бизнеса. Теперь материал объясняет, почему этот код не подходит для новой PT PMA и чем отличаются ранее выданные лицензии.
Обновлено 20 июля 2026 года
Следующая плановая проверка: 15 августа 2026 года
Перед решением проверьте источники и дату обновления.
Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.
Источники и ограничения
Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.
Проверьте дату, действующий текст на Bahasa Indonesia в
официальной базе нормативных актов Индонезии
и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.
Сообщить об ошибке или устаревшем источнике:
notes@dalleau.ai
.
Владелец виллы на Бали редко выполняет все задачи сам. Один человек может владеть объектом, другая компания принимать бронирования, третья заниматься гостями и персоналом. Платформа только приводит клиента. Для KBLI это разные роли.
Поэтому вопрос «какой код нужен для виллы?» слишком общий. Сначала нужно описать, что именно происходит в объекте, кто заключает договор с гостем или жильцом и на чей счёт поступают деньги.
Сначала разберите роли
Для первичной проверки достаточно пяти вопросов:
Кто владеет объектом или имеет договорное право им пользоваться?
Кто предлагает проживание и принимает обязательства перед гостем?
Кто ежедневно управляет объектом, персоналом, заселением и жалобами?
Кто занимается только поиском клиентов или бронированием?
Кто получает выручку и оплачивает расходы?
Ответы могут вести к нескольким видам деятельности. Один код не обязан описывать всю цепочку.
Практическая позиция в 2026 году
В текущей публичной матрице KBLI 55203 нет маршрута для крупного бизнеса. Новая PT PMA не должна рассматривать этот код как вариант прямой эксплуатации виллы. KBLI 55901 отдельно признаёт операционное управление размещением третьей стороной и на национальном уровне содержит путь для крупного бизнеса и PMA. Для новой заявки на Бали всё равно нужен фактический результат OSS, поскольку провинциальное ограничение затрагивает старую категорию 55900, из которой был выделен 55901.
Может ли PT PMA эксплуатировать виллу на Бали?
Кто на самом деле эксплуатирует виллу?
Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе.
Что описывают основные коды
55203 Aktivitas Vila
относится к краткосрочному размещению туристов в частном доме с удобствами, когда объектом управляет собственник. Само описание кода не подтверждает, что он доступен любой PT PMA, в любом месте и при любом масштабе бизнеса.
55901 Aktivitas Jasa Manajemen Akomodasi
касается повседневного управления размещением для другого собственника за вознаграждение. Это отдельная услуга. Она не делает управляющего собственником и не заменяет документы по основной деятельности объекта.
55400
относится к посредничеству в размещении. Посредник помогает заключить сделку, но обычно не ведёт ежедневную эксплуатацию.
68292
охватывает управление жилой недвижимостью в своей классификационной области. Он не превращается автоматически в код туристического размещения.
68112
относится к сдаче и эксплуатации собственной или арендованной жилой недвижимости в рамках соответствующей классификации. Его также нельзя выбирать по названию без проверки фактической модели.
Эти пояснения нужны для постановки вопросов. Окончательный результат даёт актуальная проверка OSS по конкретному заявителю, масштабу, месту и заявленной деятельности.
Четыре проверки, которые часто смешивают
У результата OSS есть несколько уровней. Их лучше хранить отдельно:
классификация деятельности;
уровень риска;
доступность деятельности для иностранной инвестиции;
документ, фактически выданный конкретной компании.
Низкий риск не означает, что деятельность открыта конкретной PT PMA. Доступность для иностранной инвестиции не подтверждает документы участка, здания или выбранную схему работы. Публичная карточка кода тоже не заменяет результат по заявителю.
Почему встречаются номера 55193 и 55203
В официальных материалах переходного периода используются два номера. BPS сопоставляет старый
55193
с новым
55203
. При этом приложение к Permenpar 6/2025 по виллам продолжает использовать
55193
.
Такое несовпадение нельзя устранять предположением. В материалах проверки нужно сохранить дату каждого источника, старый и новый номер, а затем приложить актуальную выгрузку OSS. Так будет видно, на каком документе основан вывод.
Что означает граница в один год
KBLI 2025 разделяет виды деятельности по сроку размещения: размещение менее чем на год относится к разделу 55, а проживание сроком от года рассматривается в другой классификационной области.
Эта граница отвечает на вопрос классификации. Она сама по себе не решает вопросы зонирования, назначения здания, налога, условий договора, лицензирования или доступа иностранного капитала.
Управляющая компания не заменяет проверку владельца
Наличие NIB у менеджера подтверждает сведения о его компании. Для объекта всё равно проверяют собственника или правообладателя, оператора, разрешённое использование участка, документы здания, заявленную деятельность и денежный поток.
То же относится к OTA. Размещённое объявление показывает, что объект присутствует на платформе. Оно не является доказательством полного соответствия требованиям.
Что сохранить до запуска
В проектном файле должны быть:
краткое описание фактической деятельности;
схема сторон, договоров и платежей;
актуальная выписка KBLI;
актуальную выгрузку OSS по заявителю с датой получения;
документы участка и здания;
перечень требований к работе объекта и туристической деятельности;
договоры с менеджером и посредником, если они участвуют;
налоговая записка по реальному потоку денег.
Если роли меняются, документы и выводы пересматривают до подписания новых договоров и до запуска продаж.
Практический вывод
Слово «вилла» описывает объект для рынка. Для лицензирования важны действия и участники. Хорошая проверка начинается с карты ролей, после чего каждый вывод подтверждается своим документом.
Проверьте структуру проекта до запуска продаж или передачи объекта оператору.
Связанные материалы
Что подтверждает NIB и какие документы всё равно нужны
Общий бассейн: что именно получает владелец виллы
Источники и границы
https://ppid.bps.go.id/upload/doc/Klasifikasi_Baku_Lapangan_Usaha_Indonesia_2025_1769138593.pdf
https://www.bps.go.id/id/publication/2026/04/22/909d503355d2b7664e43dea8/tabel-konversi-kbli-2020---kbli-2025.html
https://www.bps.go.id/id/news/2026/07/14/922/kbli-2025--menangkap-perubahan--menguatkan-fondasi-data-pariwisata.html
https://peraturan.bpk.go.id/Details/332573/permeninvesbkpm-no-5-tahun-2025
Что изучить дальше
Связанный вопрос
Что подтверждает NIB и какие документы всё равно нужны
От информации к решению по проекту
Этот вопрос относится к реальному проекту резиденции на Бали?
Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.
Заполнить конфиденциальный бриф
Получать новые материалы
Мы отправим короткое письмо после новой публикации или действительно важного обновления.
Сайт
Я хочу получать Field Notes и ознакомился с
информацией о конфиденциальности (EN)
.
Подписаться
Метод
Источники и дата обновления
DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.
Читать дальше
Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A
Один бренд может скрывать несколько разных сторон
Что подтверждает NIB и какие документы всё равно нужны
Связанные материалы
Что подтверждает NIB и какие документы всё равно нужны

## С маленькими детьми на Бали: наш семейный опыт | DALLEAU

URL: https://dalleau.ai/ru/notes/living-in-bali-family.html

Ко всем материалам Материалы DALLEAU 10 июля 2026 С маленькими детьми на Бали: наш семейный опыт

Перед переездом я больше всего переживала из-за климата, медицины, дорог и бытовых вопросов.

DALLEAU | Исследования и практические материалы Опубликовано

10 июля 2026

Последняя проверка

23 июля 2026

Проверено | 23 июля 2026 | первичные источники

Короткий ответ СЕМЬЯ · ДЕТИ · ЖИЗНЬ НА БАЛИ

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

Перед переездом я больше всего переживала из-за климата, медицины, дорог и бытовых вопросов. Мне было непонятно, как дети перенесут жару и влажность, быстро ли привыкнут к новой обстановке, сможем ли мы найти хорошего врача и детский сад, в котором им действительно будет комфортно.

В реальности дети адаптировались гораздо легче, чем я ожидала. Сложнее было нам, взрослым: заново выстроить быт, разобраться с транспортом, понять, куда обращаться в случае болезни, найти людей, которым можно доверять, и привыкнуть к тому, что многое здесь устроено иначе, чем в Европе.

Я не хочу доказывать, что Бали лучше для всех семей. У каждого ребёнка свой характер, возраст и потребности. Я могу поделиться только тем, что увидела у своих детей и что оказалось важным для нас.

Как я поняла, что детям здесь хорошо

Для ребёнка Бали может оказаться очень естественной средой. Здесь дети много времени проводят на свежем воздухе. Вокруг природа, вода, животные, дети из разных стран. По моему опыту, люди тепло относятся к детям, улыбаются им, разговаривают с ними и стараются помочь. У ребёнка реже возникает ощущение, что он кому-то мешает.

Но одной улыбки у ворот детского сада мне недостаточно, чтобы судить об адаптации. Я смотрю, хочет ли ребёнок туда идти, в каком настроении возвращается домой, как спит, как общается с другими детьми и рассказывает ли, что происходило в течение дня.

По своим детям я увидела, что здесь они стали более расслабленными. Они стали самостоятельнее, любознательнее и увереннее в общении. Это только мой личный опыт как мамы. Он не означает, что любой ребёнок почувствует себя на Бали так же.

На что я смотрю при выборе детского сада

Мы попробовали несколько дошкольных учреждений, и они оказались очень разными. Где-то мне нравилась программа, но не хватало вовлечённости воспитателей. Где-то у меня возникали вопросы к безопасности территории, размеру группы или общей атмосфере.

С тех пор при выборе детского сада я в первую очередь смотрю, как взрослые относятся именно к моему ребёнку. Замечают ли они его характер и сильные стороны? Понимают ли, когда ему нужно больше времени на адаптацию? Готовы ли подстраиваться под ребёнка, если стандартный подход ему не подходит?

Все дети разные. Один сразу включается в игру, другой сначала долго наблюдает. Одному нужно много движения. Другому важны спокойствие и время. Поэтому для меня важно, чтобы воспитатели не пытались привести всех детей к одному стандарту.

Я обязательно спрашиваю, сколько детей в группе и сколько воспитателей и помощников приходится на эту группу. Ещё я смотрю, кто может войти на территорию, как контролируется вход и кому отдают ребёнка после занятий. Внешний вид детского сада на эти вопросы не отвечает.

В детском саду, куда мы ходим сейчас, мне нравится ощущение настоящего сообщества. Родители общаются, дети знают друг друга, семьи иногда встречаются и вне школы. У нас появилось чувство, что мы стали частью общего круга, а не просто привозим ребёнка утром и забираем вечером.

Что было иначе в нашем прежнем европейском саду

До переезда наши дети ходили в детский сад в Европе. Там всё было более привычным и предсказуемым. Родителям подробно рассказывали, что ребёнок ел, сколько пил, когда спал и как прошёл его день. Внимательнее относились к медицинским документам и организационным правилам. От этого мне было спокойнее.

В детских садах, которые мы попробовали на Бали, мне больше запомнились игра, природа и разнообразие занятий. Дети рисовали, делали поделки, наблюдали за насекомыми, что-то выращивали, проводили небольшие эксперименты и много двигались. Ребёнок шёл играть с друзьями и при этом незаметно учился новому.

Я не могу сказать, что один подход однозначно лучше другого. Мне нравится, что здесь детям дают больше свободы и стараются их увлечь. При этом мне не хватает подробных и понятных рассказов воспитателей о том, как прошёл день. Мне хотелось бы, чтобы в одном детском саду сочеталось и то, и другое.

Если ребёнку уже нужна не дошкольная группа, а полноценная школьная программа, вопросов становится больше. Нужно заранее узнать язык обучения, программу, правила поступления, все обязательные платежи и то, как ребёнок сможет продолжить образование, если семья снова переедет. Наш личный опыт относится прежде всего к маленьким детям, поэтому я не берусь судить, насколько Бали подходит школьникам старшего возраста.

Повседневность совсем не похожа на вечный отпуск

Большая часть недели всё равно состоит из детского сада, сна, еды, работы, покупок, приготовления ужина, уборки и других домашних дел. Да, вокруг пальмы, океан и бассейны. Но с маленькими детьми это не значит, что вы будете каждый день проводить на пляже.

Поездка на пляж превращается в отдельное мероприятие. Нужно учитывать жару, сильное солнце, воду, песок, еду, игрушки, сменную одежду и дорогу обратно. Иногда проще провести время рядом с домом, чем потратить несколько часов на дорогу туда и обратно.

Во время сильной жары мы стараемся не оставаться надолго на солнце в середине дня. В сезон дождей планы приходится менять в последний момент. Когда много комаров, мы особенно внимательно следим за защитой детей от укусов.

Поэтому семейный дом на Бали я теперь оцениваю не только по количеству спален и красивому бассейну. Важно, можно ли закрыть доступ к воде, есть ли тень, где дети будут играть, удобно ли стирать и сушить вещи, защищены ли спальни от насекомых и остаётся ли у семьи своё пространство, если в доме работает персонал.

Из-за транспорта мне пришлось больше всего изменить свои привычки

Больше всего из европейской жизни мне не хватает возможности просто выйти из дома и пойти пешком. Я скучаю по тротуарам, паркам, детским площадкам, общественному транспорту и прогулкам с коляской, во время которых не нужно постоянно думать о дороге.

На Бали даже небольшое расстояние на карте не всегда означает, что его удобно пройти пешком. Дорога до детского сада может занять гораздо больше времени, чем кажется, особенно в часы пик или во время дождя. Поэтому я бы сначала выбрала детский сад, несколько раз проехала маршрут в обычное время и только потом искала дом.

Я бы заранее продумала, на чём маленькие дети будут ездить каждый день и где взять подходящее автокресло. Не стоит рассчитывать, что оно окажется в любом такси или у любого водителя. Я не хочу советовать другим родителям перевозить маленьких детей на байке.

Всемирная организация здравоохранения напоминает, что дети особенно уязвимы на дороге, а правильно подобранное и установленное автокресло снижает риск травм. Перед переездом стоит проверить не только время в пути, но и машину, кресло, страховку водителя и запасной вариант на случай дождя или если водитель не сможет приехать.

С медициной мне спокойнее, когда всё продумано заранее

Я не могу сказать, что чувствую себя на Бали так же уверенно в медицинских вопросах, как в Европе или России. Хороших врачей найти можно, но доверие появляется постепенно. Сначала спрашиваешь других родителей, собираешь контакты, узнаёшь, куда ехать днём и что делать ночью.

Рекомендации знакомых очень помогают начать поиск, но окончательное решение всё равно приходится принимать самим. Для меня важно заранее знать номер педиатра, ближайшую клинику для обычной консультации, место, куда можно обратиться ночью, и порядок действий, если понадобится специалист или лечение за пределами острова.

Страховка заслуживает отдельного разговора. Я бы не ограничивалась обещанием, что полис «покрывает экстренные случаи». Нужно письменно узнать, входят ли обычные консультации, госпитализация, обследования и эвакуация; требуется ли предварительное согласование; может ли клиника получить оплату напрямую или семье придётся сначала заплатить самостоятельно.

Что удалось подтвердить по официальным источникам

Bali International Hospital в Сануре пишет, что у него круглосуточно работает отделение неотложной помощи, оказывается помощь детям и новорождённым и возможна медицинская транспортировка по земле и воздуху. Это информация самого госпиталя, а не независимая оценка качества и не гарантия, что нужный специалист будет свободен в конкретный момент.

Министерство иностранных дел Великобритании в рекомендациях по Индонезии советует заранее проверить доступность медицинской помощи и иметь страховку, которая покрывает местное лечение и непредвиденную эвакуацию. Рекомендации написаны для путешественников, но по ним удобно составить список вопросов страховщику до переезда.

В 2026 году Министерство здравоохранения Индонезии выпустило предупреждение о риске вспышек денге. Для меня денге остаётся одним из главных медицинских опасений. Мы внимательно относимся к защите от комаров. С педиатром лучше заранее обсудить, какие симптомы требуют срочной помощи и что держать в домашней аптечке.

Как я выбирала няню

Няня стала для меня одной из самых важных частей семейного быта на Бали. Мы всегда устраивали пробные дни, потому что за одно собеседование невозможно понять, подходит вам человек или нет.

Мне важно увидеть, как няня разговаривает с детьми, как реагирует на усталость, капризы и неожиданные ситуации. Иногда человек с большим опытом и прекрасным резюме подходит ребёнку хуже, чем человек с меньшим опытом, с которым сразу возникает тёплый контакт.

Я всегда связываюсь с предыдущими работодателями и заранее обсуждаю правила. Кто и когда может забирать ребёнка? Можно ли фотографировать детей? Что делать, если ребёнок заболел? Разрешены ли поездки и гости? Чем яснее всё сказано в начале, тем меньше недопонимания потом.

Лично мне подходит няня без проживания. Я хочу, чтобы вечером, когда дети спят, дом снова становился нашим личным пространством. Другой семье может быть удобнее жить с няней постоянно. Здесь нет одного правильного варианта.

Если вы нанимаете няню, у вас появляются обязанности работодателя. В Индонезии с апреля 2026 года действует закон о защите домашних работников. Конкретные условия оплаты, отдыха, обязательных выплат и прекращения работы нужно уточнить у местного специалиста и зафиксировать заранее. Низкая зарплата не должна быть главным критерием выбора человека, которому вы доверяете ребёнка.

Знакомиться здесь легко, но люди часто уезжают

На Бали мне оказалось легче знакомиться с другими семьями. Многие сами недавно переехали и легко идут на контакт. Детский сад тоже может стать местом, где родители находят друзей, а дети общаются вне группы.

Но у этого есть обратная сторона. Некоторые семьи приезжают только на несколько месяцев, а потом уезжают домой или в другую страну. У нас бывало так: только успеешь привыкнуть к людям, а их уже нет рядом. Знакомств может быть много, но близкий круг всё равно складывается медленно.

Мама или папа могут чувствовать себя одиноко между домом, работой, детским садом и повседневными делами. Красивый дом и хороший климат сами по себе не спасают от усталости. Нужны помощь, время без детей и партнёр, который действительно берёт на себя часть забот.

Поэтому я бы не стала заранее говорить, что на Бали у любой семьи вырастет уровень жизни. Помощь по дому может стать доступнее, но школа, страховка, машина, поездки домой и хороший дом тоже стоят денег. Важнее не сравнить одну цифру с Европой, а понять, как будет устроен весь ваш быт и сколько сил он потребует каждый день.

Что я посоветовала бы семье перед переездом

Я бы не принимала решение только из-за страхов. Но одних красивых фотографий в интернете тоже недостаточно.

Лучше сначала приехать на несколько недель или на месяц. Пожить в обычном режиме, а не как в отпуске. Посмотреть детские сады своими глазами, познакомиться с воспитателями, несколько раз проехать дорогу утром и вечером и понять, куда вы поедете, если ребёнок заболеет.

Прежде чем подписывать долгосрочный договор аренды или покупать дом, я бы проверила:

подходит ли ребёнку конкретная группа и есть ли в ней место;

как устроены вход в детский сад и передача ребёнка взрослым;

сколько на самом деле занимает дорога в обычный будний день;

есть ли подходящая машина и автокресло;

что именно покрывает медицинская страховка;

кому можно позвонить днём и ночью;

подходит ли семье няня и понятны ли обеим сторонам условия работы;

удобно ли жить в выбранном доме с детьми, а не только проводить там выходные;

хватает ли бюджета не только на аренду, но и на школу, медицину, транспорт, помощь и поездки домой.

Бали действительно может оказаться местом, где именно вашей семье будет хорошо. У нас многое получилось легче, чем мы ожидали. Но это очень личное решение. Лучше сначала прожить здесь свою обычную жизнь и только потом строить долгие планы.

Источники к проверяемой части

Bali International Hospital: About us

Bali International Hospital: Emergency Medical Services

UK Foreign, Commonwealth & Development Office: Health in Indonesia

Министерство здравоохранения Индонезии: предупреждение о денге, 2026

Всемирная организация здравоохранения: дети и безопасность дорожного движения

Министерство труда Индонезии: Закон № 2 от 2026 года о защите домашних работников

Это опыт одной семьи. Ссылки выше подтверждают только заявленные услуги и действующие документы; они ничего не гарантируют в конкретной ситуации. Перед переездом медицинские, страховые, юридические и образовательные вопросы нужно проверить применительно к своей семье.

Связанные материалы

Как выбрать основание для пребывания в Индонезии по реальной деятельности

Въезд на Бали с семьёй: B1, All Indonesia и паспортный контроль

E33 Second Home: что семья должна подтвердить и поддерживать

Что изучить дальше

Связанный вопрос Как выбрать основание для пребывания в Индонезии по реальной деятельности Связанный вопрос Въезд на Бали с семьёй: B1, All Indonesia и паспортный контроль

Проверить ситуацию в подборщике виз Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе. | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/management-fee-pt-pma-local-operator-indonesia/

Field Notes

/

Руководство по принятию решений

Field Notes · Налогообложение

Плата за управление должна соответствовать реальной услуге. Она не переносит прибыль сама по себе.

Как PT PMA может выставлять счета индонезийскому оператору размещения, не превращая счёт в бизнес-модель

01

Потребность

02

Услуга

03

Доказательства

04

Цена

05

Налоги

06

Счёт

Плата за управление между индонезийской местной PT и PT PMA может быть полностью законной и коммерчески разумной.

Она также может стать самым слабым элементом структуры.

Разница определяется не процентом на счёте. Она определяется тем, существовали ли услуга, люди, полномочия, доказательства, метод ценообразования и налоговое отражение до выставления фактуры.

Практический ответ:

Местный оператор может платить связанной PT PMA за настоящие услуги.

Плата должна соответствовать реально выполненной работе, которая нужна оператору и приносит ему понятную коммерческую пользу.

Одна и та же функция не должна оплачиваться дважды. Контроль инвестиции со стороны акционера не становится автоматически услугой оператору.

Универсального безопасного процента не существует.

Пять, десять или пятнадцать процентов могут быть обоснованными или недоказуемыми в зависимости от реального объёма работы.

Законом не установлена фиксированная минимальная маржа местного оператора.

Но компания, которая несёт договор с гостем, персонал, лицензию и операционный риск, не должна систематически оставаться почти без экономики без очень сильного объяснения.

PT PMA не может просто «перевыставить прибыль».

Остаточный результат не является описанием услуги.

PPh 23, НДС, PBJT, права на бренд и программное обеспечение нужно разделять.

Одна общая строка создаёт ненужную неопределённость.

Граница этой заметки

Текст объясняет порядок анализа. Он не рассчитывает плату или налоги для конкретной компании. Договоры, налоговый статус, KBLI, счета и фактическая работа должны проверяться вместе.

Как выглядит типичная схема

МЕСТНАЯ PT

Бронирования гостей

Счета гостям

Выручка размещения

Персонал на объектах

Операционная деятельность

↓ плата за управление

PT PMA

Надзор основателя

Маркетинг

Бронирования

Финансы

Технологии

Закупки

Управление

На бумаге это выглядит аккуратно.

Местная PT представлена оператором. PT PMA представлена управляющей компанией. Деньги переходят к PT PMA через счёт за услуги.

Главный вопрос:

Что именно сделала PT PMA, за что независимый оператор действительно заплатил бы?

Пока нет ответа, у платы нет надёжной основы.

Счёт является последним шагом

Логичная последовательность:

Реальная операционная потребность

↓

Определённая услуга

↓

Разрешённая деятельность

↓

Люди, системы и полномочия

↓

Работа, выполненная в периоде

↓

Польза для оператора

↓

Доказательства результата

↓

Метод цены по принципу вытянутой руки

↓

PPh, НДС, PBJT и бухгалтерия

↓

Счёт и платёж

Слабая схема идёт в обратную сторону:

Желаемая прибыль в PT PMA

↓

Процент выбран после окончания года

↓

Общая счёт «плата за управление»

↓

Договор создан для объяснения

Вторая последовательность исходит из желаемого перевода средств и лишь затем формирует обоснование услуги.

Практический пример

Местная PT эксплуатирует три виллы и получает за месяц 1 миллиард IDR выручки.

Она заключает договоры с гостями, указана продавцом на OTA, нанимает команду, платит расходы, оформляет возвраты, рассчитывает и декларирует местный налог и несёт риск низкой загрузки.

Связанная PT PMA нанимает шесть человек, которые выполняют:

ежедневное управление ценами и доходностью;

управление каналами и резервированием;

месячную финансовую отчётность;

групповые закупки;

платную рекламу;

администрирование систем;

управленческий обзор.

Каждый месяц существуют отчёты, решения по ценам, данные кампаний, документы закупок, журналы систем и протоколы встреч. Работу можно связать с конкретными объектами.

Это узнаваемая услуга.

Теперь изменим факты.

У PT PMA нет выделенной команды. Иностранный основатель периодически читает WhatsApp и смотрит банковский счёт. В конце года у местной PT прибыль 3,2 миллиарда IDR. PT PMA выставляет 3,1 миллиарда как плату за управление, чтобы оставить 100 миллионов.

Это другая структура. Сумма выбрана для изъятия прибыли, а не для оплаты измеримой работы.

Семь тестов до обсуждения цены

1. Работа действительно выполнена?

Поставщик должен показать:

кто работал;

когда;

для какого объекта;

какие решения приняты;

какие результаты произведены;

как всё это проверить.

Подписанный договор не доказывает выполнение услуги.

2. Услуга была нужна оператору?

Независимая компания не покупает услугу только потому, что акционер хочет выставить счёт.

Нужда должна быть коммерчески понятной: центральные бронирования, управление ценами и доходностью, групповые закупки, консолидация отчётности, системное администрирование или управленческая компетенция, которой нет на месте.

3. Оператор получил идентифицируемую пользу?

Польза не означает гарантированную прибыль.

Это может быть доступ к специалистам, системам, персоналу, закупочной силе, распределению или отчётности.

Оператор должен объяснить, почему он заплатил бы несвязанному поставщику за ту же работу.

4. Работа не дублируется?

Если местная PT уже нанимает генерального менеджера, бухгалтера, специалиста по управлению доходностью, сотрудников маркетинга и закупок, вторая компания не должна повторно выставлять те же функции без отдельного и реального объёма.

5. Это не деятельность акционера?

Контроль инвестиции, решение о вложении капитала и анализ доходности акционера могут служить собственнику, а не оператору как клиенту.

Нужно спросить, покупает ли местная PT услугу или финансирует обычную функцию инвестора.

6. PT PMA имеет право и способность оказывать услугу?

Договор может называть работу консалтинг, но ежедневные факты могут показывать прямое операционное управление.

KBLI 55901 отделяет операционное управление размещением от общего консультационного управления. Если PT PMA контролирует цены, бронирования, персонал и ежедневные решения, её деятельность и OSS должны соответствовать реальности.

Компания также должна иметь сотрудников, системы, расходы и организацию, соответствующие заявленному пакету.

7. Цена соответствует принципу вытянутой руки?

Только после первых шести тестов цена становится основным вопросом.

Метод должен соответствовать сделке.

Поддержка административных функций может анализироваться через релевантную базу затрат и обоснованную надбавку.

Полный мандат операционного управления может использовать процент от выручки, если функции и независимые аналоги это поддерживают.

Определённый проект может иметь фиксированную цену.

Бренд или технология требуют отдельного анализа.

Нет процента, который становится безопасным только потому, что его часто называют на рынке.

Почему процент не является первым вопросом

Десять процентов могут быть понятны для сильного управляющего, который отвечает за распределение, цены, старшее управление, системы и закупки портфеля.

Те же десять процентов могут быть недоказуемы для пустой компании без сотрудников и результатов.

Даже два процента могут быть неверными, если работа не выполнена или уже оплачивается местной команде.

Процент не доказывает услугу.

Местный оператор должен оставаться экономически реальным

Фиксированной обязательной маржи нет.

Но функции и риски должны получать вознаграждение.

Если местная PT:

заключает договоры с гостями;

получает выручку;

нанимает команду;

несёт расходы;

отвечает за загрузку;

оформляет возвраты и претензии;

финансирует оборотный капитал;

держит операционные разрешения;

несёт ответственность перед клиентом;

она выполняет значимые функции.

Если плата за управление почти всегда оставляет её без прибыли, возникает вопрос:

Почему компания, которая несёт эксплуатацию, почти ничего не получает за эту работу?

Обоснование возможно, но оно должно подтверждаться договорами, лицензиями, сотрудниками, системами и сопоставимыми сделками.

Остаточная прибыль не является строкой фактуры

После оплаты реальных расходов и реальных внутригрупповых услуг остаточный результат принадлежит местной PT.

Он приносит выгоду её настоящим акционерам согласно их правам.

PT PMA может получать вознаграждение по реальной сделке. Она не может назвать весь остаток «платой за управление», только потому что иностранному основателю удобнее хранить деньги в PT PMA.

Это особенно важно, если местной PT владеют два индонезийских сотрудника или бывших сотрудника. Реальное владение имеет реальные экономические последствия.

Разделите компоненты счёта

Одна строка «управление, бренд, маркетинг и технологии» может скрывать разные сделки.

Компонент

Что нужно показать

Почему разделение важно

Операционное управление

Права решений, именованные менеджеры, отчёты и записи объектов

Может относиться к управление объектом размещения, а не к общему консалтингу.

Управление ценами и доходностью

Решения по ценам, прогнозы, каналы и загрузка

Можно проверить по каждому объекту.

Маркетинг

Кампании, материалы, медиа-расходы и результаты

Расходы третьих лиц нельзя смешивать с вознаграждением поставщика.

Финансы и отчётность

Месячные счета, бюджеты, сверки и контроль

Предотвращает дублирование местного бухгалтера.

Технология

Права, пользователи, лицензии, поддержка и собственник системы

Может иметь другое налоговое значение.

Бренд

Права интеллектуальной собственности и разрешение использования

Роялти не является услугой управления.

Закупки

Заказы, переговоры и цепочка поставщиков

Польза должна быть видимой.

Персонал или предоставление персонала

Работодатель, время, роль и распределение

Люди не меняют компанию одной бухгалтерской записью.

Возмещение затрат

Реальный расход третьей стороны и обоснованная надбавка, если есть

Отделяет перевыставляемые от вознаграждения.

Налоги простыми словами

PPh 23

Актуальная разъяснения DJP обычно предусматривают удержание PPh 23 в размере двух процентов от валовой суммы внутренних услуг управления и других охватываемых услуг.

Для получателя в Индонезии это обычно налоговый кредит, а не окончательный налог на прибыль PT PMA.

Роялти

Настоящая внутренняя роялти обычно подпадает под удержание PPh 23 в размере пятнадцати процентов от валовой суммы.

Поэтому права на бренд, товарный знак или программное обеспечение нельзя без анализа прятать в плата за управление.

НДС

Размещение гостиничного типа находится в местной системе PBJT, а не в обычной центральной системе НДС.

PT PMA со статусом PKP может выставить НДС на облагаемую услугу управления. Входной НДС, связанный с не облагаемой обычным НДС выручкой размещения, может не полностью зачитываться и стать реальным расходом оператора.

Выручка гостей под PBJT

↓

Местный оператор

↓

Услуга PT PMA

↓

НДС на услугу

↓

Возможный невозмещаемый расход

Схема, которая выглядит выгодной по налогу на прибыль, может стать дороже после косвенных налогов.

Какими должны быть доказательства каждый месяц

сотрудники и роли по компаниям;

трудовые договоры;

доступы PMS, OTA, финансов и закупок;

решения по ценам;

операционные и финансовые отчёты;

маркетинговые планы и материалы;

бюджеты и прогнозы;

закупочные документы;

журналы услуг по каждому объекту;

протоколы и решения;

регистры проблем;

центры затрат и ключи распределения;

обоснование цены, подготовленное одновременно со сделкой;

налоговые фактуры и удержания;

доказательство платежа;

доказательства собственных функций местного оператора.

Услуга должна быть видимой до начала проверки.

Три операционные картины

Относительно логичная

Местная PT является реальным оператором, заключает договоры, нанимает персонал, несёт обязательства и сохраняет результат, соответствующий её роли.

PT PMA имеет команду и системы, оказывает определённые услуги, создаёт доказательства и определяет цену до того, как известна финальная прибыль.

Возможная, но сложная

Местная PT является оператором, однако важные функции разделены. PT PMA контролирует центральные бронирования, маркетинг, часть цен и решений по персоналу.

Схема возможна, но права решений, сотрудники, лицензии, затраты и доказательства должны быть исключительно ясными.

Высокий риск

Местная PT существует в основном на лицензии, OTA и фактуре. У неё мало персонала, контроля и экономики.

PT PMA или иностранный основатель контролирует банки, цены, команду, бронирования, жалобы, закупки и бюджеты, затем выставляет почти всю маржу.

Тогда вопросы касаются не только трансфертное ценообразование, но и реальной деятельности, бенефициарного владения, номинального контроля, иммиграции и труда.

Проверка перед подписанием договора

Кто реальный оператор размещения?

Какую конкретную услугу оказывает PT PMA?

Какой KBLI разрешает её в этой локации?

Кто выполняет каждую функцию?

Какая компания нанимает этих людей?

Какие системы и права решений нужны?

Какие результаты будут создаваться ежемесячно?

Какую пользу получает оператор?

Что дублируется местной командой?

Что относится к функции акционера?

Какой метод ценообразования подходит каждому компоненту?

Какие независимые аналоги действительно сопоставимы?

Как распределяются общие затраты?

Какой результат должен получать оператор за свои функции и риски?

Какие строки подпадают под PPh 23 в два процента?

Есть ли роялти или другая категория платежа?

Применяется ли НДС и может ли оператор его зачесть?

Какие правила PBJT применяются к выручке?

Совпадают ли договор, счёт, бухгалтерия и банковский платёж?

Можно ли доказать услугу без устного объяснения основателя?

Решение простыми словами

Плата за управление не является ни автоматическим основанием безопасности, ни сама по себе признаком нарушения.

Это плата за услугу.

PT PMA нужны правильная деятельность, компетентные люди, реальная работа, доказательства, коммерческая польза и цена вытянутой руки. Местная PT должна оставаться настоящим оператором с правами, обязанностями и экономикой, соответствующими её роли.

Главное правило:

Оценивайте работу. Не оценивайте сумму прибыли, которую хотите перенести.

Обсудить проект с Франсуа

Основные источники и прямые ссылки для проверки

PMK 172/2023 о принципе вытянутой руки и сделках между связанными сторонами

Официальный OSS, KBLI 55901, управление размещением

Налоговая служба Индонезии, PPh статья 23

PMK 70/2022 о гостиничных услугах вне обычного НДС

Закон 25/2007 об инвестициях

Постановление Министерства права 2/2025 о бенефициарном владельце

Точный результат по PPh, НДС, PBJT и вычету расходов зависит от конкретной сделки, налогового статуса, местной юрисдикции и своевременно собранных доказательств.

## Ограничения PMA на Бали: 18 кодов KBLI | DALLEAU

URL: https://dalleau.ai/ru/notes/ogranichenie-pma-bali-18-kbli-oss-2026.html

Брифинг | Компания и лицензирование
Ограничение PMA на Бали по 18 видам деятельности: что подтверждают открытые источники.
Бали официально объявил об ограничении в OSS для новых заявок PMA на лицензии по 18 категориям деятельности. Мера действительно введена. Точный список кодов опубликован в сообщениях по KBLI 2020, однако для конкретного проекта по-прежнему нужны сопоставление с KBLI 2025 и проверка актуального результата в OSS.
Опубликовано
27 июля 2026 года
Проверено
27 июля 2026 года
Время чтения
12 минут
Статус источников
Официальное сообщение правительства Бали проверено. Список из 18 кодов KBLI 2020, опубликованный ANTARA, сопоставлен с другими источниками. BPS подтверждает, что ряд кодов был разделён или изменён в KBLI 2025. Публичное нумерованное приложение и результат OSS для конкретной сделки не найдены.
Редакционное обновление
20 сентября 2026
Кратко
Что изменилось
Правительство провинции Бали сообщает, что OSS перестал принимать новые заявки PMA на лицензии по 18 указанным категориям деятельности на территории Бали.
Что это означает
ANTARA опубликовала 18 кодов KBLI 2020. Несколько кодов изменились или были разделены в KBLI 2025, поэтому фактическую деятельность и актуальный результат OSS всё равно нужно проверять.
Чего из этого не следует
Официальное сообщение не устанавливает общий запрет иностранных инвестиций и не отменяет автоматически все действующие лицензии, договоры аренды или права на землю.
Что нужно проверить владельцу
До принятия обязательств проверьте актуальный вид деятельности по KBLI 2025, историю лицензий, результат OSS, договоры, платёжные потоки, земельные документы и операционные роли.
Статус источников
Официальное сообщение провинции проверено. Нумерованный список 18 кодов опубликован ANTARA. Таблицы конвертации BPS подтверждают, что обозначения KBLI 2020 нельзя механически переносить в KBLI 2025.
Последняя проверка
27 июля 2026 года
Политика обновления
Материал будет обновлён, если появятся публичное нумерованное приложение, акт центрального правительства или более точные инструкции по работе OSS.
Важно
Материал носит общий информационный характер. Для реальной компании или сделки необходимы актуальная консультация индонезийских юристов и налоговых специалистов, а также проверка в OSS.
Различие имеет практическое значение.
23 июля 2026 года правительство провинции Бали опубликовало официальное сообщение. В нём указано, что для мест ведения бизнеса на Бали доступ OSS закрыт для новых заявок PMA на лицензии по 18 категориям деятельности с низким и средне-низким уровнем риска. По данным провинции, ограничение действует с третьей недели мая 2026 года после согласования с центральным правительством.
Открытые источники подтверждают целевое административное ограничение для новых заявок PMA. Они не подтверждают утверждение, что Бали запретил все формы иностранных инвестиций, все структуры владения недвижимостью или все проекты вилл.
Фактическая деятельность, код KBLI, масштаб предприятия, статус лицензий, структура прав на объект и операционная модель остаются отдельными вопросами.
Что изменилось
KBLI является кодом классификации вида экономической деятельности в Индонезии. Сам по себе он не является компанией, правом на землю, разрешением на строительство или операционной лицензией.
ANTARA сообщила следующие 18 кодов KBLI 2020 и названия видов деятельности на индонезийском языке. Русские формулировки ниже являются редакционным изложением сообщения, а не официальным приложением на русском языке. ANTARA указывает порог 6 000 м² для обоих гостиничных кодов. Официальное сообщение Бали прямо упоминает этот порог для категорийных гостиниц, но перечисляет некатегорийные гостиницы без публикации нумерованного приложения.
Важно учитывать версию классификатора.
Опубликованный список использует KBLI 2020, тогда как внедрение KBLI 2025 в OSS и AHU было запланировано не позднее 18 июня 2026 года. Таблицы BPS показывают, что соответствие не всегда однозначно. Гостиничный код 55110 был разделён на коды 55101-55105, код 55120 стал 55106, общий код недвижимости 68111 был распределён между несколькими жилыми и нежилыми видами деятельности, 70204 перенесён в 70202, а 70209 разделён между 70203 и 70209. Поэтому актуальный проект нужно классифицировать по фактической деятельности и проверять непосредственно в OSS.
KBLI 2020
Деятельность по сообщению ANTARA в классификации KBLI 2020
55110
Категорийная гостиница, если соответствующая площадь здания меньше 6 000 м²
68111
Собственная или арендованная недвижимость
55120
Некатегорийная гостиница, если соответствующая площадь здания меньше 6 000 м²
70209
Прочие консультационные услуги по управлению
77100
Аренда автомобилей, автобусов, грузовиков и аналогичного транспорта
47711
Розничная торговля одеждой
47511
Розничная торговля текстилем
77311
Аренда мотоциклов без права выкупа
47249
Прочая розничная торговля продуктами питания
47991
Передвижная розничная торговля сельскохозяйственными продуктами питания
55900
Прочие услуги размещения
56303
Питейные заведения и кафе
56305
Заведения или магазины традиционной медицины
14120
Пошив и изготовление одежды на заказ
93111
Стадионные объекты
93116
Фитнес-центры
93191
Организаторы спортивной деятельности
70204
Консультации по промышленному управлению
Примечание по соответствию KBLI 2025
Провинциальный перечень был сформулирован по старым группам деятельности и включает Penyediaan Akomodasi Lainnya, прежний KBLI 55900. В KBLI 2025 эта группа была разделена на несколько видов деятельности, включая 55901 для управления размещением и 55909 для иных видов размещения. Публичное заявление не содержит полной таблицы соответствия после конверсии. Поэтому для новой заявки PMA по одному из кодов-преемников необходим фактический результат OSS и письменное подтверждение того, как ограничение применяется на Бали.
Может ли PT PMA эксплуатировать виллу на Бали?
Вилла на Бали размещена на OTA. Что это на самом деле доказывает?
Чего эта мера не означает автоматически
01
Это не запрет всех иностранных инвестиций на Бали
Ограничение касается указанных KBLI и новых заявок PMA через OSS. Другие виды деятельности не подпадают автоматически под этот список из 18 кодов.
02
Оно не отменяет автоматически все действующие лицензии
В публичном сообщении не сказано, что действующие лицензии автоматически отменяются. Компании, уже имеющие лицензии, должны продолжать подавать отчётность LKPM. При этом сообщение не определяет порядок изменения, расширения, продления или перехода на KBLI 2025. Каждый случай требует проверки в OSS и письменной консультации.
03
Оно само по себе не решает вопросы земли и имущественных прав
Само сообщение не отменяет договор аренды или право на землю. Оно касается доступа к лицензированию бизнеса и напрямую не регулирует права на землю или договорные права. Возможность продолжения конкретного проекта является отдельным вопросом.
04
Подмена KBLI не делает структуру законной
Код должен соответствовать реальному бизнесу. Значение имеют договоры, доходы, ежедневные операции и фактически оказываемая услуга.
05
Низкий риск не означает автоматическую доступность для иностранного капитала
Класс риска и допустимость иностранного инвестирования проверяются отдельно. Деятельность с низким риском может иметь упрощённый путь лицензирования, но быть недоступной для PMA из-за требований к инвестициям, масштабу предприятия, месту деятельности или отрасли.
Почему это важно для проектов вилл и резиденций
В опубликованный список KBLI 2020 входят небольшие гостиницы, прочие услуги размещения, собственная или арендованная недвижимость и управленческий консалтинг. Эти виды деятельности близки к структурам, используемым для владения объектом, аренды, эксплуатации объектов размещения, управления резиденцией и консультационных услуг.
В проекте недвижимости могут участвовать разные лица: владелец, арендодатель, девелопер, оператор размещения, управляющий и консультант. Смешение этих ролей создаёт лицензионный риск.
Почему одной публикации в социальных сетях недостаточно
Публичное описание меры менялось в течение нескольких месяцев. 9 июля ANTARA процитировала представителя провинции, который говорил о 56 кодах KBLI с низким и средне-низким риском. Официальное сообщение Бали от 23 июля указывает 18 категорий деятельности, а ANTARA отдельно опубликовала соответствующие 18 кодов KBLI 2020. Найденные публичные источники не объясняют формально соотношение между прежней цифрой 56 и последующим списком из 18. Поэтому материал не утверждает, что один показатель окончательно заменил другой.
Проверка для владельца
Что следует проверить владельцу или инвестору
Получить актуальный NIB и полный профиль лицензий в OSS.
Определить деятельность, которая фактически создаёт доход.
Сопоставить каждую деятельность с актуальным KBLI.
Определить, является ли предполагаемый шаг новой заявкой, изменением, расширением или продолжением действующей лицензии.
Проверить актуальную доступность в OSS и получить письменное разъяснение, если результат неоднозначен.
Разделить имущественные права, разрешения на строительство и операционные лицензии.
Проверить договоры и платёжные потоки между владельцем, оператором, управляющим и гостем.
До принятия обязательств получить консультацию индонезийских юристов и налоговых специалистов.
Вывод для инвестора
Изменение не означает, что каждый проект на Бали с иностранным капиталом стал невозможен. Оно означает, что структуры, в которых деятельность, лицензии и договоры не согласованы, становится всё сложнее обосновывать.
В совокупности сообщения указывают на повышенное внимание к фактической деятельности бизнеса, его связи с местной экономикой и к тому, соответствует ли лицензия фактической деятельности.
Одного названия компании, общего консультационного кода или автоматически выданного NIB недостаточно. Деятельность, масштаб предприятия, документы на объект, лицензии, договоры и фактические операции должны соответствовать друг другу.
За чем мы следим дальше
Мы следим за возможной публикацией нумерованного приложения или акта центрального правительства, более точными разъяснениями по эквивалентам KBLI 2025, работой OSS в зависимости от деятельности и места проекта, а также правилами изменения, расширения, продления и иных корректировок действующих лицензий. Это юридические вопросы конкретного дела, а не основание преувеличивать значение публичного объявления.
Источники и история обновлений
Официальные источники и подтверждающие публикации.
Правительство провинции Бали
Официальное сообщение об ограничении доступа OSS для PMA в отдельных категориях деятельности
23 июля 2026 года
Губернатор Бали
Письмо B.27.000/642/PM/DPMPTSP
28 января 2026 года
BKPM
Инвестиционный контроль и специальная группа по Бали
22 января 2026 года
ANTARA Bali
Опубликованный нумерованный список из 18 кодов KBLI 2020 и заявленная позиция по применению
23 июля 2026 года
ANTARA Bali
Ранее заявленный запрос и изменение публичного объёма меры
9 февраля 2026 года
ANTARA Bali
Предыдущее заявление о более широком перечне кодов
9 июля 2026 года
OSS Indonesia
Карточка KBLI 2020 для кода 68111
Проверено 27 июля 2026 года
OSS Indonesia
Карточка KBLI 2025 для кода 68111
Проверено 27 июля 2026 года
OSS Indonesia
Руководство по переходу с KBLI 2020 и более ранних классификаций на KBLI 2025
2026 год
Badan Pusat Statistik
Официальная таблица соответствия KBLI 2020 и KBLI 2025
Апрель 2026 года
BKPM
График внедрения KBLI 2025 в OSS и AHU
2026 год
Правительство Индонезии
PP 28/2025 о лицензировании бизнеса на основе риска
2025 год
Правительство Индонезии
PP 18/2021 о правах на землю и регистрации земель
2021 год
Этот материал отражает публичную информацию, проверенную 27 июля 2026 года. Он объясняет опубликованные источники и не определяет правовое положение конкретной компании, лицензии, права на землю, договора или сделки. Доступность в OSS и административная практика могут меняться. До принятия обязательств получите консультацию индонезийских юристов и налоговых специалистов.
Связанные материалы
Компания и лицензирование
KBLI 2025 для вилл на Бали
Имущественные права
PT PMA, номинальная структура или долгосрочная аренда
До принятия обязательств
Семь проверок до внесения депозита за недвижимость
Планируете резиденцию или операционную структуру на Бали?
Определите структуру компании, права на объект и операционную модель до вложения капитала.
Обсудить проект с Франсуа

## NIB и обязательные документы для виллы | DALLEAU

URL: https://dalleau.ai/ru/notes/pp-28-2025-villa-licensing.html

Ко всем материалам Материалы DALLEAU 12 апреля 2026 Что подтверждает NIB и какие документы всё равно нужны

При проверке проекта на Бали собственнику часто показывают NIB и говорят, что компания может работать. NIB действительно важен, но это лишь часть проверки.

DALLEAU | Исследования и практические материалы Опубликовано

12 апреля 2026

Последняя проверка

20 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ При проверке проекта на Бали собственнику часто показывают NIB и говорят, что компания может работать. NIB действительно важен, но это лишь часть проверки. Для запуска виллы нужно сопоставить деятельность, заявителя, участок, здание, стандарты и документы, которые были выданы именно этому бизнесу.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

PP 28/2025 не создал одну новую «лицензию виллы». Он изменил общий порядок риск-ориентированного лицензирования бизнеса в Индонезии.

Три даты, три разных вопроса

5 июня 2025 года. Вступил в силу PP 28/2025, который заменил PP 5/2021 и обновил общий механизм лицензирования бизнеса на основе риска.

10 октября 2025 года. Permenpar 6/2025 установил туристические стандарты, порядок надзора и санкций. В приложении по виллам указан старый код 55193 и средне-низкий уровень риска.

26 мая 2026 года. Министерство туризма сообщало о регистрации объектов и точечных мерах контроля. Полная автоматическая интеграция Kemenpar, OSS и OTA на тот момент ещё разрабатывалась, целевой срок назывался июнь 2027 года.

Эти события связаны, но не взаимозаменяемы. Общая система, отраслевой стандарт и технический обмен данными отвечают на разные вопросы.

Что подтверждает NIB

NIB идентифицирует бизнес и фиксирует заявленные сведения в системе OSS. Дальнейший набор документов зависит от деятельности, риска и результата конкретной заявки.

По одному NIB нельзя подтвердить:

допустимость заявленной деятельности для конкретной PT PMA;

соответствие участка фактическому использованию;

назначение и законность здания;

выполнение туристических стандартов;

наличие всех требуемых сертификатов или разрешений;

соответствие ежедневной работы тому, что было заявлено.

Поэтому NIB стоит воспринимать как один из документов, а не как окончательное подтверждение законности всей деятельности.

Риск и доступность для иностранной инвестиции

Уровень риска определяет механизм лицензирования. Он не отвечает на вопрос, открыта ли деятельность для иностранного капитала в выбранном масштабе и месте.

Для конкретной PT PMA нужна актуальная выгрузка OSS с датой получения. Публичная страница кода полезна для ориентира, но не показывает все ограничения, применимые к конкретному заявителю.

Переход с 55193 на 55203

BPS официально сопоставляет старый код виллы 55193 с новым 55203 . В туристическом приложении 2025 года всё ещё фигурирует старый номер.

В материалах проверки следует хранить оба источника с датами. Нельзя просто заменить номер в тексте старого акта и считать, что все параметры нового кода совпадают с прежними.

Что проверяют помимо OSS

Для работающей виллы обычно рассматривают несколько самостоятельных блоков:

Фактическую услугу и роли всех компаний.

Право на участок и допустимое использование по пространственному плану.

Назначение, состояние и документы здания.

KBLI и результат OSS по каждому участнику.

Туристические, эксплуатационные и местные требования.

Договоры, движение денег и налоговую квалификацию.

Документ управляющей компании относится к её услугам. Он не исправляет недостатки документов собственника или объекта.

Что происходит с OTA

Платформы могут участвовать в контроле и удалять отдельные объявления. Однако наличие объявления не доказывает законность работы, а его отсутствие не заменяет официальную проверку.

На 26 мая 2026 года автоматический обмен данными через API между государственными системами и OTA ещё не был полностью внедрён. Перед подачей заявления или запуском проекта нужно проверить актуальный статус интеграции в действующих государственных системах.

Что должен хранить собственник

До начала продаж полезно собрать в одном месте:

описание фактической модели размещения;

схему собственника, оператора, менеджера и посредника;

NIB и полный результат OSS;

документы участка и здания;

перечень обязательных стандартов;

договоры и схему денежных потоков;

записи о проверках, сроках действия и ответственных лицах.

Такой файл помогает увидеть пробелы до проверки банка, платформы или государственного органа.

Практический вывод

PP 28/2025 задаёт общий порядок. Законность деятельности конкретной виллы подтверждается согласованным комплектом документов и тем, что фактическая работа соответствует заявленной модели.

Закажите независимую проверку документов до запуска объекта.

Связанные материалы

KBLI выбирают по деятельности, а не по слову «вилла»

Зонирование участка на Бали: почему цвета на карте недостаточно

Что означает слово «мораторий» для проекта на Бали

Источники и границы

https://peraturan.bpk.go.id/Details/319773/pp-no-28-tahun-2025

https://jdih.kemenpar.go.id/peraturan/1422

https://sisupar.kemenpar.go.id/unsur-standar/detail-standardisasi/vila

https://peraturan.bpk.go.id/Details/168534/perpres-no-49-tahun-2021

Что изучить дальше

Связанный вопрос KBLI выбирают по деятельности, а не по слову «вилла» Связанный вопрос Зонирование участка на Бали: почему цвета на карте недостаточно

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Капитал PT PMA, инвестиционный план и E28A | DALLEAU

URL: https://dalleau.ai/ru/notes/pt-pma-capital-idr-10-billion-investment-e28a.html

Материалы DALLEAU

Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

Как разделить капитал компании, план OSS, деньги на счёте, финансирование проекта и долю заявителя E28A.

DALLEAU | Исследования и практические материалы Опубликовано

16 июля 2026

Последняя проверка

16 июля 2026

Проверено | 16 июля 2026 | первичные источники

Обновлено 16 июля 2026 года

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

В переписке один перевод часто называют капиталом PT PMA. В документах эта сумма может иметь разные значения. Ошибка возникает, когда один платёж одновременно считают оплаченным капиталом, инвестиционным планом, доступными деньгами компании, заёмным финансированием и долей для E28A.

До перевода нужно определить назначение суммы и документ, который его подтверждает.

Какие суммы нельзя смешивать

Объявленный капитал. Это общий капитал, записанный в корпоративных документах.

Размещённый и оплаченный капитал. Это часть объявленного капитала, которую участники приняли на себя и оплатили в обмен на доли.

Инвестиционный план OSS. Он показывает планируемые вложения по конкретной деятельности и месту проекта. Это не банковский остаток и не обязательно единый платёж.

Деньги на счёте компании. Выписка подтверждает остаток на определённую дату. Она не объясняет сама по себе, являются ли деньги капиталом, займом, авансом или выручкой.

Финансирование проекта. Сюда могут входить займы участников и другие документированные источники. Заём создаёт долг компании, но сам по себе не создаёт долю в капитале.

Условие E28A для доли конкретного заявителя следует проверять отдельно от этих пяти сумм.

Минимум оплаченного капитала и правило 25 процентов

На дату проверки Положение BKPM 5/2025 устанавливает общий минимум размещённого и оплаченного капитала PT PMA в размере не менее 2,5 млрд IDR, если для конкретной деятельности не предусмотрено более высокое требование.

Одновременно корпоративное правило требует разместить и полностью оплатить не менее 25 процентов объявленного капитала. Поэтому объявленный капитал и оплаченный капитал нельзя выбирать независимо. Корпоративный акт, решения участников и подтверждение оплаты должны совпадать.

Новая общая планка не переписывает автоматически документы существующей PT PMA. Для старой компании нужно проверить её акт, историю изменений, NIB, лицензии и переходные положения.

Инвестиционный план обычно должен превышать 10 млрд IDR

Общий тест плана для PT PMA сформулирован как сумма строго больше 10 млрд IDR по применимой единице. Обычно она определяется сочетанием пятизначного KBLI и места проекта, но правила содержат отраслевые формулы и способы группировки.

Ровно 10 млрд IDR не следует автоматически считать выполнением условия «больше 10 млрд». Один план также не покрывает без проверки все виды деятельности и адреса компании.

Земля и здания требуют отдельного внимания. Для определённых операций с недвижимостью, а также для краткосрочного или долгосрочного размещения Положение BKPM 5/2025 предусматривает специальные формулы. Поэтому цена виллы не всегда включается в расчёт и не всегда исключается из него. Сначала определяются право или актив, вид деятельности, место и применимая формула.

Выписка не показывает юридическое назначение денег

Одинаковая сумма на счёте может появиться после оплаты акций, займа участника, аванса клиента или поступления выручки. Банк показывает движение и остаток, бухгалтерия и корпоративные документы объясняют причину.

Если участник переводит деньги как заём, нужны договор, условия возврата, бухгалтерские проводки и согласованное использование средств. Конвертация долга в капитал требует отдельного корпоративного оформления. Нельзя превратить заём в капитал, просто изменив назначение платежа в банковском переводе.

Доля для E28A относится к конкретному заявителю

Официальная страница E28A на дату проверки указывает долю заявителя в компании-гаранте стоимостью не менее 10 млрд IDR или эквивалента. Деньги компании, её инвестиционный план, стоимость имущества или заём участника не заменяют зарегистрированную долю.

Если заявителей двое, положение каждого проверяется отдельно. Нельзя разделить общий проектный бюджет между ними без соответствующих акций и принятых иммиграционной службой доказательств.

Почему правило двенадцати месяцев требует осторожности

Статья 27 Положения BKPM 5/2025 относит покупку активов компании, строительство зданий и её текущую деятельность к допустимым направлениям использования средств. При этом в статье есть внутренняя ссылка, которая не совпадает с расположением общего требования о минимуме в 2,5 млрд IDR.

Из-за этой ошибки нельзя уверенно утверждать ни обязательное хранение всей суммы без движения в течение двенадцати месяцев, ни полную свободу немедленно потратить её. Для практического решения нужны актуальная декларация OSS и письменная позиция квалифицированного специалиста или BKPM.

Проверка перед переводом денег

Вопрос

Документ, который должен ответить

Какой объявленный капитал?

Акт и решения участников

Сколько размещено и оплачено?

Реестр участников, корпоративное решение, подтверждение оплаты и бухгалтерия

Какой инвестиционный план?

Действующий OSS по KBLI и месту

Что находится на счёте?

Банковская выписка и сверка проводок

Как финансируется проект?

Договоры займа, аванса или иного источника

Какова доля заявителя E28A?

Реестр долей и принятое иммиграционное доказательство

Можно ли включить землю или здание?

Анализ вида права, деятельности и применимой формулы

Положительный ответ должен описывать одну конкретную сумму. Если документы дают ей разные названия, перевод лучше приостановить до сверки.

Связанные материалы

E28A: доля заявителя, роль в компании и фактическая работа

Как законно получить деньги из своей PT PMA

PT PMA и nominee: где находятся права иностранного инвестора

Источники и границы

Положение BKPM 5/2025 , статьи 26, 27 и переходные положения.

PP 8/2021 , статьи 3-5.

Официальная страница E28A .

Материал содержит общую информацию и не заменяет индонезийскую юридическую, бухгалтерскую, налоговую, инвестиционную или иммиграционную проверку конкретной компании.

Что изучить дальше

Связанный вопрос E28A: доля заявителя, роль в компании и фактическая работа Связанный вопрос Как законно получить деньги из своей PT PMA

От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

Метод

Источники и дата обновления

DALLEAU поддерживает этот материал на основе указанных официальных источников, показывает даты проверки и принимает сообщения об исправлениях.

Читать дальше

KBLI выбирают по деятельности, а не по слову «вилла» Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A Как законно получить деньги из своей PT PMA

Связанные материалы

PT PMA и nominee: где находятся права иностранного инвестора E28A: доля заявителя, роль в компании и фактическая работа

## PT PMA и nominee на Бали: кто держит права | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/pt-pma-vs-nominee.html

Ко всем материалам

Материалы DALLEAU

7 июля 2026

PT PMA и nominee: где находятся права иностранного инвестора

Как различаются зарегистрированный держатель, доля в компании, экономическое требование и фактический контроль.

DALLEAU | Исследования и практические материалы

Опубликовано

7 июля 2026

Последняя проверка

20 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ

Когда инвестор говорит, что объект «оформлен на него», нужно уточнить, о каком праве идёт речь. Это может быть доля в компании, земельное право компании, договор аренды, требование о возврате денег или возможность подписывать банковские документы. Все эти позиции различаются.

Перед решением проверьте источники и дату обновления.

Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в

официальной базе нормативных актов Индонезии

и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике:

notes@dalleau.ai

.

PT PMA и nominee-схема изначально отражаются в документах по-разному. В PT PMA иностранное участие указывается в корпоративном реестре. В nominee-схеме зарегистрированное право или доля остаётся у другого лица, а предполагаемые экономические выгоды или контроль описываются частными документами.

Четыре разных значения слова «моё»

Зарегистрированное право на землю.

Реестр показывает держателя конкретного права. Финансирование покупки не меняет запись автоматически.

Доля в компании.

Участник PT PMA владеет акциями индонезийского юридического лица. Если земельное право зарегистрировано на компанию, право принадлежит компании, а не её участнику лично.

Договорное или денежное требование.

Заём, опцион, залог, аренда, доверенность или признание долга могут давать определённые права требования. Их содержание и исполнимость зависят от документов и законной цели.

Фактический контроль.

Доступ к банку, подпись, управление персоналом и хранение документов описывают текущее положение. Оно может измениться после конфликта, смерти, развода, банкротства или отзыва полномочий.

Уверенный ответ требует сопоставить все четыре уровня.

Земельное право и доли компании регулируются разными нормами

Hak Milik

предназначен для граждан Индонезии. Статья 26(2) UUPA касается прямой или косвенной передачи Hak Milik лицу, которое не может иметь такое право.

Статья 33 Закона об инвестициях относится к заявлениям и соглашениям о владении долями от имени другого лица. Эти нормы нельзя объединять в одно простое правило для любого комплекта nominee-документов. Земельная схема и nominee по акциям требуют отдельного анализа.

Фраза

beneficial owner

также не заменяет зарегистрированное право. Она может иметь значение для раскрытия контроля и соответствующих обязанностей, но не является обещанием иностранной собственности на землю.

Что решает PT PMA

PT PMA является индонезийской компанией с иностранным участием. Она может вести доступную иностранным инвестициям деятельность при выполнении требований к KBLI, масштабу, капиталу, месту и лицензированию.

Для надлежащей индонезийской компании может быть доступно HGB, право строить и использовать здания на определённом основании. Это проверяется по земельному реестру, корпоративным полномочиям и фактам сделки.

PT PMA не выдаёт иностранному участнику личный Hak Milik. Компания также не исправляет неподходящее зонирование, недостаток PBG, отсутствие доступа, проблему воды или нелицензированную эксплуатацию.

На дату проверки PP 28/2025 определяет действующий общий порядок риск-ориентированного лицензирования бизнеса. Общие показатели инвестиций и капитала нельзя превращать в универсальную цену создания компании или доказательство доступности любой деятельности.

Почему частные документы не дают гарантии контроля

Доверенность может быть ограничена, отозвана или оспорена. Залог требует проверки предмета, оформления и способа обращения взыскания. Опцион зависит от законности будущей сделки. Признание долга даёт денежное требование, но не обязательно право на землю.

Нотариальное удостоверение подтверждает форму и действия в пределах компетенции нотариуса. Оно не исправляет запрещённую цель и не гарантирует исполнение.

Судебные решения показывают, что результат спора зависит от полного комплекта документов и фактов. Одно дело из Бали не предсказывает исход следующего.

Что произойдёт, если договорённости перестанут работать

Полезно заранее ответить на вопросы:

кто голосует и назначает руководство компании;

кто подписывает сделки с землёй и объектом;

кто распоряжается банковским счётом;

кому принадлежат договоры с гостями и подрядчиками;

что происходит при смерти или банкротстве зарегистрированного держателя;

можно ли продать долю, право или договор;

к какой стороне предъявляется требование;

какие активы доступны для взыскания;

сколько времени и денег займёт восстановление контроля.

Если структура выглядит устойчивой только при полном доверии между сторонами, этот факт должен быть записан как риск, а не скрыт за словом

nominee

.

Что собрать до перевода денег

актуальную запись о земельном праве или полный договор;

корпоративный акт и реестр участников PT PMA;

схему органов управления и подписей;

KBLI, NIB, место проекта и лицензионный путь;

все займы, опционы, залоги, доверенности и признания долга;

движение денег и налоговую квалификацию;

отдельные иммиграционные и трудовые документы иностранца;

письменный сценарий выхода и спора;

независимое заключение индонезийского юриста по полному комплекту.

Связанные материалы

Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

Проверка участка на Бали до предварительного платежа

Leasehold на Бали: какие права действительно получает владелец

Источники и границы

UUPA, Law 5/1960

, статьи 21 и 26.

Law 25/2007 on Investment

, статья 33.

PP 18/2021

,

PP 28/2025

и

Положение BKPM 5/2025

.

Каталог решений Верховного суда Индонезии по запросу nominee

, используется только для понимания фактической зависимости споров.

Материал не рекомендует конкретную структуру и не оценивает комплект nominee-документов. Для действующей сделки требуется независимый юридический, корпоративный, земельный и налоговый анализ.

Риск номинального владения может находиться и в операционной компании

Вопрос номинального владения касается не только лица, которое держит землю или акции компании-собственника. Он может возникнуть и тогда, когда два индонезийца указаны акционерами местной операционной PT, а другой человек финансирует компанию, назначает руководство, контролирует банковские счета, получает почти всю экономическую выгоду и может по своему желанию убрать зарегистрированных акционеров.

Существуют только две логичные исходные позиции. Либо индонезийские акционеры действительно владеют акциями и имеют настоящие права управления и экономические интересы, либо структура должна ответить на вопросы статьи 33 и правил бенефициарного владельца. Прекращение трудовых отношений само по себе не прекращает владение акциями.

Отдельная Field Note Может ли PT PMA эксплуатировать виллу на Бали? рассматривает операционные, лицензионные и платёжные последствия такой структуры.

Может ли PT PMA эксплуатировать виллу на Бали?

Что изучить дальше

Связанный вопрос

Деньги PT PMA: капитал, инвестиционный план, заём и доля для E28A

Связанный вопрос

Проверка участка на Бали до предварительного платежа

От информации к решению по проекту

Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт

Я хочу получать Field Notes и ознакомился с

информацией о конфиденциальности (EN)

.

Подписаться

## Кто на самом деле эксплуатирует виллу? | DALLEAU | DALLEAU

URL: https://dalleau.ai/ru/notes/reality-check-who-is-the-real-villa-operator/

Field Notes

/

Reality Check

Field Notes · Компании

Кто на самом деле эксплуатирует виллу?

01

Объявление

02

Договор с гостем

03

Деньги

04

Персонал

05

Системы

06

Право на объект

07

Лицензия и налоги

08

Риск и прибыль

Название компании в счёте не всегда даёт ответ.

Лицензия может находиться в одной компании. Аккаунт OTA может принадлежать другой. Сотрудники могут получать инструкции от третьей. Иностранный основатель может принимать все решения, пока два индонезийских бывших сотрудника указаны акционерами местного оператора.

Разные компании могут законно выполнять разные функции.

Проблема начинается тогда, когда документы и ежедневная деятельность описывают разных операторов.

Практический принцип

Оператором является не компания с самым удобным названием. Операционную реальность показывает совокупность договоров, денег, людей, систем, решений и риска.

Задайте десять вопросов

1. Кто указан в объявлении?

Проверьте юридическое имя продавца или хоста, владельца аккаунта, счёт выплат и права администратора.

Публичный бренд может отличаться от компании, заключающей договор с гостем. Это допустимо, если юридическая роль объяснена и согласована. Это проблема, если бренд скрывает, что компания в объявлении не имеет отношения к лицензии или клиентскому договору.

2. Кто заключает договор с гостем?

Какая компания обещает предоставить проживание, принимает условия бронирования и несёт обязательства перед клиентом?

Смотрите не только счёт. Проверяйте:

подтверждение бронирования;

правила отмены;

условия проживания;

политику конфиденциальности;

данные продавца в платёжном процессе;

компанию, к которой гость обращается с претензией.

3. Кто получает и возвращает деньги?

Счёт, на который OTA перечисляет выплаты, является важным доказательством.

Не менее важны права решать, что происходит с этими деньгами. Кто утверждает возвраты, скидки, компенсации и споры по банковским картам?

Компания, которая получает деньги на несколько часов, но не может самостоятельно распоряжаться ими, может быть платёжным каналом, а не экономическим оператором.

4. Кто нанимает и руководит командой?

Кто подписывает трудовые договоры? Кто составляет графики? Кто даёт ежедневные инструкции? Кто оценивает работу, применяет дисциплинарные меры и решает проблемы гостя?

Компания, которая контролирует людей, выполняет существенную часть операционной функции.

Пример:

местная PT подписывает договоры с персоналом

но

директор PT PMA каждый день

назначает смены

утверждает отпуск

даёт инструкции службе уборки и подготовки номеров

решает жалобы гостей

и увольняет сотрудников

В такой ситуации название работодателя в договоре не завершает анализ. Нужно понять, на каком законном основании PT PMA или её директор фактически руководят персоналом другой компании.

5. Кто устанавливает цены и контролирует бронирования?

Проверьте права доступа к PMS, системе управления каналами продаж, OTA, CRM и платёжному кабинету.

Кто может:

открыть и закрыть даты;

изменить тариф;

принять бронирование;

предоставить скидку;

отменить проживание;

изменить правила минимального срока;

просмотреть данные гостя;

вывести деньги;

создать нового администратора?

Компания с паролями, правами утверждения и ежедневным контролем может говорить об операционной реальности больше, чем логотип на счёте.

6. Кто имеет деятельность и разрешения?

Проверьте действующую запись OSS, KBLI, NKU, локацию, требуемый сертификат стандарта и дополнительные разрешения.

NIB сам по себе не является полным ответом.

Сравните не только коды, но и содержание деятельности:

прямое предоставление размещения;

операционное управление чужим объектом;

общая управленческая консультация;

управление жилой недвижимостью;

посредничество в бронировании;

отдельные услуги питания, транспорта или туров.

Одинаковое коммерческое слово «управление» может скрывать разные регулируемые виды деятельности.

7. Кто имеет право использовать объект для этого бизнеса?

Компания может иметь правильный KBLI и всё равно не иметь договорного права эксплуатировать конкретную виллу.

Проверьте:

титул, аренду или иной основной документ;

договор передачи права эксплуатации;

ограничения владельца или арендодателя;

совместимость назначения объекта;

PBG и SLF;

разрешённость краткосрочного размещения в этой локации.

Оператор должен быть связан с объектом не только фактически, но и юридически.

8. Кто декларирует налог и иностранных гостей?

Какая компания ведёт PBJT и APOA?

Эти процессы создают регулярный документальный след. Он должен быть совместим с компанией, заявленной как оператор.

Если одна компания продаёт проживание, другая получает деньги, третья декларирует местный налог, а четвёртая подаёт APOA, структура может быть допустима только при ясной договорной причине и корректном распределении ответственности.

9. Кто несёт риск, когда что-то идёт не так?

Кто отвечает за:

возвраты и требования гостей;

оспаривание карточного платежа;

ущерб имуществу;

безопасность;

трудовые споры;

поставщиков;

страхование;

убыток при падении загрузки;

оборотный капитал;

ошибку в отчётности?

Риск часто показывает, является ли заявленный оператор реальным.

Компания не может убедительно утверждать, что она оператор, если она не принимает решений, не имеет людей и не несёт последствий.

10. Кто сохраняет остаточный результат?

После операционных расходов и реальных межкорпоративных услуг какая компания сохраняет прибыль или убыток бизнеса?

Если местная PT несёт договор с гостем, персонал, эксплуатационный риск и ответственность, но каждый год остаётся почти без результата из-за платы за управление, нужно объяснить, почему её экономическая роль оценивается так низко.

Если PT PMA получает почти всю маржу, она должна показать соответствующие функции, людей, разрешения, активы, риск и доказательства работы.

Нельзя сначала выбрать желаемое распределение прибыли, а затем использовать счёт для создания объяснения.

Прочитайте всю картину

ОБЪЯВЛЕНИЕ

+ ДОГОВОР С ГОСТЕМ

+ ПЛАТЕЖИ И ВОЗВРАТЫ

+ ПЕРСОНАЛ И РЕШЕНИЯ

+ СИСТЕМЫ И ПАРОЛИ

+ ПРАВО НА ОБЪЕКТ

+ ЛИЦЕНЗИИ

+ НАЛОГ И APOA

+ РИСК

+ ОСТАТОЧНЫЙ РЕЗУЛЬТАТ

= ОПЕРАЦИОННАЯ РЕАЛЬНОСТЬ

Ни один ответ не определяет структуру в одиночку.

Ответы должны поддерживать одну и ту же историю.

Согласованная структура

РЕАЛЬНЫЙ МЕСТНЫЙ ОПЕРАТОР

правильная деятельность и локация

право использовать объект

договор с гостем

OTA и выплаты

операционный персонал

возвраты и ответственность

PBJT и APOA

реальные решения, прибыль и риск

↓ реальный договор услуг

PT PMA, УПРАВЛЯЮЩАЯ ИЛИ СЕРВИСНАЯ КОМПАНИЯ

разрешённая деятельность

реальная команда и системы

определённые функции

доказательства работы

понятные права принятия решений

коммерчески обоснованное вознаграждение

Эту модель можно объяснить гостю, банку, OSS, налоговому консультанту, иммиграции и аудитору, не меняя историю для каждой аудитории.

Противоречивая структура

МЕСТНАЯ PT

два бывших сотрудника в реестре акционеров

лицензия

OTA

счёт

банковский транзит

почти нет людей, решений или риска

↓ почти вся экономика

PT PMA ИЛИ ИНОСТРАННЫЙ ОСНОВАТЕЛЬ

финансирование

банковский контроль

цены

бронирования

персонал

жалобы гостей

закупки

все системы

все важные решения

почти вся экономическая выгода

Проблема здесь не ограничивается налогом или размером платы за управление.

Одновременно могут возникнуть вопросы о:

фактическом операторе;

соответствии лицензии;

бенефициарном владельце;

номинальном владении акциями;

трудовых и миграционных полномочиях иностранного директора;

трансфертном ценообразовании;

ответственности перед гостем.

Два варианта владения для бывших сотрудников

Когда два индонезийских сотрудника становятся акционерами местной PT, структура должна соответствовать одной из двух юридических и экономических позиций.

Они действительно владеют акциями

Тогда у них есть реальные права, экономический интерес и последствия владения.

Прекращение трудовых отношений не прекращает владение акциями. Выход требует действительного корпоративного и договорного механизма.

Они не владеют акциями по существу

Тогда структура должна ответить на вопросы о номинальном владении, статье 33 Закона об инвестициях и правилах бенефициарного собственника.

Формула проста:

Акционер без реальных прав может создать проблему номинального владения. Акционер с реальными правами создаёт настоящую систему корпоративного управления. Фраза «просто поставьте двух сотрудников» не устраняет ни одну из этих реальностей.

Самый полезный финальный тест

Спросите:

Какая компания сможет продолжить эксплуатировать объект завтра, если другая компания перестанет помогать?

Если местная PT не может без иностранного основателя установить цену, принять бронирование, организовать команду, заплатить поставщикам, вернуть деньги гостю и выполнить отчётность, её независимая операционная роль может быть слабее, чем утверждают документы.

Если PT PMA прекращает работу, а местный оператор сохраняет людей, систему, договоры, деньги и ответственность, разделение функций выглядит значительно убедительнее.

Решение простыми словами

Компания в счёте является одним доказательством. Не главным и не единственным.

Серьёзная структура должна согласовать:

право на объект;

деятельность и лицензию;

договор с гостем;

деньги;

персонал;

системы;

решения;

налоги и APOA;

риск;

экономический результат;

фактический контроль.

Правило, которое стоит сохранить:

Счёт должен следовать за бизнесом. Он не должен создавать вторую версию бизнеса.

Обсудить проект с Франсуа

Основные источники и связанные материалы

Официальный OSS, KBLI 55203, деятельность виллы

Официальный OSS, KBLI 55901, управление размещением

Закон 25/2007 об инвестициях

PMK 172/2023 о сделках между связанными сторонами

Связанные материалы DALLEAU:

Может ли PT PMA эксплуатировать виллу на Бали?

,

Плата за управление должна соответствовать реальной услуге

,

Может ли иностранный директор работать в собственной компании на Бали?

и

Вилла на Бали размещена на OTA. Что это на самом деле доказывает?

## Закрасить пятно не значит устранить путь воды. | DALLEAU Field Notes

URL: https://dalleau.ai/ru/notes/repainting-stain-does-not-fix-water-ingress.html

Field Notes / Reality Check / Вода, ограждающие конструкции и влага

Field Notes · Reality Check · Вода, ограждающие конструкции и влага

Закрасить пятно не значит устранить путь воды.

Новая краска может создать видимость ремонта, хотя путь воды не изменился.

Уровень доказательности

Устоявшийся принцип расследования. Источник определяется на объекте.

Тип применения

Наблюдение владельца и последовательность расследования

Обновлено

4 августа 2026 г.

Источники

4

На этой странице

Reality Check

Почему видимое место может вводить в заблуждение

Косметический ремонт может уничтожить данные

Более полезная последовательность

Вопросы перед приёмкой ремонта

Сигналы риска

Что это не доказывает

Действие владельца

Источники

Карта системы

Reality Check

Нативная схема делает путь решения понятным, не превращая проектные критерии в ложный рейтинг.

01 Хронология

Когда и при каких условиях

02 Карта

Видимая точка, распространение и высота

03 Гипотезы

Один возможный путь за раз

04 Проверка

Контролируемая и записанная

05 Ремонт

Источник и повреждённый материал

06 Повтор

Сопоставимые условия

Иллюстративный контекст

Reality Check

Новая краска может создать видимость ремонта, хотя путь воды не изменился.

Пятно является признаком состояния. Оно не обязательно находится в месте входа воды и не является диагнозом.

Почему видимое место может вводить в заблуждение

Вода способна войти через кровлю или парапет, пройти по арматуре, трубе или полости, накопиться за штукатуркой или плиткой и выйти в другом месте. Иногда след появляется только после насыщения конструкции и высыхает до осмотра.

Пятно внизу стены может быть связано с грунтом, боковым дождём, ландшафтом, сантехникой, мокрой зоной или конденсацией. Пятно на потолке может быть связано с кровлей, террасой, ванной, конденсатом или инженерной проходкой.

Косметический ремонт может уничтожить данные

Немедленная шлифовка, покраска или герметизация могут убрать форму пятна, высолы, пузыри, трещины, связь со швами и временную последовательность.

Сначала зафиксируйте состояние.

Более полезная последовательность

1. Восстановить хронологию

Во время дождя или после него? При использовании ванной? Зависит ли от ветра? Появляется ли только в охлаждаемой комнате? Какие работы проводились раньше?

2. Нанести на план

Укажите помещение, ориентацию, высоту, площадь, материал, запах и близкие инженерные системы.

3. Проверить возможные пути

Кровля, фасад, окно, порог, терраса, кашпо, мокрая зона, труба, конденсат и наружные отметки.

4. Проверять одну гипотезу за раз

Целевой тест понятнее, чем одновременное смачивание нескольких зон.

5. Вскрывать только при достаточных основаниях

Небольшое целевое вскрытие может потребоваться. Оно должно следовать за расследованием.

6. Исправить путь и повреждение

Источник или механизм и повреждённые материалы требуют отдельных решений.

7. Повторно проверить

Воспроизведите релевантное условие или наблюдайте следующий сопоставимый дождь.

Вопросы перед приёмкой ремонта

Какая рабочая причина была принята?

Какие данные её поддерживают?

Какое примыкание отремонтировано?

Влажный материал высушен или заменён?

Как проверили ремонт?

Какой результат потребует продолжения расследования?

Кто осмотрит зону в следующий влажный сезон?

Сигналы риска

повторная покраска без письменной причины;

герметик на всех видимых трещинах;

одно измерение влажности как окончательный диагноз;

закрытие до проверки высыхания;

отсутствие фотографий до и после вскрытия;

отсутствие повторного теста;

отсутствие проверки наружных уровней и дренажа.

Что это не доказывает

Одно пятно не доказывает капиллярный подъём, отказ кровли, скрытую плесень или ответственность конкретного подрядчика. Удалённая фотография не определяет источник.

Действие владельца

Попросите одну страницу, связывающую:

```text Наблюдение → возможные пути → тест → ремонт → повторная проверка → следующий осмотр ```

Источники

Источники

S01 WHO guidelines for indoor air quality: dampness and mould

World Health Organization

Открыть исходный материал

S02 EPA Moisture Control Guidance for Building Design, Construction and Maintenance

US Environmental Protection Agency

Открыть исходный материал

S05 DR04, Indoor Air Quality, Humidity, Mould, Ventilation and Filtration in Private Residences

DALLEAU

S09 DR18, DALLEAU Atelier Master Synthesis and Build Brief

DALLEAU

Продолжить с актуального вопроса

Продолжить с актуального вопроса

После сильного дождя: что владельцу стоит проверить до того, как всё высохнет. → Гидроизоляция: непрерывная система, а не финишное покрытие. → Плита по грунту или подвесной пол на Бали? → Мембрана не спасёт плоскую кровлю без уклонов. →

Подготовить хронологию, фотографии и сведения о предыдущих ремонтах.

Включить путь воды, узлы и доказательства в задание до того, как их скроет отделка.

Обсудить с Франсуа

## Общий бассейн: что именно получает владелец виллы | DALLEAU

URL: https://dalleau.ai/ru/notes/shared-estate-amenities.html

Ко всем материалам Материалы DALLEAU 7 июля 2026 Общий бассейн: что именно получает владелец виллы

В презентации небольшой резиденции всё выглядит как единый продукт. Рядом с виллой показаны бассейн, парковка, прачечная, кухня, охрана и водоподготовка.

DALLEAU | Исследования и практические материалы Опубликовано

7 июля 2026

Последняя проверка

17 июля 2026

Проверено | 17 июля 2026 | первичные источники

Короткий ответ В презентации небольшой резиденции всё выглядит как единый продукт. Рядом с виллой показаны бассейн, парковка, прачечная, кухня, охрана и водоподготовка. Покупатель предполагает, что эти объекты входят в его сделку и будут доступны столько же, сколько сама вилла.

Перед решением проверьте источники и дату обновления. Правила и административная практика могут меняться. Материал помогает поставить вопросы, но не заменяет проверку вашей конкретной ситуации.

Источники и ограничения

Это не официальный текст или перевод и не юридическая, налоговая, бухгалтерская, иммиграционная, финансовая, земельная или нотариальная консультация.

Проверьте дату, действующий текст на Bahasa Indonesia в официальной базе нормативных актов Индонезии и применение правил к вашим фактам у компетентного органа или уполномоченного специалиста.

Сообщить об ошибке или устаревшем источнике: notes@dalleau.ai .

На практике каждый элемент может находиться на другом участке, принадлежать отдельной компании или работать только по договору с оператором. Поэтому значение слова «общий» нужно раскрыть в документах.

Три карты одной резиденции

Физическая карта

Где находится каждый объект, к чему он подключён и какие виллы зависят от него? Здесь отмечают трубопроводы, электричество, проходы, технические помещения и точки отключения.

Карта прав

Кому принадлежит земля, помещение и оборудование? Кто имеет право прохода, пользования, ремонта и замены? Где записаны ограничения и срок этих прав?

Карта эксплуатации

Кто открывает, убирает, обслуживает и ремонтирует? Кто собирает платежи, хранит резерв, выбирает подрядчиков и принимает решение при аварии?

Эти три схемы должны совпадать. Если центральная водоподготовка стоит на соседнем участке, принадлежит одной компании и обслуживается другой, права владельца виллы на доступ и обслуживание должны быть прямо закреплены в документах.

Что проверить по каждому общему объекту

Для бассейна, парковки, кухни или инженерной системы запишите:

точное местоположение;

собственника земли и оборудования;

круг пользователей;

основание доступа;

правила и ограничения;

управляющего и подрядчиков;

текущий бюджет и резерв на замену;

порядок действий при отказе;

ответственность и доступные способы защиты.

Такая краткая сводка обычно полезнее общего перечня удобств и услуг.

Плата за сервис и резерв

Ежемесячный платёж может включать текущую уборку, персонал, электричество и обычное обслуживание. Замена насоса, ремонт бассейна или новая система очистки требуют других сумм.

В договоре следует разделить:

регулярные расходы;

управленческое вознаграждение;

плановые крупные замены;

аварийные работы;

резерв и правила его использования.

Сам по себе платёж за обслуживание не доказывает, что резерв действительно создан. Полезно знать, на каком счёте он хранится, кто видит остаток и как согласуются расходы.

Центральные системы экономят место, но одна авария затрагивает всех

Общая прачечная, водоподготовка или система сточных вод позволяют не дублировать оборудование для каждой виллы. Но при аварии проблема затронет сразу несколько домов.

Проектировщик проверяет возможность изоляции участка сети, обходную схему, запасную ёмкость, доступ к оборудованию, сигнализацию, наличие деталей и время реакции подрядчика.

Обещание «полного управления» не отвечает на эти вопросы.

Если меняется оператор

Доступ к бассейну или центральной системе не должен зависеть только от доброй воли одной компании. До покупки стоит понять, что произойдёт при прекращении договора, банкротстве оператора, споре сторон или продаже земли с общим объектом.

Проверьте:

кто сможет продолжить обслуживание;

можно ли заменить управляющего;

кому принадлежат ключи, данные и оборудование;

кто вправе войти в техническое помещение;

как оплачиваются срочные работы;

сохраняются ли права владельцев вилл.

Разрешения проверяются по объекту и деятельности

Общий объект может иметь собственные строительные, пространственные, экологические и лицензионные вопросы. Один PBG, SLF или NIB оператора не обязательно охватывает все помещения и услуги.

Особого внимания требуют кухня, спа, площадка для мероприятий, водозабор, водоподготовка и система сточных вод. Их фактическое использование должно соответствовать проектным и эксплуатационным документам.

Проверка до депозита

Попросите приложить к договору план с границами участков и общими объектами. Затем сопоставьте его с правами доступа, бюджетом, формулой платежей, договорами обслуживания и аварийным планом.

Если важная система ещё только обещана, зафиксируйте спецификацию, срок, ответственного, порядок приёмки и последствия задержки.

Практический вывод

Общие пространства могут заметно улучшить жизнь и работу резиденции. Их ценность зависит от документов, доступа, обслуживания и того, продолжат ли они работать после смены оператора или отказа оборудования.

Проверьте общую инфраструктуру как часть сделки, а не как иллюстрацию в буклете.

Связанные материалы

KBLI выбирают по деятельности, а не по слову «вилла»

Что подтверждает NIB и какие документы всё равно нужны

Почему одной глубины скважины недостаточно

Что изучить дальше

Связанный вопрос KBLI выбирают по деятельности, а не по слову «вилла»

Смоделировать решение в Stay Matrix Открыть инструмент (EN) > От информации к решению по проекту Этот вопрос относится к реальному проекту резиденции на Бали?

Опишите в конфиденциальном брифе участок, бюджет и решение, которое вы рассматриваете. DALLEAU определит, какой следующий шаг будет полезен владельцу. Регулируемые вопросы остаются в компетенции уполномоченных специалистов.

Заполнить конфиденциальный бриф

Получать новые материалы

Мы отправим короткое письмо после новой публикации или действительно важного обновления.

Сайт Я хочу получать Field Notes и ознакомился с информацией о конфиденциальности (EN) . Подписаться

## Франсуа Далло и команда проекта на Бали | DALLEAU

URL: https://dalleau.ai/ru/people/

Люди
Люди, которые ведут работу.
За каждой резиденцией стоят люди. Важно не количество имён под логотипом, а то, кто участвует в ключевых решениях и доводит их до повседневной эксплуатации дома.
DALLEAU · Основная ответственность
François Dalleau
Основатель
Франсуа Далло начал инвестировать в недвижимость как частный инвестор в 2012 году. В 2015 году он основал Investissement Budapest, где участвовал примерно в шестидесяти проектах, включая проекты с несколькими объектами. С 2022 года он сосредоточен на развитии и эксплуатации частных резиденций на Бали. Он лично ведёт каждый мандат DALLEAU и отвечает за него в согласованных пределах.
Как разделена ответственность
DALLEAU
Управление и контроль со стороны владельца
Формулирует вопрос владельца, координирует решения и связывает согласования, затраты, доказательства и ответственность.
Bee My Guest · при отдельном назначении
Эксплуатация резиденции
Обеспечивает персонал, обслуживание и гостеприимство только в рамках отдельного операционного назначения.
Независимые назначения
Специалисты конкретного проекта
Архитекторы, инженеры, подрядчики и регулируемые консультанты отвечают за собственный назначенный объём.
DALLEAU · БЮРО НА СТОРОНЕ ВЛАДЕЛЬЦА
Управление остаётся связано с вопросом владельца.
DALLEAU координирует мандат, не подменяя назначенного архитектора, инженера, подрядчика или регулируемого консультанта. Общие функции подключаются только в явно указанном объёме.
Финансовые записи, координация индонезийского налогового и бухгалтерского учёта и закупки поддерживают мандат или эксплуатационный архив только в рамках указанного назначения.
Intan
Общая поддержка · объём указан
Финансовое управление
Отвечает за финансовый контроль и внутреннюю координацию данных.
Tio
Общая поддержка · объём указан
Налоги и бухгалтерский учёт в Индонезии
Координирует налоговые и бухгалтерские вопросы с профильными специалистами в Индонезии.
Lystia
Общая поддержка · объём указан
Закупки и операционная поддержка
Координирует закупки и оказывает операционную поддержку.
BEE MY GUEST · ПРИ ОТДЕЛЬНОМ НАЗНАЧЕНИИ
Эксплуатация оформляется отдельным назначением.
Bee My Guest обеспечивает эксплуатацию, персонал, обслуживание, уборку и гостеприимство только при отдельном назначении. Эта операционная роль не заменяет девелоперский мандат DALLEAU на стороне владельца.
Amar
Bee My Guest · при назначении
Операционная работа резиденции
Координирует повседневную работу резиденций.
Betty
Bee My Guest · при назначении
Подбор команды и кадровая координация
Занимается подбором людей и кадровой координацией.
Sheva
Bee My Guest · при назначении
Контент и редакционная работа
Работает над контентом и редакционной подготовкой.
Ibu Ketut
Bee My Guest · при назначении
Руководитель команды по уходу за резиденциями и работе с гостями
Ибу Кетут руководит уборкой, подготовкой комнат, ежедневным уходом за резиденциями и подачей завтраков на объектах, за которые отвечает.
Независимые назначения
Независимые специалисты для конкретного проекта.
Архитекторы, инженеры, подрядчики, юридические и налоговые консультанты и другие регулируемые специалисты получают определённый объём и сохраняют ответственность за собственную профессиональную работу.
Начните с проекта, а не с презентации.
Заполнить конфиденциальный бриф

## Инструменты DALLEAU | Подготовка решений по проекту

URL: https://dalleau.ai/ru/tools/

ИНСТРУМЕНТЫ DALLEAU Начните с вопросов, которые меняют проект.

Каждый инструмент проясняет одну часть первоначального решения. С их помощью можно подготовить бриф, проверить сценарий проживания и сопоставить рыночные условия до профессиональной оценки.

Многие дорогостоящие ошибки на Бали возникают ещё до первого разговора со специалистом. Эти инструменты помогают избежать части из них.

Инструменты доступны без обязательной регистрации, адреса электронной почты или разговора с менеджером.

Сначала выберите вопрос, затем инструмент.

РЕШЕНИЯ О РЕЗИДЕНЦИИ

Сформулируйте саму задачу резиденции.

Начните здесь, если решение касается брифа, семьи, площади, качества, стоимости или предполагаемого использования.

01 Интерфейс проверен, 18 июля 2026 года

Описать проект Конфиденциальный проектный бриф

Пошагово собирает информацию о роли владельца, предполагаемом использовании, участке, бюджете, составе семьи, требуемой помощи и сроке решения. Ответы остаются на вашем устройстве, пока вы сами не решите ими поделиться.

Заполнить бриф &#8599; 02 Исходная версия проверена, 16 июля 2026 года

Собрать сценарий проживания Stay Matrix (EN)

Инструмент связывает людей и ежедневный распорядок с программой дома, участком, уровнем сервиса и эксплуатацией. Открывается на английском языке.

Открыть английскую версию &#8599;

КОНТЕКСТНЫЕ ИНСТРУМЕНТЫ

Проверьте внешний контекст.

Используйте их, когда непосредственный вопрос касается иммиграции или сравнения рыночных условий.

03 Официальные источники проверены, 13 июля 2026 года

Подобрать официальный вариант Какая виза для Индонезии?

Помогает определить официальный визовый маршрут по цели поездки, длительности пребывания и предполагаемой деятельности. Результат нужно сверять с действующими официальными правилами.

Найти визовый маршрут &#8599; 04 Рыночные источники проверены, 18 июля 2026 года

Сравнить рыночный контекст Global Market Compass (EN)

Инструмент сравнивает рыночный контекст, показывает сопоставимые данные, явно отмечает, каких данных не хватает, и не выбирает победителя вместо пользователя. Открывается на английском языке.

Открыть английскую версию &#8599;

Когда исходные вопросы прояснены: Заполнить конфиденциальный бриф .

Перед тем как опираться на результат Инструменты помогают подготовить первый разговор. Они не заменяют юридическую, налоговую, финансовую, инвестиционную, архитектурную или инженерную консультацию. Данные и правила меняются, поэтому перед тем как действовать проверяйте дату обновления и источники.

Условия использования инструментов

## Work | Документальные материалы проекта | DALLEAU

URL: https://dalleau.ai/ru/work/

Документальные материалы проекта

Work

DALLEAU — девелоперское бюро в интересах владельца. В разделе Work проект представлен как досье решений: состояние проекта, вопрос владельца, доступные подтверждения, действие и то, что оставалось открытым.

ИНДЕКС WORK

Начните с того вида работы, который нужен проекту.

Проектные записи

Этапы строительства и сдачи, сохранённые как ограниченные по времени записи.

↓ Дизайн-исследования

Как DALLEAU превращает потенциал участка, целевой спрос и предполагаемое использование в ясное продуктовое и дизайн-направление.

↓ Эксплуатационные записи

Что остаётся полезным после сдачи для обслуживания, ответственности и последующих решений.

↓ Прикладные заметки

Проектные наблюдения, переведённые в вопросы для следующего брифа.

↓

Исходная видеозапись строительства Harmonie, Бали · Строительная видеозапись с организацией площадки, наружными работами и незавершёнными узлами.

Harmonie · Оригинальная видеозапись со стройки · Этап: строительство · Текущий статус: сдан и эксплуатируется

Harmonie. Запись фиксирует состояние. Доказательства объясняют, почему оно важно.

Статус проекта и источник

Текущий статус: объект сдан и эксплуатируется. Источник: исходная видеозапись, сделанная во время строительства до сдачи.

Вопрос владельца

Что необходимо зафиксировать, пока условие остаётся видимым, чтобы решения владельца сохраняли практическую ценность после ухода строительных команд?

Решение или действие

Сохранить видеозапись как привязанный ко времени строительный материал, а состояние после сдачи и в эксплуатации учитывать как отдельный уровень доказательств.

Статус доказательств

Исходная видеозапись этапа строительства; текущий статус подтверждается существующим досье проекта.

Обсудить досье вашего проекта

Этап

Во время строительства оставались видимыми наружные работы и незавершённые узлы.

Наблюдаемое состояние

Видеозапись фиксирует организацию площадки, наружные работы, проёмы и незавершённые узлы до сдачи.

Значение для владельца

Запись сохраняет ценность, когда её дата, видимое состояние, связанное решение, ответственная область и следующая проверка остаются соединены.

Объём записи

Видимые условия на этапе строительства; материалы по сдаче и эксплуатации документируются отдельно.

Что остаётся открытым

Наблюдения в эксплуатации и документы назначенных специалистов остаются отдельными уровнями доказательств.

Следующий шаг

Продолжать досье наблюдениями в эксплуатации, решениями по обслуживанию и документами ответственных специалистов.

Материалы проекта

Один проект — несколько зафиксированных состояний.

Строительство

Сдано и эксплуатируется

Лестница и центральный сад

Harmonie · Сопоставленные фотоматериалы проекта · Строительство → сдан и эксплуатируется

Строительство

Сдано и эксплуатируется

Конструкция криволинейной лестницы и центральный объём

Harmonie · Сопоставленные фотоматериалы проекта · Строительство → сдан и эксплуатируется

Строительство

Сдано и эксплуатируется

Внутренний объём и маршруты движения

Harmonie · Сопоставленные фотоматериалы проекта · Строительство → сдан и эксплуатируется

Строительство

Сдано и эксплуатируется

Конструкция и эксплуатация бассейна

Harmonie · Сопоставленные фотоматериалы проекта · Строительство → сдан и эксплуатируется

Наиболее близкие из доступных ракурсов сопоставляют этап строительства и состояние после сдачи в четырёх зонах Harmonie.

ДИЗАЙН-ИССЛЕДОВАНИЯ

Реальные участки, переведённые в концепции продукта, опыта и дизайна.

Реальная фотография участка · Концептуальные визуализации DALLEAU

СИДЕМЕН · КОНЦЕПТУАЛЬНОЕ ПРОЕКТИРОВАНИЕ

Место, ради которого стоит отправиться в путь.

DALLEAU определил целевую аудиторию, сервисную модель и дизайн-направление частной резиденции с полным обслуживанием, построенной вокруг редкого вида на долину.

Реальная фотография участка · Концептуальные визуализации DALLEAU

Открыть дизайн-исследование

ЭКСПЛУАТАЦИОННАЯ ЗАПИСЬ

После сдачи ведётся отдельная запись непрерывности.

Прочитать полевой материал о Harmonie

Проект

Harmonie

Этап

Сдан и эксплуатируется

Тип доказательства

Запись непрерывности на стороне владельца

Вопрос владельца

Что должно оставаться видимым после сдачи, чтобы обслуживание, ответственность и последующие решения сохраняли контекст?

Что сохраняется

После сдачи решения по обслуживанию, ответственность и контекст проекта остаются связанными.

Продолжить из проектной записи

Выберите нужный уровень доказательств.

Полевая запись

Что мы бы повторили и что изменили бы.

Откройте ограниченную запись Harmonie и решения, которые она сделала видимыми.

Читать полевую запись →

Atelier · Иллюстративная концепция

Превратить наблюдение в вопрос для проекта.

Как доказательства, критерии, макеты и проверка входят в бриф.

Открыть Atelier →

Applied Note

Водораспределение, которое остаётся обслуживаемым.

Почему изоляция, доступ и документация важны до закрытия отделки.

Читать Applied Note →

Обсудить проект

## Место, ради которого стоит отправиться в путь | Концепция резиденции в Сидемене | DALLEAU

URL: https://dalleau.ai/ru/work/sidemen-destination-concept/

← Вернуться в Work WORK · КОНЦЕПТУАЛЬНОЕ ПРОЕКТИРОВАНИЕ · СИДЕМЕН, БАЛИ

Место, ради которого стоит отправиться в путь.

На участке на склоне в Сидемене DALLEAU задумал частную резиденцию с полным сервисом вокруг одной идеи: превратить исключительный ландшафт в самостоятельное направление.

Концептуальное проектирование · Концепция участка и дизайн-направление Франсуа Далло

Когда адрес сам по себе не создаёт спрос, концепция должна создать причину приехать.

Обсудить с Франсуа Посмотреть концепцию

Реальный контекст участка · Сидемен, Бали

Участок Реальный участок на склоне в Сидемене

Аудитория Частное пребывание премиального уровня с полным сервисом

DALLEAU Продуктовая концепция и дизайн-направление Франсуа Далло

Стадия Концептуальное проектирование

Локация может использовать существующий спрос. Сильная концепция может создать новую причину приехать.

ПРОДУКТОВАЯ ИДЕЯ

Один путь — быть там, где спрос уже существует. Другой — создать направление.

Локация остаётся решающей. Одни проекты входят в уже сложившийся рынок. Другие начинаются с участка, ландшафт которого способен поддержать уникальный опыт, после чего целевая аудитория, резиденция, сервис и сценарий прибытия выстраиваются вокруг этого преимущества.

В Сидемене возможность заключалась в сочетании редкого места и достаточно точной концепции, чтобы сама поездка стала частью желания.

УЧАСТОК

Вид стал первым преимуществом продукта.

Участок расположен над рисовыми террасами и обращён к широкому вулканическому горизонту. Концепция не использует ландшафт как фон, а делает его основой прибытия, совместного времени, приватности и ритма пребывания.

Резиденция задумана так, чтобы сохранить ощущение удалённости и спокойствия, добавив защищённость, комфорт и уровень сервиса, ожидаемый международной аудиторией премиального сегмента.

ДИЗАЙН-НАПРАВЛЕНИЕ

Минеральная архитектура. Тёплый комфорт. Открытый горизонт.

Направление намеренно строится на контрасте между сдержанной, почти монолитной архитектурой и мягкостью масштабного ландшафта. Тёмные рамы, камень, бетон и тёплое дерево создают защищённую границу интерьера, не конкурируя с видом.

Панорамная гостиная, низкая терраса у бассейна и остеклённая сауна превращают ландшафт в последовательность ежедневных впечатлений, а не в единственный красивый кадр.

Концептуальная визуализация · Терраса, бассейн и остеклённая сауна

Концептуальная визуализация · Панорамная гостиная

ПРОСТРАНСТВЕННЫЙ ОПЫТ

Четыре решения превращают вид в полноценное пребывание.

01 Прибытие и раскрытие

Маршрут сдерживает панораму и раскрывает её в момент, когда резиденция открывается в сторону долины.

02 Общий горизонт

Гостиная, столовая, бассейн и наружная лаунж-зона образуют единую социальную границу для семьи или частной группы.

03 Приватность и уединение

Сьюты и тихие комнаты защищают сон, личное пространство и дистанцию от общей активности, не теряя связь с ландшафтом.

04 Незаметный сервис

Кухня, персонал, хранение, прачечная, транспорт и обслуживание поддерживают пребывание, не занимая маршрут гостей.

ЦЕЛЕВОЕ ПРЕБЫВАНИЕ

Частное направление с полным сервисом, а не ещё одна вилла в аренду.

Целевой аудиторией была семья или частная группа премиального уровня, выбирающая несколько дней спокойствия, приватности и сервиса вокруг редкого ландшафта.

Концепция объединяет частное размещение, общие пространства, бассейн, сауну, питание, уборку, транспорт и поддержку на месте в единый многодневный опыт.

Сервис не добавлялся к архитектуре позднее. Он был частью концепции с самого начала и влиял на служебные маршруты, хранение, прибытие, приватность и обслуживание.

Обещание пребывания Частный многодневный опыт вокруг дистанции, спокойствия и редкого вида.

Сервисная модель Поддержка на месте, питание, уборка, транспорт и обслуживание как единая система.

Приватный опыт Совместное время и уединение спроектированы как взаимодополняющие условия.

Ценность во времени Сильная идентичность уравновешена эксплуатационной дисциплиной, обслуживаемостью и достойным старением.

ПРОДУКТОВОЕ МЫШЛЕНИЕ

Концепция связывает рынок, впечатление, архитектуру и эксплуатацию.

01 Аудитория и спрос

Определить гостя, который выберет Сидемен ради опыта, а не просто примет его как замену более известному адресу.

02 Уникальный опыт

Использовать ландшафт, прибытие, общий горизонт и контраст материалов, чтобы создать пребывание, принадлежащее именно этому месту.

03 Эксплуатационная модель

Организовать персонал, питание, уборку, транспорт и обслуживание без вмешательства в частный опыт.

04 Долгосрочная привлекательность

Сочетать опыт премиального уровня с пропорциональной сложностью строительства и эксплуатации, реалистичным обслуживанием и материалами, которые достойно стареют в условиях Бали.

РОЛЬ DALLEAU

От потенциала участка к сформированной концепции резиденции.

Франсуа Далло определил вид как центральный актив продукта, задал целевой сценарий пребывания и разработал для DALLEAU первоначальную концепцию участка, продукта, сервиса и дизайн-направление.

Представленная работа показывает эту концепцию: что должно сделать направление желанным, как архитектура усиливает его и какая сервисная модель поддерживает пребывание.

Местоположение

Сидемен, Бали

Проект

Частная резиденция с полным сервисом

Целевое пребывание

Многодневное пребывание премиального уровня для семьи или частной группы

Стадия

Концептуальное проектирование

Роль DALLEAU

Анализ участка, определение аудитории, продуктовая концепция и дизайн-направление Франсуа Далло

Источники

Реальная фотография участка и концептуальные визуализации под руководством основателя

ДИЗАЙН-ФОРМУЛА

Достаточно выразительно, чтобы привлекать. Достаточно дисциплинированно, чтобы работать и достойно стареть.

01 Уникальное преимущество участка

02 Чётко определённая целевая аудитория

03 Причина совершить поездку

04 Архитектура, усиливающая ландшафт

05 Баланс совместного времени и уединения

06 Незаметная сервисная и служебная логика

07 Пропорциональная сложность строительства и эксплуатации

08 Материалы и системы с долгосрочной актуальностью

У вас есть участок, потенциал которого шире текущего задания?

DALLEAU может начать с анализа участка, определения аудитории и формирования продукта до того, как программа, стоимость и назначенная команда станут фиксированными.

Обсудить с Франсуа Узнать о Feasibility Study

## Decision tools for private residences in Bali | DALLEAU

URL: https://dalleau.ai/tools/

DALLEAU Intelligence Start with the questions that change the project.

Each tool clarifies one part of an early decision. Use them to structure a brief, test the resident experience and compare markets before a professional review.

Many expensive mistakes in Bali begin before the first professional conversation. These tools can help prevent some of them.

Free to use in full. No account, email address or sales call required.

Choose the question before choosing the tool.

RESIDENCE DECISIONS

Frame the residence itself.

Use these first when the decision concerns the project brief, household, space, quality, cost or intended use.

01 Interface reviewed · 18 July 2026

Frame the project Project Assessment

Turn the first facts about your project into a clear brief. Your answers stay on this device until you choose to share them.

Start the assessment &#8599; 02 Product reviewed · 16 July 2026

Program the residence The Stay Matrix

Test how resident and household needs, space, quality and construction cost pull against one another while the total budget stays visible.

Open the Stay Matrix &#8599;

CONTEXT TOOLS

Check the external context.

Use these when the immediate question concerns immigration or a comparison between market contexts.

03 Official sources checked · 13 July 2026

Check the official route Which visa for Indonesia?

Start with the activity and length of stay. The guided path identifies the official visa route to verify and keeps entry, residence, work and investor status separate.

Find a visa route &#8599; 04 Market sources checked · 18 July 2026

Compare the context Global Market Compass

Use one capital amount across three partial city scenarios and three narrower market capabilities, with assumptions and sources beside every figure.

Open the Compass &#8599;

When the tools have done their part: Start a private brief .

Before you rely on a result These tools support an early conversation. They do not replace legal, tax, financial, architectural or technical advice. Figures and rules can change, so check the update date and the linked sources before acting.

Tool terms

## Global Market Compass: compare property markets | DALLEAU

URL: https://dalleau.ai/tools/global-market-compass.html

Global Market Compass · aligned market comparison Compare one property budget across three markets.

See estimated purchase area, acquisition costs, gross annual rent and gross yield on the same USD budget.

Reading guide The same budget, columns and display currency. Every visible figure uses a stated residential scenario and published source. Methods and local-currency inputs remain available behind the information markers.

Selected budget US$500,000 Enter the total capital available for purchase and the acquisition costs included in this comparison.

Comparison capital

Display currency USD only

Update the comparison

What is being compared What the four columns include

The grid includes Dubai, Lisbon and Paris because the current evidence supports the same four calculations. Bali, Phuket and Budapest stay outside the grid until their data can be normalized without mixing asset types, dates or unmatched sale and rent cohorts. Gross yield is not net return.

Comparable market view What the same budget may buy

Capital applied to this grid US$500,000 Every row uses this same capital amount.

Read across each row or down a column. Every large figure uses the same units and total budget; assumptions, source dates and local-currency values are available from the information markers.

Only figures supported on the same basis appear in this grid.

Bali Indicative built-area equivalent ≈ 181 to 302 m² Selected budget divided by a dated Bali-wide built-area benchmark. This is not land area or an all-in project budget.

Bali stays project-specific.

Location, lease term, villa specification and operating model materially change the result. The available market-wide sale and rent cohorts are not matched, so the Compass does not turn them into a Bali yield.

Open the Stay Matrix

Market detail Methods, assumptions and additional market research

Ownership route, assumptions, tax and short-stay position.

Important distinction Gross yield is not net return

Recurring operating costs, financing, tax position and management choices differ too much to publish one reliable net-return figure across these markets.

Comparison method Method, definitions and exclusions

The grid closes the apples-and-oranges gap

Every card stays inside its approved evidence capability. A value appears only when the asset scope, geography, date and legal route are explicit. Partial figures disclose what is excluded, and withheld outputs are omitted rather than shown as zero.

Evidence remains neutral and market-specific

No gross yield presented as investor net

No country average silently used as a city or district rule

Reading guide Important research notice

This tool provides general research information, not legal, tax or investment advice. Verify the asset, ownership route, tax residence and operating permissions before committing capital.

Open the machine-readable comparison contract

## The Stay Matrix | DALLEAU

URL: https://dalleau.ai/tools/stay-matrix/

The Stay Matrix

Project context optional

FR Save Exit

→

What should this villa become?

→ →

Illustrative guidance. Review the Tool terms and Legal and privacy information before relying on a result.

your stay Edit

your project Edit

fixed by you

2 · test another guest Main target. Test other guests.

Annual family 5-14 nights · daily care Budget family Value first · self-led Groups / friends Short social stay Young professionals Design · short escape Seasonal residents 1-3 months · live and work Multi-generation Long stay · full service

·

project envelope

Stay Matrix Move the Bronze Dot on two axes: Comfort to Design, and Price to Build to Quality. SUGGESTED Preparing the live project ranges... The Matrix will unlock as soon as the calculations are ready.

Current position

From your Natural Fit

Fine-tune with accessible controls

Comfort to Design Comfort Design Price to Build to Quality Price to Build Quality Use the arrow keys for precise movement.

Illustrative Natural fit &#9635; View image

Watch point, not the visual result

architectural consequence A project you can picture.

Illustrative architectural consequence, not a design proposal.

guest perspective at this position Annual family holiday Main target

… /10

2 villas · total project area and per-villa area shown after calculation

Move the point and complete the project inputs to reveal this guest's likely reaction.

Complete the basis, then move toward this guest profile's natural fit.

Why this review: position versus guest expectations

This test reads the actual space available to each villa, not only the estate total.

Simulated from this project and guest profile. It is not a real guest review, survey result or platform rating.

&times;

live project response Move the point. Keep your constraint.

Project response

causal outcomes

Review this project with DALLEAU

## Work | Owner-side project evidence in Bali | DALLEAU

URL: https://dalleau.ai/work/

Documentary project evidence

Work

DALLEAU is an owner-side development office. Work is presented as a decision record: the project state, the owner question, the available evidence, the action and what remained open.

WORK INDEX

Start with the type of work the project requires.

Project records

Construction and delivered states kept as time-bounded records.

↓ Design studies

How DALLEAU turns site potential, target demand and intended use into a clear product and design direction.

↓ Operations records

What remains useful after handover for maintenance, responsibility and later decisions.

↓ Applied Notes

Project observations translated into questions another brief can use.

↓

Original construction record Harmonie, Bali · Construction footage showing site organisation, exterior works and unfinished interfaces.

Harmonie · Original construction footage · Construction stage · Current status: delivered and operating

Harmonie. The record shows the state. The evidence explains why it matters.

Project and source status

Current project status: delivered and operating. Source: original construction footage recorded before delivery.

Owner question

What must be recorded while a condition remains visible so owner-side decisions stay usable after construction teams leave?

Decision or action

Preserve the footage as a time-bounded construction record and keep the delivered-and-operating state as a separate evidence layer.

Evidence status

Original construction-stage footage; current status comes from the existing project record.

Discuss your project record

Stage

Exterior works and unfinished interfaces remained visible during construction.

Observed condition

The footage records site organisation, exterior works, openings and unfinished interfaces before delivery.

Owner consequence

The record remains useful when its date, visible condition, related decision, responsible scope and next verification stay connected.

Record scope

Construction-stage conditions visible in the record; delivered-and-operating evidence is documented separately.

What remains open

Future operating observations and appointed specialist records remain separate evidence layers.

Next step

Continue the record through operating observations, maintenance decisions and the responsibilities of appointed scopes.

Project evidence

One project, several evidence states.

Construction

Delivered and operating

Stair and central garden

Harmonie · Paired project record · Construction → delivered and operating

Construction

Delivered and operating

Curved stair structure and central void

Harmonie · Paired project record · Construction → delivered and operating

Construction

Delivered and operating

Interior shell and circulation

Harmonie · Paired project record · Construction → delivered and operating

Construction

Delivered and operating

Pool structure and use

Harmonie · Paired project record · Construction → delivered and operating

The closest available viewpoints pair construction-stage and delivered conditions across four parts of Harmonie.

DESIGN STUDIES

Real sites translated into product, experience and design concepts.

Real site photography · DALLEAU concept visualisations

SIDEMEN · CONCEPT DESIGN

A place worth travelling for.

DALLEAU defined the target guest, service model and design direction for a fully serviced private retreat built around a singular valley view.

Real site photography · DALLEAU concept visualisations

Open the design study

OPERATIONS RECORD

Delivery is followed by a separate continuity record.

Read the Harmonie field record

Project

Harmonie

Stage

Delivered and operating

Evidence type

Owner-side continuity record

Owner question

What must remain visible after handover so maintenance, responsibility and later decisions retain context?

What remains

Maintenance decisions, responsibilities and project context remain connected after handover.

Continue from the project record

Choose the evidence layer you need.

Field record

What we would repeat, and what we would change.

Read the bounded Harmonie record and the decisions it made visible.

Read the field record →

Atelier · Illustrative concept

Turn an observation into a project question.

See how evidence, criteria, mock-ups and verification enter the brief.

Explore Atelier →

Applied note

Water distribution that remains maintainable.

Why isolation, access and documentation matter before finishes close.

Read the Applied Note →

Talk to François

## A place worth travelling for | Sidemen residence concept | DALLEAU

URL: https://dalleau.ai/work/sidemen-destination-concept/

← Back to Work WORK · CONCEPT DESIGN · SIDEMEN, BALI

A place worth travelling for.

From a hillside site in Sidemen, DALLEAU shaped a fully serviced private retreat around one proposition: turn an exceptional landscape into a destination in its own right.

Concept design · Site and product direction by François Dalleau

When the address does not create the demand, the concept must create the reason to make the journey.

Talk to François See the concept

Real site context · Sidemen, Bali

Site Real hillside site in Sidemen

Target High-end fully serviced private stay

DALLEAU Product concept and design direction by François Dalleau

Phase Concept design

Location can capture existing demand. A strong concept can create a new reason to travel.

THE PRODUCT IDEA

A prime address is one route. Creating a destination is another.

Location remains decisive. Some projects buy into an established market. Others begin with a site whose landscape is strong enough to support a distinct experience, then align the target guest, residence, service model and arrival around that advantage.

In Sidemen, the opportunity was to combine a rare place with a concept precise enough to make the journey part of the appeal.

THE SITE

The view was the product's first advantage.

The site looks across rice terraces toward a broad volcanic horizon. Rather than treating the landscape as a backdrop, the concept made it the organising asset for arrival, shared time, privacy and the rhythm of the stay.

The residence was conceived to preserve distance and calm while adding the shelter, comfort and service depth expected by an international high-end guest.

DESIGN DIRECTION

Mineral architecture. Warm comfort. An open horizon.

The direction deliberately contrasts a restrained, almost monolithic architecture with the softness and scale of the landscape. Dark frames, stone, concrete and warm timber create a protected interior edge without competing with the view.

Panoramic living spaces, a low pool terrace and a glazed sauna turn the landscape into a sequence of daily experiences, not a single photograph.

Concept visualisation · Pool terrace and glazed sauna

Concept visualisation · Panoramic living room

SPATIAL EXPERIENCE

Four choices turn the view into a stay.

01 Arrival and reveal

The approach holds back the full panorama, then releases it when the residence opens to the valley.

02 Shared horizon

Living, dining, pool and outdoor lounge form one continuous social edge for a family or private group.

03 Privacy and retreat

Suites and quiet rooms protect sleep, intimacy and distance from shared activity without losing the landscape.

04 Invisible service

Kitchen, staff, storage, laundry, transport and maintenance routes support the experience without taking over the guest journey.

TARGET STAY

Designed as a fully serviced private destination, not another villa rental.

The target was a high-end family or private group choosing several days of calm, privacy and service around a singular landscape.

The concept brings private accommodation, shared spaces, pool, sauna, meals, housekeeping, transport and on-site support into one coherent multi-day stay.

Service was not an amenity added after the architecture. It was part of the concept from the beginning, shaping back-of-house routes, storage, arrival, privacy and maintenance.

Guest promise A private multi-day stay built around distance, calm and a singular outlook.

Service model On-site support, meals, housekeeping, transport and maintenance planned as one system.

Private experience Shared moments and retreat are designed as complementary, not competing, conditions.

Value over time A strong identity is balanced with operational discipline, maintainability and credible ageing.

PRODUCT INTELLIGENCE

The concept connects market, experience, architecture and operations.

01 Target and demand

Define the guest who will choose Sidemen for the experience, not simply accept it as an alternative address.

02 Distinctive experience

Use the landscape, arrival, shared horizon and material contrast to create a stay that belongs to this site.

03 Operating model

Make staff, meals, housekeeping, transport and maintenance work without intruding on the private experience.

04 Long-term desirability

Balance a premium-positioned experience with proportionate construction and operating complexity, maintainability and materials that can age credibly in Bali.

DALLEAU'S ROLE

From site opportunity to a defined residence concept.

François Dalleau identified the site's view as the central product asset, defined the target stay and developed the initial site, product, service and design direction for DALLEAU.

The work shown here presents that concept: what would make the destination desirable, how the architecture would frame it and what the service model needed to support.

Location

Sidemen, Bali

Project

Fully serviced private retreat

Target stay

High-end multi-day stay for a family or private group

Phase

Concept design

DALLEAU role

Site reading, target definition, product concept and design direction by François Dalleau

Sources

Real site photograph and founder-directed concept visualisations

THE DESIGN EQUATION

Distinct enough to attract. Disciplined enough to operate and age.

01 Singular site advantage

02 Clearly defined target guest

03 A reason to make the journey

04 Architecture that amplifies the landscape

05 Shared and private experiences in balance

06 Discreet service and back-of-house logic

07 Proportionate build and operating complexity

08 Materials and systems selected for long-term relevance

Have a site with more potential than its current brief?

DALLEAU can begin with the site, define the target and form the product concept before the programme, cost and appointed team become fixed.

Talk to François Explore the Feasibility Study


## Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix | DALLEAU

URL: https://dalleau.ai/fr/notes/comparer-devis-construction-bali/

Comparer des devis de construction à Bali : chiffrer le même projet avant de comparer les prix
Un devis moins cher n’est utile que s’il couvre les travaux dont vous avez réellement besoin. Avant de négocier le total, rapprochez les périmètres, les quantités, les spécifications, les exclusions et les conditions d’exécution. Sinon, vous risquez de comparer un lot complet avec un lot incomplet.
Publication :
20 septembre 2026
9 min de lecture
Un prix comparable commence par un engagement comparable.
Mêmes plans et quantités
Clarifications écrites
Prix complet comparable
Télécharger la grille de comparaison BOQ
Classeur Excel, libellés anglais. Renseignez vos devis réels et des montants numériques. Une réponse manquante ne vaut pas zéro.
La décision en une minute
Demandez à chaque entreprise consultée de chiffrer la même version des plans et du descriptif. Conservez ses offres originales. Consignez les différences dans un comparatif distinct, puis obtenez des réponses écrites. Un poste non résolu doit rester visible, pas devenir un zéro dans le tableur.
Il ne s’agit pas d’écarter le prix le plus bas. Une fois les propositions réellement comparables, la moins chère peut être la meilleure offre commerciale. Il faut comprendre si l’écart vient d’une organisation efficace, d’une autre solution technique, d’une répartition différente des risques ou de travaux absents.
Deux devis, une résidence, des engagements différents
Prenons une résidence avec piscine, terrasses paysagées et local technique indépendant. Deux entreprises reçoivent les mêmes plans d’architecture. L’entreprise A remet un devis synthétique. L’entreprise B remet un BOQ, ou
bill of quantities
, plus détaillé : un document décomposant les travaux en postes décrits, quantités, unités et prix.
Le comparatif suivant est illustratif. Il ne reproduit ni une consultation DALLEAU ni des prix de marché à Bali.
Poste
Offre A
Offre B
Question à résoudre
Drainage extérieur
« À la charge du propriétaire »
Canalisations et regards inclus
Quels plans, exutoires et points de raccordement sont couverts ?
Finitions de salle de bains
Provision pour la fourniture du carrelage
Carrelage nommé, colle et pose
La surface et l’ensemble posé sont-ils identiques ?
Climatisation
Équipement seul
Équipement, pose et commandes
Qui fournit évacuations, alimentation, mise en service et accès ?
Étanchéité
« Étanchéité incluse »
Zones, préparation et essais précisés
Quel système, quelle réception du support, quelle prise en charge d’un nouvel essai ?
Installations provisoires
Non mentionnées
Eau, électricité, protection et déchets
Le silence du premier devis signifie-t-il réellement une inclusion ?
Livraison
« Achèvement du projet »
Plans, notices et formation listés
Quels documents doivent précéder le règlement final ?
Ce tableau ne prouve pas que B est une meilleure entreprise. Il montre que comparer immédiatement les totaux reviendrait à répondre à la mauvaise question.
« À la charge du propriétaire » signifie que quelqu’un d’autre doit commander la prestation. « Non mentionné » signifie que son attribution reste à clarifier. Aucun des deux ne signifie que le travail sera gratuit.
1. Figer la base remise aux entreprises
Transmettez un dossier de consultation daté. Identifiez les indices des plans, le descriptif, les études pertinentes, les hypothèses de calendrier et les responsabilités de conception. Précisez si l’entreprise doit concevoir un élément, exécuter une conception déjà coordonnée ou prévoir une provision en attendant une décision.
Si un plan change pendant la consultation, transmettez la modification à tous les soumissionnaires et demandez une offre révisée. Le devis de l’un ne doit pas intégrer le nouveau local piscine pendant que celui de l’autre repose encore sur l’ancienne implantation.
Le cadre NRM de RICS distingue la planification des coûts du métré détaillé des travaux. Il apporte notamment une méthode cohérente pour les informations de coût et les documents de chiffrage. C’est une référence méthodologique utile ici, pas l’affirmation qu’un contrat privé balinais adopte automatiquement une norme britannique. [1]
2. Comparer les quantités et les unités avant les prix unitaires
Deux prix au mètre carré ne sont comparables que si le travail mesuré est le même.
Pour une douche carrelée, demandez quelle surface est comptée et ce que le poste comprend : préparation du support, chape, pentes, étanchéité, colle, carrelage, profilés, joints de mouvement et pose. Vérifiez où figure la provision pour les chutes : quantité, prix du matériau ou ligne séparée. Elle peut sinon être omise ou comptée deux fois.
Un écart de quantité peut provenir d’une erreur de métré, d’un périmètre différent ou d’une interprétation légitime. Demandez le détail et la méthode de mesure. Ne remplacez pas silencieusement la quantité de l’entreprise en présentant ensuite votre calcul comme son prix accepté.
Conservez trois valeurs distinctes : l’offre initiale, le retraitement du comparatif et le prix ensuite confirmé par l’entreprise.
3. Lire les exclusions comme un second devis
Examinez le défrichage, les sols impropres, leur évacuation, les accès, les installations provisoires, le drainage, les raccordements, l’assistance des spécialistes, les essais et la remise des documents. Chaque élément nécessaire doit avoir un responsable, un périmètre et une place dans le budget. Tous ne doivent pas nécessairement appartenir au même lot.
Exclure un raccordement final peut être parfaitement cohérent si un prestataire distinct est déjà désigné. Cela devient un trou dans le budget lorsque personne ne l’a chiffré, que le tracé reste inconnu et que le propriétaire pense que « clés en main » comprend tout.
La bonne question ne se limite pas à « Est-ce inclus ? ». Demandez : « Inclus par qui, jusqu’à quelle limite et selon quel document ? »
4. Distinguer un prix ferme d’une provision
Une provision réserve un montant pour une prestation ou un choix encore insuffisamment défini. Ce n’est pas un prix confirmé pour la fourniture et la pose d’un produit précisément nommé.
Deux offres peuvent comporter une provision pour la salle de bains. L’une couvre seulement la fourniture du carrelage, l’autre également sa pose. L’intitulé est identique, mais pas l’engagement. Notez ce qui est compris, comment le choix final modifiera le prix, les éventuelles marges ou frais d’assistance supplémentaires et l’autorité qui approuvera le changement.
N’ajoutez pas une nouvelle provision complète à celle déjà incluse. Le comparatif doit retenir l’ajustement entre les deux, avec une justification.
Gardez la réserve du propriétaire pour aléas séparée. Elle sert à absorber l’incertitude, pas à masquer des omissions ou à faire paraître complet un devis incomplet.
5. Comparer l’ensemble posé, pas seulement le nom du produit
Une référence d’étanchéité ne décrit pas tout le lot d’étanchéité. Une référence de climatiseur ne décrit pas toute l’installation de climatisation.
Examinez les interfaces : préparation, supports, traversées, alimentation, évacuation, commandes, accès, essais et responsabilités. Dans une salle de bains, coordonner le profilé de la paroi vitrée avant le carrelage n’est pas la même méthode que découper une rainure dans un carrelage tout juste posé. La page
Partenaires d’exécution
illustre cette question de séquence.
Le prix de l’entreprise doit correspondre à la méthode coordonnée réellement retenue. Une substitution moins chère s’examine au regard de la spécification, de la compatibilité, du délai et de l’entretien, pas seulement de la réduction du prix initial.
6. Rapprocher fiscalité et conditions commerciales
Consignez si chaque offre inclut les taxes applicables et le traitement proposé par son émetteur. Faites confirmer la situation propre au projet par le conseil fiscal concerné. N’ajoutez pas un pourcentage générique à tous les devis en considérant le rapprochement terminé.
Comparez ensuite validité, monnaie, révision des prix, mobilisation, échéancier, retenue lorsqu’elle est convenue, garanties et calendrier. Deux totaux identiques peuvent porter des risques de trésorerie et d’achèvement très différents.
Une demande de règlement intitulée « 70 % réalisés » ne suffit pas à comprendre ce que vous payez. Identifiez le jalon contractuel, les travaux couverts, le relevé de contrôle et les points non résolus. Les
pièces nécessaires avant un paiement
appartiennent donc à la même discussion que le prix.
7. Poser des questions qui produisent une réponse exploitable
Remplacez « Merci de nous faire votre meilleur prix » par un court registre de clarifications numérotées.
Pour le drainage : « Merci de confirmer l’inclusion des caniveaux de terrasse, canalisations, regards et raccordement à l’exutoire approuvé figurant sur l’indice X. Identifiez les exclusions et leur incidence sur le prix et le calendrier. »
Pour la livraison : « Merci d’identifier les plans de récolement, listes d’équipements, procès-verbaux d’essai et formations compris dans votre offre, ainsi que le jalon de paiement auquel ils sont rattachés. »
Laissez l’entreprise proposer une meilleure méthode. Présentez cette variante séparément de son offre conforme, pour ne pas confondre une amélioration avec une omission.
Ce que le comparatif final doit montrer
Il faut pouvoir lire le montant initial, les ajouts ou déductions confirmés, les points non résolus et le total comparable qui en résulte. L’acceptabilité technique, les ressources, le calendrier et les conditions commerciales demandent une décision distincte.
Une exclusion non résolue ne doit pas disparaître dans une formule. Notre tableur maintient le résultat
Not comparable
tant qu’il manque des informations nécessaires. Il n’attribue pas le marché et ne prétend pas que le moins cher doit gagner.
Une conclusion utile pourrait être : « A reste moins cher sur la base convenue. Son exclusion de drainage est maintenant chiffrée, l’équipe technique a accepté le système proposé et le calendrier comme les modalités de paiement sont consignés. » La décision repose alors sur un dossier, pas sur un montant de première page.
Le rôle de DALLEAU
Dans le cadre de son mandat, DALLEAU coordonne la base de consultation du propriétaire, rassemble les questions et conserve le lien entre décisions et clarifications. Le concepteur, l’ingénieur, l’économiste et l’entreprise gardent leurs responsabilités propres. Le propriétaire doit voir le comparatif commercial et les raisons de la recommandation.
Découvrez
le fonctionnement du mandat
ou
parlez à François
de la décision à prendre pour votre projet.
Références
[1]
RICS New Rules of Measurement
. Référence méthodologique pour les métrés et les informations de coût. Les exemples et le tableur sont une explication illustrative de DALLEAU, pas des formulaires RICS ni un contrat indonésien prescrit.
[2]
DALLEAU Partenaires d’exécution
. Méthode publique de consultation, de communication et de coordination des interfaces.
Poursuivre avec la prochaine décision
Le
Reality Check sur une villa à 150 000 €
explique pourquoi prix d’acquisition et devis de construction demandent deux comparaisons du coût complet.
Poursuivre avec la prochaine décision
Comparer le budget réel d’acquisition
→
La méthode des partenaires d’exécution
→
Comprendre le mandat côté propriétaire
→
Un terrain, un devis ou une offre à examiner ? Commençons par la décision à prendre.
Parler à François
The Bali Brief
Les changements importants et les guides pratiques pour préparer, construire ou exploiter une résidence à Bali.


## Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ? | DALLEAU

URL: https://dalleau.ai/fr/notes/villa-bali-150000-euros-cout-reel/

Villa à 150 000 € à Bali : bonne affaire ou budget incomplet ?
Un prix d’appel ne dit pas ce que vous achetez, ce qu’il reste à payer ni combien d’années vous pourrez en profiter. Voici comment distinguer une offre accessible d’un risque transféré à l’acheteur.
Publication :
20 septembre 2026
10 min de lecture
Un prix. Trois vérifications avant de décider.
Comprendre le droit acquis
Comparer le périmètre complet
Tester les hypothèses d’exploitation
La réponse avant le prix
Une villa annoncée à 100 000, 150 000 ou 200 000 € ne peut pas être évaluée à partir de son prix et de ses images. Il faut rapprocher ce montant du droit acquis, du terrain, de la surface utilisable, des travaux compris, de l’usage prévu et des dépenses qui resteront à votre charge.
La question décisive est simple : pourquoi cette offre coûte-t-elle moins cher ?
Une résidence compacte, une implantation moins recherchée, une construction simple ou des équipements partagés peuvent expliquer un prix réduit. Un périmètre incomplet, une durée de bail courte ou une difficulté non résolue peuvent aussi expliquer l’écart.
La première situation correspond à un choix. La seconde peut correspondre à une dépense future. Une incompatibilité d’usage peut, elle, empêcher le projet. L’objectif n’est pas de justifier un prix élevé. C’est de comprendre le prix proposé.
Cette note présente une méthode de comparaison. L’examen des droits, des autorisations, des contrats et de la fiscalité d’un bien précis relève des professionnels indonésiens mandatés.
Acheter une villa et payer sa construction ne sont pas la même opération
« Une villa à 150 000 € » peut désigner un prix de vente, une cession de droits locatifs, un lot de construction, une unité livrée sans certains équipements ou une première tranche de paiement. Ces offres ne sont pas directement comparables.
Si vous disposez déjà du terrain ou du bail et recevez un devis de construction, ce devis ne représente pas le capital total engagé. Les études, les infrastructures, les équipements et la préparation à l’exploitation peuvent appartenir à d’autres budgets.
À l’inverse, lorsqu’un promoteur vend un ensemble comprenant des droits sur le terrain et une construction, il ne faut pas ajouter une seconde fois ces mêmes postes au prix de vente.
Le travail consiste à lire les inclusions, pas à gonfler artificiellement le total.
Demandez une fiche identifiant le droit transmis, les surfaces par catégorie, le prix contractuel total, les inclusions, les exclusions et les conditions de livraison. Une piscine commune, une terrasse et une chambre ne rendent pas le même service. Les réunir dans une seule surface commerciale peut rendre la comparaison trompeuse.
La durée achetée compte autant que les mètres carrés
Un droit d’usage à durée déterminée doit être examiné avec son calendrier. Identifiez la date de début du bail, la livraison prévue, la période disponible après livraison et le traitement d’un retard. Si le bail court déjà pendant la construction, cette période n’est pas disponible pour habiter ou louer le bien.
Distinguez une prolongation déjà encadrée par le contrat d’une possibilité de renégocier plus tard. « Renouvelable » ne décrit pas, à lui seul, le prix, les conditions ou l’obligation de l’autre partie.
Mettez côte à côte les droits et les années d’usage prévus par les documents. Un montant identique peut acheter des horizons différents. Diviser le prix par une durée peut révéler un écart, mais ne remplace pas une évaluation : ce calcul ignore notamment les dépenses, le calendrier des revenus et la valeur éventuelle à la sortie.
Notre explication du
leasehold à Bali
accompagne la lecture du contrat, sans s’y substituer.
Un terrain moins cher peut être un choix intelligent ou une mauvaise base
Une adresse moins centrale peut convenir à une résidence privée. Elle peut aussi porter un projet de séjour lorsque l’expérience, les accès et la clientèle rendent cette implantation cohérente.
Le prix du terrain ne répond cependant pas aux questions de constructibilité, d’accès juridique, de drainage, de capacité des réseaux et d’usage touristique. Ne vous contentez pas d’une couleur sur une capture de carte. Identifiez la parcelle, le plan applicable et les règles correspondant au projet. Le portail officiel
Tarubali
présente les plans territoriaux et détaillés ;
OSS
distingue notamment compatibilité spatiale, environnement et bâtiment.
Le dossier doit également expliquer les travaux nécessaires : accès, terrassements, soutènements éventuels, évacuation des eaux et alimentation des installations.
Économiser sur l’achat du terrain ne fait pas disparaître les travaux nécessaires pour l’utiliser.
Une difficulté de sol peut avoir une réponse technique chiffrable. Une utilisation incompatible avec les règles applicables n’est pas une ligne de travaux ordinaire. Ces deux situations doivent être traitées séparément.
Les documents doivent correspondre au bien et à son usage
Une villa terminée, photographiée et proposée à la location ne suffit pas à établir la situation de son dossier.
Faites vérifier les documents applicables au bâtiment, leur portée et leur correspondance avec la parcelle, les plans, les surfaces, la fonction et les transformations réalisées. Les démarches bâtiment PBG et SLF disposent d’un portail officiel,
SIMBG
. L’autorisation de l’activité d’hébergement constitue une autre question : un document ne doit pas être présenté comme la réponse à toutes les couches du dossier.
Pour un bâtiment ancien, faites examiner les autorisations correspondant à son historique. L’absence d’un document intitulé PBG ne suffit pas, à elle seule, à qualifier chaque bâtiment ancien d’irrégulier.
« Toutes les villas font comme cela » et « les papiers viendront après » n’établissent ni ce qui manque ni comment ce point sera résolu. Avant un engagement irréversible, demandez quelle pièce doit être obtenue, par quelle partie, à quel moment et ce que prévoit le contrat si elle ne l’est pas. Pour un contrat déjà signé, faites examiner vos obligations avant de suspendre un paiement.
La qualité importante est souvent celle que la visite ne montre pas
Une belle finition ne permet pas de conclure sur la structure, les réseaux dissimulés ou la continuité de l’étanchéité.
Prenons une terrasse. Le revêtement peut être convaincant sur une photographie. Il reste à comprendre les pentes, l’évacuation, le seuil de la baie, les traversées et l’entretien du drain. Une ligne « étanchéité incluse » ne décrit pas cet ensemble.
Pour la climatisation, le prix de l’appareil ne comprend pas nécessairement toutes les alimentations, évacuations, commandes, possibilités d’accès et opérations de mise en service attendues. La question se vérifie dans le descriptif et le devis.
Sur plan, demandez que les responsabilités soient définies avant la fermeture des travaux. Pour une villa existante, une inspection peut identifier des défauts visibles et des investigations nécessaires. Elle ne rend pas tous les éléments cachés observables.
L’objectif est de savoir ce qui a été prévu, exécuté, contrôlé et conservé. Le guide pour
comparer les devis de construction
montre comment rattacher chaque engagement à un poste identifiable.
Trois offres au même prix, trois décisions différentes
Ces situations sont illustratives. Elles ne décrivent aucun promoteur ni aucune transaction constatée.
Offre
Ce qui explique le prix de 150 000 €
Ce que l’acheteur doit en conclure
A. Une résidence plus simple
Unité compacte, implantation moins centrale, certains équipements partagés. Droits, surfaces et charges documentés.
Le prix peut correspondre à des choix assumés. Vérifier les documents, l’exécution et l’adéquation au besoin.
B. Un budget incomplet
Mobilier, raccordements et préparation à l’ouverture exclus. Plusieurs provisions restent indéfinies.
Obtenir les montants et les conditions manquants avant de comparer le coût complet.
C. Une condition bloquante
L’usage prévu ou le droit d’accès reste incompatible ou contesté dans les documents examinés.
Une remise supplémentaire ne crée pas le droit manquant. La résolution documentée prime sur le prix.
Dans le premier cas, le propriétaire accepte un produit plus simple. Dans le deuxième, il ne connaît pas encore le coût du produit qu’il pense acheter. Dans le troisième, le prix ne résout pas la question déterminante.
Reconstituer le budget sans inventer les montants manquants
Le budget d’entrée dans le projet doit réunir le prix contractuel et les dépenses nécessaires qui ne sont pas déjà incluses : frais de transaction, conseils, travaux complémentaires, équipements, raccordements, préparation à l’exploitation et trésorerie initiale.
État du poste
Traitement dans le budget
Confirmé
Le périmètre et le montant sont documentés.
Estimé
L’hypothèse et sa source sont indiquées.
Non chiffré
Une réponse manque. Le montant n’est pas nul.
Bloquant
La question ne peut pas être traitée par une simple provision.
Les méthodes
RICS NRM
distinguent la planification du coût initial, le métré détaillé et les coûts de maintenance. Cette séparation aide à organiser le budget, sans fournir un tarif universel pour Bali.
Séparez entretien courant, remplacement futur et réparation d’un défaut identifié. Une réserve d’entretien normale n’est pas une preuve de mauvaise construction. À l’inverse, une réparation déjà nécessaire ne doit pas être présentée comme de l’entretien courant pour rendre le prix attractif.
Un rendement ne se vérifie pas en lisant seulement le pourcentage
Demandez ce que désigne le revenu annoncé : recettes brutes, résultat d’exploitation, distribution au propriétaire ou obligation contractuelle de paiement. Ces montants ne sont pas interchangeables.
Pour une projection locative, demandez les biens comparables, la période d’observation et les hypothèses. Examinez saisonnalité, usage personnel, commissions, personnel, énergie, entretien, charges communes, réserves et fiscalité pertinente.
Au dénominateur, vérifiez le capital réellement nécessaire. Un mobilier exclu du prix mais indispensable à la location appartient à l’analyse. La trésorerie d’ouverture n’est pas une facture de construction, mais reste de l’argent à mobiliser.
Exemple arithmétique : à revenu annuel inchangé, un ratio calculé sur 200 000 € est inférieur d’un quart au même ratio calculé sur 150 000 €.
Cela ne signifie pas qu’une offre de 150 000 € coûtera habituellement 200 000 €. Cela montre pourquoi le dénominateur compte.
Une appréciation future ne doit pas être comptée comme un revenu annuel. Une garantie qui complète les recettes locatives ne doit pas être additionnée une seconde fois à ces mêmes recettes. Le
guide sur les rendements garantis
détaille les questions relatives au payeur et au contrat.
Sur plan, le calendrier fait partie de la comparaison
Acheter un bien livré et financer une construction future ne créent pas la même exposition.
Demandez ce qui existe au moment de chaque échéance : droits, plans, autorisations requises, travaux exécutés, contrôles, équipements et documents. Identifiez la partie qui reçoit l’argent et son obligation envers vous.
Un prix réduit contre un paiement plus précoce peut être une condition commerciale explicite. L’acheteur doit néanmoins comprendre ce qu’il finance, les conséquences d’un retard, les conditions de sortie et les recours prévus.
Une photographie de chantier montre un état. Elle ne chiffre pas automatiquement la valeur des travaux conformes ni le montant encore nécessaire à l’achèvement. Les
pièces liées aux jalons de paiement
servent à examiner cette correspondance.
La demande à envoyer au vendeur
Merci de préciser le droit et la durée transmis, les surfaces par catégorie, le prix contractuel total, les inclusions et exclusions, les documents applicables au terrain et au bâtiment, le calendrier de livraison et les conditions de paiement. Pour l’exploitation, merci d’identifier l’opérateur, les charges restant au propriétaire et les hypothèses documentées du revenu annoncé. Les éléments encore en préparation doivent être indiqués séparément, avec leur responsable et leur échéance.
Les réponses ne doivent pas rester dispersées entre une brochure, des messages et un contrat disant autre chose.
Le bon prix est celui d’un projet que vous comprenez
Un budget limité peut conduire à choisir moins de surface, une autre implantation, une architecture plus simple ou certains équipements partagés. Ce sont des arbitrages que le propriétaire peut accepter en connaissance de cause.
Une dépense omise, une promesse de revenu sans base vérifiable ou une difficulté d’autorisation ne constitue pas le même arbitrage.
Une bonne affaire a une raison économique identifiable. Cette raison doit rester convaincante après lecture du contrat, examen du bien et reconstitution du budget.
Dans le cadre de son
mandat
, DALLEAU coordonne les questions du propriétaire, les périmètres des spécialistes et la comparaison des engagements. Pour une offre ou un site précis,
parlez à François
.
Poursuivre avec la prochaine décision
Comparer les devis de construction
→
La méthode des partenaires d’exécution
→
Comprendre le mandat côté propriétaire
→
Un terrain, un devis ou une offre à examiner ? Commençons par la décision à prendre.
Parler à François
The Bali Brief
Les changements importants et les guides pratiques pour préparer, construire ou exploiter une résidence à Bali.


## A €150,000 villa in Bali: good value or an incomplete budget? | DALLEAU

URL: https://dalleau.ai/notes/bali-villa-150000-euros-real-cost/

A €150,000 villa in Bali: good value or an incomplete budget?
A headline price does not tell you what you acquire, what remains to be paid or how many years you can use it. Here is how to distinguish an affordable offer from a risk transferred to the buyer.
Published :
20 September 2026
9 min read
One price. Three checks before deciding.
Understand the right acquired
Compare the complete scope
Test the operating assumptions
The answer before the price
A villa advertised at €100,000, €150,000 or €200,000 cannot be assessed from its price and pictures. Match the amount to the property right, site, usable area, included works, intended use and expenses that will remain yours.
The decisive question is simple: why does this offer cost less?
A compact residence, a less sought-after location, simple construction or shared facilities can explain a lower price. An incomplete scope, a shorter lease or an unresolved constraint can also explain the difference.
The first is a choice. The second may be a future expense. An incompatible use may prevent the project altogether. The objective is not to justify a high price. It is to understand the offered price.
This note provides a comparison method. The rights, permissions, contracts and tax position of a particular property require the appointed Indonesian professionals.
Buying a villa and paying for its construction are different transactions
“A villa for €150,000” might describe a sale price, a transfer of lease rights, a construction package, a unit delivered without certain equipment or the first payment instalment. These offers are not directly comparable.
If you already have the land or lease and receive a construction quotation, that quotation is not the whole capital committed. Investigations, infrastructure, equipment and operational preparation may sit in other budgets.
Conversely, when a developer sells a package containing land rights and construction, do not add those same items to the sale price a second time.
The task is to read the inclusions, not artificially enlarge the total.
Ask for a summary identifying the right transferred, areas by category, total contract price, inclusions, exclusions and delivery conditions. A shared pool, terrace and bedroom do different jobs. Combining them into a single marketed area can make comparison misleading.
The term acquired matters as much as the floor area
A time-limited right of use needs a calendar. Identify the lease start, expected delivery, period available after delivery and treatment of delay. If the lease is already running during construction, that period is unavailable for living in or renting out the property.
Distinguish an extension already governed by the contract from an opportunity to negotiate later. “Renewable” does not, by itself, specify the price, conditions or the other party’s obligation.
Compare the rights and years of use in the documents. The same price can buy very different horizons. Dividing price by term may reveal a difference but is not a valuation: it ignores expenses, the timing of income and any eventual exit value.
Our explanation of
Bali leasehold
accompanies the actual contract; it does not replace it.
Cheaper land can be a sensible choice or a poor starting point
A less central address may suit a private residence. It may also support a destination stay when the experience, access and intended guests make that location coherent.
The land price does not answer questions about permitted development, legal access, drainage, network capacity or tourist accommodation use. Do not stop at a colour on a map screenshot. Identify the parcel, applicable plan and relevant rules. The official
Tarubali portal
explains territorial and detailed plans;
OSS
distinguishes spatial compatibility, environmental requirements and building requirements.
The file should also explain the works needed on site: access, earthworks, possible retaining structures, water disposal and utility supplies.
Saving on land acquisition does not remove the works needed to use it.
A ground constraint may have a costable engineering response. A use incompatible with applicable rules is not an ordinary construction line item. Treat these separately.
Documents must match the property and its use
A completed villa, photographed and offered for rent, does not establish its documentary position.
Have the applicable building documents checked: what they cover and how they correspond to the parcel, drawings, areas, function and subsequent alterations. Building procedures for PBG and SLF have an official portal,
SIMBG
. Permission for the accommodation activity is a separate question. One document should not be presented as the answer to every layer of the file.
For an older building, have the permissions examined against its history. Absence of a document labelled PBG does not, by itself, make every older building irregular.
“Every villa does it this way” and “the paperwork will come later” establish neither what is missing nor how it will be resolved. Before an irreversible commitment, ask which document must be obtained, by whom, when and what the contract provides if it is not obtained. For a signed contract, have your obligations reviewed before withholding a payment.
The important quality is often what a viewing cannot show
Attractive finishes do not establish the condition of the structure, concealed services or waterproofing continuity.
Consider a terrace. Its surface may look convincing in a photograph. You still need to understand falls, outlets, the door threshold, penetrations and drain maintenance. “Waterproofing included” does not describe the complete assembly.
For air conditioning, the equipment price does not necessarily include every supply, drain, control, access provision and commissioning task expected. Check the specification and quotation.
Off plan, require responsibilities to be defined before the work becomes concealed. For an existing villa, an inspection can identify visible defects and necessary further investigation. It cannot make every hidden element observable.
The aim is to understand what was specified, built, checked and recorded. Our guide to
comparing construction quotations
shows how to attach each commitment to an identifiable item.
Three offers at the same price, three different decisions
These situations are illustrative. They describe no named developer or observed transaction.
Offer
What explains the €150,000 price
What the buyer should conclude
A. A simpler residence
Compact unit, less central location and some shared facilities. Rights, areas and charges are documented.
The price may reflect accepted choices. Documentation, execution and fit still need checking.
B. An incomplete budget
Furniture, connections and opening preparation are excluded. Several allowances remain undefined.
Obtain the missing amounts and terms before comparing the complete cost.
C. A blocking condition
Intended use or access rights remain incompatible or disputed in the examined documents.
A further discount does not create the missing right. Documented resolution matters before price.
In the first case, the owner accepts a simpler product. In the second, the owner does not yet know the cost of the product they believe they are buying. In the third, the price does not resolve the decisive issue.
Reconstruct the budget without inventing missing amounts
The entry budget should combine the contract price with necessary costs not already included: transaction expenses, advisers, additional works, equipment, connections, operational preparation and initial working capital.
Item status
Budget treatment
Confirmed
Scope and amount are documented.
Estimated
The assumption and its source are stated.
Unpriced
An answer is missing. The amount is not zero.
Blocking
The issue cannot be resolved with an ordinary allowance.
RICS NRM
distinguishes initial cost planning, detailed measurement and maintenance cost planning. That separation helps organise the budget. It does not supply a universal price for Bali villas.
Separate routine maintenance, future replacement and repair of an identified defect. An ordinary maintenance reserve is not evidence of poor construction. Conversely, a repair already needed should not be disguised as routine maintenance to make the asking price more attractive.
A return cannot be checked by reading the percentage alone
First ask what the stated income represents: gross receipts, operating result, distribution to the owner or a contractual payment obligation. These are different amounts.
For a rental forecast, ask for comparable properties, observation periods and assumptions. Examine seasonality, personal use, commissions, staff, energy, maintenance, common charges, reserves and relevant tax treatment.
Check the capital actually required in the denominator. Furniture excluded from the price but essential to rental operation belongs in the analysis. Opening working capital is not a construction invoice, but it is still money that must be available.
Arithmetic example: with annual income unchanged, a ratio calculated on €200,000 is one quarter lower than the same ratio calculated on €150,000.
This does not suggest a €150,000 offer usually costs €200,000. It explains why the denominator matters.
Future appreciation is not annual operating income. A guarantee topping up rental receipts must not be added to those same receipts a second time. Our
guaranteed-return guide
explains the counterparty and contract questions.
Off plan, timing belongs in the comparison
Buying a delivered property and funding future construction create different exposure.
Ask what exists at each payment milestone: rights, drawings, required permissions, executed work, checks, equipment and records. Identify who receives the money and what that party owes you.
A discount in exchange for earlier payment can be an explicit commercial term. The buyer still needs to understand what they fund, the consequences of delay, exit conditions and contractual remedies.
A construction photograph records a state. It does not automatically establish the value of compliant work or the amount still required to complete. The
payment-evidence guide
examines that connection.
The request to send the seller
Please identify the right and term transferred, areas by category, total contract price, inclusions and exclusions, applicable land and building documents, delivery programme and payment terms. For operation, please identify the operator, owner-borne charges and documented assumptions behind the stated income. List items still in preparation separately, with the responsible party and due date.
The answers should not remain scattered across a brochure, messages and a contract saying something different.
A good price belongs to a project you understand
A limited budget may lead to less space, another location, simpler architecture or shared equipment. Those are choices an owner can knowingly accept.
An omitted cost, unsupported income promise or unresolved permission is not the same choice.
Good value has an identifiable economic reason. That reason should remain convincing after reading the contract, examining the property and reconstructing the budget.
Within its
mandate
, DALLEAU coordinates the owner’s questions, specialist scopes and comparison of commitments. For a particular site or offer,
Talk to François
.
Continue with the next decision
Compare construction quotations
→
How delivery partners work with DALLEAU
→
Understand the owner-side mandate
→
A site, a quotation or an offer to examine? Start with the decision in front of you.
Talk to François
The Bali Brief
Material changes and practical guides for owners planning, building or operating a residence in Bali.


## Comparing construction quotations in Bali: price the same project first | DALLEAU

URL: https://dalleau.ai/notes/comparing-bali-construction-boq/

Comparing construction quotations in Bali: price the same project first
A lower quotation is useful only when it covers the work you actually need. Before negotiating the total, reconcile the scope, quantities, specifications, exclusions and delivery conditions. Otherwise, you may be comparing a complete package with an incomplete one.
Published :
20 September 2026
8 min read
A comparable price starts with a comparable commitment.
Same drawings and quantities
Written clarifications
Complete comparable price
Download the BOQ comparison worksheet
Excel workbook, English labels. Enter your actual quotations and numeric amounts. Missing answers do not count as zero.
The decision in one minute
Ask each shortlisted contractor to price the same issue of the drawings and specifications. Preserve their original offers. Record every difference in a separate comparison, then obtain written clarifications. Keep unresolved items visible rather than assigning them a zero cost.
This is not a reason to reject the lowest price. Once the offers are genuinely comparable, the lower price may be the better commercial proposal. The purpose is to find out whether the difference comes from efficiency, a different solution, a different allocation of risk or missing work.
Two quotations, one residence, different promises
Consider a residence with a pool, landscaped terraces and a separate technical room. Both contractors receive the same architectural plans. Contractor A returns a short quotation. Contractor B submits a longer bill of quantities, or BOQ: a document that breaks the work into described items, quantities, units and prices.
The following comparison is illustrative. It is not a record of a DALLEAU tender or a statement about Bali market prices.
Item
Offer A
Offer B
What must be resolved
External drainage
“By owner”
Pipework and chambers included
Which drawings, outlets and connection point are included?
Bathroom finishes
Tile supply allowance
Named tile, adhesive and installation
Do both cover the same area and installed assembly?
Air conditioning
Equipment only
Equipment, installation and controls
Who provides drains, power, commissioning and access?
Waterproofing
“Waterproofing included”
Specified areas, preparation and testing
What is the system, who accepts the substrate, and who pays for a retest?
Temporary site facilities
Not mentioned
Temporary power, protection and waste removal
Is the first offer silent or genuinely inclusive?
Handover
“Project completion”
Listed drawings, manuals and training
Which deliverables are required before final release?
Nothing in this table proves that B is the better contractor. It shows that comparing their totals immediately would answer the wrong question.
“By owner” means someone else must procure the work. “Not mentioned” means the allocation is unresolved. Neither means the work will be free.
1. Freeze what everyone is pricing
Send one dated pricing package. Identify the drawing revisions, specification, relevant surveys, schedule assumptions and allocation of design responsibilities. Record whether the contractor must design an element, construct an already coordinated design, or price an allowance pending a decision.
If a drawing changes during the tender, issue that change to every bidder and request a revised return. Do not let one quotation include the revised pool plant while another still prices the earlier layout.
The RICS NRM framework distinguishes cost planning from detailed measurement for building works. Its purpose includes a consistent basis for cost information and pricing documents. That is a useful methodological reference here, not a claim that a private Bali contract automatically adopts a UK measurement standard. [1]
2. Compare quantities and units before unit rates
A rate for one square metre is not comparable until the measured work is comparable.
For a tiled shower, ask what area is measured and what the item includes: substrate preparation, screed, falls, waterproofing, adhesive, tile, trims, movement joints and installation. Confirm whether a waste allowance sits in the quantity, the material rate or another line. Otherwise the same allowance can be omitted or counted twice.
A difference in quantity may be a measurement error, a scope difference or a legitimate different interpretation. Ask for the take-off and measurement basis. Do not silently replace a contractor’s quantity and call the adjusted number an agreed price.
Keep three figures distinct: the original offer, the comparison adjustment and the contractor’s subsequently confirmed price.
3. Read the exclusions as a second quotation
Review site clearance, unsuitable ground, disposal, access, temporary services, drainage, utility connections, specialist attendance, testing and handover. Not every item belongs in every contractor’s package, but each necessary item needs an owner, a scope and a budget location.
For example, excluding a final utility connection can be entirely sensible if a separate provider is already appointed. It becomes a budget gap when nobody has priced it, the connection route is unknown and the owner assumes that “turnkey” includes everything.
The useful question is not “Is this included?” alone. Ask: “Included by whom, to which boundary, against which document?”
4. Separate fixed prices from allowances
An allowance is money reserved for work or a selection that has not yet been fully defined. It is not the same as a confirmed price for a named installed product.
Suppose both offers contain a bathroom allowance. One may cover tile supply only; the other may include installation. The heading is the same, but the commitment is different. Write down what the allowance includes, how the eventual selection changes the price, what margin or attendance may be added, and who approves that change.
Avoid adding a new full allowance on top of an existing one. The comparison needs the adjustment between them, with its basis recorded.
Keep owner contingency separate. It is a reserve for uncertainty, not a device for hiding omissions or making an incomplete tender look complete.
5. Compare the assembled result, not the product name
A named waterproofing product does not describe the complete waterproofing package. A named air-conditioning unit does not describe the whole cooling installation.
Check the interfaces: preparation, supports, penetrations, power, drainage, controls, access, tests and responsibilities. In a bathroom, coordinating the shower-glass profile before tiling is a different delivery method from cutting a channel into newly installed tile. Our
Delivery Partners
page illustrates that sequencing question.
The contractor’s price should correspond to the coordinated method actually selected for the project. A cheaper substitution should be assessed for specification, compatibility, lead time and maintenance, not accepted solely because the initial price falls.
6. Put tax and commercial conditions on the same basis
Record whether each offer includes the applicable taxes and what treatment its supplier proposes. Have the relevant tax adviser confirm the project-specific position. Do not add a generic percentage to every quotation and assume the comparison is complete.
Then compare validity, currency, escalation provisions, mobilisation, payment milestones, retention where agreed, warranties and programme. Two equal totals can carry very different cash-flow and completion risks.
A payment request labelled “70% complete” is not enough to understand what is being paid for. Identify the contractual milestone, the work covered, the inspection record and unresolved items. This is why
payment evidence
belongs alongside the price comparison.
7. Ask better clarification questions
Replace “Please give us your best price” with a short, numbered clarification schedule.
For the drainage example: “Please confirm whether the terrace drains, pipework, inspection chambers and connection to the approved outfall shown on revision X are included. Identify exclusions and the corresponding price and programme effect.”
For handover: “Please identify the as-built information, equipment schedules, test records and staff training included in your offer, and the payment milestone against which they are due.”
Give the contractor space to propose a better method. Record the alternative separately from the conforming offer so that an improvement is not confused with an omission.
What the comparison should show
The final comparison needs the original total, confirmed additions or deductions, unresolved items and the resulting comparable total. It also needs a separate decision on technical acceptability, resources, programme and commercial terms.
An unresolved exclusion must not disappear into a spreadsheet formula. Our worksheet leaves the result as
Not comparable
while required information is missing. It does not award a contract or imply that the cheaper resolved offer must win.
A good conclusion might be: “A remains less expensive on the agreed basis. Its drainage exclusion is now priced, the technical team has accepted the proposed system, and the programme and payment terms are recorded.” That is a decision supported by a file, rather than a preference supported by a headline number.
Where DALLEAU fits
Within the appointed mandate, DALLEAU coordinates the owner’s pricing basis, consolidates questions and keeps decisions and clarifications connected. The appointed designer, engineer, cost consultant and contractor retain their own responsibilities. The owner should see both the commercial comparison and the reasons for the recommendation.
Read
how the mandate works
or
Talk to François
about the decision facing your project.
References
[1]
RICS New Rules of Measurement
. Methodological reference for measurement and cost information. The examples and worksheet above are DALLEAU’s illustrative owner-side explanation, not RICS forms or a prescribed Indonesian contract.
[2]
DALLEAU Delivery Partners
. Public procurement, communication and interface-control method.
Continue with the next decision
The
€150,000 villa Reality Check
explains why a sale price and a construction quotation require different complete-cost comparisons.
Continue with the next decision
Compare the real acquisition budget
→
How delivery partners work with DALLEAU
→
Understand the owner-side mandate
→
A site, a quotation or an offer to examine? Start with the decision in front of you.
Talk to François
The Bali Brief
Material changes and practical guides for owners planning, building or operating a residence in Bali.


## Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект | DALLEAU

URL: https://dalleau.ai/ru/notes/sravnenie-stroitelnyh-smet-bali/

Сравнение строительных смет на Бали: сначала убедитесь, что оценивается один и тот же проект
Более низкая цена полезна только тогда, когда предложение включает необходимые вам работы. До обсуждения итоговой суммы сопоставьте объём, количества, спецификации, исключения и условия выполнения. Иначе полная комплектация может оказаться в одном сравнении с неполной.
Опубликовано :
20 сентября 2026
6 мин чтения
Сопоставимая цена начинается с сопоставимых обязательств.
Одинаковые планы и объёмы
Письменные уточнения
Полная сопоставимая цена
Скачать таблицу сравнения смет BOQ
Файл Excel с подписями на английском. Внесите данные реальных предложений и числовые суммы. Отсутствующий ответ не означает нулевую стоимость.
Решение за одну минуту
Передайте всем отобранным подрядчикам одну версию чертежей и спецификации. Сохраните исходные предложения. Внесите различия в отдельную сравнительную таблицу и получите письменные уточнения. Нерешённый вопрос должен оставаться видимым, а не превращаться в ноль в расчёте.
Это не повод отвергать самую низкую цену. После приведения предложений к общей основе она может оказаться лучшим коммерческим вариантом. Важно понять причину разницы: эффективность организации, иное техническое решение, другое распределение рисков или отсутствующие работы.
Две сметы, одна резиденция, разные обязательства
Рассмотрим резиденцию с бассейном, озеленёнными террасами и отдельным техническим помещением. Обе компании получили одинаковые архитектурные чертежи. Подрядчик A представил краткую смету. Подрядчик B подготовил более подробный BOQ, или bill of quantities: ведомость с описанием работ, количествами, единицами измерения и ценами.
Пример ниже условный. Он не воспроизводит конкурс DALLEAU и не содержит сведений о рыночных ценах на Бали.
Позиция
Предложение A
Предложение B
Что необходимо выяснить
Наружный дренаж
«За счёт владельца»
Трубы и колодцы включены
Какие чертежи, выпуски и точки подключения охвачены?
Отделка ванной
Резерв на поставку плитки
Указаны плитка, клей и укладка
Совпадают ли площадь и состав готовой конструкции?
Кондиционирование
Только оборудование
Оборудование, монтаж и управление
Кто выполняет отвод конденсата, электропитание, наладку и доступ для обслуживания?
Гидроизоляция
«Включена»
Указаны зоны, подготовка и испытания
Какая система, кто принимает основание и оплачивает повторное испытание?
Временное обустройство
Не упомянуто
Электричество, защита и вывоз отходов
Означает ли отсутствие строки, что всё включено?
Передача объекта
«Завершение проекта»
Перечислены чертежи, инструкции и обучение
Что должно быть передано до окончательного расчёта?
Таблица не доказывает, что B лучше. Она показывает, почему немедленное сравнение итогов не даст полезного ответа.
«За счёт владельца» означает, что работу должен заказать кто-то другой. «Не упомянуто» означает, что распределение ответственности не определено. Ни то ни другое не означает бесплатного выполнения.
1. Зафиксируйте общую основу расчёта
Выдайте датированный комплект для подготовки цены. Укажите версии чертежей, спецификацию, существенные исследования, исходный график и распределение ответственности за проектирование. Подрядчик должен понимать, требуется ли ему разработать решение, выполнить уже согласованный проект или предусмотреть резерв до принятия решения.
Изменение чертежа во время конкурса нужно передать всем участникам и запросить пересмотренные предложения. Нельзя сравнивать цену нового оборудования бассейна у одного подрядчика со старой схемой у другого.
Система RICS NRM разделяет планирование затрат и подробное измерение объёмов строительных работ. Она предлагает последовательную основу для стоимостной информации и документов для расчёта цены. Это полезный методический ориентир, но не основание считать, что частный договор на Бали автоматически подчиняется британскому стандарту измерения. [1]
2. Сопоставьте количества и единицы, затем расценки
Цены за квадратный метр сопоставимы только при одинаковом составе измеряемой работы.
Для облицованной душевой уточните площадь и включённые операции: подготовку основания, стяжку, уклоны, гидроизоляцию, клей, плитку, профили, деформационные швы и укладку. Проверьте, где учтён запас на подрезку: в количестве, цене материала или отдельной строке. Иначе его можно пропустить или посчитать дважды.
Разница в количестве может быть ошибкой, различием объёма или обоснованной иной трактовкой. Запросите расчёт и основу измерения. Не меняйте количество подрядчика молча, представляя собственный пересчёт как согласованную цену.
Различайте исходное предложение, корректировку для сравнения и цену, которую подрядчик впоследствии подтвердил письменно.
3. Читайте исключения как вторую смету
Проверьте расчистку, непригодный грунт и его вывоз, доступ, временные коммуникации, дренаж, подключения, участие специалистов, испытания и передачу документов. Каждой необходимой работе нужны ответственный, границы и место в бюджете. Не всё должно входить в один договор.
Исключить окончательное подключение может быть разумно, если уже назначен отдельный исполнитель. Пробел возникает, когда подключения никто не оценивал, маршрут неизвестен, а владелец полагает, что формулировка «под ключ» включает всё.
Поэтому спрашивайте не только «Включено ли это?», но и «Кем, до какой границы и по какому документу?»
4. Отделите фиксированную цену от предварительного резерва
Резерв предусматривает сумму для ещё не полностью определённой работы или выбора. Это не подтверждённая цена поставки и монтажа конкретного изделия.
В обеих сметах может быть резерв на ванную комнату. Один включает только плитку, другой также укладку. Заголовок одинаков, обязательства различаются. Запишите состав резерва, порядок пересчёта после выбора, возможные наценки и сопутствующие расходы, а также лицо, утверждающее изменение.
Не добавляйте новый резерв целиком поверх уже включённого. Для сравнения нужна разница между ними с понятным основанием.
Резерв владельца на непредвиденные обстоятельства учитывайте отдельно. Он предназначен для неопределённости, а не для сокрытия пропусков в смете.
5. Сравнивайте готовую систему, а не название изделия
Марка гидроизоляционного материала не описывает весь комплекс гидроизоляции. Модель кондиционера не описывает всю систему кондиционирования.
Проверьте подготовку, крепления, проходки, питание, дренаж, управление, доступ, испытания и ответственность. Согласование профиля душевого стекла до укладки плитки отличается от прорезания канала в только что готовой отделке. Страница
партнёров DALLEAU
иллюстрирует эту последовательность.
Цена должна соответствовать реально выбранному согласованному способу выполнения. Более дешёвую замену нужно оценивать по спецификации, совместимости, сроку поставки и обслуживанию, а не только по сокращению первоначальных затрат.
6. Приведите налоги и коммерческие условия к общей основе
Укажите, включены ли применимые налоги и какой порядок предлагает поставщик. Попросите соответствующего налогового консультанта подтвердить положение конкретного проекта. Произвольное прибавление одного процента ко всем сметам не завершает сравнение.
Сопоставьте срок действия цены, валюту, условия пересмотра, мобилизацию, этапы оплаты, согласованные удержания, гарантии и график. Одинаковые суммы могут предполагать разные риски финансирования и завершения.
Формулировка «Выполнено 70 %» недостаточна для понимания платежа. Нужны договорный этап, состав работ, запись о проверке и нерешённые вопросы. Поэтому подтверждение выполненного объёма следует рассматривать вместе с ценой.
7. Задавайте вопросы, на которые можно дать проверяемый ответ
Вместо «Предложите лучшую цену» направьте краткий пронумерованный перечень уточнений.
Для дренажа: «Подтвердите включение лотков террасы, труб, колодцев и подключения к согласованному выпуску по версии X. Укажите исключения и их влияние на цену и график».
Для передачи объекта: «Перечислите исполнительные чертежи, ведомости оборудования, протоколы испытаний и обучение, включённые в предложение. Укажите, к какому этапу оплаты они относятся».
Оставьте подрядчику возможность предложить лучший метод. Представляйте альтернативу отдельно от предложения по исходному заданию, чтобы улучшение не путали с отсутствующей работой.
Что должно быть видно в итоговом сравнении
Сравнение должно показывать исходную сумму, подтверждённые добавления или вычеты, нерешённые позиции и итог на общей основе. Техническая приемлемость, ресурсы, сроки и коммерческие условия требуют отдельного решения.
Не позволяйте нерешённому исключению исчезнуть внутри формулы. Пока необходимой информации нет, наш шаблон показывает
Not comparable
. Он не выбирает подрядчика и не утверждает, что наименьшая цена должна победить.
Полезный вывод может звучать так: «A остаётся дешевле на согласованной основе. Исключённый дренаж теперь оценён, техническая команда приняла предлагаемую систему, график и условия оплаты зафиксированы». Такое решение опирается на документы, а не только на сумму на первой странице.
Роль DALLEAU
В рамках назначенного мандата DALLEAU координирует основу запроса цены со стороны владельца, объединяет вопросы и сохраняет связь решений с уточнениями. Проектировщик, инженер, специалист по стоимости и подрядчик сохраняют собственную ответственность. Владельцу необходимы и коммерческое сравнение, и причины рекомендации.
Узнайте
как устроен мандат
или
обсудите проект с Франсуа
.
Источники
[1]
RICS New Rules of Measurement
. Методический источник по измерению объёмов и стоимостной информации. Примеры и таблица представляют собственное иллюстративное объяснение DALLEAU, а не формы RICS или установленный индонезийский договор.
[2]
Партнёры DALLEAU
. Публичный подход к закупкам, коммуникации и согласованию интерфейсов.
Следующий вопрос для решения
Reality Check о вилле за 150 000 €
объясняет, почему цена приобретения и строительная смета требуют разных сравнений полной стоимости.
Следующий вопрос для решения
Сопоставить полный бюджет покупки
→
Как подрядчики работают с DALLEAU
→
Понять мандат на стороне собственника
→
Нужно разобрать участок, смету или предложение? Начнём с решения, которое вам предстоит.
Обсудить проект с Франсуа
The Bali Brief
Важные изменения и практические материалы для собственников, планирующих, строящих или эксплуатирующих резиденцию на Бали.


## Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет? | DALLEAU

URL: https://dalleau.ai/ru/notes/villa-bali-150000-evro-polnaya-stoimost/

Вилла на Бали за 150 000 €: выгодная покупка или неполный бюджет?
Цена в объявлении не объясняет, что именно вы приобретаете, какие расходы остаются и сколько лет вы сможете пользоваться объектом. Разберём, как отличить доступное предложение от риска, переложенного на покупателя.
Опубликовано :
20 сентября 2026
8 мин чтения
Одна цена. Три проверки перед решением.
Разобраться в приобретаемых правах
Сопоставить полный состав
Проверить предпосылки дохода
Сначала ответ, затем цена
Виллу за 100 000, 150 000 или 200 000 € нельзя оценивать только по цене и изображениям. Сумму нужно сопоставить с приобретаемым правом, участком, полезной площадью, составом работ, предполагаемым использованием и расходами собственника.
Главный вопрос прост: почему это предложение стоит дешевле?
Компактный дом, менее востребованное место, простая конструкция или общая инфраструктура могут объяснять низкую цену. Но разницу могут объяснять и неполный состав поставки, короткий срок аренды или нерешённое ограничение.
В первом случае это осознанный выбор. Во втором возможны дополнительные расходы. Несовместимость использования с действующими правилами может помешать проекту. Цель не в том, чтобы оправдать высокую цену. Нужно понять предложенную цену.
Материал объясняет метод сравнения. Права, разрешения, договоры и налогообложение конкретного объекта проверяют назначенные индонезийские специалисты.
Купить виллу и оплатить её строительство не одно и то же
«Вилла за 150 000 €» может означать цену продажи, передачу арендных прав, строительный пакет, объект без части оборудования или первый платёж. Эти предложения нельзя сравнивать напрямую.
Если участок или аренда уже у вас и вы получили строительную смету, она не отражает весь вложенный капитал. Исследования, инфраструктура, оборудование и подготовка к эксплуатации могут находиться в других бюджетах.
И наоборот: если девелопер продаёт пакет, включающий права на участок и строительство, не нужно второй раз прибавлять эти позиции к цене продажи.
Задача в том, чтобы прочитать состав предложения, а не искусственно увеличить итог.
Запросите документ с видом передаваемого права, площадями по категориям, полной договорной ценой, включениями, исключениями и условиями передачи. Общий бассейн, терраса и спальня выполняют разные функции. Объединение их в одну рекламную площадь может искажать сравнение.
Приобретаемый срок важен не меньше площади
Право пользования на определённый срок рассматривают вместе с календарём. Установите дату начала аренды, ожидаемую передачу объекта, оставшийся после неё срок и последствия задержки. Если аренда уже идёт во время строительства, этот период нельзя использовать для проживания или сдачи виллы.
Отличайте продление с уже закреплёнными условиями от возможности провести новые переговоры. Слово «продлеваемая» само по себе не определяет цену, условия и обязательства другой стороны.
Сравнивайте права и годы использования по документам каждого предложения. Одна цена может давать разный горизонт. Деление цены на срок помогает увидеть разницу, но не заменяет оценку объекта: оно не учитывает расходы, распределение доходов во времени и возможную стоимость при выходе.
Наш материал об
аренде leasehold на Бали
сопровождает чтение конкретного договора, но не заменяет его.
Более дешёвый участок может быть разумным выбором или слабой основой
Менее центральное расположение может подойти частной резиденции. Оно может подойти и для туристического проживания, если впечатление от места, доступ и целевые гости делают проект целостным.
Цена участка не решает вопросы допустимости строительства, законного доступа, водоотведения, мощности сетей и туристического использования. Не ограничивайтесь цветом на снимке карты. Установите участок, применимый план и правила для проекта. Официальный
Tarubali
описывает территориальные и детальные планы;
OSS
выделяет пространственное соответствие, экологические требования и требования к зданиям.
Досье должно объяснять работы на месте: подъезд, земляные работы, возможные подпорные конструкции, отвод воды и подключение коммуникаций.
Экономия при приобретении участка не отменяет работы, необходимые для его использования.
Для сложных грунтов может существовать инженерное решение с расчётной стоимостью. Несовместимое с правилами использование не является обычной строкой строительной сметы. Это разные вопросы.
Документы должны соответствовать объекту и его использованию
Готовая вилла, фотографии и объявление об аренде не подтверждают состояние документации.
Проверяются применимые документы на здание, их содержание и соответствие участку, чертежам, площадям, функции и выполненным изменениям. Для процедур PBG и SLF существует официальный портал
SIMBG
. Разрешение на деятельность по размещению гостей является отдельным вопросом. Один документ не должен подменять весь комплект проверок.
Для старого здания документы нужно оценивать с учётом его истории. Отсутствие документа с названием PBG само по себе не означает, что любое старое здание незаконно.
«Так делают все виллы» и «документы будут позже» не объясняют, чего не хватает и как это будет решено. До необратимого обязательства выясните, какая сторона должна получить документ, когда и что предусматривает договор при его отсутствии. Если договор уже подписан, прежде чем приостанавливать платёж, получите оценку своих обязательств.
Важное качество часто не видно на просмотре
Красивая отделка не подтверждает состояние конструкций, скрытых сетей или непрерывность гидроизоляции.
Возьмём террасу. Покрытие может отлично выглядеть на фотографии. Но нужно разобраться с уклонами, водоотводом, порогом двери, проходками и доступом для очистки лотка. Строка «гидроизоляция включена» не описывает весь узел.
Для кондиционирования цена оборудования не обязательно включает все подводки, отвод конденсата, управление, доступ для обслуживания и пусконаладку. Это проверяют по спецификации и предложению подрядчика.
При покупке на этапе строительства определяйте ответственность до закрытия работ отделкой. Для готовой виллы обследование может выявить видимые дефекты и необходимость дополнительных исследований. Оно не делает все скрытые элементы доступными осмотру.
Важно понять, что предусмотрено, выполнено, проверено и сохранено в документах. Материал о
сравнении строительных смет
показывает, как связать каждое обязательство с конкретной позицией.
Три предложения по одной цене, три разных решения
Ситуации являются учебными примерами. Они не описывают конкретного девелопера или установленную сделку.
Предложение
Чем объясняется цена 150 000 €
Вывод для покупателя
А. Более простая резиденция
Компактный объект, менее центральное место, часть инфраструктуры общая. Права, площади и платежи описаны.
Цена может отражать осознанные компромиссы. Документы, исполнение и соответствие потребностям всё равно проверяются.
Б. Неполный бюджет
Мебель, подключения и подготовка к открытию исключены. Несколько предварительных сумм не определены.
Получить недостающие суммы и условия до сравнения полной стоимости.
В. Блокирующее условие
Предполагаемое использование или право доступа остаются несовместимыми либо спорными по изученным документам.
Дополнительная скидка не создаёт отсутствующее право. Документально подтверждённое решение важнее цены.
В первом случае собственник принимает более простой продукт. Во втором он ещё не знает стоимость продукта, который считает предметом покупки. В третьем цена не решает определяющую проблему.
Восстановить бюджет, не придумывая недостающие суммы
Бюджет входа должен объединять договорную цену и необходимые расходы, которые ещё не включены: расходы по сделке, консультантов, дополнительные работы, оборудование, подключения, подготовку к эксплуатации и первоначальный оборотный капитал.
Статус позиции
Как учитывать в бюджете
Подтверждено
Состав и сумма документированы.
Оценка
Указаны предположение и источник.
Не оценено
Ответа пока нет. Это не нулевая стоимость.
Блокирующее условие
Вопрос нельзя закрыть обычным резервом средств.
Методика
RICS NRM
различает первоначальные затраты, детальное измерение работ и планирование затрат на обслуживание. Это полезное разделение для бюджета, а не универсальная расценка для Бали.
Отделяйте текущее обслуживание, будущую замену и ремонт выявленного дефекта. Нормальный резерв на обслуживание не доказывает низкое качество строительства. Но уже необходимый ремонт не следует выдавать за обычное обслуживание ради привлекательной цены.
Доходность нельзя проверить по одному проценту
Уточните, что означает заявленный доход: валовая выручка, операционный результат, выплата собственнику или договорное обязательство по платежу. Это разные суммы.
Для прогноза аренды запросите сопоставимые объекты, период наблюдения и предпосылки. Проверьте сезонность, личное использование, комиссии, персонал, энергию, обслуживание, общие платежи, резервы и применимое налогообложение.
В знаменателе нужен действительно необходимый капитал. Мебель, исключённая из цены, но необходимая для аренды, относится к анализу. Оборотные средства на открытие не являются строительным счётом, но их тоже нужно иметь.
Арифметический пример: при неизменном годовом доходе показатель, рассчитанный на 200 000 €, на четверть ниже того же показателя, рассчитанного на 150 000 €.
Это не означает, что предложение за 150 000 € обычно обходится в 200 000 €. Пример объясняет значение знаменателя.
Будущий рост стоимости не является ежегодным операционным доходом. Гарантию, дополняющую арендные поступления, нельзя повторно прибавлять к этим же поступлениям. О плательщике и основании выплаты читайте в
материале о гарантированной доходности
.
При покупке на этапе строительства важен календарь
Покупка готового объекта и финансирование будущего строительства создают разную степень риска.
Уточняйте, что существует к каждому сроку платежа: права, чертежи, необходимые разрешения, выполненные работы, проверки, оборудование и записи. Установите получателя денег и его обязательства перед вами.
Скидка за более ранний платёж может быть согласованным коммерческим условием. Покупателю нужно понимать, что он финансирует, последствия задержки, условия выхода и предусмотренные договором средства защиты.
Фотография стройки показывает состояние объекта. Она не устанавливает автоматически стоимость надлежащим образом выполненных работ и остаток средств для завершения. Эту связь объясняет
материал о документах для платежных этапов
.
Что запросить у продавца
Просим указать передаваемое право и его срок, площади по категориям, полную договорную цену, включения и исключения, применимые документы на участок и здание, график передачи и условия оплаты. Для эксплуатации просим определить оператора, расходы собственника и документированные предпосылки заявленного дохода. Позиции в подготовке перечислите отдельно, с ответственными сторонами и сроками.
Ответы не должны оставаться разрозненными сообщениями, расходящимися с рекламой и договором.
Хорошая цена относится к понятному проекту
Ограниченный бюджет может означать меньшую площадь, другое место, более простую архитектуру или общую инфраструктуру. Собственник вправе осознанно принять такой выбор.
Неучтённый расход, обещание дохода без проверяемой основы или нерешённое разрешение не являются тем же компромиссом.
У выгодного предложения есть понятная экономическая причина. Она должна оставаться убедительной после изучения договора, обследования объекта и восстановления бюджета.
В рамках
мандата
DALLEAU координирует вопросы собственника, задачи специалистов и сравнение обязательств. По конкретному участку или предложению
обсудите проект с Франсуа
.
Следующий вопрос для решения
Сравнить строительные сметы
→
Как подрядчики работают с DALLEAU
→
Понять мандат на стороне собственника
→
Нужно разобрать участок, смету или предложение? Начнём с решения, которое вам предстоит.
Обсудить проект с Франсуа
The Bali Brief
Важные изменения и практические материалы для собственников, планирующих, строящих или эксплуатирующих резиденцию на Бали.

